Federal Register / Vol. 71, No.

9 / Friday, January 13, 2006 / Notices 2217

In the EA we 1 will discuss impacts comments are received in time and Environmental Mailing List
that could occur as a result of the properly recorded: An effort is being made to send this
construction and operation of the • Send an original and two copies of notice to all individuals, organizations,
proposed project. your letter to: Magalie R. Salas, and government entities interested in
We will also evaluate possible Secretary, Federal Energy Regulatory and/or potentially affected by the
alternatives to the proposed project or Commission, 888 First St., NE., Room proposed project. This includes all
portions of the project, and make 1A, Washington, DC 20426. landowners who own homes within
recommendations on how to lessen or • Label one copy of the comments for distances defined in the Commission’s
avoid impacts on the various resource the attention of Gas Branch 3. regulations of certain aboveground
areas. facilities.
The EA will present our independent • Reference Docket No. CP06–26–
analysis of the issues. Depending on the 000. Additional Information
comments received during the scoping • Mail your comments so that they Additional information about the
process, the EA may be published and will be received in Washington, DC, on project is available from the
mailed to Federal, state, and local or before February 6, 2006. Commission’s Office of External Affairs,
agencies, public interest groups, The Commission strongly encourages at 1–866–208–FERC or on the FERC
interested individuals, affected electronic filing of any comments or Internet Web site (http://www.ferc.gov)
landowners, newspapers, libraries, and interventions or protests to this using the eLibrary link. Click on the
the Commission’s official service list for proceeding. See 18 CFR eLibrary link, click on ‘‘General Search’’
this proceeding. A comment period will 385.2001(a)(1)(iii) and the instructions and enter the docket number excluding
be allotted for review if the EA is on the Commission’s Web site at the last three digits in the Docket
published. We will consider all http://www.ferc.gov under the ‘‘e- Number field. Be sure you have selected
comments on the EA before we make Filing’’ link and the link to the User’s an appropriate date range. For
our recommendations to the Guide. Before you can file comments assistance, please contact FERC Online
Commission. you will need to create a free account Support at FercOnlineSupport@ferc.gov
To ensure your comments are which can be created on-line. or toll free at 1–866–208–3676, or for
considered, please carefully follow the TTY, contact (202) 502–8659. The
Becoming an Intervenor
instructions in the public participation eLibrary link also provides access to the
section below. In addition to involvement in the EA texts of formal documents issued by the
Currently Identified Environmental scoping process, you may want to Commission, such as orders, notices,
Issues become an official party to the and rulemakings.
proceeding known as an ‘‘intervenor’’. In addition, the Commission now
We have already identified issues that Intervenors play a more formal role in offers a free service called eSubscription
we think deserve attention based on a the process. Among other things, which allows you to keep track of all
preliminary review of the proposed intervenors have the right to receive formal issuances and submittals in
facilities and the environmental copies of case-related Commission specific dockets. This can reduce the
information provided by Dominion. documents and filings by other amount of time you spend researching
This preliminary list of issues may be intervenors. Likewise, each intervenor proceedings by automatically providing
changed based on your comments and must send one electronic copy (using you with notification of these filings,
our analysis. the Commission’s eFiling system) or 14 document summaries and direct links to
• The installation of a 20,500 HP gas paper copies of its filings to the the documents. Go to http://
turbine generator may substantially Secretary of the Commission and must www.ferc.gov/esubscribenow.htm.
increase air contaminant emissions from send a copy of its filings to all other
the Dominion Cove Point facility above Magalie R. Salas,
parties on the Commission’s service list
currently permitted emission levels. Secretary.
for this proceeding.2 If you want to
• The installation of a 20,500 HP gas become an intervenor you must file a [FR Doc. E6–278 Filed 1–12–06; 8:45 am]
turbine generator and two air separation motion to intervene according to Rule BILLING CODE 6717–01–P
units may increase noise levels at 214 of the Commission’s Rules of
affected noise-sensitive areas (NSAs). Practice and Procedure (18 CFR
385.214) (see Appendix).3 Only DEPARTMENT OF ENERGY
Public Participation
intervenors have the right to seek Federal Energy Regulatory
You can make a difference by rehearing of the Commission’s decision.
providing us with your specific Commission
comments or concerns about the project. Stakeholders and parties with
environmental concerns may be granted [Docket No. PF06–8–000]
By becoming a commentator, your
concerns will be addressed in the EA intervenor status upon showing good Golden Pass Pipeline LP; Notice of
and considered by the Commission. You cause by stating that they have a clear Intent To Prepare an Environmental
should focus on the potential and direct interest in this proceeding Assessment for the Proposed Golden
environmental effects of the proposal, which would not be adequately Pass Optimized Pipeline Project and
alternatives to the proposal and represented by any other parties. You do Request for Comments on
measures to avoid or lessen not need intervenor status to have your Environmental Issues
environmental impact. The more environmental comments considered.
January 6, 2006.
specific your comments, the more useful
hsrobinson on PROD1PC70 with NOTICES

