Steam-Calc-Medina 500 Bed - Rev2
Steam-Calc-Medina 500 Bed - Rev2
Steam-Calc-Medina 500 Bed - Rev2
1.0
Qty.
Shower Tray
Wash Basin
Janitor Sink
Bathtub
Scrub Sink
Kitchen Sink
Lavatory (Wash Basin)
Dish Washer
Washing Machine
452
1226
34
48
51
196
45
2
5
(Assumed)
Total Demand
33900
7356
680
960
1020
3920
270
300
2000
50,406 GPH
2.0
= 1377 Kgs/Hr
3.0
Humidification
As per the AHU Humidification Schedule the Steam required for Humidification is 980 Kg/Hr
Steam required for humidification
4.0
980 Kgs/Hr
C.S.S.D
Due to non-availability of Equipment data, we will base our steam calculation on another 500
Bed MOH Hospital, the steam consumption can be considered as 600 Kg/Hr
Steam required for Sterilization =
5.0
600 Kgs/Hr
Laundry
Assumptions for the Laundry Equipment based on 500 Bed MOH Hospital:
Steam
Equipment
Qty
Consumption
Total Steam
Load
Washer Extractor
50 Kg/Hr
150 Kg/Hr
Tumbler Dryers
75 Kg/Hr
300 Kg/Hr
255 Kg/Hr
255 Kg/Hr
Ironing Board
20 Kg/Hr
40 Kg/Hr
Presses
25 Kg/Hr
100 Kg/Hr
80 Kg/Hr
160 Kg/Hr
1005 Kgs/Hr
1005 Kgs/Hr
4830 x 30%
=
1450 Kg/Hr.
1394 x100%
=
1394 Kg/Hr.
980 x 100%
=
980 Kg/Hr.
600 x 30%
=
180 Kg/Hr.
1005 x 30%
=
302 Kg/Hr.
-----------------------------------------------Total Steam Demand 4306 Kg/Hr
4830 x 100%
=
4830 Kg/Hr.
1394 x 30%
=
418 Kg/Hr.
980 x 30%
=
294Kg/Hr.
600 x 100%
=
600 Kg/Hr.
1005 x 100%
=
1005 Kg/Hr.
-----------------------------------------------Total Steam Demand 7147 Kg/Hr
Considering the maximum of the above two cases, the Max. Steam demand is 7147 Kg/Hr
Consider 10% Losses due to Feed Water Re-heating and Blowdown 715 Kg/Hr
Hence Total Steam required shall be 7147 + 715 = 7862 Kg/Hr
SELECTION DATA
As per attached Technical Submittal Approval
Quantity: 3 Each (2 Duty and 1 Standby)
Boiler Capacity Selected 4000 Kgs/Hr F&A 100 Deg C.
Boiler Type: Conventional 3 Pass Wet Back Type
Boiler Working Pressure: 10.3 Bar(g)
Fuel Type: Diesel Oil
Electrical Rating: 380 V / 3 Ph / 60 Hz.
Equipment Specifications:
1. Boiler:
As per attached Technical Submittal Approval
Selection Criteria:
The detail selection procedure is provided in the steam consumption calculations.
Boilers Selected:
Qty: 3 Off (2 Duty and 1 Standby)
Model: Cochran Wee-Chieftain Packaged Steam Boiler
Capacity: 4000 Kg/Hr F&A 100 Deg C @ 10.3 bar(g)
Overall Dimensions: Approx. 4896 long x 2690 wide x 3251 high (Dimensions in mm)
Boiler Specifications
The boilers should be Horizontal Three Pass Wet Back Conventional Type and shall be
designed and constructed to BS2790 latest revision.
Model: Cochran Wee-Chieftain
The boilers will be rated at 4000 kg/hr F&A 100 0C.
Working Pressure: 10.3 bar(g)
Electrical supply: 380 V / 3 Ph / 60 Hz; Control Circuit: 220 V / 1 Ph / 60 Hz.
Fuel: Diesel Oil
Accessories:
The boiler package shall consist of:
3. Blowdown Vessel:
As per attached Technical Submittal Approval
Selection Criteria:
The Selection of a blowdown vessel depends on the flowrate and the proportion of flash steam
released.
The following factors affect the selection:
Vessel Specifications:
The Vessel is designed, constructed and tested by Spirax Sarco to BS 5500 Category 3 with
Independent Third Party Verification and Inspection.
Accessories:
Spirax Sarco Blowdown Vessel System is supplied complete with all necessary manifolds,
valves and check valves required on the Bottom Blowdown connection and the TDS
Blowdown Connection from the three boilers. A cooling water system is provided to be
installed on the BDV for proper cooling of the boiler blow down water before being dumped to
the drain.
: Storage Calorifiers
: Feed Water Tank St. St. material as per Spirax Sarco Design.