Professional Documents
Culture Documents
JOB AID-1 (W1 S1) : Digital Switching Systems (DSS) Job Aid Job Aid
JOB AID-1 (W1 S1) : Digital Switching Systems (DSS) Job Aid Job Aid
JOB AID-1 (W1 S1) : Digital Switching Systems (DSS) Job Aid Job Aid
Job Aid
1.2
Objective:
On completion of this visit/ practical exercise, the participant will be able to:
a) Identify different telecom components
b) Explain their role in telecom
1.3
1.4
1.5
b)
c)
Power plant
d)
Telephone exchange/lab
e)
Transmission system
1.6
Exercise:
1.6.1
1.6.2
Page 1 of 6
i.
ii.
iii.
iv.
v.
Earthing arrangements
vi.
SMPS
vii.
1.6.3
Job Aid
1.7
2.
3.
4.
5.
Page 2 of 6
Job Aid
6.
7.
8.
9.
10.
Page 3 of 6
Job Aid
2.2
Objective:
On completion of this visit/ practical exercise, the participant will be able to:
a)
Identify different customer premises equipments and outdoor plant
components
b)
2.3
2.4
2.5
b)
c)
FAX
d)
e)
f)
Cabinet , Pillar, DP
g)
h)
VCC card
i)
2.6
Exercise:
2.6.1
Page 4 of 6
Job Aid
---------------------
b) Called number -------------------------c) Meter reading of the calling number before the call ------------d) Meter reading of the calling number after the call ------------e) Meter reading of the called number before the call ------------f) Meter reading of the called number after the call ------------2.6.4
Demonstration of
a)
Page 5 of 6
Job Aid
Page 6 of 6