Draft Application Format For Electricity Connection
Draft Application Format For Electricity Connection
Draft Application Format For Electricity Connection
RuralSupply
DRAFTAPPLICATIONFORMATFORELECTRICITYCONNECTION
ApplicationNo:______________.
Date:XX/XX/XXXX
To
The(NameoftheRuralSystemOperator)
________________________________________________
________________________________________________
________________________________________________
Subject:
SupplyofElectricityfor_____________________________________(Domestic/Commercial/
Industrial)Purpose.
Sir,
I/We hereby apply for electrical connection to my/our premises described hereunder
andI/weagreeasfollows:
1.
I/Weherebyagreetotakefromthe________________________________________________(Nameof
theRuralSystemOperator)atthepremisesstatedbelowasupplyofelectricalenergynot
exceedingthecontractedloadofmy/ourinstallationasstatedintheenclosedschedule
foraperiodofnotlessthanOneyearfromthedateofcommencementofsupply.
2.
I/WefurtheragreetopayforthesaidsupplyinaccordancewiththeScheduleofTariff
mentionedintheAppendixandalsotopayforallsuchotherchargesasmaybecomedue
by me/us to the supplier if any, at rates laid down in the Rural System Operators
InstallationRules.
3.
ModelOffGridRECRegulations,2012
Page1
DraftApplicationFormatforElectricityConnectionforOffGrid
RuralSupply
4.
I/Wefurtheragreetogiveyousuchsecurityasmayberequiredformetersandmetering
equipments supplied by _______________________________________ (Name of the Rural System
Operator).
5.
I/We hereby agree that the power supply of Rural System Operator under this
arrangement shall be governed as per Central Electricity Regulatory Commission
(Accreditation, Registration and Issuance of Renewable Energy Certificates for
CommunityLeveloffGridDistributedREGenerationProjects)Regulations,2012
Thenecessaryparticularsforthesupplyofenergytomy/ourpremisesaregivenintheSchedule
hereunder(Appendix).
SignatureofWitness/RepresentativeofRSOSignatureofApplicant
NAME:_________________________________________
NAME:_________________________________________
Address:______________________________________
PresentAddress:_____________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
ModelOffGridRECRegulations,2012
Page2
DraftApplicationFormatforElectricityConnectionforOffGrid
RuralSupply
APPENDIX:PARTICULARSFORSUPPLYOFENERGY
1.
Applicant'sName
2.
Descriptionofthepremises
(Wheresupplyisrequired)
:__________________________________________________________________
:__________________________________________________________________
___________________________________________________________________
Town/Village:__________________________________________________
3.
Nameandpermanentaddressoftheownerofthepremiseswheresupplyisrequired:
NameoftheOwner
:__________________________________________________________________
PermanentAddress
:__________________________________________________________________
___________________________________________________________________
(Iftheapplicantistheownerofthepremises,thismaybefilledupwith'Applicant'
(If the applicant is not the owner of the premises, a consent letter from the owner of the
premisesandindemnitybond,indemnifyingthedepartmentagainstanylossfortheservice
connectionandconsumptionofenergy,shouldbeenclosedalongwiththeapplication.)
4.
Thefollowingaremy/ourrequirements:
Sr.
Descriptionofapparatus
Quantity
No.
Wattage
Total
Approx.
per
Demandin
Hoursof
Apparatus
Watts
use/day
ModelOffGridRECRegulations,2012
Page3
DraftApplicationFormatforElectricityConnectionforOffGrid
RuralSupply
A=GrossTotalDemand(inKilowatt)
5.
RequiredContractedLoadoftheInstallation,therefore,is_______________________Kilowatt.
6.
Categoryunderwhichtheconnectionshallbeclassified_____________________________________.
7.
ScheduleofTariff:
The applicable rate for the applicant will be Rs. ____________ per kWh or on flat rate of
Rs._____________w.r.t.thenos.ofpowerpoint/electricalappliancesorasperTariffRate
andTariffScheduleasapprovedbyStateCommissionandapplicableforsuchcategoryof
consumeroutlinedunderPara6above.
8.
9.
The Applicable Tariff Rate shall be revised by Rural System Operator with advance
intimation of one month notice or it shall be revised as per applicable Tariff rate for
consumersbelongingtosameconsumercategoryoftheDistributionLicensee,asmaybe
approvedbyStateElectricityRegulatoryCommissionfromtimetotime.
