Professional Documents
Culture Documents
BoQ Part 1 Version 1
BoQ Part 1 Version 1
BoQ Part 1 Version 1
10
The number, quantities and measurements set out in the Bill of Quantities are approximate and their accuracy or inaccuracy shall in no way affect the validity of
the Contract based thereon. The total amount of each item set out in the Bill of Quantities are required solely for the purpose of assessment and shall not be
deemed to be the actual sums which shall be paid to the Contractor for the execution of the works. The sum to be paid to the Contractor shall (subject to the
provisions of the Contract) be determined by measuring the work actually done in accordance with the Contract and valuing it at the rates and prices inserted by
the Contractor in the Bill of Quantities.
The rates and prices entered in the Bill of Quantities shall except insofar as is otherwise provided under the Contract be deemed to cover all obligations as set out
in the Contract. Items in the Bill of Quantities against which no price is entered shall be deemed to be included in the prices or rates of other items in the Bills. All
rates and prices given in the Bill of Quantities are exclusive of IGV.
Provisional Sums and Dayworks shall be expended in whole or in part only at the direction and discretion of the Engineer. Items marked Optional shall be carried
to the Summary.
Works subjected to measurement shall be measured as stated in the Specifications. Where no rule for measurement is stated, works as executed shall be measured
in accordance with the Civil Engineering Standard Method of Measurement issued by the Institution of Civil Engineers, UK, The net measurement or weight of
the finished work in place will always be taken except where otherwise stated.
The brief descriptions of the items given in the Bill of Quantities are purely for the purpose of identification and shall in no way modify or supersede the detailed
descriptions given in the Conditions of Contract, Specifications or Drawings.
If any material is directed by the Engineer to be measured in vehicles by the cubic metre it shall be hauled in approved vehicles and measured therein at the point
of delivery. Vehicles shall be of size or type acceptable to the Engineer, provided that the body is of such shape that the volume of the contents may be readily and
accurately determined. Unless all approved vehicles are of uniform capacity, each approved vehicle must bear a plainly legible identification mark indicating the
specified approved capacity.
The rates entered by the Contractor for earthworks and pavement construction related to roadwork shall also apply when carrying out such work to accesses,
junctions and the like where these are indicated on the drawings or instructed by the Engineer.
"Authorised", "Directed" or "Approved" shall mean the authority, direction or approval by the Engineer, unless otherwise stated. Certain priced items marked as
additional work to normal shall only be accepted for payment when ordered or approved by the Engineer.
The following terms and abbreviations have been used in the Bill of Quantities:
Unit of description
Abbreviations Bill of Quantities
metre
m square metre
kg tonne (1000 kg)
t lump sum
hr man-hour
mhr litre
BoQ millimetre
m2 cubic metre
LS number
l diameter
mm
m3 hectare (10 000 m2)
no hour
D
ha kilogramme
Term
Rate
Provisional Sums
The unit price for executing the BoQ item complete in full accordance with the requirements of the Contract.
A sum provided in the BoQ for works or costs which cannot be entirely foreseen, defined or detailed.
10
Los nmeros, cantidades y medidas establecidas en la lista de cantidades son aproximadas y su exactitud o inexactitud no ser en modo afectar a la validez del
contrato base de estos colorantes. La cantidad total de cada artculo que figura en la lista de cantidades se requiere con el nico propsito de la evaluacin y no se
considerar que las cantidades reales que se pagarn al Contratista para la ejecucin de las obras. La suma que se pagar a la Contratista (sujeto a las
disposiciones del Contrato) se determina midiendo el trabajo efectivamente realizado de conformidad con el Contrato y valorndola en las tarifas y los precios
incluidos por el contratista en la Lista de Cantidades.
Se considerar que las tasas y precios consignados en la Lista de Cantidades se salvo en lo que se disponga otra cosa en el Contrato para cubrir todas las
obligaciones establecidas en el Contrato. Los elementos de la lista de cantidades contra la que se ha introducido ningn precio se considerarn incluidos en los
precios o tarifas de otros elementos en los proyectos de ley. Todas las tarifas y precios que figuran en la lista de cantidades no incluyen el IGV.
Montos provisionales y Dayworks se utilizarn, en su totalidad o en parte slo en la direccin y la discrecin del Ingeniero. Los elementos marcados opcional se
llevar al Resumen.
Obras sometidas a medicin se medirn segn lo indicado en las especificaciones. Cuando se declar ninguna regla para la medida, funciona como ejecutado se
medir de acuerdo con la Ingeniera Civil mtodo estndar de medida emitida por la Institucin de Ingenieros Civiles, Reino Unido, la medicin neta o el peso de
la obra terminada en su lugar se dictarn siempre de excepcin donde se indique lo contrario.
Las breves descripciones de los elementos que figuran en la lista de cantidades son nicamente con fines de identificacin y no ser en modo modificar o sustituir
las descripciones detalladas que figuren en las Condiciones del contrato, las especificaciones o dibujos.
Si cualquier material es dirigido por el Ingeniero de medirse en los vehculos por el metro cbico ser transportada en vehculos habilitados y medido en el mismo
en el punto de entrega. Los vehculos debern ser de tamao o tipo aceptable para el Ingeniero, a condicin de que el cuerpo es de tal forma que el volumen de los
contenidos puede ser determinada fcilmente y con precisin. A menos que todos los vehculos aprobados son de capacidad uniforme, cada vehculo homologado,
deber llevar una marca de identificacin claramente legibles indicando la capacidad aprobada especificado.
Las tasas introducidas por el Contratista para movimiento de tierras y construccin de pavimentos relacionados con la obra vial se aplicar tambin cuando se
lleva a cabo una labor de accesos, cruces y similares cuando stas se indican en los planos o indique el Ingeniero.
"Autorizado", "Director" o "Aprobado": la autoridad, direccin o aprobacin del Ingeniero, a menos que se indique lo contrario. Ciertos artculos con precios
marcados trabajo como adicional a la normalidad slo se aceptan pagos en cuando es ordenado o aprobado por el Ingeniero.
Abbreviations
millimetre
m
cubic metre
hectare (10 000 m2)
kilogramme
kg
tonne (1000 kg)
t
lump sum, suma global
LS
number
no
hour
hr
man-hour
mhr
litre
l
diameter
D
Bill of Quantities
mm
square metre
ha
Term
Tarifa
El precio unitario para la ejecucin de la partida BoQ completa de plena conformidad con los requisitos del Contrato.
Montos Provisionales
Una cantidad prevista en el BoQ para obras o gastos que no pueden ser totalmente previsibles, definidos o detallada.
CHEVES HPP
CIVIL CONTRACT
DESCRIPTION
No. 5 - Headrace
5.1 Adit 1
5.2 Surgetunnel
5.3 Headrace tunnel H01 to H18
5.4 Headrace tunnel H18 to H31
TOTAL
PRICE (USD)
39,271,663.78
4,973,522.15
788,551.25
3,333,609.63
9,624,234.24
18,301,121.12
3,565,813.30
2,800,687.44
18,812,561.81
17,333,736.54
1,546,953.67
5,722,270.58
591,174.48
1,733,471.50
6,889,577.46
1,370,389.29
11,147,799.11
5,943,047.73
1,197,632.08
154,947,817.16
3,503,455.00
CHEVES HPP
CIVIL CONTRACT
DESCRIPTION
No. 5 - Aduccin
5.1 Adit N1 - Tnel secundario 1
5.2 Tnel de sobretensiones
5.3 Tnel de aduccin H01 to H18
5.4 Tnel de aduccin H18 to H31
TOTAL
PRICE (USD)
39,271,663.78
4,973,522.15
788,551.25
3,333,609.63
9,624,234.24
18,301,121.12
3,565,813.30
2,800,687.44
18,812,561.81
17,333,736.54
1,546,953.67
5,722,270.58
591,174.48
1,733,471.50
6,889,577.46
1,370,389.29
11,147,799.11
5,943,047.73
1,197,632.08
154,947,817.16
3,503,455.00
Description
A.
A.1
A.2
1.1
1.1.01
1.1.02
1.1.03
1.1.04
1.1.05
1.1.06
1.1.07
1.1.08
1.2
1.2.01
Unit
LS
LS
Included in
Included in
Included in
Included in
Included in
Included in
Included in
Prov. Sum
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
1.2.02
1.2.03
LS
LS
LS
LS
1.2.04
LS
1.2.05
Provision of first aid station with ambulance car and all required furniture and medical equipment.
LS
1.2.06
1.2.07
1.2.08
1.2.08.01
1.2.08.02
1.2.08.03
1.2.08.04
1.2.08.05
1.2.09
1.2.10
Huaura Site
Checras Site
Picunche Site
Tailrace outlet
Access Tunel Site
Not used
Contractor's general survey, control of survey network, traversing, establishing of control points and bench marks
1.2.11
1.2.12
1.2.13
1.2.14
Not used
Operation and maintenance of first aid station with ambulance car, personnel and medicines
1.2.15
1.2.16
1.2.17
1.2.17.01
1.2.17.02
1.2.17.03
1.2.17.04
1.2.17.05
1.2.17.06
1.2.18
1.3
Included in Mark-Up
LS
LS
LS
LS
LS
LS
kWh
LS
LS
LS
LS
LS
Prov. Sum
%
LS
Prov. Sum
%
LS
1.3.01
m2
1.3.02
m2
1.3.03
1.3.04
1.3.05
1.3.06
1.3.07
1.3.08
1.3.09
1.3.10
1.3.11
1.3.12
LS
No
No
LS
No
No
month
Prov. Sum
%
Sum
Unit Price
USD
1 435,120.00
1 948,948.00
Total Price
USD
Item
A.
A.1
A.2
435,120.00
948,948.00
1.1
1 700,000.00
700,000.00
1.1.01
1.1.02
1.1.03
1.1.04
1.1.05
1.1.06
1.1.07
1.1.08
1.2
1.2.01
1 2,686,344.00
1 2,336,891.00
1 518,190.00
2,686,344.00
2,336,891.00
518,190.00
1
1
1
1
287,996.00
128,398.00
137,999.00
179,998.00
1.2.03
1 1,176,574.00
1,176,574.00
1.2.04
1 259,446.00
259,446.00
1.2.05
1.2.02
287,996.00
128,398.00
137,999.00
179,998.00
1.2.06
1.2.07
1.2.08
1
1
1
1
1
198,737.86
664,919.00
512,545.00
145,481.65
166,555.00
1 59,623.23
1,000,000.00
1.00
198,737.86
664,919.00
512,545.00
145,481.65
166,555.00
59,623.23
1.2.08.01
1.2.08.02
1.2.08.03
1.2.08.04
1.2.08.05
1.2.09
1.2.10
9,887,456.39
0.29 290,000.00
9,887,456.39
1.2.11
1.2.12
1 1,066,894.77
1,066,894.77
1.2.13
1.2.14
1 15,585,702.84
1 321,472.00
15,585,702.84
321,472.00
1 16,521.00
16,521.00
1.2.15
1.2.16
1.2.17
1.2.17.01
1,000.00
200
748,131.00
1,000.00
200
-1,500,000.00
1.2.17.02
1.2.17.03
1.2.17.04
1.2.17.05
1.2.17.06
1.2.18
1
20
1
1
20
1
1,000.00
1,000.00
748,131.00
1,000.00
1,000.00
-1,500,000.00
1.3
22,300.00
5.53 123,319.00
120
1
4
6
1
3
5
34
1.3.01
462
55,440.00
1.3.02
224,070.00
6,601.00
24,000.00
367,732.00
42,000.00
33,600.00
1,804.56
224,070.00
26,404.00
144,000.00
367,732.00
126,000.00
168,000.00
61,355.04
1.3.03
1.3.04
1.3.05
1.3.06
1.3.07
1.3.08
1.3.09
1.3.10
1.3.11
1.3.12
1 10,000.00
30 10,000.00
10,000.00
3,000.00
39,271,663.78
Sum
Obras preliminares y costos iniciales- PRECONSTRUCTION PHASE and EARLY WORKS COST
Obras provicionales - Preconstruction Phase
Obras preliminares - Early Works
OBLIGACIONES EN CONDICIONES CONTRACTUALES - OBLIGATIONS UNDER CONTRACT CONDITIONS (CC).
Garanta de fiel Cumplimiento - Performance Security.
Seguros que deber prestar Contratista - Insurances to be provided by Contractor
Cumplimiento de la Clusula 4.8 Procedimientos de Seguridad
Cumplimiento de la Clusula 4.18 de Proteccin del Medio Ambiente y la Mitigacin Social
Cumplimiento de la Clusula 4.24 Arqueologa - Compliance with Clause 4.24 Archaeology
Cumplimiento de las tareas y responsabilidades como Contratista Principa
El cumplimiento de los Estatutos y Reglamentos de conformidad con el Contratista
LEG-3 Seguros a ser proporcionados por el Contratista
MOVILIZACIN DEL CONTRATISTA, INSTALACIONES TEMPORALES Y ADMINISTRACIN GENERAL.
Provisin de del Contratista campamentos, oficinas, talleres, almacenes, etc.
a) Mirahuay (Personal campamentos, oficina, taller)
b) Pampa Libre trabajos de campo.
c) Oficinas del sitio
Provisin de todas las instalaciones temporales para el suministro de agua, alcantarillado, comunicaciones, recoleccin de desechos slidos y otros servicios necesarios
a) Mirahuay (Personal campamentos, oficina, taller)
b) Pampa Libre trabajos de campo.
c) Oficinas del sitio
Provisin de todas las instalaciones temporales para la generacin de energa, la transmisin y la salida con los medidores, etc.
Movilizacin de los equipos del Contratista incluyendo tambin trituracin, cribado, dosificacin
Y preparacin de mezcla
La provisin de puesto de primeros auxilios con ambulancia y todo el mobiliario necesario y equipos mdicos.
Todas las obras viales temporales excepto Artculo 2.1.13
Not used
Desvios temporales, ataguias, cuidados en el rio en bombeo y drenaje
Huaura Sitio
Checras Sitio
Picunche Sitio
Salida de descarga
Acceso Tnel Sitio
Not used
Estudio general del Contratista, el control de redes de vigilancia, de desplazamiento, el establecimiento de puntos de control y puntos de referencia
Suministro de energa elctrica a otros contratistas.
Operacin y mantenimiento de campamentos, oficinas, talleres, almacenes, etc.
Operacin y mantenimiento de instalaciones temporales para el suministro de agua, alcantarillado, electricidad, comunicacin, recogida de residuos slidos y otras
obras temporales y permanentes.
Not used
Operacin y mantenimiento de la estacin de primeros auxilios con el coche ambulancia, personal y medicamentos
Supervisin del contratista y administracin dentro y fuera del sitio.
La eliminacin de todas las obras temporales, limpieza y restablecimiento del sitio.
Laboratorio del sitio y de Prueba
Proporcionar edificio de laboratorios y equipo para pruebas especificadas
Equipos adicionales de estudio de sitio ordenado por el Ingeniero
Los gastos generales del contratista y el beneficio sobre el punto .17.02
Ejecucin de laboratorio del Sitio
Fuera de las instalaciones de pruebas de laboratorio.
Los gastos generales del contratista y el beneficio sobre el punto .17.05
Deduccin
ASISTENCIA Y SUMINISTROS AL EMPLEADOR E INGENIEROS.
Establecer rea de trabajo y de almacenamiento para otros contratistas
Proporcionar oficinas para otros Contratistas
Proporcionar oficinas para el personal del Contratante
Proporcionar a las oficinas de campo para el Ingeniero
Proporcionar viviendas temporales para el Personal del Contratante
Proporcionar hoteles temporales para el Personal del Contratante
Proporcionar casas tipo A permanentes para el empleador
Proporcionar casas tipo B permanentes para el empleador
Mantenimiento y limpieza de las oficinas
Not used
Suministro de mobiliario adicional, equipos y diversos suministros en sitio
Los gastos generales del contratista y el beneficio sobre el punto 1.3.11
Unit
Quantity
Glb (LS)
Glb (LS)
Included in
Included in
Included in
Included in
Included in
Included in
Included in
Prov. Sum
Unit Price
USD
Total Price
USD
1 435,120.00
1 948,948.00
435,120.00
948,948.00
1 700,000.00
700,000.00
Glb (LS)
Glb (LS)
Glb (LS)
1 2,686,344.00
1 2,336,891.00
1 518,190.00
2,686,344.00
2,336,891.00
518,190.00
Glb
Glb
Glb
Glb
1
1
1
1
287,996.00
128,398.00
137,999.00
179,998.00
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
Mark-Up
ervicios necesarios
(LS)
(LS)
(LS)
(LS)
287,996.00
128,398.00
137,999.00
179,998.00
Glb (LS)
1 1,176,574.00
1,176,574.00
Glb (LS)
1 259,446.00
259,446.00
1
1
1
1
1
198,737.86
664,919.00
512,545.00
145,481.65
166,555.00
Included in Mark-Up
Glb
Glb
Glb
Glb
Glb
(LS)
(LS)
(LS)
(LS)
(LS)
Glb (LS)
kWh
Glb (LS)
198,737.86
664,919.00
512,545.00
145,481.65
166,555.00
1 59,623.23
1,000,000.00
1.00
59,623.23
9,887,456.39
0.29 290,000.00
9,887,456.39
Glb (LS)
1 1,066,894.77
1,066,894.77
Glb
Glb
Glb
Glb
1 15,585,702.84
1 321,472.00
15,585,702.84
321,472.00
1 16,521.00
16,521.00
(LS)
(LS)
(LS)
(LS)
Prov. Sum
1
20
1
1
20
1
%
Glb (LS)
Prov. Sum
%
Glb (LS)
m2
22,300.00
m2
120
Glb (LS)
No
No
Glb (LS)
No
No
month
Prov. Sum
%
1,000.00
1,000.00
748,131.00
1,000.00
1,000.00
-1,500,000.00
1,000.00
200
748,131.00
1,000.00
200
-1,500,000.00
5.53 123,319.00
1
4
6
1
3
5
34
462
55,440.00
224,070.00
6,601.00
24,000.00
367,732.00
42,000.00
33,600.00
1,804.56
224,070.00
26,404.00
144,000.00
367,732.00
126,000.00
168,000.00
61,355.04
1 10,000.00
30 10,000.00
10,000.00
3,000.00
39,271,663.78
Item
2.1.01
2.1.01
2.1.02
2.1.02.01
2.1.02.02
2.1.02.03
2.1.02.04
2.1.02.05
2.1.02.06
2.1.02.07
2.1.02.08
2.1.02.09
2.1.02.10
2.1.02
2.1.02.01
2.1.02.02
2.1.02.03
2.1.02.04
2.1.02.05
2.1.02.06
2.1.02.07
2.1.02.08
2.1.02.09
2.1.02.10
2.1.03
2.1.03.01
2.1.03.02
2.1.03.03
2.1.03.04
2.1.03.05
2.1.03.06
2.1.03.07
2.1.03.08
ACCESS ROAD TO CHECRAS DAM, INTAKE AND SAND EXCLUDER. Design and built.
Reinforced concrete pipe. Di = 500 mm
Fully cement grouted rock bolts. D= 25 mm. Depth in rock 3.0 m.
Subgrade preparation.
Subbase. Thickness minimum 300 mm
Concrete pavement as specified for access roads, thickness 200 mm
Guard rail.
Shotcrete, plain
Welded wire fabric fixed to rock bolts
2.1.03
2.1.03.01
2.1.03.02
2.1.03.03
2.1.03.04
2.1.03.05
2.1.03.06
2.1.03.07
2.1.03.08
2.1.04
2.1.04.01
2.1.04.02
2.1.04.03
2.1.04.04
2.1.04
2.1.04.01
2.1.04.02
2.1.04.03
2.1.04.04
2.1.04.05
2.1.04.06
2.1.04.07
2.1.04.08
2.1.04.09
2.1.04.10
2.1.04.11
2.1.04.05
2.1.04.06
2.1.04.07
2.1.04.08
2.1.04.09
2.1.04.10
2.1.04.11
2.1.04.12
Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 3.9 m
2.1.04.12
2.1.04.13
Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 5.9 m
2.1.04.13
2.1.04.14
2.1.04.15
2.1.04.16
2.1.04.14
2.1.04.15
2.1.04.16
2.1.05
2.1.05
2.1.06
2.1.06
2.1.06.01
2.1.06.02
2.1.06.03
2.1.06.04
2.1.06.05
2.1.06.06
2.1.06.07
2.1.06.08
2.1.06.09
2.1.06.10
2.1.07
2.1.07.01
2.1.07.02
2.1.07.03
2.1.07.04
2.1.07.05
2.1.07.06
2.1.07.07
2.1.07.08
2.1.07
2.1.07.01
2.1.07.02
2.1.07.03
2.1.07.04
2.1.07.05
2.1.07.06
2.1.07.07
2.1.07.08
2.1.06.01
2.1.06.02
2.1.06.03
2.1.06.04
2.1.06.05
2.1.06.06
2.1.06.07
2.1.06.08
2.1.06.09
2.1.06.10
2.1.07.09
2.1.07.10
Guard rail.
Spoiling of surplus
2.1.07.09
2.1.07.10
Unit
Quantity
LS
1.00
m3
m3
m3
m3
m
m2
m3
m3
m2
m3
m
no
m2
m3
m2
m
m3
m2
m3
m3
m3
m3
500
8,000.00
2,500.00
500
m
m2
m3
m3
m3
m
no
6,000.00
1,500.00
750
2,500.00
600
125
Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 3.9 m.
no
40
Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 5.9 m.
no
10
m2
m
m3
400
2,000.00
50
300
20
1,000.00
300
140
900
2,450.00
50
100
1,000.00
300
900
200
50
100
80
250
100
20
m3
m3
m3
m
m2
m3
m3
m2
m
m3
m3
m3
m3
m3
m
m2
m3
m2
50
3,500.00
12,000.00
150
3,500.00
1,250.00
300
600
500
300
600
1,500.00
500
7,500.00
50
1,500.00
450
1,300.00
m
m3
50
2,100.00
Unit Price
USD
Total Price
USD
615,091.00
615,091.00
5.25
5.13
32.72
24.5
334
0.88
29.25
29.25
4.37
3.73
334
2,100.00
10,260.00
1,636.00
7,350.00
6,680.00
880
8,775.00
4,095.00
3,933.00
9,138.50
16,700.00
8,891.00
880
8,775.00
52,542.00
17,890.00
17,424.00
11.65 1,165.00
88.91
0.88
29.25
58.38
89.45
348.48
5.25
5.13
32.72
24.5
2,625.00
41,040.00
81,800.00
12,250.00
0.88
29.25
29.25
20.53
89.45
47.74
26,720.00
5,280.00
43,875.00
21,937.50
51,325.00
53,670.00
5,967.50
334
54.26 2,170.40
106.5
348.48
334
1,065.00
14.48 3,620.00
42.01 4,201.00
6,969.60
5.25 262.5
5.13 17,955.00
24.5 294,000.00
50,100.00
0.88 3,080.00
29.25 36,562.50
20.53 6,159.00
58.38 35,028.00
89.45 44,725.00
20.53 6,159.00
5.25
5.13
32.72
24.5
334.02
3,150.00
7,695.00
16,360.00
183,750.00
16,701.00
0.88 1,320.00
29.25 13,162.50
4.37 5,681.00
89.44 4,472.00
3.73 7,833.00
Description
Unit
2.1.08
2.1.08.01
2.1.08.02
2.1.08.03
m3
m3
m3
2.1.08.04
2.1.08.06
2.1.08.07
2.1.08.08
2.1.08.09
2.1.08.10
2.1.08.11
2.1.08.12
m
m2
m3
m3
m3
m
m3
no
2.1.08.13
Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 3.9 m
no
2.1.08.14
Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 5.9 m
no
2.1.08.15
2.1.08.16
2.1.08.17
m2
m
m3
2.1.09
2.1.09.01
2.1.09.02
2.1.09.03
2.1.09.04
2.1.09.05
2.1.09.06
2.1.09.07
2.1.09.08
2.1.09.09
2.1.09.10
2.1.09.11
2.1.09.12
m3
m3
m3
m3
m
m2
m3
m3
m3
m
m3
no
2.1.09.13
Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 3.9 m
no
2.1.09.14
Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 5.9 m
no
2.1.09.15
2.1.09.16
2.1.09.17
m2
m
m3
2.1.10
2.1.10.01
2.1.10.02
2.1.10.03
2.1.10.04
2.1.10.05
2.1.10.06
m2
m3
m3
m3
m
LS
2.1.11
2.1.11.01
2.1.12
2.1.12.01
2.1.12.02
2.1.12.03
PAVED AREAS AT ACCESS TUNNEL PORTAL AND SWITCHYARD. Design and built.
Subgrade preparation.
Subbase. Thickness minimum 300 mm
Concrete pavement as specified for access roads, thickness 200 mm
Sum
months
m2
m3
m2
Description
Unit
2.1.08
2.1.08.01
2.1.08.02
2.1.08.03
m3
m3
m3
2.1.08.04
2.1.08.06
2.1.08.07
2.1.08.08
2.1.08.09
2.1.08.10
2.1.08.11
2.1.08.12
m
m2
m3
m3
m3
m
m3
no
2.1.08.13
Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 3.9 m.
no
2.1.08.14
Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 5.9 m.
no
2.1.08.15
2.1.08.16
2.1.08.17
m2
m
m3
2.1.09
2.1.09.01
2.1.09.02
2.1.09.03
2.1.09.04
2.1.09.05
2.1.09.06
2.1.09.07
2.1.09.08
2.1.09.09
2.1.09.10
2.1.09.11
2.1.09.12
m3
m3
m3
m3
m
m2
m3
m3
m3
m
m3
no
2.1.09.13
Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 3.9 m.
no
2.1.09.14
Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 5.9 m.
no
2.1.09.15
2.1.09.16
2.1.09.17
m2
m
m3
2.1.10
2.1.10.01
2.1.10.02
2.1.10.03
2.1.10.04
2.1.10.05
2.1.10.06
m2
m3
m3
m3
m
LS
2.1.11
2.1.11.01
2.1.12
2.1.12.01
2.1.12.02
2.1.12.03
Sum
months
m2
m3
m2
Quantity
Unit Price
USD
160
4,000.00
4,000.00
Total Price
USD
5.25 840
5.13 20,520.00
32.72 130,880.00
50 334
400
118
0.88
29.25
29.25
20.53
89.45
3.73
47.74
53
344
40
8,160.00
300
30
54.26 1,627.80
20 106.5
1,000.00
100
50 348.48
2,600.00
11,000.00
5,000.00
1,000.00
120
6,500.00
2,000.00
900
5,600.00
2,130.00
14.48 14,480.00
42.01 4,201.00
17,424.00
5.25
5.13
32.72
24.5
334
0.88
29.25
29.25
20.53
89.45
3.73
47.74
40
12,600.00
500
70
300
50
348.48
500
147
67
430
20
1 33,188.00
34.00
750
250
650
13,650.00
56,430.00
163,600.00
24,500.00
40,080.00
5,720.00
58,500.00
26,325.00
114,968.00
3,578.00
46,998.00
23,870.00
54.26 3,798.20
30 106.5
200
16,700.00
352
3,451.50
1,550.25
7,062.32
3,578.00
30,436.80
14,322.00
59,803.32
3,195.00
14.48 4,344.00
42.01 2,100.50
69,696.00
0.88
29.25
29.25
20.53
89.45
440
4,299.75
1,959.75
8,827.90
1,789.00
33,188.00
2,033,312.88
0.88 660
29.25 7,312.50
58.38 37,947.00
4,973,522.15
Description
Unit
Bill 2.2 includes also permanent drainage and erosion protection at spoil areas
2.2.01.0
2.2.01.01
2.2.01.02
2.2.01.03
2.2.01.04
2.2.01.05
2.2.01.06
2.2.01.10
2.2.01.11
2.2.01.12
2.2.02.0
2.2.02.01
2.2.02.02
2.2.02.03
2.2.02.04
2.2.02.05
2.2.02.06
2.2.02.07
2.2.02.08
2.2.02.09
2.2.02.10
2.2.02.11
2.2.02.12
2.2.02.13
2.2.02.14
Sum
2.2.01.07
2.2.01.08
2.2.01.09
m
m
m3
m3
m3
m3
m3
m3
m3
m3
no
m2
m2
m2
m3
m2
m3
m3
m
m
m
m
m
m
m2
m2
m3
m3
t
t
Description
Unit
Bill 2.2 Incluye tambin el drenaje permanente y proteccin contra la erosin en zonas de relleno
2.2.01.0
2.2.01.01
2.2.01.02
2.2.01.03
2.2.01.04
2.2.01.05
2.2.01.06
2.2.01.10
2.2.01.11
2.2.01.12
2.2.02.0
2.2.02.01
2.2.02.02
2.2.02.03
2.2.02.04
2.2.02.05
2.2.02.06
2.2.02.07
2.2.02.08
2.2.02.09
2.2.02.10
2.2.02.11
2.2.02.12
2.2.02.13
2.2.02.14
Sum
2.2.01.07
2.2.01.08
2.2.01.09
m
m
m3
m3
m3
m3
m3
m3
m3
m3
no
m2
m2
m2
m3
m2
m3
m3
m
m
m
m
m
m
m2
m2
m3
m3
t
t
Quantity
Unit Price
USD
200
2,000.00
1,000.00
300
500
Total Price
USD
65.22
65.22
25.62
23.76
53.39
300
300
500
300
400
13,044.00
130,440.00
25,620.00
7,128.00
26,695.00
27.3
27.3
27.3
27.3
445.36
20
8,190.00
8,190.00
13,650.00
8,190.00
178,144.00
12.2 244
1,000.00
1,000.00
500
700
1,000.00
2.79
2.79
37.27
36.62
11.17
200
150
100
7.92 1,584.00
31.97 4,795.50
41,694.00
33,373.80
49,924.00
9.77 3,908.00
16.77 3,354.00
20.04 3,006.00
44.71 4,471.00
44.71 22,355.00
28,833.00
57,666.00
36,727.95
16,305.00
400
200
150
100
500
150
300
416.94
60 556.23
40 1,248.10
192.22
192.22
15 2,448.53
5 3,261.00
2,790.00
2,790.00
18,635.00
25,634.00
11,170.00
788,551.25
Description
Unit
3.1.01.05
3.1.01.06
3.1.01.07
3.1.01.08
3.1.02.0
3.1.02.01
3.1.02.02
3.1.02.03
3.1.03.0
EARTHWORKS
Remove usable timber
Clearing and grubbing
Topsoil excavation
Soil excavation
a) Bulk excavation, to spoil deposit
b) Excavation to stock pile (gravel, boulders)
c) Excavations for footings
Preparation of rock foundation for concreting
Fill and backfill
a) Embankment fill
i) Gravel
ii) Rock
b) Structural backfill
c) High quality rockfill
d) Backfill of trenches
e) Low permeability fill
f) Filter material, 0 - 60 mm
g) Drainage material , 50 - 100 mm
Placing of topsoil
Turfing (optional)
3.1.03.01
3.1.03.02
3.1.03.03
3.1.03.04
3.1.03.05
3.1.03.06
3.1.03.08
3.1.04.0
3.1.04.01
3.1.04.02
Rip-rap
a) Stone size 200 - 300 mm
b) Stone size 300 - 500 mm
c) Selected blocks > 500 mm
d) Grouted Rip rap
Filter fabric
a) Minimum 180 g/m2
b) Minimum 250 g/m2
c) Minimum 300 g/m2
Drilling of weep holes, vertical or sloping holes. Diameter 51 mm
3.1.04.03
3.1.04.04
3.1.04.05
3.1.04.06
3.1.04.07
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
ROCK EXCAVATION
a) Bulk excavation
b) Trench/ditch excavation
Contour boreholes
Above ground. Rock excavation. Abnormal overbreak.
