Professional Documents
Culture Documents
Notice: Endangered and Threatened Species: Incidental Take Permits— Ukumehame, Maui, Hawaii Hawaiian Petrel Et Al.
Notice: Endangered and Threatened Species: Incidental Take Permits— Ukumehame, Maui, Hawaii Hawaiian Petrel Et Al.
Notice: Endangered and Threatened Species: Incidental Take Permits— Ukumehame, Maui, Hawaii Hawaiian Petrel Et Al.
VerDate Aug<31>2005 16:55 Oct 03, 2005 Jkt 205001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\04OCN1.SGM 04OCN1
Federal Register / Vol. 70, No. 191 / Tuesday, October 4, 2005 / Notices 57889
‘‘take’’ means to harass, harm, pursue, minimum the following measures: (1) documents, and comments submitted
hunt, shoot, wound, kill, trap, capture, Using ‘‘monopole’’ steel tubular towers thereon to determine whether the
or collect, or to attempt to engage in any to eliminate perching and nesting application meets the requirements of
such conduct (16 U.S.C. 1538). opportunities and minimize collision NEPA regulations and section 10(a) of
However, under section 10(a) of the risk; (2) utilizing a rotor with a the ESA. If we determine that those
ESA, we may issue permits to authorize significantly lower rotation speed (11– requirements are met, we will issue a
‘‘incidental take’’ of listed fish and 20 rpm) which makes the rotor more permit to the applicant.
wildlife species. Incidental take is visible during operations; (3) choosing a
Dated: September 28, 2005.
defined by the ESA as take that is site in proximity to existing electrical
incidental to, and not the purpose of, transmission lines to eliminate the need David J. Wesley,
carrying out an otherwise lawful for an overhead transmission line from Deputy Regional Director, Regional Office,
activity. Regulations governing the project to the interconnect location; Portland, Oregon.
incidental take permits for threatened (4) restricting construction activity to [FR Doc. 05–19825 Filed 10–3–05; 8:45 am]
and endangered species are found at 50 daylight hours to avoid the use of BILLING CODE 4310–55–P
CFR 17.32 and 17.22, respectively. All nighttime lighting; (5) implementing a
species included on the permit would minimal lighting plan for the wind
receive assurances under the Service’s turbines and minimizing on-site lighting DEPARTMENT OF THE INTERIOR
‘‘No Surprises’’ regulation. to reduce impacts to birds attracted to
The applicant has applied to the lights; (6) limiting on-site vegetation to Bureau of Indian Affairs
Service for a 20-year incidental take that which is already established to
permit for the endangered Hawaiian eliminate new foraging attractions for Rate Adjustments for Indian Irrigation
Petrel (Pterodroma sandwichensis), Nene; (7) conducting surveys during Projects
threatened Newell’s (Townsend’s) nesting and fledging seasons of the
Shearwater (Puffinus auricularis covered birds during the first year of AGENCY: Bureau of Indian Affairs,
newelli), endangered Nene (Branta project operation to better understand Interior.
sandvicensis), and the endangered the species’ habits and population status
ACTION:Notice of proposed rate
Hawaiian Hoary Bat (Lasiurus cinereus and document the response to turbines;
semotus) (covered species), pursuant to adjustments.
(8) conducting surveys to locate
section 10(a)(1)(B) of the ESA. The unknown or unconfirmed nesting
activities proposed to be covered by the colonies of Hawaiian Petrels and SUMMARY: The Bureau of Indian Affairs
permit include the construction and Newell’s Shearwaters in West Maui, (BIA) owns, or has an interest in,
operation of the island of Maui’s first estimate nest numbers and distribution, irrigation facilities located on various
commercial wind energy generation identify management needs and Indian reservations throughout the
facility. The proposed facility would implement management measures United States. We are required to
consist of 20 General Electric wind- where possible; (9) providing financial establish rates to recover the costs to
generation turbines, situated in a single contribution to the Nene propagation administer, operate, maintain, and
articulated row at an elevation and release program and funding rehabilitate those facilities. We request
extending from approximately 2,000 to construction and operation of a new your comments on the proposed rate
3,200 feet in the vicinity of existing release facility for Nene for 5 years; and adjustments.
Maui Electric Company (MECO) (10) contributing $20,000 to the
transmission lines. The height of each Hawaiian Bat Research Cooperative and DATES: Interested parties may submit
proposed monopole steel turbine tower conducting surveys for bat activity comments on the proposed rate
is 55 meters (180 feet), and the diameter within the project area. adjustments on or before December 5,
of the rotors is 70.5 meters (231 feet), for Our Environmental Assessment 2005.
a total peak structural height of considers the direct, indirect, and
ADDRESSES: All comments on the
approximately 90 meters (296 feet). The cumulative effects of the proposed
proposed rate adjustments must be in
proposed project would include an action of permit issuance, including the
writing and addressed to: Arch Wells,
operation and maintenance facility, a measures that would be implemented to
Acting Deputy Director, Office of Trust
substation and wind monitoring minimize and mitigate such impacts.
equipment, all situated in proximity to The Environmental Assessment Services, Attn.: Irrigation and Power,
the turbines, as well as improvements contains an analysis of two alternatives: Mail Stop 4655–MIB, 1849 C Street,
and some realignment to an existing (1) The No Action Alternative (no NW., Washington, DC 20240, Telephone
four-wheel-drive access road. permit issuance); and (2) the Proposed (202) 208–5480.
The entire facility has the capacity to Action Alternative (construction and FOR FURTHER INFORMATION CONTACT: For
generate 30 megawatts of power, which operation of the Kaheawa Pastures Wind details about a particular irrigation
would eliminate the use of Generation Facility as proposed with project, please use the tables in
approximately 150,000 to 250,000 the issuance of the permit and SUPPLEMENTARY INFORMATION section to
barrels of oil annually, thereby reducing implementation of the HCP). Alternative contact the regional or local office
annual emissions from the MECO power turbine designs and alternative sites where the project is located.
plant by approximately 177.6 million were considered but not analyzed in
pounds of carbon dioxide, 1.24 million detail in the Environmental Assessment SUPPLEMENTARY INFORMATION: The tables
pounds of sulfur dioxide and 0.32 because these alternatives were in this notice list the irrigation project
million pounds of nitrogen oxides. infeasible. contacts where the BIA recovers its
Incidental take of covered species This notice is provided pursuant to costs for local administration, operation,
may occur as a result of these proposed section 10(a) of the ESA and the maintenance, and rehabilitation, the
covered activities. The applicant regulations of the National current irrigation assessment rates, and
proposes to avoid, minimize, and Environmental Policy Act (NEPA) of the proposed rates for the 2006
mitigate the impacts of the taking of 1969 (40 CFR 1506.6). We will evaluate irrigation season and subsequent years
these species by implementing at a the permit application, associated where applicable.
VerDate Aug<31>2005 16:55 Oct 03, 2005 Jkt 205001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\04OCN1.SGM 04OCN1