SANITARY TECHNICAL SPECIFICATION


TENDER DESIGN
TIU CHUN K THUT PHN H THNG CP THOT NC
THIT K U THU THI CNG

DEUTSCHES HAUS
Le Van Huu Street, District 1, Ho Chi Minh, Vietnam
ng L Vn Hu, Qun 1, Tp.H Ch Minh , Vit Nam

WSP-TN-PL-SPC- 70001

DATE OF ISSUE: 12 Aug 2015


PHT HNH: 12 thng 08 nm 2015

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

TABLE OF CONTENT
MC LC
SECTION 1 SCOPE OF WORKS AND PARTICULAR REQUIREMENT ............................................. 11
PHN 1 PHM VI CNG VIC V YU CU RING .......................................................................... 11
1.1

General .......................................................................................................................................... 11
Tng quan ...................................................................................................................................... 11

1.2

Scope of Work ............................................................................................................................... 11


Phm vi cng vic .......................................................................................................................... 11

1.3

Design Conditions .......................................................................................................................... 17


iu kin thit k ........................................................................................................................... 17

1.4

Construction Tolerance .................................................................................................................. 18


Dung sai thi cng ........................................................................................................................... 18

1.5

Works Excluded ............................................................................................................................. 19


Nhng cng vic ngoi phm vi .................................................................................................... 19

1.6

Building Provisions ........................................................................................................................ 21


Cung cp cng trnh ...................................................................................................................... 21

1.7

Main Contractor's Attendance on Nominated Contractors/Suppliers; Specialist Contractors and


Separate Contractors ..................................................................................................................... 22
S c mt ca nh thu chnh trn cc nh thu/nh cung cp c ch nh; cc nh thu
chuyn gia v cc nh thu ring l .............................................................................................. 22

SECTION 2 PIPEWORKS, VALVES AND FITTINGS ........................................................................... 28


PHN 2 H THNG NG, VAN V CHI TIT NI .............................................................................. 28
2.1

Unions, Joints Flanges and Fittings............................................................................................... 28


Khp ni, mt bch ni v chi tit ni............................................................................................. 28

2.2

Class of pipework........................................................................................................................... 29
Phn loi ng ng ..................................................................................................................... 29

2.3

Pipe sleeves................................................................................................................................... 33
ng lng ........................................................................................................................................ 33

2.4

Installation of pipework .................................................................................................................. 35


Lp t ng dn ............................................................................................................................. 35

2.5

Pipe supports ................................................................................................................................. 36


Gi ng ..................................................................................................................................... 36

2.6

Brackets, Supports and Hangers Material ..................................................................................... 40


B , gi v vt liu treo ......................................................................................................... 40

2.7

Anchors .......................................................................................................................................... 41
Thit b neo ng ............................................................................................................................. 41

J10068 12 Aug 2015


SN R05

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.8

Pipe movement & expansion joints ............................................................................................... 41


S dch chuyn ng v cc khp ni co gin ................................................................................ 41

2.9

Guides ............................................................................................................................................ 42
Thit b chuyn hng ................................................................................................................... 42

2.10

Fire Collars..................................................................................................................................... 43
Vng (m)chng chy .................................................................................................................. 43

2.11

Isolating Valves and Cocks............................................................................................................ 43


Van cch ly v vi kha ................................................................................................................. 43

2.12

Pressure Gauges ........................................................................................................................... 46


p k .............................................................................................................................................. 46

2.13

Pipeline Strainers ........................................................................................................................... 47


B lc ng ng .......................................................................................................................... 47

2.14

Flexible Pump Connectors............................................................................................................. 47


Cc im u ni mm vi my bm ............................................................................................ 47

2.15

Cleansing and Watering Taps ....................................................................................................... 48


Vi nc......................................................................................................................................... 48

2.16

Traps .............................................................................................................................................. 48
By nc........................................................................................................................................ 48

2.17

Rainwater outlets ........................................................................................................................... 50


Ming thu nc ma...................................................................................................................... 50

2.18

Floor Drains ................................................................................................................................... 50


Phu thu sn .................................................................................................................................. 50

2.19

Termination of Soil/Waste Vents ................................................................................................... 51


Cc u cui ng hi nc thi en/ xm ..................................................................................... 51

2.20

Fresh air Inlets ............................................................................................................................... 51


Ming cp gi ti ......................................................................................................................... 51

2.21

Clean Outs ..................................................................................................................................... 52


Thng tc ....................................................................................................................................... 52

2.22

Draw-off Taps ................................................................................................................................ 52


Vi ly nc ................................................................................................................................... 52

2.23

Water Hammer Arrestors ............................................................................................................... 52


Ba hm nc (chng va) ............................................................................................................. 52

2.24

Manholes, Sump Pump Chambers, Petrol Interceptors, Grease Traps and Road Gully Pits ...... 53
H ga, H bm, B tch du, b tch m v H thu nc mng .............................................. 53

2.25

Puddle Flanges .............................................................................................................................. 53


Mt bch ngn m .......................................................................................................................... 53

J10068 12 Aug 2015


SN R05

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.26

Pressure Reducing Valves ............................................................................................................ 53


Van gim p ................................................................................................................................... 53

2.27

Ultra-Violet Purifier ......................................................................................................................... 54


Thit b lc tia cc tm .................................................................................................................... 54

SECTION 3 UNDERGROUND DRAINAGE AND WATER MAINS ....................................................... 55


PHN 3 NG THOT NC NGM V NG NC CHINH ...................................................... 55
3.1

General .......................................................................................................................................... 55
Tng quan ...................................................................................................................................... 55

3.2

Terminal Fittings and Components for Underground Drainage .................................................... 55


Phu kin v cc thnh phn cho ng thot nc ngm ................................................................ 55

3.3

Workmanship ................................................................................................................................. 59
Cht lng thi cng ....................................................................................................................... 59

3.4

Excavating ..................................................................................................................................... 60
o t........................................................................................................................................... 60

3.5

Bedding, Laying and Surrounding ................................................................................................. 61


Gi , lp m v lp ph ........................................................................................................... 61

SECTION 4 PUMPS................................................................................................................................ 63
PHN 4 BM.......................................................................................................................................... 63
4.1

General .......................................................................................................................................... 63
Tng qut ....................................................................................................................................... 63

4.2

Pump Selections ............................................................................................................................ 64


Chn bm ...................................................................................................................................... 64

4.3

Potable and Flushing Water Pumps .............................................................................................. 65


Bm nc sinh hot ...................................................................................................................... 65

4.4

Hydro-Pneumatic Booster Sets ..................................................................................................... 66


Bm nc thy lc ........................................................................................................................ 66

4.5

Variable Speed Pump Unit ............................................................................................................ 68


Bm bin tn .................................................................................................................................. 68

4.6

Pump Set Installation ..................................................................................................................... 72


Lp t h bm .............................................................................................................................. 72

4.7

Drainage Sump Pumps.................................................................................................................. 74


Bm h nc thi .......................................................................................................................... 74

4.8

Motors for Pump Drives ................................................................................................................. 75


ng c ca bm .......................................................................................................................... 75

SECTION 5 WATER TANKS, SUMP PITS AND EQUIPMENTS .......................................................... 77


PHN 5 B NC, H BM V THIT BI.......................................................................................... 77

J10068 12 Aug 2015


SN R05

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

5.1

Concrete Water Tanks ................................................................................................................... 77


B nc b tng ............................................................................................................................ 77

5.2

Fibreglass Water Tanks ................................................................................................................. 77


B nc si thuy tinh ..................................................................................................................... 77

5.3

Level Switches in Tanks ................................................................................................................ 78


Cng tc mc nc trong b ......................................................................................................... 78

5.4

Suction Tank Strainers with Anti-Vortex Plates ............................................................................. 80


B lc v a chng xoy............................................................................................................... 80

5.5

Tank Fittings .................................................................................................................................. 81


Phu kin b .................................................................................................................................... 81

5.6

Sump Pits....................................................................................................................................... 82
H thu............................................................................................................................................. 82

5.7

Level Switches in Sump Pit ........................................................................................................... 82


Cng tc mc nc trong h thu ................................................................................................... 82

SECTION 6 SANITARY FIXTURES AND FITTINGS ............................................................................ 83


PHN 6 THIT BI V SINH V PH KIN ........................................................................................... 83
6.1

General .......................................................................................................................................... 83
Tng quan ...................................................................................................................................... 83

6.2

Installation Requirement ................................................................................................................ 84


Lp t thit b ............................................................................................................................... 84

6.3

Protection of Sanitary Fixtures and Fittings ................................................................................... 85


Bo v thit b v linh kin ............................................................................................................. 85

6.4

Supply of Accessories ................................................................................................................... 85


Cung cp phu kin ......................................................................................................................... 85

6.5

Test of Sanitary Fixture Function ................................................................................................... 86


Th nghim chc nng thit b v sinh ......................................................................................... 86

SECTION 7 INSTANTANEOUS ELECTRIC WATER HEATER ........................................................... 87


PHN 7 MY NC NNG TRC TIP ............................................................................................. 87
7.1

General .......................................................................................................................................... 87
Tng quan ...................................................................................................................................... 87

7.2

Instantaneous Electric Water Heater ............................................................................................. 87


My nc nng trc tip ................................................................................................................ 87

SECTION 8 ELECTRIC STORAGE WATER HEATER .......................................................................... 88


PHN 8 MY NC NNG GIN TIP ............................................................................................... 88
8.1

General .......................................................................................................................................... 88
Tng quan ...................................................................................................................................... 88

J10068 12 Aug 2015


SN R05

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

8.2

Electric storage water heater ......................................................................................................... 88


My nc nng gin tip ............................................................................................................... 88

SECTION 9 - SWIMMING POOL FILTRATION AND CIRCULATION PLANT ........................................ 89


PHN 9 H THNG LOC V TUN HON NC H BI ............................................................... 89
9.1

General .......................................................................................................................................... 89
Khi qut ........................................................................................................................................ 89

9.2

Sand Filter ...................................................................................................................................... 89


B lc ct ....................................................................................................................................... 89

9.3

Chemical Pumps ............................................................................................................................ 90


Bm ha cht ................................................................................................................................. 90

9.4

Chemical Tanks ............................................................................................................................. 91


Binh ha cht ................................................................................................................................. 91

9.5

Pool Fittings ................................................................................................................................... 92


Phu tung h bi.............................................................................................................................. 92

9.6

Hair Lint Strainer ............................................................................................................................ 92


B lc tc v x vi ........................................................................................................................ 92

9.7

Pool Maintenance Equipment........................................................................................................ 93


Thit b bo dng h.................................................................................................................... 93

9.8

Underwater Lighting ....................................................................................................................... 93


en di nc ............................................................................................................................... 93

9.9

Chlorination Equipment and Chemical Controller ......................................................................... 94


My clo ha v b kim sot ha cht .......................................................................................... 94

9.10

Chemical Dosing Equipment ......................................................................................................... 96


Thit b nh lng ha cht .......................................................................................................... 96

9.11

Test Kits ......................................................................................................................................... 96


Dung cu th nghim ...................................................................................................................... 96

9.12

Chemicals for Commissioning and Testing Chemicals ................................................................. 97


Ha cht chy th v nghim thu ha cht .............................................................................. 97

9.13

Installation ...................................................................................................................................... 97
Vic lp t .................................................................................................................................... 97

9.14

Finishes .......................................................................................................................................... 98
Hon thin ...................................................................................................................................... 98

9.15

Identification ................................................................................................................................... 99
Nhn dng ..................................................................................................................................... 99

9.16

Water Treatment ............................................................................................................................ 99


X l nc...................................................................................................................................... 99

J10068 12 Aug 2015


SN R05

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

9.17

Underwater Music System Power Amplifier ................................................................................ 100


H thng khuch i m thanh di nc .................................................................................. 100

9.18

Electrical Interface ....................................................................................................................... 102


Giao thc in.............................................................................................................................. 102

SECTION 10 - WATER TREATMENT EQUIPMENT ............................................................................. 103


PHN 10 - THIT BI X L NC........................................................................................................ 103
10.1

General ........................................................................................................................................ 103


Tng quan .................................................................................................................................... 103

10.2

Wastewater Treatment System ................................................................................................... 103


H thng x l nc thi ............................................................................................................. 103

10.3

Wastewater Treatment Equipment .............................................................................................. 106


Thit b x l nc thi. ............................................................................................................... 106

10.4

Submersible Pump ...................................................................................................................... 106


Bm chm ..................................................................................................................................... 106

10.5

Sludge Pump ............................................................................................................................... 107


Bm bun....................................................................................................................................... 107

10.6

Drinking water treatment system ................................................................................................. 108


H thng x l nc ung ........................................................................................................... 108

10.7

Water treatment system ............................................................................................................... 108


H thng x l nc. ................................................................................................................... 108

SECTION 11 ELECTRICAL WORKS ................................................................................................... 112


PHN 11 CNG TC IN ................................................................................................................. 112
11.1

General ........................................................................................................................................ 112


Quy nh chung ............................................................................................................................ 112

11.2

Busbar Chamber .......................................................................................................................... 113


Thanh ci ..................................................................................................................................... 113

11.3

Electric Motors ............................................................................................................................. 113


ng c in ................................................................................................................................ 113

11.4

Direct-On-Line Starters ................................................................................................................ 114


Cc b khi ng ni tip trc tip .............................................................................................. 114

11.5

Star-Delta Starters ....................................................................................................................... 115


Cc b khi ng ni kiu tam gic - hnh sao ........................................................................... 115

11.6

Contactors .................................................................................................................................... 115


Cc tip im ............................................................................................................................... 115

11.7

Ammeters..................................................................................................................................... 115
Cc ng h ampek ................................................................................................................... 115

J10068 12 Aug 2015


SN R05

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

11.8

Overload Protection ..................................................................................................................... 116


Bo v qu ti .............................................................................................................................. 116

11.9

Fuse Protection ............................................................................................................................ 116


Cu ch bo v d phng ............................................................................................................ 116

11.10 Lock Buttons ................................................................................................................................ 116


Nt kha ....................................................................................................................................... 116
11.11 System of Wiring .......................................................................................................................... 117
H thng dy ................................................................................................................................ 117
11.12 PVC Insulated Cable ................................................................................................................... 117
ng cp bc PVC .................................................................................................................... 117
11.13 PVC Insulated Armoued Cable .................................................................................................... 118
ng cp c thp c bc PVC ............................................................................................. 118
11.14 Connections to Motors ................................................................................................................. 118
Ni vi ng c ............................................................................................................................ 118
11.15 Switchgear ................................................................................................................................... 118
C cu chuyn mch ................................................................................................................... 118
11.16 Conduits and Accessories ........................................................................................................... 118
ng i dy v phu kin ................................................................................................................ 118
11.17 Terminal Box and Terminals ........................................................................................................ 119
Hp u ni v cc u ni ......................................................................................................... 119
11.18 LV Motor Control Cubicle (MCC) ................................................................................................. 120
Ngn iu khin ng c h th .................................................................................................. 120
11.19 Earthing and Bonding .................................................................................................................. 123
Ni t v s lin kt ................................................................................................................... 123
SECTION 12 MISCELLANEOUS ......................................................................................................... 124
PHN 12 CC VN KHC ............................................................................................................ 124
12.1

Labels and Notices ...................................................................................................................... 124


Dn nhn v ghi ch .................................................................................................................... 124

12.2

Danger Notices ............................................................................................................................ 125


Ghi ch cnh bo nguy him ....................................................................................................... 125

12.3

Painting and Finishing ................................................................................................................. 125


Sn v hon thin ........................................................................................................................ 125

12.4

Paint, Machinery & Equipment .................................................................................................... 126


Sn, my mc v thit b ............................................................................................................. 126

12.5

Exposed Metal Work.................................................................................................................... 127


Cc hng muc bng kim loi l ra ngoi ..................................................................................... 127

J10068 12 Aug 2015


SN R05

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

12.6

Concealed Metal Work ................................................................................................................ 127


Hng muc kim loi nm khut ..................................................................................................... 127

12.7

Pipework and Metal Sheathing .................................................................................................... 127


ng ng v lp bc kim loi .................................................................................................... 127

12.8

Pipework Identification ................................................................................................................. 127


Nhn din ng ng .................................................................................................................. 127

12.9

Colour Schemes .......................................................................................................................... 128


S mu ................................................................................................................................... 128

12.10 Application of Painting ................................................................................................................. 129


ng dung ca sn. ...................................................................................................................... 129
12.11 Spares and Tools ......................................................................................................................... 130
D phng v cc cng cu ............................................................................................................ 130
SECTION 13 COMMISSIONING AND ACCEPTANCE TEST............................................................. 132
PHN 13 KIM TRA NGHIM THU V TH NGHIM ...................................................................... 132
13.1

Adjustment, Commissioning, Performance Tests ....................................................................... 132


iu chnh, kim tra, th nghim tnh nng................................................................................. 132

13.2

Labour and Materials ................................................................................................................... 132


Nhn cng v vt liu .................................................................................................................. 132

13.3

Factory Acceptance Tests (FAT) ................................................................................................. 133


Kim tra nghim thu ti nh my (FAT) ...................................................................................... 133

13.4

Site Test during Construction ...................................................................................................... 134


Th nghim cng trng trong qu trnh thi cng....................................................................... 134

13.5

Water System Tests .................................................................................................................... 134


Th nghim h thng nc ......................................................................................................... 134

13.6

Electrical Systems Tests .............................................................................................................. 137


Th nghim h thng in ........................................................................................................... 137

13.7

Cleansing, Flushing and Pretreatment ........................................................................................ 138


Qu trnh suc ra, lm sch v tin x l .................................................................................... 138

13.8

Plumbing and Drainage System Commissioning ........................................................................ 139


Nghim thu h thng cp thot nc .......................................................................................... 139

13.9

Electrical System Commissioning ............................................................................................... 140


Nghim thu h thng in............................................................................................................ 140

13.10 Final Acceptance Test ................................................................................................................. 140


Th nghim nghim thu sau cng ................................................................................................ 140
13.11 Statutory Authorities Tests and Inspections ............................................................................... 141
Cc th nghim theo lut nh chnh ph v gim st ................................................................ 141

J10068 12 Aug 2015


SN R05

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

13.12 Commissioning and Testing Report and Certificate of Completion ............................................ 142
Nghim thu, bo co th nghim v chng nhn hon thnh .................................................... 142
SECTION 14 MAINTENANCE SERVICES .......................................................................................... 143
PHN 14 DICH V BO TR ............................................................................................................... 143
14.1

General Maintenance Requirements ........................................................................................... 143


Nhng yu cu bo tr chung ...................................................................................................... 143

14.2

Emergency Inspections, Tests and Repairs ................................................................................ 145


Kim tra khn cp, th nghim v sa cha .............................................................................. 145

14.3

Routine Monthly Inspection, Testing and Maintenance .............................................................. 146


Kim tra bo dng hng thng, th nghim v bo tr ............................................................. 146

14.4

Final Annual Inspection, Testing and Maintenance .................................................................... 148


Kim tra cui cung hng nm, th nghim v bo tr ................................................................. 148

14.5

Certificate of Maintenance ........................................................................................................... 149


Chng nhn bo hnh ................................................................................................................. 149

14.6

Handover of Plumbing and Drainage Installation ........................................................................ 149


Bn giao lp t cp thot nc.................................................................................................. 149

J10068 12 Aug 2015


SN R05

10

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 1 SCOPE OF WORKS AND PARTICULAR REQUIREMENT


PHN 1 PHM VI CNG VIC V YU CU RING
1.1

General
Tng quan
The Specification covers the standards, performance, materials, engineering, fabrication, factory
testing, delivery, site testing and commissioning, handover and inspection for the supply and
installation of complete plumbing and drainage system for this project. The P&D Contractor shall
furnish all labour, superintendence, materials, tools, equipment storage, certificates, drawings,
temporary work, inspection, testing necessary to complete the Works in a proper, thorough and
skillful manner.
Thuyt minh k thut bao gm nhng tiu chun, c tnh, vt t, k thut, ch to, th nghim ti
nh my, phn phi, th nghim ngoi cng trng v nghim thu, chuyn giao v kim tra cung
cp v lp t ton b h thng cp thot nc cho cng trinh. Nh thu cp thot nc s sp
xp nhn cng, gim st trng, vt t, cng cu, kho bi cha thit b, chng nhn, bn v, cng
vic thi vu, kim tra, th nghim cn thit hon tt cng vic theo phng php phu hp, ton
din v y k nng.
The Works shall fully comply with all statutory obligations and regulations together with any
amendments made thereto as required by the authorities for the safe and satisfactory standards of
the works to be carried out, whether detailed on the Specification or on the Drawings or not. The
P&D Contractor shall arrange for all submissions and allow for all costs relating to statutory
inspections and certificates as appropriate and as necessary.
Vic thi cng s hon ton tun theo cc ngha vu v quy phm php lut cung vi nhng hiu
chnh nh kem c chnh quyn yu cu v tiu chun an ton, tha ng trong thi cng, du
trong thuyt minh k thut hoc trn bn v c c chi tit hay khng. Nh thu cp thot nc
s sp xp tt c trinh v chp nhn tng chi ph lin quan n vic kim tra v chng nhn
theo lut nh khi thch hp v khi cn thit.

1.2

Scope of Work
Phm vi cng vic
The works to be carried out under this Sub-Contract comprises the furnishing of all labour,
materials, equipment and services for the supply and installation of the plumbing and drainage
systems, works and items described below including but not limited to:
Vic thi cng c nh thu tin hnh bao gm sp t nhn cng, vt t, thit b v cc dch vu
cung cp v lp t h thng cp thot nc, v bao gm nhng hng muc c m t di y
nhng khng gii hn:

1.2.1

Supply and installation of the cold water system including incoming water main, all distribution
pipework, pump sets, fiberglass water tanks, PRV sets ,valves, fittings, hangers, equipment
supporting frameworks, etc. as per Tender Drawings.
Cung cp v lp t h thng nc nng v nc lnh bao gm mng li cp nc chnh vo
cng trinh, tt c ng ng phn phi, b bm, bn p lc, b cha si thy tinh, b van gim
p, van, phu kin, gi treo, khung thit b, v.v nh bn v thu.

J10068 12 Aug 2015


SN R05

11

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

1.2.2

Supply and installation of the flushing water system including incoming water main, all distribution
pipework, pump sets, pressure vessels, fiberglass water tank, PRV sets ,valves, fittings, hangers,
equipment supporting frameworks, etc. as per Tender Drawings.
Cung cp v lp t h thng nc x bao gm ng ng cp nc chnh, tt c ng ng
phn phi, b bm, bn p lc, b cha bng vt liu si thy tinh, van gim p, van, phu kin,
gi treo, khung thit b, v.v nh bn b thu.

1.2.3

Supply and installation of the cleansing water system including incoming water main, all
distribution pipework, PRV sets, fibreglass water tanks, bib taps, lockable boxes, valves, fittings,
hangers, equipment supporting frameworks, etc. as per the Tender Drawings.
Cung cp v lp t h thng nc ra bao gm ng ng cp chnh, tt c ng ng phn
phi, b van gim p, b cha bng vt liu si thy tinh, vi nc, hp c kha, van, phu kin,
gi treo, khung thit b, v.v... nh bn v thu.

1.2.4

Supply and installation of irrigation water system including incoming water main, all distribution
pipework, pump sets, pressure vessels, bib taps, lockable boxes, valve, fittings, hangers,
equipment supporting frameworks, etc. as per Tender Drawings.
Cung cp v lp t h thng nc ti bao gm nc cp vo chnh, tt c ng ng phn
phi, b bm, bn p lc, vi nc, hp c kha, van, phu kin, gi treo, khung thit b, v.v
nh bn v thu.

1.2.5

Supply and installation of the aboveground rainwater drainage system including all collecting
pipework, rainwater outlets, open trapped gullies, back inlet trapped gullies, planter drains, planter
sub-soil drain pipes, down stacks, hangers, pipe fittings, equipment supporting frameworks,
channel cover etc. as per the Tender Drawings. The works of bedding, concrete surrounding &
haunching work for U/G drainage pipeworks and construction (formwork & reinforcement work) of
on-grade manholes, petrol interceptors, sump pits and gullies, Builder's works such as excavation
and soil backfilling works shall be carried out by the Main Contractor and checked by P&D
Contractor. All suspended manholes shall be carried out by Main Contractor and checked by P&D
Contractor. All builders works information, location, setting out and dimension to be provided by
P&D Contractor.
Cung cp v lp t h thng thot nc ma trn mt t bao gm tt c mng li ng thu
gom, u thu ma, mng thot h c by, mng thot c by pha sau, ng thot nc ti
cy, ng thot nc ti c, ng ng thot nc, gi treo, phu kin ng, khung thit b, np
y mng, v.v... nh bn v thu. Vic thi cng b b tng xung quanh v vic thi cng gia
c cc ng ng thot nc ngm v vic thi cng (cp pha, ct thp) ca cc h ga theo
dc, thit b tch du, h thu v mng thu, cng vic thi cng bao gm o v lp t s c
tin hnh bi nh thu chnh v c kim tra bi nh thu cp thot nc. Tt c h ga ni s
c tin hnh bi nh thu chnh v c kim tra bi nh thu. Tt c thng tin thi cng, v tr,
lp t v kch thc c cung cp bi nh thu.

1.2.6

Supply and installation of the aboveground soil & waste system including all collecting pipework
and fittings, floor drains, open trapped gullies, back inlet trapped gullies, down stacks, drainage
pumps, valves, hangers, channel cover, S.S. grease traps etc. as per the Tender Drawings. The
works of bedding, concrete surrounding & haunching work for U/G drainage pipeworks and
construction work (formwork & reinforcement) of on-grade manholes, petrol interceptors, sump
pits and gullies, Builder's works such as excavation and soil backfilling works shall be carried out
by the Main Contractor and checked by P&D Contractor. All suspended manholes shall be carried
out by Main Contractor and checked by P&D Contractor. All builders works information, location,
setting out and dimension to be provided by P&D Contractor.
Cung cp v lp t h thng thot nc thi v phn trn mt t bao gm tt c ng ng thu
gom, phu kin, thot sn, mng thot h c by, mng thot c by pha sau, ng ng ng
thot nc, bm thot nc, van, gi treo, np y mng, b tch du bng thp khng r, v.v...

J10068 12 Aug 2015


SN R05

12

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

theo bn v thu. Vic thi cng b b tng xung quanh v vic thi cng gia c cc ng ng
thot nc ngm v vic thi cng (cp pha, ct thp) ca cc h ga theo dc, thit b tch du,
h thu v mng thu, cng vic thi cng bao gm o v lp t s c tin hnh bi nh thu
chnh v c kim tra bi nh thu cp thot nc. Tt c h ga ni s c tin hnh bi nh
thu chnh v c kim tra bi nh thu. Tt c thng tin thi cng, v tr, lp t v kch thc
c cung cp bi nh thu.
1.2.7

Sanitary fixtures shall be supplied by others but installed by the P&D Contractor. The P&D
Contractor should do the delivery of all sanitary ware from G/F store. After installation, general
protection of sanitary wares and fitting should be carried out by this P&D Contractor.
Thit b v sinh s c cung cp bi nh thu khc nhng c lp t bi nh thu cp thot
nc. Nh thu cp thot nc s phn phi tt c thit b v sinh t kho cha tng trt. Sau khi
lp t, vic bo v chung cc thit b v sinh v phu kin s c tin hnh bi nh thu cp
thot nc.

1.2.8

The P&D Contractor shall supply and install all necessary supports, fixing screws, final
connections with accessories for sanitary fixtures fixing and services fittings when connecting the
sanitary fixtures included but not limited to wash basins, sinks, water taps/faucets, traps, water
mixers, shower trays, bath tubs, water closets, flushing cisterns, urinals, water closet seats etc.
Angle stop valves shall be supplied and installed by the P&D Contractor.
Nh thu cp thot nc s cung cp v lp t tt c gi cn thit, ren c nh, nhng mi ni
sau cung vi cc phu kin cho tt c thit b v sinh v cc phu kin hng muc khi ni cc thit b
v sinh bao gm nhng khng gii hn lavabo, bn ra, vi nc, xi phng, van ha trn nc,
khay tm, bn tm, bn cu, bn git nc, bn tiu nam, b ngi bn cu, v.vVan gc s c
cung cp v lp t bi nh thu.

1.2.9

Supply and installation of plastic bottle & running traps, metal traps and UPVC stop cock for
flushing cisterns to Building Department requirement.
Cung cp v lp t xi phng ch U, xi phng chai bng nha, xi phng kim loi v van kha
UPVC cho bn git nc theo yu cu ca b xy dng.

1.2.10 Supply and installation of pipe expansion joint when pipeworks passing through building
movement joints.
Cung cp v lp t khp ni gin n cho ng ng khi ng ng bng qua nhng im ni co
gin ca cng trinh.
1.2.11 Supply and installation all puddle flanges, puddle sleeves and sleeves for plumbing and drainage
systems. Supply and Installation all anchors, steelwork, supports and brackets for plumbing and
drainage systems.
Cung cp v lp t tt c mt bch thp putlinh, ng ch putlinh v ng ch cho h thng cp v
thot nc. Cung cp v lp t neo, khung thp, gi hay gi treo cho h thng cp thot
nc.
1.2.12 Connections of the fresh water and the flushing water incoming mains with the Government
mains.
u ni ng ng chnh cp vo cho nc x v nc sch t ng ng nc chnh ca Khu
vc.
1.2.13 Connections of the rainwater; and the soil & waste water drains to Government drains or
manholes.
u ni nc ma, nc thi v nc phn vo h thng thot nc ca Khu vc hay h ga.

J10068 12 Aug 2015


SN R05

13

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

1.2.14 The P&D Contractor are responsible for liaison with the Authorities and other Utilities to solve the
problems in connection works with water connections and drainage connection pipes.
Nh thu cp thot nc c trch nhim lin kt vi nhng c quan dch vu cng cng khc
gii quyt cc vn trong vic u ni vi h thng cp nc hay thot nc.
1.2.15 The P&D Contractor are responsible to provide the information and necessary action (as site
survey, trial pits, construction programme, temporary traffic control, traffic diversion signage and
operations, etc.) to satisfy the Authorities requirements and assisting the Architect to apply the
relevant working permits for water connection and drainage connection works.
Nh thu cp thot nc c trch nhim cung cp thng tin v cc hot ng cn thit (nh kho
st cng trng, ging thm d, chng trinh thi cng, kim sot giao thng tm thi, bng k
hiu chuyn dng v vn hnh, v.v) p ng nhng yu cu ca c quan chnh quyn v h
tr cho kin trc trinh xin php cho vic u ni cp nc v thot nc.
1.2.16 The P&D Contractor are responsible for collection, delivery & installation of water meters supplied
by the Water Authority including all necessary form submission and statutory charges.
Nh thu cp thot nc c trch nhim thu gom, phn phi v lp t ng h nc c cung
cp bi c quan cp nc bao gm tt c cc giy t trinh cn thit v cc ph theo lut nh.
1.2.17 Supply and installation of fire brake intumescent collars for all plastic pipe running through
separate fire compartments.
Cung cp v lp t ai ngn chy cho tt c ng ng nha xuyn tng ngn chy.
1.2.18 Supply and installation of all covers and frames for manholes, Channel, Sump pits, petrol
interceptors and trapped gullies.
Cung cp v lp t tt c np y v khung cho h ga, knh mng, h thu, b tch du v
phu thot.
1.2.19 Supply of all specified Spare Parts.
Cung cp tt c cc phn d phng k thut.
1.2.20 Supply and installation of the electrical and control installations associated with the plumbing &
drainage installations including the motor control panels; excluded a power supply isolator by the
Electrical Contractor adjacent to the control panel or equipment.
Cung cp v lp t tt c h thng in kim sot lin quan n h thng cp thot nc bao
gm cc bn kim sot ng c, khng bao gm ngun cp in c lp tip xc vi bng iu
khin hay thit b t nh thu.
1.2.21 Provide of all equipotential bonding terminals to all plumbing & drainage installation and sanitary
fixtures. Connection from the equipotential bonding terminals to all earthing facilities shall be
provided by Electrical Contractor.
Cung cp tt c u ni lin kt ng th cho vic lp t h thng cp thot nc v cc thit b
v sinh. S kt ni t u ni lin kt ng th n cc thit b ni t s do nh thu v in
cung cp.
1.2.22 All co-ordination works with the Main Contractor and Contractors of other Trades.
Tt c cng vic phi hp vi nh thu chnh v cc thu phu khc.
1.2.23 Provision the as-built drawings, operation and maintenance manuals, training and instructing for
Clients staffs. Details of the requirement shall refer to Appendix B of this document.
Cung cp bn v hon cng, hng dn vn hnh v bo tri, hun luyn v o to nhn vin
ca khch hng. Nhng chi tit yu cu s c tham kho trong phu luc B ca ti liu ny.

J10068 12 Aug 2015


SN R05

14

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

1.2.24 Provision shop/working/installation drawings and builder's work drawings.


Cung cp cc bn v thu/ thi cng/ lp t v cc bn v xy dng.
1.2.25 Testing, commissioning and balancing work for any part of the installation. Details of the
requirement shall refer to Appendix A of this document.
Cng tc th nghim, nghim thu v cn bng cho mt phn bt k trong vic lp t. Nhng chi
tit yu cu s c tham kho trong phu luc A ca ti liu ny.
1.2.26 Finishing, painting and labelling of the entire plumbing and drainage systems. The colour of
painting for pipework shall be approved by the Architect.
Cng tc hon thin, sn v dn nhn ton b h thng cp thot nc. Mu sn cho ng ng
s c kin trc ph duyt.
1.2.27 Provision of free comprehensive maintenance services and rectification of defects during the
Defects Liability Period.
Cung cp dch vu bo tri min ph v ci to cc h hng trong sut thi gian bo hnh.
1.2.28 Preparation of up-dated drainage drawings and amendment submission drawings with proper
colouring in accordance with the latest architectural drawings and Building Department comments
for Architects onwards submission to Building Department until approval is obtained.
Chun b cc bn v thot nc cp nht mi v cc bn v trinh c hiu chnh cung vi
mu chnh xc tun theo bn v kin trc sau cung v nhng kin ngh t s xy dng i vi h
s trinh ca kin trc cho s xy dng n khi c s chp thun ph duyt.
1.2.29 Preparation of up-dated plumbing drawings, calculation and amendment submission drawings with
proper highlight in accordance with the latest architectural drawings and Water Authority
comments for submission to Water Authority until approval is obtained.
Chun b cc bn v cp nc cp nht mi, cc tnh ton v bn v trinh c hiu chnh
theo nhng bn v sau cung ca kin trc v nhng kin ngh t c quan cp nc i vi h s
trinh n c quan cp nc n khi c chp thun ph duyt.
1.2.30 Liaison with Government Authorities for approval and inspection of the works including drawings
and necessary forms submissions.
Lin h vi c quan chnh quyn ph duyt v kim tra cc cng vic bao gm cc bn v v
nhng h s giy t trinh cn thit.
1.2.31 Provision of make-up water supplies for the Kitchen for Restaurants and Staff canteen.
Cung cp ng nc cp cho nh bp, nh hng v cn tin nhn vin.
1.2.32 Liaison with Government Authorities for application of the water meters for the kitchen areas for
Restaurants.
Lin h vi c quan chnh quyn xin php lp ng h nc cho khu vc bp nh hng.
1.2.33 The P&D Contractor shall coordinate with the BMS Installation Contractor for the interfacing of the
monitoring and remote control signals in varies locations. Please refer to the Schedule F (BMS
point schedule for PD installation) for details. The interfacing boxes/ panels shall be supplied and
installed by the P&D Contractor. The exact location shall be submitted to Architect for approval.
Nh thu cp thot nc s phi hp vi nh thu lp t h thng qun l ta nh (BMS) lin
kt cc tn hiu kim sot t xa v gim st ti nhng v tr khc nhau. Xin tham kho chi tit trong
danh muc F (danh muc im u ni BMS cho h thng cp thot nc). Hp/bng tng tc s

J10068 12 Aug 2015


SN R05

15

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

c cung cp v lp t bi nh thu cp thot nc. V tr chnh xc s c trinh cho kin


trc ph duyt.
1.2.34 The P&D Contractor responsible employed the Competent Persons and Certified Workers to carry
out the installation works inside the Confined space. The Competent Persons and Certified
Workers shall be authorized to certify persons and workers.
Nh thu cp thot nc c trch nhim tuyn dung nhng ngi thnh tho v nhng cng nhn
c chng nhn tin hnh cc cng vic lp t bn trong khng gian gii hn. Nhng ngi thnh
tho v nhng cng nhn c chng nhn s c y quyn thnh nhng ngi v nhng cng
nhn c chng nhn.
1.2.35 The P&D Contractor shall be provided the adequate approved apparatus and trainings for
Competent Persons and Certified Workers before the working inside the Confined space.
Nh thu cp thot nc s c cung cp y nhng dung cu v s hun luyn cho nhng
ngi thnh tho, nhng cng nhn c chng nhn trc khi thi cng bn trong khu vc gii hn.
1.2.36 The P&D Contractor is responsible to provide the information and necessary action (including any
submissions, approved apparatus, competent persons and working procedures) to satisfy the
Authorities requirements to receive the relevant working permits for Confined space installation
works.
Nh thu cp thot nc c trch nhim cung cp thng tin v hot ng cn thit (bao gm cc
trinh, cc cng cu c ph duyt, nhng ngi thnh tho v nhng phng thc tin hnh
thi cng) tha mn cc yu cu ca c quan chuyn trch nhn c chng nhn lin quan
cho vic thi cng trong khu vc gii hn.
1.2.37 The P&D Contractor shall be responsible to coordinate with other Contractors to finalize all builder
work drawings for Architect approval prior to all off site pre-fabricated external wall. The Contractor
shall be carried out off site inspection to verify the reserved builder works are made in good order
for future installation.
Nh thu s c trch nhim phi hp vi cc nh thu khc hon tt nhng bn v xy dng
kin trc ph duyt trc khi tng bao c thi cng c sn bn ngoi cng trng. Nh
thu s tin hnh kim tra bn ngoi cng trng xc nhn nhng cng vic xy dng trc
c thc hin tt cho cc lp t sau ny.
1.2.38 The P&D Contractor shall supply and install the Plumbing and Drainage equipments and
pipeworks for in site or off site.
Nh thu cp thot nc s cung cp v lp t tt c thit b v ng ng cp thot nc trong
hay ngoi cng trng.
1.2.39 The supply and installation of spring loaded pipe brackets for 80mm dia. and above pump
discharge pipes installed inside pump rooms. Rubber gaskets shall be inserted between the pipe
and pipe bracket and between the bracket base and concrete.
Cung cp v lp t gi ng chu ti ng bng l xo cho ng bm thot nc c ng knh t
80mm tr ln c lp t bn trong phng bm. m cao su s c t vo gia ng ng
v gi ng v gia gi v b tng.

J10068 12 Aug 2015


SN R05

16

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

1.2.40 Every opening for the passage of electrical trunking, conduits, pipes and wires through a
compartment wall or floor, and every hole in such a wall or floor left after construction should be
protected with fire dampers or other suitable form of fire stop to maintain the required FRP of that
wall or floor. Where the pipes, wires and any insulation passing through such as a wall or floor is
of combustible material, such material should be contained within an enclosure having an FRP of
not less than that of the wall or floor. Any access opening provided to the enclosure should be
provided with doors having an FRP of not less than 1/2 that of the enclosure.
Mi khong m cho mng hp in, ng dn, ng ng v dy dn qua tng hay sn ngn
chy, v mi l ch trong tng hay sn sau khi thi cng s c bo v bi van chng chy hay
loi ngn chy khc thch hp duy tri mc chng chy theo yu cu i vi tng hay sn
. Ni ng ng, dy dn hay bt k ng dn cch in i qua tng hay sn chng chy c
thnh phn vt liu d bt la, vt liu bao xung quanh cn c h s chng chy khng nh hn
h s chng chy ca tng hay ca sn . Bt k l m tip cn c thit k ca c h s
chng chy khng nh hn h s chng chy ca tng ngn.
1.2.41 The P&D Contractor shall provide one no. of mock-up for typical toilets including the supply and
installation of the materials and all necessary accessories.
Nh thu cp thot nc s cung cp mt s nh v sinh in hinh mu bao gm cung cp lp
t cc vt liu v tt c phu kin cn thit.
1.2.42 The P&D Contractor shall provide one no. of water meter room mock-up including the supply and
installation of the materials and all necessary accessories.
Nh thu s cung cp mt s phng ng h nc mu bao gm cung cp v lp t cc vt liu
v tt c phu kin cn thit khc.
1.2.43 The P&D Contractor is required to maintain the mock-up, once accepted by the Architect, in good
conditions to the satisfaction of the Architect throughout the whole Contract Period. The
Contractor is deemed to have included in his tender all cost so incurred including temporary
protections and cleaning, out-of-sequence works, repair and replacement works, etc. The
Contractor will be also responsible for any cost incurred including dummy or temporary works for
this mock up and final cleaning, and all installed system components prior hand over to residents.
Nh thu cp thot nc c yu cu duy tri nh mu trong iu kin tt, khi c ph duyt
bi kin trc, p ng kin trc trong sut qu trinh thu. Nh thu c cho rng cn phi
bao gm trong gi thu tt c chi ph pht sinh bao gm vic bo v tm thi v cng tc lm v
sinh v nhng cng tc khng thng xuyn, cng vic sa cha, thay th, v.vNh thu cng
s c trch nhim i vi cc chi ph pht sinh bao gm m hinh hay cc cng vic tm thi cho
nh mu v vic v sinh sau cung ny, v tt c thnh phn h thng c lp t trc khi
chuyn giao cho khch hng.
1.2.44 Supply and installation of water supply and drainage systems for Water Features.
Cung cp v lp t h thng cp thot nc cho cc h nc cnh quan.
1.2.45 Supply and installation of S.S. water meter cabinet.
Cung cp v lp t hp ng h nc bng vt liu thp khng r.

1.3

Design Conditions
iu kin thit k

1.3.1

Design Climatic Conditions


iu kin kh hu thit k

J10068 12 Aug 2015


SN R05

17

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

The design is based on the following prevailing climatic conditions, and equipment/material
provided shall achieve specified performance/criteria under local climatic conditions.
Thit k c da trn nhng iu kin kh hu ph bin, v thit b/ vt t c cung cp s t
tnh nng k thut phu hp vi iu kin kh hu a phng ny.
(a)

Extreme Climatic Conditions


Nhng iu kin kh hu cc bin.
The P&D Contractor is deemed to be familiar with the climatic conditions prevailing in Vit
Nam, which shall be taken to be with a temperature range of 0C to +40C and a relative
humidity of 100%. The P&D Contractor shall be assumed to warrant that all materials and
items of equipment are suitable for continued use and operation in the climatic conditions
encountered.
Nh thu cp thot nc c cho rng quen thuc vi cc iu kin kh hu ph bin ti
Vit Nam, nhng iu kin s c p dung trong khong nhit t 0oC n +40oC v
m lin quan l 100%. Nh thu cp thot nc s gi nh m bo tt c vt t v
thit b s dung thch hp v vn hnh lin tuc khi tip xc nhng iu kin kh hu ny.

(b)

Electrical Supply
Cp in
Electricity supply from the power supply company will be at nominal 380/220V 50Hz, 3phase 4-wire.
in cp t cng ty cp in l 380/220V 50Hz, 3-phase 4-dy
Under normal conditions, the limits of supply are: Di iu kin binh thng, gii hn cp:

1.4

Voltage:
in p:

220V 1-phase / 380V 3-phase 6%


220 1 pha/ 380V 3 pha 6%

Frequency:
Tn sut:

50Hz 2%
50Hz 2%

Construction Tolerance
Dung sai thi cng
The Contractor must ensure that the design tolerances are rigidly adhered to. The Contractor shall
observe and take into account the tolerance allowed in the Main Contract for the building
structure.
Nh thu phi m bo dung sai thit k c tn trng trit . Nh thu s quan st v thng
k dung sai cho php trong gi thu chnh cho kt cu cng trinh.
The Contractor shall state and show on the shop drawings the provisions intended to
accommodate the constructional tolerances of the surrounding elements.
Nh thu s th hin trn bn v thi cng d liu xem xt dung sai thi cng ca cc yu t xung
quanh.
Unless specify by Architect, the building construction tolerances are as follows:
Tr khi c yu cu c bit t kin trc, dung sai trong thi cng cng trinh nh sau:

J10068 12 Aug 2015


SN R05

18

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

The structural tolerances for lift shafts at any level shall be in accordance with BS 5655: Pt.6,
where applicable. In addition, for lift shafts above the height of 90 metres, the limits of accuracy of
well plum dimensions shall be +50 and -0mm.
Dung sai kt cu cho khoang thang my bt c tng no s tun theo BS 5655: phn 6. Hn
na, i vi khoang thang my c cao trn 90m, gii hn chnh xc ca kch thc h thang
s l +50 v -0mm.
Maximum Inter-storey Drift = 10mm;
lch ti a gia cc tng = 10mm.
Maximum Overall Building Deflection = 350mm in all direction.
un cng trinh tng cng ti a = 350mm theo mi hng.

