Sample Estimate
Sample Estimate
Date
:
:
:
:
:
Project
Location
Owner
Subject
23-Jun-15
MT. HAMIGUITAN ECOTOURISM DEVELOPMENT_OUTDOOR TOILET
Brgy. La Union, San Isidro, Davao Oriental
PROVINCIAL GOVERNMENT OF DAVAO ORIENTAL
COST ESTIMATE
ITEM
WORK ITEMS
I.
1.1
1.2
1.3
1.4
1.5
PRELIMINARIES
Mobilization / Demobilization
Permits and Government Fees ( By PGO )
Heavy Equipment Cost and Supply ( By PGO )
Equipment Cost
Temporary Facilities
1.6
2
SITE WORKS
2.1 Site Clearing and Ground Levelling
2.2 Lay-out and Staking
2.3 Excavation ( Footing , Wall Footing, & Septic Tank )
2.4 Backfilling Earthfill
2.5 Backfill Levelling and Compaction
3
FORMWORKS AND SCAFFOLDINGS
3.1 Formworks and Scaffolding - Columns & Roofbeams
ARCHITECTURAL WORKS
Ceiling Finishes ( Main Ceiling & Strips Design )
Double Metal Furring and Carrying Channel
3.5mm thk. Hardilite Ceiling Boards
5/32 x 1/2 Blind Rivets
12" x 24" PVC Ceiling Vents
Consumables
7.2 Exterior Wall Cladding
1 1/2" x 3" x 3.0m. Metal Studs Vertical Frame for Wall Cladding
1" x 8" x 10' Seasoned Good Lumber
1" x 2" x 10' Seasoned Good Lumber
Handrail ( Ramps )
2" dia. Sch. 40 B.I. Pipe - Handrail and Railings
OPMENT_OUTDOOR TOILET
COST
ITEMS
QTY
UNIT
Materials
Unit Cost
T & CONCRETE )
SUB-TOTAL 2
SUB-TOTAL 3
1.00
1.00
1.00
1.00
1.00
lot
lot
lot
lot
lot
1.00
lot
SUB-TOTAL 4
SUB-TOTAL 6
SUB-TOTAL 7
r Main Breaker
SUB-TOTAL 8
SUB-TOTAL 9
COST ESTIMATE
Materials
Labor
Amount
Unit Cost
TOTAL
Unit Cost
Amount
10,000.00
10,000.00
15,000.00
15,000.00
15,000.00