DMCI ROYALTON AT CAPITOL COMMONS - MANPOWER DISTRIBUTION

As of July 21, 2015

ITEM

WORK DESCRIPTION

GRP #

ENGR. / FOREMAN

CAPATAZ / SUB.

MA
BUDGET

1.0

2.0

STRUCTURAL WORKS
FORMWORKS/CARPENTRY
a. Soriano, Willy C.
b. Romano, Benedicto G.
c. Orfinada Jr., Abraham C.
d. Luyao, Rayan R.
e. Ignacio, Ronald D.
f. Luyao, Gaudioso R.
g. Zamora, Rito L.
h. Moreno, Marito S.
CONCRETING and TOPPING
a. Hanginon, Darwin D.

3.0

b. Galisanao, Reynaldo B.
c. Integro, Jerry L.
WIREMESH INSTALLATION
a. Bulanadi, Arthuro S.

101
103
104
106
108
109
111
112
201
301
203
302
207

Salazar, JD.

Soriano, W.

Arzobal, A.
Salazar, JD.
Arzobal, A.

Arzobal, A.

Mirafuentes, P.
Gueta, R.
Flores, R.
Soriano, W.
Gueta, R.
Flores, R.

Peralta, BF.

Yabes, E.

N/S

Galisanao, R.

Salazar, JD.

Gueta, R.

Salazar, JD.

SUBTOTAL =
ARCHITECTURAL WORKS
1.0
PLASTERING
1.1 Interior
a. Baraquel, Camilo S.
b. Madara, Carlos M.
c. Pacana Sr., Reynaldo O.

304
303
307

Macaraig, R.

Borda, S.

Tria, D.

Yabes, E.

2.0

CHB LAYING
2.1 Interior
a. Floriano III, Jose B.
b. Baraquel, Camilo S.
c. Madara, Carlos M.
d. Pacana Sr., Reynaldo O.
2.2 Handling
a. Geronimo Jr., Jose M.
3.0
RUBBED CONCRETE
3.1 Interior
a. Bulanadi Jr., Arthuro S.
b. Dino, Gregorio V.
c. Pacana Sr., Reynaldo O.
3.2 Exterior

4.0
5.0

6.0

305
304
303
307

Macaraig, R.

204

Macaraig, R.

Pagobo, E.

207
306
307

Tria, D.

Yabes, E.

a. Ybanez Jr., Primitivo U.

308
309

Tria, D.

Somino, C.

MATERIAL HANDLING
a. Barbero, Marcos F.
STRIPPING AND BACKLOADING

202

N/S

Galisanao, R.

a. Soriano, Alexander A.

206

Peralta, BF.

Pagobo, E.

DOWELS INSTALLATION FOR CONCRETE


TOPPING
a. Dino, Gregorio V.

306

Pabuna, LM.

Yabes, E.

Borda, S.
Yabes, E.

SUBTOTAL =
OTHERS
a. Utility/Expediter/SC & TK/CQC Crew
b. Line & Grade
c. Safety Crew
d. Motorpool Crew
e. TempFacil Construction

1
3
205
5
306

Admin
Jose, RM.
Mendoza, G.
Muyco, C.
Ramirez, D.

SUBTOTAL =
TOTAL =

MASON
ACTUAL

VARIANCE

BUDGET

QUANTITY
CARP
ACTUAL

14

VARIANCE

BUDGET

LABOR
ACTUAL

14

14

14

14

12

12

11

11

11

11

12

12
9

10
13

11

17
11

13

25

VARIANCE

11

11

TOTAL

101

11
13

26

152

11

14

16
3

9
4

12

12

12

12

12

12

74

46

120

10

10

23

31

104

104

95

303
303

ACTIVITY

LOCATION

Deflection Walls
Parapet/Balcony Walls
Slab Formworks
Dropwall and Exterior RC walls
Corewall
Deflection Walls
Stairs and RC walls
Corewall

Level 7 - 8
Level 7 - 8
Level 16
Level 3-5
Level 17
Level 7-8
Level 12
Level 17

Concreting and Topping


Concreting (Night Shift)

Level
Level
Level
Level

16,
16,
16,
16,

B5
B5
B5
B5

Deflection Walls

Level 7-8

Plastering
Stair Rectification
RC wall Rectification

Level 7-9
Level 9

CHB Laying

Level 7-9
Level 7-9
Level 2
B5, B1

Material Handling for Masonry

GF-L9

Rubbed Concrete

Tower
Tower
Tower

Rubbed Concrete

Tower
Tower

Material Handling (Night Shift)

GF-L9

Stripping, Backloading and Recovery

Level 10-11

Dowels Installation

Basement