they will be. Please carefully follow


2 Interventions may also be filed electronically via The staff of the Federal Energy
these instructions to ensure that your
the Internet in lieu of paper. See the previous Regulatory Commission (FERC or
discussion on filing comments electronically. Commission) will prepare an
3 The appendix referenced in this notice is not
1 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the being printed in the Federal Register. Copies of the
environmental assessment (EA) that
environmental staff of the Office of Energy Projects appendix was sent to all those receiving this notice discusses the environmental impacts of
(OEP). in the mail. Golden Pass Pipeline LP’s (Golden Pass)

VerDate Aug<31>2005 15:41 Jan 12, 2006 Jkt 208001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\13JAN1.SGM 13JAN1
2218 Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices

proposed Optimized Pipeline Project with respect to environmental issues to authorized facilities and the proposed
(OP Project or Project) which involves cooperate with us in the preparation of OP Project is provided in Appendix 1.4
design and route changes to the pipeline the EA. These agencies may choose to
Non-Jurisdictional Facilities
facilities previously approved as part of participate once they have evaluated the
the Golden Pass LNG Terminal and proposal relative to their There are no proposed non-
Pipeline Project.1 In the OP Project, responsibilities. Agencies which would jurisdictional facilities associated with
Golden Pass proposes the following like to request cooperating status should this proposal.
changes to the previously authorized follow the instructions for filing Land Requirements for Construction
facilities: (1) Replace the dual 36-inch- comments described later in this notice.
diameter pipelines (mainline and loop) We encourage government Construction of the OP Project would
with a single 42-inch-diameter pipeline representatives to notify their reduce the total acreage of land
and (2) incorporate a route change that constituents of this planned project and impacted by the Authorized Pipeline as
would replace about 20.4 miles of encourage them to comment on their a result of the design change (from two
pipeline with about 11.6 miles of areas of concern. 36-inch-diameter pipelines to one 42-
pipeline, thus reducing the total length Some affected landowners may be inch-diameter pipeline) and the route
of the pipeline by about 8.8 miles. contacted by a project representative change (from 20.4 miles to 11.6 miles).
The OP Project is currently in the about the acquisition of an easement to The typical overland construction right-
preliminary stages of design and at this construct, operate, and maintain the of-way width would be reduced from
time a formal application has not been proposed pipeline. If so, the company 125 feet to 100 feet, and the operating
filed with the Commission. For this should seek to negotiate a mutually right-of-way width would be reduced
project, the Commission is initiating the acceptable agreement. In the event that from 75 feet to 50 feet. The typical open
National Environmental Policy Act the Project is certificated by the water construction right-of-way width
(NEPA) review prior to receiving the Commission, that approval conveys the would be reduced from 375 feet to 300
formal application. This allows right of eminent domain for securing feet, and the operating right-of-way
interested stakeholders to become easements for the pipeline. Therefore, if width would be reduced from 125 feet
involved early in the project planning easement negotiations fail to produce an to 50 feet. The 225-foot-wide
and to identify and resolve issues before agreement, the company could initiate construction right-of-way and the 125-
a formal application is filed with the condemnation proceedings in foot-wide operating right-of-way along
FERC. A docket number (PF06–8–000) accordance with State law. horizontal directional drills would be
has been established to place A fact sheet prepared by the FERC reduced to 150 feet and 50 feet,
information filed by Golden Pass and entitled ‘‘An Interstate Natural Gas respectively. The OP Project would be
