Contract M&J Scott Breil DOOR-GLASS
4 Dado hardwood custom molding to act as glass stops and trim glass opening
NET 30 DAYS
All material is guaranteed to be as specified. All work to be completed in a workmanship like manner according to standard practices. If the client requests deviations from
the above specifications that represent added costs beyond the time and materials quoted, a separate written addendum will be required before the alterations can be executed.
The changes requested by the client will become an additional charge over and above the originally quoted price. The client agrees that M&J General Contracting will not be
held liable for delays caused by labor strikes, accidents, adverse weather conditions, or other factors beyond the control of M&J General Contracting. The employees and sub-
contractors of M&J General Contracting are fully covered by Workman's Compensation Insurance.
IMPORTANT NOTE:
This contract may be withdrawn
if not accepted within
Authorized Signature - Marshall L. Self, President Date of contract Thirty (30) Days
Description of work to be performed and services to be provided (continued from previous page):
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Acceptance of Contract