Coal Unloading Estimation
Coal Unloading Estimation
W
Sl.No.
Description
USW
273
37.1553
ESI @ 4.75%
12.9675
13.65
11.48
T&P @ 3%
27.3
8.0535
13.4316
8.19
10
11
Dust Allowances
12
4
38.46
447.69
RATE ANALYSIS2
As per Ref Circular SMPP/HR-ER/MW/2013 Dated 08.05.2013
W
Sl.No.
Description
1
2
3
4
9
10
11
12
USW
273
27.3
37.1553
12.9675
8.19
4
38.46
401.07
from 01.04.2014
WAGES
SSW
SW
309
363
30.9
36.3
42.0549
49.4043
14.6775
17.2425
9.1155
10.7085
15.2028
17.8596
15.45
18.15
11.48
11.48
9.27
10.89
38.46
38.46
499.61
577.49
d 08.05.2013
WAGES
SSW
SW
309
30.9
42.0549
14.6775
9.27
4
38.46
363
36.3
49.4043
17.2425
10.89
4
38.46
448.36
519.30
ESTIMATION OF MANPOWER
(A) For Unloading of wagons and cleaning of coal in between track at track hopper 1&2, For up keepment of track hopper 1
bay, commercial room, coal sampling room compressor room at track hopper and in & around track hopper area as directed
EIC.
Un-skilled
: 09 persons per shift
Semi- skilled
: 01 person per shift
Total manpower required
: 30 Nos. (27 unskilled + 03 sup)
(B) Unloading of coal from BOXN wagons at wagon tippler.
Un-skilled
: 05 Persons
Semi- skilled
: 01 persons per shift
(C) Manual Unloading of coal from BOXN wagons at track hopper in case of exigency
: 160 Persons(As and when Required)
Un-skilled
(D) Stone breaking, stacking and transportation by mechanical
means.
Un-skilled
: 03 Persons
(E) For Up-Keep of R&D building and surroundings & for upkeep of
Railway commercial staff office, coal sampling building, in-motion
weighbridge, daily sweeping of both the track hoppers and newly : 06 Person / day
constructed S&T control room at wagon tippler and crossing station
building(Un-Skilled)
(F) Supply of unskilled manpower as and when required as per scope : 01 person
of work.
(G) Supply of skilled manpower for weigh bridge operation
: 03 Persons
(H) Re railing of wagons at track hopper, wagon tippler and inside plant
: 07 Persons(As and when Required)
area.
(I) Clearing of cell jamming in both track hoppers
d + 03 sup)
t
when Required)
when Required)
when Required)
RATE ANALYSYS
BOQ-A
S.No
27
BOQ-B
S.No
Total SSW manpower required for unloading BOXN rake in Wagon tipplers
BOQ-C
Assuming one full rake consists of 59 wagons having side doors (openings) will be unloaded
unskilled labourers.
rake unloading time is around 7:00 Hrs
Opening of doors of wagon. Sometimes, for defective doors, which dont open easily, it req
effort to open the door.
Cleaning of wagons after manual unloading.
Closing of doors of wagons. Special attention is required for defective doors.
Cleaning the track hopper grill, floor, and spilled coal along the track up to 200mts in fron
Miscellaneous expenditure like mobile phone and gas (O2+DA) for cutting of welded wagon
For unloading each rake labour payment may be paid for minimum 02 shifts for delay in pla
S.No
1
2
Descrpition
U/S Manpower required for unloading one BOXN rake
Cost per shift
BOQ-D
S.No
Descrpition
Presently prevailing hire charges for one tractor with trolley per
day at SMSTPP including driver and diesel cost
BOQ-E
S.No
Descrpition
Cost of manpower USW
BOQ-G
S.No
BOQ-H
S.No
1
2
BOQ-I
S.No
Descrpition
BOQ-F
Up keepment of R&D, Crossing station, In Motion weigh bridge, Tippler yard S&T
room buildings
S.No
1
USW / USW /
Day
Trip
RACK HOPPERS(1&2)
/Year
Rate
Total Cost
9855
447.68
4,411,886.40
1095
499.61
547,072.95
4,958,959.35
128200 wagons
AGON TIPPLER(1&2)
/Rake
Rate
38.68
50
Total Cost
447.68
2238.4
499.61
499.61
2,738.01
59 Wagons
46.41
s.
200mts in front & rear of the track hopper.
welded wagon doors.
Rate
Total Cost
401.07
64,171.20
50
128,342.40
59 Wagons
2,175.29
50
Cost per
Day
1800.00
600.00
401.07
401.07
1,001.07
20
Rate
Total Cost
447.68
2,686.08
20
when required
USW /
Rate
Day
1
Total Cost
401.07
eigh bridge
/day Rate
3
577.49
1732.47
577.49
20
Total Cost
401.07
519.3
2406.42
519.3
2925.72
2,925.72
ers in Monsoon
/6 cells Rate
20
Total Cost
401.07
Total Cost
20
10
401.07
4010.7
668.45
50
S.No
1
2
3
4
5
6
7
8
Coal
LMT
LMT
LMT
LMT
LMT
LMT
MT
Rounded
9
10
11
12
13
BOXN
BOBRN
52
46.2
10
5
26
Say
4,680,000
3,003,000
1,000,000
500,000
2,600,000
11,783,000
65.00
181,277
181,300
MT
MT
MT
MT
MT
MT
MT
wagons
wagons
2.5 wagons
59 wagons
75 wagons
53,100 wagons
128,200 wagons
Items
Unloading of coal from IR BOBRN wagons at track
hopper. Up keepment of Track hopper of 1&2,
Railway commercial staff room compressor, coal
sampling room as per scope of work.
NO
53100
PWN
300
TRP
50
OPR
312
MD
500
man
power
as
NO
128200
Supply of un
requirement.
OPR
1095
NO
OPR
300
per
Quantity
skilled
Unit
Total
YEAR
Rate
Value in Rs.
38.68
4,958,776.00
46.41
2,464,371.00
2175.29
652,587.00
1001.07
50,053.50
2686.06
838,050.72
401.07
200,535.00
577.49
632,351.55
2925.72
668.45
Total
14,628.60
200,535.00
10,011,888.37
FHPLP00GN100
10,011,888.37
Rupees One Crore Eleven Thousand Eight Hundre
RUPEES ONE CRORE ELEVEN THOUSAND EIGHT H