related documents issued or received by Facility On My Land? What Do I Need approximately 8.8 miles shorter than the
the Commission, into the public To Know?’’ addresses a number of corresponding segment of the
record.2 Once a formal application is typically asked questions, including the Authorized Pipeline.
filed with the FERC, a new docket use of eminent domain and how to The EA Process
number will be established. participate in the Commission’s
This notice announces the opening of proceedings. It is available for viewing NEPA requires the Commission to
the scoping period that will be used to on the FERC Internet Web site (http:// take into account the environmental
gather environmental input from the www.ferc.gov). impacts that could result from an action
public and interested agencies on the whenever it considers the issuance of a
Project. Please note that the scoping Summary of the Proposed Project Certificate of Public Convenience and
period will close on February 6, 2006. In the Commission’s July 6, 2005 Necessity under Section 7 of the Natural
Details on how to submit comments are Order, Golden Pass was authorized to Gas Act. NEPA also requires us to
provided in the Public Participation construct and operate approximately discover and address concerns the
section of this notice. 77.8 miles of 36-inch-diameter public may have about proposals. This
This notice is being sent to potentially mainline, 42.8 miles of 36-inch- process is referred to as ‘‘scoping’’. The
affected landowners along the OP diameter loop, and 1.8 miles of 24-inch- main goal of the scoping process is to
Project route; Federal, State, and local diameter pipeline and related pipeline focus the analysis in the EA on the
government agencies; elected officials; facilities. These facilities (or the important environmental issues. By this
environmental and public interest Authorized Pipeline) would be used to Notice of Intent, the Commission staff
groups; Native American tribes; and transport natural gas on an open-access requests public comments on the scope
local libraries and newspapers. basis from the proposed Golden Pass of the issues to address in the EA. All
With this notice, we 3 are asking LNG Terminal on the Port Arthur ship comments received are considered
Federal, State, and local agencies with channel to various interstate and during the preparation of the EA. By
jurisdiction and/or special expertise intrastate pipelines in Texas and this notice, we are also asking Federal,
Louisiana. State, and local agencies with
1 On July 6, 2005, the Commission approved the
Golden Pass proposes in the OP jurisdiction and/or special expertise
Golden Pass LNG Terminal and Pipeline Project in
Project to construct and operate a single with respect to environmental issues to
Docket Nos. CP04–386–000, CP04–400–000, CP04– formally cooperate with us in the
401–000, and CP04–402–000. The Golden Pass LNG 42-inch-diameter pipeline, in place of
Terminal and Pipeline Project included a liquefied the 42.8 miles of dual 36-inch-diameter preparation of the EA. Agencies that
natural gas (LNG) terminal and associated LNG pipelines and shorten the pipeline would like to request cooperating status
facilities, 77.8 miles of 36-inch-diameter mainline
pipeline, 42.8 miles of 36-inch-diameter looping
route. This proposal would involve only
hsrobinson on PROD1PC70 with NOTICES

4 The appendices referenced in this notice are not


pipeline that would be constructed adjacent to the those pipeline facilities in Jefferson and being printed in the Federal Register. Copies are
mainline, and associated pipeline facilities. Orange Counties, Texas. Authorized available on the Commission’s Internet Web site
2 To view information in the docket, follow the
Pipeline facilities in Newton County, (http://www.ferc.gov) at the ‘‘eLibrary’’ link or from
instructions for using the eLibrary link at the end Texas, and Calcasieu Parish, Louisiana, the Commission’s Public Reference and Files
of this notice. Maintenance Branch at 1–202–502–8371. For
3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the would not be affected by the proposed instructions on connecting to eLibrary refer to the
environmental staff of the Office of Energy Projects. OP Project. A map illustrating the Additional Information section of this notice.