3.1.03.07
no
ha
m3
m3
m3
m
m3
m
m
m
no
no
kg
kg
kg
kg
kg
kg
no
no
no
no
no
m3
m3
m3
m3
m3
m2
m2
m2
m
m3
m
m
m2
Description
Unit
Bill 3.1 Incluido portal tunel aguas arriba - includes upstream tunnel portal
3.1.01.0
3.1.01.01
3.1.01.02
3.1.01.03
3.1.01.04
3.1.01.05
3.1.01.06
3.1.01.07
3.1.01.08
3.1.02.0
3.1.02.01
3.1.02.02
3.1.02.03
3.1.03.0
3.1.03.01
3.1.03.02
3.1.03.03
3.1.03.04
3.1.03.05
3.1.03.06
3.1.03.08
3.1.04.0
3.1.04.01
3.1.04.02
Enrrocado - Rip-rap
a) Tamao de piedra 200 - 300 mm
b) Tamao de piedra 300 - 500 mm
c) Bloques seleccionados >500 mm
d) Enrrocado embebido en mortero - Grouted rip-rap
Geotextil - Filter fabric
a) Mnimo 180 g/m2
b) Mnimo 250 g/m2
c) Mnimo 300 g/m2
La perforacin de agujeros de drenaje, vertical o inclinada agujeros. Dimetro 51 mm
3.1.04.03
3.1.04.04
3.1.04.05
3.1.04.06
3.1.04.07
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
PRUEBAS DE SUELO, CEMENTACIN Y SOPORTE EN ROCA - GROUND TESTING AND GROUTING, ROCK SUPPORT
Soporte en roca del Portal tnel, incluye reglamento 3.2 - Rock support at tunnel portal, incuded in bill 3.2
Perforacin por percusin, dimetro mnimo de 51 mm, profundidad 0-20 m (en roca y hormign)
3.1.03.07
no
ha
m3
m3
m3
m
m3
m
m
m
no
no
kg
kg
kg
kg
kg
kg
no
no
no
no
no
m3
m3
m3
m3
m3
m2
m2
m2
m
m3
m
m
m2
Quantity
Unit Price
USD
10 105.23
3 9,990.00
Total Price
USD
100
1,052.30
29,970.00
3.34 334
12,000.00
500
500
800
5.62
6.35
6.52
3.59
67,440.00
3,175.00
3,260.00
2,872.00
750
750
3,500.00
400
400
400
500
250
500
250
22.43
17.21
15.92
23.68
14.89
16.76
25.96
26.49
0.32
0.32
16,822.50
12,907.50
55,720.00
9,472.00
5,956.00
6,704.00
12,980.00
6,622.50
160
6,000.00
200
400
200
18.92
20.37
17.98
14.2
113,520.00
4,074.00
7,192.00
2,840.00
300
15.58 4,674.00
100
80
119.42
63.4 6,340.00
80.04 4,002.00
2,388.40
60 129.12
7,747.20
50
20.00
9,000.00
6,000.00
4,000.00
3,000.00
3,000.00
100
0.88
1.05
1.27
1.63
2.61
23.71
80
40
30
20 102.26
10 129.48
7,920.00
6,300.00
5,080.00
4,890.00
7,830.00
2,371.00
56.9 4,552.00
68.24 2,729.60
79.57 2,387.10
2,045.20
1,294.80
1,000.00
18.08 18,080.00
600
600
750
100
20.01 12,006.00
20.04 12,024.00
20.43 15,322.50
12,962.00
129.62
1,000.00
200
200
50
100
6,410.00
1,332.00
1,402.00
779
3.41 341
100
50
200
6.41
6.66
7.01
15.58
24.32 2,432.00
33.28 1,664.00
14.49 2,898.00
3.1.05.0
3.1.05.01
CONCRETE WORKS
Grouted rock bolts. D = 25 mm
Length in concrete 1.5 m
Item
3.1.05.0
3.1.05.01
3.1.05.02
3.1.05.03
3.1.05.04
3.1.05.05
3.1.05.06
3.1.05.07
3.1.05.08
3.1.05.09
3.1.05.10
3.1.05.11
3.1.05.12
3.1.05.13
3.1.05.14
3.1.05.15
3.1.05.16
3.1.05.17
3.1.05.18
a) D = 20 mm
b) D = 25 mm
c) D = 32 mm
a) Stainless steel bars. D = 32 mm
b) Stainless steel bars. D = 25 mm
Embedded PVC-pipes including bends and fixtures
a) D = 50 mm
b) D = 75 mm
c) D = 100 mm
3.1.05.02
3.1.05.03
3.1.05.04
3.1.05.05
3.1.05.06
3.1.05.07
3.1.05.08
3.1.05.09
3.1.05.10
3.1.05.11
3.1.05.12
3.1.05.13
3.1.05.14
3.1.05.15
3.1.05.16
3.1.05.17
3.1.05.18
3.1.05.19
3.1.05.20
d) D = 150 mm
e) D = 200 mm
Embedded cast-iron floor gullies with hot dip galvanized steel cover
Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete
3.1.05.19
3.1.05.20
Unit
Quantity
no
no
no
no
no
no
no
50
100
15
20
20
10
10
m2
m2
m2
m2
m2
1,000.00
700
1,000.00
1,000.00
250
m2
m2
m2
m2
200
150
m2
m2
m2
m2
300
500
400
m2
m2
m2
m2
m2
m2
600
200
900
600
50
50
50
50
400
m
m
50
15
no
no
m2
m
5
5
20
40
m
m
m
10
100
110
m
kg
l
200
150
m2
kg
m
150
m2
150
t
t
t
600
a) D = 20 mm
b) D = 25 mm
c) D = 32 mm
a) Barras de acero inoxidable - Stainless steel bars. D = 32 mm
b) Barras de acero inoxidable - Stainless steel bars. D = 25 mm
PVC-tubos empotrados, incluida curvas y accesorios - Embedded PVC-pipes including bends and fixtures
a) D = 50 mm
b) D = 75 mm
c) D = 100 mm
no
no
no
no
no
40
80
20
5
5
m
m
m
20
30
50
50
50
15
2
4
d) D = 150 mm
e) D = 200 mm
hierro fundido embebido con covertura de acero galvanizado en caliente
Seccin del ngulo de acero de 100 x 100 con anclaje c / c de 300 mm, embebido en concreto en la primera etapa.
- Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete
m
m
no
kg
20
20
2
120
Unit Price
USD
Total Price
USD
66.07 3,303.50
77.22 7,722.00
88.36 1,325.40
102.26
129.48
68.24 1,364.80
79.57 1,591.40
1,022.60
1,294.80
53.95
53.95
53.95
53.95
53.95
53,950.00
37,765.00
53,950.00
53,950.00
13,487.50
73.51
73.51
73.51
73.51
14,702.00
11,026.50
3,675.50
3,675.50
53.99
53.99
53.99
53.99
16,197.00
26,995.00
21,596.00
2,699.50
51.55
51.55
51.55
51.55
51.55
51.55
30,930.00
10,310.00
46,395.00
30,930.00
2,577.50
20,620.00
33.5 1,675.00
34.25 513.75
26.7
26.7
53.95
22.63
133.5
133.5
1,079.00
905.2
15.27 152.7
24.93 2,493.00
30.31 3,334.10
3.67 734
1.01 151.5
2.5 125
6.2 930
18.25 912.5
72.58 1,088.70
6.07 910.5
1,459.67
1,459.67
2,812.50
875,802.00
2,919.34
11,250.00
8.05
11.14
17.63
27.28
17.95
322
891.2
352.6
136.4
5.45 109
7.15 214.5
8.92 446
89.75
123.23
16.9 338
25.92 518.4
246.46
7.41 889.2
3.1.05.21
3.1.05.22
3.1.05.23
Item
3.1.05.21
3.1.05.22
3.1.05.23
3.1.05.27
3.1.05.28
3.1.05.29
Concrete Class F
Finishing of unformed surfaces
a) Class UA
b) Class UB, curved surfaces
c) Class UB, plane surfaces
d) Class UC, plane surfaces
Blockout for and grouting of fence posts in concrete slabs
3.1.05.30
Grouting around hydraulic steelworks with expanding mortar. Incl. plant positioning
3.1.05.30
3.1.05.31
3.1.05.32
Not used
Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant
positioning.
3.1.05.31
3.1.05.32
3.1.05.33
Grouting of construction joints with cement based grout. Incl. plant positioning
3.1.05.33
3.1.05.34
3.1.05.34
3.1.06.0
3.1.06.0
3.1.05.24
3.1.05.25
3.1.05.26
3.1.05.27
3.1.05.28
3.1.05.24
3.1.05.25
3.1.05.26
3.1.05.29
3.1.06.01
3.1.06.02
3.1.06.03
3.1.06.04
3.1.06.05
3.1.06.06
3.1.06.07
3.1.06.08
3.1.06.01
3.1.06.02
3.1.06.03
3.1.06.04
3.1.06.05
3.1.06.06
3.1.06.07
3.1.06.08
3.1.07.0
3.1.07.01
BUILDER'S WORKS
Blockwork Walling
a) 150 mm
b) 100 mm
Roofing membrane
Doors
a) Insulated single steel doors. Fire rating A60. External dimensions 1000x2100mm
3.1.07.0
3.1.07.01
3.1.07.02
3.1.07.03
3.1.07.02
3.1.07.03
b) Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm
3.1.07.04
3.1.07.05
3.1.07.06
3.1.07.07
Not used
Windows
a) Aluminium window with fixed panes Size 1000 x 1200 mm
b) Louvred aluminium ventilation grilles with aluminium frame and insect screen size
500 x 400 mm
c) Glazing 5 mm float glass and glazing in panes of any size.
Plastering on walls
Painting and decorating. Painting of:
a) Internal metalwork or steelwork
b) Galvanized metalwork
3.1.07.04
3.1.07.05
3.1.07.06
3.1.07.07
Unit
Quantity
no
kg
300
25
m3
m3
2,500.00
400
m3
m3
45
50
m3
m3
m3
m3
m3
m3
m3
m3
1,100.00
1,060.00
1,500.00
650
m3
200
m3
150
m2
m2
m2
m2
no
1,000.00
300
800
200
15
1,460.00
40
200
60
40
20
50
m2
20
LS
LS
LS
LS
LS
LS
LS
1
1
1
1
1
1
1
m2
m2
m2
25
15
40
no
no
no
no
4
2
m2
m2
3
70
m2
m2
10
5
m2
m2
10
90
Unit Price
USD
Total Price
USD
15.71 392.75
7.41 2,223.00
128.39
128.39
320,975.00
51,356.00
130.16
130.16
5,857.20
6,508.00
135.63
135.63
135.63
135.63
135.63
135.63
135.63
135.63
149,193.00
143,767.80
203,445.00
88,159.50
2,034.45
198,019.80
5,425.20
27,126.00
173.13
34,626.00
119.09
17,863.50
4.2
4.65
4.65
4.85
48.2
4,200.00
1,395.00
3,720.00
970
2,892.00
30.95 1,238.00
30.95 619
30.95 1,547.50
10.64 212.8
4,786.21
18,408.50
1,110.51
4,418.04
1,472.68
2,209.02
736.34
146.58
4,786.21
18,408.50
1,110.51
4,418.04
1,472.68
2,209.02
736.34
73.3 1,832.50
73.3 1,099.50
5,863.20
3,049.00
3,049.00
3,415.00
3,415.00
427.5
464
1,710.00
928
1,044.67
3,134.01
42.76 2,993.20
24.43 244.3
24.43 122.15
24.43 244.3
24.43 2,198.70
Item
3.1.08.0
3.1.08.01
3.1.08.02
3.1.08.03
3.1.08.0
3.1.08.01
3.1.08.02
3.1.08.03
3.1.09.0
3.1.09.01
3.1.09.02
3.1.09.03
3.1.09.04
3.1.09.05
3.1.09.06
MISCELLANEOUS WORKS
Light duty hatch cover
Light duty duct cover
Heavy duty duct cover
External railings, fixed or removable
a)Type A
b)Type B
Steel ladders
Fencing, excavation and casting of individual foundation included
3.1.09.07
3.1.09.07
3.1.09.08
3.1.09.09
3.1.09.08
3.1.09.09
3.1.09.10
3.1.09.10
3.1.09.11
3.1.09.12
3.1.09.11
3.1.09.12
3.1.10.0
3.1.10.01
3.1.10.0
3.1.10.01
3.1.11.0
3.1.11.0
3.1.11.01
Water supply, plumbing and sanitary installation and sewerage in the intake gate house. Design, supply and installation.
3.1.11.01
3.1.12.0
3.1.12.01
3.1.12.0
3.1.12.01
Sum
Sum
3.1.08.04
3.1.09.0
3.1.09.01
3.1.09.02
3.1.09.03
3.1.09.04
3.1.09.13
3.1.09.14
3.1.09.15
3.1.08.04
3.1.09.05
3.1.09.06
3.1.09.13
3.1.09.14
3.1.09.15
Unit
Quantity
m2
m2
35
g) Losa de concreto con cargas moderadas. Tipo de epoxy, propuesto por licitador: - Concrete floors with
moderate loads. Epoxy, Type proposed by tenderer:
m2
25
h) Losa de concreto con cargas pesadas, incluyendo salas de bateras. Auto epoxi nivelacin. Escriba
propuesto por licitador: - Concrete floors with heavy loads, including battery rooms. Self levelling epoxy.
Type proposed by tenderer:
ANALISIS E INSTRUMENTACIN - INVESTIGATION AND INSTRUMENTATION
Piezmetro elctrico. dispositivo de medicin - Electric piezometer. Measuring device
Piezmetro elctrico, tuberas - Electric piezometer, piping
Miras monumentadas en superficies - Surface settlement monuments
a)Fundacin en roca - Foundation on rock
b) Fundacin en suelo - Foundation on soil
Puntos de control de asentamiento - Surface settlement fixed point
a) Fundacin en roca - Foundation on rock
b) Fundacin en tierra - Foundation on soil
TRABAJOS VARIOS - MISCELLANEOUS WORKS
Tapa de escotilla, liviana - Light duty hatch cover
Tapa de ductos, liviana - Light duty duct cover
tapa de ductos de alta resistencia - Heavy duty duct cover
Barandas exteriores, fijas o desmontables - External railings, fixed or removable
a)Tipo A
b)Tipo B
Escaleras de acero - Steel ladders
Cerca, y la excavacin, hormigonado de fundaciones individuales incluidos - Fencing, excavation and casting
of individual foundation included
m2
120
10.00
no
m
3
60
no
no
2
3
no
no
2
4
kg
kg
kg
100
300
2,000.00
kg
kg
kg
m
500
1,000.00
150
20
no
no
m2
m3
m3
60
m2
70
m
no
no
1
1
300
70
300
5
50
m2
LS
LS
LS
Unit Price
USD
Total Price
USD
24.43 2,931.60
24.43 855.05
24.43 610.75
24.43
244.30
975.67
2,927.01
9.75 585
911.3
842.95
1,822.60
2,528.85
915.86
847.51
1,831.72
3,390.04
7.01 701
7.01 2,103.00
6.34 12,680.00
7.01
7.01
7.01
85.5
4,275.00
1,832.00
3,505.00
7,010.00
1,051.50
1,710.00
4,275.00
1,832.00
0.88 264
29.25 2,047.50
29.25 1,755.00
4.37 305.9
101.2
230.3
21.34 6,402.00
506
11,515.00
8.5
25.5
2,112.01
2,112.01
14,017.73
14,017.73
2,112.01
2,112.01
3,333,609.63
Item
Portals shall be regarded and measured as support work behind the face
3.2.01.0
EARTHWORKS
Above ground works at upstream portal, included in bill 3.1
3.2.01.0
3.2.01.01
3.2.01.02
Topsoil excavation.
Soil excavation.
3.2.01.01
3.2.01.02
3.2.02.0
3.2.02.01
3.2.02.02
ROCK EXCAVATION.
Above ground. Bulk rock excavation (width > 2 m).
Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).
3.2.02.0
3.2.02.01
3.2.02.02
3.2.02.03
3.2.02.03
3.2.02.04
Underground. Excavation of Diversion Tunnel. Minimum cross section, 15.9 m2 (3.80 m x 4.60 m).
3.2.02.04
3.2.02.05
3.2.02.05
3.2.02.06
3.2.02.06
3.2.02.07
3.2.02.07
3.2.02.08
3.2.02.08
3.2.02.09
Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).
3.2.02.09
3.2.02.10
3.2.02.10
3.2.02.11
3.2.02.11
3.2.02.12
3.2.02.12
3.2.02.13
3.2.02.13
3.2.02.14
3.2.02.14
3.2.03.00
3.2.03.01
3.2.03.00
3.2.03.01
3.2.03.02
3.2.03.02
3.2.03.03
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face
3.2.03.03
3.2.03.04
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face
3.2.03.04
3.2.03.05
3.2.03.06
3.2.03.07
3.2.03.08
3.2.03.09
3.2.03.10
3.2.03.11
3.2.03.12
3.2.03.13
3.2.03.14
3.2.03.15
3.2.03.16
3.2.03.17
3.2.03.18
3.2.03.05
3.2.03.06
3.2.03.07
3.2.03.08
3.2.03.09
3.2.03.10
3.2.03.11
3.2.03.12
3.2.03.13
3.2.03.14
3.2.03.15
3.2.03.16
3.2.03.17
3.2.03.18
Unit
Quantity
Trabajos de apoyo se valoran como parte del Portal de tunel - Portals shall be regarded and measured as
support work behind the face
MOVIMIENTO DE TIERRAS - EARTHWORKS
Trabajos de excavacin masiva aguas arriva del portal incluye factura 3.1 - Above ground works at upstream
portal, included in bill 3.1
Excavacin tierra vegetal - Topsoil excavation
Excavacin de suelo - Soil excavation
EXCAVACIN EN ROCA - ROCK EXCAVATION.
Excavacin masiva en suelo rocoso ( ancho > 2m) - Above ground. Bulk rock excavation (width > 2 m).
Perforacin de taladros y disparos en suelo rocoso (0.7 m profundida requerida).
m3
m3
Subterrneo. La excavacin del tnel de desvo. Seccin mnima, 15,9 m2 (3,80 mx 4,60 m).
m3
900
800.00
m3
100
Excavacin masiva en suelo rocoso. Sobreexcavacin normal. - Excavacin en suelo rocoso. Abnormal
overbreak.
10
500
2,530.00
Subterrneo. La excavacin del tnel de desvo. Adicin de una mayor seccin transversal.
m3
300
m3
500
m
m
114
76
50.00
300
month
4.00
month
2.00
month
0.50
month
0.50
Vertederos.
Perforacin exploratoria e inyeccin.
Perforacin a percusin, diametro mnimo 50 mm. Profundidad 0 - 30 m. Directa a roca (At the face)
Perforacin a percusin, diametro mnimo 50 mm. Depth 0 - 30 m. Uso de tapon de hormigon (Behind the
face)
no
20,000.00
2,000.00
Pruebas de presin de agua. Segn resistencia de packer. Pruebas con un packer. profundidad 0-5 m. directa no
a roca
150.00
Pruebas de presin de agua. Segn resistencia de packer. Pruebas con un packer. profundidad 0-5 m. Uso de no
tapon de hormigon.
20.00
no
no
no
no
kg
kg
kg
kg
kg
m
kg
kg
hr
hr
150
10
500
80
350,000.00
140,000.00
50,000.00
100
1,000.00
120
400
400
600
60
Unit Price
USD
Total Price
USD
3.34
5.68 2,840.00
21.76
29.66 26,694.00
17,408.00
14.2 1,420.00
1,424.29
3,603,453.70
31.71 9,513.00
15.76 7,880.00
587.18
2,046.38
855.66
66,938.52
155,524.88
42,783.00
15.23 4,569.00
9,942.33
39,769.32
12,052.57
24,105.14
14,162.81
7,081.41
16,273.05
8,136.53
2,385.50
4,771.00
15.58
311,600.00
13.55
27,100.00
73.32
10,998.00
60.68
1,213.60
143.86
140.23
605
520
30.3 4,545.00
26.25 262.5
71,930.00
11,218.40
1.01 353,500.00
2.59 362,600.00
7.19 359,500.00
23.71 2,371.00
1.9 1,900.00
31.11 3,733.20
22.57 9,028.00
26.23 10,492.00
363,000.00
31,200.00
33.4
Item
3.2.04.0
3.2.04.01
3.2.04.0
3.2.04.01
3.2.04.02
Temporary installation for rock fall protection at Huaura portal. Contractors design
3.2.04.02
3.2.04.03
3.2.04.03
3.2.04.04
3.2.04.04
3.2.04.05
3.2.04.05
3.2.04.06
3.2.04.07
3.2.04.06
3.2.04.07
3.2.04.08
3.2.04.08
3.2.04.09
3.2.04.09
3.2.04.10
3.2.04.10
3.2.04.11
3.2.04.11
3.2.04.12
3.2.04.12
3.2.04.13
3.2.04.13
3.2.04.14
3.2.04.14
3.2.04.15
3.2.04.15
3.2.04.16
3.2.04.16
3.2.04.17
3.2.04.17
3.2.04.18
3.2.04.18
3.2.04.19
3.2.04.19
3.2.04.20
3.2.04.20
3.2.04.21
3.2.04.21
3.2.04.22
3.2.04.22
3.2.04.23
3.2.04.23
3.2.04.24
3.2.04.24
3.2.04.25
3.2.04.25
3.2.04.26
3.2.04.26
3.2.04.27
3.2.04.27
3.2.04.28
3.2.04.28
3.2.04.29
3.2.04.29
3.2.04.30
3.2.04.30
Unit
Quantity
Prov. Sum
1.00
Temporary installation for rock fall protection at Huaura portal. Contractors design
Prov. Sum
1.00
hr
200
hr
300
m2
500
m2
no
500
1,000.00
no
2,000.00
no
1,300.00
no
100.00
no
130.00
no
100.00
no
100.00
no
1,000.00
no
1,000.00
no
2,000.00
no
100.00
no
1,800.00
no
1,400.00
no
50.00
m2
50
m2
200
m2
400
m2
100
100
200
m3
300
m3
100
m3
3,800.00
m3
1,200.00
Unit Price
USD
Total Price
USD
25,000.00
25,000.00
25,000.00
25,000.00
87.62 17,524.00
69.96 20,988.00
24.34 12,170.00
53.27
9.06 4,530.00
53,270.00
54.35
108,700.00
65.04
84,552.00
47.72
4,772.00
52.95
6,883.50
61.32
6,132.00
49.06
4,906.00
50.65
50,650.00
61.20
61,200.00
93.00
186,000.00
43.62
4,362.00
47.74
85,932.00
54.26
75,964.00
106.50
5,325.00
14.48 724
13.1 2,620.00
10.45 4,180.00
9.51 951
42.01 4,201.00
37.89 7,578.00
300.41
90,123.00
260.72
26,072.00
363.79
1,382,402.00
315.64
378,768.00
Item
3.2.04.31
3.2.04.32
3.2.04.31
3.2.04.32
3.2.04.33
3.2.04.33
3.2.04.34
3.2.04.35
3.2.04.34
3.2.04.35
3.2.04.36
3.2.04.36
3.2.04.37
3.2.04.37
3.2.04.38
3.2.04.38
3.2.04.39
3.2.04.40
3.2.04.39
3.2.04.40
3.2.04.41
3.2.04.41
3.2.04.42
3.2.04.43
3.2.04.42
3.2.04.43
3.2.05.0
3.2.05.01
3.2.05.02
3.2.05.03
3.2.05.0
3.2.05.01
3.2.05.02
3.2.05.03
3.2.05.04
3.2.05.04
3.2.05.05
3.2.05.06
3.2.05.05
3.2.05.06
3.2.05.07
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
3.2.05.07
3.2.05.08
3.2.05.09
3.2.05.10
Lugeon tests
Convergence station. Max. 3 pins.
Multipoint borehole extensometer.
3.2.05.08
3.2.05.09
3.2.05.10
3.2.06.0
3.2.06.01
3.2.06.02
3.2.06.03
3.2.06.04
3.2.06.05
3.2.06.06
CONCRETE WORKS.
Formwork Class B. Plain.
Formwork Class B. Curved.
Finishing of concrete surfaces, Class UA
Concrete Class C.
Reinforcement. Deformed bars.
Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reiforcement mesh min 6.5 kg/m2
3.2.06.0
3.2.06.01
3.2.06.02
3.2.06.03
3.2.06.04
3.2.06.05
3.2.06.06
Sum
Sum
Unit
Quantity
kg
m
27,000.00
1,100.00
700
kg
m
7,500.00
200
100
m3
320
m3
m2
m3
500
200
m3
200
kg
kg
20,000.00
25,000.00
hr
no
m
60
2
90
80
kg
30
no
500
4.00
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
no
4.00
Lugeon tests
Convergence station. Max. 3 pins.
Multipoint borehole extensometer.
no
no
no
m2
m2
m2
m3
t
8
2
2
400
300
60
80
6
2,500.00
Unit Price
USD
Total Price
USD
1.8 48,600.00
18.87 20,757.00
13.7 9,590.00
3.2 24,000.00
71.17 14,234.00
59.43 5,943.00
190.04
60,812.80
190.04
5,701.20
136.53
100.41
68,265.00
20,082.00
99.56 19,912.00
2.31 46,200.00
2.4 60,000.00
605
1,108.00
125.06
36,300.00
2,216.00
11,255.40
171.84
13,747.20
115.56
1.01 505
462.24
135.56
542.24
1,440.00
3,269.62
7,612.00
11,520.00
6,539.24
15,224.00
142.91
1,459.67
138.00
67.26 26,904.00
96.29 28,887.00
4.2 252
11,432.80
8,758.02
345,000.00
9,624,234.24
Item
4.1.01.07
4.1.01.08
4.1.01.09
4.1.01.10
EARTHWORKS
Remove usable timber
Clearing and grubbing
Topsoil excavation
Soil excavation
a) Excavation to spoil deposit
b) Excavation to stockpile (gravel & sandy gravel)
c) Excavation for footings/structures
Preparation of rock foundation for concreting
Fill and backfill
a) Embankment fill
i) Gravel
ii) Rock
b) Structural backfill
c) High quality rockfill
d) Backfill of trenches
e) Low permeability fill
f) Filter material, 0 - 60 mm
g) Drainage material, 50 - 100 mm
Placing of topsoil
Turfing (optional)
Not Used.
Additional borings
4.1.02.0
4.1.02.01
4.1.02.02
4.1.02.03
4.1.02.02
4.1.02.03
4.1.02.04
Steel support beam, tentative type: 2 no UNP 300, weight 100 kg/m Adjustment rate for other type: 3.50 USD/kg
4.1.02.04
4.1.02.05
Self drilling soil anchor (type Ischebeck Titan 52/ 20 or similar), fully grouted
4.1.02.05
4.1.02.06
a) Number of Anchors
b) Total length of Anchors
Load testing, prestressing, fixing of steel beam and other works not covered by previous bills
4.1.02.06
4.1.03.0
4.1.03.01
ROCK EXCAVATION
Excavation of the right abutment and foundation for the intake structure, left abutment, desander and intake
4.1.03.0
4.1.03.01
4.1.03.02
4.1.03.03
a) Bulk excavation
b) Trench/ditch excavation
Contour boreholes
Above ground. Rock excavation. Abnormal overbreak.
