Part Design and Construction of Viaduct of Length 6.583 KM From Noida City Part Design and Construction of Viaduct of Length 6.583 KM From Noida City

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Part Design and Construction of Viaduct of Length 6.

583 Km from Noida city


Activity ID

Classic WBS Layout

Activity Name

Original Start
Duration

09-Sep-15 18:11
Finish

Total
Float

130.00w
10-Aug-15
Part Design and Construction of Viaduct of Length 6.583 Km from Noida
city

04-Feb-18

0.00w

0.00w 10-Aug-15

10-Aug-15

130.00w

0.00w 10-Aug-15

10-Aug-15

0.00w

0.00w 10-Aug-15

10-Aug-15

0.00w

0.00w 10-Aug-15

10-Aug-15

130.00w

AWARD OF THE WORK


Commencement Date
A1000

Date of commencement

Area Handover by Clients


AH1010

Handing over of area for preliminary activities for Viaduct

0.00w 10-Aug-15

10-Aug-15

0.00w

AH1020

Handing over of area for preliminary activities for Stations

0.00w 10-Aug-15

10-Aug-15

130.00w

AH1030

Handing over of area for Casting yard

0.00w 10-Aug-15

10-Aug-15

130.00w

AH1040

Handing over of test pile location - Viaduct

0.00w 10-Aug-15

10-Aug-15

1.47w

AH1050

Handing over of test pile location - Station

0.00w 10-Aug-15

10-Aug-15

0.00w

AH1060

Handing over of hindrance free area for construction for Phase 1

0.00w 10-Aug-15

10-Aug-15

130.00w

AH1070

Handing over of hindrance free area for construction for Phase 2

0.00w 10-Aug-15

10-Aug-15

130.00w

AH1080

Handing over of hindrance free area for construction for Phase 3

0.00w 10-Aug-15

10-Aug-15

130.00w

20.50w 10-Aug-15

31-Dec-15

109.50w

6.00w 10-Aug-15

20-Sep-15

122.60w

6.00w 10-Aug-15

20-Sep-15

122.60w

7.40w 10-Aug-15

30-Sep-15

122.60w

7.40w 10-Aug-15

30-Sep-15

122.60w

15.50w 10-Aug-15

26-Nov-15

114.50w

INITIAL ACTIVITIES
Surveying
S1010

Initial survey of the Alignment

Geo Technical Investgation


GT1010

Geo-Technical Investigation

Utilities & Trees


UT1010

Trees identification

7.40w 10-Aug-15

30-Sep-15

77.10w

UT1040

Approval of tree cutting and (or) transplantation (Arranged by DMRC)