VerDate Aug<31>2005 15:41 Jan 12, 2006 Jkt 208001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\13JAN1.SGM 13JAN1
Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices 2219

should follow the instructions for filing Public Participation paper copies of its filings to the
comments below. You can make a difference by Secretary of the Commission and must
In the EA we will discuss impacts that providing us with your specific send a copy of its filings to all other
could occur as a result of the comments or concerns about the Project. parties on the Commission’s service list
construction and operation of the By becoming a commentor, your for this proceeding. If you want to
proposed Project under these general concerns may be addressed in the EA become an intervenor you must file a
headings: and considered by the Commission. You motion to intervene according to Rule
• Geology and soils should focus on the potential 214 of the Commission’s Rules of
• Land use Practice and Procedure (18 CFR
environmental effects of the proposal,
• Water resources, fisheries, and 385.214, see Appendix 2). Only
alternatives to the proposal (including
wetlands intervenors have the right to seek
alternative locations and routes), and
• Cultural resources
measures to avoid or lessen rehearing of the Commission’s decision.
• Vegetation and wildlife
• Air quality and noise environmental impact. The more Affected landowners and parties with
• Endangered and threatened species specific your comments, the more useful environmental concerns may be granted
• Hazardous waste they may be. Please carefully follow intervenor status upon showing good
• Public safety these instructions to ensure that your cause by stating that they have a clear
We will also evaluate possible comments are received in time and and direct interest in this proceeding
alternatives to the proposed Project or properly recorded: which would not be adequately
portions of the Project, and make • Send an original and two copies of
represented by any other parties. You do
recommendations on how to lessen or your letter to: Magalie R. Salas,
not need intervenor status to have your
avoid impacts on the various resource Secretary, Federal Energy Regulatory
environmental comments considered.
areas. Commission, 888 First St., NE., Room
Our independent analysis of the 1A, Washington, DC 20426. Environmental Mailing List
issues is included in the EA. Depending • Label one copy of the comments for
on the comments received during the the attention of Gas Branch 2. If you do not want to send comments
scoping process, the EA would be • Reference Docket No. PF06–8–000 at this time, but still want to remain on
published and mailed to Federal, State, on the original and both copies. our mailing list, please return the
and local agencies, Native American • Mail your comments so that they attached Mailing List Retention Form
tribes, public interest groups, interested will be received in Washington, DC on (Appendix 3). If you do not return the
individuals, affected landowners, or before February 6, 2006. form, you will be taken off the mailing
newspapers, libraries, and the Please note that we are continuing to list.
Commission’s official service list for experience delays in mail deliveries
from the U.S. Postal Service. As a result, Additional Information
this proceeding. A comment period
would be allotted for review of the EA. we will include all comments that we Additional information about the
All comments received on the EA would receive within a reasonable time frame Project is available from the
be considered before we make our in our environmental analysis of this Commission’s Office of External Affairs,
recommendations to the Commission. project. However, the Commission at 1–866–208–FERC or on the FERC
The EA is used by the Commission in strongly encourages electronic filing of
Internet Web site (http://www.ferc.gov)
its decisionmaking process to determine any comments or interventions or
using the eLibrary link. Click on the
whether the Project is in the public protests to this proceeding. See 18 CFR
eLibrary link, click on ‘‘General Search’’
convenience and necessity. 385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at and enter the docket number excluding
To ensure your comments are the last three digits in the Docket
considered, please carefully follow the http://www.ferc.gov under the ‘‘e-
Filing’’ link and the link to the User’s Number field. Be sure you have selected
instructions in the public participation an appropriate date range. For
section described later in this notice. Guide. Before you can file comments,
you will need to open a free account assistance, please contact FERC Online
Currently Identified Environmental which can be created on-line. Support at FercOnlineSupport@ferc.gov
Issues or toll free at 1–866–208–3676, or for
Becoming an Intervenor TTY, contact 1–202–502–8659. The
We have identified several issues that
we think deserve attention based on a In addition to involvement in the EA eLibrary link also provides access to the
preliminary review of the proposed scoping process, you may want to texts of formal documents issued by the
facilities and the environmental become an official party to the Commission, such as orders, notices,
information provided by Golden Pass. proceeding known as an ‘‘intervenor’’. and rulemakings.
This preliminary list of issues may be However, there is no procedure for In addition, the Commission now
changed based on your comments and parties to become intervenors during the offers a free service called eSubscription
our analysis. pre-filing process. You may request which allows you to keep track of all
➢ Water Resources intervenor status after Golden Pass files formal issuances and submittals in
• Impact on water quality. its formal certificate application with specific dockets. This can reduce the
• Impact on wetlands. the Commission and is assigned a ‘‘CP’’
amount of time you spend researching
➢ Endangered and Threatened docket number.
proceedings by automatically providing
Species Intervenors play a more formal role in
you with notification of these filings,
• Impact on essential fish habitat. the process. Among other things,
hsrobinson on PROD1PC70 with NOTICES