SignatureofAuthority
Signatureoftheapplicant
________________________________________
NameoftheRuralSystemOperator
Nameoftheapplicant
Date:__________________________________
Date:__________________________________
_______________________________________
(Seal)
ModelOffGridRECRegulations,2012
Page4
DraftApplicationFormatforElectricityConnectionforOffGrid
RuralSupply
RURALSYSTEMOPERATORSINSTALLATIONRULES
1.
Definitions:
1.1
Applicantmeansthepersonwhoisapplyingfortheelectricityconnection.
1.2
1.3
1.4
InstallationmeansanelectricalinstallationlocatedattheSite.
1.5
Electricity Charges means the charges for electrical energy payable by the
ApplicantinaccordancewiththeScheduleofTariff.
1.6
1.7
1.8
Sitemeansthelandwereelectricityconnectionisrequiredasmentionedinthe
application.
2.
PreconditionstoConnection:
TheApplicantisonlyentitledtoreceivetheElectricityServicesif:
(a)
(b)
RuralSystemOperatorapprovestheprovisionofElectricityServicestotheSite;
and
ModelOffGridRECRegulations,2012
Page5
DraftApplicationFormatforElectricityConnectionforOffGrid
RuralSupply
(c)
TheApplicantcomplieswithanyotherpreconditionsreasonablynotifiedtothe
ApplicantbyRSOatthattime.
3.
Access:
TheApplicantmustgiveRSOsafeandunhinderedaccesstotheSiteforthepurposesof
theElectricityServices,includingtocompleteandmaintaintheelectricalconnectionto
theSite,readanymetersandinstallanynecessaryequipmentattheSite.
4.
ChargesandBilling:
4.1
The rates of the Electricity Charges payable to RSO by the Applicant for the
Electricity Services will be determined by State Electricity Regulatory
Commissionfromtimetotime1,
OR
The rates of the Electricity Charges payable to RSO by the Applicant for the
Electricity Services will be be based on the reasonable costs of the connection
and supply of electricity at the Site and shall be mutually agreed between RSO
andApplicantandmayberevisedfromtimetotime..
4.2
RSO will bill the Applicant for Electricity Charges in respect of the Electrical
Energy Consumed in a month as recorded by the consumer meters installed at
consumer premises, or over a different period reasonably notified to the
ApplicantbyRSO,atthebillingaddressstatedontheApplicant'sApplicationfor
anElectricityConnection.
4.3
The Applicant must pay the amount specified on each bill, by the due date
specifiedonthatbill.RSOmaychargetheApplicantfeesforlatepaymentofabill.
4.4
RSOmayestimatetheamountofelectricityconsumedattheSiteif:
(a)
RSOisnotabletoreasonablyorreliablybasethebillonanactualmeter
reading;or
(b)
4.5
RSOhastheApplicant'sconsent.
1Strikeoutasapplicable
ModelOffGridRECRegulations,2012
Page6
DraftApplicationFormatforElectricityConnectionforOffGrid
RuralSupply
5.
Compliance:
The Applicant must comply with any applicable energy laws relating to the Electricity
ServicesandRSO'sreasonablerequirementsunderthoselaws.
6.
QualityandReliabilityofSupply:
To the extent permitted by law, RSO gives no condition, warranty or undertaking, and
makes no representation to the Applicant, about the condition or suitability of the
electricity supplied to the Site, its quality, reliability of supply, fitness for purpose or
safety,otherthanassetoutintheAgreement.
7.
Interruptionsanddisconnections:
Withoutlimitation,RSOmayinterruptordisconnectthesupply ofelectricitytotheSite
where:
(a)
TheApplicantfailstocomplywiththeseinstallationrulesorbreachesatermof
theAgreement;
(b)
Thereisanemergency,healthorsafetyreason;
(c)
RSOundertakesmaintenanceof,oralterationsto,itselectricityinfrastructurein
theIndustrialArea;
8.
(d)
RSOisrequiredtodosobylaworarelevantauthority;or
(e)
RSOisoftheopinionthattheSiteisunsuitablefortheElectricityServices.
ChangestotheseInstallationRules:
8.1
TheseinstallationrulesmaybeupdatedbyRSOfromtimetotime.RSOmustgive
theApplicantatleast30daysnoticebeforethosechangestakeeffect.
8.2
The Applicant must comply with any updated installation rules that have been
notifiedtotheApplicantbyRSOinaccordancewithrule8.1.
ModelOffGridRECRegulations,2012
Page7