6.00w 24-Aug-15

04-Oct-15

114.50w

UT1050

Tree cutting and (or) transplantation

7.50w 05-Oct-15

26-Nov-15

114.50w

15.50w 14-Sep-15

31-Dec-15

1.47w

6.80w 14-Sep-15

30-Oct-15

1.47w

Initial Pile Load Test


IP1010

Test Pile - Viauduct

IP1020

Test Pile - Station

5.90w 19-Sep-15

30-Oct-15

0.00w

IP1030

Initial pile load test - Viaduct

11.50w 12-Oct-15

31-Dec-15

1.47w

IP1040

Initial pile load test - Station

10.50w 17-Oct-15

30-Dec-15

0.00w

52.90w 10-Aug-15

13-Aug-16

77.10w

52.90w 10-Aug-15

13-Aug-16

77.10w

52.90w 10-Aug-15

13-Aug-16

77.10w

51.90w 10-Aug-15

06-Aug-16

78.10w

ENGINEERING
Design & Drawing
Viaduct
Submission of Design & Drawings
S.D.1010

Submission of Span Configuration pier location

0.30w 14-Sep-15

15-Sep-15

77.10w

S.D.1020

Submission of Span Configuration pier location with vertical alignment

2.10w 15-Sep-15

30-Sep-15

121.70w

S.D.1030

Submission of design, drawing for foundation

18.00w 26-Oct-15

28-Feb-16

3.47w

S.D.1040

Submission of design, drawing for Sub-Structure

40.00w 31-Oct-15

06-Aug-16

77.10w

S.D.1050

Release of design, drawing for Segment casting

Approval of Design & Drawings

5.20w 10-Aug-15

15-Sep-15

124.80w

47.60w 15-Sep-15

13-Aug-16

77.10w

A.D.1060

Approval of Span Configuration pier location

2.10w 15-Sep-15

30-Sep-15

122.60w

A.D.1070

Approval of Span Configuration pier location with vertical alignment

2.00w 22-Sep-15

06-Oct-15

121.70w

A.D.1080

Approval of design, drawing for foundation

18.00w 02-Nov-15

06-Mar-16

100.00w

A.D.1090

Approval of design, drawing for Sub-Structure

40.00w 07-Nov-15

13-Aug-16

77.10w

13.50w 02-Sep-15

05-Dec-15

113.10w

For Station by Client


A.D.1110

Release of details/drawings for foundations -Station

4.00w 31-Oct-15

28-Nov-15

1.00w

A.D.1120

Release of details/drawings for Substructure -Station

4.00w 07-Nov-15

05-Dec-15

113.10w

A.D.1130

Release of details/drawings for Superstructure -Station

MOBILIZATION
Installations

2.00w 02-Sep-15

16-Sep-15

124.60w

26.00w 10-Aug-15

07-Feb-16

104.00w

17.10w 10-Aug-15

07-Dec-15

112.90w

IS.1120

Precasting Yard Installation

16.00w 10-Aug-15

29-Nov-15

114.00w

IS.1130

First batching plant mobilization/installation

10.00w 10-Aug-15

19-Oct-15

112.90w

IS.1140

Second batching plant mobilization/installation

10.00w 28-Sep-15

07-Dec-15

112.90w

KD.V. 010

KEY DATE 1 : SUBMISSION OF CONSTRUTION PROGRAMME, ESTABLISHING


0.00w
SITE OFFICE

13-Sep-15

125.00w

KD.V. 020

KEY DATE 2 : COMMISIONING OF 1ST BATCHING PLANT

0.00w

19-Oct-15

119.90w

KD.V. 040

KEY DATE 4 : COMMISIONING OF 2ND BATCHING PLANT

0.00w

07-Dec-15

112.90w

24.00w 24-Aug-15

07-Feb-16

32.00w

Enabling Works
E.W.1150

Fabrication of shuttering sets (Pile cap/Pier/Pier Cap)

24.00w 24-Aug-15

07-Feb-16

32.00w

E.W.1160

Fabrication of shuttering sets (Segment casting)

12.00w 24-Aug-15

15-Nov-15

40.00w

KD.V. 030

KEY DATE 3: COMPLETION FO 1ST FORMAWORK OF BOX GIRDER PRODUCTION


0.00w LINE FOR ENGINEER'S
22-Nov-15 APPROVAL
41.00w

CONSTRUCTION

116.10w 14-Nov-15

04-Feb-18

0.00w

78.00w 28-Dec-15

25-Jun-17

32.00w

A1120

Segment Casting

70.00w 28-Dec-15

30-Apr-17

40.00w

A1130

Parapet Casting

70.00w 22-Feb-16

25-Jun-17

32.00w

KD.V. 060

KEY DATE 6 :START OF CASTING OF BOX GIRDERS/SEGMENT

28-Dec-15

110.00w

103.00w 07-Dec-15

26-Nov-17

10.00w

71.03w 07-Dec-15

17-Apr-17

41.97w

Precasting Works

Elevated Viaduct
Viaduct - Phase 1 ( CH: 0000 - 2100 , TOTAL 2100 M of viaduct)

