Download as pdf or txt
Download as pdf or txt
You are on page 1of 50

safety blasting material

safety berm
safety signal device
ammonite

ammonium nitrate-fuel oil agent


open-pit in rolling terrain
slusher
blasting engineering
safety pillar
excavator with planning operation
muck pile
detonation
detonation power
blasting-power handling
blasting safety
measurements of blasting action and effect
flyrock
effect of cumulative energy
blasting crater
ore break by blasting
qulity of blasting
index of blasting action
deflagration
velocity of detonation
explosion
stoping reserve
caving mining methed
cushioned mat of caved rock or ore
ore drawing under caved rock
geological work for mine closure
long-wall fill stoping
slope
engineering geology of side slope
meshing and grouting
slope monitoring
mode of slope failure
slope design
slope drainage
probabilistic method for slope stability analysis
rigid equilibrium method for slope stability analysis
numerical value method for slope stability analysis
parameter analysis for slope stability
substation

deformation measurement
metamorphic rock
parallel flow network
stripping ratio
stripping
compensating space
acceptance surveying of excavated volume
total excavation quantity
surveying stope
sill structure of stope
ground control of stope
chamber surveying
stope ventilation
reinforcement of surrounding rock of stope
extracted ore
development ratio
electric distribution box at workings
mining machinery
extraction-development plan of mine
balance between development and extraction
goaf management
mining
mining engineering
mining industry
mining technology
mining system engineering
mining science
expert system in mining
dredge
digging procedure of dredging
dredging method
preventing ground freeze in dredging area
thrawing of dredging area
water supply in dredging area
dredging
development of dredging
breaking and screening of dredging
washing process on the dredge
stope preparation
ratio of preparation work
prepared reserve
eluvium
trench and shallow-shaft explorations
side triping bucket loader
station for air measurement

diesel-powered load-haul-damp unit


power shovel with tilting boom and conveyor
long dead-end driving face ventilation
detecting water with pilot hole
ultraacoustic measurement
ratio of truck to shovel
auto loader
sedimentary rock
track rope
postponed explosion

filling
multiple ratio pipe length-to-column in filling
filling material
rate of fill settlement
pipelining of filling material
permeability coefficient or fill
filling material preparation
mining method employing fill
stowing machine
fill tightenning
filling shaft
general layout for filling shaft area
automation of filling material preparation
function of fill mass
filling system
percussive drilling
exhaust ventilation
dust remover
vibrating auto loader
tripping to reserve ratio
collaidal mud
drilling
train hoisting
series flow network
perpendicular slot fill stoping
block open-stoping with vertical longhole
shaft for speedening development excavation
ventilation after large blasting
boulder
continental shelf placer mining
extraction of water-contained ore body
belt conveyor
automation of belt conveyor
conveyor hoisting

stereographic projection

belt transfer
single slice caving
single-bucket excavator
single-bucket excavator loading
waste disposal with power shovel
retaining wall
detonating tube
detonating cord
baffle
drifter
safety fuse
deflection pulley
over-casting mining method
contour sheet
protection rank of surface ground
surface movement
probability integration method for calculation of surface movement
dewatering through well
underground mining method
computerized design of underground mining method
choice of underground mining method
underground mining jumbo
underground section substation
load-haul-dump unit
underground mining
cable line of underground mine
safe grounding of underground electrical equipment
development of underground mine
development method of underground mine
development system of underground mine
drainage in underground mine
electric power distribution of underground mine
underground mine
longhole blasting in underground mine
dump truck for underground mine
medium-longhole blasting in underground mine
continuous underground miner
groundwater
underground main substation
ground pressure measurement
geological structure
geological structure map
gaological plan
electronic powered slusher
checking instrument of electric blasting

electric priming circuit


electric excavator
electric powered load-haul-dump unit
motorized wheel dump truck
electric rock drill
rock breaking with electric heating
raise cage
car spotting hoist
freezing hole
freezing circuit
freezing pressure
chamber blasting
chamber excavation
fault
pillar for fault fracture zones
fracture structure
heap leaching
diagonell ventilation system
cage bumping
multiplepoint displacement meter
multi-bucket excavator
multi-function vehicle
multistage fan-station ventilation system
polymetallic nodule mining
secondary blasting
secondary mining
car dumper
backhoe
square-set with fill method
flood ditch
train for fire prevention
fire barrier
water ditch