4.1.03.02
4.1.03.03
4.1.01.05
4.1.01.06
4.1.04.0
4.1.01.0
4.1.01.01
4.1.01.02
4.1.01.03
4.1.01.04
4.1.01.05
4.1.01.06
4.1.01.07
4.1.01.08
4.1.01.09
4.1.01.10
4.1.04.01
4.1.04.02
4.1.04.03
4.1.04.04
4.1.04.05
4.1.04.06
4.1.04.07
4.1.04.04
4.1.04.05
4.1.04.06
4.1.04.07
4.1.04.09
4.1.04.08
4.1.04.09
4.1.04.0
4.1.04.01
4.1.04.08
e) Length 8.0 m
f) Length 10.0 m
Unit
Quantity
no
ha
m3
20
5
250
m3
m3
m3
m2
200,000.00
8,000.00
4,000.00
1,000.00
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
5,000.00
18,000.00
4,500.00
18,000.00
700
500
500
700
700
350
no
m
no
Steel support beam, tentative type: 2 no UNP 300, weight 100 kg/m Adjustment rate for other type: 3.50 USD/kg
550
20
80
Self drilling soil anchor (type Ischebeck Titan 52/ 20 or similar), fully grouted
a) Number of Anchors
b) Total length of Anchors
Load testing, prestressing, fixing of steel beam and other works not covered by previous bills
no
m
LS
200
20
m3
m3
m
m3
15,000.00
400
900
800
GROUND TESTING AND GROUTING, ROCK SUPPORT: PRUEBAS DE SUELO, CEMENTACIN Y SOPORTE EN ROCA
Rock support at tunnel portal Headrace Tunnel, included in bill 5.3
Percussion drilling, diameter minimum 50 mm, depths up to 30 m in rock/concrete
m
600
m
no
no
100
kg
kg
kg
kg
kg
l
l
9,000.00
6,000.00
4,000.00
4,000.00
3,000.00
500
200
no
no
no
no
130
30
130
80
60
40
e) Length 8.0 m
f) Length 10.0 m
no
no
20
20
Unit Price
USD
105.23
9,990.00
Total Price
USD
2,104.60
49,950.00
3.34 835
3.38
3.38
3.38
3.59
676,000.00
27,040.00
13,520.00
3,590.00
22.43
17.21
15.92
23.68
14.89
16.76
25.96
26.49
0.32
0.32
112,150.00
309,780.00
71,640.00
426,240.00
10,423.00
8,380.00
12,980.00
18,543.00
224
112
8,653.00
34,612.00
689.07
771,758.40
161.85
54.35 29,892.50
3,237.00
716.48
57,318.40
131.27
2,625.40
3.1 620
12,214.00
12,214.00
18.92
20.37
17.98
14.2
283,800.00
8,148.00
16,182.00
11,360.00
15.58 9,348.00
63.40
63.4 22,190.00
50,720.00
119.42
129.12
63.4 6,340.00
3,582.60
16,785.60
0.88
1.05
1.27
1.63
2.61
2.5
23.71
102.26
7,920.00
6,300.00
5,080.00
6,520.00
7,830.00
1,250.00
4,742.00
56.9 7,397.00
68.24 5,459.20
79.57 4,774.20
4,090.40
129.48
161.85
2,589.60
3,237.00
Item
4.1.05.0
4.1.05.01
4.1.05.0
4.1.05.01
4.1.05.02
Rip-rap
a) Stone size 150 - 300 mm
b) Stone size 300 - 600 mm
c) Selected blocks > 600 mm
d) Grouted Rip rap
Filter fabric
a) Minimum 180 g/m2
b) Minimum 250 g/m2
c) Minimum 300 g/m2
Drilling of weep holes, vertical or sloping holes. Diameter min. 51 mm
4.1.05.02
4.1.05.05
4.1.05.06
CONCRETE WORKS
Grouted rock bolts. D = 25 mm
Length in concrete 1.5 m
4.1.06.0
4.1.06.01
4.1.05.03
4.1.05.04
4.1.05.05
4.1.05.06
4.1.05.07
4.1.06.0
4.1.06.01
4.1.06.02
4.1.06.03
4.1.06.04
4.1.06.05
4.1.06.06
4.1.06.07
4.1.06.08
4.1.06.09
4.1.06.10
4.1.05.03
4.1.05.04
4.1.05.07
4.1.06.02
4.1.06.03
4.1.06.04
4.1.06.05
4.1.06.06
4.1.06.07
4.1.06.08
4.1.06.09
4.1.06.10
4.1.06.11
a) 150 mm wide
b) 225 mm wide
c) 300 mm wide
d) 500 mm wide
Grouting of joints and interphases
a) Supply and installation of tubes
4.1.06.11
Unit
Quantity
m3
1,700.00
m3
m3
m3
m3
1,800.00
2,100.00
2,100.00
200
m2
m2
m2
m
3,400.00
700
500
300
m3
200
m
m
m2
300
100
400
no
no
no
150
150
no
no
no
no
100
150
m2
m2
m2
m2
m2
m2
m2
m2
800
2,300.00
3,000.00
1,000.00
2,000.00
600
250
400
m2
m2
m2
m2
m2
100
680
300
m2
m2
m2
m2
m2
m2
m2
m2
900
2,700.00
700
900
7,500.00
1,300.00
280
470
m2
m2
m2
m2
m2
m2
m2
m2
m2
110
440
4,000.00
2,900.00
1,360.00
4,460.00
1,500.00
730
530
Rip-rap
a) Stone size 150 - 300 mm
b) Stone size 300 - 600 mm
c) Selected blocks > 600 mm
d) Grouted Rip rap
Filter fabric
a) Minimum 180 g/m2
b) Minimum 250 g/m2
c) Minimum 300 g/m2
Drilling of weep holes, vertical or sloping holes. Diameter min. 51 mm
Excavation of permanent ditches and catchwater drains
Reinforced concrete drain pipes including bends and tees. Internal diameter:
a) 150 mm
b) 200 mm
Prefabricated plastic mesh for slope protection.
CONCRETE WORKS OBRAS DE CONCRETO
Grouted rock bolts. D = 25 mm
Length in concrete 1.5 m
m
m
no
no
m2
m
30
20
20
50
10
500
50
15
30
20
200
a) 150 mm wide
b) 225 mm wide
c) 300 mm wide
d) 500 mm wide
Grouting of joints and interphases
a) Supply and installation of tubes
m
m
m
m
200
2,100.00
100
100
500
Unit Price
USD
Total Price
USD
18.08 30,736.00
129.62
20.01 36,018.00
20.04 42,084.00
20.43 42,903.00
25,924.00
6.41
6.66
7.01
15.58
21,794.00
4,662.00
3,505.00
4,674.00
3.41 682
24.32 7,296.00
33.28 3,328.00
14.49 5,796.00
66.07 9,910.50
77.22 11,583.00
88.36 2,650.80
102.26
129.48
68.24 6,824.00
79.57 11,935.50
2,045.20
2,589.60
53.95
53.95
53.95
53.95
53.95
53.95
53.95
53.95
43,160.00
124,085.00
161,850.00
53,950.00
107,900.00
32,370.00
13,487.50
21,580.00
73.51
73.51
73.51
73.51
73.51
7,351.00
49,986.80
22,053.00
3,675.50
735.1
53.99
53.99
53.99
53.99
53.99
53.99
53.99
53.99
48,591.00
145,773.00
37,793.00
48,591.00
404,925.00
70,187.00
15,117.20
25,375.30
51.55
51.55
51.55
51.55
51.55
51.55
51.55
51.55
51.55
5,670.50
22,682.00
206,200.00
149,495.00
70,108.00
229,913.00
77,325.00
37,631.50
27,321.50
33.5 16,750.00
34.25 1,712.50
26.7
26.7
53.95
22.63
400.5
801
1,079.00
4,526.00
15.27
24.93
30.31
47.44
3,054.00
52,353.00
3,031.00
4,744.00
3.67 1,835.00
4.1.06.12
4.1.06.13
4.1.06.14
4.1.06.15
4.1.06.16
4.1.06.17
b) Cement grouting
c) Chemical grouting
Type proposed by tenderer:
Bituminous coating on concrete surface
Joint sealing compound.
Steel details in bridge expansion joints (dam piers). Hot dip galvanized.
Preparation of contraction joints.
Reinforcement. All dimensions
a) Deformed bars, 420 N/mm2
b) Plain bars
c) Welded mesh reinforcement
Deformed steel bars of weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc.
Length approx .2.0 m Partly embedded
4.1.06.20
4.1.06.21
a) D = 20 mm
b) D = 25 mm
c) D = 32 mm
a) Stainless steel bars. D = 32 mm
b) Stainless steel bars. D = 25 mm
Embedded PVC-pipes including bends and fixtures
a) D = 50 mm
b) D = 75 mm
c) D = 100 mm
d) D = 150 mm
e) D = 200 mm
Embedded cast-iron floor gullies with hot dip galvanized steel cover
Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete
4.1.06.22
4.1.06.23
4.1.06.24
4.1.06.18
4.1.06.19
4.1.06.25
4.1.06.26
4.1.06.27
4.1.06.28
4.1.06.29
4.1.06.30
4.1.06.31
Item
4.1.06.12
4.1.06.13
4.1.06.14
4.1.06.15
4.1.06.16
4.1.06.17
4.1.06.18
4.1.06.19
4.1.06.20
4.1.06.21
4.1.06.22
4.1.06.23
4.1.06.24
4.1.06.25
4.1.06.26
4.1.06.27
4.1.06.28
4.1.06.29
4.1.06.30
4.1.06.31
4.1.06.32
4.1.06.33
Concrete Class F
Finishing of unformed surfaces
a) Class UA
b) Class UB, curved surfaces
c) Class UB, plane surfaces
d) Class UC
Blockout for and grouting of fence posts in concrete slabs
Grouting around hydraulic steelworks with expanding mortar. Incl. plant positioning
4.1.06.34
Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant positioning.
4.1.06.34
4.1.06.35
Grouting of construction joints with cement based grout. Incl. plant positioning
4.1.06.35
4.1.06.36
4.1.06.36
4.1.06.32
4.1.06.33
Unit
b) Cement grouting
c) Chemical grouting
Type proposed by tenderer:
Bituminous coating on concrete surface
Joint sealing compound.
Steel details in bridge expansion joints (dam piers). Hot dip galvanized.
Preparation of contraction joints.
Reinforcement. All dimensions
a) Deformed bars, 420 N/mm2
b) Plain bars
c) Welded mesh reinforcement
Deformed steel bars of weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc.
Length approx .2.0 m Partly embedded
Quantity
kg
l
500
200
m2
kg
kg
m2
300
400
550
1,200.00
t
t
t
2,900.00
2
5
a) D = 20 mm
b) D = 25 mm
c) D = 32 mm
a) Stainless steel bars. D = 32 mm
b) Stainless steel bars. D = 25 mm
Embedded PVC-pipes including bends and fixtures
a) D = 50 mm
b) D = 75 mm
c) D = 100 mm
d) D = 150 mm
e) D = 200 mm
Embedded cast-iron floor gullies with hot dip galvanized steel cover
Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete
no
no
no
no
no
no
kg
no
500
m3
m3
m3
15,000.00
2,000.00
1,000.00
m3
m3
350
m
m
m
m
m
no
kg
50
300
200
30
40
50
50
100
50
50
4
300
50
16
90
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
315
1,050.00
11,700.00
5,900.00
4,800.00
9,120.00
2,370.00
m3
110
m3
780
m3
400
m2
m2
m2
m2
no
l
5,000.00
600
4,000.00
500
140
100
30
250
4,100.00
240
1,000.00
Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant positioning.
Grouting of construction joints with cement based grout. Incl. plant positioning
200
m2
100
50
Unit Price
USD
Total Price
USD
1.01 505
2.5 500
6.2
18.25
10.52
6.07
1,459.67
1,459.67
2,812.50
1,860.00
7,300.00
5,786.00
7,284.00
4,233,043.00
2,919.34
14,062.50
8.05
11.14
17.63
27.28
17.95
402.5
3,342.00
3,526.00
818.4
718
5.45
7.15
8.92
16.9
25.92
123.23
856.23
272.5
357.5
892
845
1,296.00
492.92
7.41 2,223.00
15.71 785.5
7.41 3,705.00
13,699.68
117.83
117.83
117.83
1,767,450.00
235,660.00
117,830.00
124.99
124.99
11,249.10
43,746.50
127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78
127.78
40,250.70
134,169.00
1,495,026.00
753,902.00
613,344.00
1,165,353.60
302,838.60
3,833.40
31,945.00
523,898.00
30,667.20
127,780.00
160.77
17,684.70
163.15
127,257.00
133.53
53,412.00
4.2
4.65
4.65
4.85
48.2
30.95
21,000.00
2,790.00
18,600.00
2,425.00
6,748.00
3,095.00
30.95 1,547.50
30.95 6,190.00
10.64 1,064.00
4.1.07.0
Item
4.1.07.0
4.1.07.01
4.1.07.02
4.1.07.03
4.1.07.04
4.1.07.05
4.1.07.06
4.1.07.07
4.1.07.08
4.1.07.09
4.1.07.10
4.1.07.11
4.1.07.12
4.1.07.13
4.1.07.14
4.1.07.15
4.1.07.01
4.1.07.02
4.1.07.03
4.1.07.04
4.1.07.05
4.1.07.06
4.1.07.07
4.1.07.08
4.1.07.09
4.1.07.10
4.1.07.11
4.1.07.12
4.1.07.13
4.1.07.14
4.1.07.15
4.1.08.0
4.1.08.01
BUILDER'S WORKS
Blockwork Walling
a) 150 mm
b) 100 mm
Roofing membrane
Doors
a) Insulated single steel doors. Fire rating A60. External dimensions 1000x2100mm
4.1.08.0
4.1.08.01
4.1.08.02
4.1.08.03
4.1.08.02
4.1.08.03
b) Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm
c) Insulated double steel doors. Fire rating A60. External dimensions 2200x2200mm
4.1.08.04
4.1.08.05
4.1.08.06
4.1.08.04
4.1.08.05
4.1.08.06
4.1.09.04
4.1.10.0
4.1.10.01
4.1.09.0
4.1.09.01
4.1.09.02
4.1.09.03
MISCELLANEOUS WORKS
Light duty hatch cover
4.1.10.0
4.1.10.01
4.1.09.04
4.1.10.02
Heavy duty hatch cover incl. fittings with concrete, Class C and surface finishing
4.1.10.02
4.1.10.03
4.1.10.04
4.1.10.05
4.1.10.03
4.1.10.04
4.1.10.05
Unit
Quantity
INTERFACE WITH H, EMBEDMENT OF HYDRAULIC STEELWORKS SISTEMA DE COMUNICACIN CON H, INTEGRACION DE ESTRUCCTURAS HIDRAULICAS DE ACERO.
Reference H-tender documents, Part D, Section 2
This item shall include all works related to forming of recesses, blockouts and the like to divide between
first and second step concreting, provision and removal of shuttering for items to be embedded, extra over
for embedment and second stage
concreting and the like, for hydraulic steelworks as listed below. The concrete volumes and concrete
reinforcement are catered for under Concrete Works.
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
m2
m2
m2
90
30
no
b) Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm
no
c) Insulated double steel doors. Fire rating A60. External dimensions 2200x2200mm
no
no
no
no
6
5
m2
m2
m2
m2
m2
30
30
15
m2
m2
m2
m2
m2
200
340
m2
150
g) Concrete floors with moderate loads. Epoxy,Type Sherwin Williams poly-cote 4685
m2
100
h) Concrete floors with heavy loads, including battery rooms. Self levelling epoxy,Type
Sherwin Williams poly-cote 4685
m2
no
m
155
200
40
10
40
40
10
250
no
no
4
6
no
no
3
4
kg
100
Heavy duty hatch cover incl. fittings with concrete, Class C and surface finishing
kg
500
kg
kg
kg
150
400
15,000.00
Unit Price
USD
Total Price
USD
3,681.70
2,577.19
13,990.46
12,149.61
1,104.51
6,258.89
736.34
12,149.61
1,840.85
6,258.89
13,622.29
8,099.74
5,890.72
1,472.68
20,617.52
146.58
3,681.70
2,577.19
13,990.46
12,149.61
1,104.51
6,258.89
736.34
12,149.61
1,840.85
6,258.89
13,622.29
8,099.74
5,890.72
1,472.68
20,617.52
73.3 6,597.00
73.3 2,199.00
22,719.90
3,049.00
9,147.00
3,415.00
3,415.00
5,542.00
5,542.00
1,044.67
3,134.01
427.5
464
2,565.00
2,320.00
1,044.67
5,223.35
28.43
28.43
70.98
42.76
852.9
852.9
1,064.70
8,552.00
24.43
24.43
24.43
24.43
24.43
977.2
244.3
977.2
4,886.00
8,306.20
24.43 3,664.50
24.43 2,443.00
24.43 977.2
975.67
9,756.70
9.75 2,437.50
911.3
842.95
3,645.20
5,057.70
915.86
847.51
2,747.58
3,390.04
7.01 701
6.34 3,170.00
6.34 951
7.01 2,804.00
6.34 95,100.00
4.1.10.06
Item
4.1.10.06
4.1.10.10
4.1.10.11
4.1.10.12
4.1.10.12
4.1.10.13
4.1.10.14
4.1.10.13
4.1.10.14
4.1.11.0
4.1.11.1
4.1.11.0
4.1.11.1
4.1.12.0
4.1.12.1
4.1.12.0
4.1.12.1
4.1.13.0
4.1.13.01
4.1.13.0
4.1.13.01
Sum
Sum
4.1.10.07
4.1.10.08
4.1.10.09
4.1.10.15
4.1.10.07
4.1.10.08
4.1.10.09
4.1.10.10
4.1.10.11
4.1.10.15
Unit
Quantity
no
no
m2
m3
1,450.00
290
m3
220
m2
1,450.00
m
no
no
m2
600
kg
kg
kg
kg
m
LS
10,000.00
5,000.00
1,000.00
400
150
1
1
10
80
5
WATER SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE: SUMINISTRO DE AGUA, FONTANERIA E INSTALACION SANITARIA Y ALCANTARILLADO
Water supply, plumbing and sanitary installation and sewerage in the intake gate house. Design, supply and installation.
LS
1
LS
Unit Price
USD
Total Price
USD
7.01
7.01
7.01
7.01
85.5
4,275.00
1,832.00
70,100.00
35,050.00
7,010.00
2,804.00
12,825.00
4,275.00
1,832.00
0.88 1,276.00
29.25 8,482.50
29.25 6,435.00
4.37 6,336.50
101.2
230.3
5,841.00
21.34 12,804.00
1,012.00
18,424.00
8.5
5,841.00
5,841.00
5,841.00
18,301,121.12
42.5
Item
Rock support at portal shall be regarded and measured as support work behind the face
5.1.01.0
5.1.01.01
5.1.01.0
5.1.01.01
5.1.02.0
5.1.02.01
5.1.02.02
5.1.02.0
5.1.02.01
5.1.02.02
5.1.02.04
EARTH WORKS.
Topsoil excavation.
Soil excavation
a) Excavation to spoil deposit
b) Excavation to stockpile (gravel & sandy gravel)
c) Excavation for footings/structures
Fill and backfill
a) Embankment fill
b) Structural backfill
c) High quality rockfill
d) Backfill of trenches
Preparation of rock foundation for concreting
5.1.03.00
5.1.03.01
5.1.03.02
ROCK EXCAVATION.
Above ground. Bulk rock excavation (width > 2 m).
Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).
5.1.03.00
5.1.03.01
5.1.03.02
5.1.03.03
5.1.03.03
5.1.03.04
Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m)
5.1.03.04
5.1.03.05
5.1.03.05
5.1.03.06
5.1.03.06
5.1.03.07
5.1.03.07
5.1.02.03
5.1.03.08
5.1.02.03
5.1.02.04
5.1.03.08
5.1.03.09
5.1.03.09
5.1.04.0
5.1.04.01
5.1.04.0
5.1.04.01
5.1.04.02
5.1.04.02
5.1.04.03
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face
5.1.04.03
5.1.04.04
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face
5.1.04.04
5.1.04.05
5.1.04.05
5.1.04.06
5.1.04.06
5.1.04.07
5.1.04.07
5.1.04.08
5.1.04.08
5.1.04.09
5.1.04.10
5.1.04.11
5.1.04.12
5.1.04.13
5.1.04.14
5.1.04.15
5.1.04.16
5.1.04.17
5.1.04.09
5.1.04.10
5.1.04.11
5.1.04.12
5.1.04.13
5.1.04.14
5.1.04.15
5.1.04.16
5.1.04.17
5.1.05.00
5.1.05.00
5.1.05.01
5.1.05.01
5.1.05.02
5.1.05.02
5.1.05.03
5.1.05.03
5.1.05.04
5.1.05.04
5.1.05.05
5.1.05.05
Unit
Quantity
Rock support at portal shall be regarded and measured as support work behind the face
m3
450
m3
50
m3
m3
m3
200
150
m3
m3
m3
m3
m2
800
150
m3
1,000.00
400.00
m3
100
893
m3
100
m3
200
40
50
200
50
m
m
m
60
25
20
no
1,250.00
1,000.00
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face
no
10
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face
no
40
no
10
no
20
no
20
no
60
kg
kg
kg
kg
m
kg
kg
hr
hr
22,000.00
18,000.00
5,000.00
2,000.00
250
1,000.00
1,500.00
45
50
Prov. Sum
hr
1
80
hr
80
m2
500
m2
500
Unit Price
USD
Total Price
USD
29.25 13,162.50
3.34 167
3.7 740
3.7 555
3.7 148
16.76
15.92
23.68
14.89
3.59
21.76
13,408.00
2,388.00
1,184.00
2,978.00
179.5
29.66 29,660.00
8,704.00
14.2 1,420.00
2,020.93
1,804,690.49
31.71 3,171.00
15.76 3,152.00
615.83
2,204.10
855.66
36,949.80
55,102.50
17,113.20
2,385.50
2,385.50
15.58 19,475.00
13.55 13,550.00
73.32 733.2
60.68 2,427.20
30.3 303
26.25 525
143.86
2,877.20
140.23
8,413.80
1.01
2.59
7.19
1.9
31.11
22.57
26.23
605
520
22,220.00
46,620.00
35,950.00
3,800.00
7,777.50
22,570.00
39,345.00
27,225.00
26,000.00
25,000.00
25,000.00
87.62 7,009.60
69.96 5,596.80
24.34 12,170.00
9.06 4,530.00
Item
5.1.05.06
5.1.05.06
5.1.05.07
5.1.05.07
5.1.05.08
5.1.05.08
5.1.05.09
5.1.05.09
5.1.05.10
5.1.05.10
5.1.05.11
5.1.05.11
5.1.05.12
5.1.05.12
5.1.05.13
5.1.05.13
5.1.05.14
5.1.05.14
5.1.05.15
5.1.05.15
5.1.05.16
5.1.05.16
5.1.05.17
5.1.05.17
5.1.05.18
5.1.05.18
5.1.05.19
5.1.05.19
5.1.05.20
5.1.05.20
5.1.05.21
5.1.05.21
5.1.05.22
5.1.05.22
5.1.05.23
5.1.05.23
5.1.05.24
5.1.05.24
5.1.05.25
5.1.05.25
5.1.05.26
5.1.05.26
5.1.05.27
5.1.05.27
5.1.05.28
5.1.05.28
5.1.05.29
5.1.05.29
5.1.05.30
5.1.05.31
5.1.05.30
5.1.05.31
5.1.05.32
5.1.05.32
5.1.05.33
5.1.05.34
5.1.05.33
5.1.05.34
5.1.05.35
5.1.05.35
5.1.05.36
5.1.05.36
5.1.05.37
5.1.05.37
5.1.05.38
5.1.05.39
5.1.05.38
5.1.05.39
Unit
Quantity
no
80.00
no
550.00
no
550.00
no
30.00
no
30.00
no
30.00
no
30.00
no
300.00
no
300.00
no
500.00
no
80.00
no
600.00
no
500.00
no
100.00
m2
100
m2
200
m2
80
m2
80
50
100
m3
80
m3
60
m3
850
m3
500
kg
m
3,400.00
140
kg
m
60
m3
35
90
2,300.00
90
m3
m2
m3
10
175
80
Unit Price
USD
Total Price
USD
53.27
4,261.60
54.35
29,892.50
65.04
35,772.00
47.72
1,431.60
52.95
1,588.50
61.32
1,839.60
49.06
1,471.80
50.65
15,195.00
61.20
18,360.00
93.00
46,500.00
43.62
3,489.60
47.74
28,644.00
54.26
27,130.00
106.50
10,650.00
14.48 1,448.00
13.1 2,620.00
10.45 836
9.51 760.8
42.01 2,100.50
37.89 3,789.00
300.41
24,032.80
260.72
15,643.20
363.79
309,221.50
315.64
157,820.00
1.8 6,120.00
18.87 2,641.80
13.7 1,233.00
3.2 7,360.00
71.17 6,405.30
59.43 3,565.80
190.04
6,651.40
190.04
1,900.40
136.53
100.41
23,892.75
8,032.80
Item
5.1.05.40
5.1.05.40
5.1.05.41
5.1.05.42
5.1.05.41
5.1.05.42
5.1.06.00
5.1.06.01
5.1.06.02
5.1.06.03
5.1.06.00
5.1.06.01
5.1.06.02
5.1.06.03
5.1.06.04
5.1.06.04
5.1.06.05
5.1.06.06
5.1.06.05
5.1.06.06
5.1.06.07
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
5.1.06.07
5.1.06.08
5.1.06.09
Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests
5.1.06.08
5.1.06.09
5.1.06.10
5.1.06.11
5.1.06.12
5.1.06.10
5.1.06.11
5.1.06.12
5.1.07.00
5.1.07.01
5.1.07.02
5.1.07.03
5.1.07.04
5.1.07.05
5.1.07.06
5.1.07.07
5.1.07.08
5.1.07.09
CONCRETE WORKS.
Not used
Formwork Class A, Plain
Formwork Class B. Plain.
Formwork Class B. Curved.
Finishing of unformed surfaces, Class UA.
Finishing of unformed surfaces, Class UB.
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh
5.1.07.00
5.1.07.01
5.1.07.02
5.1.07.03
5.1.07.04
5.1.07.05
5.1.07.06
5.1.07.07
5.1.07.08
5.1.07.09
5.1.08.00
5.1.08.01
5.1.08.00
5.1.08.01
5.1.08.02
5.1.08.03
5.1.08.04
5.1.08.02
5.1.08.03
5.1.08.04
5.1.09.00
5.1.09.01
5.1.09.02
METAL WORKS.
Bar-gate with steel frame and lock at tunnel entrance 4m x 4 m.
Steeldoor, 1m x 2m at entrance of tunnel
5.1.09.00
5.1.09.01
5.1.09.02
5.1.10.00
5.1.10.01
5.1.10.02
5.1.10.00
5.1.10.01
5.1.10.02
5.1.10.03
5.1.10.04
PVC pipes for grouting of voids between concrete and rock before contact grouting and for contact grouting. Placed through formwork.
5.1.10.04
Dimension in accordance with cont
5.1.10.05
5.1.10.06
5.1.10.07
5.1.10.03
5.1.10.05
5.1.10.06
5.1.10.07
Unit
Quantity
m3
30
kg
kg
2,000.00
5,500.00
hr
no
m
200
100
kg
2
180
no
800
6.00
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
no
6.00
Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests
no
no
12
2
no
no
no
6
2
2
m2
m2
m2
m2
m2
m3
t
t
50
200
50
15
35
350
9
0.5
830
m3
m3
m
120
kg
no
400
50
1,600.00
PARTICULAR WORKS FOR INSTALLATION OF ADIT GATE:OBRAS PARTICULARES PARA LA INSTALACIN DE PUERTA DE TUNEL O LA PUERTA DE ENTRADA.
Preparation of rock surface for concreting.
m2
200
Grouted rock bolts of weldable quality for fixing of gate, D = 25 mm.
a) Length 3 m, depth in rock 2.0 m
no
25
b) Length 2 m, depth in rock 1.0 m
no
30
PVC Waterstop in construction joints. Width 200 mm
m
20
PVC pipes for grouting of voids between concrete and rock before contact grouting and for contact grouting. Placed
no
through formwork.
25.00
Dimension in accordance with contractors grouting
m
m
10
20
1.00
Unit Price
USD
Total Price
USD
99.56 2,986.80
2.31 4,620.00
2.4 13,200.00
605
1,108.00
125.06
121,000.00
2,216.00
22,510.80
171.84
17,184.00
115.56
1.9 1,520.00
693.36
135.56
813.36
1,440.00
1,140.23
17,280.00
2,280.46
961.56
3,269.62
7,612.00
5,769.36
6,539.24
15,224.00
67.26
67.26
96.29
4.2
4.65
142.91
1,459.67
2,812.50
3,363.00
13,452.00
4,814.50
63
162.75
50,018.50
13,137.03
1,406.25
43.34 35,972.20
20.37 2,444.40
28.89 1,444.50
8.92 14,272.00
1,832.00
7.01 2,804.00
1,832.00
33,135.00
3,755.25
36.12 361.2
22.63 452.6
33,135.00
3,565,813.30
Item
Portal shall be regarded and measured as support work behind the face
5.2.01.00
5.2.01.01
5.2.01.02
ROCK EXCAVATION.
Above ground. Bulk rock excavation (width > 2 m).
Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).
5.2.01.00
5.2.01.01
5.2.01.02
5.2.01.03
5.2.01.03
5.2.01.04
Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m)
5.2.01.04
5.2.01.05
5.2.01.05
5.2.01.06
5.2.01.06
5.2.01.07
5.2.01.07
5.2.01.08
5.2.01.08
5.2.01.10
5.2.01.10
5.2.02.00
5.2.02.01
5.2.02.00
5.2.02.01
5.2.02.02
5.2.02.02
5.2.02.03
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face
5.2.02.03
5.2.02.04
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face
5.2.02.04
5.2.02.05
5.2.02.05
5.2.02.06
5.2.02.06
5.2.02.07
5.2.02.08
5.2.02.09
5.2.02.07
5.2.02.08
5.2.02.09
5.2.02.10
5.2.02.11
5.2.02.10
5.2.02.11
5.2.02.12
5.2.02.12
5.2.02.13
5.2.02.14
5.2.02.13
5.2.02.14
5.2.03.00
5.2.03.00
5.2.03.01
5.2.03.01
5.2.03.02
5.2.03.02
5.2.03.03
5.2.03.03
5.2.03.04
5.2.03.05
5.2.03.04
5.2.03.05
5.2.03.06
5.2.03.06
5.2.03.07
5.2.03.07
5.2.03.08
5.2.03.08
5.2.03.09
5.2.03.09
5.2.03.10
5.2.03.10
5.2.03.11
5.2.03.11
5.2.03.12
5.2.03.12
5.2.01.09
5.2.01.09
Unit
Quantity
Portal shall be regarded and measured as support work behind the face
ROCK EXCAVATION. EXCAVACION DE ROCA
Above ground. Bulk rock excavation (width > 2 m).
Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).
m3
m
1,500.00
500
m3
100
Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m)
702.00
m3
m3
70
210
m
m
m
50
20
15
no
1,000.00
100.00
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face
no
10.00
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face
no
no
10
no
no
kg
15
2
12,000.00
kg
kg
8,000.00
3,000.00
kg
200
hr
hr
30
8
hr
60
hr
60
m2
50
no
m2
100
70.00
no
450.00
no
500.00
no
25.00
no
30.00
no
25.00
no
25.00
no
250.00
Unit Price
USD
Total Price
USD
29.66 44,490.00
21.76 10,880.00
14.2 1,420.00
2,223.27
1,560,735.54
31.71 2,219.70
15.76 3,309.60
706.07
2,576.71
855.66
35,303.50
51,534.20
12,834.90
2,385.50
2,385.50
15.58 15,580.00
13.55
1,355.00
73.32
733.20
60.68
60.68
30.3 303
26.25
143.86
140.23
26.25
2,157.90
280.46
1.01 12,120.00
2.59 20,720.00
7.19 21,570.00
23.71 4,742.00
605
520
18,150.00
4,160.00
87.62 5,257.20
69.96 4,197.60
24.34 1,217.00
53.27
9.06 906
3,728.90
54.35
24,457.50
65.04
32,520.00
47.72
1,193.00
52.95
1,588.50
61.32
1,533.00
49.06
1,226.50
50.65
12,662.50
Item
5.2.03.13
5.2.03.13
5.2.03.14
5.2.03.14
5.2.03.15
5.2.03.15
5.2.03.16
5.2.03.16
5.2.03.17
5.2.03.17
5.2.03.18
5.2.03.18
5.2.03.19
5.2.03.19
5.2.03.20
5.2.03.20
5.2.03.21
5.2.03.21
5.2.03.22
5.2.03.22
5.2.03.23
5.2.03.23
5.2.03.24
5.2.03.24
5.2.03.25
5.2.03.25
5.2.03.26
5.2.03.26
5.2.03.27
5.2.03.27
5.2.03.28
5.2.03.28
5.2.03.29
5.2.03.29
5.2.03.30
5.2.03.30
5.2.03.31
5.2.03.31
5.2.03.32
5.2.03.32
5.2.03.33
5.2.03.33
5.2.03.34
5.2.03.34
5.2.03.35
5.2.03.35
5.2.03.36
5.2.03.36
5.2.03.37
Additional concrete.
