CONTRACT

M&J General Contracting, Inc.


61371 Barclay Washington Twp. MI 48094
Telephone:586-907-1299 Fax 586-992-9248

Client Receiving Contract Client Telephone


MFC NETFORM 586-731-2003
Street Address Job Name and Location

51810 Technology Court 10.07 Door glass


City, State, Zip Code Date of Contract Page Number

Shelby, MI 48315 3/15/2010 Page 1


Description of work to be performed and services to be provided:
1 Furnish labor and materials to add insulated safety glass to one office door at the above mentioned address as follows:

2 Remove existing door, transport to M&J shop sometime in the am.

3 Cut opening in door to match existing door previously finished by others

4 Dado hardwood custom molding to act as glass stops and trim glass opening

5 Miter and attach custom molding/glass stops one side

6 Silicone seal and install glass envelope 3/4" safety glass

7 Miter, silicone and install second side of custom molding

8 Paint to match previously finished door

9 Install finished door pm. Same day.

Any changes to this contract must be in written form.


License # M&J 2102183763 Marshall Self Builders License # 2101084565
We propose hereby to furnish material and labor, complete in accordance with the above specifications, for the sum of:
FOUR HUNDRED SEVENTY-FIVE DOLLARS (475.00)

Payments to be made as follow:

NET 30 DAYS

All material is guaranteed to be as specified. All work to be completed in a workmanship like manner according to standard practices. If the client requests deviations from
the above specifications that represent added costs beyond the time and materials quoted, a separate written addendum will be required before the alterations can be executed.
The changes requested by the client will become an additional charge over and above the originally quoted price. The client agrees that M&J General Contracting will not be
held liable for delays caused by labor strikes, accidents, adverse weather conditions, or other factors beyond the control of M&J General Contracting. The employees and sub-
contractors of M&J General Contracting are fully covered by Workman's Compensation Insurance.

IMPORTANT NOTE:
This contract may be withdrawn
if not accepted within
Authorized Signature - Marshall L. Self, President Date of contract Thirty (30) Days

Acceptance Of This Contract


The above prices, specifications, and conditions are satisfactory and are hereby accepted. Signatures below authorize M&J General Contracting to commence work on the
project. Payment for the project will be made as detailed above. Client acknowledges that they carry adequate levels of hazard insurance on the location/premises in which
the work will be performed.

Signature Date of Acceptance Title/Position

Signature Date of Acceptance Title/Position


CONTRACT
M&J General Contracting, Inc.
61371 Barclay Washington Twp. MI 48094
Telephone:586-907-1299 Fax 586-992-9248

Client Receiving Contract Client Telephone

MFC NETFORM 586-731-2003


Street Address Job Name and Location

51810 Technology Court 10.07 Door glass


City, State, Zip Code Date of Contract Page Number

Shelby, MI 48315 3/15/2010 Page 2 of 2

Description of work to be performed and services to be provided (continued from previous page):
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Acceptance of Contract

For M&J General Contracting Signature of Client Signature of Client


For M&J General Contracting
Signature of Client Signature of Client
All material is guaranteed to be as specified. All work to be completed in a workmanship like manner according to
standard practices. If the client requests deviations from the above specifications that represent added costs beyond the
time and materials quoted, a separate written addendum will be required before the alterations can be executed. The
changes requested by the client will become an additional charge over and above the originally quoted price. The
client agrees that M&J General Contracting will not be held liable for delays caused by labor strikes, accidents,
adverse weather conditions, or other factors beyond the control of M&J General Contracting. The employees and sub-
contractors of M&J General Contracting are fully covered by Workman's Compensation Insurance.