1.5

Works Excluded
Nhng cng vic ngoi phm vi
The following works shall be excluded from P&D Contractor unless otherwise stated:Nhng cng vic sau s thuc ngoi phm vi cng vic ca nh thu cp thot nc tr khi c
ch th khc:

1.5.1

Concreting plinths shall be formed by the Main Contractor to the P&D Contractors details.
B b tng s c thi cng bi nh thu chnh theo nhng chi tit ca nh thu cp thot nc.

1.5.2

Reservation of all boxing outs, and equipment holding down bolts where required to be built in
structural or non-structural elements during construction. The P&D Contractor shall supply these
provisions and detailed drawings approved by the Architect and check on site the reservation of
builders works before concreting.
D tr tt c hp, bu lng gi thit b khi cn thi cng cc phn kt cu v khng kt cu trong
qu trnh thi cng. Nh thu cp thot nc s cung cp nhng th d tr ny v nhng bn v
chi tit c ph duyt bi kin trc v kim tra ngoi cng trng vic d tr cho cng tc thi
cng trc khi b tng.

1.5.3

Removable access panels in fixed ceilings, walls and slab and at other positions as required for
adjustment and maintenance access. Locations to be nominated by the P&D Contractor prior to
work commencing.
Nhng ca kim tra di ng trong trn c nh, tng v sn v nhng v tr khc theo yu cu
iu chnh v bo tri. V tr c ch nh bi nh thu cp thot nc trc khi khi cng.

1.5.4

Roof channels, screenings for drainage and water proofing.


Mng trn mi, thanh chn thot nc v chng thm.

1.5.5

Supporting stone or granite for sub-soil drain pipe.


hoc granite cho ng thot nc ca tng t ci.

1.5.6

The works of bedding, concrete surrounding & haunching work for underground drainage
pipeworks.
Cng tc lt, ng bng b tng xung quanh i vi ng thot nc chn ngm.

1.5.7

Construction of manholes, valve pits, petrol interceptor, sump pits, catch pits, excavation, backfilling and surface channels.

J10068 12 Aug 2015


SN R05

19

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Thi cng h ga, h van, b tch du, h thu, ging thu nc, o, san lp v knh thot nc
mt.
1.5.8

Excavation and backfilling work for the Contractors connection to Government water mains.
o p v san lp cho cng tc u ni vi ng ng cp nc chnh ca Khu vc.

1.5.9

Excavation and backfilling work for the Contractors connection to Government drains or
manholes.
o p v san lp im cho cng tc u ni vi ng thot nc chnh ca Khu vc.

1.5.10 Fire rated enclosures for accommodation of piping passing through protected lobbies, etc.
Bc chng chy cho ng ng i qua snh c bo v chng chy, v.v
1.5.11 380V/3/50Hz and 220V/1/50Hz electric power supplies terminated adjacent to control panels
and the equipment. The P&D Contractor shall coordinate with the Electrical Contractor the
required rating and location of main power isolating switch for the water supply pump rooms. The
Electrical Contractor shall supply and install the main power isolating switch in the respective
pump rooms. The P&D Contractor shall be responsible for the complete electrical distribution
system from this main switch for the plumbing installations.
Cng cp in 380V/3 /50Hz v 220V/1 /50Hz gn k vi bng kim sot v thit b. Nh thu
cp thot nc s phi hp vi nh thu in yu cu nh mc v v tr ca cng tc in chnh
cho phng bm cp nc. Nh thu in s cung cp v lp t cng tc in chnh trong phng
bm tng ng. Nh thu cp thot nc s c trch nhim hon tt h thng phn phi in t
cng tc chnh cho cng tc lp t cp thot nc.
1.5.12 Connection from equipotential bonding terminals to all earthing facilities.
Ni t cc cng kt ni ng th n tt c cc thit b ni t.
1.5.13 To carry out the following works and special conditions by the Main Contractor: tin hnh nhng cng vic sau v nhng iu kin c bit bi nh thu chnh:
(a)

Provision of external and underground works for cables and pipes supplied and laid by the
Contractors, including excavation, concrete, setting out for trenches, plinths, beds,
ductworks, conduits, draw cables, manholes, draw pits and the like with all necessary
associated works.
Nh thu thi cng ng ng v ng cp ngm bn ngoi, bao gm o, b tng, thi
cng mng thot, b , lt, ng ng, ng dn, cp ko, h ga, h ht v nhng th
tng t vi nhng cng vic lin quan cn thit.

(b)

Distribution of sanitary wares and fittings to a specific location on each floor for installation
designated by the Main Contractor. The Main Contractor shall be responsible to properly
hand over the sanitary wares and fittings to the Contractor and the Contractor shall take
over the same and further delivery and distribution to the positions of fixing for installation.
Phn phi thit b v sinh v phu kin cho cc v tr ring bit trn mi tng cho vic thit
k lp t bi nh thu chnh. Nh thu chnh s c trch nhim chuyn giao thit b v
sinh v phu kin cho nh thu v nh thu s tip tuc cng vic phn phi v cung cp
n nhng v tr lp t c nh ging nh vy hoc nhiu hn.

(c)

Protection to all installed sanitary wares, fittings and fixture against damages. Protection
shall mean plastic sheet, 5mm thick plywood boards or card boards etc.
Bo v tt c nhng thit b v sinh lp t, cc phu kin v thit b chng li s h
hng bng tm nha, g vn p dy 5mm hay bng th, v.v

J10068 12 Aug 2015


SN R05

20

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

(d)

Provision and installation of 10mm (min.) thick plywood board to cover the bathtub as
protection after installation.
Cung cp v lp t tm bng g vn p dy 10mm ph ln bn tm bo v sau khi lp
t.

(e)

Sealing of all gaps between faucet and wall finish, bath tub and finishes, water closet and
floor etc.
Bt kn tt c l h gia vi nc v tng hon thin, bn tm v phn hon thin, bn
cu v sn, v.v

1.6

Building Provisions
Cung cp cng trnh

1.6.1

It shall be the P&D Contractors responsibility to ensure that the Main Contractor is informed of all
holes/openings and inserts required in the structure and to co-ordinate the builder's work
requirements with the Main Contractor and all other Contractors. Where additional holes/openings
are required after concrete has been poured, such holes shall be provided at the P&D Contractors
expense, unless they are duly authorized basis by the Employer and covered by an instruction
issued by the Architect. The P&D Contractor shall also be responsible to ensure that these holes
are correctly reserved and protected during construction.
Nh thu cp thot nc c trch nhim bo m rng nh thu chnh s xc nhn tt c l m
c yu cu v kt cu v phi hp nhng yu cu cng vic thi cng vi nh thu chnh v tt c
nh thu khc. Nhng ni cn thit b sung cc l m sau khi b tng, nhng l ny s
c thi cng bng chi ph ca nh thu cp thot nc, tr khi chng c ch u t cho php
mt cch thch ng v c hng dn t kin trc. Nh thu cp thot nc cng s c trch
nhim m bo nhng l ny c d phng chnh xc v c bo v trong qu trinh thi cng.

1.6.2

The Main Contractor shall carry out infill and repairs around openings in the building structure for
the passage of building services. Where pipes and services pass through walls, floors, etc.,
(including floors in ducts), the P&D Contractor shall provide pipe sleeves and in fill between the
sleeves and pipe/services.
Nh thu chnh s tin hnh trm bt v sa cha xung quanh l m trong kt cu cng trinh cho
cc ng ng hng muc i qua. Ni ng ng v cc cng trinh k thut i qua tng, sn,
v.v... (bao gm ng dn di sn) nh thu cp thot nc s cung cp ng ch v trm bt v tr
gia ng ch v ng ng.

1.6.3

Concrete bases and/or plinths required for the support or anchoring of equipment shall be
provided by the Main Contractor except where otherwise specified. The P&D Contractor shall
provide and securely fix the anchor bolts in position in concrete bases before concrete is poured.
B b tng v/hay b yu cu hay neo thit b s c cung cp bi nh thu chnh tr
khi c ghi ch c bit khc. Nh thu cp thot nc s cung cp v c nh cc bu lng neo
mt cch an ton trong v tr b b tng trc khi b tng.

1.6.4

All structural and supporting steelwork required for the installation of the P&D-Contract Works
shall be supplied and fixed by the P&D Contractor, except otherwise specified.
Tt c khung thp v kt cu yu cu cho lp t cng trinh ca nh thu cp thot nc s
c cung cp v c nh bi nh thu cp thot nc, tr khi c ghi ch c bit khc.

1.6.5

The concealed conduit work, wall/beam/slab openings, puddle flanges for water tanks, substructure drainage pipeworks at basement 4 to basement 1 floors has been installed by the
Basement Contractor. The P&D Contractor should take the responsibility to check and report the
installed works and openings to ensure that works are suitable for the P&D System installation.

J10068 12 Aug 2015


SN R05

21

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

The P&D Contractor shall provide all modification / remedial works of those installed concealed
conduit, openings, the connection of drainage pipeworks and puddle flanges if necessary without
additional cost.
ng ng dn giu n, nhng l m sn/dm/tng, mt bch putlinh cho b cha nc, ng
ng thot nc kt cu phu tng hm 4 n tng 1 c lp t bi nh thu tng hm. Nh
thu cp thot nc s chu trch nhim kim tra v bo co cc cng vic lp t v cc l m
m bo vic thi cng thch hp cho cc thit b cp thot nc. Nh thu cp thot nc s
cung cp tt c cng vic sa cha ng ng n lp t, nhng l m, mi ni cc ng
ng thot nc v nhng mt bch putlinh nu cn m khng tnh thm chi ph.

1.7

Main Contractor's Attendance on Nominated Contractors/Suppliers; Specialist


Contractors and Separate Contractors
S c mt ca nh thu chnh trn cc nh thu/nh cung cp c ch nh; cc nh
thu chuyn gia v cc nh thu ring l
The Main Contractor is to provide the following services free of charge to the Nominated Contractors
and to afford them all reasonable facilities for the proper execution of their work including: Nh thu chnh cung cp nhng dch vu sau min ph i vi cc nh thu c ch nh v to
cho h nhng tin nghi hp l thi cng cng vic bao gm:

1.7.1

Every facility to move about the site in the legitimate pursuit of their work.
Mi thun li di chuyn quanh cng trng di s gim st cng vic hp php.

1.7.2

Space on site or in the building under construction to allow the Nominated Contractors to erect
and/or multi-relocate their own offices, amenities and/or stores as may reasonably be required.
However, storage space on site may be restricted.
Khu vc ngoi cng trng hoc bn trong ta nh khi thi cng cho php nhng nh thu c
ch nh xy dng v/hay di chuyn nhiu ln vn phng, nhng tin nghi v/hay nhng kho bi
ca h theo yu cu mt cch hp l. Tuy nhin, khng gian kho bi ngoi cng trng c th b
cm.

1.7.3

Temporary storage space on site for the Nominated Contractors to distribute the materials and
equipments to the upper floors. Such space shall be sized adequately and be structurally sufficient
to take the necessary loadings.
Khng t kho bi tm thi ngoi cng trng cho nhng nh thu c ch nh phn phi vt
t, thit b n cc sn pha trn. Nhng khng gian s c nh kch thc thch hp v hiu
qu v mt kt cu t ti cn thit.

1.7.4

Use of access roads within the Site or working area. Working space for and clear access to the
Nominated Contractors' works.
S dung cc ng i trong cng trng hay khu vc thi cng. Khng gian thi cng v li tip cn
thng thong cho vic thi cng ca cc nh thu c ch nh

1.7.5

Use of the telephone, mess rooms, latrines and the usual conveniences of a building site.
S dung in thoi, cc phng rc, nh x v nhng tin nghi thng thng ngoi cng trng.

1.7.6

Any fencing, hoardings, etc. required for site safety as required and incidental to the execution of the
Sub-Contract works.
Bt k hng ro, hay panel hng ro quanh cng trng, v.v...c yu cu v s an ton ngoi
cng trng khi nh thu tin hnh thi cng.

J10068 12 Aug 2015


SN R05

22

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

1.7.7

Adequate water, lighting and electrical supplies at convenient positions throughout the Works under
construction and to working and storage areas within the Site. The electrical supply shall be sized to
cater for full load testing and commissioning, if required, up to and including final acceptance of the
installations by the Architect/Authorities.
Cung cp in, en, nc y ti nhng v tr thun tin trong cng trng thi cng v nhng
khu vc kho cha trong cng trng. in s c cung cp th nghim v kim tra ti y ,
nu cn, bao gm c s chp thun lp t sau cung ca Kin trc s / c quan chnh quyn.

1.7.8

Watching over Nominated Contractors works.


Gim st cng vic ca nh thu c ch nh.

1.7.9

Vertical transportation of all necessary building materials and/or equipments, etc. for all Nominated
Contractors and Separate Contractors works shall be provided by the Main Contractor. Prior to the
commencement of works by Nominated Contractors and Separate Contractors, the Main Contractor
shall allow reasonable time for the use of vertical transportation by the Nominated Contractors and
Separate Contractors to the satisfaction of the Architect.
Phng tin vn chuyn thng ng ca tt c vt t v/hay cn thit, v.v... cho cc nh thu
c ch nh v nhng cng vic ca nhng nh thu ring l s c cung cp bi nh thu
chnh. Trc khi cc nh thu c ch nh v cc nh thu ring l tin hnh thi cng, nh thu
chnh s cho php thi gian hp l s dung phng tin vn chuyn thng ng p ng
theo kin trc.

1.7.10 Any making good on completion of work disturbed by the removal of preceding facilities.
Hon tt tt cc cng vic gy cn tr bi vic di di cc thit b c sn trc.
The Main Contractor shall ascertain from each Nominated Contractor all particulars relating to his
work with regard to the order of its execution and the positions in which chases, holes, mortices,
etc. will be required, before the work is put in hand. No claims for work arising out of lack of
liaison with the Architect and/or other Nominated Contractors will be considered.
Nh thu chnh s bit chc chn cc chi tit lin quan n vic thi cng ca tng nh thu c
ch nh vi vic quan tm n trt t ca qu trinh thi cng v nhng v tr ct ren, l, rnh, v.v..
s c yu cu, trc khi cc cng vic n tay. Khng c khiu ni cng vic pht sinh do thiu
s lin kt vi kin trc v/hay nhng nh thu khc.
The Nominated Contractor shall inform the Main Contractor of all Builders Work required to be
carried out as early as possible and not later than three weeks before the relevant sections of
work commence so that all chases, holes, openings, etc. may be cut or formed as the work
proceeds.
Nh thu s xc nhn vi nh thu chnh tt c cc cng vic yu cu tin hnh cng sm
cng tt v khng tr hn 3 tun trc khi cc phn lin quan c tin hnh, cc v tr ct ren, l
rnh, v.v...c yu cu ct hay thi cng.
Should the Nominated Contractor fail to give the Main Contractor reasonable notice and full
particulars of the Builders Work all additional work incurred shall be at the Nominated
Contractors expense.
Nh thu khng a c cho nh thu chnh thng bo hp l v chi tit y ca cc cng
tc thi cng thm vo th nh thu s chu chi ph.
The Main Contractor shall ensure that the Nominated Contractor shall under their obligation and
duty to accurately mark on drawings and set out on Site the position of all holes, chases, anchors,
cleats and any other embedded/fix-in elements of a like nature and shall provide supervision on
Site to ensure that the Works are carried out to his requirements. The Main Contractor shall be

J10068 12 Aug 2015


SN R05

23

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

responsible for fixing in position the embedded/fix-in elements and rectifying once any off-setting
problem as found deviated from the mark-up position upon being informed by the Nominated
Contractor. Thereafter, any further off-setting will be rectified by the Nominated Contractor at the
Main Contractors expense.
Nh thu chnh s m bo nh thu chu trch nhim v ngha vu xc nh v tr chnh xc ca
cc l, ren, neo, thang v cc thit b c c nh/gn vo theo c tnh v s cung cp vic
gim st ngoi cng trng m bo cng vic c tin hnh theo nhng yu cu ca nh
thu chnh. Nh thu chnh s c trch nhim c nh v tr cc thit b c nh/gn vo v iu
chnh khi c bt k vn v lch do vic xc nh v tr ca nh thu. Sau , bt k s sai
lch no s c iu chnh bi nh thu vi chi ph ca nh thu chnh.
All additional openings, holes through the building structure, partition walls and all concrete bases,
supports, ducts, etc. required by the Nominated Contractor beyond those included in the
Architectural or Structural drawings will also be carried out free of charge by the Main Contractor
including trimming bars if required, provided that the Nominated Contractor shall submit to the
Architects for approval, full details of such requirements, so that due consideration may be given
before the Main Contractor commences work in the area concerned. Following approval by the
Architect, the Main Contractor to carry out such works as his work proceeds. The Nominated
Contractor shall be liable for all expenses incurred that are brought about by failure to comply with
the above requirements.
Nhng l m thm vo kt cu cng trinh, tng ngn v tt c nn b tng, gi , ng, v.v
c yu cu bi nh thu m khng nm trong phm vi bao gm ca bn v kt cu hay kin
trc s c tin hnh min ph bi nh thu chnh bao gm vic ct thanh nu cn, nh thu s
trinh cho kin trc ph duyt, ton b chi tit ca nhng yu cu , vic xem xt c th c
tin hnh trc khi nh thu chnh thi cng khu vc lin quan. Sau khi c kin trc ph duyt,
nh thu chnh tin hnh nhng cng vic theo nh tin . Nh thu s c trch nhim chi tr
cc chi ph pht sinh do h hng tun th nhng yu cu trn.
The Main Contractor shall attend upon all the Nominated Contractors, cut or form chases, holes
and openings, etc. of all sizes and build in sleeves, supply cement mortar for fixing brackets, bed
and grout behind frames including supplying cement mortar, fill around and / or seal around all
pipes, ducts, cables, conduits, cable trunking, cable trays and air-ducting with approved mastic,
make good all work disturbed and all other necessary work of a like nature outside all plant rooms.
Proper fire seal material should be grouted around all pipes, ducts, cables, conduit, cable trunking,
cable trays and control panels, etc., passing through compartments and E/M plant rooms. These
sealing materials should be accompanied with relevant test certificates demonstrating their
performance in achieving the required Fire Rating Period as stipulated under the Building
Ordinance / Regulations and related Code of Practice.
Nh thu chnh s ch tm n tt c cng vic ca cc nh thu, vic ct hay nh hinh rnh ct
ren, l, khong m, v.v... ca cc kch c v vic lp t ng ch, cung cp va xi mng c
nh cc gi treo, b v trt pha sau khung bao gm cung cp va xi mng, trm xung quanh
v/hay trt kn xung quanh ng ng, ng dn, cp, rnh cp, khay dn cp v ng dn kh
vi loi mastic c ph duyt, thc hin tt cc cng vic b chi phi v tt c nhng vic cn
lm khc thuc c tnh bn ngoi ca tt c phng my. Vt liu trt chng chy s c trt
xung quanh tt c ng, ng dn, cp, rnh cp, khay dn cp v bng iu khin, v.v... xuyn
qua cc khoang ngn chy v phng my c in. Nhng vt liu trt kn ny s nh kem theo
nhng chng nhn chng minh c tnh ca chng trong vic t c yu cu v thi gian
chng chy theo php lnh/ quy phm trong xy dng cng trinh.
The Main Contractor shall attend upon all the Nominated Contractors, prepare, prime and paint all
pipes, ducts, conduits, cables, cable trunking, cable trays, air ducting, wiring and exposed
supporting bracket, and all of which whether insulated or not outside all plant rooms and prepare
and prime to all mild steel work not exposed to view.

J10068 12 Aug 2015


SN R05

24

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Nh thu chnh s ch tm n tt c vic chun b s b, sn ng ng, ng dn, cp, rnh


cp, khay dn cp, ng dn kh, dy dn v gi v tt c nhng cng tc bc cch nhit hay
khng bn ngoi khu vc phng my v vic chun b s b cc khung thp n ca nh thu.
All sleeves, puddle flanges and the likes for water tanks constructed of concrete shall be supplied
and delivered to ground floor level by relevant Nominated Contractors.
Tt c ng ch, mt bch v nhng th nh b cha bng b tng s c cung cp v phn
phi cho tng trt bi nh thu.
All works for manholes, sump pits, interceptors, etc. including supply and installation of sleeves,
conduit and the like with all necessary associated works shall be the responsibility of the Main
Contractor.
Tt c cng vic lin quan n h ga, h thu, b tch du, v.v bao gm cung cp v lp t ng
ch, ng dn v nhng th khc vi tt c nhng cng vic cn thit c lin quan s thuc trch
nhim ca nh thu chnh.
All Nominated Contractors shall be responsible for caulking and filling sleeves, and the like around
pipes, conduits and the like with approved material and pointing both ends of sleeves, and the like
with approved mastic sealant. These materials and pointing should be accompanied with relevant
test certificates demonstrating their performance in achieving the required Fire Rating Period as
stipulated under the Building Ordinance/Regulations and related Code of Practice should the
services pipe-runs pass through compartments or plant rooms.
Tt c nh thu s c trch nhim trt kn cc ng ch xung quanh ng ng, ng dn vi vt
liu c ph duyt v trt va c 2 u ca ng ch v nhng th tng t vi loi mastic trt
c ph duyt. Nhng vt liu ny s c chng ch chng nhn c tnh t yu cu v thi gian
chng chy tun theo php lnh/ quy phm trong xy dng cng trinh v theo quy chun xy
dng cc ng ng chy qua cc khoang ngn chy hay phng my.
All Nominated Contractors shall be responsible for the painting to plant, surface wiring, conduits,
cable trays, air-ducting, pipeworks and the like inside all M&E plant rooms. The Nominated
Contractors shall also be responsible for the labelling/marking to plant, surface writing, conduits,
cable trays, air-ducting, pipeworks and the like outside M&E plant rooms.
Tt c nh thu s c trch nhim sn thit b, b mt dy dn, ng dn, khay cp, ng dn kh,
ng ng v nhng th tng t bn trong tt c phng my c in. Nh thu cng s c trch
nhim dn nhn/ nh du thit b, b mt dy dn, ng ng, khay cp, ng dn kh, ng
ng v nhng th tng t bn ngoi cc phng my c in.
The Main Contractor is to inform all Nominated Contractors of the casting of reinforced concrete,
allowing them enough time for the laying of their anchors, cables, conduits, pipes, etc.
Nh thu chnh bo cho tt c thu phu v vic c b tng chu lc, cho php h c thi gian
t neo, cp, ng dn, ng ng, v.v...
The Main Contractor shall co-ordinate and make all necessary arrangements with all Separate
Contractors employed direct by the Employer, the Authorities and Public Utility Companies as to
the time and manner of executing their work or delivering their goods and materials, obtaining full
particulars of their requirements with regard to chases, recesses and other such details and for the
execution of the same, and supplying them with all dimensions and other information necessary to
ensure that their work may be correctly executed or correct goods and materials supplied. No
claim for time and/or Additional Monetary Compensation will be entertained should the Main
Contractor fail to make proper arrangement and liaise with all direct Contractors and Contractors,
the Authorities and Public Utility Company in executing their works for suiting with the Main
Contractors Master Programme. In the event of the Main Contractor failing to make the proper
arrangements required under this Sub-Clause, he shall execute free of charge or pay to the

J10068 12 Aug 2015


SN R05

25

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Employer all expenses properly incurred in executing any alterations, in cutting chases or recesses
or in altering or re-supplying any goods and materials which may be necessary as a result of such
failure.
Nh thu chnh s phi hp v sp xp vi nhng nh thu ring l, c thu trc tip t ch
u t, chnh quyn v cc cng ty dch vu cng cng, thi gian v cch thc thc hin cng vic
ca h hay phn phi sn phm v vt t ca h, t c ton b nhng yu cu ring bit c
lin quan n cc rnh ct ren, uc rnh v nhng chi tit khc v cho qu trinh tin hnh tng
t, v cung cp cho h nhng kch thc v cc thng tin khc cn thit m bo cng vic
ca h c th tin hnh chnh xc hay cung cp ng sn phm, vt t. Khng c khiu ni v
thi gian v/hay bi thng thm chi ph c xem xt khi nh thu chnh khng thc hin ng
cng tc sp xp, lin kt vi nhng nh thu trc tip v cc nh thu, c quan chnh quyn v
cng ty dch vu cng cng trong vic tin hnh thi cng phu hp vi chng trinh thi cng ca
thu chnh. Khi nh thu chnh tin hnh khng ng cc th tuc thu xp c yu cu trong iu
khon phu ny, thu chnh s thc hin min ph hay chi tr cho ch u t tt c chi ph do qu
trinh tin hnh sa i, nh ct rnh ren hay uc rnh hay trong vic sa i, cung cp li cc
thit b, vt liu cn thit do nhng sai st .
The Main Contractor shall allow in addition for: Nh thu chnh s cho php thm cho:
a.

Provision of a temporary, suitable and adequate electricity supply inside plant rooms or in
vicinity (not exceeding 10m) to all equipment of Nominated Contractors for testing and
commissioning.
Cung cp in tm thi, thch hp v y cho bn trong phng my hay trong trong khu
vc ln cn (khng vt qu 10m) i vi tt c thit b ca nh thu kim tra v nghim
thu.

b.

Provision and maintenance of stout guard rails to prevent accidental access to the lift shafts
at every point of entry.
Cung cp v bo tri cc ng ray bo v chc chn ngn chn cc tai nn t ngt ng
vo cc khoang thang my mi im ng vo.

c.

Provision of fire-rated enclosures for those cables / trunking running at protective lobby /
corridor / escape, and to ensure proper FRP separation between different compartments by
the use of fire-rates enclosure when these services pipe-runs pass through such different
compartments.
Cung cp v chng chy cho cp/ rnh chy trong khu vc snh bo v/ hnh lang/ li thot
him, v m bo chng chy tch bit gia nhng khoang ngn chy khc nhau bng
cch s dung v bc chng chy khi nhng ng ng chy xuyn qua nhng khoang ngn
chy khc nhau.

d.

Provision of external and underground works for cables and pipes supplied and laid by the
Contractors, including excavation, concrete, setting out for trenches, plinths, beds,
ductworks, conduits, draw cables, manholes, draw pits and the like with all necessary
associated works.
Cc ng ng cp, cp ngm bn ngoi c cng cp v lp t bi nh thu, bao gm
o, b tng, xy dng rnh, , b m, ng ng, cp, h ga, h ht v nhng th
tng t vi tt c cng vic cn thit c lin quan.

e.

Forming of concrete plinths completed with necessary reinforcement, stools, bases, inertia
blocks, supports, etc. for plant, equipment, chiller, pipework, ductwork, cable tray, kitchen
cabinets and basin cabinets, etc.

J10068 12 Aug 2015


SN R05

26

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Chun b hon tt cc b b tng vi kh nng chu lc cn thit, b, b qun tnh, gi


, v.v... cho my mc, thit b, my lm lnh, ng ng, khay cp, t bp v t chu ra,
v.v...
f.

g.

Provision of all necessary openings, holes, access panels and the like on floor, wall, roof
and suspended ceiling and making good.
Cung cp tt c khong m, l m cn thit, cc np thm v nhng th tng t trn sn,
tng, mi v trn treo v tin hnh tt.
Construction of curb and/or curb flashing for pipes, cables, etc.
Thi cng b v/hay b chng thm cho ng ng, cp, v.v...

h.

All patching and making good of the building structure and ceilings for the installation of
piping and conduits.
Tt c vic p v, lm tt kt cu v trn cng trinh cho lp t ng ng v ng dn.

i.

Removable tile ceilings, access panels in wall and ceilings and at other positions as required
for adjustment and maintenance purpose. Locations shall be nominated by the Nominated
Contractors prior to work commencing.
Trn lt gch c th tho di, cc tm np thm trong tng v trn v nhng v tr khc
nh yu cu cho muc ch iu chnh v bo tri. Cc v tr s c ch nh bi nh thu
trc khi tin hnh thi cng.

j.

Provision of all chases and furring for pipes.


Cung cp tt c rnh ct ren v co cu ng ng

k.

Positioning and fixing of all Nominated Contractors pipe sleeves, conduits, pipes and
brackets where necessary. Details to be submitted by the Nominated Contractors and
approved by the Architect.
V tr v c nh cc ng ch ng ng ca nh thu, ng dn, ng ng, gi nhng
ni cn thit. Chi tit c trinh cho nh thu v c ph duyt bi kin trc.

l.

Grouting and sealing of gap between pipe sleeves and openings with approved materials
and subsequent making good around openings, chases, recesses, etc
Trt v lm kn cc khong trng gia ng ch v l m vi nhng vt liu c ph duyt
v sau hon thin tt xung quanh l m, rnh ct, rnh uc, v.v...

m.

Preparing, priming and painting of exposed pipeworks and fittings except those installed
inside Plant Rooms and Pump Rooms.
Chun b, lt v sn cc ng ng l ra ngoi v cc phu kin ngoi tr nhng ng ng
ng lp t bn trong phng my, phng bm.

n.

Provision of plant room floor topping properly graded to floor drain.


Cung cp lp trn sn phng my c dc n phu thot sn.

o.

Provision of concrete / brick jamb for roller shutter or fire shutter installation.
Cung cp dm bng gch/ b tng cho ca sp cun hay ca sp ngn chy.

J10068 12 Aug 2015


SN R05

27

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 2 PIPEWORKS, VALVES AND FITTINGS


PHN 2 H THNG NG, VAN V CHI TIT NI

2.1

Unions, Joints Flanges and Fittings


Khp ni, mt bch ni v chi tit ni

2.1.1

General
Quy nh chung
(a)

In all pipe systems, long radius bends and pitcher tees shall be used wherever possible.
All fittings shall be suitable for a working and test pressure not lower than the specified for
the pipework system concerned elsewhere in this Specification.
Trong ton b h thng ng, cc khuyu bn knh ln v ni ch T dc s c dung khi c
th. Ton b cc chi tit ni phi phu hp iu kin lm vic v p sut th nghim khng
c nh hn so vi quy nh cho h thng ng c lin quan n cc phn khc trong
thuyt minh k thut ny.

(b)

2.1.2

Reduction in bore of pipe shall be generally made eccentric for horizontal pipes (to prevent
air locking) and concentric taper fittings shall be fitted for vertical pipes unless specifically
required to achieve the required space and invert levels.
Vic gim kch thc ca ng, ni chung lm lch tm cc ng nm ngang (ngn nga
ng kh) v chi tit ni hinh cn ng tm s c p dung cho cc ng thng ng tr
phi c quy nh c bit p ng v khong khng v cc cao y theo yu cu.

Galvanized Steel Pipes to B.S. 1387 with uPVC Lined


ng thp trng km theo BS 1387 c lp lt bng uPVC
(a)

Screw joints shall be used except for connection to cast iron pipes where joints shall be
made by molten lead joints. All fittings shall be beaded with built-in plastic core.
Mi ni ren s c dung, ngoi tr u ni vi ng gang ni m im lin kt s c
lm bng chi nung chy nhit cao. Ton b chi tit ni s c lin kt vi li nha
bn trong.

(b)

No welded joint shall be allowed.


Khng c php dung lin kt hn.

(c)

Union Joints shall be used for joints subject to disconnection for future maintenance at a
maximum distance of 6m and at connection to equipment. Galvanized malleable iron
bronze to iron spherical seat unions with jointing material to BS 5292 : 1976 shall be used.
Khp ni mng-xng c lp t cho cc ch ni cn phi tho khi bo dng sau ny
vi khong cch di ti a 6m v cc ch ni vi thit b. ng thp do cho khp ni
cu vi vt liu ni ng theo BS 5292 : 1976.

(d)

No yarn shall be permitted in any joint, plastic plumber's PTFE tapes shall be used
throughout the installation.
Khng c php dung si kim loi cho bt k khp ni no, phi dung bng cht do
PTFE cho mi ch lin kt.

J10068 12 Aug 2015


SN R05

28

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.2

Class of pipework
Phn loi ng ng

2.2.1

Main Cold Water Pipes (from city)


ng nc lnh chnh ( cp t thnh ph)

2.2.2

Cold water pipe of size up to 100 mm (4 inches) in diameter and smaller shall be galvanized
steel pipes, medium weight, conforming to BS 1387.
ng st trng km, hng trung, t chun BS 1387 s c p dung cho ng ng nc
lnh c ng knh danh nh bng hoc b hn 100mm (4 inch)

Cold water pipes of size greater than 100 mm (4 inches) in diameter shall be ERW
galvanized steel pipes, conforming to ASTM A-53, grade A, schedule 40.
ng st trng km, t chun ASTM A-53, hng A, cp 40 s c p dung cho ng ng
nc lnh c ng knh danh nh ln hn 100mm (4 inch).

Fittings for galvanized steel pipes of size 25 mm (1 inch) in diameter and smaller
shall be galvanized malleable cast-iron, conforming to ASTM A 120-73 with screw joints.
Phu kin st m km loi ren , t chun ASTM A 120-73 s c p dung cho ng ng
nc lnh c ng knh danh nh bng hoc b hn 25mm (1 inch)

Fittings for galvanized steel pipes of size greater than 25 mm (1 inch) in diameter
shall be galvanised grooved-end fittings, conforming to ASTM F 1548.
Phu kin st m km, khp ni victaulic, t chun ASTM F 1548 s c p dung cho
ng ng nc lnh c ng knh danh nh ln hn 25mm (1 inch).

Cold Water Pipes


ng nc lnh

Cold water standpipe and main pipes of nominal size greater than 32mm in diameter shall be
polypropylene Copolymer Random pipes, conforming to ISO 15874 DIN 8077, DIN 16962,
SDR 7.4 suitable for potable water supply, 40oC maximum working temperature.
ng PP-R, t chun ISO 15874, DIN 8077, 8078, cp SDR 7.4, nhit lm vic ti a
40oC s c s dung cho ng dn nc lnh trong truc chnh k thut v cc ng cp
nc chnh c ng knh ln hn 32mm.
Cold water branch pipes of nominal size 32mm in diameter and smaller shall be PeroxideCrosslinked Polyethylen (PE-Xa), conforming to ISO 15875, BS 7291, DIN 16892/93 and
AS/NZS 2492 suitable for potable water supply.
ng nhnh cp nc c ng knh nh hn hoc bng 32mm, s l ng PE-Xa, t chun
ISO 15875, BS 7291, DIN 16892/93 v AS/NZS 2492 thch hp cho ng cp nc sch.
Fittings for polypropylene shall be conforming to DIN 16962 with weld joints.
Phu kin PP-R t chun DIN 16962 c yu cu v kt ni ng bng phng php hn
c p dung.
The connection between the PPR pipes and PPR fittings shall be permanent fusion
connection and without using O-ring. The connections shall be designed for normal operating
pressure of 1000kPa/ 10 bars at a temperature of 60oC.
Mi ni gia ng PPR v phu kin PPR s l mi ni hn nhit v khng s dung vng m.
Mi ni s c thit k chu c p sut vn hnh 1000kPa/ 10 bar nhit 60 oC.

J10068 12 Aug 2015


SN R05

29

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.2.3

Connections to other materials shall be available in form of threaded and union adaptors.
Adaptors joining PPR pipes and PE-Xa pipes shall be available and shall be made from PPR
and Dezincification Resistance Brass (DZR Brass).
Mi ni vi cc vt liu khc s l loi u ni ren. u ni ng PPR v ng PE-Xa s c
lm t vt liu PPR v ng thau DZR.

PE-Xa pipe fittings: Brass fittings that are in contact with potable water shall be of
Dezincification Resistant (DZR) Brass with compliance with BS EN 1982 or BS EN 12163 or
BS EN 12165 or BS EN 12420 Class A and shall be marked with DZR or CR. Nonmetallic fittings that are in contact with water shall comply with SS 375 or BS 6920 and
clause 8 of SS 375: Part 1. All threaded fittings are made from Dezincification Resistant
Brass DZR.
Phu kin cho ng PE-Xa: Phu kin ng thau c tip xc vi nc sch s l loi ng thau
DZR tun theo BS EN 1982 hoc BS EN 12163 hoc BS EN 12165 hoc BS EN 12420
Class A v s c nh du DZR hoc CR. Phu kin phi kim loi c tip xc vi nc
sch s tun theo SS 375 hoc BS 6920 v chng 8 ca SS 375: Phn 1. Tt c phu kin
ren s c lm bng ng thau DZR.

The connections between the PE-Xa pipes and DZR brass fitting or Non-metallic fittings
shall be a permanent mechanical connection and without using O-ring. The connections
shall be designed for normal operating pressure of 1000 kPa / 10 bars at a temperature of
70C.
Mi ni gia ng PE-Xa v phu kin ng thau DZR hoc cc phu kin phi kim loi khc s
l mi ni c kh c nh v khng s dung vng m. Cc mi ni c thit k hot
ng p sut 1000kPa/10bar 70oC.

The polypropylene pipes which penetrate through the fire rated walls shall be
equipped with approved fire stop pipe collars on both sides of the wall.
ng PP-R khi lp t xuyn tng ngn chy phi trang b vnh ngn la c 2 bn tng.

Underground water supply pipes shall be polypropylene Copolymer Random pipes,


conforming to ISO 15874 DIN 8077, DIN 16962, SDR 7.4 suitable for potable water supply,
40oC maximum working temperature.
ng PP-R, t chun ISO 15874, DIN 8077, 8078, cp SDR 7.4, nhit lm vic ti a
40oC s c s dung cho ng dn nc lnh chn ngm.

Hot Water Pipes


ng nc nng

All hot water pipes of nominal size 32mm in diameter and smaller shall be PeroxideCrosslinked Polyethylen (PE-Xa), conforming to ISO 15875, BS 7291, DIN 16892/93 and
AS/NZS 2492 suitable for potable hot water supply with maximum operating temperature
90oC..
ng cp nc nng c ng knh nh hn hoc bng 32mm, s l ng PE-Xa, t chun
ISO 15875, BS 7291, DIN 16892/93 v AS/NZS 2492 thch hp cho ng cp nc nng vi
nhit ti a ln n 90oC.
PE-Xa pipe fittings: Brass fittings that are in contact with potable water shall be of
Dezincification Resistant (DZR) Brass with compliance with BS EN 1982 or BS EN 12163 or
BS EN 12165 or BS EN 12420 Class A and shall be marked with DZR or CR. Nonmetallic fittings that are in contact with water shall comply with SS 375 or BS 6920 and

J10068 12 Aug 2015


SN R05

30

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

clause 8 of SS 375: Part 1. All threaded fittings are made from Dezincification Resistant
Brass DZR.
Phu kin cho ng PE-Xa: Phu kin ng thau c tip xc vi nc sch s l loi ng thau
DZR tun theo BS EN 1982 hoc BS EN 12163 hoc BS EN 12165 hoc BS EN 12420
Class A v s c nh du DZR hoc CR. Phu kin phi kim loi c tip xc vi nc
sch s tun theo SS 375 hoc BS 6920 v chng 8 ca SS 375: Phn 1. Tt c phu kin
ren s c lm bng ng thau DZR.

2.2.4

The connections between the PE-Xa pipes and DZR brass fitting or Non-metallic fittings
shall be a permanent mechanical connection and without using O-ring. The connections
shall be designed for normal operating pressure of 1000 kPa / 10 bars at a temperature of
70C.
Mi ni gia ng PE-Xa v phu kin ng thau DZR hoc cc phu kin phi kim loi khc s
l mi ni c kh c nh v khng s dung vng m. Cc mi ni c thit k hot
ng p sut 1000kPa/10bar 70oC.

Soil, Waste, Drain, Storm and Vent Pipe


ng thot phn, nc thi, nc ma v ng thng hi

Soil, waste, drain branch pipes within floor including horizontal drainage pipe in toilets shall
be acoustic mineral-reinforced polypropylene pipe (PP), conforming to EN 1451, ISO
7671, DIN 8078, DIN 4109.
ng nha cch m PP tha tiu chun EN 1451, ISO 7671, DIN 8078 c dung cho ng
nhnh thot phn, nc thi, nc ma bao gm tt c ng thot ngang trong khu vc nh
v sinh..

Above ground soil, waste, drain stacks shall be uPVC pipe, conforming to ISO
4422:1990 PN16.
ng uPVC tha tiu chun ISO 4422:1990 PN16 c dung cho ng ng thot phn, nc
thi, nc ma.

Vent pipes shall be uPVC, conforming to ISO 4422:1990 PN6.


ng nha uPVC tha tiu chun ISO 4422:1990 PN6 c dung cho ng thng hi.

The PP soil, waste, drain pipes and fittings shall be joined by means of spigot and socket.
The seals shall be made of Styrene butadiene rubber (SBR) in accordance with DIN 4060
and EN 681-1 and with hardness of 605 Shore A
ng ng v phu kin ng PP thot phn, nc thi, nc ma s c u ni bng u
ni spigot v socket. Giong lm t cao su Styrene Butadiene (SBR) theo tiu chun DIN
4060 v EN 681-1 v c cng 605 ct A

Fittings for use with PVC shall be injection molded suitable for PVC pipe of the type and
material corresponding to the application and to the material of the pipe.
Phu kin PVC phi l loi c sn phu hp vi ng dung cng nh vt liu ng.

The threaded end of PVC fittings shall be jointed with PTFE (teflon) tape only.
Cao su non c s dung cho kt ni ren ca phu kin PVC.

PVC socket unions shall incorporate rubber "O" ring seals.


Khp ni sng phi c vng m kn nc O khi kt ni.

Fittings for polyvinyl chloride pipes shall be rigid, unplasticized polyvinyl chloride
(PVC) as designated in ASTM D 2241, ASTM D 1785, schedule 40 with solvent cement

J10068 12 Aug 2015


SN R05

31

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.2.5

joint. Before applying the solvent cement to the pipes and fittings that PVC pipes and
fittings joint surfaces shall be cleaned thoroughly with "cleaning solution for PVC pipe and
fitting".
Phu kin PVC c dung phi tha tiu chun ASTM D 2241, ASTM D1785, cp 40, mi ni
bng keo dn chuyn dung. Trc khi dn keo cho ng v phu kin, thi b mt ng v phu
kin phi c lm sch.
The PVC pipes which penetrate through the fire rated walls shall be equipped with approved
fire stop pipe collars on both sides of the wall.
Khi lp t ng PVC xuyn tng ngn chy thi phi lp t vng chng chy c 2 bn
tng.
Underground soil, waste and vent pipe should be uPVC PN12.5 conforming to ISO4422
ng nc thi i ngm, ng thng hi chn ngm s l ng uPVC PN12.5 tun theo ISO
4422

Swimming Pool Pipes (PVC)


ng dn nc cho h bi

2.2.6

All swimming pool pipes shall be polypropylene Copolymer Random pipes, conforming to
ISO 15874 DIN 8077, DIN 16962, SDR 7.4 suitable for potable water supply, 40oC maximum
working temperature.
ng PP-R, t chun ISO 15874, DIN 8077, 8078, cp SDR 7.4, nhit lm vic ti a
40oC s c s dung cho ng dn nc h bi, tha tiu chun ASTM D1785-06 cp 40

Fittings for polypropylene shall be conforming to DIN 16962 with weld joints.
Phu kin PP-R t chun DIN 16962 c yu cu v kt ni ng bng phng php hn
c p dung.

Cleansing water, watering plant and make-up water


ng ra, ti cy v cp cho gii nhit
(a) Incoming and supply pipe
ng dn nc v cp nc
Pipe of nominal size 25 mm in diameter and smaller shall be polypropylene copolymer
random 80 (PP-R 80) pipes, conforming to DIN 8077, 8078, SDR 6 suitable for potable
water supply, 40 oC maximum working temperature.
ng knh ng nc danh ngha DN25mm v nh hn s dung ng polypropylene
copolymer mc 80 (PP-R 80), theo DIN 8077, 8078, SDR 6 phu hp cho ng cp nc
sch, nhit lm vic ti a 40 oC.
Pipe of nominal size greater than 25 mm in diameter shall be polypropylene copolymer
random 80 (PP-R 80) pipes, conforming to DIN 8077, 8078, SDR 11 suitable for potable
water supply, 40 oC maximum working temperature.
ng knh ng nc danh ngha ln hn DN25mm s dung ng polypropylene
copolymer mc 80 (PP-R 80), theo DIN 8077, 8078, SDR 6 phu hp cho ng cp nc
sch, nhit lm vic ti a 40 oC.
Fittings for polypropylene copolymer random 80 (PP-R 80) shall be made of polypropylene
Random 80 (PP-R 80) and conforming to DIN 16962 with weld joints.