Behind the face.
Formwork for concrete lining, Class C
5.2.03.38
5.2.03.38
5.2.03.39
5.2.03.39
5.2.03.40
5.2.03.40
5.2.03.41
5.2.03.41
5.2.04.00
5.2.04.01
5.2.04.00
5.2.04.01
5.2.04.02
5.2.04.02
5.2.04.03
5.2.04.03
5.2.04.04
5.2.04.04
5.2.03.37
5.2.04.05
5.2.04.06
5.2.04.05
5.2.04.06
Unit
Quantity
no
250.00
no
300.00
no
25.00
no
500.00
no
500.00
no
10.00
m2
m2
m2
50
200
50
m2
50.00
50.00
100.00
m3
60
m3
50.00
m3
700.00
m3
350.00
kg
2,800.00
110.00
kg
70
50
m3
30
Additional concrete.
Behind the face.
Formwork for concrete lining, Class C
m3
m3
m2
m3
80
1,800.00
150
60
30.00
kg
1,600.00
kg
4,000.00
hr
no
60
2
90.00
100
kg
no
500
20.00
Unit Price
USD
Total Price
USD
61.20
15,300.00
93.00
27,900.00
43.62
1,090.50
47.74
23,870.00
54.26
27,130.00
106.50
1,065.00
14.48 724
13.1 2,620.00
10.45 522.5
9.51
475.50
42.01
2,100.50
37.89
3,789.00
300.41
18,024.60
260.72
13,036.00
363.79
254,653.00
315.64
110,474.00
1.80
5,040.00
18.87
2,075.70
13.7 1,096.00
3.2 5,760.00
71.17 4,981.90
59.43 2,971.50
190.04
5,701.20
190.04
950.2
136.53
20,479.50
100.41
6,024.60
99.56
2,986.80
2.31 3,696.00
2.4 9,600.00
605
36,300.00
1,108.00
2,216.00
125.06
11,255.40
171.84
17,184.00
115.56
1.9 950
2,311.20
Item
5.2.04.07
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
5.2.04.07
5.2.04.08
5.2.04.09
5.2.04.10
Lugeon tests
Convergence station. Max. 3 pins.
Multipoint borehole extensometer.
5.2.04.08
5.2.04.09
5.2.04.10
5.2.05.00
5.2.05.01
5.2.05.02
5.2.05.03
5.2.05.04
5.2.05.05
5.2.05.06
5.2.05.07
5.2.05.08
CONCRETE WORKS.
Formwork Class B. Plain..
Formwork Class B. Curved.
Finishing of unformed surfaces, Class UC.
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh
Not used
Grouted rock bolts for concrete walls D = 25 mm, depth in rock 1.5 m depth in concrete
1m
5.2.05.00
5.2.05.01
5.2.05.02
5.2.05.03
5.2.05.04
5.2.05.05
5.2.05.06
5.2.05.07
5.2.05.08
5.2.05.09
Concrete pavement.Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2
5.2.05.09
5.2.06.00
5.2.06.01
5.2.06.02
METAL WORKS.
Steel ventilation grating
Steel door with lock, 1m x 2m at entrance of tunne
5.2.06.00
5.2.06.01
5.2.06.02
Sum
Sum
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
Lugeon tests
Convergence station. Max. 3 pins.
Multipoint borehole extensometer.
CONCRETE WORKS. OBRAS DE CONCRETO
Formwork Class B. Plain..
Formwork Class B. Curved.
Finishing of unformed surfaces, Class UC.
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh
Not used
Grouted rock bolts for concrete walls D = 25 mm, depth in rock 1.5 m depth in concrete
1m
Unit
Quantity
no
10.00
no
no
no
m2
m2
m2
m3
t
t
30
2
2
250
80
50
90
5
1
no
60
Concrete pavement.Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2
697
kg
no
150
Unit Price
USD
Total Price
USD
135.56
1,355.60
1,440.00
3,269.62
7,612.00
43,200.00
6,539.24
15,224.00
142.91
1,459.67
2,812.50
67.26 16,815.00
96.29 7,703.20
4.85 242.5
12,861.90
7,298.35
2,812.50
66.07 3,964.20
169.26
1,832.00
117,974.22
6.34 951
1,832.00
2,800,687.44
Item
Description
Item
Rock support at portal shall be regarded and measured as support work behind the face
5.3.01.0
ROCK EXCAVATION.
Above ground works included in Bill 4, except for rock support and temporary rock fall protection as included below
5.3.01.0
5.3.01.01
Underground. Excavation of tunnel, minimum net cross section 22.6 m2, (4.50m x
5.50m)
5.3.01.01
5.3.01.02
5.3.01.02
5.3.01.03
5.3.01.03
5.3.01.04
Underground. Excavation of tunnel with cross section 22.6 m2. Addition for short blasting rounds.
5.3.01.04
5.3.01.05
5.3.01.05
5.3.01.06
Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).
5.3.01.06
5.3.01.07
5.3.01.07
5.3.01.08
5.3.01.08
5.3.01.09
5.3.01.09
5.3.01.10
5.3.01.10
5.3.01.11
5.3.01.11
5.3.02.00
5.3.02.01
5.3.02.00
5.3.02.01
5.3.02.02
5.3.02.02
5.3.02.03
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face
5.3.02.03
5.3.02.04
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face
5.3.02.04
5.3.02.05
5.3.02.06
5.3.02.07
5.3.02.08
5.3.02.09
5.3.02.10
5.3.02.11
5.3.02.12
5.3.02.13
5.3.02.14
5.3.02.15
5.3.02.16
5.3.02.17
5.3.02.05
5.3.02.06
5.3.02.07
5.3.02.08
5.3.02.09
5.3.02.10
5.3.02.11
5.3.02.12
5.3.02.13
5.3.02.14
5.3.02.15
5.3.02.16
5.3.02.17
5.3.03.00
5.3.03.01
ROCK SUPPORT
Temporary installation for rock fall protection at Checras portal. See also Bill 4
Contractors design
5.3.03.00
5.3.03.01
5.3.03.02
5.3.03.02
5.3.03.03
5.3.03.03
5.3.03.04
5.3.03.04
5.3.03.05
5.3.03.06
5.3.03.05
5.3.03.06
Description
Unit
Quantity
Rock support at portal shall be regarded and measured as support work behind the face
5,668.00
m3
1,000.00
m3
1,200.00
Underground. Excavation of tunnel with cross section 22.6 m2. Addition for short blasting rounds.
a) Addition for 1/2 blasting rounds
b) Addition for 1/4 blasting rounds
Underground. Excavation of tunnel.
Addition for subdivision of cross-section into heading and benches.
m
m
m
400
200
120
Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).
1,000.00
month
8.00
month
4.00
month
2.00
month
1.00
no
12,000.00
2,000.00
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face
no
120.00
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face
no
50.00
no
120
no
no
kg
kg
kg
kg
m
kg
kg
hr
hr
350
10
Prov. Sum
80
155,000.00
100,000.00
40,000.00
1,000.00
120
400
400
450
60
1.00
hr
300
hr
600
m2
500
m2
no
500
1,200.00
Unit Price
USD
Total Price
USD
1,694.09
9,602,102.12
31.71 31,710.00
15.76 18,912.00
710.88
2,461.12
855.66
284,352.00
492,224.00
102,679.20
15.23 15,230.00
9,942.33
79,538.64
12,052.57
48,210.28
14,162.81
28,325.62
16,273.05
16,273.05
2,385.50
7,156.50
15.58
186,960.00
13.55
27,100.00
73.32
8,798.40
60.68
3,034.00
143.86
140.23
605
520
25,000.00
30.3 3,636.00
26.25 262.5
50,351.00
11,218.40
1.01 156,550.00
2.59 259,000.00
7.19 287,600.00
1.9 1,900.00
31.11 3,733.20
22.57 9,028.00
26.23 10,492.00
272,250.00
31,200.00
25,000.00
87.62 26,286.00
69.96 41,976.00
24.34 12,170.00
53.27
9.06 4,530.00
63,924.00
Item
Description
Item
5.3.03.07
5.3.03.07
5.3.03.08
5.3.03.08
5.3.03.09
5.3.03.09
5.3.03.10
5.3.03.10
5.3.03.11
5.3.03.11
5.3.03.12
5.3.03.12
5.3.03.13
5.3.03.13
5.3.03.14
5.3.03.14
5.3.03.15
5.3.03.15
5.3.03.16
5.3.03.16
5.3.03.17
5.3.03.17
5.3.03.18
5.3.03.18
5.3.03.19
5.3.03.19
5.3.03.20
5.3.03.20
5.3.03.21
5.3.03.21
5.3.03.22
5.3.03.22
5.3.03.23
5.3.03.23
5.3.03.24
5.3.03.24
5.3.03.25
5.3.03.25
5.3.03.26
5.3.03.26
5.3.03.27
5.3.03.27
5.3.03.28
5.3.03.28
5.3.03.29
5.3.03.29
5.3.03.30
5.3.03.31
5.3.03.30
5.3.03.31
5.3.03.32
5.3.03.32
5.3.03.33
5.3.03.34
5.3.03.33
5.3.03.34
5.3.03.35
5.3.03.35
5.3.03.36
5.3.03.36
5.3.03.37
5.3.03.37
5.3.03.38
5.3.03.38
5.3.03.39
5.3.03.39
5.3.03.40
5.3.03.40
5.3.03.41
5.3.03.41
Description
Unit
Quantity
no
4,500.00
no
4,000.00
no
200.00
no
200.00
no
200.00
no
200.00
no
500.00
no
1,000.00
no
3,300.00
no
200.00
no
4,500.00
no
3,600.00
no
400.00
m2
150
m2
500
m2
600
m2
500
400
400
m3
500
m3
500
m3
5,700.00
m3
3,000.00
kg
m
27,000.00
1,100.00
700
kg
m
18,000.00
700
500
m3
310
m3
m2
30
1,400.00
m3
600
m3
200
kg
16,500.00
Unit Price
USD
Total Price
USD
54.35
244,575.00
65.04
260,160.00
47.72
9,544.00
52.95
10,590.00
61.32
12,264.00
49.06
9,812.00
50.65
25,325.00
61.20
61,200.00
93.00
306,900.00
43.62
8,724.00
47.74
214,830.00
54.26
195,336.00
106.50
42,600.00
14.48 2,172.00
13.1 6,550.00
10.45 6,270.00
9.51 4,755.00
42.01 16,804.00
37.89 15,156.00
300.41
150,205.00
260.72
130,360.00
363.79
2,073,603.00
315.64
946,920.00
1.8 48,600.00
18.87 20,757.00
13.7 9,590.00
3.2 57,600.00
71.17 49,819.00
59.43 29,715.00
190.04
58,912.40
190.04
5,701.20
136.53
191,142.00
100.41
60,246.00
99.56 19,912.00
2.31 38,115.00
Item
Description
Item
5.3.03.42
5.3.03.42
5.3.04.00
5.3.04.01
5.3.04.02
5.3.04.03
5.3.04.00
5.3.04.01
5.3.04.02
5.3.04.03
5.3.04.04
5.3.04.04
5.3.04.05
5.3.04.06
5.3.04.05
5.3.04.06
5.3.04.07
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
5.3.04.07
5.3.04.08
5.3.04.09
Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests
5.3.04.08
5.3.04.09
5.3.04.10
5.3.04.11
5.3.04.12
5.3.04.10
5.3.04.11
5.3.04.12
5.3.05.0
5.3.05.01
CONCRETE WORKS.
Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2
5.3.05.0
5.3.05.01
Sum
Sum
Description
Unit
Quantity
kg
40,000.00
hr
no
m
200
100
kg
1
120
no
800
6.00
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
no
6.00
Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests
no
no
12
2.00
no
no
no
6
2
2
5,668.00
Unit Price
USD
Total Price
USD
2.4 96,000.00
605
1,108.00
125.06
121,000.00
1,108.00
15,007.20
171.84
17,184.00
115.56
1.9 1,520.00
693.36
135.56
813.36
1,440.00
1,140.23
17,280.00
2,280.46
961.56
3,269.62
7,612.00
5,769.36
6,539.24
15,224.00
166.49
943,665.32
18,812,561.81
Item
Description
Item
5.4.01.0
5.4.01.01
ROCK EXCAVATION.
Underground. Excavation of tunnel, minimum net cross section 30.1 m2, (6m x 5.50m)
5.4.01.0
5.4.01.01
5.4.01.02
5.4.01.02
5.4.01.03
5.4.01.03
5.4.01.04
Underground. Excavation of tunnel with cross section 30.1 m2. Addition for short blasting rounds.
5.4.01.04
5.4.01.05
5.4.01.05
5.4.01.06
Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).
5.4.01.06
5.4.01.07
5.4.01.07
5.4.01.08
5.4.01.08
5.4.01.09
5.4.01.09
5.4.01.10
5.4.01.10
5.4.01.11
5.4.01.11
5.4.01.12
5.4.01.12
5.4.02.00
5.4.02.01
5.4.02.00
5.4.02.01
5.4.02.02
5.4.02.02
5.4.02.03
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face
5.4.02.03
5.4.02.04
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face
5.4.02.04
5.4.02.05
5.4.02.06
5.4.02.07
5.4.02.08
5.4.02.09
5.4.02.10
5.4.02.11
5.4.02.12
5.4.02.13
5.4.02.14
5.4.02.05
5.4.02.06
5.4.02.07
5.4.02.08
5.4.02.09
5.4.02.10
5.4.02.11
5.4.02.12
5.4.02.13
5.4.02.14
5.4.03.00
5.4.03.01
5.4.03.00
5.4.03.01
5.4.03.02
5.4.03.02
5.4.03.03
5.4.03.03
5.4.03.04
5.4.03.05
5.4.03.04
5.4.03.05
5.4.03.06
5.4.03.06
5.4.03.07
5.4.03.07
Description
Unit
Quantity
4,215.00
m3
500
m3
1,200.00
Underground. Excavation of tunnel with cross section 30.1 m2. Addition for short blasting rounds.
m
m
m
Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).
300
150
80
1,000.00
m3
600
month
8.00
month
4.00
month
2.00
month
1.00
no
12,000.00
1,200.00
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face
no
120.00
Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face
no
15.00
no
130
no
no
kg
kg
kg
kg
hr
hr
400
hr
500
hr
1,000.00
m2
100
m2
no
100
1,100.00
no
4,000.00
no
3,500.00
15
40
150,000.00
100,000.00
40,000.00
200
400
40
Unit Price
USD
Total Price
USD
2,121.98
8,944,145.70
31.71 15,855.00
15.76 18,912.00
655.17
2,306.34
855.66
196,551.00
345,951.00
68,452.80
15.23
15,230.00
31.71 19,026.00
9,942.33
79,538.64
12,052.57
48,210.28
14,162.81
28,325.62
16,273.05
16,273.05
2,385.50
7,156.50
15.58
186,960.00
13.55
16,260.00
73.32
8,798.40
60.68
910.20
143.86
140.23
605
520
30.3 3,939.00
26.25 393.75
57,544.00
5,609.20
1.01 151,500.00
2.59 259,000.00
7.19 287,600.00
22.57 4,514.00
242,000.00
20,800.00
87.62 43,810.00
69.96 69,960.00
24.34 2,434.00
53.27
9.06 906
58,597.00
54.35
217,400.00
65.04
227,640.00
Item
Description
Item
5.4.03.08
5.4.03.08
5.4.03.09
5.4.03.09
5.4.03.10
5.4.03.10
5.4.03.11
5.4.03.11
5.4.03.12
5.4.03.12
5.4.03.13
5.4.03.13
5.4.03.14
5.4.03.14
5.4.03.15
5.4.03.15
5.4.03.16
5.4.03.16
5.4.03.17
5.4.03.17
5.4.03.18
5.4.03.18
5.4.03.19
5.4.03.19
5.4.03.20
5.4.03.20
5.4.03.21
5.4.03.21
5.4.03.22
5.4.03.22
5.4.03.23
5.4.03.23
5.4.03.24
5.4.03.24
5.4.03.25
5.4.03.25
5.4.03.26
5.4.03.26
5.4.03.27
5.4.03.27
5.4.03.28
5.4.03.29
5.4.03.28
5.4.03.29
5.4.03.30
5.4.03.30
5.4.03.31
5.4.03.32
5.4.03.31
5.4.03.32
5.4.03.33
5.4.03.33
5.4.03.34
5.4.03.34
5.4.03.35
5.4.03.35
5.4.03.36
5.4.03.37
5.4.03.36
5.4.03.37
5.4.03.38
5.4.03.38
5.4.03.39
5.4.03.40
5.4.03.39
5.4.03.40
5.4.04.00
5.4.04.01
5.4.04.00
5.4.04.01
5.4.04.02
5.4.04.02
Description
Unit
Quantity
no
200.00
no
200.00
no
200.00
no
200.00
no
450.00
no
1,000.00
no
3,000.00
no
300.00
no
4,000.00
no
3,200.00
no
250.00
m2
150
m2
500
m2
500
400
200
m3
500
m3
500
m3
5,600.00
m3
2,800.00
kg
m
22,500.00
900
600
kg
m
15,000.00
600
400
m3
200
m3
m2
m3
850
600
m3
250
kg
kg
10,000.00
40,000.00
hr
200
20
no
Unit Price
USD
Total Price
USD
47.72
9,544.00
52.95
10,590.00
61.32
12,264.00
49.06
9,812.00
50.65
22,792.50
61.20
61,200.00
93.00
279,000.00
43.62
13,086.00
47.74
190,960.00
54.26
173,632.00
106.50
26,625.00
14.48 2,172.00
10.45 5,225.00
9.51 4,755.00
42.01 16,804.00
37.89 7,578.00
300.41
150,205.00
260.72
130,360.00
363.79
2,037,224.00
315.64
883,792.00
1.8 40,500.00
18.87 16,983.00
13.7 8,220.00
3.2 48,000.00
71.17 42,702.00
59.43 23,772.00
190.04
38,008.00
190.04
3,800.80
136.53
100.41
116,050.50
60,246.00
99.56 24,890.00
2.31 23,100.00
2.4 96,000.00
605
121,000.00
1,108.00
1,108.00
Item
Description
Item
5.4.04.03
5.4.04.03
5.4.04.04
5.4.04.04
5.4.04.05
5.4.04.06
5.4.04.05
5.4.04.06
5.4.04.07
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
5.4.04.07
5.4.04.08
5.4.04.09
Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests
5.4.04.08
5.4.04.09
5.4.04.10
5.4.04.11
5.4.04.12
5.4.04.10
5.4.04.11
5.4.04.12
5.4.05.0
5.4.05.01
5.4.05.02
5.4.05.03
5.4.05.04
5.4.05.05
CONCRETE WORKS.
Formwork Class B. Plain. Lining from rocktrap to cone including transissions
Concrete Class C.
Reinforcement. Deformed bars.
Reinforcement. Welded mesh
Grouted rock bolts D = 25 mm, depth in rock 2.5 m depth in concrete 1 m
5.4.05.0
5.4.05.01
5.4.05.02
5.4.05.03
5.4.05.04
5.4.05.05
5.4.05.06
5.4.05.06
Sum
Sum
Description
Unit
Quantity
120
100
kg
no
800
6.00
Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m
no
6.00
Lugeon tests
Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests
no
no
no
no
no
m2
m3
t
t
no
12
1.00
3
2
2
900
560
14
0.5
80
4,215.00
Unit Price
USD
Total Price
USD
125.06
15,007.20
171.84
17,184.00
115.56
1.9 1,520.00
693.36
135.56
813.36
1,440.00
1,140.23
17,280.00
1,140.23
961.56
3,269.62
7,612.00
2,884.68
6,539.24
15,224.00
142.91
1,459.67
2,812.50
67.26 60,534.00
80,029.60
20,435.38
1,406.25
77.22 6,177.60
167.18
704,663.70
17,333,736.54
Proyecto de LeyNo. 7 - acero forrado tubera forzada, H31 como Powerhouse caverna
Artculo
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
7.1.01.0
ROCA EXCAVACIN.
7.1.01.01
Underground.La
excavacin del
tnel.De dimetro de
acero forro entre el
cono de admisin y
bifurcacin 2,4 m,
dimetro de acero de
revestimiento entre la
bifurcacin y entrada
de la turbina tubo de
2,0 m.Seccin
transversal de la
excavacin para ser
recomendado por
contracto r.Tasa
independiente de la
subdivisin de corte
transversal.
7.1.01.02
Underground.La
excavacin del tnel.
La adicin de una
mayor seccin
transversal.
m3
50
31.71 1,585.50
7.1.01.03
Underground.La
excavacin del tnel.
Desmonte excesivo
anormal.
m3
25
15.76 394
7.1.01.04
Underground.La
descarga de agua.
101
3,623.00
365,923.00
mes
9,942.33
9,942.33
mes
0.5
12,052.57
6,026.29
mes
0.5
14,162.81
7,081.41
Bombear tasa de 1 -. 2
m3 / min Incluye
tambin se descarga
de las vas fluviales y
otras cavidades
excavadas en este
tnel
7.1.01.05
Underground.La
descarga de agua.
Bombear tasa. 2 - 3 m3
/ min Incluye tambin
se descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel
7.1.01.06
Underground.La
descarga de agua.
Bombear tasa. 3 - 4 m3
/ min Incluye tambin
se descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel
7.1.01.07
Estacin de medicin
de agua
no
2 2,385.50
4,771.00
7.1.02.00
La perforacin
exploratoria e
inyeccin.
7.1.02.01
Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
en la cara.
300
15.58 4,674.00
7.1.02.02
Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
Detrs de la cara.
1,100.00
13.55 14,905.00
7.1.02.03
Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m. En
la cara
no
10
73.32 733.2
7.1.02.04
Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m.
Detrs de la cara
no
40
60.68 2,427.20
7.1.02.05
no
10
30.3 303
7.1.02.06
20
26.25 525
7.1.02.07
Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara
no
15 143.86
2,157.90
7.1.02.08
Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara
no
60 140.23
8,413.80
7.1.02.09
Lechada de
cemento.Tipo de
consumo A. Cemento
kg
10,000.00
1.01 10,100.00
7.1.02.10
Lechada de
cemento.Tipo consumo
B. Cemento
kg
9,000.00
2.59 23,310.00
7.1.02.11
Lechada de
cemento.Escriba C. El
consumo de cemento
kg
2,000.00
7.19 14,380.00
7.1.02.12
Inyecciones de
consolidacin.
kg
3,000.00
1.9 5,700.00
7.1.02.13
250
31.11 7,777.50
7.1.02.14
Contacto
mampostera.Escriba
D.
kg
1,000.00
22.57 22,570.00
7.1.02.15
Contacto
mampostera.Tipo E.
kg
1,500.00
26.23 39,345.00
7.1.02.16
Tiempo de la
lechada.En la cara
hr
20 605
12,100.00
7.1.02.17
Tiempo de la
lechada.Detrs de la
cara
hr
50 520
26,000.00
7.1.03.00
7.1.03.01
Escalamiento Extra. En
la cara.
hr
10
87.62 876.2
7.1.03.02
Escalamiento Extra.
Detrs de la cara.
hr
10
69.96 699.6
7.1.03.03
Inviertalimpieza y
escalamiento. Detrs
de la cara.
m2
350
24.34 8,519.00
7.1.03.04
Alta presin de
descarga de
agua.Detrs de la cara
m2
500
9.06 4,530.00
7.1.03.05
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
no
60
53.27
3,196.20
no
50
54.35
2,717.50
D = 20 mm. De
profundidad en la roca
2,4 m
7.1.03.06
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
7.1.03.06
no
50
54.35
2,717.50
no
10
65.04
650.4
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
10
47.72
477.2
10
52.95
529.5
61.32
306.6
49.06
245.3
D = 20 mm. De
profundidad en la roca
2,9 m
7.1.03.07
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
7.1.03.08
D = 20 mm. De
profundidad en la roca
2,4 m
7.1.03.09
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
2,9 m
7.1.03.10
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
3,9 m
7.1.03.11
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,4 m
Proyecto de LeyNo. 7 - acero forrado tubera forzada, H31 como Powerhouse caverna
Artculo
Descripcin
Unidad
Cantidad
Precio Unitario
DLAR
ESTADOUNIDENSE
7.1.03.12
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
Precio total
DLAR
ESTADOUNIDENSE
50.65
253.25
20
61.2
1,224.00
50
93
4,650.00
55
43.62
2,399.10
D = 20 mm. De
profundidad en la roca
2,9 m
7.1.03.13
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
7.1.03.14
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 25 mm. De
profundidad en la roca
5,9 m
7.1.03.15
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,4 m
7.1.03.16
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
50
47.74
2,387.00
54.26
271.3
106.5
532.5
D = 20 mm. De
profundidad en la roca
2,9 m
7.1.03.17
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
7.1.03.18
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
5,9 m
7.1.03.19
MallaChainlinkedfijado
para el rock pernos. En
la cara.
m2
50
7.1.03.20
MallaChainlinkedfijado
para el rock pernos.
Detrs de la cara.
m2
7.1.03.21
m2
10
7.1.03.22
m2
10
7.1.03.23
Correasde
acerofijados a pernos
de anclaje. En la cara.
10
42.01 420.1
7.1.03.24
Correasde
acerofijados a pernos
de anclaje. Detrs de la
cara.
10
37.89 378.9
7.1.03.25
El hormign
proyectado.Plain. En la
cara.
m3
10 300.41
3,004.10
7.1.03.26
El hormign
proyectado.Plain.
Detrs de la cara.
m3
10 260.72
2,607.20
7.1.03.27
El hormign
proyectado.De fibra
reforzada. En la cara.
m3
80 363.79
29,103.20
7.1.03.28
El hormign
proyectado.De fibra
reforzada. Detrs de la
cara.
m3
25 315.64
7,891.00
7.1.03.29
Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.
kg
7.1.03.30
La instalacinde las
costillas de hormign
proyectado reforzado.
En la cara.
12
7.1.03.31
La instalacinde las
costillas de hormign
proyectado reforzado.
Detrs de la cara.
7.1.03.32
Prefabricacin y
suministro de vigas de
celosa.
kg
7.1.03.33
La instalacinde vigas
de celosa para
costillas de hormign
proyectado. En la cara.
300
14.48 724
10.45 104.5
9.51
95.1
1.8 540
200
18.87 226.44
13.7 109.6
3.2 640
71.17 569.36
7.1.03.34
La instalacinde vigas
de celosa para
costillas de hormign
proyectado. Detrs de
la cara.
59.43 297.15
7.1.03.35
Inviertaconcreto. En la
cara.
m3
7.1.03.36
Refuerzo de
invertido.En o detrs
de la cara
kg
7.1.04.00
INVESTIGACIN E
INSTRUMENTACIN.
7.1.04.01
Investigacin y pruebas
subterrneas.Tiempo
de inactividad.
hr
7.1.04.02
Perforacin de
base.Puesta en
marcha en cada lugar
de perforacin.
no
7.1.04.03
Perforacin de base,
dimetro mnimo de 76
mm. De profundidad de
0-30 m
90 125.06
11,255.40
7.1.04.04
Perforacin de base,
dimetro mnimo de 76
mm. De profundidad
30-100 m
80 171.84
13,747.20
7.1.04.05
Perforacin de
base.Estabilizacin
Hole.Lechada de
cemento.
kg
7.1.04.06
AjustePackerpara la
prueba de presin de
agua. Prueba
concurrente con la
perforacin (single
envasador).
Profundidad 0-100 m
no
115.56
462.24
7.1.04.07
AjustePackerpara la
no
prueba de presin de
agua. Prueba de
perforacin despus de
completado (doble
packer). Profundidad 0100 m
135.56
542.24
7.1.04.08
Pruebas Lugeon
no
8 1,440.00
11,520.00
7.1.04.09
Estacin de
Convergencia.Max.3
pines.
no
2 3,269.62
6,539.24
7.1.04.10
Multipunto
extensmetro pozo.
no
2 7,612.00
15,224.00
10 100.41
500
1,004.10
2.4 1,200.00
60 605
36,300.00
2 1,108.00
500
2,216.00
1.01 505
Proyecto de LeyNo. 7 - acero forrado tubera forzada, H31 como Powerhouse caverna
Artculo
Descripcin
Unidad
Cantidad
Precio Unitario
DLAR
ESTADOUNIDENSE
7.1.05.00
OBRAS DE
CONCRETO.
7.1.05.01
Encofrado Clase B.
Plain.Cono de entrada
m2
7.1.05.02
Encofrado Clase B.
curvada.Cono de
entrada
m2
7.1.05.03
Clase de hormign C.
Cono Inlet
m3
7.1.05.04
Refuerzo.Barras
corrugadas.
100
136.53
60 136.53
100
142.91
2 1,459.67
Precio total
DLAR
ESTADOUNIDENSE
13,653.00
8,191.80
14,291.00
2,919.34
7.1.05.05
Penstockempotramient m
o revestimiento,
47
7,305.90
343,377.30
54 5,844.72
315,614.88
Penstockempotramient
o revestimiento,
7.1.06.00
ACCIONES PARA LA
INSTALACIN DE
FORRO DE ACERO Y
REJUNTADO DE REA
DEL CONO
7.1.06.01
Preparacin de
superficie de la roca
para el hormigonado
en el rea del cono
7.1.06.02
Lechadapernos de
anclaje para el anclaje
de apoyo concreto, D =
25 mm. Longitud en
concreto
m2
100
3.59 359
1,0 m
7.1.06.03
a) La profundidad en la
roca 3,0 m
no
30
77.22 2,316.60
7.1.06.04
b) Profundidad en la
roca 4,0 m
no
10
88.36 883.6
7.1.06.05
no
b) D = 25 mm,
profundidad en la roca
2,0 m
no
60
11.14 668,4
c) D = 32 mm,
profundidad en la roca
2,0 m
no
50
17.63 881.5
7.1.06.06
LS
7.1.06.07
Interfazcon H en el
LS
montaje de la tubera
de carga en el tnel. Se
hace referencia a los
documentos H-tiernas.
