Professional Documents
Culture Documents
采矿专业英语大全
采矿专业英语大全
safety berm
safety signal device
ammonite
deformation measurement
metamorphic rock
parallel flow network
stripping ratio
stripping
compensating space
acceptance surveying of excavated volume
total excavation quantity
surveying stope
sill structure of stope
ground control of stope
chamber surveying
stope ventilation
reinforcement of surrounding rock of stope
extracted ore
development ratio
electric distribution box at workings
mining machinery
extraction-development plan of mine
balance between development and extraction
goaf management
mining
mining engineering
mining industry
mining technology
mining system engineering
mining science
expert system in mining
dredge
digging procedure of dredging
dredging method
preventing ground freeze in dredging area
thrawing of dredging area
water supply in dredging area
dredging
development of dredging
breaking and screening of dredging
washing process on the dredge
stope preparation
ratio of preparation work
prepared reserve
eluvium
trench and shallow-shaft explorations
side triping bucket loader
station for air measurement
filling
multiple ratio pipe length-to-column in filling
filling material
rate of fill settlement
pipelining of filling material
permeability coefficient or fill
filling material preparation
mining method employing fill
stowing machine
fill tightenning
filling shaft
general layout for filling shaft area
automation of filling material preparation
function of fill mass
filling system
percussive drilling
exhaust ventilation
dust remover
vibrating auto loader
tripping to reserve ratio
collaidal mud
drilling
train hoisting
series flow network
perpendicular slot fill stoping
block open-stoping with vertical longhole
shaft for speedening development excavation
ventilation after large blasting
boulder
continental shelf placer mining
extraction of water-contained ore body
belt conveyor
automation of belt conveyor
conveyor hoisting
stereographic projection
belt transfer
single slice caving
single-bucket excavator
single-bucket excavator loading
waste disposal with power shovel
retaining wall
detonating tube
detonating cord
baffle
drifter
safety fuse
deflection pulley
over-casting mining method
contour sheet
protection rank of surface ground
surface movement
probability integration method for calculation of surface movement
dewatering through well
underground mining method
computerized design of underground mining method
choice of underground mining method
underground mining jumbo
underground section substation
load-haul-dump unit
underground mining
cable line of underground mine
safe grounding of underground electrical equipment
development of underground mine
development method of underground mine
development system of underground mine
drainage in underground mine
electric power distribution of underground mine
underground mine
longhole blasting in underground mine
dump truck for underground mine
medium-longhole blasting in underground mine
continuous underground miner
groundwater
underground main substation
ground pressure measurement
geological structure
geological structure map
gaological plan
electronic powered slusher
checking instrument of electric blasting
water barrier
bulk-head
water-sealing curtain
water door
room-and-pillar method
chart of ore drawing
cut-off gradeof ore drawing
procedure of ore drawing
pipelining of fill with heterogeneous flow
decoupling loading
ventilation for exhausting radon in non-uranium mine
fire door
waste
waste dump
the stability of waste pile
leaching water control of waste dump
waste rate
waste disposal
top slicing
bench stripping ratio
layer trenching
sublevel caving method
sublevel open stoping
block opening with ground breaking from sublevel
zone ventilation system
ventilating shaft
local resistance of airflow
friction resistance of airflow
frontal resistance of airflow
air door
air bulkhead
air bridge
air tube
air brattice
ventilation resistance factor
contourline passing the lowest point of topage in final pitlimit
regulating air volumn by booster fan
multiple-shaft wall
complex ventilation network
auxiliary shaft
dry-stowing system
dust-collecting in dry drilling
churn-drill rig
cable belt conveyor
steel belt conveyor
hoisting equipment with wire rope
wire pressuremeter
height compensator for mine car
mining at high elevation
high bench blasting
rock cutting by high pressure water jet
impermeable layer
toe rock
industrial reserve
working slope
angle of working slope
structure-concour map
shaft guide
cage
cage hoisting
smooth blasting
rock breaking with rolling disk
beach placer mining
marine mining
marine mineral resource
aquifer
millisecond detonator
transverse cutmining method
cross cut
overshot loader
slope covering
back analysis of slope failure
prevention and remedy of slope failure
annular cut mining method
stoping
extraction unit
stope face
rotary drilling
concrete pump
concrete placer
shotcrete machine
shotcrete robot
support of precast concrete set
jet piercer
re-opening of fire zone
monitoring of fire zone
locomotive
mechanical filling
mechanical ore breaking
mechanical handling
machine loading ore
skip
skip hoisting
skip dumping arrangement
skip loading arrangement
tight blasting
detonating relay
mat
aerial tramway
timbering machine
repair truck
slurry
cone of depression
belt hoisting equipment
cement-filling system
diagonal flow network
level
block caving method
interval of level
mining sequence of level
block open stoping
forced block caving method
layout of level
stage ventilation system
spontaneous block caving mining method
joint
rose diagram of joint
diamond drill
diamond drilling
metal support
near shaft-point surveying
break-even stripping ratio
shaft station
drainage at shaft bottom
lowering the water table by well-point
headframe
tower
shaft pillar
layout of the shaft
shaft drilling
underground electric locomotive haulage
underground rooms
underground elevation surveying
underground theodolite traversing