water barrier
bulk-head
water-sealing curtain
water door
room-and-pillar method
chart of ore drawing
cut-off gradeof ore drawing
procedure of ore drawing
pipelining of fill with heterogeneous flow
decoupling loading
ventilation for exhausting radon in non-uranium mine

fire door

waste
waste dump
the stability of waste pile
leaching water control of waste dump
waste rate
waste disposal
top slicing
bench stripping ratio
layer trenching
sublevel caving method
sublevel open stoping
block opening with ground breaking from sublevel
zone ventilation system
ventilating shaft
local resistance of airflow
friction resistance of airflow
frontal resistance of airflow
air door
air bulkhead
air bridge
air tube
air brattice
ventilation resistance factor
contourline passing the lowest point of topage in final pitlimit
regulating air volumn by booster fan
multiple-shaft wall
complex ventilation network
auxiliary shaft
dry-stowing system
dust-collecting in dry drilling
churn-drill rig
cable belt conveyor
steel belt conveyor
hoisting equipment with wire rope
wire pressuremeter
height compensator for mine car
mining at high elevation
high bench blasting
rock cutting by high pressure water jet
impermeable layer
toe rock
industrial reserve
working slope
angle of working slope
structure-concour map

sealing of drop-shaft bottom to rock


scraper chain conveyor

shaft guide
cage
cage hoisting
smooth blasting
rock breaking with rolling disk
beach placer mining
marine mining
marine mineral resource
aquifer
millisecond detonator
transverse cutmining method
cross cut
overshot loader
slope covering
back analysis of slope failure
prevention and remedy of slope failure
annular cut mining method
stoping
extraction unit
stope face
rotary drilling
concrete pump
concrete placer
shotcrete machine
shotcrete robot
support of precast concrete set
jet piercer
re-opening of fire zone
monitoring of fire zone
locomotive
mechanical filling
mechanical ore breaking
mechanical handling
machine loading ore
skip
skip hoisting
skip dumping arrangement
skip loading arrangement
tight blasting
detonating relay
mat
aerial tramway

fire extinguishing with mud

timbering machine
repair truck
slurry
cone of depression
belt hoisting equipment
cement-filling system
diagonal flow network
level
block caving method
interval of level
mining sequence of level
block open stoping
forced block caving method
layout of level
stage ventilation system
spontaneous block caving mining method
joint
rose diagram of joint
diamond drill
diamond drilling
metal support
near shaft-point surveying
break-even stripping ratio
shaft station
drainage at shaft bottom
lowering the water table by well-point
headframe
tower
shaft pillar
layout of the shaft
shaft drilling
underground electric locomotive haulage
underground rooms
underground elevation surveying
underground theodolite traversing
mud drainage in underground mine
underground crusher station
dust control in station of treaker
underground tow vechicle
underground pump room
underground sump
underground sump cleaning
underground trackless haulage
underground haulage
automatic control of underground haulage

underground explosive magazine


air velocity in airway
conpound support of shaft-and-drift
surveying for drivage of two approaching headings
rockbolt support of shaft-drift
cable bolt support of shaft-drift
combined support of shotcrete with rock bolt and wire-mesh
support of shaft-drift with shotcrete
support of shaft-drift
monitoring of support
electrostatic protection
rock breakage with static expansive agent
stripping ratio of pit limit
boundary pillar
local ventilation
local fan ventilation
misfire
polycrystalline diamond bit
trenching
tunnelling sheld
tunnel jumbo
fire extinguishing by pressure balancing
pipelining of fill with homogeneous flow
kata degree
mining intensity
mining sequence
development opening
development reserve
pile

mining productive unit


haul way
open stope mining method
air-filtering arrangement
regulating air volume by air curtain
air compressor
air-compressor cooling system
air-compressor plant
controlled blasting
ore bin
ore reserve
mineral resource
protection of mineral resource
the law of mineral resource
comprehensive utilization of mineral resource

opening exploration

mine car
mine dust
dust measurement
ore deposit
genetic type of ore deposit
commercial type of ore deposit
mining stage of deposit
technical condition of mining
sequence of mineral mining
exploration of ore deposit
exploratory degree of deposit