En esta partida se
incluyen los trabajos
relacionados con el
montaje de la tubera
de carga en el tnel
que no estn incluidos
en otras partidas, en
coordinacin con la Hcontratista en su
transporte y el trabajo,
etc.
100
6.66 666
1 4,025.40
66,270.00
4,025.40
66,270.00
Suma
1,546,953.67
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
El apoyode la rocaen
el portal se considerar
y se mide como el
trabajo de apoyo
detrs de la cara
8.1.01.0
TIERRA DE OBRAS.
8.1.01.01
Compensacin y
arranque
8.1.01.02
ja
1 9,990.00
1,500.00
9,990.00
a) Excavacin para
estropear depsito
m3
6.14 9,210.00
b) La excavacin de
zapatas / estructuras
m3
50
6.14 307
8.1.01.03
Preparacin de la
fundacin de la roca
para el hormigonado
m2
50
3.59 179.5
8.1.01.04
Llenar y rellenar
a) No se utiliza
b) relleno estructural
m3
200
15.92 3,184.00
c) Alta calidad de
escollera
m3
200
23.68 4,736.00
d) El relleno de las
zanjas
m3
100
14.89 1,489.00
8.1.01.05
Encespado (opcional)
m2
200
8.1.02.0
OBRAS VIALES.
8.1.02.01
Concretopavimento en m2
tnel, el tipo de
hormign C, espesor
mnimo de 200 mm,
tratamiento de
superficies UB, refuerzo
min 12,0 kg / m2
8.1.02.02
8.1.03.0
ROCA EXCAVACIN.
8.1.03.01
8.1.03.02
3,800.00
0.32
46.04
64
174,952.00
m3
800
9.37 7,496.00
En latierra. Excavacin
a granel roca
(anchura>2m).
m3
200
29.66 5,932.00
En latierra. Barrenos
de contorno perimetral
para voladuras
(cuandomenosde 0,7
m
150
21.76 3,264.00
8.1.03.02
150
21.76 3,264.00
Se requiere distancia).
8.1.03.03
En latierra. Roca
excavacin.
m3
20
14.2 284
Desmonte excesivo
anormal.
8.1.03.04
Underground.La
excavacin del
tnel.Seccin
transversal 41 m2,
(7.30m 6.00mx), zanja
incl
960
8.1.03.05
8.1.03.06
2,582.81
2,479,497.60
Underground.La
excavacin del tnel.
La adicin de una
mayor seccin
transversal.
m3
150
31.71 4,756.50
Underground.La
excavacin del tnel.
m3
300
15.76 4,728.00
Desmonte excesivo
anormal.
8.1.03.07
Underground.La
excavacin del tnel.
La adicin de rondas de
voladura cortos.
a) Adicin de medio
rondas de voladura
60 727.4
43,644.00
b) Adicin de cuarta
rondas de voladura
40 2,502.70
100,108.00
8.1.03.08
Adems para la
subdivisin de la
seccin transversal en
el rumbo y bancos
20 855.66
17,113.20
8.1.03.09
Subterrneas.Perforaci
ones contorno
perimetral para
voladuras
(cuandomenosde 0,7
m de distancia
200
15.23 3,046.00
se requiere).
8.1.03.10
Underground.La
descarga de agua.
mes
12
9,942.33
119,307.96
mes
12,052.57
48,210.28
mes
14,162.81
28,325.62
mes
16,273.05
16,273.05
Bombear tasa de 1 - 2
m3 / min.Incluye las
descargas de las vas
fluviales y otras
cavidades excavadas
en este tnel (incluido,
pero no limitado a,
casa de mquinas,
tnel de presin y
8.1.03.11
Underground.La
descarga de agua.
Bombear tasa de 2-3
m3 / min Incluye altas
por vas fluviales y
otras cavidades
excavadas en este
tnel.
8.1.03.12
Underground.La
descarga de agua.
Bombear tasa de 3-4
m3 / min Incluye altas
por vas fluviales y
otras cavidades
excavadas en este
tnel.
8.1.03.13
Underground.La
descarga de agua.
Bombear tasa de ms
de 4 m3 / min.Includes
descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel
8.1.03.14
Estacin de medicin
de agua
no
4 2,385.50
9,542.00
8.1.04.00
La perforacin
exploratoria e
inyeccin.
8.1.04.01
Perforacindepercusi m
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
en la cara.
1,600.00
15.58
24,928.00
8.1.04.02
Perforacindepercusi m
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
Detrs de la cara.
200
13.55
2,710.00
8.1.04.03
Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m. En
la cara
no
16
73.32
1,173.12
8.1.04.04
Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m.
Detrs de la cara
no
60.68
121.36
8.1.04.05
no
16
8.1.04.06
no
8.1.04.07
Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara
no
30 143.86
8.1.04.08
Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara
no
5 140.23
8.1.04.09
Lechada de
cemento.Tipo de
consumo A. Cemento
kg
20,000.00
1.01 20,200.00
8.1.04.10
Lechada de
cemento.Tipo consumo
B. Cemento
kg
10,000.00
2.59 25,900.00
8.1.04.11
Lechada de
cemento.Escriba C. El
consumo de cemento
kg
5,000.00
7.19 35,950.00
8.1.04.12
Lechada
qumica.Escriba D.
consumo lechada peso
seco
kg
100
8.1.04.13
Inyecciones de
consolidacin.
kg
1,000.00
8.1.04.14
Tiempo de la
lechada.En la cara
hr
50 605
30,250.00
8.1.04.15
Tiempo de la
lechada.Detrs de la
cara
hr
10 520
5,200.00
30.3 484.8
26.25
52.5
4,315.80
701.15
23.71 2,371.00
1.9 1,900.00
Descripcin
Unidad
Cantidad
Precio Unitario
DLAR
ESTADOUNIDENSE
8.1.05.00
Precio total
DLAR
ESTADOUNIDENSE
8.1.05.01
Instalacintemporalde Prov.Suma
proteccin contra
cadas de roca en el
portal. Diseo
Contratistas
1 100,000.00
100,000.00
8.1.05.02
Escalamiento Extra. En
la cara.
hr
100
87.62 8,762.00
8.1.05.03
Escalamiento Extra.
Detrs de la cara.
hr
150
69.96 10,494.00
8.1.05.04
Inviertalimpieza y
escalamiento. Detrs
de la cara.
m2
200
24.34 4,868.00
8.1.05.05
Alta presin de
descarga de
agua.Detrs de la cara
m2
500
9.06 4,530.00
8.1.05.06
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
no
800
54.35
43,480.00
no
800
65.04
52,032.00
no
150
80.22
12,033.00
50
52.95
2,647.50
60
61.32
3,679.20
40
73.74
2,949.60
50
50.65
2,532.50
300
61.2
18,360.00
300
71.44
21,432.00
D = 20 mm. De
profundidad en la roca
2,9 m
8.1.05.07
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.1.05.08
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
4,9 m
8.1.05.09
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en roca
2.9m
8.1.05.10
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.1.05.11
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
4,9 m
8.1.05.12
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,9 m
8.1.05.13
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.1.05.14
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
8.1.05.14
no
300
71.44
21,432.00
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
600
93
55,800.00
700
47.74
33,418.00
800
54.26
43,408.00
500
67.87
33,935.00
50
106.5
5,325.00
D = 20 mm. De
profundidad en la roca
4,9 m
8.1.05.15
D = 25 mm. De
profundidad en la roca
5,9 m
8.1.05.16
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,9 m
8.1.05.17
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.1.05.18
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
4,9 m
8.1.05.19
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
5,9 m
8.1.05.20
MallaChainlinkedfijado
para el rock pernos. En
la cara.
m2
50
14.48 724
8.1.05.21
MallaChainlinkedfijado
para el rock pernos.
Detrs de la cara.
m2
500
13.1 6,550.00
8.1.05.22
m2
100
10.45 1,045.00
8.1.05.23
m2
100
8.1.05.24
Correasde
acerofijados a pernos
de anclaje. En la cara.
100
42.01 4,201.00
8.1.05.25
Correasde
acerofijados a pernos
de anclaje. Detrs de la
cara.
500
37.89 18,945.00
8.1.05.26
El hormign
proyectado.Plain. En la
cara.
m3
70 300.41
21,028.70
8.1.05.27
El hormign
proyectado.Plain.
Detrs de la cara.
m3
40 260.72
10,428.80
8.1.05.28
El hormign
proyectado.De fibra
reforzada. En la cara.
m3
1,400.00
363.79
509,306.00
8.1.05.29
El hormign
proyectado.De fibra
reforzada. Detrs de la
cara.
m3
700
315.64
220,948.00
8.1.05.30
Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.
kg
5,000.00
9.51 951
1.8 9,000.00
8.1.05.31
La instalacinde las
costillas de hormign
proyectado reforzado.
En la cara.
200
18.87 3,774.00
8.1.05.32
La instalacinde las
costillas de hormign
proyectado reforzado.
Detrs de la cara.
100
13.7 1,370.00
8.1.05.33
Prefabricacin y
suministro de vigas de
celosa.
kg
3,300.00
8.1.05.34
La instalacinde vigas
de celosa para
costillas de hormign
proyectado. En la cara.
120
71.17 8,540.40
8.1.05.35
La instalacinde vigas
de celosa para
costillas de hormign
proyectado. Detrs de
la cara.
100
59.43 5,943.00
8.1.05.36
Revestimientodehormi
gn. Detrs de la cara.
m3
50 190.04
8.1.05.37
Hormign adicional.
Detrs de la cara.
m3
5 190.04
8.1.05.38
Encofrado para
revestimiento de
hormign, Clase C
m2
8.1.05.39
Hormign Invertir.
m3
3.2 10,560.00
230
9,502.00
950.2
136.53
31,401.90
80 100.41
8,032.80
En la cara.
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
40
DLAR
ESTADOUNIDENSE
8.1.05.40
Inviertaconcreto.
Detrs de la cara.
m3
99.56 3,982.40
8.1.05.41
kg
2,500.00
8.1.05.42
Refuerzo de
invertido.En o detrs
de la cara
kg
6,000.00
8.1.06.00
INVESTIGACIN E
INSTRUMENTACIN.
8.1.06.01
Investigacin y pruebas
subterrneas.Tiempo
de inactividad.
hr
300
8.1.06.02
Perforacin de
base.Puesta en
marcha en cada lugar
de perforacin.
no
8.1.06.03
Perforacin de base,
dimetro mnimo de 76
mm. De profundidad de
0-30 m
420
125.06
52,525.20
8.1.06.04
Perforacin de base,
dimetro mnimo de 76
mm. De profundidad
30-100 m
140
171.84
24,057.60
8.1.06.05
Perforacin de
base.Estabilizacin
Hole.Lechada de
cemento.
kg
2,500.00
2.31 5,775.00
2.4 14.400,00
605
6 1,108.00
181,500.00
6,648.00
1.9 4,750.00
8.1.06.06
AjustePackerpara la
prueba de presin de
agua. Prueba
concurrente con la
perforacin (single
envasador).
Profundidad 0-100 m
no
8.1.06.07
AjustePackerpara la
no
prueba de presin de
agua. Prueba de
perforacin despus de
completado (doble
packer). Profundidad 0100 m
8.1.06.08
Pruebas Lugeon
8.1.06.09
Movilizacin /
no
desmovilizacinde
expertos y equipo para
mediciones de tensin
en 3 dimensiones
8.1.06.10
Movilizacin /
desmovilizacinde
expertos y equipo a
hydrofracture y
pruebas de gato
hidrulico
8.1.06.11
100
115.56
11,556.00
10
135.56
1,355.60
no
70 1,440.00
2
100,800.00
1,210.56
2,421.12
no
3 1,140.23
3,420.69
Nmero de mediciones
de tensin en 3
dimensiones
no
4 5,160.00
20,640.00
8.1.06.12
Nmero de
hydrofracture o
pruebas de gato
hidrulico
no
8.1.06.13
Estacin de
Convergencia.Max.3
pines.
no
6 3,269.62
19,617.72
8.1.06.14
Multipunto
extensmetro pozo.
no
5 7,612.00
38,060.00
8.1.07.0
ALCANTARILLAS
tubera y tubos de
desage.
8.1.07.01
DrainpipePVC, D = 100
mm en tnel, incl.
Tubos de acceso cada
60 m, articulaciones,
excavacin y relleno.
8.1.08.0
OBRAS DE
CONCRETO.
16 961.56
15,384.96
2,000.00
8.92 17,840.00
1,500.00
67.26 100,890.00
Estructura de entrada,
conductos y
alcantarillas cable.
8.1.08.01
Encofrado Clase B.
Plain.Inclinada o
vertical.
m2
8.1.08.02
Encofrado Clase B.
curvada.
m2
8.1.08.03
El acabado de
superficies no
formadas, UB Clase.
m2
8.1.08.04
El acabado de
superficies no
formadas, clase UC.
m2
8.1.08.05
Hormign Clase C.
m3
8.1.08.06
Refuerzo.Barras
corrugadas.
50 1,459.67
8.1.08.07
Refuerzo.Mallas
soldadas
0.5 2,812.50
50
96.29 4,814.50
350
4.65 1,627.50
60
650
4.85 291
142.91
92,891.50
72,983.50
1,406.25
8.1.08.08
Pernos de anclajecon
lechadapara muros de
hormign D = 25 mm,
profundidad en la roca
1,5 m departamento en
concreto
no
30
77.22 2,316.60
1m
8.1.08.09
Cablede alcantarillas, m
conductos
prefabricados de
hormign con
recubrimiento de
hormign desmontable
con carga de diseo de
15 kN / m2, incluyendo
ganchos de elevacin y
relleno.
970
183.22
177,723.40
8.1.09.0
METAL WORKS.
8.1.09.01
kg
2,000.00
6.34 12,680.00
8.1.09.02
kg
2,000.00
6.34 12,680.00
8.1.09.03
no
1,200.00
27.28 32,736.00
8.1.09.04
Escaleras de acero.
kg
300
8.1.09.05
Puertas de acero
individuales.Dimension
es externas
1000x2100mm
no
1 6,108.00
6,108.00
8.1.09.06
Puerta de entrada,
doble, lado bisagras de
puerta plegable de
aluminio, 5,5 mx 5,5 m
no
1 4,275.00
4,275.00
8.1.10.0
OBRAS CIVILES
VARIOS
8.1.10.01
Tomas de tierra
enterrados.Hilos de
cobre 1 x 95 mm2.En
el tnel
2,000.00
8.1.10.02
Cadwelding de juntas,
conexiones e
intersecciones
no
150
Suma
7.01 2,103.00
21.34 42,680.00
230.3
34,545.00
5,722,270.58
Descripcin
Unidad
Cantidad
Precio Unitario
DLAR
ESTADOUNIDENSE
8.2.01.0
ROCA EXCAVACIN.
Precio total
DLAR
ESTADOUNIDENSE
8.2.01.01
Underground.La
excavacin del
tnel.Seccin mnima
de 22,6 m2.
150
1,533.80
230,070.00
8.2.01.02
Underground.La
excavacin del tnel.
m3
50
31.71 1,585.50
m3
30
15.76 472.8
Underground.La
excavacin del tnel.
Desmonte excesivo
anormal.
8.2.01.04
Underground.La
excavacin del tnel.
La adicin de rondas de
voladura cortos.
8.2.01.05
a) Adicin de medio
rondas de voladura
10 363.92
3,639.20
b) incoporacion por
cuarta rondas de
voladura
10 1,766.92
17,669.20
Underground.La
descarga de agua.
mes
9,942.33
39,769.32
mes
12,052.57
24,105.14
mes
14,162.81
14,162.81
mes
16,273.05
16,273.05
Bombear tasa de 1 -. 2
m3 / min Incluye
tambin se descarga
de las vas fluviales y
otras cavidades
excavadas en este
tnel
8.2.01.06
Underground.La
descarga de agua.
Bombear tasa. 2 - 3 m3
/ min Incluye tambin
se descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel
8.2.01.07
Underground.La
descarga de agua.
Bombear tasa. 3 - 4 m3
/ min Incluye tambin
se descarga de las vas
fluviales y otras
cavidades excavadas
en este tnel
8.2.01.08
Underground.La
descarga de agua.
Bombear tasa de ms
de 4 m3 / min. Incluye
tambin se descarga
de las vas fluviales y
otras cavidades
excavadas en este
tnel
8.2.01.09
Estacin de medicin
de agua
no
1 2,385.50
8.2.02.00
La perforacin
exploratoria e
inyeccin.
8.2.02.01
Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
en la cara.
8.2.02.02
Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
Detrs de la cara.
50
8.2.02.03
Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m. En
la cara
no
250
2,385.50
15.58 3,895.00
13.55 677.5
73.32 219.96
8.2.02.04
Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m.
Detrs de la cara
no
60.68
60.68
8.2.02.05
no
30.3
90.9
8.2.02.06
26.25
26.25
8.2.02.07
Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara
no
10 143.86
8.2.02.08
Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara
no
5 140.23
8.2.02.09
Lechada de
cemento.Tipo de
consumo A. Cemento
kg
3,000.00
1.01 3,030.00
8.2.02.10
Lechada de
cemento.Tipo consumo
B. Cemento
kg
2,000.00
2.59 5,180.00
8.2.02.11
Lechada de
cemento.Escriba C. El
consumo de cemento
kg
1,000.00
7.19 7,190.00
8.2.02.12
Lechada
qumica.Escriba D.
consumo lechada peso
seco
kg
100
8.2.02.13
Tiempo de la
lechada.En la cara
hr
10 605
6,050.00
8.2.02.14
Tiempo de la
lechada.Detrs de la
cara
hr
10 520
5,200.00
8.2.03.00
8.2.03.01
Escalamiento Extra. En
la cara.
hr
10
87.62 876.2
8.2.03.02
Escalamiento Extra.
Detrs de la cara.
hr
10
69.96 699.6
8.2.03.03
Inviertalimpieza y
escalamiento. Detrs
de la cara.
m2
100
8.2.03.04
Alta presin de
descarga de
agua.Detrs de la cara
m2
100
8.2.03.05
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
1,438.60
701.15
23.71 2,371.00
24.34 2,434.00
9.06 906
no
80
53.27
4,261.60
no
90
54.35
4,891.50
no
50
65.04
3,252.00
D = 20 mm. De
profundidad en la roca
2,4 m
8.2.03.06
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
2,9 m
8.2.03.07
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.2.03.08
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
10
47.72
477.2
10
52.95
529.5
61.32
306.6
49.06
245.3
Precio Unitario
Precio total
D = 20 mm. De
profundidad en la roca
2,4 m
8.2.03.09
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
2,9 m
8.2.03.10
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.2.03.11
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,4 m
Descripcin
Unidad
Cantidad
DLAR
ESTADOUNIDENSE
8.2.03.12
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
DLAR
ESTADOUNIDENSE
60
50.65
3,039.00
60
61.2
3,672.00
90
93
8,370.00
43.62
218.1
120
47.74
5,728.80
D = 20 mm. De
profundidad en la roca
2,9 m
8.2.03.13
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.2.03.14
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 25 mm. De
profundidad en la roca
5,9 m
8.2.03.15
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,4 m
8.2.03.16
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,9 m
8.2.03.17
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
100
54.26
5,426.00
106.5
532.5
D = 20 mm. De
profundidad en la roca
3,9 m
8.2.03.18
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
5,9 m
8.2.03.19
MallaChainlinkedfijado
para el rock pernos. En
la cara.
m2
50
14.48 724
8.2.03.20
m2
15
10.45 156.75
8.2.03.21
m2
15
9.51 142.65
8.2.03.22
Correasde
acerofijados a pernos
de anclaje. En la cara.
15
42.01 630.15
8.2.03.23
Correasde
acerofijados a pernos
de anclaje. Detrs de la
cara.
37.89 189.45
8.2.03.24
El hormign
proyectado.Plain. En la
cara.
m3
15 300.41
4,506.15
8.2.03.25
El hormign
proyectado.Plain.
Detrs de la cara.
m3
15 260.72
3,910.80
8.2.03.26
El hormign
proyectado.De fibra
reforzada. En la cara.
m3
8.2.03.27
El hormign
proyectado.De fibra
reforzada. Detrs de la
cara.
m3
8.2.03.28
Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.
kg
8.2.03.29
La instalacinde las
costillas de hormign
proyectado reforzado.
En la cara.
30
18.87 566.1
8.2.03.30
La instalacinde las
costillas de hormign
proyectado reforzado.
Detrs de la cara.
18
13.7 246.6
8.2.03.31
Prefabricacin y
suministro de vigas de
celosa.
kg
8.2.03.32
La instalacinde vigas
de celosa para
costillas de hormign
proyectado. En la cara.
20
71.17 1,423.40
8.2.03.33
La instalacinde vigas
de celosa para
costillas de hormign
proyectado. Detrs de
la cara.
10
59.43 594.3
8.2.03.34
Inviertaconcreto. En la
cara.
m3
8.2.03.35
Refuerzo de
invertido.En o detrs
de la cara
kg
220
363.79
80,033.80
50 315.64
15,782.00
700
1.8 1,260.00
400
3.2 1,280.00
14 100.41
600
1,405.74
2.4 1,440.00
8.2.04.00
INVESTIGACIN E
INSTRUMENTACIN.
8.2.04.01
Estacin de
Convergencia.Max.3
pines.
8.2.05.00
OBRAS DE
CONCRETO.
8.2.05.01
Encofrado Clase B.
Plain.
m2
60
8.2.05.02
Hormign Clase C.
m3
15 142.91
8.2.05.03
Refuerzo.Barras
corrugadas.
8.2.05.04
Pernos de anclajecon
lechadapara muros de
hormign D = 25 mm,
profundidad en la roca
1,5 m dept en
hormign de 1 m
no
8.2.05.05
HormignClase B.
pavement.Concrete
espesor mnimo de 150
mm. De malla de
refuerzo min 6,5 kg /
m2
160
8.2.06.00
METAL WORKS.
8.2.06.01
kg
300
Suma
no
2 3,269.62
6,539.24
67.26 4,035.60
2,143.65
0.5 1,459.67
30
729.84
77.22 2,316.60
169.72
27,155.20
6.11 1,833.00
591,174.48
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
8.3.01.0
ROCA EXCAVACIN.
8.3.01.01
Underground.La
excavacin del tnel
socavn de tnel de
aduccin y socavn a
la habitacin
ventilacin.Seccin
mnima de 22,6 m2.
8.3.01.02
Underground.La
excavacin del tnel.
La adicin de una
mayor seccin
transversal.
m3
50
31.71 1,585.50
8.3.01.03
Underground.La
excavacin del tnel.
Desmonte excesivo
anormal.
m3
50
15.76 788
8.3.01.04
Underground.La
excavacin del tnel.
La adicin de rondas de
voladura cortos.
a) Adicin de medio
rondas de voladura
285
1,521.55
433,641.75
20 359.56
7,191.20
b) Adicin de cuarta
rondas de voladura
10 1,744.84
17,448.40
8.3.01.05
Subterrneas.Perforaci m
ones contorno
perimetral para
voladuras
(cuandomenosque se
requiere 0,7 m de
distancia).
70
15.23
1,066.10
8.3.02.00
La perforacin
exploratoria e
inyeccin.
8.3.02.01
Perforacindepercusi m
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
en la cara.
1,500.00
15.58
23,370.00
8.3.02.02
Perforacindepercusi
n, el dimetro mnimo
de 50 mm de
profundidad 0 -. 30 m
Detrs de la cara.
8.3.02.03
Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m. En
la cara
no
15
73.32 1,099.80
8.3.02.04
Pruebas de
presindeagua. Por
valor de empacador.
Prueba con solo
empacador.
Profundidad 0-5 m.
Detrs de la cara
no
40
60.68 2,427.20
8.3.02.05
no
15
30.3 454.5
8.3.02.06
10
26.25 262.5
8.3.02.07
Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara
no
60 143.86
8,631.60
8.3.02.08
Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara
no
70 140.23
9,816.10
8.3.02.09
Lechada de
cemento.Tipo de
consumo A. Cemento
kg
24,000.00
1.01 24,240.00
8.3.02.10
Lechada de
cemento.Tipo consumo
B. Cemento
kg
20,000.00
2.59 51,800.00
8.3.02.11
Lechada de
cemento.Escriba C. El
consumo de cemento
kg
5,000.00
7.19 35,950.00
8.3.02.12
Inyecciones de
consolidacin.
kg
2,000.00
1.9 3,800.00
8.3.02.13
250
31.11 7,777.50
8.3.02.14
Contacto
mampostera.Escriba
D.
kg
1,000.00
22.57 22,570.00
8.3.02.15
Contacto
mampostera.Tipo E.
kg
1,500.00
26.23 39,345.00
8.3.02.16
Tiempo de la
lechada.En la cara
hr
50 605
30,250.00
8.3.02.17
Tiempo de la
lechada.Detrs de la
cara
hr
50 520
26,000.00
8.3.03.00
1,200.00
13.55 16,260.00
8.3.03.01
Escalamiento Extra. En
la cara.
hr
20
87.62 1,752.40
8.3.03.02
Escalamiento Extra.
Detrs de la cara.
hr
20
69.96 1,399.20
8.3.03.03
Inviertalimpieza y
escalamiento. Detrs
de la cara.
m2
500
24.34 12,170.00
8.3.03.04
Alta presin de
descarga de
agua.Detrs de la cara
m2
500
9.06 4,530.00
8.3.03.05
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
no
100
53.27
5,327.00
no
170
54.35
9,239.50
no
100
65.04
6,504.00
15
47.72
715.8
15
52.95
794.25
15
61.32
919.8
15
49.06
735.9
120
50.65
6,078.00
100
61.2
6,120.00
D = 20 mm. De
profundidad en la roca
2,4 m
8.3.03.06
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
2,9 m
8.3.03.07
Anclado
finalResinapernos de
roca, barra corrugada.
En la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.3.03.08
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
2,4 m
8.3.03.09
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
2,9 m
8.3.03.10
Final
no
ancladosResinapernos
de roca, barra
corrugada. Detrs de la
cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.3.03.11
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,4 m
8.3.03.12
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
2,9 m
8.3.03.13
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.3.03.14
Totalmentepernos de no
cemento-lechada roca,
barras deformadas. En
la cara.
150
93
13,950.00
Precio Unitario
Precio total
D = 25 mm. De
profundidad en la roca
5,9 m
Descripcin
Unidad
Cantidad
DLAR
ESTADOUNIDENSE
8.3.03.15
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
DLAR
ESTADOUNIDENSE
10
43.62
436.2
300
47.74
14,322.00
200
54.26
10,852.00
106.5
532.5
D = 20 mm. De
profundidad en la roca
2,4 m
8.3.03.16
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
2,9 m
8.3.03.17
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
3,9 m
8.3.03.18
Totalmentepernos de no
cemento-lechada roca,
barras deformadas.
Detrs de la cara.
D = 20 mm. De
profundidad en la roca
5,9 m
8.3.03.19
MallaChainlinkedfijado
para el rock pernos. En
la cara.
m2
50
14.48 724
8.3.03.20
m2
30
10.45 313.5
8.3.03.21
m2
30
9.51 285.3
8.3.03.22
Correasde
acerofijados a pernos
de anclaje. En la cara.
30
42.01 1,260.30
8.3.03.23
Correasde
acerofijados a pernos
de anclaje. Detrs de la
cara.
30
37.89 1,136.70
8.3.03.24
El hormign
proyectado.Plain. En la
cara.
m3
30 297.33
8,919.90
8.3.03.25
El hormign
proyectado.Plain.
Detrs de la cara.
m3
30 257.64
7,729.20
8.3.03.26
El hormign
proyectado.De fibra
reforzada. En la cara.
m3
400
360.71
144,284.00
8.3.03.27
El hormign
proyectado.De fibra
reforzada. Detrs de la
cara.
m3
100
312.56
31,256.00
8.3.03.28
Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.
kg
8.3.03.29
La instalacinde las
costillas de hormign
proyectado reforzado.
En la cara.
50
18.87 943.5
8.3.03.30
La instalacinde las
costillas de hormign
proyectado reforzado.
Detrs de la cara.
40
13.7 548
8.3.03.31
Prefabricacin y
suministro de vigas de
celosa.
kg
8.3.03.32
La instalacinde vigas
de celosa para
costillas de hormign
proyectado. En la cara.
30
71.17 2,135.10
8.3.03.33
La instalacinde vigas
de celosa para
costillas de hormign
proyectado. Detrs de
la cara.
20
59.43 1,188.60
8.3.03.34
Inviertaconcreto. En la
cara.
m3
8.3.03.35
Refuerzo de
invertido.En o detrs
de la cara
kg
1,300.00
8.3.04.00
INVESTIGACIN E
INSTRUMENTACIN.
8.3.04.01
Investigacin y pruebas
subterrneas.Tiempo
de inactividad.
hr
300
8.3.04.02
Perforacin de
base.Puesta en
marcha en cada lugar
de perforacin.
no
8.3.04.03
Perforacin de base,
dimetro mnimo de 76
mm. De profundidad de
0-30 m
420
125.06
52,525.20
8.3.04.04
Perforacin de base,
dimetro mnimo de 76
mm. De profundidad
30-100 m
140
171.84
24,057.60
8.3.04.05
Perforacin de
base.Estabilizacin
Hole.Lechada de
cemento.
kg
2,500.00
8.3.04.06
AjustePackerpara la
prueba de presin de
agua. Prueba
concurrente con la
perforacin (single
envasador).
Profundidad 0-100 m
8.3.04.07
AjustePackerpara la
no
prueba de presin de
agua. Prueba de
perforacin despus de
completado (doble
packer). Profundidad 0100 m
8.3.04.08
Pruebas Lugeon
no
no
1,300.00
1.8 2,340.00
800
3.2 2,560.00
30 100.41
3,012.30
2.4 3,120.00
605
6 1,108.00
181,500.00
6,648.00
1.9 4,750.00
100
115.56
11,556.00
10
135.56
1,355.60
70 1,440.00
100,800.00
8.3.04.09
Movilizacin /
desmovilizacinde
expertos y equipo a
hydrofracture y
pruebas de gato
hidrulico
no
1,210.56
8.3.04.10
Nmero de
hydrofracture o
pruebas de gato
hidrulico
no
12 1,140.23
13,682.76
8.3.04.11
Estacin de
Convergencia.Max.3
pines.
no
6 3,269.62
19,617.72
8.3.04.12
Multipunto
extensmetro pozo.
no
5 7,612.00
38,060.00
8.3.05.0
OBRAS DE
CONCRETO.
8.3.05.01
Encofrado Clase B.