0.00w

KD.V. 050

KEY DATE 5 :COMPLETION OF 1ST WORKING PILE

0.00w

07-Dec-15

113.00w

KD.V. 070

KEY DATE 7 :START OF LAUNCHING OF BOX GIRDERS/SEGMENT

0.00w

28-Apr-16

92.47w

KD.V. 080

KEY DATE 8 :START OF LAUNCHING OF PARAPETS

0.00w

09-Jun-16

86.47w

KD.V. 090

KEY DATE 9 :PARTIAL ACCESS OF THE VIADUCT ( MINIMUM 2 KM IN ONE0.00w


STRETCH) FOR LAYING
17-Apr-17
TRACK

P1. 1010

Piling

20.53w 07-Dec-15

28-Apr-16

1.47w

P1. 1020

Pile Caps

23.00w 04-Jan-16

12-Jun-16

6.00w

P1. 1030

Pier

27.00w 25-Jan-16

31-Jul-16

6.00w

P1. 1040

Pier Caps

32.00w 22-Feb-16

02-Oct-16

6.00w

P1. 1050

Segment launching

39.00w 28-Apr-16

26-Jan-17

1.47w

P1. 1060

Parapet Erection

39.00w 09-Jun-16

09-Mar-17

1.47w

P1. 1070

Miscellaneous works

28.00w 29-Sep-16

13-Apr-17

1.47w

72.00w 14-Dec-15

30-Apr-17

40.00w

Viaduct - Phase 2 (CH:2100.00- ch: 4666.611 , TOTAL 2566.71 Meter of viaduct)

41.97w

P2. 1080

Piling

25.00w 14-Dec-15

05-Jun-16

10.00w

P2. 1090

Pile Caps

28.00w 11-Jan-16

24-Jul-16

10.00w

P2. 1100

Pier

33.00w 08-Feb-16

25-Sep-16

10.00w

P2. 1110

Pier Caps

39.00w 07-Mar-16

04-Dec-16

10.00w

Page 1 of 3

TASK filter: All Activities


Oracle Corporation

Part Design and Construction of Viaduct of Length 6.583 Km from Noida city
Activity ID

Activity Name

Classic WBS Layout


Original Start
Duration

09-Sep-15 18:11
Finish

Total
Float

P2. 1120

Segment launching

38.00w 02-May-16

22-Jan-17

40.00w

P2. 1130

Parapet Erection

42.00w 13-Jun-16

02-Apr-17

40.00w

P2. 1140

Miscellaneous works

30.00w 03-Oct-16

30-Apr-17

40.00w

99.30w 01-Jan-16

26-Nov-17

10.00w

Viaduct - Phase 3 (CH: 4666.61 - 6820.843 , TOTAL 2154.23 Meter of viaduct)