exploratory method of deposit


exploratory method of deposit
orebody model
evaluation of ore deposit
dewatering of ore-deposit
mutual rescue of miner
escapeway of underground
mine explosive gas
mine equivalent orifice
reversing arrangement of mine ventilation
prevention frostbite of mine
fire prevention in mine
mine radioactive gas
volume of air flowing in mine
regulating air volume in mine
air flow in mine
mine fire
purification of mine in-take air
mine air
air conditioning in mine
shaft connecting surveying
air leakage in mine
fire extinguishing in mine
enviroment of heat in mine
sourse of heat in mine
refrigeration of mine air
safety dog of hoist
safety door for hoisting
safety catch
mine hoisting rope
overwind protector of hoisting
mine hoist
speed regulator of hoist
automatic control of shaft hoisting


mine ventilation

mine ventilation structure

mine ventilation survey

design of mine ventilation

mine ventilation network

mine ventilation system

criteria for mine ventilation evaluation

automation of mine ventalation

mine toxic gas

efficiency rate of mine air quantity

natural ventilation

geological map of oreblock

constructional element of oreblock

mining sequence of oreblock

topographical geological map of mining area

vertical control surveying of mine area

engineering geological map of ore field

development plan of mine area

exploratory profile of mine area

control surveying of mine area

plane control surveying of mine area

hydrogeological map of ore field

topographic control with traversing in mine area

topographic control with triangulation in mine area

comprehensive geological map of mine area

mine safety

mine safety management

safety distance from blasting ceter in mine

ground vibrations due to blasting in mine

observation of ground vibration effect from blasting in mine

control of public nuisance from blasting in mine

air blasting wave in mine


conputerized method for the production scheduling in mines

mine surveying

mine-surveying instrument

purification of mine diesel exhaust gas

selection of mine site

dust provention of drilling operation in mine

period to attain planned annual output of mine

mine air pollution control

dispersion of mine air pollution

sourse of mine air pollution

control of surface subsidence in mine

mine surface transport

mining geological logging

work of mining geology


mining goelogical sampling
classification of mine electric load
power supply for mine electric traction
mine electric energy measurement
electric illumination of mine
dust control in mine
water control in mine
disposal of solid radioactive waste in mine
control of radiation contamination in mine
waste water treatment in mine
waste water control in mine
service life of mine
engineering geological work in mine
mining engineering qualitative management
mine industrial site
road for mine industrial site
shut off surface water for mine industrial site
pipeline for mine industrial site
drainage for mine industrial site
longitudinal arrangement for mine industrial site
general layout for mine industrial site
dust prevention of mine road transport
mine electric power supply
mine structure
disposal and reclamation of solid waste in mine
management information system in mine
scale of mine
mine track
enviromental geology work of mine
mine environmental engineering
safety in mining mechanical and electric equipments
general layout for mine mechanical work-shop
mine capital construction
centralized monitoring of mine work
computer aided design in mine
mining technical economic index
network sche-duling technique in mine construction
economic evaluation of construction project in mine
mine landscape
mine rescue
muffler of auxiliary fan in mine
the computer method of district programming in mine development
mine labour productivity
mine interal transport

annual output of mine


mine drainage
mine drainage equipment
mine drainage system
mine enterprise
general laybout for truck maintenance shop
surveying for installing mine equipment
computer management for mine equipment
remote control of mine machinery
automation of mine machinery
mine design
the optimization method in mine design
geological work in the producing stage of mine
conputer simulation in mining operation
process automation inproduction
mine capacity
mine accident prediction
hydrogeological work in mine
hydrogeological evaluation of ore deposit
water pollution control in mine
source of water pollution in mine
water resource protection in mine
mine inundation
mine hoisting
railway signalling of mine
mine ventilation
standard for mine project putting into production
risk analysis for investment evaluation in mine
sensitive analysis for investment evaluation in mine
mined land reclamation
soil pollution control in mine
mine outside transport
mining work for maintaining simple reprodution
modernization of management in mine
mine working stereogram
compressed-air in mine
rock mechanics for mine
land planning for mine
perspective plan of mine
noise control in mine
noise control of main fan in mine
mine automation
mine main substation
overall layout of mine
mine layout and transport