J10068 12 Aug 2015


SN R05

32

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Polypropylene Random 80 (PP-R 80) pipe submitted for the approval shall have a nominal
diameter of no smaller than the pipe diameter indicated on the drawings. Every outside
diameter indicated on the submitted document shall be converted to a nominal diameter
prier to the submission.
Phu kin cho ng polypropylene copolymer mc 80 (PP-R 80) v theo DIN 16962 vi mi
ni hn.
ng Polypropylene mc 80 (PP-R 80) c ph duyt l loi c ng knh danh nh
khng nh hn ng knh c ph duyt trn bn v. Cc ng knh ngoi c ch
nh trn h s ph duyt phi c quy i sang ng knh danh nh khi ph duyt.

2.2.7

Other piping system


Cc h thng ng ng khc
(a) Water tank drains and overflows
ng thot v x trn cho b nc
For 65mm dia. and below:
uPVC to conforming to ISO 4422:1990 PN10.
Vi ng Dn65 v nh hn: uPVC theo ISO 4422:1990 PN10
For 80mm dia. and above:uPVC conforming to ISO 4422:1990 PN 10 with flange joints
Vi DN80 v ln hn:uPVC the ISO 4422:1990 PN 10 ni bch .
(b) Tail pipes from flush cisterns to water closets, urinal inlet
ng phu t bn x git nc n bn cu, chu tiu nam
Acoustic PP pipework to EN 1451, ISO 7671, DIN 8078, DIN 4109
ng thot cch m PP theo tiu chun EN 1451, ISO 7671, DIN 8078, DIN 4109.

2.3

Pipe sleeves
ng lng

2.1.1

The SN-Contractor is to provide all pipe sleeves where piping passing through walls, floors and
roofs. The sleeves shall be set, keyed and fixed by this FS-Contractor unless otherwise specified.
Nh thu cung cp ton b ng lng ch sn ni ng ng xuyn tng, xuyn sn v xuyn
mi. Cc ng lng ch sn c lp t, kha v c nh tuy theo nh thu h phng chy ngoi
tr c ch nh khc.

2.1.2

Pipe sleeves shall be mild steel to BS 1387 (BS EN10255: 2004) medium grade (Class B). For
casing into heavy structure, they shall be mild steel to BS 1387 (BS EN10255: 2004) heavy grade
(Class C).
ng lng ch sn dung thp non theo BS 1387 (BS EN10255: 2004) mc trung binh (cp B).
i vi kt cu nng, s dung thp non theo BS 1387 (BS EN10255: 2004) mc cao nht (cp
C)

J10068 12 Aug 2015


SN R05

33

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.3.1

The space between pipe sleeves and the pipe or insulation shall be completely backfilled with
materials having the same fire resistant rating as the walls and floors by the Contractor. Should
multi-services or more than one single pipe be laid through box-out, the space between the
individual pipe sleeves shall be sealed off by the Main Contractor. The space between the pipe
sleeves and the service pipes shall be back-filled by the Contractor.
Khong cch gia ng lng v ng dn hoc lp cch ly phi c lp kn hon ton bng vt liu
c mc chng chy nh vi tng v sn c thc hin bi Nh thu. Khi c nhiu hng muc
hoc nhiu hn mt ng n t xuyn qua hp, khong cch gia cc ng lng ring l phi
c lm kht kn bi Nh thu chnh. Khong cch gia ng lng v cc hng muc ng khc phi
c lp kn bi Nh thu.

2.3.2

Sleeves shall be of sufficient size to allow free movement of pipes and furthermore where pipes
are insulated the sleeves shall be oversized to allow the insulation to be carried through the
sleeves. The Contractor's attention is drawn to the vertical pipe ducts at all floor levels. Where
pipes pass through floors, sleeves shall be provided.
ng bc ngoi phi c kch thc m bo ng dn dch chuyn c d dng, v hn na
trng hp nhng ng dn c cch ly, ng bc ngoi phi c kch c to hn m bo lp
cch ly c th c xuyn qua mt trong ca ng bc ngoi. Nh thu phi ch n cc ng
dn thng ng ti tt c cc sn. Ti nhng ni ng dn i xuyn qua sn phi c ng bc
ngoi.

2.3.3

Details of pipes through walls and floors shall be approval by the Clients representative before
installation.
Chi tit cc ng dn i xuyn qua tng v sn phi c s ng ca i din Ch u t
trc khi lp t.

2.3.4

The Contractor shall supply sleeves to the Main Contractor for setting in walls, floors, etc., and in
the shuttering before concrete is poured.
Nh thu phi cung cp cc ng bc ngoi cho Nh thu chnh lp t trong tng, sn.v.v. v
trong vn khun trc khi b tng.

2.3.5

Detail of the holes which are to be formed in beams shall be provided by the Contractor sufficiently
early to meet the master programme of work.
Chi tit cc l c t sn trong dm phi c cung cp sm bi Nh thu p ng tin
ca cng vic thi cng.

2.3.6

Where pipes pass through flat roofs covered with roofing material :
Ti nhng ch ng dn i xuyn qua sn mi c bao ph bi vt liu mi:
a)

Cast or build in galvanized mild steel sleeve with 2 to 12mm clearance projecting
150mm above roof finish.
khun hoc xy trong ng bc ngoi thp mm m km vi khong h t 2
n 12mm nh ra 150mm pha trn lp hon thin mi.

b)

Caulk space and point both ends with approved sealant.


Bt trm cc khong trng v lp y c hai u bng cht bt kn c ph
duyt.

c)

Cover tops of sleeves with lead collars as per roofing Specification.


Bao ph mt trn ca ng lng bng vng ai chi theo Tiu ch k thut v chng
thm.

J10068 12 Aug 2015


SN R05

34

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.3.7

All pipes passing through wall tiling shall be provided with chromium plated wall flanges plugged
and screwed.
Ton b ng dn xuyn qua gch p tng phi c b tr vi cc mt bch tng m crom
c bt kn li v c bt inh c.

2.4

Installation of pipework
Lp t ng dn

2.4.1

All pipework shall be free from burrs, rust and scale and shall be thoroughly cleaned before
erection. Open ends during the progress of work shall be blanked-off with purpose-made metal or
plastic caps and the use of wooden plugs is forbidden. Should any stoppage in the circulation
occur after the various systems have been put into operation, owing to non-compliance with this
requirement, the Contractor shall rectify the matter at no extra cost to the Sub-Contract.
Tt c cc ng dn phi khng c g sc, g hoc vy st, v phi c lm sach hon ton trc
khi lp t. Cc u h cui trong qu trinh thi cng phi c bt kn bng cc np nha hoc
kim loi chuyn dung. Khng c php s dung cc cht bng g. Nu c bt c s tc nghn
no trong qu trinh vn hnh xy ra sau khi cc h thng khc i vo hot ng, do khng tun
theo quy nh ny, Nh thu phi sa cha m khng c ly thm chi ph.

2.4.2

Pipes shall be installed with correct falls for venting and draining and attention shall be paid to
neatness of installation, i.e. groups of pipes shall be accurately spaced and valves, joints, etc.,
symmetrically arranged. Where two or more pipes are visible and change direction together
bends shall be struck from a common radius point. Adequate clearances shall be maintained in all
cases, to allow for the application of the insulation materials and finishing.
Cc ng dn phi c lp t ng hng dc c th thng hi v thot nc, v phi ch
lp t gn gng, ngha l cc nhm ng phi c t chnh xc, cc van, khp ni .v.v. phi
c sp xp i xng. Khi c hai ng ng hoc nhiu hn c th thy c v i hng ti
cung khuyu un thi phi c c cung mt im bn knh. Trong trng hp ny phi duy tri
khong trng , m bo cho vic thi cng lp vt liu cch ly v cng tc hon thin.

2.4.3

2.4.4

The Contractor shall note the restricted space available in certain service ducts and the absolute
necessary to ensure that all pipework is installed in the correct sequence, manner and position to
ensure that operation of all valves and maintenance is possible.
Nh thu phi ch cc khong khng c gii hn sn c trong cc ng dn ca h thng k
thut cu th, v cn thit m bo rng tt c cc ng dn c lp t theo ng trinh t, cch
thc v v tr chc chn rng hot ng ca tt c cc van v cng vic bo dng c th thc
hin c.
All reductions in pipe sizes shall be made using approved standard reducing fittings. Reducing
bushes shall not be used without approval. Connections between lengths of pipes shall be made
using standard fittings. Longthreads must not be used.
Ton b cng tc gim kch thc ng ng phi c thc hin bng cch s dung tiu chun
v gim phu kin ng c ph duyt. Cc ng lt gim kch thc khng c php s dung
khi cha c ph duyt. Cc on ni gia cc ng phi dung cc chi tit ni tiu chun. Cc
on ren di khng c s dung.

2.4.5

Vent pipes shall be constructed in such a way that no water trap will be formed in the entire pipe
run.
Cc ng thng hi phi c thi cng sao cho khng c by nc no c hinh thnh trn ton
b tuyn ng.

J10068 12 Aug 2015


SN R05

35

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.4.6

All pipework in pump rooms, plant rooms, and on roof level shall be installed with flanges or
unions at intervals not exceeding 6m for ease of dismantling.
Ton b ng dn trong cc trm bm, phng k thut, v trn mi phi c lp t ni mt
bch hoc ni mng-xng cc khong khng vt qu 6 mt d dng tho d.

2.4.7

Changes in direction of pipes shall be made with long radius bends or elbows, as far as
practicable. Under no circumstances shall pipes be bent without the use of fittings.
Cc ch thay i hng ng phi c bn knh im un hoc khuyu ni ln, cng xa cng d thc
hin. Khng c trng hp no ng dn c un cong m khng s dung cc khp ni.

2.4.8

All pipe runs when not installed underground or in duct shall be concealed as far as possible by
careful positioning or shall be chased into walls, laid in screed etc, or as directed by the Clients
representative.
Ton b ng ng, khi khng c lp t ngm hoc chy trong ng dn phi c che khut
cng nhiu cng tt, bng cch nh v tr cn thn hoc chn vo trong tng, t trong cc lp
va .v.v. hoc theo ch dn ca i din Ch u t.

2.4.9

All pipework within the fire protected areas must be enclosed to satisfy the F.S.D. requirements
and such enclosures shall be supplied and installed by the Main Contractor.
Ton b h thng ng ng khu vc chng chy phi c lp v bc m bo yu cu ca
C quan Phng chy cha chy v cc lp v bc phi c cung cp v lp t bi Nh thu
chnh.

2.4.10 Where pipes and rainwater outlets pass through roof slabs, the Main Contractor shall leave
suitable openings during casting. The Contractor shall install the pipe, rainwater outlets, etc.,
taking into account the water proofing installation method as detailed by the Clients
representative.
Ti v tr im x ca ng dn v thot nc ma chy xuyn qua sn mi, Nh thu chnh phi
cha cc l trng thch hp trong khi b tng. Nh thu phi lp t ng ng, im x
nc ma.v.v. c tnh n phng php chng thm c trinh by chi tit bi i din Ch
u t.
2.4.11 Floor drains shall be installed in the same manner as rain water outlets. Openings will be formed
in the slabs. Detailed dimensions and locations shall be supplied by the Contractor.
ng dn thot nc sn phi c lp t theo cung cch nh cc im x thot nc ma. Cc
l trng c cha sn cc bn sn. Cc kch thc v v tr chi tit c cung cp bi Nh
thu.
2.4.12 The Contractor shall locate all valves, traps, cleaning eyes, and similar items where they are
easily accessible for operation, inspection, and maintenance.
Nh thu phi b tr tt c cc van, xi phng, im kim tra v cc hng muc tng t ti v tr
d dng tip cn cho vn hnh, kim tra hay bo dng.

2.5

Pipe supports
Gi ng

J10068 12 Aug 2015


SN R05

36

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.5.1

All pipework fittings, valves, connections, etc. shall be efficiently supported and bracketed. All
pipework shall be supported at intervals not greater than the following on straight runs; and
additional supports shall be provided at bends, valves, etc.:
Tt c cc phu tung, van, u ni h thng ng ng .v.v. phi c g v gi mt cch hiu
qu. Ton b ng dn phi c g trong cc on khng ln hn tr s c nu bng sau,
trn mt dng chy thng; v cc im phu phi c b tr ti cc im un, van .v.v :

J10068 12 Aug 2015


SN R05

37

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Galvanized Steel, Ductile Iron, Cast Iron & Copper


Thp trng km, thp do, gang v ng
Nominal Bore of Pipe in (mm)
Kch thc ng ng danh
nh (mm)
15
22
28
35
42
54
67
76
108
130
160
200
2.5.2

Intervals in Meters
Khong cch (o bng mt)
Vertical Pipes
ng ng

Horizontal Pipes
ng ngang

2.2
2.4
2.7
2.7
3.0
3.3
3.6
3.6
4.0
4.2
4.5
4.8

1.8
2.2
2.4
2.4
2.7
3.0
3.3
3.3
3.6
4.0
4.2
4.5

All supports for ductile iron, cast iron, galvanized steel and PVC pipes inside building envelop shall
be of hot dipped galvanized steel with plastic ring. Supports for copper pipes shall be brass rod
with split type brass pipe rings (Details shall be submitted to the Clients representative for
approval). Supports for all pipework at external walls shall be of stainless steel pipe brackets.
Ton b gi cho ng thp do, gang, thp m km v ng PVC nm bn trong ta nh phi
lm bng thp m km nhng nng vi cc vng ai bng nha. Gi cho ng ng phi l
thanh ng vi cc vng ai ng bng ng cn rnh (Chi tit phi c np i din Ch
u t thng qua). H thng cho ng dn tng pha ngoi phi l cc gi ng bng thp
khng g.

2.5.3

All pipes supports shall be of such design and type to allow for the removal of any pipe section
without the necessary of disconnecting other adjacent pipes.
Ton b cc h thng cho ng dn u phi c thit k v loi m bo cho vic thay th
bt c on ng no m khng cn thit phi tho d cc on ng bn cnh.

2.5.4

Where Pipes Rings are used, they shall be split pattern with top and bottom bolts, and with the top
ears carried clear of the insulation. For horizontal pipes, the ring boss, where rocking movement of
the pipe ring is expected, shall have spherical seating washers.
Khi cc vng ai ca ng dn c s dung, cc vng ai phi l loi cn rnh c cc bu lng
nh & y, v vi cc im nh khng c bc cch ly. i vi cc ng nm ngang, phn g
ai ng, ni cc on ng c th dch chuyn, phi c cc vng m hinh cu.

2.5.5

In all plant and pump rooms discharge pipework from pumps, and all pipework where vibration
could be transmitted to the building structure, shall be supported with brackets having a tough
rubber lining in contact between the bracket and the pipe or shall have specially designed antivibration hangers/ supports.
Ti tt c cc trm bm v phng k thut, ng dn thot nc t my bm, v ti ton b nhng
ng dn m rung ng c th truyn sang cng trinh, cn phi c bng cc gi c lp lt
bng cao su bn v tr gia gi v ng dn, hoc phi c h thng /mc treo c thit k
c bit chng rung.

J10068 12 Aug 2015


SN R05

38

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.5.6

The Contractor shall be responsible for building-in of all supports, etc., required for the work.
Tenderers shall allow for using "Philips Redhead Bolt Fixings" or equal and approved. For
concrete and cutting away and building in of brackets in brickwork, etc., as required. Tenderers
shall particularly note that it may not be possible to fix the bolts directly above pipes and cantilever
or sling type supports shall be used where required.
Nh thu phi c trch nhim trong vic lp t cc h thng gi .v.v. cn thit cho cng trinh.
Nh thu c php s dung phng php gia c bu-lng Philips Redhead hoc tng ng
v c thng qua. Thc hin cng tc b tng & ct b v c nh cc gi ti tng gch,
vv khi c yu cu. Nh thu phi ch rng khng c c nh bu lng trc tip ngay trn
ng ng v loi gi cngxn hoc dy neo c th s dung nu c yu cu.

2.5.7

U.P.V.C. pipework shall be adequately supported such that no deflection of pipe occurs and
supports shall be provided at all joints.
ng dn bng U.P.V.C phi g mt cch phu hp m bo ng khng b chuyn dch v
cc gi cn phi c b tr tt c cc khp ni.

2.5.8

Special attention shall be paid to that adequate pipe anchors shall be provided at the ends or
turning points of U.P.V.C. pipes to prevent fracture of the pipe resulted from water hammer. Such
anchor points shall be fixed in a manner that the inertia in the flow will be directly transmitted onto
the anchors thus releasing the U.P.V.C. pipes from being under stress.
Lu c bit rng cc neo thch hp ca ng dn cn c b tr ti cc im chuyn hng
ca ng U.P.V.C phng trnh cc ng b gy do hin tng ba nc. Cc im neo c c
nh theo cch sao cho qun tnh ca dng chy c truyn trc tip vo neo, khng ng
U.P.V.C chu p lc.

J10068 12 Aug 2015


SN R05

39

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.6

Brackets, Supports and Hangers Material


B , gi v vt liu treo

2.6.1

All supports for ductile iron, cast iron and galvanised steel pipes shall be as follows:
Ton b h thng gi cho ng dn s bng thp mm, gang, thp trng km nh sau:
Location

Brackets, Supports and Hangers

V tr

B , gi v gi treo

External locations
Cc v tr bn ngoi

Stainless steel 316 brackets and supports with


stainless steel bolt and nut fixing on Hot dip
galvanized steel hanger to BS 729
B bng thp khng g 316 v gi vi bu
lng v ai c bng thp khng r gn trn gi
treo thp m km nhng nng theo BS 729

Internal not air-conditioned locations


such as public areas, plant rooms,
covered carparks, refuse rooms, pipe
ducts, false ceiling void, etc
Nhng v tr bn trong khng c iu
ha khng kh nh cc khu vc cng
cng, phng my, bi u xe c mi
che, phng rc, ng ng dn,
khong trng trn trn gi, v.v.

Stainless steel 316 brackets and supports with


stainless steel bolt and nut fixing on Hop dip
galvanized steel hanger to BS 729
Gi bng thp khng g 316 v h thng
vi bu lng v ai c bng thp khng r gn trn
gi treo thp m km nhng nng theo BS 729

Internal and air-conditioned locations


Nhng v tr bn trong c iu ha
khng kh

Stainless steel 316 brackets and supports with


stainless steel bolt and nut fixing on Hop dip
galvanized steel hanger to BS 729
Gi bng thp khng g 316 v h thng
vi bu lng v ai c bng thp khng r gn trn
gi treo thp m km nhng nng theo BS 729

2.6.2

All bolts and nuts shall be the same material as the brackets, support and hangers.
Tt c bu lng v ai c s cung mt loi vt liu vi b , gi v gi treo.

2.6.3

Underground piping shall be supported on concrete bedding provided by the Main Contractor and
the P&D Contractor shall provide pipe guides to the details approved by the Architect.
ng ng ngm di t s c g trn tm b tng cung cp bi nh thu chnh v Nh
thu Cp thot nc s cung cp ch dn ng ng theo cc chi tit c ph duyt bi Kin
trc s.

2.6.4

All non-ferrous piping and fittings shall have approved non-conductive isolation at all ferrous
supports.
Tt c cc ng ng v phu kin phi kim loi c duyt l loi cch in ti tt c cc h thng
kim loi.

J10068 12 Aug 2015


SN R05

40

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.7

Anchors
Thit b neo ng

2.7.1

All pipes shall be anchored as required to control the movement of pipes due to thermal changes.
Generally anchors shall also be fitted at the lower end of vertical pipes. Details of all anchor
points shall be submitted to the Clients representative for approval.
Ton b cc ng phi c neo khi c yu cu kim sot c dch chuyn ca ng do
s thay i nhit . Cc chi tit neo ni chung phi c lp vo im cui pha thp ca ng
ng. Chi tit ca ton b im neo phi c np i din Ch u t thng qua.

2.7.2

The anchors shall securely hold the pipe in a rigid position to resist the attempted movement due
to expansion and the weight of pipe and contents.
Thit b neo phi gi chc chn cc ng dn ti mt v tr c nh chng li cc chuyn v do
gin n v do trng lng ca ng dn v loi nc trong ng.
The Contractor shall submit full details to the Clients representative of all expansion and anchor
joints proposed for use throughout the building prior to installation.
Trc khi tin hnh lp t, Nh thu phi np chi tit ton b khp ni co gin v cc im neo
d kin s dung trong c cng trinh cho i din Ch u t.

2.8

Pipe movement & expansion joints


S dch chuyn ng v cc khp ni co gin

2.8.1

Wherever possible, advantage shall be taken of changes in direction of pipes to take up expansion
and contraction due to temperature changes of the pipe contents.
Ti nhng ch c th, phi tn dung s thay i v hng ca ng kt hp gin n v sut ln
ng do s thay i nhit ca ng.

2.8.2

Expansion joints and movement joints shall be provided in pipes which cross the building
expansion joints shall also be provided elsewhere to absorb the effect of expansion on pipes
whether shown on the Drawings or not.
Cc khp ni co gin v khp ni chuyn v phi c b tr trong cc ng i xuyn qua khp ni
gin n cng trinh, v cng c b tr ti ni tip nhn tc ng s co gin ca ng dn cho
du c hay khng c th hin bn v.

2.8.3

Where expansion joints are required, they shall be bellows type. Bellows shall be stainless steel
with stainless steel inner and outer telescopic sleeves. The joints shall be suitable for a test
pressure as specified for the pipes. Each joint shall be suitable for a traverse movement of not
less than 25mm and if necessary a joint of larger diameter than the pipe shall be installed with
reducing fittings to obtain the allowable required pipe movement.
Ti nhng ni cn t khp ni co gin, cc khp ny phi l loi ng xp. ng xp phi l loi
thp khng g vi thp khng g lp trong v lp bc ngoi kiu lng xp. Khp ni ny phi chu
c p sut kim tra nh c quy nh cho ng ng. Mi khp ni phi chu c mt
dch chuyn ngang khng nh hn 25mm v nu cn thit, mt khp ni c ng knh ln hn
ng knh ng dn phi c lp t vi on ni c gim kch thc c th chu c
dch chuyn ngang cn thit cho php.

2.8.4

Where movement points occur, couplings shall be used so that building movement does not cause
fracture or stress in the pipework.
Ti nhng im xy ra dch chuyn, phi b tr mc ni m bo rng dch chuyn ngang ca
cng trinh khng gy t gy hoc to ng sut trong h thng ng dn.

J10068 12 Aug 2015


SN R05

41

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.8.5

Upon sizing and fixing expansion joints on pipes crossing the building expansion joints, the
Contractor shall take into account, in addition to the expansion/contraction of pipes due to
temperature changes, the effect of relative horizontal movement of the building structure. Pipe
guides shall be fitted on each side of each joint to keep the joint and pipe in true alignment
according to manufacturer's instruction.
Khi xc nh kch thc v c nh cc khp ni co gin trn ng dn bng ngang mi ni gin n
ca cng trinh, Nh thu phi k n, ngoi s gin n hoc sut ln ca ng dn do tc dung ca
s thay i nhit , cn c tc ng do dch chuyn ngang tng i ca kt cu cng trinh. ng
dn hng phi c b tr ti mi bn ca khp ni gi cho khp ni v ng dn nm thng
hng theo hng dn ca Nh sn sut.

2.8.6

Generally expansion bellows shall be installed mid way on each water riser. Details and location
of expansion joints shall be submitted to the Clients representative for approval. A piping
expansion joint shall be provided for hot water pipework having a straight run of 30m.
Ni chung, cc ng xp gin n phi c lp t ti im gia ca mi hp k thut ca h
nc. Chi tit v v tr ca khp ni co gin phi c np i din Ch u t thng qua. Mt
khp ni co gin phi c b tr cho ng dn nc nng c chiu di chy thng khong 30 mt.

2.9

Guides
Thit b chuyn hng

2.9.1

Axial Movement Pattern


Kiu di chuyn hng tm
(a)

Guides shall be of mild steel riders welded to the pipes on roller or P.T.F.E. sliding supports
restrained with U-bolts on brackets or as otherwise detailed on the Drawings.
Thit b chuyn hng l cc np thp mm c hn vi cc ng trn truc ln hoc b
trt P.T.F.E c c nh bi cc bulng hnh ch U trn gi hoc c m t chi tit
trn bn v.

(b)

The pipework shall be guided along its length and the guides shall be capable of
withstanding not less than 15% of the maximum stresses created within the pipework
system and have an adequate safety margin.
H thng ng s c dn hng dc theo chiu di v cc thit b chuyn hng s c
kh nng chu p lc ti a trong h thng khng qu 15% v c ngng an ton thch hp.

(c)

Guides shall be adjustable in both directions in the lateral plane, so that pipework can be
accurately aligned with the expansion joint.
Thit b chuyn hng c th hiu chnh c 2 hng trong mt phng ngang h thng
ng c th sp thng hng mt cch chnh xc bng mi ni gin n.

(d)

Each guide shall not be less than 2 pipe diameters long and shall have a minimum
manufacturing clearance of the pipe diameter.
Chiu di mi thit b chuyn hng khng ngn hn 2 ln ng knh ng v s c mt
khe h ch to ti thiu ca ng knh ng.

J10068 12 Aug 2015


SN R05

42

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

(e)

The distance from the expansion joint to the first guide must not be greater than 4 pipe
diameters, and the distance between the first guide and the second guide must not be more
than 14 pipe diameters. Guides thereafter should be spaced in accordance with normal
pressure performance requirements as a minimum standard.
Khong cch t mi ni gin n n thit b chuyn hng u tin khng c ngn hn 4
ln ng knh ng, v khong cch gia thit b chuyn hng u tin n thit b th 2
khng c di hn 14 ln ng knh ng. Do , cc thit b chuyn hng nn c t
cch nhau theo cc yu cu p lc thng thng nh l mt tiu chun ti thiu.

2.9.2

Angular or Lateral Movement Pattern


Kiu di chuyn gc hoc ngang
Directional guiding shall apply, such as side plates, local to the expansion joint, the remainder of
the pipework should be supported in the nominal way, by roller or frictional supports, or pipework
hangers.
Thit b chuyn hng c s dung, chng hn nh mt bch cnh, im gin n cuc b, phn
cn li ca h ng ng nn c cp trn danh ngha, bi con ln hoc gi ma st, hoc
gi treo ng ng.

2.10

Fire Collars
Vng (m)chng chy
All uPVC drain pipes passing through floor slabs or walls separating fire compartments shall be
equipped with Fire Services Department approved fire collars to maintain the compartmentation.
Tt c cc ng thot nc uPVC i qua cc sn hoc cc tng ngn chy c lp t cc vng
(m) chng chy theo ph duyt ca S cu ho thun tin cho vic bo tri.

2.11

Isolating Valves and Cocks


Van cch ly v vi kha

2.11.1 General
Tng qut
The Contractor shall supply and install all isolating valves and control valves as indicated on the
drawings and as required for the proper and efficient operation and maintenance of the entire
systems and as may be required by the Water Authority.
Nh thu s cung cp v lp t ton b cc van cch ly v van kim sot nh c ch nh
bn v v yu cu v qu trinh vn hnh & bo dng ton b h thng c hiu qu v ng
cch theo yu cu ca C quan c thm quyn.
All valves supplied shall be suitable for the working pressure and test pressure of the system as
specified elsewhere in this Specification.
Tt c cc van phi phu hp vi p sut lm vic v p sut th nghim ca h thng nh quy
nh trong cc phn khc ca Tiu ch k thut ny.
All valves other than automatic control valves shall be full line size.
Tt c cc van khc vi loi van iu chnh t ng u phi c kch thc hon thin y .

J10068 12 Aug 2015


SN R05

43

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Each valve shall have a purpose made reference number plate or label engraved or stamped
indicating the manufacturer's catalogue number, pressure and temperature ratings. Valves shall
be arranged so that clockwise rotation of the spindle will close the valve. Dymo labels are not
acceptable.
Mi loi van s c tm nh s ch muc ch s dung hoc nhn mc c khc hoc tem ch r
loi s mt hng ca Nh sn xut, trong c ghi ch s nhit v p sut. Van c b tr sao
cho chiu quay ca truc s ng van theo chiu kim ng h. Cc nhn Dymo khng c chp
nhn.
All valves and accessory material necessary in the piping shall be furnished, whether or not shown
on drawings as follows.
Tt c vt liu ca van v phu tung cn thit trn ng ng phi c cung cp cho du c hay
khng c ch dn bn v.
All valves shall be packed with an approved packing and threads shall be coated with oil and
graphite. Packing should be replaced when found deteriorated on site.
Tt c cc van c ng gi v cc u ren c bc bng du v than chi. Phi thay th vt
liu ng gi nu pht hin thy b h hng cng trng.
Where possible all valves shall be located at convenient positions or operation from the floor with
valve stems upright.
Nu c th, tt c cc van c t v tr thun tin hoc c th thao tc t sn vi thanh iu
chnh van v tr thng ng.
The standard of valves and cocks shall comply with the current Waterworks Regulations and the
following requirements.
Tiu chun ca van v vi kha s tun theo cc quy nh ca cng tc cp nc hin hnh v
cc yu cu nh kem.
Stainless steel 316 positioner shall be provided to indicate the open/close status of each valve on
the incoming mains to water tanks. Isolating valves shall be provided to isolate the incoming
mains, water tank outlets, pumps, main distribution pipes.
nh v bng thp khng r 316 ch tinh trng ng/ m ca mi van trn ng ng dn chnh
a nc ti b cha. Van cch ly s c lp ngn cch ng ng dn chnh, cc hng ra
ca b nc, my bm, cc ng phn phi chnh.
2.11.2 Isolating Valves
Van cch ly
All isolating valves shall be suitable for the pressure ratings specified elsewhere in the
Specification.
Ton b cc van cch ly s phu hp vi ch s p sut c quy nh trong cc phn khc ca
Quy cch k thut ny.
(a)

Fresh Water System


H thng nc sch
i.

J10068 12 Aug 2015


SN R05

Up to and Including 50 mm Bore:


L van c ng knh t 50mm tr xung

44

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Full way gate vale of bronze body construction, to BS 5154 wedge and valve seat
shall be in bronze, non-rising spindle and screw collar in high tensile bronze.
Valves shall have screwed female ends for taper treads to BS 21.
Van cng a chiu c thn van bng ng, theo BS 5154 hinh nm v mt van
lm bng ng, truc van khng vng v vng lin kt vt bng ng c cng
cao. Cc van c u kha ren trong cho cc mt hinh cn theo BS21.
Above 50 mm Bore:
L van c ng knh trn 50mm
Full way gate valve of bronze body construction to BS 5154, bolted bonnet, wedge
and valve seat in bronze, non-rising spindle and screw collar in high tensile bronze.
Valves shall have Flanged connection to BS 4504.
Van cng a chiu c thn van bng ng theo BS 5154, c np y c lin kt
bng bu lng, hinh nm v mt van lm bng ng, truc van khng vng v vng
lin kt vt bng ng c cng cao. Cc van c lin kt mt bch theo BS
4504.
ii.

Thermostatic mixer with chromium plated finish provide water controlled


temperature 30C - 50C with a locked control for ablutionary purposes as
indicated on the drawings. Mixers are virtually instantaneous shut-off in event of
cold water failure.
Vi ho trn nc nng lnh tnh nhit, vi lp hon thin crm, s cung cp nc
c kim sot nhit 30C - 50C c vi kha cho muc ch ra tay nh
c ch nh bn v. Vi pha trn s tt ngay lp tc nu khng c nc lnh.
Standard connections are hot water entry on the left, cold right, bottom outlet,
when facing the mixer (All inlet and outlet sizes shall refer to the drawings
indicated). Construction of mixer shall be approved by the Water Authority.
Khi ng i mt vi thit b ho trn, tiu chun lp t phi l nc nng bn
tri v nc lnh bn phi, hng thot y (ton b kch thc hng thot v
hng cp s tham kho bn v c ch r). Cu to ca vi ho trn s do c
quan chc nng v nc thng qua.

(b)

Flush Water System and Drainage System


H thng thot nc x v h thng thot nc
Up to and Including 50 mm Bore:
L van c ng knh t 50mm tr xung:
PVC diaphragm valves to BS 5156 with reinforced spindle, rising steam. Ends of the
valves shall be suitable for flanged connection to PVC pipe flanges.
Van mng ngn PVC theo BS 5156 vi truc quay c gia cng, tng kh nng bay hi.
u cui van phi c ch to phu hp lin kt mt bch vi cc mt bch ca ng
PVC.
Above 50 mm Bore:
Van c ng knh l khoan ln hn 50mm:
Full way gate valves of cast iron construction to BS 5150, bolted bonnet, cast iron wedge
and stainless steel valve seat face ring, high tensile stainless steel spindle of non-rising
stem design with flanged ends connections to BS 4504.

J10068 12 Aug 2015


SN R05

45

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Van cng a chiu lm bng gang theo BS 5150, c np y lin kt bng bu lng, nm
lm bng gang v vng van lm bng thp khng g. Truc quay l thp khng g c
cng chu ko cao, c thit k mi khng nng ln v c lin kt hai u mt bch
theo BS 4504.
2.11.3 Stop Cocks/Valves
u kho / Van kho
Stop valves/cocks to B.S 1010 shall be installed as shown on the drawings to isolate single
fittings or groups of fittings. Stop cock in the flush water system shall be in PVC and suitable for
use with sea water. Samples shall be submitted for approval before ordering.
Vi kha nc/ Van theo BS 1010 phi c lp t theo hng dn nh trong bn v cch ly
khp ni n hoc l nhm ca chi tit ni. Vi kha nc trong h thng nc x phi l loi
PVC c kh nng s dung trong iu kin nc bin. Cc vt mu phi c np v c s ph
chun trc khi c dung.
2.11.4 Regulating Valves
Van iu chnh
Regulating valves shall be installed as shown on the drawings. Regulating valves in fresh water
systems shall have gunmetal body to BS 5154 with screwed female connections for sizes up to
50 mm bore and flanged connections for valves above this size.
Van iu chnh phi c lp t theo ch dn nh trong bn v. Van iu chnh trong h thng
nc sch c thn kim loi theo BS 5154 vi on ni c ren trong lp inh vt cho c l khoan
nh hn 50mm v cc lin kt mt bch i vi l khoan trn cng l kch thc ny.
Regulating valves in the flush water system shall be similar materials as the cast iron gate .
Valves shall have parabolic shaped discs to give a "straight line" characteristic of water flow to
spindle lift. All valves shall be lockshield type.
Van iu chnh trong h thng nc x phi lm t vt liu tng t nh van cng bng gang.
Van phi c dng a parabn to c tnh dng thng ca dng nc ti truc nng. Ton b
cc van phi l loi c tm chn kha.
2.11.5 Bib Taps for Cleansing Purpose
Vi nc cho muc ch lau ra.
Bib taps shall be provided for cleaning purpose. The bib taps shall comprise a vacuum breaker
and suitable for use with rubber hoses with female threaded connection and stainless steel
lockable box. The taps shall be chrome plated brass as the Smith model 4709 or equal and
approved. Pad lock with two sets of key shall be provided.
Vi nc c cung cp cho muc ch lau ra. Loi vi ny bao gm mt kha chn khng v
phu hp s dung vi ng cao su, c on ni bng ren trong v hp c th kha lm bng
thp khng g. Vi phi c lm bng ng thau m crm nh mu Smith 4709 hoc mu khc
tng t c thng qua. Kha mc phi c cung cp hai b chia.

2.12

Pressure Gauges
p k

2.12.1 Pressure gauges shall conform to BSEN 837 and UL listed with test certificate.
p k theo BSEN 837 v danh muc UL vi giy chng nhn th nghim.

J10068 12 Aug 2015


SN R05

46

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.12.2 Pressure gauges shall have brass cases with dials not less than 100mm diameter.
p k c v bng ng vi ng knh mt p k khng nh hn 100mm.
2.12.3 Gauges shall be calibrated in kPa to a maximum of not less than 1-1/3 times and not more than 2
times the operating pressure. Divisions of scale shall not exceed 20kPa for a maximum scale
value of 1000kPa, 50kPa for a maximum scale value of 1600kPa and 100kPa for maximum values
in excess of 1600kPa. An isolating valve/cock shall be provided for each pressure gauge.
p k c hiu chnh bng kPa ti a khng t hn 1-1/3 ln v khng qu 2 ln p lc vn
hnh. Phn chia t l khng qu 20kPa cho mt gi tr t l ti a 1000kPa, 50kPa cho mt gi tr t
l ti a 1600kPa v 100kPa cho cc gi tr t l ti a khng qu 1600kPa. Mt van kho / vi
kho s c cung cp cho mi my o p sut.

2.13

Pipeline Strainers
B lc ng ng

2.13.1 Water strainers shall be installed at all pumps suctions, and as indicated on the Drawings.
B lc nc s c lp t ti tt c cc my bm ht v nh c ch r trn bn v.
2.13.2 For pipelines of nominal bores between 15mm and 50mm diameter inclusive, strainers shall be
screwed gunmetal or bronze body Y type with brass or stainless steel screen of 2mm diameter
staining holes.
i vi ng c ng knh ngoi trong khong 15mm v 50mm, b lc phi phi l loi hp kim
gn ren c hoc thn bng ng loi "Y" vi mng chn bng ng hoc thp khng g c cc l
ng knh 2mm.
2.13.3 For pipelines of nominal bores between 65mm and 80mm diameter inclusive, strainers shall be
flanged to with Y type cast iron body, brass or stainless steel screen of 2mm diameter staining
holes.
i vi ng c ng knh ngoi trong khong 65mm n 80mm, b lc l loi mt bch loi "Y"
thn bng gang c, mng chn bng ng hoc thp khng g c cc l ng knh 2mm.
2.13.4 For pipelines of nominal bores of 100mm diameter or above, strainers shall be flanged to with
single basket type cast iron or steel body, stainless steel basket with total open area at least 5
times strainer inlet pipe area.
i vi ng c ng knh ngoi 100mm hoc hn, b lc l loi mt bch vi gi n, thn
bng gang hoc thp, gi bng thp khng g vi tng s l m t nht 5 ln so vi ng knh
ng i vo.
2.13.5 Y type strainers shall be installed with blow-off connection and single basket type shall be
installed with drain plugs.
B lc loi "Y" s c lp t bng loi lin kt x v loi gi n kem nt x s c lp t.
2.13.6 Strainers shall be suitable for maximum system operating pressure.
B lc phi phu hp vi p lc vn hnh h thng ti a.

2.14

Flexible Pump Connectors


Cc im u ni mm vi my bm

J10068 12 Aug 2015


SN R05

47

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.14.1 Flexible connectors shall be of Grade 316 stainless steel for flush water, Grade 316 stainless steel
for fresh water and twin-sphene connector with reinforcing synthetic fibre for submersible pumps.
Details shall be submitted to the Clients representative at the time of tender.
Cc on ni mm phi l loi thp khng g mc 316 khi dung cho h thng x & cp nc sch
v cc on ni kp c gia cng bng si tng hp dung cho cc my bm chim. Chi tit v sn
phm phi c trinh cho i din ch u t vo thi im u thu.
2.14.2 Pressure rating of the flexible connectors shall be the same as the system pipework unless
otherwise noted on the drawings.
p sut ca cc on ni mm phi ging nh trong cc ng ng ca h thng, tr phi c cc
ghi ch khc c nu ra trong bn v.
2.14.3 Flexible connectors shall be installed at where shown on drawings and at all pump suctions and
discharges.
Cc on ni mm phi c lp t ti ng v tr c ch ra trn bn v v ti tt c cc im
b tr bm ht v bm x.
2.14.4 All connectors shall have flanged connection to BS 4504 and suitable for connecting to the
appropriate pipework and equipment.
Tt c cc on ni phi c lin kt mt bch theo BS 4504 v thch hp cho vic lin kt vi cc
ng dn v thit b tng ng.

2.15

Cleansing and Watering Taps


Vi nc

2.15.1 All cleansing and watering taps with lockable box shall be supplied and fixed by the P&D
Contractor.
Tt c cc vi nc c hp kha c s c cung cp v lp t bi cc nh thu Cp thot
nc.
2.15.2 The taps shall be hose end valve type and/or key locked type for cleansing.
Cc vi nc phi l loi van cui ng v / hoc loi c kha lm sch.
2.15.3 The lockable box may not be required subject to the license plumber's submission of the type of
tap for Water Authority approval.
Cc hp c th hp kha khng yu cu theo ph duyt ca K s nc v loi vi nc cho C
quan c thm quyn ph duyt.
2.15.4 All lockable boxes shall be of stainless steel made and submitted by Architects approval.
Tt c cc hp c th kha l loi thp khng g v trinh cho Kin trc s ph duyt

2.16

Traps
By nc

2.16.1 Traps shall be provided where shown on the Drawings or where required for all fitting, and shall be
suitable in all respects for their particular duties.
By nc s c cung cp nh th hin trn bn v hoc nhng ch yu cu lp t, v s
phu hp cho nhng nhim vu ring ca chng mi kha cnh.

J10068 12 Aug 2015


SN R05

48

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.16.2 All traps shall be provided with an approved accessible cleaning aperture, and shall have a clear
internal cross section similar to the corresponding soil or waste branch pipe section.
Tt c cc by nc s c cung cp vi mt khong h d tip cn lm sch, v c mt ct
trong tng ng vi mt ct ca ng nhnh nc thi en v thi xm.
2.16.3 Traps sizes shall be as follows unless otherwise specified:
Kch thc by nc theo nh di y tr khi c quy nh khc:
(a)

32mm diameter outlets for wash basins shall be of anti-syphonage type with 80mm deep
seal;
ng knh ng ra 32mm cho chu ra tay l loi by nc vi m kn su 80mm;

(a)

40mm diameter outlets for bathtubs, shower trays, and sinks shall be of anti-syphonage type
with 80mm deep seal;
ng knh ng ra 40mm cho bn tm, khay tm ng, v chu ra l loi by nc vi
m kn su 80mm;

(b)

40mm diameter outlets for urinals shall be of anti-syphonage P-traps with 80mm deep seal;
ng knh ng ra 40mm cho chu tiu nam l by nc loi by nc ch P vi m kn
su 80mm;

(c)

50mm diameter outlets for floor drains inside communal toilets shall be of cast brass antisyphonage type with 80mm deep seal;
ng knh ng ra 50mm cho thot sn bn trong toilet cng cng l loi by nc ng
thau vi m kn su 80mm;

(d)

100mm diameter outlets for floor drains in mechanical rooms shall be cast iron antisyphonage traps with 80mm deep seal;
ng knh ng ra 100mm cho thot sn ti phng C kh l loi by nc ng thau vi
m kn su 80mm;

(e)

50mm diameter outlets for floor drains installation shall be installed outside of bath rooms,
shall be plastic anti-syphonage P-traps for bath rooms and kitchens, and casted brass antisyphonage P-traps for floor drains installation below floor slab. Both shall be installed 80mm
deep seal;
ng knh ng ra 50mm cho thot sn c lp bn ngoi phng tm, l loi by nc
dng ch P bng nha dnh cho thot sn phng tm v nh bp, v by nc loi ch P
bng ng thau cho thot sn c lp bn di dm sn. C hai loi trn c lp vi
m kn su 80mm;

(f)

100mm diameter outlets for floor drains in carpark floors shall be cast iron anti-syphonage
traps with 80mm deep seal.
ng knh ng ra 100mm cho thot sn ti sn xe l loi by nc bng gang vi m
kn su 80mm;

2.16.4 All traps shall be provided with cleaning eye for both sides.
Tt c by nc phi c lp im lm sch c 2 mt.

J10068 12 Aug 2015


SN R05

49

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.16.5 Gully traps shall be set to levels such that sufficient depth is given to the extension piece where
back or side inlets are shown or required.
By nc cho mng phi t cao su ni di ng ti ni ng vo bn hng hoc pha
sau nh c ch r.

