Professional Documents
Culture Documents
Manpower Distribution
Manpower Distribution
ITEM
WORK DESCRIPTION
GRP #
ENGR. / FOREMAN
CAPATAZ / SUB.
MA
BUDGET
1.0
2.0
STRUCTURAL WORKS
FORMWORKS/CARPENTRY
a. Soriano, Willy C.
b. Romano, Benedicto G.
c. Orfinada Jr., Abraham C.
d. Luyao, Rayan R.
e. Ignacio, Ronald D.
f. Luyao, Gaudioso R.
g. Zamora, Rito L.
h. Moreno, Marito S.
CONCRETING and TOPPING
a. Hanginon, Darwin D.
3.0
b. Galisanao, Reynaldo B.
c. Integro, Jerry L.
WIREMESH INSTALLATION
a. Bulanadi, Arthuro S.
101
103
104
106
108
109
111
112
201
301
203
302
207
Salazar, JD.
Soriano, W.
Arzobal, A.
Salazar, JD.
Arzobal, A.
Arzobal, A.
Mirafuentes, P.
Gueta, R.
Flores, R.
Soriano, W.
Gueta, R.
Flores, R.
Peralta, BF.
Yabes, E.
N/S
Galisanao, R.
Salazar, JD.
Gueta, R.
Salazar, JD.
SUBTOTAL =
ARCHITECTURAL WORKS
1.0
PLASTERING
1.1 Interior
a. Baraquel, Camilo S.
b. Madara, Carlos M.
c. Pacana Sr., Reynaldo O.
304
303
307
Macaraig, R.
Borda, S.
Tria, D.
Yabes, E.
2.0
CHB LAYING
2.1 Interior
a. Floriano III, Jose B.
b. Baraquel, Camilo S.
c. Madara, Carlos M.
d. Pacana Sr., Reynaldo O.
2.2 Handling
a. Geronimo Jr., Jose M.
3.0
RUBBED CONCRETE
3.1 Interior
a. Bulanadi Jr., Arthuro S.
b. Dino, Gregorio V.
c. Pacana Sr., Reynaldo O.
3.2 Exterior
4.0
5.0
6.0
305
304
303
307
Macaraig, R.
204
Macaraig, R.
Pagobo, E.
207
306
307
Tria, D.
Yabes, E.
308
309
Tria, D.
Somino, C.
MATERIAL HANDLING
a. Barbero, Marcos F.
STRIPPING AND BACKLOADING
202
N/S
Galisanao, R.
a. Soriano, Alexander A.
206
Peralta, BF.
Pagobo, E.
306
Pabuna, LM.
Yabes, E.
Borda, S.
Yabes, E.
SUBTOTAL =
OTHERS
a. Utility/Expediter/SC & TK/CQC Crew
b. Line & Grade
c. Safety Crew
d. Motorpool Crew
e. TempFacil Construction
1
3
205
5
306
Admin
Jose, RM.
Mendoza, G.
Muyco, C.
Ramirez, D.
SUBTOTAL =
TOTAL =
MASON
ACTUAL
VARIANCE
BUDGET
QUANTITY
CARP
ACTUAL
14
VARIANCE
BUDGET
LABOR
ACTUAL
14
14
14
14
12
12
11
11
11
11
12
12
9
10
13
11
17
11
13
25
VARIANCE
11
11
TOTAL
101
11
13
26
152
11
14
16
3
9
4
12
12
12
12
12
12
74
46
120
10
10
23
31
104
104
95
303
303
ACTIVITY
LOCATION
Deflection Walls
Parapet/Balcony Walls
Slab Formworks
Dropwall and Exterior RC walls
Corewall
Deflection Walls
Stairs and RC walls
Corewall
Level 7 - 8
Level 7 - 8
Level 16
Level 3-5
Level 17
Level 7-8
Level 12
Level 17
Level
Level
Level
Level
16,
16,
16,
16,
B5
B5
B5
B5
Deflection Walls
Level 7-8
Plastering
Stair Rectification
RC wall Rectification
Level 7-9
Level 9
CHB Laying
Level 7-9
Level 7-9
Level 2
B5, B1
GF-L9
Rubbed Concrete
Tower
Tower
Tower
Rubbed Concrete
Tower
Tower
GF-L9
Level 10-11
Dowels Installation
Basement