METHOD STATEMENT

PM6.10_E
Rev. 1

SYSTEM : AIR CONDITION & VENTILATION

Issued 12/1/53

METHOD STATEMENT
ON
REFRIGERANT PIPE AND FITTING INSTALLATION
1. GENERAL
The document describes the installation for the Refrigerant Pipes and Fittings, and consists of meterials, equipment
& tools, working procedure and installation flow - chart. Detail of the procedure contained herain may be modified based on the
actual site condition.
2. MATERIALS
Copper Pipes
3. Equipment & Tools
3.1 Oxyfuel Gas Equipment
3.2 Tube Cutter
3.3 Tube Bender
3.4 Flaring Tool
3.5 Vacuum Pump
3.6 Manifold Gaupe
3.7 Spirit Level
3.8 Hammer
3.9 Pliers
3.10 Step Ladder
4. WORKING PROCEDURE
4.1 Preparation
* Pipe material should be dept at dry & clean place
* If pipe is not dirty then can be installed, If pipe is dirty, clean the internal and external surface to
reasonable free from other foreign material.
Cutting
* Use tube cutter for cutting and ream the cutting edge.
4.2 Jointing
* Brazing joint method shall be used for refrigerant pipe connection, except other connection method
are required by equipment, valve and accessory
5. QUALITY CONTROL
Quality control works should be performed in the particular works as described in the following
5.1 Pipeline dimension & level
* Pipeline dimension and level of refringerant pipe should be performed in accordance with approved shop
drawing.
5.2 Nitrogen gas pressure test
* Nitrogen gas pressure test of refrigerant pipe (for DX system) should be performed in accordance
with inspection.
5.3 Flushing & Vacuum
* Refrigerant pipe flushing & vacuum shall be done after connected to DX units.
* Details for flushing & Vacuum will be descriced in method statement of split type unit installation.

X:\OFFICE DOC\ISO\Secco ISO doc\Project Management\Method Statement\Eng\PM6.10_E

Page : 1/4

METHOD STATEMENT

PM6.10_E
Rev. 1

SYSTEM : AIR CONDITION & VENTILATION

Issued 12/1/53

REFRIGERANT PIPE INSTALLATION FLOW - CHART

START
MEASURING
CUT THE TUBE END SQUARE
REAMING
CLEANING THE TUBE IF SOLED
OR EXCESSIVE OXIDE HAS BUILD UP
ASSEMBLING FITTING AND
HEAZING THE ASSEMLY
UNIFORMLY

BRAZING
END

X:\OFFICE DOC\ISO\Secco ISO doc\Project Management\Method Statement\Eng\PM6.10_E

Page : 2/4

METHOD STATEMENT

PM6.10_E
Rev. 1

SYSTEM : AIR CONDITION & VENTILATION

Issued 12/1/53

NITROGEN GAS PRESSURE TEST OF REFRIGERANT PIPE FLOW - CHART

STAR
PROVIDE SERVICE VALVE FOR TESTED PIPEAND
CONNECT OT N2 CYLINDER VIA
RECORD TEMPERATUPE
PREPRESSURIZE TESTED PIPE TO 300 kPa HOLDING

CHECX SIG LEAKAGE POINT BY


SENSE OF AUCITORY OR HAND

RECTIFY THE
LEAKGE POINT

NO

GRADUALLY PRESSURIZE PIPE UP TO 2000 kPa HOLDING 2

CHECK PRESSURE DROP

GRADUALLY RELEASE GAS FROM


PIPING OR

FIND LEAKAGE
POINT BY LIQUID

NO

YES
RECTIFY THE
LEAKGE POINT

PROTECTION BOTH ENDS BY TAFING


END

X:\OFFICE DOC\ISO\Secco ISO doc\Project Management\Method Statement\Eng\PM6.10_E

Page : 3/4

METHOD STATEMENT

PM6.10_E
Rev. 1

SYSTEM : AIR CONDITION & VENTILATION

Issued 12/1/53

CHECK LIST FOR


REFRIGERANT PIPE AND FITTING INSTALLATION
PROJECT NAME : _______________________
LOCATION : ___________________________
GRIDLINE : ________________________
REFER DRAWING NO : _______________ REV. NO : _________

ITEM

DESCRIPTION

Ref. No. : _________________


DATE : ____ / ____ / _____

SATISFIED

Materials
Copoer Pipe

2
2.1
2.2
2.3

Installation & Joint


Position & Cleaning of Joint
Hanger & Support of Pipe
Final inspection of Joint
( Brazing Joint)

Nitrogen Pressure Test

REMARKS

STATUS
UNSATISFIED

START (kPa)

END (kPa)

200 kPa Nitrogen pressurize at 2 hrs.

Note : _______________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Inspected by :
Signature : ________________
Name : ____________________
Date : ___________________

X:\OFFICE DOC\ISO\Secco ISO doc\Project Management\Method Statement\Eng\PM6.10_E

Approved by :
Signature : ________________
Name : ____________________
Date : ___________________

Page : 4/4