2.17

Rainwater outlets
Ming thu nc ma

2.17.1 All rainwater outlets as shown on the Drawings shall be supplied and installed by the Contractor.
Cc ming thu nc ma c cung cp v lp t bi Nh thu nh th hin trn bn v.
2.17.2 Details of rainwater outlets shall be submitted to the Architect for approval prior to ordering.
Chi tit ming thu nc ma c duyt bi Kin trc s trc khi t hng.
2.17.3 Rainwater outlet on all roofs shall be domed type or vertical type with removable grating as shown
on the Drawings.
Ming thu nc ma trn cc mi s l loi hinh vm vi li st c th tho lp nh th hin trn
bn v.
2.17.4 Rainwater outlets on podium deck shall be of 'Wade' dome grating or approved equivalent to avoid
clogging and stainless steel flat grating shall be installed to avoid obstruction to pedestrian.
Ming thu nc ma trn sn khi phi c li st hinh vm 'Wade hoc tng ng
c duyt trnh tc nghn v li phng bng thp khng g c lp t trnh gy cn
tr ngi i b.
2.17.5 Cast iron components shall have bitumen coating as specified herein for cast iron pipework.
Cu kin bng gang phi c lp ph bi-tum nh c quy nh cho phn cng tc ng gang.
2.17.6 Rainwater outlets shall be set in position by the P&D Contractor. The P&D Contractor shall
provide the necessary detailed drawings and check that the locations are correct. The Contractor
must ensure that the works are co-ordinated with the floor tile alignment and pattern.
u thu nc c lp t ng v tr bi nh thu Cp thot nc. Nh thu Cp thot nc c
trch nhim cung cp cc bn v chi tit cn thit v kim tra xem cc v tr c chnh xc khng.
Nh thu phi m bo rng cc cng tc lp t c phi hp vi gch lt sn .
2.17.7 Cast iron antisyphone traps shall be provide except rainwater outlet on roofs.
Cc by nc bng gang c s c cung cp tr ming thu nc ma trn cc mi nh.
2.17.8 Positions of the dome grating shall be take care to be located for avoiding ponding and obstruction
to pedestrian.
V tr cc li vm phi c cn nhc khi lp t trnh to vng v cn tr ngi i b.

2.18

Floor Drains
Phu thu sn

2.18.1 All floor drains with grating as shown on the Drawings shall be supplied and installed by the
Contractor.
Tt c cc phu thu sn c li nh th hin trn bn v phi c cung cp v lp t bi nh
thu.

J10068 12 Aug 2015


SN R05

50

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.18.2 Details of floor drains shall be submitted to the Architect for approval prior to ordering.
Chi tit phu thu sn s c trinh cho Kin trc s duyt trc khi t hng.
2.18.3 All floor drains inside toilets, kitchens, bathrooms, changing rooms and etc. shall have minimum
3mm thickness stainless steel gratings and hoppers to match the floor finishes. Fixing screws shall
be stainless steel flat head counter sunk type.
Cc phu thu sn trong nh v sinh, bp, phng tm, phng thay , v.v. c li thp khng g
vi dy ti thiu 3mm v cc phu phu hp vi lp hon thim sn. c vt l loi u phng
chm bng thp khng g.
2.18.4 Floor drains for mechanical rooms shall have cast iron grating fitted with chrome plated brass flat
head counter sunk screw.
Phu thu sn cho cc phng c kh c li bng gang gn bng vt chim bng ng u m crm.
2.18.5 Floor drains shall be set in positions by the P&D Contractor. The P&D Contractor shall seal the
clearance between the floor drains and the floor slabs after installation. The Contractor shall
ensure that the works are co-ordinated with the floor tile alignment and pattern and levelling.
Phu thu sn s c t ng v tr bi nh thu Cp thot nc. Nh thu Cp thot nc trm
cc khe h gia phu thu sn v cc tm sn sau khi lp t. Nh thu phi m bo rng cc
cng vic phi c phi hp vi cng tc b tr gch lt sn v b mt hon thin.

2.19

Termination of Soil/Waste Vents


Cc u cui ng hi nc thi en/ xm

2.19.1 All soil/waste vent pipes shall be terminated above roof level as shown on the Drawings.
Tt c ng thng hi nc thi en/ xm phi c thng hi xuyn tng mi nh c ch r trn
bn v.
2.19.2 A weathering "slate/apron" to the approval of the Architect shall be fitted with an upstand of
150mm minimum.
Np chup chu c thi tit theo ph duyt ca Kin trc s s c lp hng ln ti thiu
150mm.
2.19.3 Strong stainless steel balloon gratings of the requisite diameter shall be provided at the top of
each of the cast iron or, galvanized steel vent stacks and vertical rain water proof drain outlet.
ng knh ca cu thng hi c li chn bng thp khng g c lp pha trn mi ng thng
hi truc ng bng gang hoc thp trng km v truc ng thot nc ma.
2.19.4 Polyvinyl Chloride (PVC) Vent Cowls of the requisite diameter shall be provided at the top of each
of the polyvinyl chloride (PVC) vents stacks.
Cu thng hi Polyvinyl Chloride (PVC) c ng knh theo yu cu s c lp pha trn mi
ng thng hi truc ng bng PVC.

2.20

Fresh air Inlets


Ming cp gi ti
All fresh air inlets to the terminal manholes shall be of cast iron body with mice flap ventilator.
Cc ming cp gi ti cho cc h ga cui l loi thn gang c ca thng hi v np chng chut.

J10068 12 Aug 2015


SN R05

51

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.21

Clean Outs
Thng tc

2.21.1 The Contractor shall provide where shown on the Drawings and as required, floor and wall clean
outs with cover plates in finished areas.
Nh thu s cung cp thng tc sn v tng c tm che nhng khu vc hon thin theo nh
yu cu trn bn v.
2.21.2 All clean outs shall be easily accessible and shall be leak proof.
Tt c thng sn l loi d tho lp v khng r r nc.

2.22

Draw-off Taps
Vi ly nc

2.22.1 Draw-off taps shall be to BS 1010 Part 2.


Vi ly nc tun theo BS 1010 Phn 2.
2.22.2 Taps shall be constructed in forged brass for use in potable water supply system and zinc free
bronze for use in flushing water supply system for sea water corrosion resisting.
Vi nc ren bng ng s dung cho h thng cp nc sinh hot v bng km khng c
ng s dung cho h thng nc x ni b nc bin n mn.
2.22.3 Taps shall be of heavy pattern bib or pillar taps or screw-down or non-concussive spring type
appropriate to the duty required.
Vi nc l loi vi c tay cm bng vt liu nng hoc vi dng m hoc dng vi vn xung
hoc loi l xo khng dn nhit phu hp vi yu cu.
2.22.4 Chromium plated shall be provided with capstan head marked 'HOT' or 'COLD' or with coloured
index for 'HOT' or 'COLD' to the approval of the Architect.
Units shall be capable of withstanding a working pressure of at least 10 bar.
Lp m crom cho cc u c nh du NNG hoc LNH hoc vi mu sc ch nh cho
NNG hoc LNH theo s ph duyt ca Kin trc s.
Cc thnh phn phi c kh nng chu c p sut lm vic t nht 10 bar.

2.23

Water Hammer Arrestors


Ba hm nc (chng va)

2.23.1 Water hammer arresters shall be installed in the pump discharge pipe constructed entirely of noncorrosive stainless steel or copper for use in fresh water supply system, Grade 316 stainless steel
for use in flushing water supply system.
Ba hm nc phi c lp t ti cc ng ng x ca my bm v phi c ch to hon
ton bng thp hoc ng chng n mn, khng g s dung trong h thng cung cp nc
sch; thp khng g mc 316 s dung trong h thng cung cp nc x.
2.23.2 All parts of the fitting shall be of stainless steel construction and suitable for use with sea water.
Ton b cc b phn ca phu kin phi lm bng thp khng g v thch hp s dung trong
mi trng nc bin.

J10068 12 Aug 2015


SN R05

52

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.24

Manholes, Sump Pump Chambers, Petrol Interceptors, Grease Traps and Road Gully
Pits
H ga, H bm, B tch du, b tch m v H thu nc mng

2.24.1 The reinforced concrete structure of the manholes, sump pump chambers, petrol interceptors,
grease traps, and road gully pit, pipe haunch and bedding and cast-in of associated pipe fittings
shall be supplied by the Main Contractor including cover and frames, cat ladder, cast iron step and
other accessories unless otherwise specified. The P&D Contractor shall responsible to co-ordinate
with the Main Contractor to verify correctness for his installation purposes, as necessary, and shall
assist in the supervision of their construction, in order to ensure their suitability and proper
functioning.
Kt cu b tng ct thp ca cc h ga, h bm, b tch du, b tch m v h thu nc mng,
vm cng v nn c trong cc phu kin ng ng c cung cp bi nh thu chnh bao gm
tm che v khung, thang, bc di chuyn bng gang v cc phu kin khc tr khi c quy nh khc.
Nh thu Cp thot nc c trch nhim phi hp vi nh thu chnh xc minh chnh xc cho
cho muc ch lp t ca minh nu cn thit, v h tr trong vic gim st phn thi cng ca h,
bo m phu hp v chc nng chun xc.
2.24.2 The P&D Contractor shall be responsible to supply and install all connection pipeworks, sump
pipes, level switches, controls, wiring/conduits, valves and fittings inside the manholes, sump
pump chambers, petrol interceptors, grease traps and road gully pits.
Nh thu Cp thot nc c trch nhim cung cp v lp t cng tc ni ng, ng h chim, thit
b bo mc, iu khin, dy/ ng i dy, van v ni ng ti bn trong cc h ga, h bm, b tch
du, b tch m v h thu nc mng.

2.25

Puddle Flanges
Mt bch ngn m

2.25.1 Puddle flanged connectors shall be provided for all pipework penetrating through water tanks.
Cc lin kt mt bch ngn m s c cung cp cho h thng ng ng i qua b nc.
2.25.2 Puddle flanged connectors for fresh water system shall be gunmetal for size below and including
50mm dia. and of ductile iron for sizes of 65mm dia. and above. Puddle flanged connector for
flushing water system shall be stainless steel grade 316 for sizes below and including 50mm dia.
and of ductile iron for sizes of 65mm dia. and above.
Cc kt ni mt bch ngn m cho h thng nc sch l hp kim i vi kch thc ng knh
nh hn v bng 50mm, v l st d un i vi cc kch thc ng knh ln hn v bng
65mm. Kt ni mt bch ngn m cho h thng x nc l loi thp khng g 316 i vi cc kch
thc ng knh nh hn v bng 50mm, v l st d un cho cc kch thc ng knh ln
hn v bng 65mm.

2.26

Pressure Reducing Valves


Van gim p

2.26.1 Pressure reducing valves shall be of the direct acting type capable of pressure reduction
adjustment to provide suitable pressure at each draw-off point.
Van gim p l loi hot ng trc tip c kh nng iu chnh gim p sut to p ph hp
mi im ly nc.
2.26.2 The selected valves shall be dead-tight shut-off under 'no-flow' condition.
Van c chn l loi ng kn khng thm nc trong iu kin khng c dng chy.

J10068 12 Aug 2015


SN R05

53

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

2.26.3 Pressure reducing valves shall be constructed of materials similar to that of gate valves for various
systems. All parts of the valves shall be suitable for sea water application. Connection ends shall
be similar to that of gate valves.
Van gim p phi lm t vt liu tng t nh van cng cc h thng khc. Cc thnh phn ca
van phi ph hp vi ng dung trong nc bin. Cc im ni cui phi tng t nh van cng.
2.26.4 All pressure reducing valves shall be selected in strict accordance with the manufacturer
recommendations. Under no circumstances should the reduction of pressure diminish the
required flow at down streams of the pressure reducing valves.
Tt c van gim p phi c chn mt cch nghim ngt theo yu cu ca nh sn xut. Trong
bt k hon cnh no vic gim p sut lm gim lu lng yu cu ti im cui dng ca van
gim p.
2.26.5 Bucket type strainer should be provided at the upstream of pressure reducing valve set.
B lc loi cnh c cung cp ti im u dng ca b van gim p.
2.26.6 Pressure gauges with stop valves should be provided at both upstream and downstream of PRV
set.
ng h p sut c van chn phi c cung cp ti im u v im cui dng ca b van
gim p.
2.26.7 A pressure vessel worked as water hammer arrestor is required at the downstream side.
Mt bnh p sut lm vic ging nh ba hm nc c yu cu t ti pha cui dng.
2.26.8 A high pressure sensor shall be installed at the down stream of each pressure reducing valve.
Mt cm bin p sut c lp t ti cui dng ca mi van gim p.
In the event that the down stream pressure exceeds 5% of working pressure, the high pressure
sensor shall actuate an signal or alarm in the Central Building Monitoring Console installed inside
the Building Management Plant Room of building.
Trong trng hp p sut ti cui dng vt qu 5% so vi p sut lm vic, cm bin p sut
cao s kch hot mt tn hiu hoc bo ng gi n Bng iu khin trung tm ca to nh c
lp bn trong Phng ca qun l to nh.

2.27

Ultra-Violet Purifier
Thit b lc tia cc tm

2.27.1 The housing of UV sterilizer shall be of stainless steel type 316.


V thit b lc UV lm bng thp ko r loi 316
2.27.2 Minimum UV intensity shall be 30,000 microwatt seconds per square centimeter.
Cng ti thiu l 30 000 microwatt s/cm2
2.27.3 The unit shall complete with ultraviolet monitor, solenoid valve, alarm and flow control valve.
Thit b phi ng b vi mn hinh, van in t, van iu khin dng v van bo.

J10068 12 Aug 2015


SN R05

54

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 3 UNDERGROUND DRAINAGE AND WATER MAINS


PHN 3 NG THOT NC NGM V NG NC CHINH
3.1

General
Tng quan

3.1.1

All products/materials shall comply with the regulations and requirements of the Building Authority
and the Water Authority.
Tt c sn phm/vt liu phi tun theo nguyn tc v cc yu cu ca c quan qun l nh v
c quan qun l nc.

3.1.2

The pipes and fittings shall be inspected before fixing and rejected any which are defective.
ng v phu kin phi c kim tra trc khi lp t v loi b nhng khim khuyt.

3.1.3

Jointing rings, coupling and adapters:- types recommended by manufacturer of pipes being
jointed. Rubber jointing rings shall be stored in their delivery bags and shall be not exposed to
sunlight.
ai ni, khp ni v ng ni: loi c nh sn xut khuyn co cho ng ni. ai cao su c
bo qun trong cc ti giao hng v trnh b phi nng.

3.1.4

Pipes shall be stacked on level surface and not allowed to rest pipes on their sockets or jointing
fairings. Securely chock end pipes in bottom row to prevent collapse of stack. The pipes shall be
handled and stored to manufacturer's recommendations.
ng ng s c b trn b mt cao v khng cho php c ng d trn hay lp bc mi
ni. Gi u ng mt cch chc chn theo chiu di y ngn chn sut ln ng ng. ng s
c bo qun v lu tr theo ch dn ca nh sn xut.

3.1.5

The pipes shall be made good damage to coatings or recoat as recommended by pipe
manufacturer.
ng phi c bc hay sn ph theo khuyn co ca nh sn xut.

3.1.6

The current Government's standard and requirement for the underground drainage and water
mains installation shall fully comply with.
Vic lp t cho ng thot nc ngm v ng nc chnh phi tun theo tiu chun hin hnh
ca chnh ph v yu cu khc.

3.2

Terminal Fittings and Components for Underground Drainage


Phu kin v cc thnh phn cho ng thot nc ngm

3.2.1

Manholes constructed by Builder with reinforced concrete of design mix grade 25D/20 with cast
iron cover of appropriate type. For manhole exceeding 900mm in depth, provide 'U' shaped step
irons to the internal side wall of manhole at 300mm centres.
H ga c nh thu xy dng thc hin bng b tng ct thp vi dc thit k 25D/20 cung
np y bng gang vi hinh dng tng ng. i vi su qu 900mm, lp t thang leo bn trong
bng thp hinh ch U vi cc bc cch nhau 300mm.

J10068 12 Aug 2015


SN R05

55

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

3.2.2

Manhole dimensions shall be as follows:


Kch thc h ga nh bn di
Depth-Ground Level to Invert
su-Cao trinh mt t n y

Up to 1500
Ln ti 1500

1500 to 3000
1500 n 3000

750

750

1000

1350

750

750

1350

1350

1050

750

1350

1350

1250

750

1350

1350

750

750

1600

1350

750

750

1350

1350

1050

750

1350

1500

3 nhnh
4 Branch
4 nhnh

1350

750

1350

1500

225 Dia. Main Turning

No Branch

900

750

1000

1350

K ng 225

Khng nhnh
1 Branch
1 nhnh
No Branch
Khng nhnh

100 Dia. Main Turning

No Branch

K ng 100

Khng nhnh
1 Branch
1 nhnh
No Branch
Khng nhnh

Ch r

Straight
Thng

1 Branch
1 nhnh
2 Branch
2 nhnh
3 Branch
3 nhnh
4 Branch
4 nhnh
150 Dia. Main Turning

No Branch

K ng 150

Khng nhnh
1 Branch
1 nhnh
No Branch
Khng nhnh

Ch r

Straight
Thng

1 Branch
1 nhnh
2 Branch
2 nhnh
3 Branch

Ch r

Straight
Thng

J10068 12 Aug 2015


SN R05

56

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

No Branch
Khng nhnh
1 Branch
1 nhnh
2 Branch
2 nhnh
3 Branch
3 nhnh
300 375
Dia. Main
K ng
300-375

Turning
Ch r

Straight
Thng

No Branch
Khng nhnh
1 Branch
1 nhnh
No Branch
Khng nhnh
1 Branch
1 nhnh
2 Branch

900

750

1350

1350

1250

750

1350

1500

1500

750

1350

1500

1050

900

1050

1350

1200

750

1350

1350

1050

900

1050

1350

1200

900

1350

1350

2 nhnh
450 750
Dia. Main
K ng
450-750

Turning
Ch r
Straight
Thng

No Branch
Khng nhnh
No Branch
Khng nhnh
1 Branch
1 nhnh

1200

1000

1350

1350

1200

1000

1350

1350

900 1200
Dia. Main

Turning
Ch r

No Branch
Khng nhnh

1800

1800

2000

2000

K ng
Straight
No Branch
900-1200
Thng
Khng nhnh
Note: All dimensions shown are in mm.
Ghi ch: tt c kch thc th hin l mm.

1800

1800

2000

2000

J10068 12 Aug 2015


SN R05

57

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

3.2.3

Construction of suspended road gullies shall be similar to that of manholes.


Thi cng mng ch tng t nh h ga.

3.2.4

Manholes with disconnecting trap shall be constructed in reinforced cement concrete of design
mix grade 25D/20 with disconnecting trap of appropriate size and cast iron manhole cover of
appropriated type as shown on the Drawings.
H ga khng c by nc c lm bng b tng xi mng ct thp vi dc 25D/20 vi kch
thc phu hp v lp np gang hinh dng tng ng nh th hin trong bn v.

3.2.5

Disconnecting traps shall be of cast iron or earthware to match with the drain pipes and set in
concrete surrounding of design mix grade 25D/20 as shown on the Drawings.
By ngt c lm bng gang hoc dy t phu hp vi ng thot nc v b tng xung
quanh vi dc thit k 25D/20 nh th hin trn bn v.

3.2.6

Standard manhole covers and frames shall be of cast iron to BS 497 coated with 2 coats of
bitumastic paint. The sizes and weights shall be 560mm diameter for storm water manhole and
510mm square for sewage and waste manhole. The standard weights shall be 64kg.
Tiu chun khung v np y h ga c lm bng gang theo BS 497 trng 2 lp sn bitumastic.
Kch thc v trng lng s l ng knh 560mm cho h ga nc ma v 510mm vung cho
h ga nc thi. Trng lng tiu chun l 64kg.

3.2.7

Double-seal manhole covers and frames shall be of cast iron to BS EN 124 (BS497) coated with 2
coats of bitumastic paint. The sizes and weights shall be 660mm diameter for storm water
manhole and 610mm square for sewage and waste manhole. The standard weights shall be 68kg
and 113kg for heavy-duty cover.
Np y kp v khung lm t gang theo BS 124 (BS 497) trng 2 lp sn bitumastic. Kch thc
v trng lng s l ng knh 660mm cho h ga nc ma v 610mm vung cho h ga nc
thi. Trng lng tiu chun l 68kg v 113kg cho np ti trng cao

3.2.8

Heavy-duty manhole covers and frames shall be of cast iron to BS EN 124 (BS497) coated with 2
coats of bitumastic paint. The sizes and weights shall be 560mm diameter for storm water
manhole and 510mm square for sewage and waste manhole. The standard weights shall be
102kg.
Np y ti trng cao v khung lm bng gang theo BS EN 124 (BS497) trng 2 lp sn
bitumastic. Kch thc v trng lng s l ng knh 560mm cho h ga nc ma v 510mm
vung cho h ga nc thi. Trng lng tiu chun l 102kg.

3.2.9

Heavy-duty manhole covers and frames shall be used for all carpark levels and external and
internal area subject to vehicular loading.
Np y ti trng cao v khung dung cho bi u xe v nhng khu vc c ti trng t xe c.

3.2.10 Fresh air inlets shall consist of a strong cast iron box approximately 150mm x 100mm with cast
fixing ears and cast brass grilled front screwed on and fitted with mica or aluminium flap fixed at a
minimum height of 2.4M above ground level, unless otherwise specified. Fresh air inlets shall be
connected to the manhole with 100mm diameter cast iron ventilating pipe.
Ca cp gi ti bng gang kch thc 150mm x 100mm vi tai bng gang c v gn vi mica
hoc nhm ti chiu cao ti thiu 2.4m t mt t tr khi c ghi ch khc. Ca ht gi ti c
ni vi h ga bng ng thng hi gang c ng knh 100mm.

J10068 12 Aug 2015


SN R05

58

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

3.2.11 Trapped gullies shall be constructed with concrete of design mix grade 25D/20 with hinged cast
iron grating and salt glazed ware or cast iron trap of appropriate size to match with the drain pipes
and set in concrete surrounding as shown on the Drawings. 75mm x 75mm concrete curbs shall
be provided as receptor as required.
Mng by c lm bng b tng vi dc thit k 25D/20 vi khp ni bng li gang c v
thit b trng men hoc by bng gang kch thc chnh xc khp vi ng thot nc v b
tng xung quanh nh th hin trong bn v. g b tng 75mm x 75mm theo yu cu.
3.2.12 Back inlet trapped gullies shall be constructed similar to trapped gullies but include a square cast
iron or chrome plated brass air-tight cover and a diameter galvanized steel vent pipe as shown on
the detail drawings.
Phu thu ni pha sau c thc hin ging nh mng by nhng bao gm tm gang c hinh
vung hay tm crom v ng thng hi m km nh chi tit th hin trn bn v.
3.2.13 Gully sump with gratings shall be constructed in reinforced concrete of 25D/20 with a square cast
iron or chrome plated brass grating as shown on Drawings.
Rnh thu vi np li lm bng b tng ct thp dc 25D/20 vi nhng tm gang c hinh
vung nh th hin trn bn v.
3.2.14 Cast iron grating channel covers shall be of 13mm thick for light duty and 25mm thick for heavy
duty, or shown on the Drawings.
Np mng li gang dy 13mm cho loi ti trng nh v 25mm cho loi ti trng nng hoc theo
nh th hin trn bn v.
3.2.15 Grease traps by Builder shall be constructed in reinforced cement design mix grade 25D/20 as
shown on the Drawings.
Thit b tch m c nh thu xy dng thi cng, lm bng b tng xi mng vi dc 25D/20
nh th hin trn bn v.
3.2.16 Petrol interceptors by Builder shall be constructed similar to grease traps but with three
compartment chambers.
Thit b tch du c nh thu xy dng thc hin ging nh Thit b tch m nhng vi 3 ngn.

3.3

Workmanship
Cht lng thi cng

3.3.1

Plumbing and drainage works shall generally to BSEN 752 (BS8301) for air test/ smoke test.
Cc cng tc my bm v ng nc ni chung theo BSEN 752 (BS 8301) cho th kh/th khi.

3.3.2

All works shall be carried out by a registered building contractor/licensed plumber and in
accordance with the regulations and requirements of the Building Authority and the Water
Authority.
Tt c cng vic c m nhn bi nh thu c giy php xy dng / th c tay ngh v theo
quy nh & yu cu ca c quan thm quyn xy dng v c quan thm quyn v nc.

3.3.3

Manufacturers recommendation on installation of pipe-work, fittings, components and accessories


shall be strictly followed.
Cc khuyn co ca nh sn xut v lp t ng, phu kin v cc thnh phn phi c theo di
nghim ngt.

J10068 12 Aug 2015


SN R05

59

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

3.3.4

Invert levels and positions of existing drains, sewers, inspection chambers and manholes with
invert levels shown on Drawings shall be checked their correctness before laying new drains.
Cao y v v tr ng thot hin hu, ging thm v h ga vi cao y th hin trn bn v
phi c kim tra trc khi t ng thot mi.

3.3.5

All temporary open ends of pipes shall be sealed to prevent ingress of debris during construction.
Tt c cc l m tm thi ca ng phi c bt kn ngn cc vt ri vo trong qu trinh thi
cng.

3.3.6

Differential settlements shall be obtained approval of and comply with Building Authority's
requirements in respect of arrangement, flexible jointing, bedding and surround of pipes at
junctions with manholes, foundation walls and other points where differential settlement may
occur.
X l s sai khc phi c ph duyt v tun theo cc yu cu ca c quan thm quyn v xy
dng i vi cng tc sp xp, mi ni co gin, gi v ng ni xung quanh h ga, tng mng
v cc v tr khc nhau c th ln.

3.3.7

Arrangements shall be made for the Local Authority to connect new pipework to existing sewers.
Cng tc t chc c lp ra c quan s ti u ni ng ng mi vo h thng hin hu.

3.4

Excavating
o t

3.4.1

Excavation shall not be commenced of any section of work until a full supply of pipes and fittings is
available for that section.
Vic o t khng nn tin hnh n khi cung cp y ng v phu kin cho khu vc .

3.4.2

Formation for beds shall be excavated immediately before laying beds or pipes. Rock projections,
boulders, hard spots and tree roots shall be removed.
o p hinh thnh mt trc khi t gi hoc ng. tng, r cy phi c o i.

3.4.3

Where pipes to be laid on natural bed, it shall replace with backfilling 150mm thick (minimum), well
consolidated. Harden local soft spots shall be by tamping in backfilling.
Nhng v tr ng t trn nn t nhin, phi c lp li ti thiu 150mm, m cht. Nhng khu
t cng hn cng phi c m cht.

3.4.4

Where pipes to be laid on concrete bed, it shall replace with concrete filling. Excess excavation
shall be replaced to below required level or as required. Architect shall be informed to give him
reasonable opportunity to inspect excavated formation for each section of the work.
Nhng ni ng c t trn gi b tng, phi c thay th bng b tng lt. o vt qua cao
cn thit hoc theo yu cu. Kin trc s phi c thng bo kim tra vic o cho tng v
tr cng vic.

3.4.5

Trench width shall be as small as practicable, but not less than external diameter of pipe plus
300mm or larger dimension if specified. Trench sides must be vertical from bottom up to 300mm
above crown of pipe.
Chiu rng rnh cng nh cng tt, nhng khng nh hn ng knh ngoi ca ng cng
300mm hoc ln hn ng knh ch nh. Thnh rnh phi thng ng t y ln n 300mm
trn nh ng.

J10068 12 Aug 2015


SN R05

60

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

3.4.6

Combined trenches shall be provided where one pipe is at a lower level than another adjacent
pipe in a common trench.
Rnh kt hp c lm nhng ni ng giao nhau vi cao trinh khc nhau.

3.4.7

A sub-trench shall be permissible provided the soil of the step is stable and unlikely to break away.
Rnh phu c th dung vung t n nh v khng th ph v.

3.4.8

If a sub-trench is not permissible, the whole trench must have a depth related to the lower pipe,
with increased thickness of bedding to the upper pipe as necessary.
Nu rnh phu khng dung c, ton b mng phi c su thp hn ng lin quan, tng
chiu dy gi cho cc ng cao hn l cn thit.

3.4.9

The lower pipe must be backfilled with thoroughly compacted granular material up to a level not
less than half way up the higher pipe.
Cc ng thp hn phi c lp li vi vt liu ht m cht n cao trinh thp hn mt na ca
ng cao hn.

3.5

Bedding, Laying and Surrounding


Gi , lp m v lp ph

3.5.1

Pipes shall be lay singly, straight to line and true to gradient on a solid and even foundation for the
full length of the barrel with sockets (if any) facing up the gradient.
ng c nm ring l, thng v ng dc trn mt nn chc chn v ngay c i vi ton b
chiu di ca ng vi cc mi ni (nu c) theo dc.

3.5.2

Any obstacles including temporary shuttering, trench sheeting etc. shall be removes sufficiently to
permit compacted filling of all spaces with bedding or surrounding material.
Bt k chng ngi vt no bao gm vn khun tm, tm mng .v.v phi c loi b cho
php m cht tt c khng gian vi gi hay vt liu xung quanh.

3.5.3

Natural beds shall be accurately trimmed to provide uniform and solid bearing for the pipes
through-out the length of the barrels and formed short recesses in bed to clear sockets by 50mm
(minimum).
Cc gi t nhin c ct ng dng chc chn ng i qua v tru nguyn khi cho ng
theo sut chiu di v gi cho cc khp ni cch mi 50mm (ti thiu).

3.5.4

Concrete, clay or cast iron pipes shall be lay on concrete bed as per standard drawings.
ng b tng, t st hay gang nm trn gi b tng theo bn v tiu chun.

3.5.5

Pipes shall be lay with sockets facing up the gradient and uniformly supported for their entire
length.
ng nm cung vi b mt gi ng theo dc v ng dng gi cho ton b chiu di.

3.5.6

Concrete hunching and surrounds shall be placed as per standard drawings.


B tng xung quanh c t theo bn v tiu chun.

3.5.7

Concrete or clay pipes shall be surrounded with concrete where cover is less than 600mm.
Cc ng b tng hay t st c bao bc bng b tng khi ng knh ng nh hn 600mm.

J10068 12 Aug 2015


SN R05

61

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

3.5.8

Pipes under buildings and extending to first manhole outside building shall be cast iron on
concrete bed and hunched.
ng i ngm di sn v ko di n h ga u tin bn ngoi c lm bng gang t trn gi
b tng.

3.5.9

Pipes under roads or other areas carrying vehicular traffic shall be cast iron on concrete bed and
hunched. Where pipe is less than 900mm of cover, concrete surround shall be provided.
ng di mt ng hay nhng ni c xe c qua li lm bng gang t trn gi b tng. Cc ng
c bao bc bng b tng khi ng knh ng nh hn 900mm.

3.5.10 Subsoil Drain Pipes shall be lay strictly to manufacturer's recommendation.


ng thot nc thi c lp t theo khuyn co ca nh sn xut.
3.5.11 75mm concrete blinding layer shall be provided for all trenches, manholes, petrol interceptors,
grease traps, sump pits etc.
Lp b tng lp dy 75mm dung cho tt c cc mng, h ga, b tch du, by m, h thu v.v

J10068 12 Aug 2015


SN R05

62

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 4 PUMPS
PHN 4 BM
4.1

General
Tng qut

4.1.1

Duties of pumps and materials to be used are specified in the Schedule of Pumps, but all duties,
power consumption and system curves shall be submitted for the approval before ordering against
requirements of the systems as finally installed.
Cng sut ca bm v cc vt liu s dung c ch r trong Danh muc Bm, nhng tt c cng
sut, in nng tiu thu v ng c tnh ca h thng phi c trinh duyt trc khi t hng.

4.1.2

The duties of pump in the Schedule of Pumps are given for guidance only and the Contractor shall
be responsible for checking the total final resistance of each systems, based on the actual pipe
runs and equipment offered, prior to ordering. Any modifications to the system or any of the
components, i.e. pumps, pipework, motors and the like, which may be required to meet the
scheduled duties and space limitations shall be carried out at the Contractor's own expense.
Cng sut bm trong Danh muc bm c a ra ch nhm muc ch hng dn v Nh thu s
chu trch nhim kim tra bn ca mi h thng, da trn ng ng dn thc t v thit b
xut, trc khi t hng. Bt ki s thay i no ca h thng hoc ca cc thnh phn, v du
bm, ng ng dn, ng c hoc cc phn tng t, c php yu cu p ng danh
muc thit b v hn ch v khong trng c th hin muc chi ph pht sinh ca Nh thu.

4.1.3

All pumps shall be constructed to meet the required working conditions and test pressure of the
system concerned.
Cc bm phi p ng c yu cu v iu kin lm vic v kim tra p sut ca h thng lin
quan.

4.1.4

Each pump shall be coupled with the electric motor and aligned in the manufacturer's factory.
Mi bm s c kt hp vi ng c in v t thng hng ti nh my sn xut.

4.1.5

The water pump control cubicles shall be factory assembled pre-wired fully automatic control
cubicle in weather-proof mild steel enamel finished steel enclosure and to be supplied and
installed by the Contractor.
T iu khin bm nc phi l loi t iu khin t ng hon ton c lp sn ti nh my vi
lp v ngoi bng thp mm chng thm v c cung cp, lp t bi nh thu.

4.1.6

All pumps shall be as commercially silent in operation.


Ton b bm phi trong tinh trng yn lng khi vn hnh.

4.1.7

Noise level for pump and motor shall not exceed 65dBA at 1m away.
n ca bm v ng c khng qu 65dBA khi cch xa 1m.

4.1.8

All pumps installation should comply strictly with acoustic requirements from Aurecon for vibration
isolators and bases,
Tt c bm c lp t tun th nghim ngt nhng yu cu v cch m theo t vn Aurecon
cho phn v thit b chng rung.

J10068 12 Aug 2015


SN R05

63

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

4.2

Pump Selections
Chn bm

4.2.1

Pumps with stable characteristics for plumbing and drainage installations shall be selected to suit
the design requirements for capacity (flow rate) as specified and shall discharge at a pressure
which shall produce running pressures within the statutory requirements at the location concerned.
Bm c cc c tnh n nh lp t cho h thng cp v thot nc s c chn phu hp vi
yu cu v cng sut (lu lng) ch r v x nc ti p sut vn hnh theo yu cu lut nh
ti v tr lin quan.

4.2.2

The required net positive suction head of the selected pumps shall be compatible with the
available net positive suction head in the installations. The design figures given on the
Specification and/or Drawings are for guidance only. No adjustment in cost will be entertained if
the actual required duty points (pressure and flow rate) are different from the specified figures.
Close valve total pressure head shall not exceed 140% of rated head.
Yu cu chiu cao ht ca bm c chn phi tng thch vi chiu cao ht sn c trong qu
trinh lp t. Hinh minh ha thit k a ra trong Tiu ch k thut v/hoc Bn v ch nhm muc
ch hng dn. Cc iu chnh v chi ph s c xem xt nu yu cu thc t ca im lm
vic (p sut v lu lng) khc bit so vi hinh minh ha ch ra. Tng chiu cao ct p khng
vt qu 140% ct p nh mc.

4.2.3

The Contractor shall be responsible for carrying out a final accurate calculation of operating heads
based upon the characteristics of the pipework systems including fittings, equipment and
accessories as actually installed by him. Certified performance curves for the pumps shall be
provided with the operating range clearly indicated.
Nh thu phi chu trch nhim thc hin bng tnh chnh xc cui cung ca ct p vn hnh da
trn cc c tnh ca h thng ng ng bao gm phu kin, thit b v phu tung nh vic lp t
trn thc t. Chng nhn ng cong c tnh bm phi c cung cp kem theo khong vn
hnh c ch r.

4.2.4

Pump drive motor output power shall be rated to give 20% more power in addition to the hydraulic
power required for the rated flow of the system.
Cng sut in u ra ca truc dn ng bm phi cao hn 20% so vi cng sut thy lc yu
cu ti lu lng thit k ca h thng.

4.2.5

Pump impellers shall be sized at 80% to 85% of casing diameter so that impeller size may be
upgraded where necessary to accommodate any unforeseen or unexpected increase in pump
head or flow.
Cnh cng tc bm c kch thc t 80% n 85% v bm kch thc cnh c th tng ln khi
cn thit nhm p ng nhu cu khng d kin hoc khng mong mun v ct p v lu lng
bm.

4.2.6

Pumps shall be capable of running under conditions of zero or low "draw-off" continuously without
overheating. This may be achieved either by pump design or by an automatic by-pass circuit
arrangement. Details of this are not given on the Tender Drawings but shall be shown on the
Contractor's Installation Drawings.
Bm phi c kh nng chy mc khng ti hoc mc x thp lin tuc m khng b qu nhit. iu
ny c th t c qua cng tc thit k bm hoc mch nhnh iu khin t ng. Chi tit ny
khng c a ra trong Bn v u thu nhng phi c ch ra trong Bn v lp t ca Nh
thu.

J10068 12 Aug 2015


SN R05

64

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

4.2.7

Overheat alarm devices may be provided if necessary but these shall not be arranged to shut
down the pump automatically.
Thit b bo qu nhit phi c cung cp nu cn thit nhng thit b phi m bo ngt bm
mt cch t ng.

4.3

Potable and Flushing Water Pumps


Bm nc sinh hot
The pumps shall be with flanged suction and delivery connections.
u ht v u y ca bm phi c kt ni mt bch.
Materials for construction of potable water pumps shall be as follows:
Bm nc sinh hot phi c sn xut theo yu cu vt liu nh sau:
(a)

Casing
Gung bm

Grey cast iron to BSEN 1561:1997 (BS1452Grade 220)


Or Stainless steel to BS 970 : 1970
Bng gang tha BSEN 1561:1997 (BS1452Grade 220)
hoc thp khng g tha BS 970 : 1970

(b)

Impellers
Cnh bm

Leaded bronze to BSEN 1982:1999 (BS1400:1973 LG2), key to shaft


Bng ng tha BSEN 1982:1999 (BS1400 : 1973 LG2),

(c)

Shaft
Truc bm

Stainless steel to BS 970:1970 minimum 13% CR. With Ni content


Thp khng g tha BS 970:1970 cha ti thiu 13% Cr. C cha Ni

(d)

Seal
m kn

Mechanical seal
m kn c kh

(e)

Couplings
Khp ni

Flexible type, complete with coupling guards


Loi cn chnh tho lp c, kem lng bo v

(f)

Guide Rings
Vng chu ma st

Phosphor bronze
Hp kim ng phos-pho

(g)

Bearings
Bc n

Ball thrust type, grease lubricated


Loi bi chn, du bi trn

Materials for construction of flushing water pumps shall be suitable for sea water duty and as
follows:
Bm nc x v sinh phi c sn xut phu hp cho nc bin vi cc iu kin nh sau:
(a)

Casing
Gung bm

(b)

Impellers
Cnh bm

(c)

Shaft
Truc bm

J10068 12 Aug 2015


SN R05

Grey cast iron to BSEN 1561:1997 (BS1452 Grade 220) with internal
sea water corrosion resistant coating
Gang xm tha BSEN 1561:1997 (BS1452 Grade 220) vi lp ph
chng n mn bn trong gung.
Zinc free bronze to BSEN 1982:1999 (BS1400 : 1973 CT1, PB1) or
with zinc content not exceeding 0.5% or Type 316 Stainless steel
ng khng cha km tha BSEN 1982:1999 (BS1400:1973
CT1, PB1) hoc km chim khng qu 0.5% hoc thp khng g 316
Type 316 Stainless steel to BS 970 : 1970
Thp khng g 316

65

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

(d)

Seal
m kn

Gland packing (suitable for sea water duty)


Lp lt kn (thch hp cho vung bin)

(e)

Couplings
Khp ni

Flexible type, complete with coupling guards


Loi cn chnh tho lp c, kem hp bo v.

(f)

Guide Rings
Vng chu ma st

Phosphor bronze
Hp kim ng phos-pho

(g)

Bearings
Bc n

Ball thrust type, grease lubricated


bi chn, du bi trn.

4.4

Hydro-Pneumatic Booster Sets


Bm nc thy lc

4.4.1

The fully automatic and water hydro-pneumatic booster set shall be of robust design. Booster
pumps and pressure tanks shall be mounted on a vibration-absorbing mild steel baseplate.
Hon ton t ng cho h bm v ng b trong thit k v iu khin bng kh-nc.Bm tng
p v binh cha p lc phi lp t trn b chng rung.

4.4.2

Each sets shall comprise the following:


H bm bao gm:

4.4.3

a.

One set approved pattern vertical multi centrifugal pumps (no. of pumps as shown on
Drawings).
Mt h bm ly tm truc ng a tng (s lng bm c th hin trn bn v)

b.

One set pressure tank with rubber bag (no. of pressure tanks as shown on Drawings).
Mt h binh tch p dung mng cao su kim sot p ( s lng binh c th hin trn bn
v)

c.

One set factory assembled pre-wired fully automatic control, cubicle in weather-proof mild
steel enamel finished steel enclosure.
B iu khin c tch hp v u ni sn t nh my, chu c thi tit vi v bc trng
men.

d.

Associate pipework including control valves, water hammer absorber, check valves, flexible
connectors and the like.
H ng ng kem theo bao gm c van iu khin, van chng va p nc, van 1 chiu,
khp ni mm v cc van lin quan.

e.

Vibration-absorbing baseplate.
B chng rung.

f.

Pressure gauges, pressure switches, and safety valves, and the like.
ng h p, cng tc p sut, v van an ton v cc van lin quan.

The pressure tank shall be of adequate capacity to accommodate a considerable fluctuation in


water demand by the system and shall minimize the start/stop cycles of the pumps.
Binh tch p phi tng thch vi cng sut dao ng do nhu cu s dung nc v phi m bo
ti thiu s ln ng /ngt ca bm tng p.

4.4.4

Only one pump shall be in operation at a time, the other one shall be on standby. The pumps shall
be changed over after each cycle by an automatic device. The standby pump shall be
automatically switched on if the water pressure of the pressure tank drops down to the minimum

J10068 12 Aug 2015


SN R05

66

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

set pressure and then the two pumps shall be in parallel operation. Dry running protection shall
also be provided.
H bm hot ng theo kiu 01 chy 01 d phng. 02 bm s lun chuyn t ng sau mi chu
k hot ng ci t cho bm. Bm d phng s t ng chy khi p sut trong binh tch p gim
xung thp hn gi tr ci t trc v sau 02 bm s cung hot ng song song. Phi trang b
thit b bo v bm khi mt nc.
4.4.5

Construction of the pumps shall conform to the requirements stipulated in the preceding Clause
for potable and flushing water pumps.
Cu to ca bm phi tha cc qui nh/ yu cu cho nc sinh hot & nc v sinh trong nhng
iu khon qui nh trc .

4.4.6

Pressure tanks shall be of galvanised mild steel cylindrical pre-charged pressure vessels with
epoxy or polypropylene anti-corrosion lining in the internal surface. A rubber diaphragm shall be
fitted for seperation of the water nitrogen gas and corrosion resistant.
Binh tch p l loi hinh tru, m km, c np sn kh t 1 gi tr p nht nh trn b mt
mng ngn, b mt bn trong binh phi c lp epoxy hoc po-ly pro-pi-len chng n mn. Mng
kim sot p sut phi cch ly c nc vi kh ni-t to p cho mng ngn v chng n mn.

4.4.7

The pressure tanks shall be externally treated in synthetic enamel. An approved type valve shall
be fitted for pre-pressure adjustment. Baseplates shall be manufactured in heavy gauge fabricated
mild steel, zinc plate finish.
Binh tch p c ph bn ngoi 1 lp men tng hp. Binh phi c trang b van iu chnh
c gi tr p ban u. B phi c gia cng bng loi thp dy, m km.

4.4.8

Each set shall be completed with pressure switches to UL listing and selected for the operating
pressure range. The pressure switches shall control the start/stop of duty and standby pumps.
Pump start/stop frequency shall not be more than 6 times per hour at the rated output.
Mi b binh tch p s bao gm cng tt p sut tha UL v dy p sut hot ng ca h thng.
Cng tc p sut s iu khin bm thng trc v bm d phng. Bm khng c ng ngt
qu 06 ln / gi.

4.4.9

The control system shall rotate the operation of the pumps on a first-in/first-out bases for ensuring
equal wear and tear.
B iu khin s iu khin s vng quay ca bm sao cho nhp nhng trnh b rung ng, mt
cn bng

4.4.10 The following accessories shall be provided by the Contractor:


Nh thu phi cung cp cc phu kin sau:
a.

One number of pressure gauge with syphon pipes and isolating valves for each pressure
tank air chamber.
Mt b ng h p kem si-phon, van cch li cho mi binh cha kh c p.

b.

Three numbers of adjustable pressure switches for incoming and outgoing pressure
adjustable individually and low water pressure (no flow) cut-out of booster pumps;
Ba b cng tc p sut iu chnh c, c lp cho tng ng vo & ra v b cng tc p
sut thp cho bm tng p.

c.

One number of bronze drain cock at the bottom of each pressure tank with pipe extension to
the nearest drain point;
Mi binh tch p phi c van x y bng ng kem ng dn n phu thu sn gn nht.

J10068 12 Aug 2015


SN R05

67

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

d.