Plain.Inclinada o
vertical.
m2
8.3.05.02
Encofrado Clase B.
curvada.Transicin
Forro
m2
8.3.05.03
Hormign Clase C.
m3
8.3.05.04
Refuerzo.Barras
corrugadas.
8.3.05.05
Preparacin de
superficie de la roca
para el hormigonado
m2
8.3.05.06
Acabado de superficies
sin forma, UB Clase
m2
50
4.65 232.5
8.3.05.07
Ranuras, rectangulares
100 x 100 mm
10
36.12 361.2
8.3.05.08
Teclas cortantes en
juntas de construccin
20
22.63 452.6
8.3.05.09
HormignClase
pavement.Concrete C.
espesor mnimo de 150
mm. De malla de
refuerzo min 6,5 kg /
m2
225
67.26 15,133.50
10
500
2,421.12
96.29 962.9
139.83
69,915.00
10 1,459.67
450
14,596.70
3.59 1,615.50
180
163.15
29,367.00
Precio Unitario
Precio total
Descripcin
Unidad
Cantidad
DLAR
ESTADOUNIDENSE
8.3.06.0
ACCIONES PARA LA
INSTALACIN DE
MAMPARO
8.3.06.01
8.3.06.02
DLAR
ESTADOUNIDENSE
a) Longitud 3 m,
profundidad en la roca
2,0 m
no
30
88.36 2,650.80
b) Longitud 2 m,
profundidad en la roca
1,0 m
no
30
66.07 1,982.10
PVC Waterstop en
juntas de construccin,
200 mm de ancho
100
24.93 2,493.00
8.3.06.03
PVCtuberas para
inyeccin de huecos
entre hormign y roca
para contactar
lechada.Colocado a
travs
encofrado.Dimensin
de acuerdo con el
equipo de contratistas
rejuntado
no
8.3.06.04
Interfazcon H,
LS
empotramiento y
rejuntado de
mamparo.Documentos
de referencia H-tierno,
Parte D, Seccin 2. Esta
partida incluir obras
relacionadas con la
preparacin para, y
empotramiento en el
hormign y similares
para el cierre, que
puede no estar incluida
en otros artculos, la
coordinacin con la Hcontratista en su
transporte y trabajo
Scaling, encofrado,
armadura, hormign y
mampostera es
atender a otros
lugares.
8.3.07.0
DRENAJE
8.3.07.01
Perforacindel agujero
dos drenaje para tnel
de descarga D = min
120 mm, longitud de
cada hoyo 35 m, todo
incluido.
8.3.07.02
8.3.07.03
Roca excavacin de
zanja, sobre artculo
8.3.07.02
m3
8.3.07.04
Drainpipe, PVC, D =
100 mm con acceso
tubera cada 60 m
8.3.07.05
Tubera de PE fija al
techo del tnel para
areation 50 mm
20
24.2
484
44,180.00
44,180.00
70
63.4 4,438.00
180
43.34 7,801.20
70
31.71 2,219.70
360
8.92 3,211.20
90
5.45 490.5
1,733,471.50
Descripcin
Unidad
Cantidad
Precio Unitario
DLAR
ESTADOUNIDENSE
Precio total
DLAR
ESTADOUNIDENSE
Caverna se considerar
y se mide por el trabajo
de apoyo detrs de la
cara
8.4.01.0
ROCA EXCAVACIN.
8.4.01.01
Underground.La
excavacin de la
caverna. Independiente
de la subdivisin de la
seccin transversal.
Aplicable para Top
Rubro
m3
6,600.00
8.4.01.02
Underground.La
excavacin de la
caverna. Independiente
de la subdivisin de la
seccin transversal.
Aplicable para Bancos
m3
18,250.00
8.4.01.03
Subterrneos.Perforaci m
ones contorno
perimetral para
voladuras (cuando se
requiere menos de 0,7
m de distancia).
8.4.02.0
La perforacin
exploratoria e
inyeccin.
8.4.02.01
Perforacindepercusi
n, dimetro mnimo de
50 mm de profundidad
0 -. 30 m.
8.4.02.02
Pruebas de presin de
agua.Ajuste
Packer.Las pruebas con
solo
empacador.Profundida
d 0-5 m
no
73.32 366.6
8.4.02.03
no
30.3 151.5
8.4.02.04
no
8.4.02.05
Lechada de
cemento.Tipo A ..
kg
3,000.00
1.01 3,030.00
8.4.02.06
Lechada de
cemento.Tipo consumo
B. Cemento
kg
6,000.00
2.59 15,540.00
8.4.02.07
Lechada de
cemento.Escriba C. El
consumo de cemento
kg
1,000.00
7.19 7,190.00
8.4.02.08
Lechada.Tiempo de
inactividad.
hr
20 605
8.4.03.0
8.4.03.01
Escalamiento Extra.
hr
70
68.62 452,892.00
41.2 751,900.00
300
15.23
450
4,569.00
15.58 7,011.00
25 143.86
3,596.50
12,100.00
87.62 6,133.40
Aplicable para la
central elctrica de Top
Rumbo y Bancos
8.4.03.02
Invierta limpieza y
escalamiento.
m2
1,000.00
24.34 24,340.00
8.4.03.03
m2
200
38.42 7,684.00
8.4.03.04
Alta presin de
descarga de agua.
m2
500
9.06 4,530.00
8.4.03.05
Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,9 m
no
400
54.35 21,740.00
8.4.03.06
Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 3,9 m
no
500
65.04 32,520.00
8.4.03.07
Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 4,9 m
no
400
80.22 32,088.00
8.4.03.08
Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,9 m
no
300
52.95 15,885.00
8.4.03.09
Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 3,9 m
no
500
61.32 30,660.00
8.4.03.10
Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 25
mm.Profundidad en la
roca 4,9 m
no
400
73.74 29,496.00
8.4.03.11
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.D = 25
mm.Profundidad en la
roca 5,9 mpernos
spiling as como pernos
radiales
200
93
18,600.00
8.4.03.12
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.D = 32
mm.Profundidad en la
roca 6,9 mpernos
spiling as como pernos
radiales
100
116.21
11,621.00
8.4.03.13
m2
100
14.48 1,448.00
8.4.03.14
m2
1,000.00
10.45 10,450.00
8.4.03.15
Correas de acero
fijados para el rock
pernos.
100
42.01 4,201.00
8.4.03.16
Suministrode la barra
de tendones (activos)
anclajes de
roca.Longitud 10 m
no
5 210.3
1,051.50
8.4.03.17
Suministrode la barra
de tendones (activos)
anclajes de
roca.Longitud 15 m
no
5 252.36
1,261.80
8.4.03.18
Suministrode hebra
tendn (pasivo)
anclajes de
roca.Longitud 10 m
no
10 189.27
1,892.70
8.4.03.19
Suministrode hebra
tendn (pasivo)
anclajes de
roca.Longitud 15 m
no
10 227.12
2,271.20
8.4.03.20
La perforacin de
agujero para bar /
hebra anclas ..
375
8.4.03.21
Re-perforacin despus
de la lechada para bar /
hebra anclas ..
100
8.4.03.22
Instalacinde la barra
de tendones (activos)
anclajes de
roca.Longitud 10 m
no
30.4 11,400.00
18.98 1,898.00
5 315.46
1,577.30
8.4.03.23
Instalacinde la barra
de tendones (activos)
anclajes de
roca.Longitud 15 m
no
5 378.54
1,892.70
8.4.03.24
Instalacinde hebra
tendn (pasivo)
anclajes de
roca.Longitud 10 m
no
10 283.91
2,839.10
8.4.03.25
Instalacinde hebra
tendn (pasivo)
anclajes de
roca.Longitud 15 m
no
10 340.69
3,406.90
8.4.03.26
El hormign
proyectado.Plain.
m3
150
300.41
45,061.50
8.4.03.27
El hormign
proyectado.Reforzado
con fibra.
m3
1,200.00
363.79
436,548.00
8.4.03.28
Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado
(RRS).Aplicable para la
central elctrica
kg
11,000.00
8.4.03.29
Instalacinde costillas
de hormign
proyectado reforzado
(RRS).En la
cara.Aplicable para la
central elctrica
750
8.4.04.0
INVESTIGACIN E
INSTRUMENTACIN.
8.4.04.01
Estacin de
Convergencia.Max.3
pines.
no
1.8 19.800,00
18.87 14,152.50
3 3,269.62
9,808.86
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
8.4.04.02
Estacin de
Convergencia.Max.5
pines.
no
3 3,339.62
10,018.86
8.4.04.03
Multipunto
extensmetro pozo.
no
8 7,612.00
60,896.00
8.4.04.04
Investigacin e
instrumentacin.Tiemp
o de inactividad.
hr
8.4.05.0
ALCANTARILLAS
tubera y tubos de
desage.
8.4.05.01
8.4.05.02
Compactado roca
triturada 8-16 mm a lo
largo de las tuberas de
drenaje.
m3
30
8.4.05.03
Compactado roca
triturada 8-11 mm
alrededor del tanque
de recogida.
m3
8.4.05.04
Compactado roca
triturada 16-32 mm
como supuesto Base de
losa de hormign
m3
10 605
150
100
6,050.00
8.92 1,338.00
22.24 667.2
22.61 113.05
23.1 2,310.00
8.4.06.0
OBRAS DE
CONCRETO.
8.4.06.01
Encofrado Clase A.
Llano.Inclinada o
vertical.Por encima de
la elevacin 1569.0
m2
8.4.06.02
Encofrado Clase A.
Llano.Horizontal.Por
encima de la elevacin
1569.0
m2
50
84.01 4,200.50
8.4.06.03
Encofrado Clase A.
curvas.Por encima de
la elevacin 1569.0
m2
20
81.12 1,622.40
8.4.06.04
Encofrado Clase B.
Plain.Inclinada o
vertical.Por debajo de
la elevacin 1561.3
m2
1,650.00
67.26 110,979.00
8.4.06.05
Encofrado Clase B.
Plain.Inclinada o
vertical.De elevacin
1.561,3 1.565,0 a la
elevacin
m2
2,150.00
75.33 161,959.50
8.4.06.06
Encofrado Clase B.
Plain.Inclinada o
vertical.De elevacin
1.565,0 1.569,0 a la
elevacin
m2
2,400.00
82.86 198,864.00
8.4.06.07
Encofrado Clase B.
Plain.Inclinada o
vertical.Por encima de
la elevacin 1569.0
m2
1,850.00
92.8 171,680.00
8.4.06.08
Encofrado Clase B.
Plain.Horizontal.Por
debajo de la elevacin
1561.30
m2
500
68.51 34,255.00
8.4.06.09
Encofrado Clase B.
Plain.Horizontal.De
elevacin 1.561,3
1.565,0 a la elevacin
m2
750
76.73 57,547.50
8.4.06.10
Encofrado Clase B.
Plain.Horizontal.De
elevacin 1.565,0
1.569,0 a la elevacin
m2
850
84.4 71,740.00
8.4.06.11
Encofrado Clase B.
Plain.Horizontal.Por
encima de la elevacin
1569.0
m2
350
92.84 32,494.00
8.4.06.12
Encofrado Clase C.
Plain.Inclinada o
vertical.Por debajo de
la elevacin 1561.3
m2
100
72.31 7,231.00
8.4.06.13
Encofrado Clase C.
Plain.Horizontal.Por
debajo de la elevacin
1561.3
m2
100
80.98 8,098.00
8.4.06.14
Encofrado
articulaciones Clase C.
Construccin.Por
debajo de la elevacin
1569.0
m2
300
73.21 21,963.00
8.4.06.15
Encofrado
articulaciones Clase C.
Construccin.Por
encima de la elevacin
1569.0
m2
100
85.12 8,512.00
8.4.06.16
Encofrado.Clase A.
gra Vigas y Columnas
m2
1,000.00
8.4.06.17
Vaco rectangular, de
hasta 0,1 m2.
no
30
26.7 801
8.4.06.18
no
30
26.7 801
250
69.43 17,357.50
156.65
156,650.00
8.4.06.19
no
20
41.2 824
8.4.06.20
no
10
41.2 412
8.4.06.21
Groove, triangular
garganta goteo 25 mm.
200
33.5 6,700.00
8.4.06.22
Groove, rectangular.W
x H = 100 x 100 mm
100
36.12 3,612.00
8.4.06.23
Groove, rectangular.W
x H = 200 x 200 mm
200
37.23 7,446.00
8.4.06.24
Teclas cortantes en
juntas de construccin
200
22.63 4,526.00
8.4.06.25
Encofrado.Ranura de
drenaje a lo largo de
las paredes de roca
700
42.12 29,484.00
8.4.06.26
Refuerzo.Barras
corrugadas.
385
8.4.06.27
Refuerzo.Las barras
lisas.
3 1,459.67
4,379.01
8.4.06.28
Refuerzo.Mallazo.
2 2,812.50
5,625.00
8.4.06.29
Lechadabarras
corrugadas.D = 20
mm.Longitud total 2,0
m.Profundidad en la
roca 1,0 m
no
20
66.07 1,321.40
8.4.06.30
Lechadabarras
corrugadas.D = 25
mm.Longitud en
concreto 1,0
m.Profundidad en la
roca 1,5 m
no
50
66.07 3,303.50
8.4.06.31
Lechadabarras
corrugadas.D = 32
mm.Longitud de
hormign de 1,5
m.Profundidad en la
roca 2,0 m
no
20
66.07 1,321.40
8.4.06.32
Lechadabarras
corrugadas.D = 32
mm.Longitud de
hormign de 1,5
m.Profundidad en la
roca 6,0 m.Gra Vigas
y Columnas
no
54 129.48
8.4.06.33
Lechadabarras
corrugadas.D = 25
mm.Longitud de
hormign de 1,5
m.Profundidad en la
roca 5,0 m.Gra Vigas
y Columnas
no
8.4.06.34
Deformadosbares.D = no
25 mm.Longitud:
2,0m.Longitud de
hormign de 1,0 m.de
calidad soldable para la
fijacin de acera
hidrulicas, equipos
electromecnicos etc.
parcialmente
embutidos.
8.4.06.35
Preparacin de
superficie de la roca
para el hormigonado.
m2
700
8.4.06.36
Clase de hormign B. A
continuacin elevacin
1561.30
m3
700
137.15
96,005.00
8.4.06.37
Clase de hormign C. A
continuacin elevacin
1561.30
m3
1,550.00
142.91
221,510.50
8.4.06.38
Clase de hormign C.
De elevacin 1.561,3
1.569,0 a la elevacin
m3
1,550.00
142.91
221,510.50
1,459.67
561,972.95
6,991.92
160
129.48
20,716.80
100
66.07
6,607.00
3.59 2,513.00
8.4.06.39
Clase de hormign C.
Por encima de la
elevacin 1569.0
m3
370
142.91
52,876.70
8.4.06.40
Hormign Clase C.
Crane Vigas y
Columnas
m3
300
142.91
42,873.00
8.4.06.41
Lechadabajo carriles
para viajar gras con la
expansin de
mortero.Rails sern
suministrados por
otros.
400
2.5 1,000.00
8.4.06.42
El acabado de
superficies no
formadas, Clase UA.
m2
600
4.2 2,520.00
8.4.06.43
El acabado de
superficies no
formadas, UB Clase.
m2
2,700.00
4.65 12,555.00
8.4.06.44
El acabado de
superficies no
formadas, clase UC.
m2
300
4.85 1,455.00
8.4.06.45
200
15.27 3,054.00
8.4.06.46
100
24.93 2,493.00
8.4.06.47
Ganchos de
elevacin.Barras de
acero inoxidable.D =
25 mm
no
10
97.35 973.5
8.4.06.48
Hierros
Paso.Parcialmente
incrustado en el
hormign.
no
20
15.71 314.2
8.4.06.49
Inoxidabletubos de
acero.Parcialmente
incrustado en concreto,
inlcuyendo flexin y
accesorios.Diam. =
100mm.
20
40.08 801.6
8.4.06.50
Inoxidabletubos de
acero.Parcialmente
embebido en el
hormign, incluyendo
doblarse y
accesorios.Diam. =
150mm.
20
78.18 1,563.60
8.4.06.51
Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 50 mm
100
8.92 892
8.4.06.52
Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 100 mm
100
8.92 892
8.4.06.53
Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 150 mm
100
8.92 892
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
8.4.06.54
Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 200 mm
8.4.06.55
Hinchazn banda
arcilla
50
100
DLAR
ESTADOUNIDENSE
43.34 2,167.00
110.2
11,020.00
8.4.06.56
Compuesto de sellado
de juntas.
kg
20
18.25 365
8.4.06.57
Tubo de neopreno
Sellado de juntas.
kg
20
31.35 627
8.4.06.58
Sellado de juntas.Tubo
de inyeccin.
50
52.32 2,616.00
8.4.06.59
Sellado de juntas.La
inyeccin de tubos de
inyeccin con epoxi.
kg
10
18.25 182.5
8.4.06.60
Selladoalrededor de
LS
tuberas, cables,
conductos, etc., en
bloqueadores con
masilla resistente al
fuego para satisfacer
clase A60 fuego.Varios
espesor de las
paredes.El trabajo que
se lleva a cabo despus
de la instalacin de los
equipos.
8.4.06.61
Segundaetapa en
concreto bloqueadores
con mortero.Varios
espesor de las
paredes.El trabajo que
se lleva a cabo despus
de la instalacin de los
equipos.
8.4.07.0
CONSTRUCTORES DE
TRABAJO
8.4.07.01
Piso solado de
hormign, 50 mm de
espesor.
m2
50
17.02 851
8.4.07.02
Baldosas de cermica.
m2
30
28.43 852.9
8.4.07.03
m2
40
70.98 2,839.20
8.4.07.04
Suelos de terrazo.
m2
30
59.57 1,787.10
8.4.07.05
Sistema de suelo
elevado.
m2
40 522.8
8.4.07.06
Mampostera de
bloques de
hormign.Espesor
nominal.
m2
40
73.3 2,932.00
8.4.07.07
Enyesado, interno.
m2
80
42.76 3,420.80
8.4.07.08
Rendering, llano,
externo.
m2
50
17.1 855
8.4.07.09
Rendering, teido,
externo.
m2
50
17.1 855
8.4.07.10
Azulejo cermico.
m2
8.4.07.11
m2
50
55.9 2,795.00
8.4.07.12
m2
40
27.35 1,094.00
8.4.07.13
200
18.58 3,716.00
8.4.07.14
De altadensidad de la
lana mineral.Espesor
100 mm
m2
200
6.67 1,334.00
8.4.07.15
Aisladospuertas de
acero
individuales.Clasificaci
n fuego
A60.Dimensiones
externas
1000x2100mm
no
LS
18,627.10
18,627.10
1 12,873.10
12,873.10
130
20,912.00
28.43 3,695.90
26 3,049.00
79,274.00
8.4.07.16
Aisladospuertas de
no
acero
individuales.Clasificaci
n fuego
A60.Dimensiones
externas
1000x2100mmpresin
de explosin de ambos
lados: 10 kN / m2.
3,049.00
12,196.00
8.4.07.17
Aisladospuertas de
no
acero
individuales.Clasificaci
n fuego
A60.Dimensiones
externas
1100x2500mm
4,505.00
18,020.00
8.4.07.18
Puertas de acero de
doble
aislamiento.Clasificaci
n fuego
A60.Dimensiones
externas
1600x2200mm
no
6 5,542.00
33,252.00
8.4.07.19
Puertas de acero de
doble
aislamiento.Clasificaci
n fuego
A60.Dimensiones
externas
2000x2500mm
no
6 5,542.00
33,252.00
8.4.07.20
Puertas de madera
interiores
individuales.Ranura
aire
Inclusiv.Dimensiones
externas 900x2100
mm.
no
3 1,044.67
3,134.01
8.4.07.21
Principalpuerta de
entrada a sala de
mquinas.Aluminio
compuerta
rodante.Dimensin
exterior4500x5500mm
.
no
1 9,874.02
9,874.02
8.4.07.22
m2
2,000.00
24.43 48,860.00
8.4.07.23
m2
900
24.43 21,987.00
8.4.07.24
Pintura de paredes de
hormign.
m2
8,500.00
24.43 207,655.00
8.4.07.25
Acabado de superficies
de hormign
proyectado en casa
caverna con rociado de
pintura de hormign
blanco.
m2
1,500.00
24.43 36,645.00
8.4.07.26
La pintura de las
puertas de acero, solo
no
34
8.4.07.27
La pintura de las
puertas de acero, doble
no
12 119.5
8.4.07.28
Pintura de puertas de
madera interiores
no
8.4.08.0
ACERO
ESTRUCTURAL DE
OBRAS.
8.4.08.01
Arcode techo.Pernos
m2
completos incluido
roca, abrazaderas de
cables, estructura de
soporte y cinta
cncava leve lminas
de techo de
acero.Canalones y
tubos de drenaje hacia
abajo a la viga de la
gra tambin se
incluirn.
61.12 2,078.08
1,000.00
1,434.00
34 102
293.55
293,550.00
8.4.09.0
HVAC,SANITARIAS Y
DE LUCHA CONTRA
INCENDIOS
INSTALACIONES.PAR
A TNEL DE ACCESO,
central elctrica,
TNELES BARRAS,
TRANSFORMADOR
HALL Y CABLE DEL
TNEL
8.4.09.01
Aireacondicionado y
Prov.Suma
sistemas de
ventilacin.En sala de
mquinas de un hall de
transformador.Diseo
deempleador.
1 600,000.00
600,000.00
8.4.09.02
Aireacondicionado y
sistemas de
ventilacin.En el
edificio de oficinas de
la sala de
mquinas.Diseo por
el empleador.
Prov.Suma
1 110,000.00
110,000.00
8.4.09.03
Sistema de agua
helada.Diseo por el
empleador.
Prov.Suma
1 25,000.00
25,000.00
8.4.09.04
Alcantarillado,instalaci LS
ones de fontanera y
sanitarios, con planta
de tratamiento de agua
potable y alcantarillado
del tanque de volumen
mnimo 6.000 l, etc.
71,530.00
71,530.00
8.4.09.05
Instalaciones de lucha
contra incendios y
equipos de
rescate.Diseo por el
empleador.
Prov.Suma
1 80,000.00
80,000.00
8.4.09.06
1 14,000.00
14,000.00
8.4.10.0
METAL WORKS.
8.4.10.01
Tapa de la escotilla de
poca potencia.
kg
4.000,00
7.01 28,040.00
8.4.10.02
Tapa de la escotilla de
servicio pesado.
kg
35,000.00
6.34 221,900.00
8.4.10.03
kg
1,000.00
7.01 7,010.00
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
8.4.10.04
kg
100
6.34 634
8.4.10.05
Rejilla de poca
potencia.
kg
1,000.00
7.01 7,010.00
8.4.10.06
Rejilla de alta
resistencia.
kg
1,000.00
6.34 6,340.00
8.4.10.07
Barandilla desmontable
alrededor del cascarn.
kg
1,000.00
6.34 6,340.00
8.4.10.08
Barandilla de la
escalera interna.
a) Tipo 1
kg
2,000.00
7.01 14,020.00
b) Tipo 2
kg
1,000.00
7.01 7,010.00
a) Tipo A
kg
400
7.01 2,804.00
b) Tipo B
kg
100
7.01 701
8.4.10.10
Escaleras de acero.
kg
2,000.00
7.01 14,020.00
8.4.10.11
Escalas de acero.
kg
1,000.00
7.01 7,010.00
8.4.10.12
Elevador
LS
1 36,644.00
8.4.10.13
Piezas de recambio
para ascensor por
cinco (5) aos, tal
como recomiendan la
fabricacin
LS
8.4.10.14
Guas y alfizares de
las trozas de
parada.Incrustado en
concreto.
kg
100
7.03 703
8.4.10.15
Deje de
registros.Acero.
kg
200
6.34 1,268.00
8.4.11.0
Interfazcon E:. M,
empotramiento de
equipos
electromecnicosEsta
partida incluir todos
los trabajos
relacionados con la
preparacin para, y
imbedment en
hormign y similares,
de electro relevante equipo mecnico
(incluyendo, pero no
limitado a, el proyecto
de turbina de tubo y
otras partes de la
turbina, generador de
los mecanismos de
apoyo, etc.)
8.4.11.1
La formacinde
rebajes, bloqueadores
y similares, para devide
entre las diferentes
etapas de hormigonado
8.4.11.2
Provisiny remocin de LS
encofrados para
elementos a ser
incorporados, extra
ms para
empotramiento y
encofrado.
8.4.12.0
OBRAS CIVILES
VARIOS
8.4.12.01
Tierraelectrodos,
contra la roca o fijado
al refuerzo.Hilos de
cobre 1 x 95 mm2.En
caverna central
elctrica.
300
21.34 6,402.00
8.4.12.02
Tierraelectrodos,
contra la roca o fijos a
los cables
reinforcementCu 2 x 95
mm2.En caverna
central elctrica.
200
21.34 4,268.00
8.4.10.09
LS
36,644.00
0
1 73,089.60
73,089.60
67,416.00
67,416.00
8.4.12.03
Varillas de puesta a
tierra en los agujeros
perforados, min 6 m de
largo
no
10 101.2
8.4.12.04
Varillas de puesta a
tierra en los agujeros
perforados, mnimo 10
m de largo
no
4 101.2
8.4.12.05
Cadwelding de juntas,
conexiones e
intersecciones
no
80 230.3
8.4.12.06
Plataforma temporal en
la cota 1569,0 para la
descarga de los
distribuidores y los
tubos de entrada
LS
1,012.00
404.8
18,424.00
1 14,155.20
14,155.20
Bill 8.4 de
Powerhouse Caverna
6,889,577.46
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
Embarradoconexiones
y caverna se
considerarn y se
miden para el trabajo
de apoyo detrs de la
cara
8.5.01.0
ROCA EXCAVACIN.
8.5.01.01
Underground.La
excavacin del
tnel.Seccin
transversal14.2m2
40
2,226.50
89,060.00
Aplicable para
embarrado Tneles e
independiente de la
subdivisin de la
seccin transversal
8.5.01.02
Underground.La
excavacin del
tnel.Desmonte
excesivo anormal.
m3
8.5.01.03
Underground.La
m3
excavacin de la
caverna.Independiente
de la subdivisin de la
seccin
transversal.Aplicable
para el transformador
Saln Top Rubro
3,200.00
76.61
245,152.00
8.5.01.04
Underground.La
m3
excavacin de la
caverna.Independiente
de la subdivisin de la
seccin
transversal.Aplicable
para Transformer
Ayuntamiento Bancos
1,200.00
63.49
76,188.00
8.5.01.05
Subterrneos.perforaci
ones contorno
perimetral para
voladuras (cuando se
requiere menos de 0,7
m de distancia).
25
100
15.76 394
15.23 1,523.00
8.5.01.06
LS
1 26,712.25
26,712.25
b) Perforacin de
excavacin de al
menos 300 mm de
dimetro
25
c) lechada de presin
para la estabilizacin
del agujero
25
85.76 2,144.00
d) re-perforacin
despus de la lechada
25
18.98 474.5
e) Suministro e
instalacin de tubera
de acero de 200 mm de
dimetro, con
empotramiento
25
60.75 1,518.75
30.4 760
8.5.02.0
La perforacin
exploratoria e
inyeccin.
8.5.02.01
Percusinperforacin,
dimetro mnimo de 50
mm.de profundidad 0 30 m.
8.5.02.02
Pruebas de presin de
agua.Ajuste
Packer.Las pruebas con
solo
empacador.Profundida
d 0-5 m
no
73.32 366.6
8.5.02.03
no
30.3 151.5
8.5.02.04
no
8.5.02.05
Lechada de
cemento.Tipo A ..
kg
3,000.00
1.01 3,030.00
8.5.02.06
Lechada de
cemento.Tipo consumo
B. Cemento
kg
6,000.00
2.59 15,540.00
8.5.02.07
Lechada de
cemento.Escriba C. El
consumo de cemento
kg
1,000.00
7.19 7,190.00
8.5.02.08
Lechada.Tiempo de
inactividad.
hr
8.5.03.0
8.5.03.01
Extrade
hr
escala.Aplicable para
el transformador Saln
Top Rubro y bancos, as
como de embarrado
Tneles
8.5.03.02
Invierta limpieza y
escalamiento.
m2
8.5.03.03
Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 1,9 m
no
70
53.27 3,728.90
8.5.03.04
Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,4 m
no
30
53.27 1,598.10
450
15.58 7,011.00
25 143.86
20 605
60
87.62
500
3,596.50
12,100.00
5,257.20
24.34 12,170.00
8.5.03.05
Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,9 m
no
50
54.35 2,717.50
8.5.03.06
Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 3,9 m
no
8.5.03.07
Resinaextremo
anclado pernos de
roca, barra
corrugada.D = 20
mm.Profundidad en la
roca 4,9 m
no
70
80.22 5,615.40
8.5.03.08
Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 1,9 m
no
40
49.06 1,962.40
8.5.03.09
Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca.2,4 m
no
40
49.06 1,962.40
8.5.03.10
Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 2,9 m
no
50
50.65 2,532.50
8.5.03.11
Totalmentepernos de
anclaje con lechada de
cemento, barra
corrugada.D = 20
mm.Profundidad en la
roca 3,9 m
no
70
61.2 4,284.00
8.5.03.12
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.D = 25
mm.Profundidad en la
roca 4,9 mpernos
spiling as como pernos
radiales.
70
93
6,510.00
8.5.03.13
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.D = 25
mm.Profundidad en la
roca 5,9 mpernos
spiling as como pernos
radiales.
70
93
6,510.00
8.5.03.14
m2
8.5.03.15
m2
250
10.45 2,612.50
8.5.03.16
Correas de acero
fijados para el rock
pernos.
100
42.01 4,201.00
8.5.03.17
El hormign
proyectado.Plain.
m3
8.5.03.18
El hormign
proyectado.Reforzado
con fibra.
m3
350
8.5.03.19
Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado
(RRS).
kg
1,300.00
100
65.04 6,504.00
50
14.48 724
20 300.41
363.79
6,008.20
127,326.50
1.8 2,340.00
8.5.03.20
La instalacin de las
costillas de hormign
proyectado reforzado
(RRS).
8.5.04.0
INVESTIGACIN E
INSTRUMENTACIN.
8.5.04.01
Estacin de
Convergencia.Max.3
pines.
90
no
18.87 1,698.30
2 3,269.62
6,539.24
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
8.5.04.02
Estacin de
Convergencia.Max.5
pines.
no
2 3,339.62
6,679.24
8.5.04.03
Multipunto
extensmetro pozo.
no
2 7,612.00
15,224.00
8.5.04.04
Investigacin e
instrumentacin.Tiemp
o de inactividad.
hr
10 605
8.5.05.0
ALCANTARILLAS
tubera y tubos de
desage.