ore recovery
ratio of extracted ore to reserve consumed
ore loss rate
ore loss and dilution
handling of broken ore

ore quality control


minimum industrial grade of ore
ore body
cavability of orebody
permissible maximum thickness of gangue parting
minimum mining thickness of orebody
mine field
mine survey map
mineral
spontaneous combustion of ore
mining rocket
mine fan
mine pump
mining explosive
calculation of pillar size
pillar recovery
detonator
ripper
digging arm loader
continuous line bucket mining system
combined mining method
combined development method
bucket-chain excavator
stone support
fissure
base friction model of fissured rock
chute
ore pass
reinforcement of ore-pass
orepass driving
dust control at ore-pass
shrinkage stope
quick sand bed
glorghole mining method
funnel sill structure
grounding of open-pit electrical equipment
lightning-protecting of open-pit
construction element of open pit

electric power distribution of open-pit mine


scraper
scraper loading
combined opencut-and-underground mining
surface mining
open-pit limit
computerized method for the design of open-pit limit
semi-stationary crushing plant in open-pit
semi-continuons transportation of openpit
open pit blasting
blasting surveying of surface mine
blast hole pattern in open pit
mining and stripping procedure of open-pit
slope stability of openpit
mining cut of open-pit
open pit loading
open pit drilling
development of open-pit with conveyer belt way
open pit transportation by belt conveyor
push-back mining of open-pit
dust control in open-pit
open pit mining by stages
vertical control surveying of surface mine
general layout for open pit industrial site
working face of open-pit
working line of open pit
development of open-pit with haulage road
open pit transportation by haulage road
development of open-pit with fixed haulage way
computer-based dispatching system in open pit mine
ore dilution
second delineation of ore body
non-continuous transportation of open-pit
working trench of open-pit
open-pit development
full-continuous transportation of open-pit
combined development of open pit
combined transportation of open pit
management of ore-pass in open pit
setting down the collar of ore-pass in open pit
open pit transportation by ore-pass
drainage in open-pit
development of open pit with tunnel and ore-pass

plane control surverying of surface mine


computer-based dispatching of open-pit haul-truck
surface mine
hole blasting in open -pit
production surveying of surface mine
production technology of open pit
production capacity of open-pit
surface hydraulic mining
development of open-pit with hoist-way
open pit hoisting
development of open-pit with railroad
open pit transportation by railroad
ventilation for open-pit
route surveying of surface mine
preparation of new level
selection mining method of open-pit
development of open-pit with movable haulage way
open pit transportation
combined-bench of open-pit
continuous surface miner
transition of open-pit mining to underground mining
surface drill rig
bucket-wheel stackerreclaimer
bucket-wheel excavator
bucket wheel excavator loading
tyre bucket-wheel loader
breaking ground
Inset
shaft inset construction
blind shaft
misfire
jumbolter
anchor
cable bolter
brisance
high explosive
airtight dust-exhausting system
simulation of ore drawing
anti-slip safety factor of friction hoist
timber support
diesel-electric locomotive
petrol-drive rock drill
coupling loading

raise climber
scraper-type loader
drainage pipeline
waste disposal with over-burden spreader
waste disposal with plough
throw blasting
slinger belt stowing machine
blasthole dewatering truck
blasthole stemming machine
pre-charging of blast-hole
ore blending
mechanism of shotcrete-bolt supporting
sill structure with level bottom at handing elevation
adit
general layout for adit site
development method with adit
average stripping ratio
slope stability analysis of plane failure
bench floor
drift
ground pressure around tunnel
drafting by shield
drafting
drifting with drift borer
drifting machine
mechanized operating line for drifting
ground pressure around tunnel in theological rock
drifting by conventional method
ground presseure around tunnel in elastic-plastic rock
drifting by special method
tunnel boring mechine
talus accumulation
site for crushing station
crushing-and-transfering plant
P theory of ground pressure
P classification of rock firmness by
method of initiation
delay interval of priming
sensitivity to initiation
exploder
initiation sequence
initiating explosive
pneumatic rock drill