One number of 25mm diaphragm type safety valve at air chamber of each pressure tanks.
Mt b mng ngn dy 25mm, kem van an ton cho bung cha kh ca binh tch p.

4.4.11 A test certificate for the performance and test pressure of the tank issued by the manufacturer
shall be submitted by the P&D Contractor to the PM for approval.
Nh thu phi trinh chng nhn v cht lng v kim tra p lc ca binh c pht hnh bi
nh sn xut cho Qun l d n chp thun.
4.4.12 The packaged type fully automatic booster pump set shall be assembled in the manufacturer's
factory, except the control panel supply and install by Contractor.
Bm tch p kem b iu khin hon ton t ng c lp t ti nh my, tr khi t iu khin
c cung cp & lp t bi nh Thu.

4.5

Variable Speed Pump Unit


Bm bin tn

4.5.1

The variable speed pump packaged unit shall be factory assembled.The entire unit including the
control panel shall be pre-piped, pre-wired, mounted on a common base plate to delivery. The unit
shall be capable to provide constant discharge pressure at the outlet draw off points at variable
demand flow down to 5 % of the design condition.
Trn b bm bin tn phi c lp t ti nh my. Trn b bm bin tn phi bao gm t iu
khin; phi c u dy, u ni ng ti nh my, lp t sn trn b trc khi vn chuyn ti
cng trng.
H bm phi m bo gi tr p sut nht nh khng i ti u y ngay c khi nhu cu s dung
nc c dao ng thp hn 5% iu kin thit k.

4.5.2

Motors shall be specially designed for variable speed operation fully matches with the
characteristic of the speed controller.
ng c bm phi l loi c thit k c bit s dung cho bin tn, sao cho chng c th phi
hp hot ng nhp nhng vi nhau.

4.5.3

The motor shall be provided with extra efficient cooling system such that the extra heat generated
due to inefficiencies of the variable speed operation can be efficiently dissipated even at reduced
speed.
ng c phi l loi c kh nng gi nhit hiu qu; chng hn nh nhit ta ra do km hiu qu
trong vic thay i tc , thi nhit ny c th c thi ra bn ngoi 1 cch hiu qu ngay khi
bm hot ng tc thp.

4.5.4

The speed control of the pumps shall be carried out by a speed controller which shall be
proprietary make with proven operating record.
B iu khin tc phi l loi c cht lng v thng hiu, vi cc chng nhn v kh nng
hot ng ca thit b.

4.5.5

The speed controller shall be fully transistorised variable frequency type housed in a self
ventilated cubicle containing all accessories necessary for an efficient and secure power supply,
regulation, control, monitoring an protection of the control and motor.
B iu khin tc phi l loi bn dn tn s thay i, c hp che chn ng thi m bo
thng thong, bao gm c cc phu kin cn thit m bo hiu qu v an ton cho cp ngun,
iu khin, gim st kh nng bo v cho iu khin v ng c.

J10068 12 Aug 2015


SN R05

68

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

4.5.6

A Programme Logic Controller (PLC) shall be provided and perform the following functions:
PLC B iu khin lp trinh phi c cung cp v hot ng nh sau:

4.5.7

a.

The PLC controller shall receive demand signals from the pressure transducer and shall
order start/ stopping of the lead and lag pump.
B iu khin lp trinh s nhn tn hiu p v ra lnh iu khin bm hot ng.

b.

Starting from zero demand, when pressure in system drops to predetermined level, the
pressure switch shall command starting of the lead and lag pump.
Khi tn hiu p b hn gi tr nh trc, cng tc p sut s ra lnh khi ng cc bm theo
ng th t trc v sau.

c.

When demand exceeds the capacity of the leading pump, the lagging pump shall be started
and both pumps shall operate at the same variable speed.
Khi bm th nht khng p ng c nhu cu dung nc, thi bm th hai phi khi ng
v hai bm cung hot ng cung mt tc .

d.

If the leading pump fails, the lagging pump shall be started automatically.
Nu bm th nht hng, thi bm th 2 s t khi ng

e.

When demand falls and stays at minimum preset level, the control shall stop the running
pump after and adjusted time interval.
Khi nhu cu dung nc gim v duy tri mc thp, thi khong thi gian ch thch hp phi
c hiu chnh trc b iu khin c th ngng bm hin hnh nh mong mun.

f.

The PLC shall be provided with the following front mounted accessories:
B iu khin lp trinh phi c cc tnh nng nh sau:

Lead lag selector


La chn th t chy bm

Command indicator
Hin th lnh

Mains voltage (healthy power)


in p

The master controller shall control main pump to be operated alternatively automatically in order of
maintaining equal wear and tear of the pumps.
B in khin chnh phi t ng iu khin lun phin cc bm m bo hiu qu trong vic
s dung nhiu bm.
The control panel shall obtain supply from a 3 phase/50 Hz/380V incoming source and shall
generate a stable modulating variable frequency output power for driving the matching variable
speed motor and external operators.
T iu khin phi c cp ngun 3 pha/50Hz/380V v phi n nh trong iu khin tn s phu
hp vi vn tc thay i ca ng c v cc thit b lin quan.
The variable frequency drive shall consist of a converter/inductor and invertors section.
B bin tn phi bao gm cc b chuyn i tn hiu.

J10068 12 Aug 2015


SN R05

69

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

The converter section shall be full wave three phase converter to change the input A.C. power to
D.C. power, which shall feed the inductor section and shall be designed to protect against a
sudden and/or random application of a short circuit on the output terminals.
B chuyn i phi dung in 3 pha, v chuyn i tn hiu xoay chiu AC u vo thnh tn hiu
u ra mt chiu DC, phn cm in s s dung tn hiu ny thit lp kh nng bo v khi
xut hin ngn mch ngu nhin ti v tr hp u ni u ra.
The inverter section shall convert the D.C. output of the inductor section to an adjustable
frequency power supply to the motor. The drive shall be fully compatible in the motor and shall not
result in excessive power losses or heat generation at the motor over the entire speed range.
B chuyn i inverter s chuyn i tn hiu mt chiu DC u ra t phn cm in thnh tn s
tng ng ca ngun in cp cho cc ng c. B bin tn phi tng thch vi ng c v m
bo ng c khng b qu ngng sut p cng nh ta nhit qu mc ca ng c.
The drive shall incorporate an input fused switch interlocked with panel door having a short circuit
interrupting capacity of 40 KA (symmetrical amps), and shall be arranged such that the door can
only be opened when the switch is in the off position.
B bin tn phi c cu chi in cp ngun lin ng vi s ngn mch ti ca t iu khin vi
kh nng ct l 40kA, phi m bo l ca ch c th c m khi cng tc ang v tr ngt.
The converter, inductor and inverter sections shall be grouped into separate section in the control
cabinet with components mounted neatly and orderly.
Cc loi b chuyn i phi c nhm theo nhng khu vc ring bit trong t iu khin vi cc
thit b c lp gn gang v ngn np.
4.5.8

The drive shall be provided with the following protection device:


B bin tn phi c cc chc nng bo v nh sau:

4.5.9

a.

Static instantaneous over current and over voltage trip.


Ngt khi qu dng v qu p xy ra.

b.

Under voltage protection


Bo v thp p

c.

Power unit overtemperature protection


Bo v qu nhit

d.

Thermistor trip relay responsive to temperature sensors within the motor.


Bo v qu nhit ng c

e.

Low level cut out of pumps


Bo v bm ngt do mc thp

The drive shall be provided with the following control features:


B bin tn phi c cc chc nng sau:
a.

Input signal shall be current or voltage signals compatible with the pressure controller.
Tn hiu p hoc tn hiu dng u vo phi tng thch vi b iu khin p sut

b.

A presettable linear acceleration and deceleration function adjustable from 1 to 40 seconds.


Chc nng thay i gia tc, vn tc tuyn tnh theo thi gian, trong khong thi gian t 1-40
giy.

J10068 12 Aug 2015


SN R05

70

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

c.

A presettable minimum and maximum frequency bottom frequency shall range from 1 to 50
Hz, top frequency shall range from 50 to 65Hz.
C th gii hn gi tr tn s thp nht v cao nht. tn s cao nht c th t c l 65
Hz.

d.

Automatic speed range shall be 0-100% of full load.


Vn tc thay i t ng tng ng vi dy ti t 0-100% khi y ti.

4.5.10 The following features shall be included on the front cubicle:


Khng gian mt trc ca b bin tn phi bao gm
a.

Input fuse switch handle.


Phi c phng tin lp cu chi

b.

Speed regulator for manual operation.


Thay i tc bng tay

c.

manual-off-auto mode selector


Tt bng tay

d.

Supply on indicator.
Hin thi ch m

e.

Control available indicator.


Hin th kh nng iu khin

f.

Digital pump speed meter.


B o k thut s tc ca bm

g.

Selection switch for manual operation.


Cng tc chuyn qua ch vn hnh bng tay.

4.5.11 The drive shall be furnish with a separate terminal compartment, completed with the necessary
terminals for the connection of the incoming supply from the mains and for the connection of the
outgoing cables to motor. The cubicle shall be drip proof to IEC 144, IP 21 and shall be provided
with manufactures standard prime and finish coats.
B bin tn phi c ngn u ni ring, cc im u cho cp ngun vo cng nh im u cp
ngun cho ng c. Khng gian mt trc phi chng nc tha IEC 144, IP 21 v phi tha cc
tiu chun quan trng v hon thin b mt.
4.5.12 Sufficient dry contacts in the panel shall be provided for BMS monitoring.
Phi cung cp cc tip im kh trong t iu khin cho phi hp vi h thng BMS.
4.5.13 The Contractor shall provide the service of a service engineer from the manufacturer to supervise
start-up and training of maintenance personnel.
Nh thu cng nh nh sn xut phi cung cp cc dch vu h tr cho qu trinh vn hnh v bo
tri h thng.
4.5.14 Detail drawing showing construction dimensions, wiring diagrams and installation procedures shall
be submitted for the Project Manager approval
Bn v chi tit th hin kch thc, s u dy v qui trinh lp t phi c trinh cho Qun
l d n ph duyt.

J10068 12 Aug 2015


SN R05

71

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

4.6

Pump Set Installation


Lp t h bm

4.6.1

Each pump shall be fitted with valves to enable it to be isolated, and in addition, where shown on
the Drawings, a silent check/non-return valve shall be fitted in each pump discharge.
Mi bm phi c cc loi van cch ly, bn cnh cng phi c cc van mt chiu nh bn v
th hin trn u y ca mi bm.
a.

All pumps shall be fitted with air-cocks and drain plugs. Each pump discharge and suction
line shall have a pressure gauge with a dial diameter of 150mm complete with copper/brass
syphon loop tube and isolating gate valves for potable water and stainless steel for flushing
water. Flow meter shall be installed at the pump discharge side for measurement of the flow
rate. Drains shall be piped to floor drain or channel.
Tt phi c van x kh & van x y. u y v u ht ca bm phi c b ng h p
bao gm ng sy-phon, van cch ly bng ng hay ng thau ng dung cho nc sinh hot
v dung cht liu thp khng g cho nc x v sinh.

b.

The Contractor shall supply and install flexible pipe connectors at the pump suction and
discharge sides for each pump.
Nh thu phi cung cp v lp t khp ni mm ti u y vu ht ca bm.

c.

All flexible connectors shall have flanged joints for the connecting pipework and must be
suitable for the working conditions and test pressure of the particular system installed.
Khp ni mm phi c kh nng kt ni mt bch, kt ni vi ng v phi c p sut
lm vic tng thch v phi c kim tra p lc cu th cho tng h thng c lp t.

d.

Automatic air valves shall be fitted in the pumps to purge any air likely to be trapped inside
the pump casings. Suitable fittings to be approval of the PM shall be used for such
connection and the automatic air valves shall not discharge at a location directly over or near
to the pump motor or any other electrical equipment.
Bm phi c cc van x kh t ng x cc kh trong gung bm. Phu kin s dung phi
c chp thun bi Qun l d n v van x kh khng x trc tip ra nhng v tr c lp
t in.

e.

The pumps and motors shall be direct coupled and mounted on a substantial machined base
plate of cast iron or of fabricated mild steel. Couplings shall be flexible of steel pin and
synthetic rubber bushing type, accurately aligned, and fitted with guards.
Bm v ng c phi c kt ni trc tip v lp t trn b st trng km. Khp ni phi
l loi iu chnh, cht thp v cao su lt tng hp, phi c canh chnh chnh xc v c
lng bo v.

f.

Pumps shall be completed with all necessary water seal connections, vents, drains and
priming plugs, and all installation materials including foundation bolts and anti-vibration
mountings.
Bm phi c kt ni kn nc, kh, x cn v tt c cc vt liu lp t bao gm c bulng, v chng rung.

g.

Drain pipework shall be in copper and shall be run to a nearby drain gully or as specified.
Automatic priming equipment shall be included where necessary to ensure that the pumps
are primed at all times.
ng nc x cn phi l ng ng v c dn n ch thot sn gn nht. Thit b mi
nc t ng phi c trang b m bo bm lun c nc.

J10068 12 Aug 2015


SN R05

72

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

h.

The exposed shafts, couplings and moving parts of pumps shall be provided with suitable
galvanized iron mesh guards coated with primers and finishing paint and shall be stoutly
constructed and easily removable complete with lifting handles.
Nhng chi tit chuyn ng, khp ni, truc bm nhin thy c thi phi c lng bo v c
sn bo v v cu to chc chn v d dng thp lp.

i.

Each pump shall be provided with pressure gauges installed to indicate the suction and
discharge pressure.
Mi bm phi c ng h p hin th p sut ht v y.

j.

Suitable permanent labels in English and Vietnamese shall be affixed for each gauge to
indicate its function. The gauges shall be suitable for the system pressure ratings
concerned.
Nhn song ng Anh/Vit th hin chc nng ca mi ng h c dn ni phu hp v v
tr nht nh.ng h p phi phu hp vi p sut hot ng ca h thng.

k.

Duty/standby selector, manual start/stop buttons, voltmeters, ammeters, high/low level


alarm, and associated indications shall be provided at the starter panel inside the pump
room.
T iu khin phi c Nt chuyn bm, nt dng/chy bm, ng h ampe, ng h in
p, bo ng mc nc cao/thp kt hp vi en bo.

l.

A lock-off type emergency stop shall be provided adjacent to each pump set.
Nt dng bm khn cp phi c lp t gn bm.

m.

Pump installation shall be completed with adequate facilities for maintenance and future
replacement of base plate.
Bm c lp t sao cho thun tin bo tri v tho lp khi cn thit.

n.

Lifting eyes shall normally be provided upon pumps, motors, and engines. Details of any
requirements for overhead run-ways, hoists, etc., required for installation and maintenance
shall be provided with the tender.
V tr nng bm thng thng c b tr trn bm, ng c in v ng c du; nhm
phuc vu cho cng tc lp t, vn chuyn v bo tri.

o.

Motor driven pump set shall be mounted upon a common base plate supported by approved
spring-type isolation mountings on concrete plinth.
ng c bm phi c lp t trn b c kem l xo chng rung.

p.

An identification plate of either brass or aluminium shall be screw-fixed to the pump or base
and shall include but not be limited to the following information:
Nhn mc bng nhm hay ng s c gn bng vt vo bm hay b bm bao gm cc
thng tin sau:

J10068 12 Aug 2015


SN R05

Maker/Origin,
Nh sn xut/Xut x

Model,
M hiu

Serial Number,
M hng

Size,
Kch c

73

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

4.6.2

RPM,
S vng/pht

Impeller size (mm),


Kch thc cnh bm

Pump rating,
Phn hng bm

Date of manufacture.
Ngy sn xut

Anti-vibration mountings shall be springs, neoprene pads or rubber-in-shear isolators with static
deflection and an isolating efficiency of not less than 95%.
S dung l xo chng rung, cao su tng hp hoc cao su nn v cch ly khng t hn 95%.

4.7

Drainage Sump Pumps


Bm h nc thi

4.7.1

Drainage sump pumps shall be of the centrifugal submersible type. The pump is to be so designed
that it can be removed from the sump without the need to drain the sump or enter the sump to
disconnect the pipework.
Bm s dung cho h nc thi l loi bm chim ly tm. Bm phi c tht k sao cho c th ly
bm ra khi h m khng cn phi tho ht nc cng nh tho ng ng.

4.7.2

Facilities shall be provided for raising and lowering the pump, and the discharge pipe connection
shall be automatic.
Nng bm, h bm v kt ni ng y ca bm phi thun tin v d dng.

4.7.3

Pump casing shall be of close grained cast iron, with impeller of cast iron or other approved
materials. Shaft sleeves shall be of zinc free bronze, and shaft of stainless steel grade 316.
Gung bm c vt liu l gang vi cu trc kn v b mt mn, cnh bm bng gang hoc vt liu
khc c ph duyt. ng lt truc bm bng vt liu ng khng cha km, truc bm bng vt
liu thp khng g 316.

4.7.4

Coupling between the pump and motor shall be by means of double mechanical seals. The seal
should be enclosed in an oil fill chamber for dissipation of heat.
Khp ni bm vi ng c phi c 2 m kn c kh. m kn c bao bc trong hp du nhm
muc ch ta nhit.

4.7.5

Pump impeller and water chute shall be of non-clog type and be so designed that it can pump out
soil or waste water contain solid up to 65mm diameter and high viscosity sludge.
Cnh bm v ng dn nc phi l loi khng b chn kn nhm muc ch bm t hoc nc
thi c cha cc vt cng vi ng knh n 65mm v bn.

4.7.6

Pump motor rating greater than 3.7kW shall incorporate with thermo protection devices to protect
the motor from over heating.
ng c bm c cng sut ln hn 3.7 kw thi phi c bo v qu nhit.

J10068 12 Aug 2015


SN R05

74

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

4.7.7

The pump shall be provided with integrated submersible power cable of adequate length to
connect to the power supply point for the pump. No intermediate junction/jointing/connection of
this cable is permitted.
Bm c tch hp cp ngun s dung trong nc vi di di i n im ngun kt ni.
Cp ny phi m bo lin tuc, khng u ni trung gian.

4.8

Motors for Pump Drives


ng c ca bm

4.8.1

Electric motor for plumbing uses shall be of totally enclosed fan cooled (TEFC) squirrel cage
induction type to BS 4999 and BS 5000 Part 10 with Class F insulation.
ng c in cho bm nc phi l loi gii nhit bng qut c v bc kn, phn ng kiu lng
sc tha tiu chun BS 4999 v BS 5000 phn 10, cch in cp F.

4.8.2

Motor shall be fitted internally with an anti-condensation heater of single phase when the motor is
started and switched on automatically after stopping.
ng c in phi c tch hp bn trong in tr si dung in 1 pha, phng khi ng c khi
ng li sau khi ngng 1 thi gian di.

4.8.3

Motors shall generally be three phases, however, small motors of 1kW or less may be single
phase.
ng c in phi l loi dung in 3 pha, tuy nhin, s s dung in 1 pha cho ng c 1 kw tr
xung.

4.8.4

The power factor shall not be less than 0.85 lagging under all normal operating conditions.
H s cng sut khng b hn 0.85 trong iu kin hot ng binh thng.

4.8.5

Motor shall be dust and moisture protect to IP 54.


ng c in phi chng m v bui tha IP 54.

4.8.6

In damp situations or in underground pump houses, motor terminal boxes shall be of weatherproof type.
Trong iu kin m t hoc di tng ngm, hp u ni in phi l loi chng nc.

4.8.7 Noise level of all motors shall be in accordance with or better than the recommendation of BS EN
60034-9.
n ng c phi tha hoc tt hn yu cu ca tiu chun BS EN 60034-9.
4.8.8

Motor shall be provided with guards at all motor shaft couplings.


ng c in phi c lng bo v cho khp ni truc bm.

4.8.9

Cast iron terminal box shall be provided for connection of heavy duty flexible conduit or armoured
cables; box shall be rated of 10MVA at 415V assuming suitable back-up protection provided.
im u in cho cp in c gip st bo v hoc ng lun hng nng th phi c hp gang
bo v. Hp u in ph hp cho in p 415V, dng in 10MVA c xem nh l bo v d
phng cn thit.

J10068 12 Aug 2015


SN R05

75

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

4.8.10 Motor shall be sized to handle minimum 25% over continuous rating of the pump brake horse
power.
ng c in phi c chn sao cho c th lm vic lin tuc trong iu kin cng sut truc quay
gim xung mc 25% so vi khi y ti.
4.8.11 Provision of tachometer shall be provided for direct driven machine.
ng c in phi c trang b thit b o s vng quay i vi trng hp ng c truyn ng
trc tip.
4.8.12 Motor shall be mounted on common bed with driven machine on isolation springs or inertia blocks
as specified.
ng c in v c cu truyn ng phi c lp cng trn mt b c chng rung l xo hoc b
qun tnh khi c ch nh.
4.8.13 Emergency stop button shall be mounted adjacent to the motor.
Nt dng bm khn cp phi c lp gn bm.
4.8.14 Lifting eyes or lugs for motors heavier than 25 kg in weight shall be provided.
ng c nng hn 25kg phi c im mc nng ng c.
4.8.15 Statically and dynamically balanced.
Bm v ng c phi c cn bng ng & tnh.
4.8.16 The method of motor starting shall be selected according to the characteristics of the pump and
shall comply with the Electricity Supply Co.s limitations on starting current.
Phng php khi ng s c chn ty thuc vo ng c tnh ca bm v phi tha yu
cu v gii hn dng khi ng nu c ca n vi cung cp in.
4.8.17 Prominent label in clearly inscribed characters in English and Vit shall be provided to read:
DANGER - This motor is automatically controlled and may start without warning. Isolate before
inspection."
Loi nhn/mc r rng d nhn bit phi c cung cp bng song ng Anh/Vit, th hin ni
dung sau: NGUY HIM ng c ny c iu khin t ng v c th hot ng bt c thi
im no m khng c cnh bo. Cn cch ly trc khi tin hnh kim tra.

J10068 12 Aug 2015


SN R05

76

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 5 WATER TANKS, SUMP PITS AND EQUIPMENTS


PHN 5 B NC, H BM V THIT BI
5.1

Concrete Water Tanks


B nc b tng

5.1.1

Concrete water tanks forming part of the building construction shall be provided by the Main
Contractor unless otherwise specified.
Cc dng b nc b tng ca cng trinh c thc hin bi nh thu chnh tr khi c ch nh cu
th

5.1.2

The P&D Contractor shall supply and install all tank fittings as specified in this Specification. All
water tanks when indicated on the Drawings as non-concrete construction shall be supplied and
installed by the P&D Contractor complete with fittings.
Nh thu phu Cp thot nc cung cp v lp t cc phu kin b nh ch nh ca tiu chun k
thut ny. Tt c cc b nc ch trn bn v m khng phi b tng c nh thu phu Cp
thot nc cung cp v lp t kem phu kin hon chnh.

5.1.3

The dimensions of the tanks shown on the Drawings are indicative only, exact sizes of all such
tanks shall be adjusted to suit site conditions as well as to suit the manufacturing tolerance, all as
approved by the Architect.
Kch thc ca b trn bn v ch l s b, kch thc chnh xc s c iu chnh phu hp vi
thc t ngoi cng trng cng nh phu hp vi dung sai ca nh sn xut v c xt duyt
ca kin trc s.

5.1.4

Materials for the construction of all the non-concrete tanks shall be of the type approved by the
Vietnam Water Authority, Building Department and Fire Services Department as appropriate.
Details of the materials shall be submitted by the P&D Contractor for the Architects approval prior
to order.
Vt liu dung cho cc b khng phi l b tng s phi c duyt ca C quan qun l Nc
Vit Nam, S Xy Dng V S Cu Ho. Chi tit ca vt liu c trinh bi thu phu Cp
thot nc kin trc s xt duyt trc khi t hng.

5.1.5

The P&D Contractor shall check the construction drawings for water tanks and verify their
correctness for his installation purposes, or submit proposals for modification to the design, as
necessary, and shall assist in the supervision of their construction, in order to ensure their
suitability and proper functioning.
Nh thu phu Cp thot nc s kim tra bn v thi cng cho b nc v lm r s ng n cho
muc ch lp t hoc trinh phng n hiu chnh thit k, nu cn thit, v h tr gim st thi
cng, t hng m bo phu hp vi cng nng.

5.2

Fibreglass Water Tanks


B nc si thuy tinh

5.2.1

The dimensions of the tanks shown on the Drawings are indicative only, exact sizes of all such
tanks shall be adjusted to suit site conditions as well as to suit the manufacturing tolerance, all as
approved by the Architect.
Kch thc ca b trn bn v ch l s b, kch thc chnh xc s c iu chnh phu hp vi
thc t ngoi cng trng cng nh phu hp vi dung sai ca nh sn xut v c xt duyt
ca kin trc s.

J10068 12 Aug 2015


SN R05

77

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

5.2.2

Materials for the construction of all the non-concrete tanks together with the coatings shall be of
the type approved by the Vietnam Water Authority, Building Department and Fire Services
Department as appropriate. Details of the materials shall be submitted by the P&D Contractor for
the Architect's approval prior to order.
Vt liu dung cho cc b khng phi l b tng s phi c duyt ca Uy Ban Nc Vit Nam,
S Xy Dng V S Cu Ho. Chi tit ca vt liu c trinh bi thu phu Cp thot nc
kin trc s xt duyt trc khi t hng.

5.2.3

Fibreglass water tanks shall be constructed in accordance with the following:


B nc si thuy tinh c xy dng theo nhng quy nh sau:
(a) Fibreglass water tanks to be of panel type construction;
B nc si thuy tinh c xy dng t nhng dng tm;
(b) In fibreglass panels with stainless steel or chrome plated bolts, washers and nuts on joints;
Trong cc tm si thuy tinh vi nhng tm thp khng g, bulong phng m crom, ming m
v ai c
(c) Approved by the Water Authority as suitable for storing water;
Chp thun bi C quan qun l Nc v v lng nc cha phu hp;
(d) With water tight hinged cover and locking device;
Vi bao kn nc v thit b kho;
(e) Supported by mild steel angle frames and bracings to details as approved by the Architect
and epoxy coating for flushing water tanks;
c bi khung thp gc nh v h ging vi chi tit c duyt bi kin trc s v sn
ph epoxy cho b cha nc.
(f)

Of sufficient rigidity suitable for the capacity;


cng phu hp vi sc cha;

(g) With uPVC nut tank ferrules and washers of the same manufacture shall be provided for
connection to inlet, outlet, over-flow vent and drain pipes to the tank;
Vi b uPVC, ai c vng m ca cung nh sn xut s cung cp ni u vo, u ra,
ng trn, ng thng hi cho b;
(h) With a stainless steel 316 cat ladder to detail as approved by the Architect.
Vi chi tit thang theo thp chng r 316 c duyt bi kin trc s.
5.2.4

Tanks shall be secured and rest on concrete plinth provided by the Main Contractor. Details of
tank plinth and required builders work shall be submitted to Architect for approval.
B c nh v chc chn v an ton trn chn b tng m nh thu chnh thc hin. Chi tit
chn b v yu cu ca ngi xy dng phi np cho Kin trc s ph duyt

5.3

Level Switches in Tanks


Cng tc mc nc trong b
The Contractor shall supply and install level switches in water tanks as indicated below and as
shown on the Drawings.
Nh thu phi cung cp v lp t thit b chuyn mch cao trong b cha nc nh c
cp bn di v th hin trn bn v

5.3.1

Roof Tanks (For Potable and Flushing water supply systems)


B nc mi (cho h thng cp nc ung c v nc ra)

J10068 12 Aug 2015


SN R05

78

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

5.3.2

5.3.3

5.3.4

5.3.5

(a)

High level alarm (over-flow),


Bo ng mc nc cao (x trn),

(b)

Low level alarm,


Bo ng mc nc thp,

(c)

Low level cut-in of transfer pump,


Mc nc thp bt my bm chuyn tip,

(d)

High level cut-out for the transfer water pump,


Mc nc cao tt my bm chuyn tip,

(e)

Low level booster pump(s) lock-out.


Mc nc thp ng bm tng p.

Transfer Tanks (For Potable and Flushing water supply systems; and for Watering planter supply
system)
B chuyn tip (cho h thng cp nc ung v nc ra; v h thng nc ti cy)
a)

High level alarm (over-flow),


Bo ng mc nc cao (x trn),

b)

Low level alarm,


Bo ng mc nc thp,

c)

Low level cut-out for the transfer water pumps.


Mc nc thp tt my bm chuyn tip.

Break Tanks (For Potable and Flushing water supply systems)


B b sung nc (cho h thng cp nc ung v nc ra)
(i)

High level alarm,


Bo ng mc nc cao,

(j)

Low level alarm.


Bo ng mc nc thp.

Storage Tank for Watering planter supply system


B cha cho h thng nc ti cy
(k)

High level alarm,


Bo ng mc nc cao,

(l)

Low level alarm,


Bo ng mc nc thp,

(m)

Low level cut-in of transfer pump,


Mc nc thp bt my bm chuyn tip,

(n)

High level cut-out for the transfer water pump,


Mc nc cao tt my bm chuyn tip,

(o)

Low level booster pump lock-out,


Mc nc thp ng bm tng p.

Storage Tank for Water Feature


B cha cho thc nc cnh
a.

High level alarm,


Bo ng mc nc cao

b.

Low level alarm,


Bo ng mc nc thp

J10068 12 Aug 2015


SN R05

79

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

c.

Low level booster pump lock-out,


Mc nc thp ng bm tng p.

5.3.6

Level switch sets shall operate with a stepped down voltage at 24V maximum. Stepped down
transformers shall be provided by the Contractor for each set of control probes and shall be
installed inside centralized control cubicles inside pump room.
Cng tc chuyn s hot ng in p gim xung 24V. B gim p c cung cp bi nh thu
cho mi b u d v c lp t bn trong b iu khin trung tm phng bm.

5.3.7

The float switches shall be of mechanical type.


Cc phao s l cc dng c hc.

5.3.8

Submersible cable shall be of Marine type to BS 6883 : 1969.


Cp chim l dng cp bin theo BS 6883:1969.

5.3.9

One BMS panel shall be installed at Management Office with indication of all alarm signals of
water tanks.
Mt tm BMS c lp ti vn phng qun l vi bng hin th ca tt c cc b.

5.4

Suction Tank Strainers with Anti-Vortex Plates


B lc v a chng xoy

5.4.1

Suction tank strainers with anti-vortex plates shall be provided and installed by the P&D
Contractor as shown on the Drawings.
B lc v a chng xoy c cung cp v lp t bi nh thu phu Cp thot nc nh c
th hin trn bn v.

5.4.2

Strainers for the Potable Water Supply System shall be:Thit b lc cho h thng cp nc ung s l:

5.4.3

(p)

3mm thick brass strainer,


Dung cu lc bng ng thau dy 3mm,

(q)

With 3mm thick stainless steel anti-vortex plates,


Tm thp khng r dy 3mm chng nc xoy,

(r)

With total perforation area of 3mm maximum diameter holes not less than twice the cross
sectional area of the pump suction pipe.
Tng din tch cc l c ng knh ln nht 3mm khng nh hn 2 ln din tch
mt ct
ngang ng ht ca bm.

Strainers for flushing Water Supply System shall be :Thit b lc cho h thng cp nc ti s l:
(s)

1.5mm thick stainless steel 316 strainer,


B phn lc bng thp khng r dy 1.5mm,

(t)

With 1.5mm thick stainless steel 316 anti-vortex plates,


Tm thp chng nc xoy bng thp khng r dy 1.5mm,

(u)

With total perforation area of 3mm maximum diameter holes not less than twice the cross
sectional area of the pump suction pipe.
Tng din tch cc l c ng knh ln nht 3mm khng nh hn 2 ln din tch
mt ct
ngang ng ht ca bm.

J10068 12 Aug 2015


SN R05

80

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

5.5

Tank Fittings
Phu kin b

5.5.1

Outlets, inlets, overflows and drain pipes connected to potable water and flushing water tanks
shall be:ng vo, ng ra, ng trn c ni vi b nc ung v nc ra s:

5.5.2

(v)

With forged brass double puddle flange tank ferrules for potable water tank,
Dung ng thau cho mi ni mt bch kp vi b nc ung c,

(w)

With gunmetal double puddle flange tank ferrules for flushing water tank,
Dung ng thau tng cho mi ni mt bch vi b nc ra,

(x)

Screwed joint tank ferrules for the use in nominal pipe sizes up to 50mm and flanged joint
for use in nominal pipe sizes over 50mm.
Ni ren cho ng kch thc di 50mm v ni mt bch cho ng kch thc trn
50mm.

Overflow pipes shall be:ng trn:


(y)

With minimum internal diameter larger than the internal diameter of inlet pipes,
ng knh trong nh nht phi ln hn ng knh trong ca ng vo

(z)

Provided with metal hinged flaps at outlets,


Lp np xoay bng kim loi u ra,

(aa) Discharging in a conspicuous position as approved by the Architect.


V tr nc chy ra phi d nhn thy v c kin trc s ph duyt.
5.5.3

Ball valves or flow switches shall shut off the supply when the water level is 25mm below the
invert level of the overflow pipes.
Van cu hay cng tt s ngt khi mc nc thp hn cao y ca ng trn 25mm.

5.5.4

Invert level of inlet pipes or the face of outlet noses of the ball valves shall be minimum 25mm
above the top overflow pipes.
Cao y ng vo hay mi ca ng ra ca van cu ti thiu cao hn nh ng trn 25mm.

5.5.5

Vent pipes at the top of tanks shall be:ng thng hi trn nh b:

5.5.6

Vent pipes provided at the tank outlet of all the down pipes shall be :ng thng hi t ti tt c cc ng ra ca b:
(bb) 20mm diameter for outlets up to 150mm diameter,
ng knh 20mm cho cc loi ng ra c ng knh di 150mm,
(cc) 25mm diameter for outlets exceed 150mm diameter.
ng knh 25mm cho cc ng ra c ng knh ln hn 150mm.

5.5.7

Unless otherwise specified on the Drawings, all overflows, vents, stilling pipes and drain pipes
shall be:
Tr khi c cc ghi ch cu th khc trn bn v, tt c cc ng trn, ng thng hi v ng thot s
l:
(dd) Unplasticized polyvinyl chloride (PVC) pipes to ISO 4422:1990 and Water Authority
approved for drinking water material for potable water supply system,
Loi ng uPVC theo ISO 4422:1990 v C quan qun l Nc duyt cho h thng cp
nc c th ung c

J10068 12 Aug 2015


SN R05

81

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

5.6

Sump Pits
H thu

5.6.1

Concrete sump pits shall be provided by the Main Contractor unless otherwise specified.
H thu b tng c thc hin bi nh thu chnh tr khi c ch nh khc.

5.6.2

The Contractor shall supply and install all fittings as specified in the relevant section of this
Specification.
Nh thu cung cp v lp t tt c cc phu kin theo ch nh cc muc lin quan trong tiu
chun k thut.

5.6.3

The dimension of the sump pits shown on the Drawings are indicative only, exact sizes of all such
sump pits shall be adjusted to suit site conditions as well as to suit the manufacturing tolerance, all
as approved by the Architect.
Kch thc ca h thu th hin trong bn v ch mang tnh tham kho, kch thc cu th ca h
thu s c iu chnh theo thc t cng trng phu hp vi dung sai nh sn xut v c kin
trc s ph duyt

5.6.4

The Contractor shall check the construction drawings for sump pits and verify their correctness for
his installation purposes, or submit proposals for modification to the design, as necessary, and
shall assist in the supervision of their construction, in order to ensure their suitability and proper
functioning.
Nh thu s phi kim tra bn v thi cng ca h thu v lm r s hp l ca muc ch lp t,
hoc trinh phng n hiu chnh thit k, nu cn thit h tr gim st thi cng, m bo
s phu hp v cng nng tng thch

5.7

Level Switches in Sump Pit


Cng tc mc nc trong h thu

5.7.1

The Contractor shall supply and install level switches in sump pits as indicated below or shown on
the Drawings.
Nh thu cung cp v lp t ccong tt chuyn mch trong h thu nh ch dn bn di hoc
trong bn v.
(ee) 1st high level cut-in for duty submersible pumps,
Mc nc th nht m bm chim thng trc,
(ff)

2nd high level cut-in for standby submersible pumps,


Mc nc th hai m bm chim d phng,

(gg) 3rd high level alarm (overflow),


Mc nc th ba bo mc cao (x trn),
(hh) Low level cut-out complete with reset operation.
Mc nc thp ngt v trng thi u.
5.7.2

The float switches shall be of mechanical type.


Phao chuyn mch c dng c hc.

5.7.3

Submersible cable shall be of marine type to BS 6883 : 1969.


Cp chim s l loi cp bin theo BS 6883:1969.

J10068 12 Aug 2015


SN R05

82

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 6 SANITARY FIXTURES AND FITTINGS


PHN 6 THIT BI V SINH V PH KIN
6.1

General
Tng quan

6.1.1

The following sanitary fixtures and fittings shall be provided by Sanitary Fixtures and Fittings
Supplier:
Cc thit b v sinh c nh v phu kin s c cung cp bi nh cung cp thit b Cp thot
nc:
(ii)

Faucets,
Vi nc

(jj)

Exposed chrome plated pipes and wall escutcheons,


ng m crom v tng i ng,

(kk)

Pop-up drains, chains and plug wastes,


Ming thot, Dy xch v nt thot

(ll)

Flushing cisterns, fittings and pipes,


Binh x nc, phu kin v ng.

(mm)

Water closets and fittings,


Bn cu v phu kin,

(nn)

Wash basins and fittings,


Bn ra tay v phu kin,

(oo)

Kitchen sinks,
Bn ra bt,

(pp)

Urinals and fitments.


u tiu v cc thit b.

For ensuring a complete sanitary fixtures and fittings, any items which not mentioned above shall
be supplied by the P&D Contractor.
m bo hon tt cc thit b v linh kin, bt k hng muc no khng k trn s c cung
cp bi nh thu phu Cp thot nc.
6.1.2

All sanitary fittings and accessories shall be installed by the Contractor as shown on the
Schedules or specified. The P&D Contractor shall be responsible for the fixtures and fittings
against all risks including damage and theft until handover to the Employer.
Tt c cc thit b v sinh v phu tung c lp t bi nh thu nh c ch trong bng hoc
Danh muc thit b. Nh thu phu Cp thot nc s chu trch nhim v cc ri ro cho cc thit b
v phu kin bao gm cc hng hc v mt mt n khi ch u t tip nhn.

6.1.3

The Contractor shall accept the sanitary fixtures and fittings from the Sanitary Fixtures and Fittings
Supplier.
Nh thu phi chp thun cc thit b v linh kin t nh cung cp thit b Cp thot nc.

6.1.4

The P&D Contractor shall handle fittings into and/or out of store to job site. The Main Contractor
shall provide rigid store room for storage of the sanitary fixtures and fittings.
Nh thu phu Cp thot nc s m nhn cc linh kin xut nhp kho ti cng trng. Nh thu
chnh s cung cp kho cha thit b v linh kin.

J10068 12 Aug 2015


SN R05

83

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

6.1.5

The P&D Contractor shall check the quantity and quality when the sanitary fixtures and fittings
delivering into the assigned location from Sanitary Fixtures and Fittings Supplier. The Contractor
shall report to Main Contractor if the sanitary fixtures and fittings are damaged, spoiled and/or
incorrect in quantity.
Nh thu phu Cp thot nc s kim tra cht lng & s lng khi thit b & phu kin c giao
nhn t nh thu cung cp thit b. Nh thu phi bo co cho Nh thu chnh nu cc thit b v
lin kin b h hi, hng v/hoc khng ng cht lng.

6.2

Installation Requirement
Lp t thit b

6.2.1

The P&D Contractor shall set all fixtures in their final positions and fix rigidly as indicated on the
Drawings. All fittings to fixtures, i.e. pillar tap, waste outlets, plugs and chains, high level cisterns,
flushing pipes, flushing cisterns, outlets, wall flanges, traps, and the like shall also be fixed
according to the manufacturers recommendation.
Nh thu phu Cp thot nc s lp tt c thit b ti v tr cui cung ca h v c nh nh c
ch nh trn bn v. Tt c linh kin lp t nh vi nc, ng thot, nt v dy xch, bn
cha trn cao, ng x, bn x, ng ra, mt bch gn tng, by nc v cc thit b tng t phi
phu hp theo khuyn co ca nh sn xut.

6.2.2

The P&D Contractor shall supply and install all jointing and fixing materials and seals to structure
using Polysulphide sealant to the approval of the Architect and other accessory materials as
necessary, and make all connections to water supply services, overflows and wastes.
Nh thu phu Cp thot nc s cung cp v lp t tt c cc mi ni v vt liu hon thin v
s dung cht bt kn Polysulphide theo s chp thun ca kin trc s v cc vt liu phu cn thit
khc, v kt ni cc hng muc cp nc, x trn v thot nc.

6.2.3

Connection of fixtures outlets shall be as specified in this Specification. Using proper jointing
medium of the type approved by Architect shall make waste outlets to lavatory basins, baths,
urinals bowls and sinks.
Mi ni u ra cu thit b s tun theo cc tiu chun nh trong bng Tiu ch k thut. Dung loi
mi ni trung tnh theo yu cu ca kin trc s ni ng thot ca bn ra tay, bn tm, u tiu
v chu ra bt.

6.2.4

The fixing method of all sanitary fittings shall be submitted to the Architect for approval. The P&D
Contractor shall ensure that installation of fixtures and fittings shall be in strict accordance with the
manufacturers recommendation.
Phng php lin kit cc linh kin s phi trinh cho kin trc c xt duyt. Nh thu phu
Cp thot nc m bo rng vic lp t cc thit b v phu kin ng theo khuyn co ca nh
sn xut.

6.2.5

The Drawings only indicate the approximate positions of sanitary fixtures, exact positions shall be
approved by the Architect before the fixtures are finally set in position.
Cc bn v ch th hin v tr tng i ca thit b, v tr chnh xc s phi c kin trc s xt
duyt trc khi c lp vo v tr cui cung.

J10068 12 Aug 2015


SN R05

84

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

6.3

Protection of Sanitary Fixtures and Fittings


Bo v thit b v linh kin

6.3.1

The sanitary fixtures and fittings shall be well protected by the P&D Contractor from damage of
any kind. After installation, each fixture shall be well protected from damage and spoilage by
effects of weather and subsequent construction and the finishing activities of other trades.
Cc thit b v linh kin s c bo v tt bi Nh thu phu Cp thot nc trnh bt k cc
hng hc no. Sau khi lp t, mi thit b s c bo v khi h hi v hng hc di tc ng
ca thi tit, trong qu trinh thi cng v hon tt s dung a vo s dung.

6.3.2

After completing installation of the sanitary fixtures and fittings, the P&D Contractor shall supply
and install protective crating with carton cardboard and plastic sheets to prevent damage until
handover to the Employer. The carton cardboard and plastic sheets shall be submitted to Architect
for approval.
Sau khi hon tt vic lp t thit b v phu kin, Nh thu phu Cp thot nc cung cp v lp
t cc tm carton hay tm nha ngn h hi cho n khi ch u t tip nhn. Tm carton
hay tm nha s phi trinh cho kin trc s xt duyt.

6.3.3

All damaged fixtures or fittings due to improper installation, storage or handling will be rejected by
the Architect and shall be replaced with new, undamaged items as specified. Any costs shall be
borne by the P&D Contractor.
Tt c cc h hi ca thit b hay linh kin do lu tr, vn chuyn hoc lp t khng ng s b
loi b v c thay bng thit b mi, khng hng hc theo nh ch nh. Tt c chi ph Nh thu
phu Cp thot nc phi chu.

6.4

Supply of Accessories
Cung cp phu kin
The P&D Contractor shall supply and install all required accessories so that the sanitary fixtures
operate satisfactorily as complete functional units. The accessories shall be included (but not be
limited to):
Nh thu phu Cp thot nc s cung cp v lp t tt c cc phu kin yu cu phu hp vi
cng nng s dung ca thit b. Cc phu kin bao gm (nhng khng gii hn):
a.

Bottle Trap with anti-syphon running traps for wash basin, the trap shall be white plastic
unless other specified;
By nc hinh chai cho bn ra tay, by nc bng nha trng tr khi c yu cu khc;

b.

All stainless steel bolts and nuts for fixing fixtures and assembly of their components. The
Contractor shall fully co-ordinate with the Sanitary Fittings Supplier to ensure all necessary
accessories have been provided;
Tt c bu lng v ai c bng thp khng g gn cho cc phu kin. Nh thu kt hp vi
nh cung cp phu kin thit b v sinh nhm m bo tt c phu kin cn thit c cung
cp.

c.