document summaries and direct links to


➢ Reliability and Safety intervenors have the right to receive
the documents. Go to http://
• Assessment of hazards associated copies of case-related Commission
with natural gas pipelines. documents and filings by other www.ferc.gov/esubscribenow.htm.
➢ Air Quality and Noise intervenors. Likewise, each intervenor Finally, public meetings or site visits
• Impacts from construction of the must send one electronic copy (using will be posted on the Commission’s
pipeline on residences. the Commission’s eFiling system) or 14 calendar located at http://www.ferc.gov/

VerDate Aug<31>2005 15:41 Jan 12, 2006 Jkt 208001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\13JAN1.SGM 13JAN1
2220 Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices

EventCalendar/EventsList.aspx along stages of design, and at this time a Facility On My Land? What Do I Need
with other related information. formal application has not been filed To Know?’’ addresses a number of
with the Commission. For this proposal, typically asked questions, including the
Magalie R. Salas,
the Commission is initiating the use of eminent domain and how to
Secretary. National Environmental Policy Act participate in the Commission’s
[FR Doc. E6–277 Filed 1–12–06; 8:45 am] (NEPA) review prior to receiving the proceedings. It is available for viewing
BILLING CODE 6717–01–P application. This allows interested on the FERC Internet Web site
stakeholders to become involved early (www.ferc.gov).
in project planning and to identify and
DEPARTMENT OF ENERGY resolve issues before an application is Summary of the Proposed Project
filed with the FERC. A docket number Rockies Express’ long-term plan is to
Federal Energy Regulatory construct three separately certificated
(PF06–3–000) has been established to
Commission locate in the public record information pipelines that together would result in
[Docket No. PF06–3–000] filed by Rockies Express and related the installation of approximately 1,323
documents issued by the Commission.1 miles of 42-inch-diameter, high pressure
Rockies Express Pipeline, LLC; Notice Once a formal application is filed with natural gas pipeline linking producing
of Intent To Prepare an Environmental the FERC, a new docket number will be areas in the Rocky Mountain region to
Impact Statement for the Proposed established. the upper Midwest and Eastern United
Rockies Express Pipeline Project, With this notice, we 2 are asking other States. This pipeline system would
Request for Comments on Federal, State, and local agencies with originate near the Cheyenne Hub, in
Environmental Issues, and Notice of jurisdiction and/or special expertise Weld County, Colorado, and would
Public Scoping Meetings with respect to environmental issues in terminate in Monroe County, Ohio.
the project area to formally cooperate Rockies Express intends to pursue this
January 6, 2006.
with us in the preparation of the EIS. system plan in three discrete phases
The staff of the Federal Energy These agencies may choose to (Western, Central, and Eastern). The
Regulatory Commission (FERC or participate once they have evaluated the FERC is now considering only the
Commission) will prepare an proposal relative to their facilities included in the Western Phase.
environmental impact statement (EIS) responsibilities. Agencies that would Rockies Express currently envisions that
that discusses the environmental like to request cooperating status should the Western Phase would include:
impacts of the proposed Rockies follow the instructions for filing • Approximately 710 miles of 42-
Express Pipeline Project, Western Phase comments described later in this notice. inch-diameter pipeline between the
(the Project), which involves the We encourage government Cheyenne Hub in Weld County,
construction and operation of facilities representatives to notify their Colorado and the Panhandle Eastern