pneumatic pick
pneumatic filling
air lift mining system
pneumatic hoisting equipment
pneumatic conveying pipeline
rod
bit
shank
traction substation
traction rope
traction network
down-the-hole drill
down-the-hole drilling
short-hole blasting
trench sill structure
intensification of mining
cutting
cutting rock breakage
stability analysis of toppling failure
cleaner for ming car
cleaning berm
blasting with sphirecal cartridge
breasting mining method
thermal breaking of rock
manrider
artificial river-bed
treatment of waste water from leaching process in mine
leaching mining
emulsion explosive
three grades of reserves
mining under surface water-body,building or railway
ground pressure around shaft in loose rock
gravel pump
placer surveying
hydraulic transport of placer
hillside open cut
fan-shaped advancing cut mining method
commodity ore
cut-and-fill stoping
drift-and-fill mining stoping
stoper
trenching with long-range shovel
deep mining

longhole blasting
long hole surveying
automatic control of longhole loading
deep open pit
ventilation in hot and deep mines
lift truck
produetion stipping ratio
number of standby stoping block
productive exploration
technique of productive exploration
acoustic measurement
acoustic emission monitoring
dust-removing by wet-drilling
cross cut
hand-held rock drill
dewatering adit
vertical shaft
shaft sinking by sheet-piling method
shaft sinking in surface soil
general layout for shaft site
drop shaft sinking
ground pressure around shaft
shaft-sinking by freezing method
shaft backhoe mucker
shaft sinking by concrete curtain wall method
shaft sinking in rock by conventional method
shaft installation
surface layout for shaft sinking
shafting machine
mechanized operating line for shaft sinking
drainage in shaft sinking
shaft sinking equipment
hoist in shaft sinking
shaft sinking ventilation
drilling and blasting in shaft sinking
shaft mucking
development method with vertical shaft
temporary support in shaft sinking
shaft sinking
surveying for shaft sinking
special method of shaft sinking
shaft deepening
protective cover for shaft deepening

permanent shaft support


shaft drill jumbo
shaft sinking with grouting
shaft mucking machine
shaft boring machine
shaft sinking by rotary drilling
automation of pump station
water-gel
hydraulic filling
hydraulic sluicing
water supply for hydraulic mining
hydraulic dump
hydraulic hoisting
hydraulic hoisting equipment
hydraulic handling
hydraulic conveying pipeline
block open stoping with horizontal longhole
water jet of hydraulic monitor
hydraulicfilling system
loosening blasting
scaler
rock breaker unit
shuttle car
trenching by shettling the car
drag line
dragline loading
bench
angle of bench slope
combination of exploration with mining
ground pressure around shaft in elastic-plastic rock
comparison between exploration and mining information
specialized method of mining
underground mining under special condition
hoisting
parameters of hoisting dynamics
hoisting conveyance
equivalent effective mass of hoisting equipment
parameter of hoisting kinematics
raising by cage lift
raising
raising machine
raising ventilation
connecting survey through raise

VCR

raising by climber
raising by conventional method
drop raising
raise boring machine
raise boring
raise boring
head sheave
general layout for ventilation shaft area
economic section of airway
ventilation pressure
ventilation resistance
permeable layer
unitary ventilation system
preliminary loosing of sediment
car pusher
bulldozer loading
waste disposal with bulldozer
vertical crater retreat mining method
short delay blasting
micro-seismic monitoring
wallrock alteration
interaction between support and surrounding rock
sublevel caving without sill pillar
endless rope haulage
no-rope hoisting equipment
flashing shaft
bacterial leaching mining
undercut-and-fill stoping
mining sequence of adjacent crebody
level plan
drainage through adit
mine working vertical section
surveying for driving
mine working longitudinal projection
resuing method
dynamite
slope stability analysis of wedge failure
inclined shaft
inclined shaft singking in surface soil
general layout for inclined shaft site
driving of inclined shaft bottom station
lifting bridge for inclined shaft
inclined shaft singking in rock