Flush pipes in between the flushing cistern and urinals shall be of stainless steel pipes and
fittings for exposed pipework, and uPVC pipes for concealed pipework.
ng x gia bn cha nc x v chu tiu nam v phu kin cho cng tc ng h l loi
ng thp khng g, v ng uPVC cho cc ng i m.

J10068 12 Aug 2015


SN R05

85

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

6.5

Test of Sanitary Fixture Function


Th nghim chc nng thit b v sinh

6.5.1

Before ordering the sanitary fixtures and fittings, one set of sample fixtures and fittings shall be
early delivered on site for testing the function. The P&D Contractor shall liaise with the Main
Contractor and co-ordinate with the Sanitary Fixtures and Fittings Supplier in determining the
proper delivery programme.
Trc khi t hng thit b v sinh v phu kin, t mt mu thit b v phu kin giao sm n
cng trng th nghim chc nng. Nh thu phu Cp thot nc gi lin lc vi thu chnh
v kt hp vi nh cung cp thit b xc nh qu trinh giao hng phu hp.

6.5.2

The P&D Contractor shall be responsible for testing the function of each type sanitary fixtures and
fittings as follows (but not be limited to):Nh thu phu Cp thot nc chu trch nhim th nghim chc nng ca tt c cc loi thit b
v sinh v phu kin nh sau (nhng khng gii hn):

6.5.3

a)

Water closet with flushing valve,


Bn cu vi van x,

b)

Urinal with auto-cistern & auto sensor


u tiu vi bn nc t ng v cm ng.

The sanitary fixtures and fittings shall be connected with temporary water supply pipes and
drainage pipes. The test equipment such as pumps, tank, meter, pressure gauge, etc. shall be
provided by the P&D Contractor.
Thit b v sinh v phu kin c ni vi ng cp v ng thot tm thi. Th nghim thit b nh
bm, b, ng h, p k v.v. c cung cp bi Nh thu phu Cp thot nc.

J10068 12 Aug 2015


SN R05

86

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 7 INSTANTANEOUS ELECTRIC WATER HEATER


PHN 7 MY NC NNG TRC TIP
7.1

General
Tng quan

7.1.1

The contractor shall be provided all equipment, including the necessary work required for proper
installation and adjustment of the instantaneous electric water heater. The size and quantity of
equipments can produce the flow rate of hot water and temperature as required on the drawings.
Nh thu s cung cp thit b, bao gm cc thit b cn thit yu cu cho cng tc lp t v iu
chnh my nc nng trc tip. Kch thc v s lng ca thit b c th sn xut ra lu lng
nc nng v nhit d theo yu cu thit k.

7.1.2

The contractor shall test and operate the equipment in order to demonstrate its performance. He
shall also instruct the Employer / Owners operating personnel in the operation and maintenance
of the equipment.
Nh thu s kim tra v vn hnh thit b m bo cht lng. Nh thu cng cn hng dn
ch u t vn hnh v bo tri thit b.

7.1.3

Material and equipment to be supplied shall be the standard products of manufacturer regularly
engaged in manufacturing the products conforming to the Specification.
Vt t v thit b c cung cp s l nhng sn phm tiu chun ca nh sn xut theo tiu ch
thit k.

7.2

Instantaneous Electric Water Heater


My nc nng trc tip
The water heater shall be instantaneous electric type, compact design to produce hot water not
less than 2.0 litre/min to be used for mixing valve. The electrical consumption shall be approx. 6
kilowatt at 220V/1/50 Hz.
My nc nng trc tip s l loi trc tip dung in, thit k trn b sn xut ra lng nc
nng khng nh hn 3 l/pht c s dung vi van ha trn. in nng tiu thu s khong 6kW
220V/1/50 Hz.

J10068 12 Aug 2015


SN R05

87

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 8 ELECTRIC STORAGE WATER HEATER


PHN 8 MY NC NNG GIN TIP
8.1

General
Tng quan

8.1.1

The contractor shall be provided all equipment, including the necessary work required for proper
installation and adjustment of the instantaneous electric water heater. The size and quantity of
equipments can produce the flow rate of hot water and temperature as required on the drawings.
Nh thu s cung cp thit b, bao gm cc thit b cn thit yu cu cho cng tc lp t v iu
chnh my nc nng trc tip. Kch thc v s lng ca thit b c th sn xut ra lu lng
nc nng v nhit d theo yu cu thit k.

8.1.2

The contractor shall test and operate the equipment in order to demonstrate its performance. He
shall also instruct the Employer / Owners operating personnel in the operation and maintenance
of the equipment.
Nh thu s kim tra v vn hnh thit b m bo cht lng. Nh thu cng cn hng dn
ch u t vn hnh v bo tri thit b.

8.1.3

Material and equipment to be supplied shall be the standard products of manufacturer regularly
engaged in manufacturing the products conforming to the Specification.
Vt t v thit b c cung cp s l nhng sn phm tiu chun ca nh sn xut theo tiu ch
thit k.

8.2

Electric storage water heater


My nc nng gin tip
The electric storage water heater should comply to IEC 60335-2. The electrical consumption shall
be approx. 4 kilowatt at 220V/1/50 Hz.
Bn nc nng gin tip tun theo IEC 60335-2. in nng tiu thu s khong 4kW
220V/1/50 Hz.
The tank shall be glass-lined tank with high quartz density enamel. The water heater should
include UL approved combined temperature and pressure relief (TPR) safty valve provides
protection against excessive water pressure, adjustable thermostat with over temperature
protection.
Bn nc nng l loi bn c lt trng men thch anh mt cao. Bn nc nng cn bao gm
van an ton p sut v nhit kt hp c UL chng nhn bo v thit b trong qu trinh
qu p, thit b o nhit c kh nng iu chnh bo v qu nhit.

J10068 12 Aug 2015


SN R05

88

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 9 - SWIMMING POOL FILTRATION AND CIRCULATION PLANT


PHN 9 H THNG LOC V TUN HON NC H BI
9.1

General
Khi qut

9.1.1

This Section specifies the construction and fitting/ accessories of the pool filtration, pool
circulation, which shall form part of the Works as shown on the Drawings.
Phn ny ch nh vic xy lp v cc b phn ni hoc phu kin ca h lc h bi, h tun hon
nc h bi nh l mt phn ca Cng vic c th hin trn cc Bn v.

9.1.2

Unless specifically stated otherwise, the terms "Filtration & Circulation System" or "system" when
used in a general context shall mean all the filters, filter media, valves, pipework, fittings, controls,
chemicals, chemical tanks, chemical dosing pumps, pool fittings, underwater lights and all other
components and accessories required for the complete installation of the system as shown on
the Drawings.
Tr khi c ch nh khc, khi khi nim H thng lc v Tun hon hoc H thng c s
dung s c cp n tt c cc b lc, lc tng, van, ng ng, cc b phn ni, cc phn
khin, ha cht, b ha cht, bm chm ha cht, b lp bm, en di nc v tt c cc
thnh phn v phu kin cn thit khc hon tt cng tc lp t h thng nh th hin trn
bn v.

9.2

Sand Filter
B lc ct

9.2.1

Filters shall be of vertical type pressure sand filters. The filter shall have a fibreglass shell
complete with internal distribution and draw-off trough, faced pads for inlet, outlet, manometers,
wash-in, drain, adequate sized access manholes, filter supporting feet, filtering media, sight
glass, pressure and gauge(s) and sundry accessories. Connection size of each filter vessel to be
the range of 50mm diameter to 150mm diameter to suit the designed system.
B lc phi l b lc ct c p kiu ng. B lc phi c lp v bng si thy tinh c hon
thin vi mng phn phi v tho nc bn trong, tm p cho ng vo, ng ra, p k, git trong,
b phn x, ca thm kch thc phu hp, chn b lc, tm lc, knh quan st, ng h o p
v cc phu kin phu. Kch thc kt ni ca mi ng lc phi trong khong t ng knh 50mm
n 150mm phu hp vi h thng thit k.

9.2.2

Filter bed shall consist of at least two but preferably more layers of filter media, each having a
different particle size properly supported by a suitable under drain. The filter manufacturer or
supplier to ensure correct size and capacity.
Lc y phi bao gm t nht hai hay nhiu lp lc tm, mi lp c mt kch c ht khc nhau
c chng bi mt b phn x thch hp bn di. n v cung cp hoc nh sn xut b
lc phi m bo cung cp ng kch c v cng sut b lc.

9.2.3

Finished filter vessels shall be subjected to a pressure test of not less than of the system twice
the actual working pressure. Temperature rating for the filter vessels to be 50oC minimum.
ng lc sau cung phi c th p khng thp hn hai ln mc p sut lm vic thc t. Nhit
danh nh ca b lc ti thiu 50oC.

9.2.4

Filters may be selected at a maximum filtration rate of 25 cubicmeters of water per square metre
of filter area per hour or other values as recommended by the manufacturer.

J10068 12 Aug 2015


SN R05

89

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

B lc c th c la chn ti mc lc 25 mt khi nc trn mt mt vung din tch lc trong


mt gi hoc mt gi tr khc nh khuyn co ca nh sn xut.
9.2.5

The filter package shall be include a multi-port valve having the following functions:
B lc phi bao gm mt van nhiu cng c nhng tnh nng sau:
a.

Filtration
Lc

b.

Backwash
Ra ngc

c.

Rinse
Sc

d.

Recirculation
Ti tun hon

e.

Drain
X

f.

Close
ng

9.3

Chemical Pumps
Bm ha cht

9.3.1

The chemical dosing pumps shall be of adjustable dosing rate type operated by eccentric cam
and plunger or approved equal.
Bm nh lng ha cht phi l loi c mc nh lng iu chnh c vn hnh bng truc
cam v pttng lch tm hoc loi tng ng c chp thun.

9.3.2

The stroke/frequency of the pumps shall be adjustable by operation of a manual control without
interfering the operation of the pump.
Hnh trinh hoc tn sut ca bm phi l loi iu chnh c bng tay m khng lm nh
hng n hot ng ca bm.

9.3.3

The pump rate shall be automatically self-adjusting and shall reduce to minimum when the preset
PH/RH level is reached and the signal shall be from the sensor immersed in the pipe line.
nh mc ca bm l loi t ng iu chnh v phi t ng gim n mc thp nht khi
PH/RH t gi tr ci t v tnh hiu nhn c t cm bin nhng trong ng ng.

9.3.4

All parts of the pump including diaphragm, pump body, and the drawing mechanism shall be
suitable for use with the system and the substances to be conveyed.
Tt c cc b phn ca bm bao gm mng bm, thn bm v c cu c kh phi thch hp vi
ng dung ca h thng.

9.3.5

The driving mechanism shall be lubricated by oil pump built into the casing of the unit.
C cu truyn ng phi c bi trn bng du nm trong v bm.

9.3.6

The chemical pump sets shall be complete with controller for PH and RH control, motors, suction
and delivery connections, and shall be of self-adjusting capacity type to suit the instantaneous
requirements of the filtering plant.

J10068 12 Aug 2015


SN R05

90

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Cc b bm ha cht phi c hon thin vi b iu khin kim sot PH v RH, cc


ng c, kt ni u ht v u y, v phi c kh nng t iu chnh phu hp vi cc yu
cu tc thi ca h thng lc.
9.3.7

Adjustment of the injection rate shall be automatic by "variable stroke" or other approved means
of verifying pump capacity at the dictates of a dosage regulator, acting on the signal of a sensing
cell. A digital display of the instantaneous PH/RH valve of the pool water shall be provided in the
pump assembly.
S iu chnh mc phun ha chy phi c t ng ha bi hnh trinh bin i hoc theo
phng php khc c chp thun nh xc nhn cng sut bm theo lnh ca b iu chnh
nh lng, phn ng theo tn hiu t t bo cm bin. Mt mn hinh k thut s hin th mc
PH/RH ca nc h bi phi c cung cp theo bm.

9.3.8

The residual chlorine sensing cell shall receive samples water from the pool via a small sampling
pump.
T bo cm bin clo tha phi nhn mu nc h bi thng qua mt bm ly mu.

9.3.9

The pump sets shall be complete with motor, control switches and all other accessories required
for the proper operation of the system.
B bm phi c hon thin vi ng c, cng tt iu khin v tt c cc phu kin khc cn
thit h thng hot ng chnh xc.

9.3.10

The electrical work shall comply with requirements in the "Electrical Installation" Section of this
Specification.
Cng tc u ni in phi tun th theo Phn Lp t in trong Tiu Ch K Thut ny.

9.4

Chemical Tanks
Binh ha cht

9.4.1

The chemical tanks shall be complete with all accessories and connections including supporting
frames, drains and covers as required for the proper operation of the system and incorporate also
a motorized stirrer mounted on the tank to form an integral unit.
Cc binh cha ha cht phi hon thin vi tt c cc phu kin v cc chi tit ni bao gm khung
, l x, tm ph theo yu cu h thng vn hnh chnh xc v kt hp vi dung cu khuy
bng ng c treo trn binh cha nh l cum thit b nguyn khi.

9.4.2

The tanks shall be of adequate size to store chemicals for use for at least one month.
Binh cha ha cht phi c kch c thch hp tr ha cht dung trong t nht mt thng.

9.4.3

The tank shall be of adequate strength with appropriate reinforcement and shall not deform when
filled with chemical solutions.
Binh cha phi chc chn vi s gia c thch hp v phi khng b bin dng khi c chm
y ha cht.

9.4.4

Covers shall be provided in all tanks with hinges and designed for easy recess for services
Np y phi c cung cp cho tt c cc binh cha kem bn l v phi c thit k thun
tin cho vic bo tri.

J10068 12 Aug 2015


SN R05

91

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

9.4.5

Chemical tanks shall be manufactured from materials suitable for use with the solution being
handled and shall not deteriorate due to chemical action.
Binh cha ha cht phi c sn xut t cc loi vt liu thch hp khng b hy hoi bi
cc phn ng ha hc.

9.5

Pool Fittings
Phu tung h bi

9.5.1

Pool inlet grilles, underwater lights, overflow outlets, vacuum adaptors & skimmers shall be
provided and installed at locations as shown. Alternative location may be accepted on approval of
the Project Manager.
Ming cp nc h, en di nc, ming x trn, vacuum adaptors & skimmers phi c
cung cp v lp t ti cc v tr nh th hin. Cc v tr thay th c th c chp nhn khi c
Qun l d n chp thun.

9.5.2

The pool inlet fittings shall be of each having an orifice plate fitted as appropriate as to ensure a
balance flow and shall be adjustable without dismantling the fitting and pipework. Alternatively, a
proprietary type of diffusing inlet may be offered for approval at the time of tender.
Tng phu kin ng vo h bi phi c tm t l thch hp m bo cn bng lu lng v c
th iu chnh c lu lng m khng cn tho d phu kin v ng ng. Ngoi ra c th
trinh loi khuych tn ng vo c chp thun vo thi im np thu.

9.5.3

The skimmers shall be constructed with overflow weirs, basket strainers, equalizer valve, flow
control devices for monitoring and adjustment of pool water level. If water level drops below skimopening, valve will open and water will be drawn through equalizer line. Valve closes
automatically when pool water is restored to operable level. The skimmers shall have removal top
covers for removal of the basket strainers for cleansing purpose.
Cc b ht nc b mt phi c cu to gm p trn, lc r, van cn bng, thit b iu khin
lu lng theo di v iu chnh mc nc trong h. Nu mc nc trong h thp hn l m
ca b ht b mt, van s m v nc s ht t ng ng cn bng. Van ng t ng khi
mc nc h dng ln mc hot ng binh thng. B ht nc b mt phi c np tho ra t
pha trn lm sch r lc.

9.6

Hair Lint Strainer


B lc tc v x vi
Hair lint strainer of bucket type with quick opening device shall be provided in the suction line of
each pump. The strainer shall comprise of best quality closed grain grey cast iron casing. The
strainers shall have quick release spring loaded swivelling cage cover. Complete with self-sealing
type cover joint ring. Strainer cage shall be constructed of stainless steel mounted on cast iron
cage ring with cast iron handle. A cock shall be fitted on the cover and a wrought iron plug
provided on the bottom of the body for drainage purposes. Basket screen shall be in stainl ess
steel.
B lc tc v x vi loi chu cha vi b phn m nhanh phi c cung cp trn ng ht
ca mi bm. B lc phi c lp v bng gang xm, kn kht, cht lng cao. B lc phi c np
khoang xoay nh nhanh bng l xo. Hon thin vi v t chen loi ni vnh. V b lc phi c
lm bng thp khng g t trn b gang vi tay nm bng gang. Mt vi kha c gn trn v
v mt nt bng thp hn c gn di y ca thn b lc x nc. Gi lc phi c lm
bng thp khng g.

J10068 12 Aug 2015


SN R05

92

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

9.7

Pool Maintenance Equipment


Thit b bo dng h
The Contractor shall provide one complete set of pool maintenance equipment which shall
include the following:
Nh thu phi cung cp mt b thit b bo tri bm hon chnh bao gm:
a.

Vacuum sweeper kit comprising, 300mm wide, 8-wheel flexible plastic vacuum head.
Telescopic handle 6.4m/4.8m. One 40mm hose wall coupling and one 40mm x 17m hose.
Dung cu ht ng chn khng bao gm u ht chn khng bng nha do 8-bnh, rng
300mm, Tay ko rt 6.4m/4.8m. Mt khp ni ng 40mm v mt ng 40mm x 17m.
This kit to be used by connecting into one of at least two hose/wall coupling points around
the perimeter of the pool. The wall points to connect to the suction line of the filtration plant
pipework.
Dung cu ny c s dung ni vo mt ca t nht 2 khp ni vch xung quanh h.
Cc im trn vch kt ni n ng ht ca h thng lc.

b.

One 450mm curved wall and floor brush, plastic back and complete with 6.4m/4.8m
telescopic, silver anodized handle.
Mt tng cong 450MM v bn chi sn, tm lt nha v hon thin vi tay ko rt xi m
bc 6.4m/4.8m

c.

One leaf skimmer with a sturdy plastic covered aluminium frame with connecting piece for
telescopic handle.
One leaf skimmer with a sturdy plastic covered aluminium frame with connecting piece for
telescopic handle.

d.

One rescue hook to fit telescopic handle.


Mt mc cu cu h gn voo tay ko rt.

9.8

Underwater Lighting
en di nc

9.8.1

The underwater lighting system shall be in accordance with the pool fittings schedule of this
Specification. Besides, 24 hour timer control with by-pass switch for manual operation shall be
included.
H thng en di nc phi phu hp vi danh muc phu kin h bi ca Tiu ch k thut ny.
Ngoi ra, cn phi bao gm b iu khin 24 gi vi cng tt chuyn sang ch vn hnh tay.

9.8.2

All underwater lights with electrical accessories directly in contact with water shall be supplied at
a voltage not exceeding 12 volts. All underwater lights shall be of such construction to allow the
removal/replacement of the lens or lamp bulbs under water without emptying the pool. Main pool
lighting normally to be 300W/12V, while children pool to be 75W/12V subject to the design
requirement and refer to the relevant lighting schedule as shown in the Drawings.
Tt c en di nc vi cc phu kin in tip xc trc tip vi nc phi c cp ngun thp
hn 12 vn. Tt c en di nc phi c cu to cho php tho d hoc thay th bng en
di nc m khng cn tho cn h. en chiu sng h chnh thng thng c mc in p 12
vn cng sut 300W, trong khi en h bi tr em l 75W/12V tuy thuc vo yu cu thit k
v tham kho danh muc en th hin trn bn v.

J10068 12 Aug 2015


SN R05

93

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Such low voltage supply shall be given by a double wound transformer in an earthed metal
casing, with the centre point of the low voltage winding earthed and the transformer located at the
Filtration Plant Room.
Mc in th thp nh vy phi c to ra t my bin th li kp trong v kim loi c ni
t, my bin th c t ti phng lc trung tm.
Test certificates of the transformers from a recognised testing agent or institution shall be
submitted for the Project Manager's approval.
Giy chng nhn th nghim ca cc my bin th t cc n v hoc hip hi c tha nhn
hoc phi c trinh cho Qun l d n chp thun.
All wiring from the transformer to the underwater lights shall be carried out in screwed galvanized
conduit or mineral insulated copper covered cable.
Tt c cc dy ni t my bin th n cc en di nc phi c lun trong ng thp trng
km hoc l loi cp in ng ph lp cch ly bng vt liu v c.
Each lighting circuit shall be protected by an independent residual current device.
Mi mch en phi c bo v bi thit b qu dng c lp.
9.8.3

Recessed luminaires shall be of wet niche design and robust construction of stainless steel for
maximum durability in chemically treated water with one lamp, rating as specified in the pool
fittings schedule and suitable for underwater application.
Cc mng en lp m phi l loi thit k cho hc tng m v c cu to vng chc t thp
khng g t bn cao nht trong mi trng nc c x l ha cht vi mt bng en, quy
cch nh c ch nh trong bng danh muc phu kin v thch hp s dung trong mi trng
nc.

9.8.4

Electrical supply shall be fed through a flexible plastic hose of sufficient length to permit the
removal of the floodlight on to the pool surround for maintenance.
Cp ngun in phi i trong ng nha do c chiu di cho php tho d en pha xung
quanh h bo tri.

9.8.5

Watertight junction box shall be the type suitable for recessing into the surface of the pool
surround or in walls.
Hp u ni kn nc phi thch hp cho vic lp t trn b mt sn quanh h hoc lp trn
tng.

9.9

Chlorination Equipment and Chemical Controller


My clo ha v b kim sot ha cht

9.9.1

The hypochlorinator shall be capable of dosing sodium hypochlorite solution into the treated,
water to provide 'break-point' chlorination so that free available chlorine residues is kept at 1.5
P.P.M. in the swimming pool. The pump shall be of adequate size for the injection of chemical
and shall be capable of handling the chemical solution.
B kim sot mc hypochlorite natri phi c kh nng phi liu mc hypochlorite natri vo trong
nc x l cung cp im gy clo m lng clo kt ta gi mc 1.5 phn triu trong
h bi. Bm nh lng phi c kch c thch hp phun ha cht v c kh nng lm vic vi
dung dch ha cht.

J10068 12 Aug 2015


SN R05

94

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

9.9.2

The hypochlorinator shall be provided with all essential safety and all accessories equipment to
form a complete chlorinator system. This shall includes but not limit to hypochlorite store tank,
measuring device, agitator, water make-up, piping, valves and controls.
B kim sot mc hypochlorite natri phi c cung cp vi tt c cc bin php an ton cn
thit v tt c cc phu kin cn thit hon thin h thng kh trung bng clo.

9.9.3

The chemical controller should include the following items to monitor the water quality:
B kim sot ha cht phi bao gm cc muc sau tm sot cht lng nc:
a.

pH control range from 7.0 to 8.0 "0.05 with direct dial setpoint.
Kim sot pH t 7.0 n 8.0 vi im ci t chn s trc tip 0.05

b.

Two sanitizer control ranges from 0.3 to 3.0 and from 0.6 to 6.0 PPM of free active sanitizer
"5% with direct dial setpoint.
Hai b kim sot cht kh trung t 0.3 n 3.0 phn triu v t 0.6 n 6.0 phn triu
ca cht kh trung hot ng t do im ci t chn s trc tip 5%

c.

LED digital displays for pH and PPM, each with single calibration adjustment.
Mn hinh i t pht quang k thut s hin th pH v mc phn triu cho tng thit
b cn chnh ring bit.

d.

Simultaneous calibration of meters and chart recorder with standard pH/PPM test kit and
without signal generating device.
B iu chnh ng b ca ng h o v b ghi biu vi dung cu th nghim pH/PPM
v thit b khng to ra tn hiu.

e.

Sealed pH and 0.5 cm2-ring platinum ORP combination electrodes.


Lp cn pH v vng in cc 0.5 cm2 kt hp bch kim v ORP

f.

Single plug-in, anticorrosion-coated, enclosed electronic control module with five (5)-year
manufacturer warranty.
M un iu khin in t ng kn, sn chng g, ng cm n vi thi hn bo hnh 5
nm t nh sn xut.

g.

Factory-calibrated high/low safety alarms and feed lockout. Sanitizer feed lockout for pH outof-range condition. Wiring for remote alarm.
Bo ng an tan mc cao/thp hiu chnh ti nh my v c kha li. C kha b kh
trung cho pH nm ngoi vung iu kin. i dy cho bo ng t xa.

h.

Momentary switch for ORP readout on PPM meter.


Cng tc tm thi c thng s nguy c gim ch s xi ha trn ng h phn triu.

i.

Two (2) panel-mounted automatic reset solid state timers for overfeed protection with direct
dial 0-to-3 hr. adjustment.
Hai bng treo nh gi mch rn t ng bo v cp trn vi di hiu chnh trc tip t 0
n 3 gi.

j.

7-day quartz timer with 48-hr. battery reserve power for automatic super-chlorination cycle
with simultaneous pH control.
B nh thi thch anh 7-ngy vi pin dung trong 48-gi cho chu trinh clo ha t ng ng
b vi iu khin pH.

J10068 12 Aug 2015


SN R05

95

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

k.

7-day quartz timer with 48-hr. battery reserve power for over-night feed control
programming.
B nh thi thch anh 7-ngy vi pin dung trong 48-gi cho chng trinh iu khin cp
liu qua m.

l.

Safety feed interrupt flow switch with panel-mounted override switch and flow interruption
light.
Cng tc an ton ngt dng cp liu vi bng treo c cng tc khng ch v en bo ngt.

9.10

Chemical Dosing Equipment


Thit b nh lng ha cht

9.10.1

Chemical treatment of the pool water shall comprise dosing of sodium bisulphate or other
approved chemical to balance the alkalinity of water. Centralised preparation and storage tank
shall be provided for the filtration plant and shall be capable of providing 12 hours continuous
supply of chemical between re-charging. The chemical preparation and storage tank shall be of
reinforced fibreglass construction complete with dissolving tray, agitator, outlet, overflow, drain
fittings, strainer, and isolating valves.
X l ha cht cho nc h bi phi bao gm mt lng mui axt (axt kh) hoc loi ha cht
c chp thun khc cn bng kim ca h bi. Bn cha v s chun b tp trung phi
cung c cung cp cho trm lc v phi c kh nng cp ha cht lin tuc trong 12 gi gia
mi ln np li. Bn chun b v bn cha ha cht phi c cu to t si khong gia cng
c hon thin vi khay ha tan, b khuy, u ra, x trn, phu kin x y, lc v van cch ly.

9.10.2

Chemical dosing pump for sodium bisulphate shall be of plastic diaphragm type controlled by an
on/off type adjustable percentage timer to provide an accurate adjustment of the feed rate and
intermittent operation of the pump.
Bm nh lng ha cht cho mui axt phi l loi mng chn nha iu khin bi b hn gi
theo ty l phn trm kiu tt/m iu chnh chnh xc lng ha cht cp vo v vn hnh
ngt qung bm.

9.10.3

Dosing pumps shall be interlocked with the filter recirculating pumps so that they operate only
when the pumps are running.
Cc bm nh lng phi l loi kha lin ng vi cc bm lc tun hon bm nh lng
ch hot ng khi cc bm lc tun hon chy.

9.11

Test Kits
Dung cu th nghim
The Contractor shall supply and hand-over to the Employer one test kit comprise of kits for the
testing of pH value, chlorine residual.
Nh thu phi cung cp v bn giao cho Ch u t mt b dung cu th nghim kim tra
pH v Clo.
Range of pH to be of 6.8 to 8.4.
Di o pH t 6.8 n 8.4
Range of chlorine to be of 0.2 to 4.0 mg/litre.
Di o clo t 0.2 n 4.0 mili gam/lt

J10068 12 Aug 2015


SN R05

96

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

9.12

Chemicals for Commissioning and Testing Chemicals


Ha cht chy th v nghim thu ha cht

9.12.1

All chemicals for commissioning and testing purposes of the filtration system shall be supplied by
the Contractor.
Tt c cc ha cht dung cho chy th v nghim thu h thng lc phi c cung cp bi nh
thu.

9.12.2

The Contractor shall also include for the supply of the dose of chemicals after the acceptance of
the testing and commissioning of the system up to one month beyond hand-over of the system.
Nh thu cng phi cung cp ha cht sau trong khong thi gian t khi kt thc chy th v
nghim thu n mt thng trc khi bn giao ton h thng.

9.12.3

All chemicals for the normal operation of the system after hand over to the Employer shall be
supplied by the Employer.
Tt c cc ha cht cho h thng vn hnh binh thng sau khi bn giao cho Ch u t c
cp bi Ch u t

9.13

Installation
Vic lp t

9.13.1

The filters shall be installed vertically as shown.


Cc b lc phi c lp ng nh th hin.

9.13.2

Each filter shall be mounted on legs of robust construction to withstand the operation load and
vibration liable to occur in the system.
Mi b lc phi c treo trn gi cu to chc chn chu c ti trng v s rung ng
ca h thng.

9.13.3

The filters shall be installed in such a way that future maintenance to the inside of the filter
through manholes can be achieve without dismantling other services and its associated
accessories. All control valves and equipment shall be installed for each operation.
Cc b lc phi c lp t theo cch c th tin hnh bo tri bn trong cc b lc t cc
ca thm m khng cn tho d cc cu kin cc v cc b phn co lin quan ca chng. Tt c
cc van iu khin v thit v phi c lp t theo tng cng on.

9.13.4

The chemical pumps and motors shall be housed in a common enclosed and the whole shall be
able to be mounted on its own supporting plinth readily provided with fixing holes, etc..
Bm ha cht v cc ng c phi c gn trong cc v kn v ton b cu kin ny phi c
kh nn treo trn chnh b ca chng bi cc l c nh,v.v..

9.13.5

Anti-vibration linings shall be provided between the bedplate and the plinth and detail shall be
submitted by the Contractor.
Cc lp lt chng rung phi c cung cp gia phin v b , chi tit lp t c cung
cp bi nh thu.

9.13.6

All valves, controls and gauges, etc., shall be installed for easy access and routine operation.
Tt c cc van, b iu khin v ng h o,v.v.. phi c lp sao cho d tip cn v d vn
hnh thng xuyn.

J10068 12 Aug 2015


SN R05

97

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

9.13.7

The chemical tanks shall be mounted on plinths. Tank supports and anchors shall be provided by
the Contractor and shall be of adequate strength to accommodate the operating weight and
vibration liable to occur in the system.
Cc b cha ha cht phi c t trn cc b . Cc gi bn cha v cht neo phi c
cung cp bi nh thu v phi chc chn chu c ti trng lm vic v rung ng pht
sinh trong h thng.

9.13.8

The tanks shall be installed in such a way so as not to interfere other systems when the tank is
being serviced.
Cc b cha phi c lp t sao cho khng nh hng n cc h thng khc mi khi cc b
c sa cha.

9.13.9

Reinforcement shall be provided to ensure adequate strength both on the sides and the bottom of
the tanks.
S gia cng phi c cung cp m bo cho mi mt cnh v mt y ca b cha.

9.13.10 Outlet & drain shall be provided with isolating valves & where necessary.
Van cch ly phi c lp ng ra v ng x v nhng v tr cn thit khc.
9.13.11 The Contractor shall supply and install the conduits and wiring, junction boxes, transformers and
all necessary accessories required for the operation of the underwater lights.
Nh thu phi cung cp v lp t h thng ng v dy dn in, hp u ni, my bin th v
tt c cc phu kin cn thit khc cho s hot ng ca cc b en di nc.
9.13.12 Details of the underwater lights including method of waterproofing and grounding attachment,
etc., shall be submitted by the Contractor.
Chi tit ca cc en di nc bao gm phng php chng thm v ni t,v.v.. phi c
trinh bi Nh thu.
9.13.13 It is the intention of the Contract that all pool fittings including the underwater lights, inlet, main
drains, gutter drains etc. to be cast into their appropriate positions before pouring of concrete.
Boxing outs of pool fittings are strictly prohibited.
C s lu trong Hp ng rng tt c cc phu kin h bi bao gm cc en di nc, u
vo, ng x chnh, mng x,v.v phi c th theo ng v tr ca chng trc khi b
tng. t hp ch cho cc phu kin h bi tuyt i b cm.
9.13.14 The Contractor shall place the pool fittings in position and secured firmly prior to concreting. The
Contractor shall ensure the fittings are correctly positioned to avoid modification in future.
Nh thu phi t cc phu kin h bi ng v tr v c nh chc chn trc khi rt b tng. Nh
thu phi m bo cc phu kin phi ng v tr trnh vic chnh sa trong tng lai.
9.13.15 Any damaged finishes shall be made good to the satisfaction of the Interior Designer. Damage
fittings shall be replaced with identical product to be installed in the system.
Tt c cc h hng cho cc b mt hon thin phi c sa cha tt lm hi lng ngi
thit k ni tht. Nhng phu kin b h hng phi c thay th bi ng loi sn phm lp trong
h thng.

9.14

Finishes
Hon thin

J10068 12 Aug 2015


SN R05

98

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

9.14.1 All filters shall be factory painted or finished in accordance with the manufacturer's
recommendations.
Tt c cc phin lc phi c sn hoc hon thin ti nh my phu hp vi khuyn co ca nh
sn xut.
9.14.2

All damages to finishes which may have occurred during transit, storage, installation or otherwise
shall be made good in the manner recommended by the manufacturer and to the satisfaction of
the Interior Designer.
Tt c cc s h hi do vn chuyn, tr, lp t phi c x l theo khuyn co ca nh sn
xut v p ng yu cu ca thit k ni tht.

9.14.3

In addition, the units may be required to be given another finishing coat (or coats) as may be
specified elsewhere to match the Interior Designer's colour coding for the plant room.
Nu thit k ni tht c yu cu v mu sc thi cc thit b ny phi c thm mt lp hon thin
khc tha ch nh.

9.15

Identification
Nhn dng

9.15.1

All pumps and chemical tanks shall be provided with an identification plate showing the code
number for each unit and the chemical stored in the tanks.
Bm v binh cha ha cht phi c nhn th hin m s cho tng thit b v loi ha cht cha
bn trong.

9.15.2

All filters shall be provided with an identification plate showing the code number for each unit as
indicated in the system schematics. This plate shall be securely fixed to the filter in a prominent
position.
Tt c cc phin lc phi c nhn nhn bit th hin m s cho tng thit b nh m th hin trn
s h thng. Nhn c gn chc chn vo thit b v phi d nhn thy.

9.15.3

In addition, each filter shall have a specification plate which shall show details of the filter rate,
velocity, filtering area, working and test pressure, etc., fixed to the filter body.
Hn na, mi phin lc nhn ghi thng s k thut th hin chi tit cng sut lc, vn tc, khu vc
lc, p sut kim tra v nhit kim tra gn cht vo thn phin lc.

9.15.4

All filters shall bear the manufacturer's nameplate giving the manufacturer's name, model/serial
number and date of manufacture.
Tt c cc phin lc phi c nhn mc ca nh sn xut th hin: tn nh sn xut, m sn phm,
m sn xut ca thit b, ngy sn xut.

9.16

Water Treatment
X l nc
The Contractor shall perform the following work:
Nh thu phi thc hin cc cng vic sau:
a.

Testing of water pH value and analysis of water quality for treatment requirement on the pool
filtration system.
Kim tra Ph v cht lng ca nc phuc vu cho yu cu x l nc cho h thng
lc.ca h bi.

J10068 12 Aug 2015


SN R05

99

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

b.

Planning of water treatment program and recommendation of chemicals.


Ln k hoch x l nc v khuyn co loi ha cht nn dung.

c.

Introduce the first dosing of the system.


Hng dn s dung h thng chm ha cht ln u.

9.17

Underwater Music System Power Amplifier


H thng khuch i m thanh di nc

9.17.1

The power amplifier shall be fully solid-state provided with the following facilities:
B khuch i phi c cc chc nng sau:

9.17.2

a.

Power on/off switch.


Cng tc on/off

b.

Mains 'on' indicator lamp.


en bo on

c.

Input protection against overload.


Bo v qu ti ng vo

d.

Volume, bass and treble controls.


Chnh m lng, m cao, m trm

e.

Balanced floating output of 70V and 100V for loudspeaker connections.


Ng ra cn bng 70V v 100V cho u loa.

f.

Flexible cord and correctly fused plug for mains supply connection.
Dy in ngun c cu chi.

g.

AC and DC fuse protection.


Cu chi bo v AC v DC.

h.

Standard sockets complete with plugs and locking rings for each input and terminals for
loudspeaker output.
cm ng chun cho ng vo v u ni ng ra.

The power amplifier shall satisfy the following minimum performance characteristics:
B khuch i phi tha mn cc yu cu ti thiu sau:
a.

Input sensitivity not to be greater than 0.77V for rated output for source impedance of 600
ohms.
Ng vo c nhy khng ln hn 0.77V cho mc ng ra 600 m

b.

Frequency response not to vary by more than +3 dB over the frequency range 50 to
15000Hz.
Tn s tng ng dao ng khng qu +3dB trn di tng s t 50Hz-1500Hz.

c.

Total harmonic distortion at rated output power not to exceed 1% between 50 and 15000Hz,
distortion shall not increase at lower power output and/or less than full load.
mo song hi ng ra khng vt qu 1% cho di tng t 50 v 15000 Hz, nhiu
phi khng tng ti khi ngun in bng hay nh hn y ti.

d.

Output regulation to be within 2 dB from no load to full load, the amplifier shall be stable
under no load conditions.

J10068 12 Aug 2015


SN R05

100

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Ng ra phi n nh trong phm vi 2 dB t khng ti n y ti, b khuch phi n nh khi


khng ti.
e.

9.17.3

Noise level to be better than 70 dB below rated output with input shorted, over the frequency
range 50 to 15000Hz unweighed.
n hn 70 dB khi ng ra ngn mch, v ngoi di tn s 50n 15000 Hz.
The power amplifier shall be mountable on standard rack cabinet.
Ngun ca b khuch i phi gn trn t k tiu chun

9.17.4

All underwater speakers shall be of high impedance and suitable for completely submerged
operation in swimming pool. They shall be of strong construction not subject to damage or
corrosion from concentrations of chlorine, acid conditions, electrolysis, salt water or ocean
environments and such minerals they may be in solution or suspension in such water.
Tt c cc loa di nc phi c tr khng cao v thch hp cho s dung di nc. Loa
phi c cu to cng cp, v khng n mn bi cc dung dch chlorine, a-xt, nc mui v nc
bin v cc loi khong c trong dung dch hay hay l lng trong nc.

9.17.5

The speakers shall be flush mounted on the sides of the pool, incorporating the wet-niche fittings.
The Contractor shall also co-ordinate for the installation of underwater lights to make a neat and
unobstructive arrangement. A minimum of four underwater speakers shall be provided.
Cc loa phi gn trn cnh h bi, khp vo cc hc, hp. Nh thu phi phi hp vi lp t
en di nc. t nht ti thiu 4 loa c cung cp.

9.17.6

The colour finish of the speakers shall be of permanent type and shall not be faded along with
time. The finish colour shall be submitted for Interior Designer's approval.
Mu sc ca loa phi l mu vnh cu, khng phai theo thi gian. Mu hon thin phi c
trinh cho thit k ni tht ph duyt.

9.17.7

Power handling capacity of each speaker shall be 30W IPM (music power). Dispersion shall be
omni-directional underwater.
Cng sut ca mi loa phi l 30W (cng sut m thanh). Phi khuch tn theo dng hinh ohm
di nc.

9.17.8

The speaker shall satisfy the following minimum performance characteristics


Loa phi c cc c tnh ti thiu:

9.17.9

a.

On-axis frequency response not be carried by more than +10 dB over the frequency range
100 to 10000 Hz.
Khng di li vi tn s trn truc hn +10dB trn dy tn s t 100 n 10000 Hz.

b.

Sensitivity not to be less than 90 dB/W.


nhy khng t hn 90 dB/W

The relay control box shall be made of minimum 1.6mm mild steel with one under coat and one
layer of grey colour over coat.
Cc tip im trn hp iu khin phi c dy ti thiu 1.6mm.

9.17.10 The relay control box shall be equipped with adequate relays sets to provide inhibit circuits to
amplifier system inputs. The Contractor shall submit a schematic diagram to show the operation
of the circuit.
Cc tip im trong hp iu khin phi tng thch vi nhng hn ch ca ng vo ca h
thng khuch i. Nh thu phi trinh s nguyn l th hin hot ng ca mch in.

J10068 12 Aug 2015


SN R05

101

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

9.17.11 The compact disk player shall be provide with the following facilities :u c da CD phi c cc chc nng sau:

9.18

a.

Power on/off switch


Cng tc on/off

b.

Microphone and headphone jacks


C tai nghe v mi-cro.

c.

Optical digital out jack (OPT out)


C ng pht tn hiu quang.

d.

Model selector (name, normal, random)


C chc nng ht ngu nhin

e.

Memory/Recall buttons (memory, recall)


C chc nng t th t cho bi ht.

f.

Repeat button
C chc nng lp li

g.

Display
C mn hinh hin th

h.

Mountable on rack cabinet


C gi treo

Electrical Interface
Giao thc in
The Electrical Contractors work will be terminated in the vicinity of the motor control cubicle. The
Contractor shall be responsible for the connection of the incoming cable to the motor control
panel including the provision of isolators. All electrical and control works in/out motor control
cubicles shall be carried out by the Contractor.
Nh thu in s cp ngun ti cc v tr gn ng c. Nh thu s c trch nhim u ni n
t iu khin ng c bao gm dao cch ly. Bao gm cc cng tc v in ng lc v iu
khin.
Equipotential bonding terminals on pipe brackets for all metallic pipework shall be provided by
the Contractor and thereafter the bonding wiring connected back to the earthing system shall be
provided by the Electrical Contractor.
Tt c cc cng tc ng ng c kh nng dn in u phi ni t bi nh thu in.

J10068 12 Aug 2015


SN R05

102

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 10 - WATER TREATMENT EQUIPMENT


PHN 10 - THIT BI X L NC
10.1

General
Tng quan

10.1.1 The CONTRACTOR shall be provided all equipment, including the necessary work required for
proper installation and adjustment of the wastewater treatment system. The wastewater treatment
plant can handle maximum load of 10% of the design capacity.
Nh thu s cung cp tt c cc thit b cn thit cho cng tc lp t thi cng h thng trm xl
nc thi.Trm x l nc thi c th vn hnh vt ti ti a 10% dung tch thit k.
10.1.2 The CONTRACTOR shall install all equipment, including the necessary works required for proper
alignment and adjustment of the equipment.
Nh thu s lp t tt c cc thit b, bao gm cc cng tc cn thit cho hiu chnh cc thit b.
10.1.3 The CONTRACTOR shall test and operate the equipment in order to demonstrate its
performance. He shall also instruct the EMPLOYER/OWNER's operating personnel in the
operation and maintenance of the equipment.
Nh thu s kim tra v vn hnh thit b m bo hiu qu cng tc. H cng s hng dn
nhn vin ca ch u t trong qu trinh vn hnh bo tri thit b.
10.1.4 All civil and concrete works will be provided by other CONTRACTOR except the machine
foundation and special designed tank structure that is part of equipment which will be provide by
the CONTRACTOR.
Tt c cc cng tc h tng v b tng s c cung cp bi nh thu khc ngoi tr phn
ca my moc v cc kt cu b thit k c bit nh mt phn ca thit b x l s c cung cp
bi nh thu.

10.2

Wastewater Treatment System


H thng x l nc thi

10.2.1 Wastewater treatment system for this project shall be the AAO technology (Anearobic + Anoxic +
Oxic) in combined with MBR (membrane bioreactor).
H thng x l nc thi cho d n s l cng ngh AAO (K kh + Thiu kh + Hiu kh) kt hp
vi mn sinh hc.
Design Criteria
Tiu ch thit k
Wastewater treatment type
Loi nc thi

Flow rate/ Lu lng


BOD5 in
SS in
BOD5 out
SS out

:
:
:
:
:

J10068 12 Aug 2015


SN R05

Domestic wastewater
Nc thi sinh hot
200
250
200

103

M3/d
mg/l
mg/l
mg/l
mg/l

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Process Description
M t quy trinh
Anaerobic tank
B k kh

Equalization tank
B trung ha

Mixer
Cnh khuy

Anoxic tank
B thiu kh

Air blower
Thi kh

Aeration tank
B hiu kh

Sludge tank
B bn

MBR tank
B MBR

Effluent tank
B u ra

J10068 12 Aug 2015


SN R05

104

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

The minimum effluent waste water quality based on QCVN14:2008 flor class A is shown in the
below table
Cht lng nc thi u ra ti thiu t loi A theo QCVN14:2008 c th hin di bng sau:
1.

pH

2.

BOD5 (20 0C)

mg/l

30

3.

Tng cht rn l lng (TSS)

mg/l

50

4.

Tng cht rn ha tan

mg/l

500

5.

Sunfua (tnh theo H2S)

mg/l

1.0

6.