KD.V. 100

KEY DATE 10 :FULL ACCESS OF THE VIADUCT INCLUDING G.I.HANGERS 0.00w


FOR LAYING OF TRACK
17-Jul-17
AND CABLE28.90w

P3. 1080

Piling

28.00w 01-Jan-16

15-Jul-16

65.30w

P3. 1090

Pile Caps

32.00w 29-Jan-16

09-Sep-16

65.30w

P3. 1100

Pier

36.00w 26-Feb-16

04-Nov-16

65.30w

P3. 1110

Pier Caps

42.00w 07-Mar-16

25-Dec-16

58.00w

P3. 1120

Segment launching

42.00w 02-May-16

19-Feb-17

10.00w

P3. 1130

Parapet Erection

48.00w 27-Jun-16

28-May-17

10.00w

P3. 1140

Miscellaneous works

48.00w 26-Dec-16

26-Nov-17

10.00w

116.10w 14-Nov-15

04-Feb-18

0.00w

55.00w 15-Jan-17

04-Feb-18

0.00w

0.00w 15-Jan-17

15-Jan-17

55.00w

0.00w

15-Jan-17

55.00w

07-May-17

39.00w

Stations
KEY DATE FOR STATION
KEY DATE 1
KDS. 010

PARTIAL ACCESS TO E&M CONTARCTOR

10.00w 26-Feb-17

KEY DATE 2
KDS. 02010

FOR ANY TWO STATIONS

0.00w

26-Feb-17

49.00w

KDS. 02020

FOR NEXT ANY TWO STATIONS

0.00w

02-Apr-17

44.00w

KDS. 02030

FOR BALANCED TWO STATIONS

0.00w

07-May-17

39.00w

6.00w 18-Jun-17

30-Jul-17

27.00w

KEY DATE 3
KDS. 3010

FOR ANY TWO STATIONS

0.00w

18-Jun-17

33.00w

KDS. 3020

FOR NEXT ANY TWO STATIONS

0.00w

25-Jun-17

32.00w

KDS. 3030

FOR BALANCED TWO STATIONS

0.00w

30-Jul-17

27.00w

3.00w 18-Jun-17

09-Jul-17

30.00w

KEY DATE 4
KDS. 4010

FOR ANY TWO STATIONS

0.00w

18-Jun-17

33.00w

KDS. 4020

FOR NEXT ANY TWO STATIONS

0.00w

25-Jun-17

32.00w

KDS. 4030

FOR BALANCED TWO STATIONS

0.00w

09-Jul-17

30.00w

3.00w 14-May-17

04-Jun-17

35.00w

KEY DATE 5
KDS. 5010

FOR ANY TWO STATIONS

0.00w

14-May-17

38.00w

KDS. 5020

FOR NEXT ANY TWO STATIONS

0.06w 29-May-17

29-May-17

35.94w

KDS. 5030

FOR BALANCED TWO STATIONS

0.00w

04-Jun-17

35.00w

21-May-17

37.00w

11.00w 05-Mar-17

KEY DATE 6
KDS. 6010

FOR ANY TWO STATIONS

0.00w

05-Mar-17

48.00w

KDS. 6020

FOR NEXT ANY TWO STATIONS

0.00w

09-Apr-17

43.00w

KDS.6030

FOR BALANCED TWO STATIONS

0.00w

21-May-17

37.00w

0.00w 04-Feb-18

04-Feb-18

0.00w

0.00w

04-Feb-18

0.00w

KEY DATE 7
A1170

KD3: COMPLETION OF ENTIRE WORK AS PER CONTRACT

59.00w 14-Nov-15

31-Dec-16

0.00w

P1. 1080

Piling

12.00w 14-Nov-15

06-Feb-16

0.00w

P1. 1090

Pile Caps

13.00w 12-Dec-15

12-Mar-16

0.00w

P1. 1100

Pier

13.00w 09-Jan-16

09-Apr-16

0.00w

P1. 1110

Arm at consourse slab

32.00w 06-Feb-16

17-Sep-16

0.00w

P1. 1120

Concourse Slab

32.00w 06-Feb-16

17-Sep-16

0.00w

P1. 1130

Arm at Track Slab

32.00w 02-Apr-16

12-Nov-16

0.00w

P1. 1140

Track Slab

32.00w 02-Apr-16

12-Nov-16

0.00w

P1. 1150

Platform slab & Misc Struture

32.00w 02-Apr-16

12-Nov-16

0.00w

P1. 1160

Finishing Work

39.00w 02-Apr-16

31-Dec-16

0.00w

59.00w 28-Nov-15

14-Jan-17

55.10w

Station - 34

Station - 52
P1. 1980

Piling

12.00w 28-Nov-15

20-Feb-16

14.10w

P1. 1990

Pile Caps

13.00w 26-Dec-15

26-Mar-16

23.10w

P1. 2000

Pier

13.00w 23-Jan-16

23-Apr-16

23.10w

P1. 2010

Arm at consourse slab

32.00w 20-Feb-16

01-Oct-16

23.10w

P1. 2020

Concourse Slab

32.00w 20-Feb-16

01-Oct-16

23.10w

P1. 2030

Arm at Track Slab

32.00w 16-Apr-16

26-Nov-16

30.10w

P1. 2040

Track Slab

32.00w 16-Apr-16

26-Nov-16

55.10w

P1. 2050

Platform slab & Misc Struture

32.00w 16-Apr-16

26-Nov-16