inclined shaft sinking


mucking of inclined shaft sinking
draining of inclined shaft sinking
development method with inclined shaft
mine car runaway in inclined shaft
turnout track of inclined shaft
device against runaway in inclined shaft
ramp
general layout for ramp site
driving of ramp
development method with ramp
dumping room
combined gathering-and-digging arm loader
new austrian tunnelling method
floating drop-shaft-lining
rotary jet grouting
rotary jet grouter
drag-bit rotary rig
recirculative ventilation
sympathetic detonation
forced-exhaust ventilation
compressed-air receiver
removing debris by compressd air
automation of air compressor station
forced ventilation
compressed-air pipeline
roller-bit rotary rig
automation of rotary drill
rotary drilling
rotary drilling bit
rock burst
strata movement
magmatic rock
rock blasting
machanism of rock blasting
constituent equation of rock
deformation modulus of rock
Poisson's ratio of rock
residual strength of rock
impedance of rock
point load strength of rock
dynamic property of rock
dynamic elastic modulus of rock

dynamic strength of rock


fracture toughness of rock
nonhomogeneity of rock
discontinuity of rock
griffith strength thoery of rock
anisotropy of rock
firmness of rock
shear strength of rock
tensile strength of rock
compressive strength of rock
blastability of rock
drillability of rock
coulomb-mohrstrength thoery of rock
analog method for rock mechanics
physical analog for rock mechanics
rheological strength of rock
rheological behaviour of rock
abrasiveness of rock
rock breakage
specific energy consumption for rock breakage
thoery of specific energy for rock breakage
method for rock strength measuring
size effect of rock strength
weakness factor of rock strength
heat expansibility of rock
triaxial compressive strength of rock
permeability of rock
acoustic property of rock
elastic-plasticity of rock
elastic modulus of rock
physical-mechanical property of rock
water absorbent expansibility of rock
water absorbability of rock
stochastic modeling for mining subsidence
linear strain strength theory of rock
hardness of rock
deformation of rock mass
geological structure analysis of rock mass
induced stress in rock mass
boundary element method for rock engineering
engineering classification of rock mass
phtoelastic model of rock engineering
distinct element method for rock engineering

RQD

analog method for rock mechanics


simulating material modeling of rock engineering
displacement back analysis for rock engineering
finite element method for rock engineering
tectonic stress in rock mass
key block analysis of rock mass
structure of rock mass
centrifugal model of rock mass
mechanics of rock mass
strength of rock mass
engineering estimation of rock mass strength
rock quality designation
shear test of discontinuity
friction angle of discontinuity
cohesion of discontinuity
strength parameter of discontinuity
temperature stress in rock mass
classification of rock stability with sum-and-difference metho
classification of rock stability with multiplication-and-divisio
classification of rock stability with cluster analysis
stress in rock mass
stress measurement in rock mass
original stress in rock mass
stress wave in rock mass
gravity stress in rock mass
landing platform
charge
mineral material for metallurgical industry
liquid explosive
hydrowedge
hydraulic excavator loading
hydraulic rock drill
flat jack
hoisting load per cycle
total time of duty cycle
mobile substation
mobile crushing plant
travelling belt conveyor
strain ellipsoid
sublevel caving with sill pallar
preslitting blasting
insitu leaching
insitu broken-ore leaching mining

raw ore
stripping to crude ore ratio
original geological logging
slope stability analysis of circular failure
premature explosion by stray current
roadway impact ripper
drilling
drilling blasting
rock drilling tool
rock drill
drill noise reduction
jumbo automation
premature explosion
loading ore through gate chute
site for explosive magazine
electric locomotive for narrow gauge
fold structure
vibrating ore-drawing machine
loading ore through vibrating chute
vibrating conveyor
vibrating loader
concrete lining
jackleg drill
priming with booster
middle ventilation system
gravity handling
main shaft
main fan airdrift
main fan diffuser
sealing water by grouting
blasting with column carlridge
transfer platform
loading ore
loading room
explosive loading truck
explosive loading equipment
construction of charge
charger
electric locomotive standard gauge
spontaneous explosion
mining of self-flaming deposit
dump truck
free face

comprehensive geological logging


longitudinal cut mining method
car stopper
drill jumbo
drill mounting
shaft drilling parameters
drilling machine
hydraulic borehole mining
borehole stressmeter
boring
drilling
line of least resistance
jumbo-loader
least transport work
angle of final pit slope
self-powered carriage

od
on method

You might also like