Amoni (tnh theo N)

mg/l

7.

Nitrat (NO3-)(tnh theo N)

mg/l

30

8.

Du m ng, thc vt

mg/l

10

9.

Tng cc cht hot ng b


mt

mg/l

Phosphat (PO43-) (tnh


theo P)

mg/l

10.

5-9

11.

MPN/
Tng Coliforms

J10068 12 Aug 2015


SN R05

100 ml

105

3.000

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

10.3

Wastewater Treatment Equipment


Thit b x l nc thi.
Materials and equipment to be supplied shall be the standard products of manufacturers regularly
engaged in manufacturing the products conforming to the Specification. Furthermore, they shall
essentially be the duplicates of the materials and the equipment that are in current use and have
performed satisfactorily in similar installations.
Vt liu v thit b c cung cp di hinh thc sn phm tiu chun ca nh sn xut c quy
nh theo thuyt minh ky thut. Hn na, cc vt t thit b v mt c bn l cc sn phm bn
sao ca cc lp t hin ang c s dung v c c hiu qu tha mn trong nhng thit k
tng t.

10.4

Submersible Pump
Bm chim

10.4.1 General
Tng quan
Pumps used for the same function shall be of the same manufacturer. Unless otherwise specified
on the drawing. The performance curves, material lists, and technical data shall be submitted for
approval.
Bm c s dung cung chc nng nn c cung nh sn xut. Tr khi c nhng yu cu c bit
ring trn bn v. Cc ng c tnh, danh muc vt t, v thng s k thut s c trinh
ph duyt.
10.4.2 Sewage Pump
Bm nc thi
The pump shall be of the automatic, electric-motor-driven non-clog submerged type, complete with
lifting chain and all necessary control equipment.
Bm l loi bm chim t ng khng tt nghn ng c in, c dy ko bm v cc thit b kim
sot cn thit
10.4.3 Motor
ng c
Pump shall be directly connected to a vertical electrical motor having continuous oiling device on
packed bearing sealed against dirt and moisture. The motor shall be class F insulation with built-in
thermal protection.
Bm s c u ni thng vo m t in vi bc n kn c du bi trn chng bui bn v
m. M t s c lp bo v nhit loi F.
10.4.4 Control
B iu khin
The motor shall be operated by a float switch adjusted to start and stop the motor at
predetermined water levels. The switch shall be completely enclosed in a rain-tight polypropylene
or plastic case. Duplex pumps shall be equipped with an automatic alternator to allow for the
change in operation from one pump to the other and for starting the second pump if the flow to the
sump exceeds the capacity of the first pump.
M t s c vn hnh bi cng tc phao iu chnh ng m ng c ti nhng mc nc ci
t. cng tc s c hon ton bao bc bi lp v PPR hoc nha. B nhiu bm cn c

J10068 12 Aug 2015


SN R05

106

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

trang b vi thit b la chn cho php thay i qu trinh vn hnh t mt bm ny sang bm khc
v khi ng bm th 2 nu lu lng trong h thu vt qu ti bm u tin.
10.4.5 Discharge Line and Accessories
ng ng y v phu kin
The discharge line from each pump shall be provided with a wafer type check valve and butterfly
valve in an accessible location near the pump.
ng ng y ca tng bm s c lp t van mt chiu dng cnh v van bm ti v tr c
th vn hnh gm bm.

10.5

Sludge Pump
Bm bun

10.5.1 General
Tng quan
The pump shall be submersible motor pump, having good statically and dynamically balanced for
vibrationless operation. The pump shaft shall be stainless steel with stainless steel keys for each
impeller. The bottom guide bearings, top guide bearings and intermediate guide bearing shall be
of bronze, rubber or other suitable material for long life and shall be water lubricated. The motor
shall have capacities and electrical characteristics shown and be water cooled, the motor may be
sealed with a balancing seal to prevent entry of water under operating conditions, especially
designed to operate under water. The motor cable entrance shall be sealed and positioned to
avoid interference between the cable and the flow of water.
Bm l loi ng c chim, c ch cn bng tnh cho vic vn hnh t rung. Truc bm l thp
khng g vi cc bnh cng tc lm bng thp khng g. Bc n trn, di v gia s lm bng
ng, cao su hoc vt liu thch hp khc c tui th cao v s l loi chng nc. Cc ng c
s c ti v c tnh in theo nh hin th v c lm mt bng nc, ng c s c gi kn
nc, ngn chn nc vo di cc iu kin vn hnh, c bit c thit k vn hnh di
nc. u vo cp m t s c hn kn v t ti v tr trnh va chm gia cp v dng nc.
10.5.2 Detail Specification
Yu cu k thut
-

Function
Chc nng

Impeller
Cnh bm
Speed
Tc
Size of Discharge Pipe
Kch thc ng y
Driving Motor
ng c
Starting Device
B khi ng
Protecting Device
B bo v

J10068 12 Aug 2015


SN R05

Returned sludge pump, Excess sludge


pump.
Bm tun hon bun, bm thi bun
Non-clog blade.
Li chng ngt
Not exceeding 1,500 rpm.
Khng vt qu 1500 vong/p
75-100 mm.

3, 380V, 50 Hz.

Direct on line.
Trc tip
Shall be included.
Bao gm

107

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Accessory
Phu kin

Everything needed to complete the


operation of sludge pumping.
Nhng phu kin cn hon thin qu
trinh vn hnh bm bun

Note:- The shop drawing of pumps, piping, valves, floated level switches etc. arrangement in
sludge sump shall be submitted for approval prior to installation.
Lu : Bn v thi cng lp t ca bm, ng, van, cng tc mc nc, v.v trong h thu bun s
c trinh ph duyt trc khi lp t

10.6

Drinking water treatment system


H thng x l nc ung
Additional activated carbon backwash filter
Bn lc cacbon tang cng.
As the drinking water quality requirement from client, the activated carbon multilayer backwash
filter optional price to be provided by Tenderer. The filters will be installed directly on roof plant
room.
Theo yu cu cht lng nc ung t khch hang, thit b lc than hot tnh s c cung cp
bo gi d phng t nh thu. Cc thit b lc ny s c lp t trc tip trong phng bm trn
mi.
The activated carbon multilayer backwash filter should comply the below requirements:
Thit b lc than hot tnh c chc nng ra ngc nn p ng nhng yu cu sau:

Removal of dirt particles, odours, bad taste, contaminants, chlorine compounds,


sediments, suspended solids.
Loi b cht bn, mui, v, cht nhim, cc thnh phn ca clo, cht cn, lng.

Additional filter (1-2mm) gravel for additional filtration.


Thm lp lc si mn (1-2mm) tang hot tnh lc

Active monitoring and automatic back wash cycle.


C chu trinh gim st ra lc t ng.

Additional removal of iron


Loi b cht st

Automatic volume controlled backwash.


Kim sot dung tch ra lc t ng

Activated carbon filter detailed specification will be provided by supplier.


Thuyt minh k thut ca cc thit b lc ny s c cung cp chi tit bi nh cung cp.

10.7

Water treatment system


H thng x l nc.

J10068 12 Aug 2015


SN R05

108

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

10.7.1 Water softener system


H thng lm mm nc
Each water softener shall comprise a closed cylindrical steel tank, containing a bed of strong
cationic exchange resin for catching calcium and magnesium. When one softener is in service,
the other is either in the stage of regeneration or standby.
Mi b lm mm bao gm bn thp kn, cha lp trao i cation mnh trao i canxi v
magne. Khi mt binh lm mm hot ng, ci cn li s trong trng thi ti to hoc d phng.
The cycle-end of each unit is fixed on a pulse counter which receives one pulse for each cubic
meter of water flow through the water meter mounted on the upstream of each unit. When the
pre-determined volume of treated water decreases, down to zero, an acoustic alarm will
(actuate) the end of the cycle then the unit shall start regenerating.
Chu trinh hot ng ca mi b c c nh bng chu trinh o m ca ng h khi 1 met khi
nc i qua ng h gn trn ng vo thit b. Khi th tch nc c x l gim xung, tin
v khng, mt chung bo s kch hot kt thc chu trinh sau thit b s bt u chu trinh
mi.
Each unit shall be provided with a selector switch with two positions, one for the softener in
service phase and the other for the softener in regeneration phase. The regeneration shall be
started by a pushbutton and will proceed automatically by a series of timers to open and close
each pneumatic operated type valve to control the valves different phases.
Mi thit b s c cung cp vi cng tc la chn vi 2 ai tr, mt thit b trong giai on
hot ng v ci th 2 dnh cho khi thit b trong giai on ti to. Giai on ti to s c khi
ng bng nt nhn v s tin hnh t ng bi chui ng h ng m mi loi van kh
kim sot van trong cc giai on khc nhau.
At the end of the regeneration, the indicating lamp mounted on the control panel will switch on,
indicating that the softener regeneration is over, and then the unit becomes in standby position
and ready for service.
Ti cui chu trinh ti to, en ch th trn bng iu khin s bt ln, ch th qu trinh ti to
chm dt, sau thit b chuyn sang trng thi d phng v sn sang phuc vu.
The technical specifications of the softeners are as follows:Thng s k thut ca thit b lm mm nc nh sau:
-

Number of Tanks
S lng b
Flow Rate Capacity
Lu lng
Position
V tr:
Process Fluid
Cht lng
Design Pressure Tank
p lc bn thit k
Material
Vt liu:

J10068 12 Aug 2015


SN R05

:
:
:
:
:
:

As indicated on the drawing


Nh ch nh trong bn v
As indicated on the drawing
Nh ch nh trong bn v
Vertical
ng
Water
Nc
690 kPa (100 psi)
690 kPa (100psi)
Carbon steel tank welded to ASME code
specification for pressure vessel.
Bn thp si cacbon theo ASME cho loi bn
p lc

109

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Corrosive Protection;
Chng n mn
Inside & Outside
Trong v ngoi

Other Components
Cc thnh phn khc

Coated with a layer of zinc-rich primer and


three layers of epoxy coating. Before the
application of painting is made, the surface
shall be cleaned by sandblasting (Sa 2).
Bao bc bi lp sn lt giu km v 3 lp o
epoxy. Trc khi sn, b mt cn c lm
sch bi phng n bn ct (Sa 2.5)

Steel skid support, nozzles, water inlet,


diaphragm valves, solenoid valves, hydraulic
tubes, sampling cock, sightglass, pressure
gauges, flow meter, double disk with strainer
type underdrain system, auto reset meter and
a suitable testing set for residual hardness.
Gi thp, nt, u ni ra, van mng chn,
van in , ng thy lc, im ly mu, knh
gim st, ng h o p, lu lng, a kp
vi h thng thot lc, ng h t khi ng
v b kim tra cho cng d.

10.7.2 Pressure sand filter system


H thng lc ct p lc
The pressure sand filter specified under this section shall be used to filter treated water for potable
water and reusing with automatic backwash system. The pressure sand filter shall form a
complete water filtering package which include all the equipment and interconnecting piping as
shown on the drawings and all the materials viz. sand and gravel.
Bn lc ct p lc c quy nh trong chng ny l loi c dung lc nc sch v ti s
dung nc vi h thng ra ngc t ng. Bn lc ct p lc s bao gm trn gi thit b lc v
cc ng ng u ni nh c trinh by trn bn v v tt c vt liu nh ct v si.
The pressure sand filter, in a complete system, shall be designed, selected, matched and
constructed to fulfill the requirements and to perform according to the conditions as specified as
follow:Bn lc ct p lc trong h thng hon chnh s c thit k, chn la, tch hp v lp t theo
nhng yu cu v th hin tun theo nhng iu kin nh sau:
-

Type
Loi

Flow Capacity
Lu lng:

Operation System
H thng hot ng

Initiation of Regeneration Cycle


Khi u chu trinh ti to:

J10068 12 Aug 2015


SN R05

110

Vertical column with sand and gravel


media.
Ct lc ng vi ct v si.
As shown in the drawing.
Theo nh ch nh trn bn v
Automatic by hydraulic diaphragm valve
and stager control.
T ng bi van mng chn v h thng
iu khin
By reset water meter and clock timer.
Bng ng h nc v ng h tnh gi.

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Electrical Power Supply


in nng:

380 V/3 /50 Hz.


380 V/3 /50 Hz.

Sand filter column shall be made of carbon steel, designed and constructed in accordance with
ASME code, section VIII, division 1. Design internal working pressure shall not be less than
490 kPa. The calculated vessel thickness shall include 1.0 mm. corrosion allowance. However
the minimum thickness of vessel plate shall not be less than 4.5 mm.
Ct lc ct s c lm t thp cacbon, c thit k v thi cng tun theo chun ASME,
chng VIII, muc 1. p lc thit k lm vic bn trong khng nh hn 490kPa. Chiu dy bn
lc tnh ton cn bao gm 1.00mm chng n mn. Tuy nhin chiu dy ti thiu ca lp bn
khng nh hn 4.5mm.
All nozzles, openings, service manholes, internals, supporting legs and lifting lugs shall be
provided as necessary.
Tt c u ni, l thm, h ga, cc thit b cuc b, chn v gi treo nhc bn s c cung
cp theo nhu cu.
Vessel nozzles of 25 mm. nominal pipe size and larger shall have carbon steel flanged end
connection. All brackets and attachments to vessels for supporting pipes, equipment, control
panel, etc. shall be purposely prepared and welded prior to surface cleaning and painting of
vessels.
Tt c u ni 25 mm v ln hn s c mi ni bch thp cacbon. Tt c gi , treo vo bn
neo ng, thit b, bng iu khin, v.v s c chun b c muc ch v c hn vo b
mt c lm sch v sn trc .
Sand filter column shall be installed and firmly fixed on concrete base which will be done by the
contractor.
Ct lc s c lp t v c nh trn b tng, c thc hin bi nh thu.
The shop drawings showing positions and arrangement of sand filter columns, equipment and
piping with free access for operation and maintenance shall be submitted for approval prior to
any installation commences. All valves, control valves, control panel etc. which are frequently
operated or to be checked shall be arranged for easily reachable and inspectionable.
Cc bn v thi cng ch nh v tr v sp xp cc bn lc, thit b v ng ng vi cc li thm
rng ri cho qu trinh vn hnh v bo tri s c trinh ph duyt trc khi tin hnh lp
t. Tt c van, van kim sot, bng iu khin, v.v c vn hnh thng xuyn hoc c
kim tra s c sp xp d dng vn hnh v gim st.

J10068 12 Aug 2015


SN R05

111

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 11 ELECTRICAL WORKS


PHN 11 CNG TC IN
11.1

General
Quy nh chung

11.1.1 The Electrical Contractor shall provide electrical supply cables completed with main isolator only
to all pump rooms.
Nh thu in s cung cp cc ng cp c cch in chnh cho ring ton b cc phng my
bm.
11.1.2

The Contractor shall provide wall mounted switch cubicles, complete with isolators, busbar
chamber, switch-boards, contactors, indicating lamps, starters, controls, ammeters, voltmeters,
alarms and all electrical wiring necessary for the satisfactory functioning of the systems installed
under this Contract.
Nh thu s cung cp bng cng tc gn tng c cch in, thanh ci (busbar), bng chuyn
i, cc tip im, en ch bo, b khi ng, b iu khin, ampe k, vn k, chung bo v
ton b h thng dy cn thit cho cc chc nng ca h thng c lp t theo Hp ng
ny.

11.1.3

The electric supply will be 380 volts 3 phase 4 wire 50 cycles per second and 220 volts single
phase. All equipment shall be suitable for voltage up to 415 volts.
Ngun cp in l 380V, 3 pha 4 dy, 50 chu k mt giy v in 220V, pha n. Ton b cc
thit b thch hp vi in p tng ti 415V.

11.1.4

All electrical work shall satisfy the requirements laid down by the Relevant Power Electrical
Company, 16th Edition, IEE Regulations and special regulations issued by Vietnamese
Government.
Ton b cng vic lp t in ng quy cch s tun theo Quy phm IEE ca Cng ty in lc,
xut bn ln th 16 v cc quy nh c bit ca cc c quan chc nng Vit Nam.

11.1.5

All work shall confirm to the best principles of modern practice.


Ton b cng vic s tun theo cc nguyn l tt nht ca thc tin hin i.

11.1.6

The pump starter cubicles shall be self-contained extendible cubicle type, "built-up" from
enclosed units. The sheet metal shall be of not less than 14 swg. Doors shall be provided with
dust-excluding gaskets of neoprene. Ventilating louvres are required on the sides and back of
panels. All paint finishes shall be of high quality enamel.
Hp khi ng my bm l loi c th m rng t cha, c t trong v kn. V kim loi khng
t hn 14 s.w.g. Cc ca c vng m bng cao su tng hp ngn bui. Cc chp thng gi
c b tr cc mt bn v mt sau. Ton b cc b mt c hon thin bng sn men cht
lng cao.

11.1.7

Busbar Chamber shall be provided for circuit distribution if there is more than a pump is installed
or more than a power circuit is taken from a single power supply point.
Thanh ci s c b tr b phn phi mch, nu c nhiu hn 1 my bm c lp hoc c
nhiu hn 1 mch in c ly t im cp in n.

11.1.8

Permanent label shall be provided for all equipment, cables, starters, motors, etc. Labels in
general shall be made from perspex and suitably engraved with black lettering in English and

J10068 12 Aug 2015


SN R05

112

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

shall be required Vietnamese. Exact details of lettering and legend shall be approved by the
Clients representative. Labels shall be fixed on panels by means of chromium plated round
headed screws.
Nhn hiu c nh c gn cho ton b cc thit b, ng cp, b khi ng, ng c .v.v. Ni
chung cc nhn hiu s c lm bng ming nha trong sut v c khc ch thch hp loi
ch mu en bng ting Anh v ting Vit. Chi tit chnh xc ca ch v ni dung s c i
din Ch u t thng qua. Cc nhn hiu c gn vo bng in bng vt trn u m crm.
11.1.9

Liaison with other contractors for the electrical installation.


Lin h vi Nh thu khc v cng tc lp in.

11.1.10 Complete and sign all parts of Form WRIA for the electrical installation done by themselves.
Hon thnh v k tt c cc mu WRIA cho cng tc lp in c thc hin bi chnh Nh
thu.

11.2

Busbar Chamber
Thanh ci
All busbar Chamber shall be factory-built assemblies to BS 5486 Part 1 and have been ASTA
certified at a rated fused short-circuit current of 50kA and the short time withstand current of their
rated current x20 for one second.
ASTA certification shall be submitted for Clients
representative if requested.
Ton b thanh ci l loi c ch to ti nh my theo BS 5486 Phn 1 v c ASTA
chng nhn theo dng ngn mch 50kA, c lp cu chi danh nh v chu c dng ngn
hn vi cng sut danh nh ca dng x 20 cho 1 giy. Chng nhn ca ASTA s c np cho
i din Ch u t nu c yu cu.

11.3

Electric Motors
ng c in

11.3.1

For each pump the Contractor shall provide an electric motor which shall have a margin of not
less than 20% between the continuous rating of the motor (without over loading) and the
maximum shaft horsepower demanded by the pump under its most arduous operating condition.
Motors shall be continuously rated in accordance with BS 4999 : 1970 or BS 5000, Part II
according to rating. The motor shall be tropic proof and shall be insulated with Class B materials.
Motors shall be of commercial-silent type having sleeve or roller bearings. The enclosure shall
be of fan cooled fully enclosed pattern.
i vi mi my bm, Nh thu s lp ng c in, chng c khong cng sut khng t hn
20% gia cng sut hot ng danh nh lin tuc ca ng c (khng c qu ti) v cng sut
trn truc ti a c yu cu bi my bm trong iu kin vn hnh ti u.Cc ng c c cng
sut hot ng danh nh lin tuc theo BS 4999 : 1970 hoc BS 5000 Phn II. Cc ng c chu
c kh hu nhit i v c lp cch ly bng vt liu loi B. Cc ng c loi chng n dnh
cho thng mi c ng lng v con ln. V ca ng c lm kn hon ton v c lm mt
bng qut.

11.3.2

Motors up to and including 3.7 kW shall be of the squirrel cage type suitable for Direct-On-Line
starting. Starting current shall not exceed six times full load current.
Cc ng c c cng sut ti 3.7 kW s l loi lng sc thch hp vi vic khi ng ni tip trc
tip. Dng khi ng khng vt qu 6 ln dng ti ton phn.

J10068 12 Aug 2015


SN R05

113

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

11.3.3

Motors exceeding 3.7 kW shall be squirrel cage type, suitable for Star-Delta starting. Starting
current shall not exceed 2-1/2 times full load current.
Cc ng c c cng sut ln hn 3.7 kW s l loi lng sc thch hp vi vic khi ng u
hinh sao. Dng khi ng khng vt qu 2 1/2 ln dng ti ton phn.

11.3.4

Motor speed shall not exceed 1,450 rpm.


Tc ng c khng vt qu 1,450 vng quay trong 1 pht.

11.4

Direct-On-Line Starters
Cc b khi ng ni tip trc tip
Each starter should include the following:
Mi b khi ng gm cc phn sau:
a)

Main Contactor.
Cng tc chnh.

b)

Adjustable overload protection.


B bo v qu ti c th iu chnh.

c)

Single phasing protection.


Bo v pha n.

d)

Main and control circuit fuses of HRC cartridge type.


Cu chi chnh v cu chi iu khin loi cu chi ng HRC.

e)

Off/On switch.
Cng tc tt/ m.

f)

Automatic/ manual mode switch


Cng tc iu khin bng tay/ hoc t ng.

g)

All necessary terminals of adequate rating, and all necessary internal wiring.
Ton b cc u ni cn thit c cng sut danh nh, v ton b cc ng dy bn
trong cn thit.

h)

Provision for cable entries.


Cc ng cp n.

i)

All necessary auxiliary contacts for sequence control.


Cc tip im phu kim sot lp trinh.

j)

A green pilot light shall be fitted to the front cover of the MCC which is to be illuminated
when the equipment is running.
en hin th mu xanh c lp mt trc ca t iu khin ng c (M.C.C), chng bt
sng khi thit b ang hot ng.

k)

A red pilot light shall be fitted to the front cover of the MCC. It shall be illuminated when the
starter had been "tripped" on overload.

J10068 12 Aug 2015


SN R05

114

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

en hin th mu c lp mt trc ca M.C.C, chng bt sng khi b khi ng b


nh do qu ti.
l)

A green pilot light shall be fitted to the front cover of the MCC to indicate the pump in
automatic mode operation.
en hin th mu xanh c lp mt trc ca M.C.C, ch my bm ch vn hnh
t ng.

m) A red pilot light shall be fitted to the front cover of the MCC to indicate the pump in manual
mode operation.
en hin th mu c lp mt trc ca M.C.C, ch my bm ch vn hnh
bng tay.

11.5

Star-Delta Starters
Cc b khi ng ni kiu tam gic - hnh sao
Star-Delta starters shall be provided with contactors, overload protection, etc, as detailed above
for Direct-On-Line starter, but arranged so that the star contactor opens before the delta
contactor closes, the time intervals being controlled by an automatic timing device.
Cc b khi ng ni kiu tam gic - hinh sao c cc tip im, bo v qu ti .v.v. theo chi tit
nh ca b khi ng ni trc tip, nhng c b tr sao cho cc tip im hinh sao m trc
khi cc tip im tam gic ng, cc khong thi gian c kim sot bi thit b m thi gian
t ng.

11.6

Contactors
Cc tip im
Contactors shall be single pole or triple pole fitted with arc-shields and nominal rating of not less
than 10 amp. Contactors generally shall be in accordance with BS 5424 : Part 1 : 1977 or BS
5583 : 1978. Contactor coils shall be operated from 220 volts AC single phase.
Cc tip im l loi cc n hoc 3 cc, c tm chn h quang v c cng sut danh nh
khng nh hn 10 amp. Ni chung cc tip im s theo BS 5424: phn 1: 1997 hoc BS 5583:
1978. Cc cun dy ca tip im hot ng bng pha n, in xoay chiu 220 V.
All contactors shall have an auxiliary relay with normally open/normally closed voltage-free
contacts for remote monitoring.
Ton b cc tip im u c rle phu vi tip im khng in p thng ng/ thng m
iu khin t xa.

11.7

Ammeters
Cc ng h ampek
Starters for pumps of 3.7kW and above shall be provided with ammeters flush mounted adjacent
to the respective starters, and shall be of the moving iron pattern with compressed scale to
comply with BS 89, Part 1 : 1970 for industrial accuracy. Current transformers shall be of ring
pattern to B.S. 3938 : 1973. The dials of the ammeters shall be marked with a red line to indicate
the normal full load current of the motor controlled.

J10068 12 Aug 2015


SN R05

115

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

B khi ng ca my bm c cng sut 3.7 kw v ln hn s c lp ampe k gn vi v tr


ca b khi ng tng ng, l loi di chuyn kim mt bng ty l theo BS 89: phn 1: 1970
dung trong cng nghip. Bin th dng l loi vng theo BS 3938: 1973. Mt ng h ca Ampe
k c nh du ng ch dng ton phn thng thng ca ng c c iu khin.
Ampe k c cc tip im phu lin kt vi ch bo t xa.

11.8

Overload Protection
Bo v qu ti
Overload protection shall be magnetic units of the solenoid operated type with silicon fluid dash
pots or thermal bi-metal type. Overloads shall be capable of a minimum setting of 100% full load.
Bo v qu ti l cc thit b t l loi c vn hnh bng van slnit c bng iu khin dung
cht lng silicone hoc l loi lng kim loi chu nhit. Kh nng chu qu ti c ci t bng
ti thiu 100% ti ton phn.

11.9

Fuse Protection
Cu ch bo v d phng

11.9.1

Fused switch shall be provided for each motor circuit. The fuse shall be of the HRC cartridge
type conforming to BS 88, 415AC 80 with utilization categories gG. All fuse ratings shall be
suitable for the loads controlled and shall be selected to give discrimination between main and
sub-main fuses.
Cu chi bo v d phng c lp cho tt c cc b khi ng. Chng l loi cu chi ng HRC
theo BS 88. Cng sut danh nh phu hp vi ti c kim sot v c la chn to s
phn bit gia cu chi chnh v cu chi phu.

11.9.2

Fused switch shall be constructed to BS5419, AC23 and shall be mechanically interlocked with
access doors so that live connections are not exposed when the doors are opened. The doors
may not be closed with isolators in the open position. All fuse switch shall be in all cases suitably
rated for the running current of the motor. Isolators shall have all the necessary ancillary
contacts to isolate the control circuits. ASTA certification shall be submitted to Clients
representative if requested.
Cng tc c cu chi s c ch to theo BS 5419, AC 23 v c kha truyn ng c hc vi
ca tip cn sao cho ton b cc kt ni dn in khng b l ra khi m ca.Cc cnh ca khng
th ng li bng ci cch in v tr m. Tt c cc ca khng th ng khi ci cch in v
tr m. Tt c cc cng tc c cu chi u c v thch hp vi loi dng hot ng ca ng c.
Cc ci cch in c tip im phu tr cch ly cc mch iu khin. Chng nhn ca ASTA
s c np cho i din Ch u t nu c yu cu.

11.10

Lock Buttons
Nt kha
In all instances where starters are mounted remote from electric motors, buttons of the lock off
pattern shall be fitted immediately adjacent to the motor.
Trong mi trng hp, khi b khi ng c lp khong cch xa so vi ng c in, thi nt
bm s c lp st vi ng c.

J10068 12 Aug 2015


SN R05

116

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

11.11

System of Wiring
H thng dy

11.11.1 The system of wiring shall be PVC insulated cable enclosed in galvanized conduit and shall be
surface run in pump room.
H thng dy l loi cp c bc PVC, c i dy trong ng i dy c m km, v c lp
ni trn b mt phng bm.
11.11.2 The Contractor shall wire all control wiring and power wiring including wiring to terminal strips
inside external relay boxes with free dry contacts for CCMS connection which are to be provided
by the Contractor. Wiring from these terminal strips to the CCMS control room shall be by the
control Contractor.
Nh thu s ni dy cho cc ng cp in v ng iu khin, k c ng dy ti cc u
ni bn trong hp rle ngoi vi cc tip im kh kt ni vi CCMS do Nh thu cp. Nh
thu s kim sot ng dy t cc u ni ny ti bung iu khin CCMS.
11.11.3 The Contractor shall before commencing work submit for approval routings etc of surface run
wiring with emphasis on neatness.
Trc khi bt u cng vic i dy, Nh thu s np thng qua v s ng chy ca dy
.v.v. ca cch i dy trn cc b mt, v c bit nhn mnh v cch i dy cho gn gng.

11.12

PVC Insulated Cable


ng cp bc PVC

11.12.1 PVC insulated cables shall consist of copper conductor, PVC insulated to CMA standard and to
BS 6004 : 1989, 600A/1000V grade.
ng cp bc PVC gm dy dn bng ng, lp bc cch ly PVC theo BS 6004: 1969, loi
600A/ 1000 V.
11.12.2 Minimum size of cable shall be as follows:
Kch thc ti thiu ca cp nh sau:
Power Cables
Cp dn in

2.50 sq mm
2.50 mm2

Control Circuit
Mch iu khin

1.50 sq mm
1.50 mm2.

11.12.3 No joints or connectors shall be allowed in any cables. Exposed ends of conductors where not
provided with cable sockets shall have their individual strand sweated solid before connection to
apparatus terminals.
Cc ng cp khng c php c cc im ni. Cc u c l ra ca dy dn khi khng c
cm cp s phi c nh cp ring c hn c trc khi ni vi u ni ca cc thit b.

J10068 12 Aug 2015


SN R05

117

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

11.13

PVC Insulated Armoued Cable


ng cp c thp c bc PVC

11.13.1 PVC insulated armound cable (PVC/SWA/PVC) shall be 600/1000 volt grade complying to BS
6346 : 1969 with each copper conductors of the same cross sectional area.
ng cp c thp c bc PVC (PVC/ SWA/PVC) l loi 600/ 1000 V theo BS 6346: 1969, c
dy dn bng ng c cung tit din ngang.
11.13.2 PVC insulated cores shall be sheathed with PVC which shall serve as a bedding for galvanized
single steel wire armouring. The armouring shall be covered with an outer PVC sheath.
Cc li c bc PVC s c bc bng lp PVC c cng dung nh lp nn cho dy thp n
m km. Dy thp s bc ngoi lp v PVC.
11.13.3 Cables shall be terminated in a gland fitted with an armour clamp. The entire gland and armour
clamp shall be made from aluminium. Provision shall be made to provide a watertight seal
between the gland and inner PVC sheath. A PVC shroud shall be fitted to cover the gland body.
Cc ng cp c u ni ming m, c lp vi kp ca dy thp. Ming m v kp
u lm bng nhm. C bin php bt trm kn nc cho k h gia ming m v lp bc
PVC pha trong. Lp v bc PVC cn bc phn thn ca ming m.
11.13.4 Cables should not be bent to a radius less than eight times their overall diameter.
Cc ng cp khng c b vi bn knh b nh hn 8 ln ng knh chung ca cp.

11.14

Connections to Motors
Ni vi ng c
Final connections to electric motors shall be made by means of PVC cable in rust proofed flexible
steel conduit with separate tinned earth wire not less than 2.50 sq mm outside the flexible
conduit.
Vic lin kt cui cung ca cc ng c s c thc hin bng ng cp PVC chy trong ng
i dy bng thp c th un, chng bui, c dy ni t ring bit vi tit din khng nh hn
2.50mm2 chy bn ngoi ng i dy.

11.15

Switchgear
C cu chuyn mch
All fused switchgear and isolators shall conform to the requirement of BS 861 and BS 2510. The
fuse link for fused switches shall be high rupturing capacity, cartridge type, conforming to BS 88.
Ton b c cu chuyn mch v ci cch ly c lp cu chi s tun theo cc yu cu ca BS 861
v BS 2510. Dy cu chi dung cho c cu chuyn mch c lp cu chi s l loi c kh nng
chu c nh thng cao, l loi cu chi ng, theo BS 88.

11.16

Conduits and Accessories


ng i dy v phu kin

11.16.1 All conduits shall be heavy gauge galvanized welded steel complying to BS 4568: Part 1 Class 4.
Minimum size of conduit used shall be 20 mm outer diameter.
Ton b ng i dy lm bng thp m km c ch lm vic nng theo BS 31 muc B. Kch
thc ti thiu ca ng i dy c dung s bng 20 mm O.D.

J10068 12 Aug 2015


SN R05

118

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

11.16.2 All conduit systems shall be installed fully in accordance with the requirements of the 16th Edition
of the IEE Regulations.
Ton b ng i dy c lp t s hon ton tun theo cc yu cu ca Quy phm IEE, xut
bn ln th 16.
11.16.3 The maximum number of cables which may be accommodated in a given size conduit shall not
exceed the number given in the tables in the code of practice for the Electricity (wiring) regulation
issued by EMSD.
S lng ti a ca cc ng cp c b tr trong mt ng i dy c kch thc cho trc
s khng c vt qu cc tr s c nu cc bng Phu luc 12 ca Quy phm IEE, xut
bn ln th 16.
11.16.4 Where conduits are run on the surface of walls or on the soffit of slabs they shall be fixed with
heavy duty spacing saddles at intervals not exceeding the limits specified in the code of practice
for the Electricity (wiring) regulation issued by EMSD.
Khi cc ng i dy chy trn b mt tng hoc y bn sn, chng s c c nh bng ai
chu ti nng cc khong khng vt cc gii hn c quy nh bng 11C ca Quy
phm IEE, xut bn ln th 16.
11.16.5 All conduits outlet boxes shall be pressed steel, galvanized finished and of standard square
pattern to BS 4662, surface mounting pattern.
Ton b cc hp ni ca ng i dy c lm bng thp dp, c m km v c lm theo
mu tiu chun BS 3676: Phn II: 1983, loi gn b mt.
11.16.6 Adaptable boxes shall be of cast iron to BS 4568. Box covers shall be of galvanized malleable
iron and shall be secured to the conduit boxes by brass screws.
Hp c th u ni lm bng gang theo BS 31. Np hp bng thp do m km v c lin kt
vi hp i dy bng vt ng.

11.17

Terminal Box and Terminals


Hp u ni v cc u ni

11.17.1 Terminals boxes shall be of such dimensions as will ensure easy access to the terminals and
allow room for the supply leads.
Hp u ni cn c kch thc d tip cn vi u ni v ch cho cc u cp.
11.17.2 Each box shall be fitted for normal bottom or top cable entry. With the exception of fractional HP
Motors, all boxes shall be capable of being turned to a further three positions 90 apart without
replacing terminal base or terminals.
Mi hp u c ng cp vo pha trn v pha di ca hp. Tr trng hp ca ng c c
cng sut di mt m lc, tt c cc hp u c kh nng c quay ti 3 v tr 90 m khng
phi thay th ni hoc cc u ni.
11.17.3 Motors above and including 7 kW shall be provided with suitably sized tinned brass cable
sockets. Sockets shall be in accordance with BS 91 : 1973.
Cc ng c ni trn v k c loi 7 kW s c b tr cc cm ng cp ng c m
thic c kch thc phu hp. Cc cm theo BS 91: 1973.

J10068 12 Aug 2015


SN R05

119

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

11.17.4 Motors smaller than and including 3.7 kW shall be provided with three terminals and for motors
above 3.7 kW, there shall be six terminals.
Cc ng c c cng sut nh hn v k c loi 3.7 kW s c b tr 3 u ni, cn cc ng
c c cng sut ln hn 3.7 kW s c 6 u ni.

11.18

LV Motor Control Cubicle (MCC)


Ngn iu khin ng c h th

11.18.1 This Contract includes the supply, delivery, installation, commissioning of motor control cubicles
associated with the plumbing services, together with all switchgear and all inter-connecting power
and control wiring between motors and starters within the plant rooms.
Hp ng ny bao gm vic cung cp, chuyn ch, lp t, chy th cc ngn iu khin ng
c h th kem theo h thng my bm, cung vi c cu chuyn mch v ton b ng dy
iu khin v dy cp in gia ng c v b khi ng bn trong bung k thut.
11.18.2 The control cubicle shall be totally enclosed 2 mm thick sheet metal cubicle of folded, bolted and
welded steel construction with rigid angle iron framework and necessary shall have concealed
hinges, and shall be provided with dust-excluding gasket and where necessary, shall be
interlocked with the switch mechanism and constructed of metal thickness specified above. Back
wired switchboards shall have, in addition, all rear portions hinged and removable to permit full
access for cable termination. All rear panels shall be secured by a minimum number of approved
fastenings. The hinge doors shall be lockable and fitted with neoprene sponge rubber seals.
Suitable openings in the switchboards shall be provided for incoming and outgoing sub-circuits.
All fixings to the front wired boards shall be drilled and capped. Sufficient space shall be
provided for access and termination of cables.
Ngn iu khin ng c h th lm bng tm kim loi dy 2 mm c bao kn hon ton, thi
cng bng cch gp tm kim loi, bng cch bt bu lng hoc hn, c khung cng bng thp
gc, v nu cn thit s c bn l chim, c vng m ngn bui, c kha lin ng vi c cu
cng tc c ch to bng tm kim loi c cung chiu dy c quy nh trn. Cc bng
in c ni dy pha sau c b phn pha sau c lp bn l v c th tho ra cho php
cc u ni cp d tip cn hon ton. Tt c cc bng pha sau s c lin kt bng s lng
ti thiu ca chi tit kp c thng qua. Cnh ca c bn l c th kha v c lp vng
m cao su tng hp. Cc l trng thch hp bng in c b tr cho cc mch phu n v
i. Ton b cc chi tit c nh pha trc c ni dy vi bng in s c thc hin bng
cch khoan v c bt u. B tr khong trng cho ng vo v u ni ca cp.
11.18.3 Busbars & conductors shall be made from hard drawn high conducting copper and busbar shall
be to BS 159:1957.
Thanh ci v dy dn c lm bng ng dn in cao, ko ngui, v thanh ci theo BS 159:
1957.
11.18.4 The motor control panel shall be suitable for indoor service on a 380V/220V 3 phase 4 wire 50 Hz
system with solidly earthed neutral and capable as a whole of withstanding the electrical and
mechanical stresses produced by fault conditions equivalent to 24 MVA at 415V for three
seconds.
Bng iu khin ng c thch hp cho cc h thng k thut trong nh vi in 380V/ 220V, 3
pha, 4 dy, 50 Hz, c dy trung ha ni t chu c ton b ng sut c v in to ra bi
s c in tng ng vi 24 MVA in th 415 V trong 3 giy.

J10068 12 Aug 2015


SN R05

120

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

11.18.5 The control cubicle shall comply with BS 5486 : Part 1, type 4 for essential sections and type 3
for the remaining non-essential sections.
Ngn iu khin s tun theo BS 5486: Phn I, mu 4 cho cc b phn thit yu v mu 3 cho
cc b phn khng thit yu cn li.
11.18.6 All control cubicle and associated equipment (switchgear, busbar assembles, etc) shall be
certified for the category of duty specified.
Ton ngn iu khin v cc thit b kem theo (c cu chuyn mch, b thanh ci .v.v.) c
chng nhn v loi lm vic c quy nh.
11.18.7 Type test certificates issued by an independent and approved test authority shall be submitted to
the Engineer on request.
Chng ch th nghim v loi c cp bi mt c quan th nghim c lp c thng qua
s c np cho K s khi c yu cu.
11.18.8 Busbars and conductors shall be made from hard drain high conductivity copper and busbars
shall be to BS 159 : 1957.
Thanh ci v dy dn c lm t ng c cng dn in cao v thanh ci theo chun BS
159:1957
11.18.9 Interconnections between the switchgear and the busbar shall not have excessive length and
shall be appropriately supported.
Lin kt gia thanh ci v c cu chuyn mch s khng qu di v c ng cch.
11.18.10 Neutral and earth busbars shall be provided with an adequate number of terminals, lugs and
bolts with nuts and washers.
Cc thanh ci ni t v trung ha c b tr c s lng u ni, nt v bu lng vi ai c
v vng m.
11.18.11 All connections between conductors and busbars shall be tinned, bolted or clamped.
Ton b kt ni gia thanh ci v dy dn phi c bt bu lng, c kp cht v c m
thic.
11.18.12 All live busbars shall be enclosed or protected on front mounted boards. All fuses shall be of the
HRC cartridge of BS 88. Fuses and fuse bars shall be of the shrouded type similar to English
Electric Manufacture.
Ton b cc thanh ci dn in s c che kn hoc c bo v cc bng lp mt trc.
Tt c cc cu chi l loi cu chi ng HRC theo BS 88, loi Q1. Cu chi v thanh cu chi l loi
c bc theo Nh sn xut in.
11.18.13 All equipment shall be suitable for use in the temperature and air conditions that will exist, and in
the plant rooms it is assumed that the air temperature will rise to 43 deg C.
Ton b cc thit b s thch hp s dung trong iu kin nhit v khng kh hin c, v
trong cc bung k thut, c gi nh l nhit khng kh c th tng ti 430C.
11.18.14 All instruments and dials, shall be arranged for flush mounting by insertion in the front through a
hole in the panel. All such items shall be secured from the back without visible fixings.
Ton b cc dung cu v ng h o c b tr lp phng vi mt trc thng qua cc l
bng in. Tt c cc hng muc c c nh pha sau khng nhin thy chi tit lin kt.

J10068 12 Aug 2015


SN R05

121

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

11.18.15 The faces to instruments shall be white and engraved in black. All glass shall be polished plate.
Cc b mt ca dung cu c mu trng, c khc ch en. Tt c cc mt knh u l cc tm
knh bng.
11.18.16 Motor Control Cubicle shall contain all starters and overloads and single phase protective
equipment for the effective automatic operation of the motors and other equipment.
Ngn iu khin ng c s cha ton b cc b khi ng v thit b bo v pha n v qu ti
m bo vic vn hnh t ng c hiu qu cho ng c v cc thit b khc.
11.18.17 Final sub-circuits shall be protected by HRC fuses or circuit breakers which shall incorporate both
magnetic and thermal overload devices.
Cc mch phu cui cung s c bo v bng cu chi HRC hoc ci ngt in, chng c kt
hp c hai loi thit b qu ti nhit v t.
11.18.18 The Contractor shall supply spare fused circuits as nominated in the Drawings. In addition,
switchboard design should contain at least 15% vacant space for future extension. Congestion of
electrical components within the switchboard will not be permitted. Shop drawings and detail
construction of the cubicles, including detail layout of components, shall be submitted to the
Clients representative for approval before manufacture.
Nh thu s cung cp cc mch c lp cu chi d tr theo ch nh bn v. Ngoi ra, vic
thit k bng in cn d tnh ti thiu 15% khong trng m rng sau ny. Cc b phn in
trong bng in khng c php chen ln nhau. Bn v ch to v chi tit thi cng, k c chi
tit b tr cc b phn c np i din Ch u t thng qua trc khi ch to.
11.18.19 Ventilation louvres where required shall be provided on the sides and the backs of panels and
shall be of approved design with internal dust baffles. Where necessary, mechanical ventilation
fans shall be provided.
Cc chp thng gi khi c yu cu s c b tr cc cnh bn v pha sau ca bng in
v l loi thit k c thng qua c mn chn bui bn trong. Khi cn thit, cc qut thng gi
c lp t.
11.18.20 All paint finished shall be of high quality enamel. The appropriate number of undercoat (minimum
two coats) shall be applied and each built-up and flatted separately. Final coat shall be of
approved light colour gloss finish and sufficient body shall be given to the paint films so that the
final appearance of the finished units is entirely free from blemishes, undulation, foreign
inclusions, scratches, patterning or any defects whatsoever.
Ton b lp sn hon thin u l loi sn men cht lng cao. S lng thch hp ca lp lt
(ti thiu 2 lp) s c qut ring bit. Lp cui cung c mu sc sng c thng qua v l
loi sn bng, b mt hon thin phi sao cho hinh dng cui cung ca lp sn hon ton khng
b khuyt tt, khng b gn sng, khng ln vt l, khng b xc hoc bt c khuyt tt no
khc.
11.18.21 Labels in general shall be made from perspex and suitably engraved with black lettering in
English and Chinese. Exact details of lettering and legend shall be approved by the Clients
representative. Labels shall be fixed on panels by means of chromium plated round headed
screws.
Cc nhn hiu ni chung c lm bng cht do trong v c khc ch ting Anh v ting
Vit. Chi tit chnh xc ca ch v ni dung s c i din Ch u t thng qua. Cc nhn
hiu c gn vo bng in bng vt u trn m crm.