8.5.05.01
30
8.92 267.6
8.5.05.02
Compactado roca
triturada 8-16 mm a lo
largo de las tuberas de
desage
m3
15
22.24 333.6
8.5.05.03
Compactado roca
triturada 16-32 mm
como capa de base
para la losa de
hormign
m3
20
23.1 462
8.5.06.0
OBRAS DE
CONCRETO.
8.5.06.01
Encofrado Clase B.
Plain.Inclinada o
vertical.
m2
1,200.00
8.5.06.02
Encofrado Clase B.
Plain.Horizontal.
m2
320
92.84 29,708.80
8.5.06.03
Encofrado Clase C.
Plain.Inclinada o
vertical.
m2
100
72.31 7,231.00
8.5.06.04
Encofrado Clase C.
Plain.Horizontal.
m2
10
80.98 809.8
8.5.06.05
Encofrado
articulaciones Clase C.
Construccin.
m2
20
73.21 1,464.20
8.5.06.06
Encofrado Clase B.
Suelo y escaleras en
los tneles de barras
m2
25 102.2
8.5.06.07
Vaco rectangular, de
hasta 0,1 m2.
no
26.7
80.1
8.5.06.08
no
26.7
80.1
8.5.06.09
no
41.2 206
8.5.06.10
no
41.2
6,050.00
92.8 111,360.00
2,555.00
82.4
8.5.06.11
Groove, triangular
garganta goteo 25 mm.
100
33.5 3,350.00
8.5.06.12
Groove, rectangular.W
x H = 100 x 100 mm
10
36.12 361.2
8.5.06.13
Groove, rectangular.W
x H = 200 x 200 mm
30
37.23 1,116.90
8.5.06.14
Teclas cortantes en
juntas de construccin
100
22.63 2,263.00
8.5.06.15
Encofrado.Ranura de
drenaje a lo largo de
las paredes de roca
140
42.12 5,896.80
8.5.06.16
Refuerzo.Barras
corrugadas.
40 1,459.67
8.5.06.17
Refuerzo.Las barras
lisas.
1 1,459.67
8.5.06.18
Lechadabarras
corrugadas.D = 20
mm.Longitud 2,0
m.Profundidad en la
roca 1,0 m
no
60
66.07 3,964.20
8.5.06.19
Lechadabarras
corrugadas.D = 25
mm.Longitud en
concreto 1,0
m.Profundidad en la
roca 1,5 m
no
40
66.07 2,642.80
8.5.06.20
Lechadabarras
corrugadas.D = 32
mm.Longitud en
concreto 1,0
m.Profundidad en la
roca 2,5 m
no
20
68.24 1,364.80
8.5.06.21
Bares.D = 20
mm.Longitud: 1,0 m
Longitud de hormign
de 0,6 m.Parcialmente
roscado para la fijacin
de los equipos.
no
20
66.07 1,321.40
8.5.06.22
Preparacin de
superficie de la roca
para el hormigonado.
m2
200
8.5.06.23
Hormign Clase C.
m3
500
8.5.06.24
El acabado de
superficies no
formadas, Clase UA.
m2
8.5.06.25
El acabado de
superficies no
formadas, UB Clase.
m2
600
4.65 2,790.00
8.5.06.26
El acabado de
superficies no
formadas, clase UC.
m2
100
4.85 485
8.5.06.27
60
15.27 916.2
8.5.06.28
Ganchos de
elevacin.Barras de
acero inoxidable.D =
25 mm, L = 4,0 M
no
16
77.22 1,235.52
8.5.06.29
Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 50 mm
10
8.92
89.2
8.5.06.30
Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 100 mm
10
8.92
89.2
8.5.06.31
Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 150 mm
50
58,386.80
1,459.67
3.59 718
142.91
10
71,455.00
4.2
43.34 2,167.00
42
8.5.06.32
Parcialmente
incrustado PVCpipe.Incluyendo curvas
y
accesorios.Complete.
D = 200 mm
10
43.34 433.4
8.5.06.33
Compuesto de sellado
de juntas.
kg
10
18.25 182.5
8.5.06.34
Tubo de neopreno
Sellado de juntas.
kg
10
31.35 313.5
8.5.06.35
Sellado de juntas.Tubo
de inyeccin.
50
52.32 2,616.00
8.5.06.36
Sellado de juntas.La
inyeccin de tubos de
inyeccin con epoxi.
kg
8.5.06.37
Reforzadosvigas de
hormign delante de
transformadores.BxHx
L=
aprox.300x400x7000m
m
no
24 683.06
8.5.06.38
Galvanizadotirando
ganchos para
transformator en
paredes de
hormign.Steelplate
con pernos de anclaje
parcialmente
incrustado.
kg
60
8.5.06.39
Galvanizadotirando
kg
ganchos para
transformator en
paredes de
roca.Steelplate
soldada a bulones A25
lechada.pernos Rock:
Profundidad en 2.5m
roca.
8.5.07.0
CONSTRUCTORES DE
OBRAS.
8.5.07.01
Aisladopuerta de acero no
individual.Clasificacin
fuego
A60.1000x2100mm
externa de
apertura.presin de
explosin de ambos
lados: 50 kN / m2.
8.5.07.02
Aluminiocompuerta
rodante.La apertura al
exterior 3500 x 4500
mm
no
8.5.07.03
m2
600
24.43 14,658.00
8.5.07.04
Pintura de paredes.
m2
400
24.43 9,772.00
8.5.07.05
La pintura de las
puertas de acero, solo
no
8.5.08.0
ACERO
ESTRUCTURAL DE
OBRAS.
8.5.08.01
Arcode techo.Pernos
completos incluido
roca, abrazaderas de
cables, estructura de
soporte y acanalada de
acero suave
revestimiento de
tejados y bajantes.
8.5.09.0
METAL WORKS.
8.5.09.01
Tapa de la escotilla de
poca potencia.
18.25
91.25
16,393.44
12.9 774
100
12.9
1,290.00
3,049.00
12,196.00
1 9,874.00
m2
350
kg
100
9,874.00
61.12 244.48
293.55
102,742.50
7.01 701
8.5.09.02
Tapa de la escotilla de
servicio pesado.
kg
10,000.00
6.34 63,400.00
8.5.09.03
kg
500
7.01 3,505.00
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
8.5.09.04
kg
100
6.34 634
8.5.09.05
Rejilla de poca
potencia.
kg
100
7.01 701
8.5.09.06
kg
2,500.00
6.34 15,850.00
8.5.09.07
Embedded
Transformador Rail 35
kg.
kg
3,500.00
6.34 22,190.00
8.5.09.08
Barandilla desmontable
alrededor del cascarn.
kg
500
6.34 3.170,00
8.5.09.09
Escalera de
caracol.Incl.barandilla
.Diam .: Aprox: 0.9m
kg
1,000.00
6.34 6,340.00
8.5.09.10
Guas y alfizares de
las trozas de
parada.Incrustado en
concreto.
kg
500
6.34 3.170,00
8.5.09.11
m3
8.5.10.0
OBRAS CIVILES
VARIOS
8.5.10.01
Tierraelectrodos,
contra la roca o fijado
al refuerzo.Hilos de
cobre 1 x 95 mm2.En
caverna transformador
y la conexin de barras
colectoras
300
21.34 6,402.00
8.5.10.02
Tierraelectrodos,
contra la roca o fijados
a los cables de refuerzo
de Cu 2 x 95 mm2.En
caverna transformador
y la conexin de barras
colectoras
100
21.34 2,134.00
8.5.10.03
Varillas de puesta a
tierra en los agujeros
perforados, min 6 m de
largo
no
4 101.2
404.8
8.5.10.04
Varillas de puesta a
tierra en los agujeros
perforados, mnimo 10
m de largo
no
2 101.2
202.4
8.5.10.05
Cadwelding de jonts,
conexiones e
intersecciones
no
80 230.3
8.5.10.06
m3
25
25
22.88 572
18,424.00
23.41 585.25
Bill 8.5
Transformador
Cavern y embarrado
Conexiones
1,370,389.29
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
Portales se
considerarn y valoran
como trabajo de apoyo
detrs de la cara
9.1.01.0
TIERRA DE OBRAS.
9.1.01.01
Excavacin tierra
vegetal.
9.1.01.02
9.1.01.03
m3
3.34
5,000.00
16.7
10.05 50,250.00
Preparacin de la
fundacin de la roca
a) Para el hormigonado
9.1.01.04
m3
m2
50
3.59 179.5
Llenar y rellenar
a) relleno estructural
m3
3,500.00
15.92 55,720.00
m3
500
29.66 14,830.00
150
21.76 3,264.00
9.1.02.0
ROCA EXCAVACIN.
9.1.02.01
Por encimadel
suelo.Excavacin de
roca a granel
(anchura>2m).
9.1.02.02
Por encimadel
suelo.Pozos de
contorno perimetral
para voladuras
(cuandomenosque se
requiere 0,7 m de
distancia).
9.1.02.03
Por encimadel
suelo.Excavacin de la
roca.Desmonte
excesivo anormal.
m3
9.1.02.04
Underground.La
excavacin del tnel
incluyendo tneles a
ambas
unidades.Seccin
mnima de 24,9 m2,
(5.70m 4.80mx)
9.1.02.05
Tnel de descarga,
ramas a la Unidad 1 y
2. Cross.section mnimo
de 3,50 mx 5,70 m
9.1.02.06
Adicionalexcavacin
en transicin entre
tnel de descarga y
ramas a la Unidad 1 y
20
3,250.00
14.2 284
1,785.53
60 1,658.30
5,802,972.50
99,498.00
m3
400
31.71 12,684.00
m3
500
31.71 15,855.00
2
9.1.02.07
Underground.La
excavacin del
tnel.Adems de una
mayor seccin
transversal.
9.1.02.08
Underground.La
excavacin del
tnel.Desmonte
excesivo anormal.
m3
700
9.1.02.09
Underground.La
excavacin del
tnel.Adems para las
rondas de voladura
cortos.
15.76 11,032.00
a) Adicin de medio
rondas blastning
200
575.83
115,166.00
b) Adicin de cuarta
rondas de voladura
120
2,009.16
241,099.20
9.1.02.10
Underground.La
excavacin del
tnel.La adicin de
subdivisin de la
seccin transversal en
el rumbo y bancos.
9.1.02.11
Subterrneas.perforaci
ones contorno
perimetral para
voladuras
(cuandomenosque se
requiere 0,7 m de
distancia).
9.1.02.12
Underground.La
mes
descarga de
agua.Bombear tasa de
1 - 2 m3 / min.Incluye
tambin los vertidos de
las vas fluviales y
otras cavidades
excavadas en este
tnel
9,942.33
39,769.32
9.1.02.13
Underground.La
mes
descarga de
agua.Bombear tasa de
2-3 m3 / min.Incluye
tambin los vertidos de
las vas fluviales y
otras cavidades
excavadas en este
tnel
12,052.57
24,105.14
9.1.02.14
Underground.La
mes
descarga de
agua.Bombear tasa de
3-4 m3 / min.Incluye
tambin los vertidos de
las vas fluviales y
otras cavidades
excavadas en este
tnel
14,162.81
14,162.81
9.1.02.15
Underground.La
mes
descarga de
agua.Bombear tasa de
ms de 4 m3 /
min.Incluye tambin
los vertidos de las vas
fluviales y otras
cavidades excavadas
en este tnel
16,273.05
16,273.05
9.1.02.16
Estacin de medicin
de agua
9.1.03.00
La perforacin
exploratoria e
inyeccin.
9.1.03.01
Percusinde
perforacin, con un
dimetro de 50
mm.Profundidad 0 - 30
m.En la cara
4,500.00
15.58 70,110.00
9.1.03.02
Percusinde
perforacin, con un
dimetro de 50
mm.Profundidad 0 - 30
m.Detrs de la cara
500
13.55 6,775.00
70 855.66
500
no
59,896.20
15.23 7,615.00
1 2,385.50
2,385.50
9.1.03.03
Aguaprueba de
presin.Por valor de
empacador.Las
pruebas con solo
empacador.Profundida
d 0-5 m.En la cara
no
45
73.32 3,299.40
9.1.03.04
Aguaprueba de
presin.Por valor de
empacador.Las
pruebas con solo
empacador.Profundida
d 0-5 m.Detrs de la
cara
no
9.1.03.05
no
45
9.1.03.06
9.1.03.07
Lechada.Por valor de
empacador.Profundida
d 0-5 m.En la cara
no
60 143.86
8,631.60
9.1.03.08
Lechada.Por valor de
empacador.Profundida
d 0-5 m.Detrs de la
cara
no
10 140.23
1,402.30
9.1.03.09
Lechada de
cemento.Tipo de
consumo A. Cemento
kg
55,000.00
1.01 55,550.00
9.1.03.10
Lechada de
cemento.Tipo consumo
B. Cemento
kg
35,000.00
2.59 90,650.00
9.1.03.11
Lechada de
cemento.Escriba C. El
consumo de cemento
kg
15,000.00
7.19 107,850.00
9.1.03.12
Lechada
qumica.Escriba D.
consumo lechada peso
seco
kg
100
9.1.03.13
Inyecciones de
consolidacin.
kg
1,000.00
9.1.03.14
Tiempo de la
lechada.En la cara
hr
150
9.1.03.15
Tiempo de la
lechada.Detrs de la
cara
hr
9.1.04.00
9.1.04.01
9.1.04.02
Extrade escala.En la
cara.
hr
250
87.62 21,905.00
9.1.04.03
Extrade escala.Detrs
de la cara.
hr
300
69.96 20,988.00
60.68 303.4
30.3 1,363.50
26.25 131.25
23.71 2,371.00
1.9 1,900.00
605
90,750.00
15 520
7,800.00
1 25,000.00
25,000.00
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
9.1.04.04
Inviertalimpieza y
escalamiento.Detrs
de la cara.
m2
500
24.34 12,170.00
9.1.04.05
Alta presin de
descarga de
agua.Detrs de la cara
m2
500
9.06 4,530.00
9.1.04.06
Resinaextremo
anclado pernos de
roca, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 2,4 m
no
700
53.27
37,289.00
9.1.04.07
Resinaextremo
anclado pernos de
roca, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 2,9 m
no
2,200.00
54.35
119,570.00
9.1.04.08
Resinaextremo
anclado pernos de
roca, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 3,9 m
no
2,100.00
65.04
136,584.00
9.1.04.09
Resinaextremo
no
anclado pernos de
roca, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 2,4 m
100
47.72
4,772.00
9.1.04.10
Resinaextremo
no
anclado pernos de
roca, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 2,9 m
100
52.95
5,295.00
9.1.04.11
Resinaextremo
no
anclado pernos de
roca, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 3,9 m
100
61.32
6,132.00
9.1.04.12
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 2,4 m
100
49.06
4,906.00
9.1.04.13
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 2,9 m
1,000.00
50.65
50,650.00
9.1.04.14
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.En la
cara.D = 20
mm.Profundidad en la
roca 3,9 m
1,000.00
61.2
61,200.00
9.1.04.15
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.En la
cara.D = 25
mm.Profundidad en la
roca 5,9 m
1,300.00
93
120,900.00
9.1.04.16
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 2,4 m
100
43.62
4,362.00
9.1.04.17
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 2,9 m
2,650.00
47.74
126,511.00
9.1.04.18
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 3,9 m
2,000.00
54.26
108,520.00
9.1.04.19
Totalmentepernos de no
anclaje con lechada de
cemento, barra
corrugada.Detrs de la
cara.D = 20
mm.Profundidad en la
roca 5,9 m
50
106.5
5,325.00
9.1.04.20
Chainlinkedmalla fija
para el rock pernos.En
la cara.
m2
100
9.1.04.21
Chainlinkedmalla fija
para el rock
pernos.Detrs de la
cara.
m2
1,500.00
9.1.04.22
Soldadotela metlica
fijada a bulones.En la
cara.
m2
400
10.45 4,180.00
9.1.04.23
Soldadotela metlica
fijada a bulones.Detrs
de la cara.
m2
300
9.51 2,853.00
9.1.04.24
Acerocorreas fijadas
para el rock pernos.En
la cara.
300
42.01 12,603.00
9.1.04.25
Acerocorreas fijadas
para el rock
pernos.Detrs de la
cara.
500
37.89 18,945.00
9.1.04.26
El hormign
proyectado.Plain.En la
cara.
m3
300
300.41
90,123.00
9.1.04.27
El hormign
proyectado.Plain.Detr
s de la cara.
m3
200
260.72
52,144.00
9.1.04.28
El hormign
proyectado.reforzado
con fibra.En la cara.
m3
3,300.00
363.79
1,200,507.00
9.1.04.29
El hormign
proyectado.reforzado
con fibra.Detrs de la
cara.
m3
1,500.00
315.64
473,460.00
9.1.04.30
Suministro de barras de
refuerzo para las
costillas de hormign
proyectado reforzado.
kg
12,000.00
9.1.04.31
Instalacinde costillas
de hormign
proyectado
reforzado.En la cara.
500
18.87 9,435.00
9.1.04.32
Instalacinde costillas
de hormign
proyectado
reforzado.Detrs de la
cara.
300
13.7 4,110.00
9.1.04.33
Prefabricacin y
suministro de vigas de
celosa.
kg
8,000.00
9.1.04.34
Instalacinde vigas de
celosa para costillas
de hormign
proyectado.En la cara.
300
71.17 21,351.00
9.1.04.35
Instalacinde vigas de
celosa para costillas
de hormign
proyectado.Detrs de
la cara.
220
59.43 13,074.60
9.1.04.36
Concreteforro.Detrs
de la cara.
m3
140
14.48 1,448.00
13.1 19,650.00
1.8 21,600.00
3.2 25,600.00
190.04
26,605.60
9.1.04.37
Adicionalconcreto.Det
rs de la cara.
m3
9.1.04.38
Encofrado para
revestimiento de
hormign, Clase C
m2
10 190.04
1,900.40
600
136.53
81,918.00
Cantidad
Precio Unitario
Precio total
Descripcin
Unidad
DLAR
ESTADOUNIDENSE
9.1.04.39
Invertirhormign.En la
cara.
m3
240
9.1.04.40
Invertirhormign.Detr
s de la cara.
m3
100
9.1.04.41
kg
7,000.00
9.1.04.42
Refuerzo de
invertido.En o detrs
de la cara
kg
16,000.00
9.1.05.00
INVESTIGACIN E
INSTRUMENTACIN.
9.1.05.01
Investigacin y pruebas
subterrneas.Tiempo
de inactividad.
hr
9.1.05.02
Perforacin de
base.Puesta en
marcha en cada lugar
de perforacin.
no
9.1.05.03
Ncleode perforacin,
dimetro mnimo de 76
mm.Profundidad 0-30
m
50 125.06
6,253.00
9.1.05.04
Ncleode perforacin,
dimetro mnimo de 76
mm.Profundidad 30100 m
30 171.84
5,155.20
9.1.05.05
Perforacin de
base.Estabilizacin
Hole.Lechada de
cemento.
kg
9.1.05.06
Packerescenario de
no
prueba de presin de
agua.Prueba
concurrente con la
perforacin (envasador
individual).Profundidad
0-100 m
115.56
577.8
9.1.05.07
Packerescenario de
no
prueba de presin de
agua.Pruebas despus
de la perforacin
completa (doble
packer).Profundidad 0100 m
135.56
677.8
9.1.05.08
Pruebas Lugeon
no
9.1.05.09
Estacin de
Convergencia.Max.3
pines.
no
9.1.06.0
DRENAJE Y EROSIN
DE PROTECCIN
9.1.06.01
Erosinde proteccin
con roca triturada 50200 mmMin.espesor
300 mm
9.1.06.02
Rip-rap
m3
100.41
DLAR
ESTADOUNIDENSE
99.56 9,956.00
2.31 16,170.00
2.4 38,400.00
40 605
1 1,108.00
100
24,200.00
1,108.00
1.01 101
10
2 3,269.62
100
24,098.40
95.56 955.6
6,539.24
18.08 1,808.00
a) Tamao de piedra
300-500 mm
m3
b) bloques
seleccionados> 500
mm
m3
100
20.43 2,043.00
a) Mnimo de 250 g /
m2
m2
200
6.66 1,332.00
9.1.06.04
Gaviones Colchones
m2
150
24.4 3,660.00
9.1.06.05
Gaviones
m3
9.1.07.0
OBRAS DE
CONCRETO.
9.1.07.01
Encofrado Clase B.
Plain.Inclinada o
vertical.
m2
2,300.00
67.26 154,698.00
9.1.07.02
Encofrado Clase B.
curvada.
m2
350
96.29 33,701.50
9.1.07.03
Hormign Clase C.
m3
920
9.1.07.04
Refuerzo.Barras
corrugadas.
9.1.07.05
Concretopavement.Co
ncrete Clase B. espesor
mnimo de 150
mm.Malla de refuerzo
min 6,5 kg / m2
9.1.06.03
60
20.04 1,202.40
Filtro de tela
80
46.44 3,715.20
142.91
131,477.20
60 1,459.67
3,340.00
87,580.20
179.14
598,327.60
11,147,799.11
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
10.1.01.0
MOVIMIENTOS DE
TIERRA
10.1.01.01
Retire la madera
utilizable
no
10.1.01.02
Compensacin y
arranque
ja
10.1.01.03
Excavacin Topsoil
10.1.01.04
30 105.23
6 9,990.00
DLAR
ESTADOUNIDENSE
3,156.90
59,940.00
m3
450
3.34 1,503.00
a) la excavacin a
granel, para estropear
depsito
m3
10,500.00
3.68 38,640.00
b) Excavacin de pila
de almacenamiento
(grava, cantos rodados)
m3
3,000.00
3.68 11,040.00
c) Las excavaciones
para cimientos
m3
2,000.00
3.68 7,360.00
10.1.01.05
Preparacin de la
fundacin de la roca
para el hormigonado
m2
500
3.59 1,795.00
10.1.01.06
Llenar y rellenar
a) de relleno del
terrapln / grava
m3
2,000.00
16.76 33,520.00
b) relleno estructural
m3
2,000.00
15.92 31,840.00
c) El relleno de las
zanjas
m3
600
14.89 8,934.00
m3
600
25.96 15,576.00
e) material de drenaje,
50 - 100 mm
m3
600
26.49 15,894.00
Seccin Dique de
contencin
10.1.01.07
Relleno de terrapln de
grava bien graduada
procesado
a) Zona 2, Zona de
transicin 0-32 mm
m3
7,800.00
18.38 143,364.00
m3
14,800.00
15.29 226,292.00
c) Zona 4, Piedras> 64
mm
m3
3,000.00
15.18 45,540.00
d) material de base
carretera
m3
600
25.24 15,144.00
10.1.01.08
Colocacin de tierra
vegetal
m2
800
0.32 256
10.1.01.09
Encespado (opcional)
m2
500
0.32 160
10.1.02.0
EXCAVACIN DEL
ROCK
10.1.02.01
La excavacindel
estribo derecho y
fundamento para la
estructura de toma,
pilar izquierdo:
a) de excavacin a
granel
m3
3,000.00
18.92 56,760.00
b) Trench / zanja de
excavacin
m3
300
20.37 6,111.00
400
17.98 7,192.00
10.1.02.02
Pozos de contorno
10.1.03.0
PRUEBAS DE SUELO
Y GROUTEO, APOYO
DEL ROCK
10.1.03.01
Perforacin de
percusin, dimetro
mnimo de 51 mm,
profundidad 0-20 m (en
roca y hormign)
200
15.58 3,116.00
10.1.03.02
Perforacin rotatoria
con revestimiento,
dimetro mnimo de 76
mm, profundidad de 020 m
400
66.74 26,696.00
10.1.03.03
10.1.03.04
Pruebas de presin de
agua, por ajuste
empacador
no
10.1.03.05
Grouting presin
Cemento, por ajuste
empacador
no
250
10.1.03.06
Cemento lechada: El
consumo de cemento
per ajuste envasador,
tipo B (microcemento
a) 0 - 100 kg
kg
8,000.00
0.88 7,040.00
b) 0 a 200 kg
kg
6,000.00
1.05 6,300.00
c) 0 a 300 kg
kg
2,000.00
1.27 2,540.00
d) 0 - 500 kg
kg
2,000.00
1.63 3,260.00
e) Ms de 500 kg
kg
1,000.00
2.61 2,610.00
10.1.03.07
Acelerador
kg
10.1.03.08
Lechada qumica.Tipo
de lechada: Epoxi
kg
10.1.03.09
no
50
69.18 3,459.00
5 119.42
129.12
50
100
597.1
32,280.00
2.5 125
23.71 2,371.00
20
56.9 1,138.00
b) Longitud 3.0 m
no
10
c) Longitud 4.0 m
no
d) Longitud 6.0 m
no
5 102.26
511.3
e) Longitud 8.0 m
no
5 129.48
647.4
f) Longitud 10.0 m
no
5 161.85
809.25
10.1.04.0
DRENAJE Y EROSIN
DE PROTECCIN
10.1.04.01
Erosinde proteccin
con roca triturada 50200 mmMin.espesor
300 mm
10.1.04.02
Rip-rap
68.24 682.4
79.57 397.85
m3
1,000.00
18.08 18,080.00
a) Tamao de piedra
150-300 mm
m3
500
20.01 10,005.00
b) Tamao de piedra
300-600 mm
m3
500
20.04 10,020.00
c) los bloques
seleccionados> 600
mm
m3
1,000.00
20.43 20,430.00
m3
1,290.00
a) Mnimo de 180 g /
m2
m2
1,800.00
6.41 11,538.00
b) Un mnimo de 250
g / m2
m2
500
6.66 3,330.00
c) Un mnimo de 300
g / m2
m2
500
7.01 3,505.00
10.1.04.04
La perforacin de
agujeros de drenaje,
vertical o inclinada
agujeros.Dimetro
min.51 mm
10.1.04.05
La excavacin de
zanjas y drenajes
permanentes
catchwater
10.1.04.06
Reforzado tuberas de
drenaje concretas
incluyendo curvas y
tees.Dimetro interior:
10.1.04.03
167,209.80
Filtro de tela
50
15.58 779
m3
100
a) 150 mm
200
24.32 4,864.00
b) 200 mm
100
33.28 3,328.00
10.1.05.0
OBRAS DE
CONCRETO
10.1.05.01
Lechadapernos de
anclaje.D = 25
mmLongitud en
concreto 1,5 m
10.1.05.02
129.62
3.41 341
a) La profundidad en la
roca 2,0 m
no
20
77.22 1,544.40
b) Profundidad en la
roca 3,0 m
no
30
88.36 2,650.80
c) Profundidad en la
roca 4,0 m
no
97.35 486.75
Lechadapernos de
anclaje.D = 32
mmLongitud de
hormign de 1,5 m
Descripcin
Unidad
Cantidad
Precio Unitario
DLAR
ESTADOUNIDENSE
Precio total
DLAR
ESTADOUNIDENSE
10.1.05.03
10.1.05.04
a) La profundidad en la
roca 2,0 m
no
10
68.24 682.4
b) Profundidad en la
roca 3,0 m
no
10
79.57 795.7
c) Profundidad en la
roca 4,0 m
no
5 102.26
511.3
d) Profundidad en la
roca 6,0 m
no
5 129.48
647.4
Encofrado Clase A.
Llano.
a) Dam, seccin
cerrada y puente
m2
4,500.00
53.95 242,775.00
b) la casa Puerta
m2
250
53.95 13,487.50
m2
500
73.51 36,755.00
a) Dam, seccin
cerrada y puente
m2
100
53.99 5,399.00
b) la casa Puerta
m2
c) Dique de contencin:
cara de concreto y
zcalo
m2
2,000.00
53.99 107,980.00
a) Dam, seccin
cerrada y puente
m2
6,000.00
51.55 309,300.00
b) La construccin y
juntas de dilatacin
incl.chavetas de
cizalladura
m2
300
51.55 15,465.00
100
33.5 3,350.00
Encofrado A. Curved
Clase
a) Dam, seccin
cerrada y puente
10.1.05.05
10.1.05.06
10.1.05.07
Encofrado Clase B.
Llano
53.99 3,779.30
Encofrado Clase C.
Surcos
a) triangulares,
gargantas de goteo, 25
mm
10.1.05.08
70
Huecos rectangulares
a) Seccin transversal
no exceda de 0,1 m2
no
26.7 106.8
b) Seccin transversal
desde 0,1 hasta 0,5 m2
no
26.7 133.5
c) de encofrado para el
hormigonado de
huecos.Clase de
acuerdo con la
superficie adyacente
m2
53.95 269.75
10.1.05.09
Teclas cortantes en
juntas de construccin
50
22.63 1,131.50
10.1.05.10
PVC waterstop
a) 150 mm de ancho
50
15.27 763.5
b) 225 mm de ancho
750
a) Suministro e
instalacin de tubos
100
3.67 367
b) lechada de cemento
kg
100
1.01 101
10.1.05.11
24.93 18,697.50
Lechada de las
articulaciones y los
interfases
c) grouting Qumica
40
2.5 100
6.2 310
Revestimiento
bituminoso sobre
superficie de hormign
m2
50
10.1.05.13
Compuesto de sellado
de juntas.
kg
60
18.25 1,095.00
10.1.05.14
Cubiertas de hormign
de conducto en
bridgedeck incluyendo
marcos de acero etc.
Ancho 500 mm
40
72.58 2,903.20
10.1.05.15
10.1.05.16
Refuerzo.Todas las
dimensiones
a) barras corrugadas
950
1,459.67
1,386,686.50
2 1,459.67
2,919.34
c) refuerzo de malla
soldada
2 2,812.50
5,625.00
Deformadosbarras de
acero de calidad
soldable para la fijacin
de estructuras de acero
hidrulico tales como
revestimiento de acero,
guas de compuerta,
etc. Longitud .2.0 aprox
m parcialmente
embutidos
a) D = 20 mm
no
b) D = 25 mm
no
c) D = 32 mm
no
50
17.63 881.5
no
10
27.28 272.8
no
10
17.95 179.5
a) D = 50 mm
20
5.45 109
b) D = 75 mm
30
7.15 214.5
c) D = 100 mm
50
8.92 446
d) D = 150 mm
35
16.9 591.5
10.1.05.18
Barrancos piso de
hierro fundido
Embedded con
galvanizado cubierta
de acero caliente
no
10.1.05.19
Aceroseccin angular
de 100 x 100 con
anclaje c / c de 300
mm, encerrado en
primera etapa concreta
kg
60
7.41 444.6
10.1.05.20
Paso hierro
parcialmente
incrustado en el
hormign
no
20
15.71 314.2
10.1.05.21
Guas y alfizares de
las trozas de parada
Embebido en hormign
kg
10.1.05.22
Hormign Clase B
10.1.05.17
10.1.05.23
10.1.05.24
20
8.05 161
140
11.14 1,559.60
PVC-tubos empotrados,
incluida curvas y
accesorios
3 123.23
400
369.69
7.41 2,964.00
a) Casa Puerta
m3
70 129.94
9,095.80
b) las alcantarillas,
conductos
m3
200
129.94
25,988.00
a) Dam, seccin
cerrada y puente
m3
12,000.00
137.07
1,644,840.00
b) la casa Puerta
m3
c) losas de proteccin
contra la erosin
m3
2,800.00
137.07
383,796.00
d) Muros
m3
500
137.07
68,535.00
e) Dique de contencin:
cara de concreto y
zcalo
m3
1,100.00
137.07
150,777.00
m3
100
167.38
16,738.00
Hormign Clase C
25 137.07
3,426.75
Hormign Clase D
a) Cubierta de puente
10.1.05.25
Hormign Clase E
a)aberturas de
puertas, piso y partes
inferiores de los
muelles y muros de
proteccin contra la
erosin y la losa.