55.10w

P1. 2060

Finishing Work

39.00w 16-Apr-16

14-Jan-17

55.10w

62.00w 12-Dec-15

18-Feb-17

50.10w

Station - 62
P1. 2070

Piling

12.00w 12-Dec-15

05-Mar-16

14.10w

P1. 2080

Pile Caps

13.00w 09-Jan-16

09-Apr-16

14.10w

P1. 2090

Pier

13.00w 06-Feb-16

07-May-16

14.10w

P1. 2100

Arm at consourse slab

32.00w 05-Mar-16

15-Oct-16

14.10w

P1. 2110

Concourse Slab

32.00w 05-Mar-16

15-Oct-16

14.10w

P1. 2120

Arm at Track Slab

32.00w 30-Apr-16

10-Dec-16

28.10w

P1. 2130

Track Slab

32.00w 30-Apr-16

10-Dec-16

28.10w

P1. 2140

Platform slab & Misc Struture

32.00w 30-Apr-16

10-Dec-16

50.10w

P1. 2150

Finishing Work

42.00w 30-Apr-16

18-Feb-17

50.10w

76.00w 13-Feb-16

29-Jul-17

27.10w

Station - 59
P1. 2160

Piling

12.00w 13-Feb-16

07-May-16

44.10w

P1. 2170

Pile Caps

13.00w 19-Mar-16

18-Jun-16

43.10w

P1. 2180

Pier

13.00w 16-Apr-16

16-Jul-16

43.10w

P1. 2190

Arm at consourse slab

32.00w 03-Sep-16

15-Apr-17

27.10w

P1. 2200

Concourse Slab

32.00w 03-Sep-16

15-Apr-17

27.10w

P1. 2210

Arm at Track Slab

32.00w 29-Oct-16

10-Jun-17

27.10w

P1. 2220

Track Slab

32.00w 29-Oct-16

10-Jun-17

27.10w

P1. 2230

Platform slab & Misc Struture

32.00w 29-Oct-16

10-Jun-17

27.10w

P1. 2240

Finishing Work

39.00w 29-Oct-16

29-Jul-17

27.10w

78.00w 27-Feb-16

26-Aug-17

23.10w

Station - 61
S62. 1610

Piling

12.00w 27-Feb-16

21-May-16

36.10w

S62. 1620

Pile Caps

13.00w 02-Apr-16

02-Jul-16

35.10w

Page 2 of 3

TASK filter: All Activities


Oracle Corporation

Part Design and Construction of Viaduct of Length 6.583 Km from Noida city
Activity ID

Activity Name

Classic WBS Layout


Original Start
Duration

09-Sep-15 18:11
Finish

Total
Float

S62. 1630

Pier

13.00w 30-Apr-16

30-Jul-16

35.10w

S62. 1640

Arm at consourse slab

34.00w 17-Sep-16

13-May-17

23.10w

S62. 1650

Concourse Slab

34.00w 17-Sep-16

13-May-17

23.10w

S62. 1660

Arm at track slab

34.00w 12-Nov-16

08-Jul-17

30.10w

S62. 1670

Track Slab

34.00w 12-Nov-16

08-Jul-17

30.10w

S62. 1680

Platform slab & Misc Struture

34.00w 12-Nov-16

08-Jul-17

30.10w

S62. 1690

FInishing Work

39.00w 26-Nov-16

26-Aug-17

23.10w

85.00w 12-Mar-16

28-Oct-17

14.10w

Station - Electronic City


P1. 1710

Piling

12.00w 12-Mar-16

04-Jun-16

27.10w

P1. 1720

Pile Caps

13.00w 16-Apr-16

16-Jul-16

26.10w

P1. 1730

Pier

13.00w 14-May-16

13-Aug-16

26.10w

P1. 1740

Arm at consourse slab

34.00w 01-Oct-16

27-May-17

14.10w

P1. 1750

Concourse Slab

34.00w 01-Oct-16

27-May-17

14.10w

P1. 1760

Arm at Track Slab

34.00w 26-Nov-16

22-Jul-17

28.10w

P1. 1770

Track Slab

34.00w 26-Nov-16

22-Jul-17

28.10w

P1. 1780

Platform slab & Misc Struture

34.00w 26-Nov-16

22-Jul-17

28.10w

P1. 1790

Finishing Work

42.00w 07-Jan-17

28-Oct-17

14.10w

130.00w 10-Aug-15

04-Feb-18

0.00w
1.47w

HANDING OVER
A1140

Handing over of viaduct

40.00w 20-Apr-17

25-Jan-18

A1150

Handing over of station

53.10w 28-Jan-17

04-Feb-18

0.00w

KD.S.070

KEY DATE 7 : STATION: COMPLETON OF ENTIRE WORK AS PER CONTRACT.


0.00w

10-Aug-15

130.00w

KD.V.110

KEY DATE 11: VIADUT: COMPLETION OF ENTIRE WORK AS PER CONTRACT


0.00w

25-Jan-18

1.47w

Page 3 of 3

TASK filter: All Activities