by Rockies Express Pipeline, LLC constituents of this planned project and Pipeline system in Audrain County,
(Rockies Express) in Colorado, encourage them to comment on their Missouri;
Wyoming, Nebraska, Kansas, and areas of concern. • 5 new compressor stations with a
Missouri. These facilities would consist This notice is being sent to total of 116,500 horsepower of
of 710 miles of 42-inch-diameter natural landowners within 0.5 mile of the compression;
gas pipeline, 5 new compressor stations; proposed compressor stations; • Approximately 42 mainline valves;
and approximately 42 mainline valves landowners along the pipeline route and
and 12 interconnects. This EIS will be under consideration; Federal, State, and • 12 interconnects.
used by the Commission in its decision- local government agencies; elected A map depicting the general location
making process to determine whether officials; environmental and public of the Project facilities is shown in
the Project is in the public convenience interest groups; Native American tribes; appendix 1.3
and necessity. and local libraries and newspapers; and Rockies Express is requesting
This notice explains the scoping other interested parties. approval such that the facilities are
process that will be used to gather input Some affected landowners may be completed and placed into service by
from the public and interested agencies contacted by a Project representative January 2008. Construction of the
on the Project. Your input will help us about the acquisition of an easement to facilities would take about eight
determine which issues/impacts need to construct, operate, and maintain the months.
be evaluated in the EIS. Please note that proposed facilities. If so, Rockies
the scoping period for the Project will Express and the affected landowners Land Requirements for Construction
close on February 10, 2006. should seek to negotiate a mutually It is estimated that the construction of
Comments may be submitted in acceptable agreement. In the event that the Project facilities would disturb
written form or verbally. In lieu of or in the Project is certificated by the about 6,929 acres of land. Following
addition to sending written comments, Commission, that approval conveys the construction, about 4,358 acres of the
you are invited to attend the public right of eminent domain for securing total would be retained for the operation
scoping meetings that have been easements for the facilities. Therefore, if of the pipeline and the above ground
scheduled in the Project area. Nine easement negotiations fail to produce an facilities (compressor/meter stations).
scoping meetings are scheduled for agreement, Rockies Express could The pipeline would be constructed on a
January 23 through 27, 2006 in various initiate condemnation proceedings in 125-foot-wide right-of-way with
locations along the route. Further accordance with State law. occasional increases in width for
instructions on how to submit written A fact sheet prepared by the FERC additional workspace at waterbody,
hsrobinson on PROD1PC70 with NOTICES

comments and additional details of the entitled ‘‘An Interstate Natural Gas
public scoping meetings are provided in 3 The appendices referenced in this notice are not
1 To view information in the docket, follow the being printed in the Federal Register. Copies are
the public participation section of this
instructions for using the eLibrary link at the end available from the Commission’s Public Reference
notice. of this notice. and Files Maintenance Branch, at (202) 502–8371.
The Rockies Express Project, Western 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the For instructions on connecting to eLibrary refer to
Phase, is currently in the preliminary environmental staff of the Office of Energy Projects. the last page of this Notice.

VerDate Aug<31>2005 15:41 Jan 12, 2006 Jkt 208001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\13JAN1.SGM 13JAN1