mud drainage in underground mine
underground crusher station
dust control in station of treaker
underground tow vechicle
underground pump room
underground sump
underground sump cleaning
underground trackless haulage
underground haulage
automatic control of underground haulage
opening exploration
mine car
mine dust
dust measurement
ore deposit
genetic type of ore deposit
commercial type of ore deposit
mining stage of deposit
technical condition of mining
sequence of mineral mining
exploration of ore deposit
exploratory degree of deposit
mine ventilation
natural ventilation
mine safety
mine surveying
mine-surveying instrument
ore recovery
ratio of extracted ore to reserve consumed
ore loss rate
ore loss and dilution
handling of broken ore
raise climber
scraper-type loader
drainage pipeline
waste disposal with over-burden spreader
waste disposal with plough
throw blasting
slinger belt stowing machine
blasthole dewatering truck
blasthole stemming machine
pre-charging of blast-hole
ore blending
mechanism of shotcrete-bolt supporting
sill structure with level bottom at handing elevation
adit
general layout for adit site
development method with adit
average stripping ratio
slope stability analysis of plane failure
bench floor
drift
ground pressure around tunnel
drafting by shield
drafting
drifting with drift borer
drifting machine
mechanized operating line for drifting
ground pressure around tunnel in theological rock
drifting by conventional method
ground presseure around tunnel in elastic-plastic rock
drifting by special method
tunnel boring mechine
talus accumulation
site for crushing station
crushing-and-transfering plant
P theory of ground pressure
P classification of rock firmness by
method of initiation
delay interval of priming
sensitivity to initiation
exploder
initiation sequence
initiating explosive
pneumatic rock drill
pneumatic pick
pneumatic filling
air lift mining system
pneumatic hoisting equipment
pneumatic conveying pipeline
rod
bit
shank
traction substation
traction rope
traction network
down-the-hole drill
down-the-hole drilling
short-hole blasting
trench sill structure
intensification of mining
cutting
cutting rock breakage
stability analysis of toppling failure
cleaner for ming car
cleaning berm
blasting with sphirecal cartridge
breasting mining method
thermal breaking of rock
manrider
artificial river-bed
treatment of waste water from leaching process in mine
leaching mining
emulsion explosive
three grades of reserves
mining under surface water-body,building or railway
ground pressure around shaft in loose rock
gravel pump
placer surveying
hydraulic transport of placer
hillside open cut
fan-shaped advancing cut mining method
commodity ore
cut-and-fill stoping
drift-and-fill mining stoping
stoper
trenching with long-range shovel
deep mining
longhole blasting
long hole surveying
automatic control of longhole loading
deep open pit
ventilation in hot and deep mines
lift truck
produetion stipping ratio
number of standby stoping block
productive exploration
technique of productive exploration
acoustic measurement
acoustic emission monitoring
dust-removing by wet-drilling
cross cut
hand-held rock drill
dewatering adit
vertical shaft
shaft sinking by sheet-piling method
shaft sinking in surface soil
general layout for shaft site
drop shaft sinking
ground pressure around shaft
shaft-sinking by freezing method
shaft backhoe mucker
shaft sinking by concrete curtain wall method
shaft sinking in rock by conventional method
shaft installation
surface layout for shaft sinking
shafting machine
mechanized operating line for shaft sinking
drainage in shaft sinking
shaft sinking equipment
hoist in shaft sinking
shaft sinking ventilation
drilling and blasting in shaft sinking
shaft mucking
development method with vertical shaft
temporary support in shaft sinking
shaft sinking
surveying for shaft sinking
special method of shaft sinking
shaft deepening
protective cover for shaft deepening
VCR
raising by climber
raising by conventional method
drop raising
raise boring machine
raise boring
raise boring
head sheave
general layout for ventilation shaft area
economic section of airway
ventilation pressure
ventilation resistance
permeable layer
unitary ventilation system
preliminary loosing of sediment
car pusher
bulldozer loading
waste disposal with bulldozer
vertical crater retreat mining method
short delay blasting
micro-seismic monitoring
wallrock alteration
interaction between support and surrounding rock
sublevel caving without sill pillar
endless rope haulage
no-rope hoisting equipment
flashing shaft
bacterial leaching mining
undercut-and-fill stoping
mining sequence of adjacent crebody
level plan
drainage through adit
mine working vertical section
surveying for driving
mine working longitudinal projection
resuing method
dynamite
slope stability analysis of wedge failure
inclined shaft
inclined shaft singking in surface soil
general layout for inclined shaft site
driving of inclined shaft bottom station
lifting bridge for inclined shaft
inclined shaft singking in rock
RQD
raw ore
stripping to crude ore ratio
original geological logging
slope stability analysis of circular failure
premature explosion by stray current
roadway impact ripper
drilling
drilling blasting
rock drilling tool
rock drill
drill noise reduction
jumbo automation
premature explosion
loading ore through gate chute
site for explosive magazine
electric locomotive for narrow gauge
fold structure
vibrating ore-drawing machine
loading ore through vibrating chute
vibrating conveyor
vibrating loader
concrete lining
jackleg drill
priming with booster
middle ventilation system
gravity handling
main shaft
main fan airdrift
main fan diffuser
sealing water by grouting
blasting with column carlridge
transfer platform
loading ore
loading room
explosive loading truck
explosive loading equipment
construction of charge
charger
electric locomotive standard gauge
spontaneous explosion
mining of self-flaming deposit
dump truck
free face
od
on method