600
174.57
104,742.00
m3
100
124.14
12,414.00
a) Clase UA
m2
1,200.00
b) Clase UB
m2
200
4.65 930
c) Clase de la UB,
superficies curvas
m2
100
4.65 465
d) Clase UC
m2
300
4.85 1,455.00
10.1.05.28
Blockout para y
rejuntado de los postes
de la cerca en losas de
hormign
no
10.1.05.29
10.1.05.30
Lechada acera
alrededor hidrulicos
con la expansin de
mortero.Incl.posiciona
miento planta
10.1.05.26
Hormign Clase F
10.1.05.27
El acabado de
superficies formadas
m3
4.2 5,040.00
30
48.2 1,446.00
250
2.5 625
40
2.5 100
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
10.1.05.31
20
10.1.05.32
Arenado de superficies
de hormign
m2
20
10.1.06.0
INTERFACE CON H,
Integracin de los
HIDRULICO
STEELWORKS
DLAR
ESTADOUNIDENSE
2.5
10.64 212.8
50
ReferenciaH-tierna
documentos, Parte D,
Seccin 2Esta partida
incluir todos los
trabajos relacionados
con la formacin de
huecos, bloqueadores y
similares para dividir
entre la primera y
segunda etapa de
hormigonado, provisin
y remocin de los
encofrados para
elementos para ser
embebido, extra ms
para empotramiento y
segunda etapade
hormigonado y
similares, para acera
hidrulicos como se
indica a
continuacin.Los
volmenes de concreto
y refuerzo de concreto
son atendidos bajo
Concrete Works.
10.1.06.01
Inundaciones Flushing
Puertas
LS
1 8,099.74
8,099.74
10.1.06.02
Descargue Reguladora
de Gates
LS
1 2,945.36
2,945.36
10.1.06.03
LS
1 26,508.24
26,508.24
10.1.06.04
LS
1 17,672.16
17,672.16
10.1.06.05
Otros (describir):
LS
10.1.07.0
OBRAS DEL
CONSTRUCTOR
10.1.07.01
Perpiao Walling
a) 150 mm
m2
50
73.3 3,665.00
b) 100 mm
m2
20
73.3 1,466.00
10.1.07.02
m2
10.1.07.03
Puertas
10.1.07.04
125
146.58
18,322.50
a)aislados puertas de
acero
individuales.Clasificaci
n fuego
A60.Dimensiones
externas
1000x2100mm
no
5 3,049.00
15,245.00
no
1 3,415.00
3,415.00
no
1 5,542.00
5,542.00
d) Individual puerta de
madera interior.La
apertura al exterior
900 x 2100
no
4 1,044.67
4,178.68
Ventanas
10.1.07.05
10.1.07.06
a) Ventana de aluminio
con paneles fijos
Tamao 1000 x 1200
mm
no
8 427.5
3,420.00
b)las rejillas de
ventilacin de lamas de
aluminio con marco de
aluminio y tamao de
pantalla de
insectos500 x 400 mm
no
4 464
1,856.00
c) de acristalamiento 5
mm de vidrio flotado y
acristalamiento en
paneles de cualquier
tamao.
m2
5 1,044.67
5,223.35
m2
10
28.43 284.3
b) Los revestimientos
cermicos
m2
20
28.43 568.6
c) Suelo de vinilo
m2
20
70.98 1,419.60
d) enlucido de paredes
m2
42.76 5,986.40
Pintura y
decoracin.Pintura de:
a) metalistera Interna
o estructuras de acero
m2
20
b) trabajos en metal
galvanizado
m2
c) Las superficies
externas de estructuras
de acero
m2
30
d) las superficies de
concreto externos
m2
115
24.43 2,809.45
e)Internos enyesado o
superficies de
hormignParedes
m2
200
24.43 4,886.00
f)Internos enyesado o
superficies de concreto,
techos
m2
100
24.43 2,443.00
g)Los pisos de
concreto con cargas
moderadas, EpoxiTipo
(a rellenar por el
Contratista):
m2
60
24.43 1,465.80
h)Los pisos de
concreto con cargas
pesadas, incluyendo
salas de bateras.Auto
Epoxi nivelacinTipo (a
rellenar por el
Contratista):
m2
40
24.43 977.2
10.1.08.0
INVESTIGACIN E
INSTRUMENTACIN
10.1.08.01
Piezmetro
Electric.Dispositivo de
medicin
no
10.1.08.02
Piezmetro elctrico,
tuberas
10.1.08.03
Monumentos de
liquidacin de
superficie
10.1.08.04
140
4 975.67
80
24.43 488.6
24.43
73.29
24.43 732.9
3,902.68
9.75 780
a) de la Fundacin en la
roca
no
2 911.3
1,822.60
b) Fundacin en suelo
no
3 842.95
2,528.85
Punto de asentamiento
superficie fija
a) de la Fundacin en la
roca
no
2 915.86
1,831.72
b) Fundacin en suelo
no
3 847.51
2,542.53
10.1.09.0
OBRAS DIVERSAS
10.1.09.01
Tapa de la escotilla de
poca potencia
kg
10.1.09.02
kg
100
6.34 634
10.1.09.03
kg
100
6.34 634
10.1.09.04
kg
200
7.01 1,402.00
10.1.09.05
kg
1,200.00
6.34 7,608.00
10.1.09.06
Barandillas exteriores,
fijas o desmontables
a) Tipo A
kg
2,000.00
7.01 14,020.00
b) Tipo B
kg
500
7.01 3,505.00
10.1.09.07
Escaleras de acero
kg
120
7.01 841.2
10.1.09.08
Esgrima, excavacin y
vaciado de fundacin
individuo incluidos
160
85.5 13,680.00
10.1.09.09
Puertas de la cerca, y
la excavacin para
hormigonado de
fundaciones
individuales incluidos
10.1.09.10
60
7.01 420.6
no
1 4,275.00
4,275.00
no
1 1,832.00
1,832.00
Preparacin de nivel
subrasante
m2
1,000.00
0.88 880
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
10.1.09.11
Subbasede roca
triturada (0-75 mm)
Espesor min.200 mm
m3
240
29.25 7,020.00
10.1.09.12
Llevarcurso de roca
triturada (0-30 mm)
Espesor min.150 mm
m3
180
29.25 5,265.00
10.1.09.13
Tratamiento de la
superficie bitumenous
Doble
m2
1,000.00
10.1.09.14
Electrodos de puesta a
tierra
10.1.09.15
4.37 4,370.00
a) 1 x 95 hilos de cobre
300
21.34 6,402.00
b) varillas de puesta a
tierra, 6 m de largo
no
5 101.2
c) Cadwelding de
juntas, conexiones e
intersecciones
no
50 230.3
Ampliadode
poliestireno en los
estribos del puente50
mm de espesor
m2
506
11,515.00
8.5
17
10.1.10.0
VENTILACIN Y AIRE
ACONDICIONADO
10.1.10.01
Ventilacin y aire
acondicionado en la
casa de la puerta de
entrada.Diseo,
suministro e
instalacin.
10.1.11.0
SUMINISTRO DE
AGUA, FONTANERIA
E INSTALACION
SANITARIA Y
ALCANTARILLADO
10.1.11.01
El aguade
alimentacin,
fontanera e instalacin
sanitaria y
alcantarillado en la
casa de la puerta de
entrada.Diseo,
suministro e
instalacin.
10.1.12.0
LUCHA CONTRA
INCENDIOS
INSTALACIONES
10.1.12.01
Instalaciones de lucha
contra incendios y
equipos de rescate.
LS
1 5,006.00
5,006.00
LS
1 11,075.00
11,075.00
LS
1 5,006.00
5,006.00
5,943,047.73
BillNo.11 - Obras
Artculo
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
01.11.00
SwitchyardY
CREACIN DE
SERVICIO EN TNEL
DE ACCESO
11.1.01.0
MOVIMIENTOS DE
TIERRA
11.1.01.01
Compensacin y
arranque
m2
4,400.00
0.99 4,356.00
11.1.01.02
m3
500
5.86 2,930.00
11.1.01.03
Excavacin del
suelo.Fundaciones,
zanjas, etc.
m3
500
5.86 2,930.00
11.1.01.04
Compactadoroca
triturada 16-32
mm.Por supuesto Base
para losas de concreto,
canales de cables,
fundaciones, etc.
m3
11.1.01.05
Compactado tnel
proyectado botn 30-60
mm en Switchyard
m3
50
2,500.00
26.18 1,309.00
23.1 57,750.00
11.1.01.06
Compactado roca
triturada 8-16 mm a lo
largo de las tuberas de
drenaje, tubos para
cables, etc.
m3
50
22.24 1,112.00
11.1.01.07
150
8.92 1,338.00
11.1.01.08
200
16.9 3,380.00
11.1.01.09
m2
1,500.00
7.01 10,515.00
11.1.01.10
Turfing
m2
1,000.00
11.1.01.11
Rellenos sanitarios,
material de escombros
del tnel, la proteccin
permanente cada de
rocas.
m3
9,500.00
11.1.02.0
EXCAVACIN DEL
ROCK
11.1.02.01
La excavacin de
zanjas para cimientos,
canales de cables,
paredes, etc.
m3
100
11.1.03.0
OBRAS DE
CONCRETO
1,100.00
0.32 320
23.68 224,960.00
5.86 586
Muros de
contencin,
fundaciones, cable
conducto etc.
11.1.03.01
Encofrado Clase B.
Plain.Inclinada o
vertical.
m2
53.95 59,345.00
11.1.03.02
Encofrado Clase B.
Plain.Curvo
m2
30
53.99 1,619.70
11.1.03.03
Encofrado Clase B.
Plain.Horizontal.
m2
50
53.99 2,699.50
11.1.03.04
Encofrado Clase C.
Plain.Inclinada o
vertical.
m2
11.1.03.05
Encofrado Clase C.
Plain.Curvadas.
m2
20
51.55 1,031.00
11.1.03.06
Encofrado Clase C.
Plain.Horizontal.
m2
50
51.55 2,577.50
11.1.03.07
Teclas cortantes en
juntas de construccin
11.1.03.08
Refuerzo.Barras
corrugadas.
50 1,459.67
11.1.03.09
Refuerzo.Las barras
lisas.
1 1,459.67
11.1.03.10
Preparacin de
superficie de la roca
para el hormigonado.
m2
11.1.03.11
Hormign Clase C.
m3
500
11.1.03.12
El acabado de
superficies no
formadas, Clase UA.
m2
100
11.1.03.13
11.1.03.14
Parcialmenteincrustad
o PVC-pipe.Incluyendo
curvas y
accesorios.Complete.
D = 200 mm
1,100.00
51.55 56,705.00
200
22.63 4,526.00
50
1,459.67
3.59 179.5
137.07
68,535.00
4.2 420
50
100
72,983.50
15.27 763.5
43.34 4,334.00
11.1.03.15
Bloqueadores para y
rejuntado de los postes
de la cerca en losas y
muros de hormign
no
80
48.2 3,856.00
Edificio de servicios
y zona al aire libre
11.1.03.16
Encofrado Clase A.
Llano.Inclinada o
vertical.
m2
150
53.95 8,092.50
11.1.03.17
Encofrado Clase B.
Plain.Inclinada o
vertical.
m2
400
53.99 21,596.00
11.1.03.18
Encofrado Clase B.
Plain.Horizontal.
m2
11.1.03.19
Encofrado Clase C.
Plain.Inclinada o
vertical.
m2
150
51.55 7,732.50
11.1.03.20
Teclas cortantes en
juntas de construccin
200
22.63 4,526.00
11.1.03.21
Vaco rectangular, de
hasta 0,1 m2.
no
20
26.7 534
11.1.03.22
no
10
26.7 267
11.1.03.23
Refuerzo.Barras
corrugadas.
35 1,459.67
11.1.03.24
Refuerzo.Las barras
lisas.
1 1,459.67
11.1.03.25
Preparacin de
superficie de la roca
para el hormigonado.
m2
11.1.03.26
Hormign Clase C.
m3
11.1.03.27
El acabado de
superficies no
formadas, Clase UA.
m2
90
11.1.03.28
El acabado de
superficies no
formadas, UB Clase.
m2
20
4.65
11.1.03.29
Parcialmenteincrustad
o PVC-pipe.Incluyendo
curvas y
accesorios.Complete.
D = 100 mm
50
8.92 446
11.1.03.30
Parcialmenteincrustad
o PVC-pipe.Incluyendo
curvas y
accesorios.Complete.
D = 150 mm
50
8.92 446
11.1.03.31
Parcialmenteincrustad
o PVC-pipe.Incluyendo
curvas y
accesorios.Complete.
D = 200 mm
50
43.34 2,167.00
11.1.04.0
OBRAS DEL
CONSTRUCTOR
20
53.99 1,079.80
50
450
51,088.45
1,459.67
3.59 179.5
137.07
61,681.50
4.2 378
Edificio de servicios
11.1.04.01
Baldosas de cermica.
m2
35
28.43 995.05
11.1.04.02
Azulejo cermico.
m2
25
28.43 710.75
11.1.04.03
m2
15
70.98 1,064.70
11.1.04.04
Mampostera de
bloques de
hormign.150 mm
Espesor nominal
m2
65
31.55 2,050.75
11.1.04.05
Enyesado, interno.
m2
200
17.58 3,516.00
11.1.04.06
Rendering, teido,
externo.
m2
150
17.1 2,565.00
93
11.1.04.07
m2
20
27.35 547
11.1.04.08
Aisladospuertas de
acero
individuales.Clasificaci
n fuego
A60.1000x2100mm
abertura en la pared
no
4 3,049.00
12,196.00
11.1.04.09
Aisladospuertas de
acero
dobles.Clasificacin
fuego
A60.1600x2200mm
abertura en la pared
no
1 3,415.00
3,415.00
11.1.04.10
Puertas de madera
interiores
individuales.900x2100
abertura en la pared.
no
2 1,044.50
2,089.00
11.1.04.11
Solteropuertas de
madera interiores.Con
ranura de
aire.900x2100
abertura en la pared.
no
1 1,044.50
1,044.50
11.1.04.12
Aluminioventana con
combinacin de louvres
/ paneles fijos.Tamao
2000x1000 mm
no
1 1,044.50
1,044.50
BillNo.11 - Obras
Artculo
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
11.1.04.13
Aluminioventana con
combinacin de louvres
/ paneles fijos.Tamao
1000x1000 mm
no
1 1,044.50
1,044.50
11.1.04.14
Acristalamiento 5 mm
de vidrio flotado y
acristalamiento en
paneles de cualquier
tamao.
m2
3 1,044.67
3,134.01
11.1.04.15
Pintura del
suelo.Epoxi.Escriba
Sherwin Williams policote 4685
m2
11.1.04.16
Pintura de
paredes.Interna.
m2
400
24.43 9,772.00
11.1.04.17
Pintura de
paredes.Externo.
m2
150
24.43 3,664.50
11.1.04.18
La pintura de las
puertas de acero, solo
no
11.1.04.19
La pintura de las
puertas de acero, doble
no
1 119.5
11.1.04.20
Pintura de puertas
interiores de madera
no
11.1.04.21
m2
11.1.04.22
LS
11.1.04.23
100 mm de alta
densidad de lana
mineral fijado a correas
de acero de calibre
ligero.
m2
11.1.05.0
OBRAS DIVERSAS
45
155
61.12 244.48
119.5
34 102
25.34 3,927.70
1 35,523.00
115
24.43 1,099.35
35,523.00
6.67 767.05
El vallado de la zona
servicebuilding.
11.1.05.01
Valla
75
85.51 6,413.25
11.1.05.02
no
1 4,275.00
4,275.00
11.1.05.03
no
1 1,832.00
1,832.00
El vallado de la zona de
maniobras.
11.1.05.04
Valla
11.1.05.05
no
1 4,275.00
4,275.00
11.1.05.06
no
1 1,832.00
1,832.00
11.1.05.07
kg
11.1.05.08
Guardia casa
no
11.1.06.0
SERVICIOS
ELCTRICOS
11.1.06.01
Tomas de tierra
enterrados.Hilos de
cobre 1 x 95 mm2.
11.1.06.02
Varillas de puesta a
tierra, min.Longitud 6
m
no
8 101.2
11.1.06.03
Cadwelding de juntas,
conexiones e
intersecciones
no
10 230.3
11.1.07.0
VENTILACIN Y AIRE
ACONDICIONADO
11.1.07.01
Ventilacin y aire
acondicionado.Diseo,
suministro e instalacin
11.1.08.0
SUMINISTRO DE
AGUA, FONTANERIA
E INSTALACION
SANITARIA Y
ALCANTARILLADO
11.1.08.01
El aguade
LS
alimentacin,
fontanera e instalacin
sanitaria y el sistema
de
alcantarillado.Diseo,
suministro e
instalacin.
11.1.09.0
Figthing FUEGO
INSTALACIONES
11.1.09.01
Instalaciones figthing
Bomberos y equipos de
rescate
02.11.00
INVESTIGACIN E
INSTRUMENTACIN
02.11.01
Extensmetros de
pozos
02.11.02
90
85.51 7,695.90
16,000.00
6.34 101,440.00
1 1,222.00
300
LS
1,222.00
21.34 6,402.00
809.6
2,303.00
1 70,087.00
70,087.00
34,842.00
34,842.00
LS
1 15,749.00
15,749.00
a) la profundidad de
anclaje 2 m
no
5 3,181.96
15,909.80
b) la profundidad de
anclaje 4 m
no
5 3,550.52
17,752.60
c) Ancla profundidad de
8m
no
5 4,169.20
20,846.00
Metros Conjunta
deformacin
no
5 707.4
3,537.00
02.11.03
11.02.04
03.11.00
no
5 731.8
3,659.00
a) Presa Huaura
LS
1 4,269.00
4,269.00
b) Presa Checras
LS
1 7,319.00
7,319.00
c) Picunche Presa
LS
1 4,269.00
4,269.00
d) Tneles y Casa de
Mquinas
LS
1 13,111.00
13,111.00
03.11.01
03.11.02
Autoancla de
perforacin del suelo
(tipo Ischebeck Titan
(40/16) o similar),
incluyendo las placas y
accesorios, totalmente
inyectados.
a) Nmero de Anclas
no
10
98.71 987.1
b) Longitud total de
Anclas
80
3.1 248
a) Nmero de Anclas
no
10 131.27
b) Longitud total de
Anclas
100
1,312.70
3.1 310
1,197,632.08
BillNo.12 - Dayworks
Artculo
Descripcin
Unidad
Cantidad
Precio Unitario
DLAR
ESTADOUNIDENSE
01.12.00
TRABAJO
Precio total
DLAR
ESTADOUNIDENSE
Lastasas dayworks
cotizados para el
trabajo sern las
cantidades totales a
pagar, e incluirn todos
los costos, tales como
subsidios para el
cumplimiento de la
legislacin laboral,
seguros, alojamiento,
tiempo de viaje,
compensacin por
horas extras, uso y
mantenimiento de
pequeas herramientas
de trabajo, supervisin,
gastos generales y
ganancias.Las tarifas
sern aplicables a
todas las categoras
funciona
independiente de la
cantidad de
trabajo;dentro del
turno-disposicin
utilizada en el
sitio.Slo el tiempo
real dedicado a la obra
ser pagado.
01.12.01
Ingeniero
hr
1,000.00
65 65,000.00
01.12.02
Capataz
hr
1,000.00
20.6 20,600.00
01.12.03
Topgrafo
hr
500
20.6 10,300.00
01.12.04
Trabajador no
cualificado
hr
20,000.00
16 320,000.00
01.12.05
Obrero semicualificado
hr
3,000.00
16 48,000.00
01.12.06
Obrero cualificado
hr
3,000.00
16 48,000.00
12.01.07
Conductor
hr
3,000.00
19.9 59,700.00
01.12.08
Operador de equipo
hr
1,000.00
19.9 19,900.00
12.01.09
Operador de equipo
pesado
hr
1,000.00
20.92 20,920.00
02.12.00
MATERIALES
02.12.01
Todos losmateriales
Prov.suma
utilizados en dayworks
debern cumplir con
las
especificaciones.Las
tarifas incluirn la
entrega en el lugar y el
almacenamiento
necesario y la
manipulacin.
02.12.02
100,000.00
12.02.03
Lechada de
cemento.Tipo B.
Expirado material
kg
2,000.00
1.42 2,840.00
02.12.04
Lechada de
cemento.Tipo C.
Expirado material
kg
2,000.00
6.02 12,040.00
12.02.05
Contacto
mampostera.Tipo D.
Expirado material
kg
2,000.00
20.24 40,480.00
12.02.06
Contacto
mampostera.Tipo E.
material caducado
kg
2,000.00
23.9 47,800.00
02.12.07
Las regalas de
materiales de cantera
100,000.00
Prov.Suma
1 100,000.00
30 30,000.00
1 -200,000.00
-200,000.00
12.03.00
EQUIPO /
MAQUINARIA
Lastarifas de los
equipos debern incluir
todos los costos de
operacin y
mantenimiento,
combustible, aceite,
grasa, operadores y
turnboys salarios,
gastos generales y
beneficio.Slo el
tiempo empleado
realmente en el trabajo
se ha pagado y las
tasas deber incluir la
compensacin por
tiempo de inactividad,
viajar y con el tiempo.
03.12.01
Tunneljumbo
hr
500
369.32
03.12.02
Robot de proyeccin de
hormign, Capacidad 4
m3 / hs
hr
500
99.8 49,900.00
03.12.03
Aparejo de
atornillamiento
hr
600
84.48 50,688.00
03.12.04
hr
600
34.6 20,760.00
12.03.05
hr
200
74.3 14,860.00
12.03.06
hr
500
74.3 37,150.00
12.03.07
hr
200
12.03.08
Generador de energa
75-115 KVA
hr
200
12.03.09
D6 Dozer o equivalente
hr
300
221.31
66,393.00
12.3.10
D6 Dozer o equivalente
hr
300
221.31
66,393.00
12.3.11
D7 Dozer o equivalente
hr
300
296.91
89,073.00
03.12.12
D8 Dozer o equivalente
hr
300
331.11
99,333.00
12.03.13
Motoniveladoras
completo con ripper,
Cat.D12 o equivalente
hr
300
161.91
48,573.00
03.12.14
Ditto, Cat.14 o
equivalente
hr
300
179.91
53,973.00
12.03.15
Excavadora,
retroexcavadora 0,7
m3
hr
200
125.91
25,182.00
03.12.16
Cargadora de
ruedas.Gato.966 o
equivalente
hr
200
170.91
34,182.00
03.12.17
hr
200
71.61 14,322.00
12.03.18
6 t rodillo vibrante
remolcado
hr
200
71.61 14,322.00
12.03.19
Rodillo de vibracin
mano-impulsado o
vibracin compactador
de placa
hr
200
23.31 4,662.00
12.03.20
8 t camin
hr
500
62.91 31,455.00
129.4
184,660.00
25,880.00
84.34 16,868.00
03.12.21
8 t volquete camin
hr
500
71.91 35,955.00
12.03.22
11 t camin volquete
hr
200
80.91 16,182.00
12.03.23
0,75 a 1,0 t de
capacidad de recogida
hr
500
44.91 22,455.00
03.12.24
hr
200
98.91 19,782.00
12.03.25
hr
200
116.91
23,382.00
03.12.26
hr
200
143.91
28,782.00
12.03.27
Gra mvil, ms de 75
t de capacidad.
hr
200
287.91
57,582.00
12.03.28
Camin mezclador de
concreto.Capacidad 610 m3.
hr
200
107.91
21,582.00
12.03.29
Bomba de
hormign.Capacidad
de hasta 50 m3 / hora.
hr
200
107.91
21,582.00
03.12.30
Bomba de
hormign.Capacidad
de ms de 50 m3 /
hora.
hr
200
179.91
35,982.00
03.12.31
Airecompresor con
accesorios.Capacidad
10-20 m3 / min.
hr
200
53.91 10,782.00
03.12.32
Airecompresor con
accesorios.Capacidad
mnima de 20 m3 / min.
hr
200
71.91 14,382.00
12.03.33
hr
200
71.91 14,382.00
03.12.34
hr
500
44.91 22,455.00
03.12.35
Completo de la bomba
de agua.Capacidad
1.000 l / min
hr
300
03.12.36
Cisterna de agua,
min.8 000 l de
capacidad.
hr
300
3.6 1,080.00
81.32 24,396.00
BillNo.12 - Dayworks
Artculo
Descripcin
Unidad
Cantidad
Precio Unitario
Precio total
DLAR
ESTADOUNIDENSE
DLAR
ESTADOUNIDENSE
12.04.00
OTROEQUIPOQUE
SE DESCRIBEN EN
CONTRATISTA
12.04.01
Planta de trituracin (w
/ o mano de obra)
hr
200
12.04.02
Bscula (w / o mano de
obra)
hr
200
12.04.03
Bao de hormign (w /
o mano de obra)
hr
200
12.04.04
Shotcrete Bthing (w / o
mano de obra)
hr
200
40.17 8,034.00
12.04.05
Camin mezclador de 4
m3
hr
200
66.18 13,236.00
04.12.06
Manitou
hr
200
49.32 9,864.00
12.04.07
Unidad de ventilacin
D = 900 mm
hr
200
29.24 5,848.00
12.04.08
Unidad de ventilacin
D = 1200 mm
hr
200
30.5 6,100.00
04.12.09
Unidad de ventilacin
D = 1400 mm
hr
200
35.8 7,160.00
12.04.10
Microbus 9 pasajeros
hr
200
64.25 12,850.00
12.04.11
Autobuses 51 pasajeros
hr
200
378.8
75,760.00
17.15 3,430.00
118.25
148.87
23,650.00
29,774.00
12.04.12
hr
200
220.71
04.12.13
Equipo de Soldadura
hr
200
16.44 3,288.00
12.05.00
VARIOS PRECIOS DE
LA UNIDAD
12.05.01
Sand cargado en
camin / camin
m3
200
21.45 4,290.00
12.05.02
Grava cargado en
camin / camin
m3
200
30.63 6,126.00
12.05.03
Adoqun, guijarro
cargado en camin /
camin
m3
200
15.1 3,020.00
12.05.04
m3
200
15.1 3,020.00
05.12.05
Aplastamiento /
tamizadode despojo
tnel (tamao 0-30
mm)y se almacena en
el rea de depsito de
despojos.
tonelada
500
22.8 11,400.00
12.05.06
Aplastamiento /
tamizadode despojo
tnel (tamao 30 a 120
mm)y se almacena en
el rea de depsito de
despojos.
tonelada
500
22.02 11,010.00
12.05.07
Hormign Clase C
entregado en el sitio
m3
100
06.12.00
TRANSPORTE
depende de la
distancia
TRANSPORTE
255.13
44,142.00
25,513.00
Lossiguientes tipos se
utilizan para los
camiones / volquetes
en el sitio o de tamao
similar, donde el
transporte de
transporte no es parte
de la obra contractual
o donde los costos de
transporte se ajustarn
de acuerdo a la
longitud de transporte,
segn el acuerdo con el
Ingeniero.Para
distancias mayores de
0,2 km y entre dos de
las distancias indicadas
en la tabla, lineal
12.06.01
a) Longitud de
transporte 0,2
kilometros
m3
100
1.35 135
12.06.02
b) Longitud de
transporte 0,5
kilometros
m3
100
1.39 139
12.06.03
c) Longitud de
transporte 1,0
kilometros
m3
100
1.69 169
12.06.04
d) Longitud de
transporte 2,0
kilometros
m3
100
2.39 239
12.06.05
e) Longitud de
transporte 5,0
kilometros
m3
100
4.32 432
12.06.06
f) Longitud de
transporte 10
kilometros
m3
100
7.52 752
12.06.07
longitud g) Transporte
20 kilometros
m3
100
13.68 1,368.00
12.06.08
longitud h) Transporte
30 kilometros
m3
100
20.5 2,050.00
12.06.09
i) Longitud de
transporte 50
kilometros
m3
100
33.26 3,326.00
12.06.10
j) Longitud de
transporte en exceso
de 50 km, por km
m3
100
0.68
12.06.11
k) La carga de
camiones / camiones /
volquetes
m3
1,000.00
2.81 2,810.00
12.06.12
l) Las camas de
Personal (1 persona /
habitacin)
cama x da
22,800.00
25 570,000.00
12.06.13
43,300.00
15 649,500.00
68
3,503,455.00
Descripcin
Unidad
Cantidad
Precio Unitario
DLAR
ESTADOUNIDENSE
14.1
Undeground
Excavacin cuarta
ronda (Mecnico)
14.01.01
Underground
Excavacin cuarta
ronda (Mecnico) Tnel
de Transferencia
3,848.52
14.01.02
Excavacin
Underground cuarta
ronda (Mecnico) Adit 1
Tnel
4,055.31
01.14.03
Underground
Excavacin cuarta
ronda (Mecnico)
sobretensiones Tunel
Tnel
4,424.31
14.01.04
Underground
Excavacin cuarta
ronda (Mecnico) de
aduccin Tnel
4,421.48
01.14.05
Underground
Excavacin cuarta
ronda (Mecnico)
Acceso Tunel
4,687.73
14.01.06
Underground
Excavacin cuarta
ronda (Mecnico) By
Pass Tunel a Tailrace
2,892.56
01.14.07
Underground
Excavacin cuarta
ronda (Mecnico) By
Pass Tunel de aduccin
2,952.68
01.14.08
Underground
Excavacin cuarta
ronda (Mecnico)
Tailrace Tnel
5,076.93
Precio total
DLAR
ESTADOUNIDENSE