J10068 12 Aug 2015


SN R05

122

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

11.19

Earthing and Bonding


Ni t v s lin kt
An earth bar will be provided inside each mechanical plant room by others. The Contractor shall
provide bonding and an earthing installation in compliance with the IEE Regulations 16th Edition.
Mt thanh ni t c Nh thu khc b tr bn trong mi bung k thut. Nh thu s lp h
thng ni t theo Quy phm I.E.E xut bn ln th 16.

J10068 12 Aug 2015


SN R05

123

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 12 MISCELLANEOUS
PHN 12 CC VN KHC
12.1

Labels and Notices


Dn nhn v ghi ch

12.1.1 Labels and notices shall be provided to all pumps, valves, switches, gauges, indicators, cables,
internal wiring terminals and all other equipment to facilitate operation and proper maintenance of
the plumbing and drainage installation.
Nhn v ghi ch c trn tt c cc bm, van, cng tc, cc thit b o, cp v dy truyn tn
hiu ni b v tt c cc thit b khc nhm phuc vu cng tc vn hnh v bo tri cho vic lp t
h thng cp thot nc.
12.1.2

The Contractor shall supply and install a permanent display board at the wall/door inside the
each water meter room/box showing the location and elevation of the meter positions. This
display board shall be constructed of durable plastic or corrosion-resistant plate engraved with
words and diagrams in black on light colour background. The wordings should be of font size not
less than 18 pt. Details of this display board shall be submitted by the Contractor for Water
Authoritys and Owners approval.
Nh thu s cung cp v lp t bng hin th c nh trn tng/ca bn trong mi phng ng
h nc th hin v tr v mt ng ca ng h. Bng hin th ny bng nha bn hoc a
chng n mn c khc ch v s mu en trn nn mu sng. Cc ch c ghi vi font
khng nh hn c 18. Chi tit ca bng hin th ny c nh thu trinh cho c quan qun l
nc v ch u t ph duyt.

12.1.3

Labels and notices required by statutory requirements shall be inscribed accordingly whereas
other labels shall indicate name and purpose of the equipment together with ratings and
commissioned set values where applicable.
Nhn v ghi ch c khc tun theo cc quy nh trong khi nhng nhn khc s th hin tn v
muc ch ca thit b cung vi cng sut v gi tr ci t ti nhng ni cn p dung.

12.1.4

Labels for equipment identifications shall be made of white plastic material with black lettering.
Lettering shall be engraved on the plastic material. All wording shall be in both Vietnamese and
English.
Nhn ch th cc thit b c lm bng vt liu nha trng vi ch en. Ch s c khc trn
vt liu nha. Tt c cc ch s bng ting Vit v ting Anh

12.1.5

Notices for safety warning and instructions shall be constructed of heavy gauge aluminium
sheets painted with symbols or wording as appropriate.
Ghi ch cnh bo an ton v bng hng dn c lm bng tm nhm dy c sn cc k hiu
hoc cc t tng thch.

12.1.6

Details of exact lettering shall be agreed with the Architect prior to manufacture.
Chi tit ca cc t chnh xc s c ng u tin vi kin trc i vi sn phm.

12.1.7

Labels and notices shall be fixed by screws. Where drilling and tapping is impracticable,
approved adhesive may be used subject to prior approval by the Owner.
Nhn v ghi ch c c nh bng ren. Nhng ni khng th thc hin khoan hoc uc l, ch
u t c th ph duyt s dung phng php dn dnh.

J10068 12 Aug 2015


SN R05

124

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

12.1.8

All major equipment and components such as pumps and motors, valves, expansion joints, pipes
and fittings, etc. shall have factory applied permanent nameplates indicating, where relevant :Tt c thnh phn v cc thit b chnh nh bm, ng c, van, mi ni dn n, ng v phu kin,
v.v s c nh sn xut p dung bng biu tn c nh, nh l:

12.2

a.

Name of Manufacturer,
Tn nh sn xut

b.

Model,
Model,

c.

Serial Number,
S seri,

d.

Design Flow Rate, Pressure, etc.,


Lu lng thit k, p sut, v.v,

e.

Rated Duty,
Nng sut nh mc,

f.

Operating Voltage, Phase, Ampere, and Frequency,


in p vn hnh, pha, ampe v tn xut,

g.

Full Load Current and Power,


in nng v dng in ti,

h.

Starting Method and Current,


Phng php v dng in khi ng,

i.

Power Factor,
H s cng sut,

j.

Date of Manufacture,
Ngy sn xut,

k.

British Standards or other Authorities' markings to indicate their compliance and grades of
application,
nh du ca c quan tiu chun Anh hoc cc c quan khc nh gi mc tun
theo tiu chun ca sn phm,

l.

Any other necessary data to conform with specified requirements and to indicate the equipment
performance.
Bt k d liu cn thit khc nhm xc nhn vi cc yu cu c bit v th hin c
tnh thit b.

Danger Notices
Ghi ch cnh bo nguy him
Danger notices worded DANGER - PLANT ON AUTOMATIC START both in English and
Vietnamese shall be provided adjacent to all automatically controlled motor-driven and enginedriven pumps.
Ghi ch cnh bo nguy him vi cum t NGUY HIM PHNG MY KHI NG T NG
c ting Vit v ting Anh s c cung cp cho cc bm ng c in v dn ng c kim
sot t ng.

12.3

Painting and Finishing


Sn v hon thin

J10068 12 Aug 2015


SN R05

125

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

12.3.1

All parts of the work installed under this Specification shall be painted with first quality enamel
paints of quality, colours, and brands as approved by the Owner, except those items specified as
being painted by others or otherwise exempted from painting in this section of the Specification.
Tt c phn hng muc c lp t tun theo quy cch k thut s c sn trng men, mu v
nhn hiu c ph duyt bi ch u t, ngoi tr nhng hng muc c bit c sn bi cc
loi khc hoc nhng phn c min sn theo quy cch k thut.

12.3.2

Paint shall be selected to withstand the temperature on the surface which it is to be applied, and
shall be suitable in all respects for the environmental conditions in which it shall be located.
Sn s c chn bn vng vi nhit trn b mt, v phu hp trong mi iu kin mi trng
lp t.

12.3.3

All paint used shall be of one manufacturer as approved by the Owner, and finishes shall be full
gloss unless otherwise instructed by the Owner.
Tt c sn s dung nn cung mt nh sn xut c ph duyt bi ch u t, v lp hon
thin s c sn bng tr khi c hng dn khc bi ch u t.

12.3.4

All painting for outdoor installation, which are subject to corrosion effects shall be epoxy paint
equivalent to Amerlock 400.
Tt c sn cho lp t ngoi nh, ni c kh nng tc ng n mn cn sn epoxy tng ng
Amerlock 400.

12.3.5

Before ordering any primer, undercoat and finishing paint, the Contractor shall propose the colour
scheme for approval of the Owner.
Trc khi t hng bt c loi sn lt, sn nn v sn hon thin, nh thu cn xut cho ch
u t ph duyt v mu sc.

12.3.6

The Contractor shall select all finishing and painting materials from types suitable for the surfaces
to which they are applied and for the environmental conditions in each area.
Nh thu s chn tt c vt liu sn v hon thin tr cc loi phu hp cho b mt ng dung v
phu hp cho mi khu vc iu kin mi trng.

12.3.7

Application of paint including all surface preparation and other pre-painting treatment shall be
executed in accordance with the paint manufacturer's recommendation.
Qu trinh sn bao gm vic chun b tt c b mt v x l trc khi sn s c thc hin tun
theo xut ca nh sn xut sn.

12.3.8

All stainless steel surfaces shall not be painted.


Tt c b mt thp khng r s khng c sn.

12.4

Paint, Machinery & Equipment


Sn, my mc v thit b
All items of plant, machinery and equipment supplied painted ex factory shall be given one
finishing coat of full gloss enamel paint using colour and brand as approved by the Owner, except
where the manufacturer's standard finish has been approved by the Owner.
Tt c hng muc my mc, thit b c sn pha ngoi nh xng s c sn ph 1 lp hon
thin trng men s dung mu v nhn hiu theo s ph duyt ca ch u t, ngoi tr nhng
ni lp hon thin tiu chun ca nh sn xut c ph duyt bi ch u t.

J10068 12 Aug 2015


SN R05

126

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

12.5

Exposed Metal Work


Cc hng muc bng kim loi l ra ngoi

12.5.1

All exposed metalwork shall be wire-brushed and cleaned from rust, scale, dirt and grease, and
shall then be given one priming coat, one undercoat and two finishing coats of full gloss enamel
to colour as approved by the Owner.
Tt c cc hng muc bng kim loi l ra ngoi s c chi v lm sch r st, cn bn, mng
bm v du m v sau sn mt lp sn lt, mt lp sn nn v 2 lp hon thin trng men
bng theo mu c ph duyt bi ch u t.

12.5.2

The priming coat for exposed galvanised iron shall be galvanized iron primer as approved by the
Owner.
Lp sn lt cho st trng km l ra ngoi s c m km theo s ph duyt ca ch u t.

12.5.3

The priming coat for exposed non-ferrous metalwork shall be suitable for the metal to which it
shall be applied and shall be to the approval of the Owner.
Lp sn ph cho cc hng muc kim loi mu l ra ngoi s thch hp i vi kim loi c dung
v s c ph duyt ca ch u t.

12.6

Concealed Metal Work


Hng muc kim loi nm khut
All galvanized iron surface concealed in roof spaces, suspended ceilings, building ducts, and the
like shall not be painted.
Tt c b mt st trng km khut trong khong khng mi, trn, ng k thut hoc nhng ni
tng t s khng c sn.

12.7

Pipework and Metal Sheathing


ng ng v lp bc kim loi

12.7.1

Pipework and metal sheathing shall be painted as for exposed or concealed metalwork as
applicable.
ng ng v lp bc kim loi s c sn i vi hng muc kim loi l ra hay giu kn.

12.7.2

Turned parts of valves, controls and the like shall be cleaned and polished to the approval of the
Owner.
Cc chi tit quay ca van, kim sot v cc hng muc tng t s c lm sch v nh bng
theo nh ph duyt ca ch u t.

12.8

Pipework Identification
Nhn din ng ng

12.8.1

All pipes and the like shall be identified in accordance with BSEN 60076-5 :2001 (BS 1710).
Tt c ng v cc hng muc tng t c nhn din theo BSEN 60076-5: 2001 (BS 1710)

12.8.2

Circumferential bands of standard ground colours shall be not less than l00mm wide on pipes up
to 50mm nominal diameter, and not less than 150mm wide on pipes greater than 50mm nominal
diameter.

J10068 12 Aug 2015


SN R05

127

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Vng bng mu c bn theo tiu chun c chiu rng khng nh hn 100mm c gn trn
ng ng c ng knh di 50mm, v khng nh hn 150mm i vi ng ng c ng
knh ln hn 50mm.
12.8.3

Supplementary colours shall be displayed as bands not less than 25mm wide in the centre of the
ground colour bands.
Bng mu b sung c chiu rng khng nh hn 25mm c gn trung tm ca bng mu c
bn.

12.8.4

Where lettering is required it shall be painted in contrasting colours in accordance with the BSEN
60076-5 :2001 (BS 1710), in block letters not less than 15mm high for pipes up to 50mm nominal
diameter, and in block letter not less than 40mm high for larger pipes.
Nhng ni cn ch, thi nhng ch ny s c sn mu tng phn theo tiu chun BSEN
60076-5: 2001 (BS 1710), cc ch c chiu cao khng nh hn 15mm cho ng ng c ng
knh di 50mm v khng nh hn 40mm i vi ng ng c ng knh ln hn.

12.8.5

Identification bands shall be located where they are clearly visible in each room or compartment
through which the pipe runs, and shall be placed at centres not exceeding 6m all to details as
approved by the Owner.
Dy bng nhn din s c t ni d nhin thy trong mi phng hoc khaong m ng ng
chy qua, v s c t trung tm khng vt qu 6m n cc chi tit theo ph duyt ca
ch u t

12.8.6

Direction of flow shall be indicated by an arrow painted on the pipe adjacent to each colour band.
Arrows shall be 75mm long for pipe sizes up to and 50mm diameter, and 150mm long for pipe
sizes 50mm above.
Hng dng chy s c nhn din bng mi tn dn trn ng ng k bn dy bng mu.
Mi tn di 75mm i vi ng ng di 50mm, v 150mm i vi ng ng ln hn 50mm.

12.9

Colour Schemes
S mu

12.9.1

The whole of the piping installation shall be painted in accordance with the following BSEN
60076-5 :2001 (BS 1710) wherever applicable and colour coded to BS 4800 : 1981.
Vic lp t ton b ng s c sn theo BSEN 60076-5: 2001 (BS 1710) ti nhng ni cn v
mu theo quy chun BS 4800: 1981

12.9.2

Equipment shall be paint and colour coded to BS 381C : 1980 as follows:


Cc thit b s c sn v quy chun my theo BS 381C: 1980 nh sau:
Equipment
Thit b
Switchboard & control panels
Bng phn phi & Bng kim sot
Electric Motors
ng c in
Electrical conduits
Dy dn in
Pumps and tanks
Bm v b cha
All other equipment
Tt c thit b khc

J10068 12 Aug 2015


SN R05

Colour
Mu
Electric Orange White Interior
Lt trong trng cam in
Primrose
Mu vng nht
Light Orange
Cam nht
As for respective piping service
Theo h ng tng ng
As directed by the Owner
Theo ch dn ca ch u t

128

No.
S
310
557
-

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

12.10

Application of Painting
ng dung ca sn.

12.10.1 All paints shall be prepared and applied in accordance with the manufacturer's recommendations.
Tt c sn c chun b v s dung theo xut ca nh sn xut.
12.10.2 All galvanized metal surfaces shall be properly etch-primed to ensure correct adhesion of the
paint to the surface. Materials for etch-priming shall be as recommended by the paint
manufacturers. Subsequent painting of galvanized surfaces shall comply with this Specification.
B mt kim loi trng km s c u tin chng n mn m bo s dnh kt ca sn trn
b mt. Vt liu chng n mn c th c xut bi nh sn xut sn. Lp sn sau i vi
b mt trng km s tun theo quy cch k thut ny.
12.10.3 Prior to painting, all metallic surfaces except galvanized surfaces shall be thoroughly scraped and
wire brushed as necessary to remove scale, rust and swarf. Surfaces shall then be solvent
cleaned to remove all oil, grease and dirt.
Trc khi sn, tt c b mt kim loi ngoi tr b mt trng km s c loi b mnh vun, ch
sch nu cn loi b cn, mng bm, r st, mt kim loi. Sau b mt s c lm sch
bng dung mi loi b du m v cht bn.
12.10.4 When the surfaces to be painted are clean and dry, one coat of primer as approved by the Owner
shall be evenly applied over the entire area. After surfaces have been primed, the Contractor
shall notify the Owner so that an inspection of the primed surfaces can be made prior to the
application of the undercoat and the finishing coats.
Khi b mt cn sn c lm sch v kh, mt lp sn lt u tin theo ph duyt ca ch
u t s c ph u trn ton b din tch. Sau khi b mt c sn, nh thu s lu
vi ch u t rng vic gim st b mt c bn c th c u tin p dung cho lp nn v lp
hon thin.
12.10.5 When the priming coat has been applied, one coat of undercoat shall be applied as approved by
the Owner. Before applying the finishing coats, the Contractor shall ensure that the undercoated
surface is rubbed flat and smooth. Finally, two coats of high gloss finishing paint as approved by
the Architect shall be applied when all dust has been removed.
Khi lp lt c ph xong, mt lp sn nn s c ph sau theo ph duyt ca ch u
t. Trc khi ph lp hon thin, nh thu cn m bo chc chn b mt ph phi nhn, trn.
Cui cung, 2 lp hon thin c bng cao c ph duyt bi ch u t s c sn ln khi
tt c bui bn c loi b
12.10.6 Each successive coating shall be completely dry prior to the application of the next coat. The
minimum thickness of each layer of paint shall be 50m.
Mi lp sn cn phi hon ton kh trc khi c ph ln mt lp khc. dy ti thiu ca
mi lp sn l 50 m.
All paint/coating/adhesive/sealant products and submittal will comply with LEED requirement.
Refer to LEED Construction Requirements and Document Guidelines and comply with the
following items:
Tt c cc sn phm sn/ph/dn/bt phi theo yu cu LEED. Phi da trn cc ti liu hng
dn v yu cu xy dng theo LEED v phi t cc yu cu sau:
- IEQ c4.1 Low Emitting Materials Adhesives and Sealants
IEQ c4.1 cc vt liu pht thi thp cc cht dn dnh v bt kn

J10068 12 Aug 2015


SN R05

129

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

IEQ c4.2 Low Emitting Materials Paints and Coatings

IEQ c4.2 cc vt liu pht thi thp cc cht sn v cht ph

12.11

Spares and Tools


D phng v cc cng cu

12.11.1 The P&D Contractor shall provide a complete set of spare parts and special tools including spare
valves, indicator lamps, special keys, fuses, etc. and for one year's operation and maintenance of
the plant and installation.
Nh thu cp thot nc s cung cp ton b cc thit b d phng v cc cng cu c bit bao
gm van d phng, en ch th, chia kha c bit, cu chi, v.v..v d phng trong mt nm vn
hnh, bo tri phng my v lp t.
12.11.2 The P&D Contractor shall submit with his tender unit rate for recommended items of spares and
consumables pertaining to all the equipment offered as per manufacturers recommendation.
Nh thu cp thot nc s pht hnh nh mc u thu xut cc hng muc d phng v
kh nng tiu thu gn lin vi tt c cc thit b c t hng theo xut ca nh sn xut.
12.11.3 A complete list of all replaceable parts with model number, part number and price shall be
submitted for purchase and use after the expiration of the maintenance period.
Cn cung cp mt bng danh sch hon chnh cc b phn thay th vi s mu m, s b phn
v gi c c th mua v s dung sau khi qu trinh bo tri ht hn.
12.11.4 The following spares shall be provided but not be limited to:Nhng phn d phng sau cn c cung cp khng gii hn:
a.

1 set valve packing for each type of valve installed,


Mt b van cho mi loi van c lp t,

b.

1 set of gland packing or mechanical seal for each pumps,


Mt b np m hay l bt c kh cho mi bm,

c.

1 set of bearings of each type of pump sets,


Mt b b cho mi b bm,

d.

1 set of special tools for operating and maintaining the installed plants/equipment,
Mt b cng cu c bit cho qu trinh vn hnh v bo tri cc thit b c lp t,

e.

2 sets of Stainless Steel key for manhole covers,


2 b chia kha thp khng r cho np h ga,

f.

4 buckets of finishing paint of the same composition as that of control panel, pumps and
pipeworks,
4 thung sn hon thin ca cung thnh phn ca bng kim sot, bm v ng ng,

g.

4 buckets of sufficient lubricating oil in screw top metal containers, suitable for all plants and
equipment,
4 thung du bi trn hiu qu trong b cha kim loi c np ren, thch hp cho tt c cc
phng my v thit b

h.

10% of 1 set of cartridge fuses and control fuse of each rating installed inside main control
panels,
10% ca 1 b cu chi hp v cu chi kim tra cho mi nh mc c lp t bn trong
bng kim sot chnh,

J10068 12 Aug 2015


SN R05

130

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

i.

10% of push button of each colour and pattern,


10% nt n cho mi mu v mi kiu,

j.

10% of indication lamps of each colour and size,


10% en ch th cho mi mu v mi kch c,

k.

10% of AC relay of all types,


10% r le AC cho tt c cc loi,

l.

10% of DC relay of all types,


10% r le DC cho tt c cc loi,

m.

10% of timer of all types,


10% b nh gi cho tt c cc loi,

n.

10% of contactor of all types,


10% b ng ct cho tt c cc loi,

o.

Any other items as recommended by the manufacturer.


Bt c cc thit b khc theo yu cu ca nh sn xut.

J10068 12 Aug 2015


SN R05

131

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 13 COMMISSIONING AND ACCEPTANCE TEST


PHN 13 KIM TRA NGHIM THU V TH NGHIM
13.1

Adjustment, Commissioning, Performance Tests


iu chnh, kim tra, th nghim tnh nng.

13.1.1 The P&D Contractor shall commission the installation and carry out complete performance tests
for all equipment and systems installed by him, make all necessary adjustments, including setting
all controls and checking the operation of all protective and safety devices in accordance with the
manufacturers' instructions, the requirements of the statutory rules and regulations and to the
satisfaction of the Owner before the installations will be accepted.
Nh thu cp thot nc s th nghim lp t v a ra cc th nghim tnh nng hon chnh
cho tt c thit b v h thng lp t, thc hin tt c cc iu chnh cn thit, bao gm thit lp
tt c qu trinh kim sot, kim tra qu trinh vn hnh cc thit b an ton v bo v tun theo
hng dn ca nh sn xut, nhng yu cu ca c quan nh nc v ch u t trc khi qu
trnh lp t c chp nhn.
13.1.2

Prior to any tests, the Contractor shall submit detailed procedures and programme for
commissioning and testing to the Owner for approval.
Trc khi c bt c cuc th nghim no, nh thu cn pht hnh phng php v chng trinh
chi tit cho vic th nghim cho ch u t ph duyt.

13.1.3

The P&D Contractor shall submit detailed commissioning plan which shall comply to nessesary
requirements.
Nh thu cp thot nc s cung cp k hoch nghim thu chi tit tun theo nhng yu cu cn
thit.

13.2

Labour and Materials


Nhn cng v vt liu

13.2.1

The P&D Contractor shall despatch competent and experienced commissioning engineers and
technicians who shall be submitted qualification for Owners approval to carry out the
commissioning and testing of the installation.
Nh thu cp thot nc s gi cc k s v cc chuyn vin k thut c kinh nghim v thm
quyn, nhng ngi s cung cp vn bng cho ch u t ph duyt tin hnh thm nh
kim tra s lp t.

13.2.2

All labour and materials necessary for carrying out the work shall be provided by the P&D
Contractor, except that the Main Contractor will supply electricity and water as required.
Instruments and recording device shall be accurately calibrated and periodically recalibrated to
the satisfaction of the Owner.
Tt c nhn cng v vt liu cn thit cho cng vic s c cung cp bi nh thu c in,
ngoi tr nh thu chnh s cung cp in nc theo yu cu. Dung cu v thit b ghi d liu s
c kim nghim mt cch chnh xc v kim nghim li theo chu k nhm tha mn yu cu
ca ch u t.

J10068 12 Aug 2015


SN R05

132

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

13.2.3

The P&D Contractor shall supply any necessary diesel or other fuel oil for engine-driven pumps,
etc.
Nh thu cp thot nc s cung cp diesel hoc bt k nhin liu cn thit cho cc ng c
bm, v.v.

13.2.4

The P&D Contractor shall ensure that the entire installation is in "as new" condition at the
conclusion of the tests.
Nh thu cp thot nc s m bo ton b vic lp t phi trong tinh trng mi theo kt lun
ca qu trinh kim tra.

13.2.5

A full set of instruments used for commissioning and testing shall be submitted for Owners
approval.
Mt b thit b y dung cho cng tc kim tra nghim thu s c cung cp cho ch u t
ph duyt.

13.3

Factory Acceptance Tests (FAT)


Kim tra nghim thu ti nh my (FAT)

13.3.1

General
Tng quan
This P&D Contractor shall carry out the following minimum tests to provide assurance that the
equipment/plant/material being supplied will meet the performance requirements of this
Specification. Where applicable, all tests shall be carried out in a manner as set down in relevant
BS. The list provided is an indicative minimum of the tests required. Develop and submit full test
schedules, procedures, and circuit diagrams for approval in accordance with the requirements of
the other sections of the Specification.
Nh thu cp thot nc s tin hnh nhng th nghim ti thiu cung cp s m bo rng
thit b/dung cu/ vt liu c cung cp s t nhng yu cu ca quy cch k thut ny. Tt c
cc th nghim s c tin hnh nhng ni c th p dung theo cch thc thuc tiu chun
BS. Danh sch c cung cp l nhng th nghim c yu cu ti thiu. . Trin khai v cung
cp lch trinh th nghim ton din, phng cch, v s mch ph duyt tun theo nhng
yu cu ca cc phn khc trong quy cch k thut ny.

13.3.2

Pumps
Bm
Type test certificates for head discharge, speed and power input (BEN ISO 9906).
Chng nhn th mu ng y, tc d v in cp (BEN ISO 9906)

13.3.3

Motors
ng c
Type test certificates in accordance with BS 5000. For motors of 40 kW output and above,
routine individual test certificates in accordance with BS 5000.
Chng nhn th mu tun theo BS 5000. i vi ng c c dng ra t 40kW tr ln, nhng
chng nhn th nghim ring l tun theo BS 5000

13.3.4

Valves, cocks and fittings


Van, kha v phu kin

J10068 12 Aug 2015


SN R05

133

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Type test certificates for pressure test and compliance with the regulation laid down by the local
Water Authority.
Chng nhn th mu cho th nghim p sut v p ng vi quy chun da trn c quan qun
l nc a phng.
13.3.5

Starters and Control Gear


C cu iu khin v khi ng
Type test certificates (BSEN 60470 :2001 (BS 587)) for control panels as a whole, routine
(individual) high voltage test in accordance with BSEN 60470 :2001 (BS 587).
Chng nhn th mu (BSEN 60470: 2001 (BS 587)) cho ton bng kim sot nh th
nghim in p cao (ring l) tun theo BSEN 60470: 2001 (BS 587)

13.4

Site Test during Construction


Th nghim cng trng trong qu trnh thi cng

13.4.1

All water pipework shall be hydraulically pressure tested to the pressure as 1.5 times of working
pressure for a period not less than 6 hours. A pressure drop after 6 hours of 2% or less may be
acceptable.
Tt c ng ng nc s c th nghim thy lc ti p sut 1.5 ln p sut hot ng trong
khong thi gian khng nh hn 6 gi. chnh p sut sau 6 gi l 2% hoc nh hn c th
c chp nhn.

13.4.2

The pressure test shall be carried out on site in convenient sections during the construction of the
works, before any insulation has been applied. Before the tests are carried out the P&D
Contractor shall remove any equipment liable to damage and fix all necessary blank flanges etc.
Th nghim p sut s c tin hnh trn cng trng trong cc phn thun tin sut qu trinh
thi cng, trc khi bt k qu trinh cch nhit c thc hin. Trc khi kim tra c thc hin,
nh thu cp thot nc s loi b cc thit b c kh nng b h hng v sa cha tt c cc
khong trng mt bch cn thit , v.v

13.5

Water System Tests


Th nghim h thng nc

13.5.1

General
Tng quan
a.

Before the tests are carried out, the P&D Contractor shall remove connected equipments
and components which are liable to damage under test, and also provide and fix all the
necessary gauges.
Trc khi th nghim c tin hnh, nh thu cp thot nc s loi b cc thit b kt ni
v cc thnh phn c kh nng h hng trong qu trinh th nghim v ng thi cung cp,
sa cha tt c cc thit b o khi cn.

b.

Prior to start-up and after satisfactory hydraulic testing, the P&D Contractor shall clean as
the entire installation and keep them in a new condition.
Trc khi tin hnh v sau khi cc th nghim thy lc hon tt, nh thu cp thot nc
s lm sch hon ton thit b v duy tri n trong trng thi mi.

J10068 12 Aug 2015


SN R05

134

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

c.

d.

All piping system shall be flushed and drained at least once through to remove
contaminating material. All pipes shall be rodded when necessary to ensure clearance of
debris, cleaning and flushing shall be carried out in sections as the complete installation.
H thng ng ng s c x sch t nht mt ln loi b cc cht bn. Tt c ng
ng s c thng khi cn m bo lm sch cc mnh vun, qu trinh lm sch v x
ng c thc hin khi qu trinh lp t c hon tt.
Hydraulic tests shall be carried out as the pipework is installed and shall be completed
before chases in walls and ducts are closed. All tests shall be carried out prior to suspended
ceilings and other finishes are installed.
Th nghim thy lc s c tin hnh khi ng ng c lp t v s hon tt trc khi
giu vo trong tng v ng dn c ng li. Tt c th nghim s c tin hnh trc
khi trn hoc cc chi tit hon thin khc c hon tt.

e.

The P&D Contractor must record all test figures together with schedules of pipe lengths and
should note that testing shall be witnessed by the Owner.
Nh thu cp thot nc phi ghi li cc biu th nghim cung vi danh muc chiu di
ng ng v nn ch rng tt c th nghim s c nghim thu bi ch u t

f.

The P&D Contractor shall provide whatever hoses or drainage channels required to safely
remove the test water discharged while carrying out these tests in order to ensure that no
damage to the building and property will be caused by the test water.
Nh thu cp thot nc s cung cp bt k ng mm hay mng thot cn thit thot
an ton lng nc x th nghim trong khi tin hnh th nghim nhm m bo khng c
bt c h hng no xy n i vi cng trinh do qu trinh th nghim gy ra.

13.5.2

Plumbing Pipework
ng ng cp nc
a.

Water systems and circuits shall be tested hydraulically to a minimum pressure of 1000kPa
or 1.5 times the working pressure whichever is higher applied at the highest point of the
system and held for a period of not less than 12 hours, leakage shall not cause pressure
variation to more than 2% for 4 hours without jacking.
H thng nc v dng s c th nghim thy lc p sut ti thiu 1000Kpa hoc 1.5
ln bt c p sut lm vic no cao hn ti im cao nht ca h thng v duy tri trong
khong thi gian khng nh hn 12 gi, s r r s khng gy nn s khc bit p sut ln
hn 2% trong 4 gi m khng c qu trinh kch.

b.

A water supply test with the drain and test valves fully opened shall be made on the
plumbing system.
Th nghim cp nc vi van th v x m hon ton s c thc hin cho h thng cp
nc.

13.5.3

Drainage Pipework
ng ng thot nc
a.

Testing of drainage systems shall be carried out in sections by dividing the system
horizontally. Each section shall comprise pipework and fitting for three floors/stories required
for testing.
Th nghim h thng thot nc s c thc hin tng phn bng cch chia h thng
theo phng ngang. Mi phn s bao gm ng ng v phu kin ca 3 sn yu cu cho
th nghim.

J10068 12 Aug 2015


SN R05

135

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

b.

c.

On completion of the section of drainage pipework to be tested, the Contractor shall blank
off all open ends of pipes and ensure that all access covers are securely tightened so that
they are airtight.
Sau khi hon tt th nghim mt phn no , nh thu cp thot nc cn bt kn cc
khong trng pha cui ng ng nhm m bo cc ming thm c ng cht an ton
kn gi.
At the base of each stack, a drain bag or drain plug shall be inserted and a small quantity of
water allowed to settle above it so as to form a seal that can easily be inspected if it leaks.
Ti ca mi ng ng, cn lp t nt tho cn v mt lng nh nc cho php lng
pha trn to thnh lp bt kn c th c kim tra d dng khi b r r.

d.

A drain plug shall be inserted at the top of the stack and in the case of rainwater pipes at
every intermittent outlet with a small quantity of water above it.
Nt tho cn c th c lp trn nh ng ng trong trng hp ca ng nc ma ti
mi im thu gin on vi mt lng nh nc pha trn.

e.

The Contractor shall remove the blank cap from one of the drain plugs (at the top of the
stack if possible) and connect the tube from a manometer gauge to it or by passing the tube
through one of the trap seals.
Nh thu s loi b np chup t mt trong cc nt tho cn (ti nh ng ng nu c th)
v ni ng t p k vo n hoc r ng qua mt trong nhng bt chn by.

f.

The Contractor shall blow air through the tube and reconnect at the manometer gauge to
obtain a reading of 38mm weight and the level shall remain for a period of not less than five
minutes without falling and without further air being added.
Nh thu s thi kh qua ng v kt ni li ti thit b p k c c 38mm v mc nc
s duy tri trong khong thi gian khng t hn 5 pht khng c tut xung v khng c kh
thm vo.

g.

For underground drainage pipework, testing shall be carried out after laying and jointing, but
before placing of concrete hunching, surround of backfilling.
i vi ng ng chn ngm, qu trinh th nghim s c tin hnh sau khi t v ni
ng, nhng trc khi t gi b tng, lp t xung quanh.

h.

Tests shall be repeated after completion of backfilling and compaction.


Cc qu trinh th nghim c lp li sau khi hon tt ph t v nn.

i.

All pipelines up to and including 450mm internal diameter shall be water tested in sections.
Tt c ng c ng knh trong t 450mm tr ln s c th nghim tng phn.

j.

Temporarily seal ends of drains and connections with expanding plugs as approved by the
Owner.
Nt kn tm thi ca ng ng thot v cc mi ni vi u nt co gin theo nh ph duyt
ca ch u t

k.

Fill system with water shall be produced 1.2m head at high end and not more than 6m head
at low end. Steeply graded pipes shall be tested in sections in order to comply.
H thng lm y vi nc s c to ra ct p 1.2m ti im cui cao v khng vt qu
6m ti im cui thp. Nhng ng c chiu cao dc s c th nghim tng phn hon
tt.

J10068 12 Aug 2015


SN R05

136

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

l.

Initial absorption shall be allowed by topping up at intervals before starting test.


S hp thu ban u c cho php bng vic lm y cc on trc khi bt u th
nghim.

m. Loss of water shall be measured over 30 minutes by adding water at 10 minutes intervals
and noting quantity required to maintain original level in standpipe or manhole.
Tn tht nc s c o lng trong 30 pht bng cch thm nc tng 10 pht v ghi
ch s lng yu cu duy tri mc nc gc trong ng ng hoc h ga.
n.

13.5.4

All pipelines exceeding 450mm diameter shall be tested by smoke test. The Contractor shall
seal both ends of pipe line and introduce smoke either by cartridge or smoke machine to the
approval of the Owner. Pipeline shall completely smoke tight.
Tt c ng ng vt qu 45omm s c th nghim bng th nghim khi. Nh thu s
bt kn c u ng v a khi vo bng c bm khi hay my to khi theo ph duyt ca
ch u t. ng ng s hon ton kn khi.

Fibreglass Water Tanks


B cha bng vt liu si thy tinh
Open top cisterns and water tanks connected to the system shall be subjected to a standing
leakage test for 24 hours. No leakage shall be permitted.
Cc bn h v b cha nc c ni vo h thng s phi chu th nghim r r trong 24 gi.
Khng c php r r.

13.6

Electrical Systems Tests


Th nghim h thng in

13.6.1

Electrical wiring systems shall be tested generally as required by the I.E.E. Regulation. Low
voltage wiring shall be insulation tested to a D.C. voltage of twice the normal working voltage of
the system. Any tests that are liable to cause damage to the delicate components such as those
incorporating electronic circuits shall be carried out with the components disconnected.
H thng dy dn in s c th nghim tng quan theo yu cu bi I.E.E. Dy dn in p
thp s c th nghim cch in trong in p mt chiu 2 ln in p hot ng binh thng
ca h thng. Bt k th nghim no c th gy ra h hng cho cc thnh phn chi tit nh nh
cc mch in t hp nht s c tin hnh khi ngt kt ni cc thnh phn.

13.6.2

The input D.C. supply to the alarm supervisory circuitry shall be checked for correct voltage and
stability such as to match the signal triggering devices.
Dng cp in mt chiu cho h mch gim st bo ng s c kim tra in p chnh xc v
n nh nh khp vi thit b lm tung ti kh tn hiu.

13.6.3

The following tests shall be carried out in full compliance with the I.E.E. Regulation by the
Contractor in the presence of the Owner:Nhng th nghim sau s c tin hnh bi nh thu hon ton tun theo I.E.E di s chng
kin ca ch u t
a.

Insulation resistance test of all power and control cables,


Th nghim in tr cch in cho tt c cp in v cp kim sot,

b.

Insulation resistance test of all motor windings,


Th nghim in tr cch in cho tt c cun ng c,

J10068 12 Aug 2015


SN R05

137

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

c.

Test of conductor continuity,


Th nghim tnh lin tuc ca dy dn,

d.

Test of effectiveness of earthing,


Th nghim tnh hiu qu ca h thng tip t,

e.

All thermal overload relays and starters,


Tt c r le qu ti nhit v thit b khi ng,

f.

Functional checks,
Kim tra chc nng,

g.

Sequence of operation,
Tnh lin tuc vn hnh,

h.

Flick test of motors.


Th nghim va p ca ng c.

13.7

Cleansing, Flushing and Pretreatment


Qu trnh suc ra, lm sch v tin x l

13.7.1

Prior to start-up and after satisfactory hydraulic testing, the P&D Contractor shall clean as the
entire installation including all sanitary fitments and pipework and the like after installation and
keep them in a new condition.
Trc v sau khi tin hnh th nghim thy lc, nh thu cp thot nc s lm sch cc thit b
bao gm tt c cc thit b v sinh v ng ng v nhng th tng t sau khi lp t v gi n
trong tinh trng mi.

13.7.2

All piping systems shall be flushed and drained at least once through to remove contaminating
materials. All pipes shall be rodded when necessary to ensure clearance of debris, cleaning and
flushing shall be carried out in sections as the installation becomes completed.
Tt c h thng ng ng s c suc ra v x t nht 1 ln loi b cc cht bn. Tt c
ng ng s c thut ra nu cn m bo lm sch mng bm, qu trinh lm sch v
suc ra s c tin hnh tng phn khi qu trinh lp t c hon tt.

13.7.3

All strainers shall be inspected and cleaned out or replaced.


Tt c b lc s c thm v lm sch hoc thay th.

13.7.4

When the entire systems are reasonably clean, a pretreatment chemical shall be introduced and
circulated for at least 8 hours. Warning signs shall be provided at all outlets during pretreatment.
The pretreatment chemical shall:Khi h thng c lm sch mt cch hp l, ha cht tin x l s c a vo v tun hon
t nht 8 gi. Tn hiu cnh bo s c cung cp ti tt c ng ra trong sut qu trinh tin x
l. Ha hc tin x l s gm:
a.

Remove oil, grease and foreign residue from the pipe work and fittings,
Loi b du, m, v cht kt ta l t ng ng v phu kin,

b.

Pre-condition the metal surfaces to resist reaction with water or air,


To iu kin s b cho b mt kim loi chu c phn ng vi nc hay du,

c.

Establish an initial protective film,


Thit lp lp mn bo v ban u,

J10068 12 Aug 2015


SN R05

138

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

d.

After pretreatment, the system shall be drained and refilled with fresh water and left until the
system is put into operation,
Sau khi x l s b, h thng s c x v lm y tr li bng nc sch v cho
n khi a vo vn hnh,

e.

Details and procedures of the pretreatment shall be submitted to the Owner for approval
prior to commencement of work.
Cc chi tit v bin php tin hnh x l s b s c trinh cho ch u t ph duyt
trc khi bt u cng vic.

13.8

Plumbing and Drainage System Commissioning


Nghim thu h thng cp thot nc

13.8.1

Water flow rate and pressure shall be measured and regulated.


Lu lng v p sut s c o v iu chnh

13.8.2

All preliminary checks, system flushing, setting to work, balancing and regulation, pump
alignment etc. shall be carried out.
Tt c qu trinh kim tra s b, sc ra h thng, iu tit cng vic, cn bng v iu chnh,
sp xp bm,v.vs c tin hnh

13.8.3

13.8.4

The following data shall be recorded on commissioning sheets as minimum:Nhng d liu sau c ti thiu ghi li trong bin bn nghim thu:
a.

Pump serving area/Location,


Din tch/ v tr phuc vu ca bm,

b.

Pump/motors maker/Serial No.,


Nh sn xut ng c/ bm/ s seri,

c.

Pump motor speed,


Tc ng c bm,

d.

Suction and discharge heads for all pumps, and flow rates as check against pump curves,
Ct p ng ht v ng y ca tt c cc bm v lu lng theo s kim tra cho vi biu
bm,

e.

Starting and operation current of each pump motor,


Dng in khi ng v vn hnh ca tt c ng c bm,

f.

Pressure setting, cut-in and cut-off pressure for operation of pumps,,


Th nghim p sut, p sut ng m trong qu trinh vn hnh bm

g.

Level switch setting for cut-in, cut-off and alarm level in percentage of tank capacity,
Ci t cng tt mc nc kim sot mc nc ng ngt v bo ng theo phn trm
dung tch ca b cha,

h.

Pressure and flow rate at highest and lowest point of plumbing system for each individual zone.
Lu lng v p sut ti im cao nht v thp nht ca h thng cp nc cho mi vung
ring l.

The P&D Contractor shall ensure automatic controls to be commissioned and tested.
Nh thu cp thot nc s m bo vic kim sot t ng c nghim thu v th nghim.

J10068 12 Aug 2015


SN R05

139

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

13.8.5

The commissioning procedure shall comply with relevant clauses set out in the current edition of
the CIBSE Guide Commissioning Code Series C.
Phng thc nghim thu s tun theo nhng iu khon thch hp ghi trong CIBSE hin hnh
quy chun nghim thu seri C.

13.8.6

All modulating ranges and set points shall be calibrated for all automatic valves, pressure
sensors and the like to ensure that operating conditions are correct. The time and control
sequence shall also be tested and verified.
Tt c khong iu chnh v cc im ci t s c iu chnh cho tt c van t ng, cm
ng p sut v nhng th tng t m bo iu kin vn hnh chnh xc. Thi gian v tn
sut kim sot cng s c th nghim v kim nghim.

13.8.7

All valves, switches, controls and the like shall be properly regulated.
Tt c van, cng tc, thit b kim sot v nhng th tng t s c iu chnh mt cch ng
n.

13.8.8

Interlocking circuit and safety devices shall be tested to ensure safety operation of the plant.
Mch kha lin ng v cc thit b an ton s c kim tra m bo qu trinh vn hnh
thit b an ton

13.9

Electrical System Commissioning


Nghim thu h thng in

13.9.1

All equipments are electrically and mechanically safe.


Tt c thit b an ton v in v c

13.9.2

All preliminary checks on earth continuity, correct wiring connection, and battery status shall be
carried out.
Tt c qu trinh kim tra s b ni t, ni dy chnh xc, v tinh trng pin s c tin hnh

13.9.3

The following data shall be recorded on commissioning sheets as minimum:D liu sau s c ti thiu ghi vo bin bn nghim thu:

13.10

a.

Check list of all interface signals which are correctly functioning;


Danh muc kim tra tt c cc tn hiu tng tc ng chc nng

b.

All indications and alarms are working correctly.


Tt c du hiu v bo ng lm vic chnh xc

Final Acceptance Test


Th nghim nghim thu sau cng

13.10.1 Following commissioning of the entire installation, and prior to issue of the Certificate of Practical
Completion, this Contractor shall carry out final acceptance tests in accordance with a
programme to be agree with the Owner.
Sau qu trinh kim nghim ton b thit b, v trc khi trinh chng nhn hon thnh theo
thc t, nh thu cn tin hnh th nghim nghim thu sau cung theo chng trinh c ng
b ch u t
13.10.2 Should the results of the acceptance tests show that plant, systems and/or equipment fail to
perform to the efficiencies or other performance figures as given in the Specification or as

J10068 12 Aug 2015


SN R05

140

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

accepted in this P&D Contractors Tender, this P&D Contractor shall adjust, modify and if
necessary replace the equipment without further payment in order that the required performance
be obtained. Should it be necessary for this P&D Contractor to attend to items of plant as above
described, he will be responsible as to cost for any damage or deterioration to the building or
other services consequent on such attendance.
Kt qu th nghim nghim thu cn c kt qu ch ra rng cc lp t, h thng v/ hoc thit b
hng v hiu sut hoc nhng c tnh khc theo nh quy cch k thut hoc theo h s mi
thu c chp nhn, nh thu cp thot nc s hiu chnh, v nu cn s thay i thit b m
khng tr thm chi ph nhm t c quy cch yu cu. Nh thu cp thot nc cn tham gia
vo cc vn c m t trn, nh thu s c trch nhim chi tr cho bt c h hng hoc
s xung cp ca cng trinh hoc cc hng muc c lin quan.
13.10.3 The developed head of each pump shall be listed and checked against the performance curve to
demonstrate that the design flow rate is being achieved.
Ct p ca mi bm s c lit k v kim tra cho vi biu c tnh bm chng minh lu
lng thit k t c.

13.11

Statutory Authorities Tests and Inspections


Cc th nghim theo lut nh chnh ph v gim st

13.11.1 As and when notified in writing or instructed by the Owner, the P&D Contractor shall attend all
tests and inspections carried out by Statutory Authorities including Water Authorities, Drainage
Services Department, etc, and shall forthwith execute free of charge any rectification work
ordered by the Owner as a result of such tests and inspections which determine non-compliance
with Statutory Regulation. These tests may take place after the issue of Practical Completion of
the Main Contract and the P&D Contractor shall make all allowances in this respect.
Ngay khi c thng bo bng cng vn hay hng dn bi ch u t, nh thu cp thot
nc s tham gia tt c th nghim v gim st thc hin bi c quan nh nc bao gm c
quan cp nc, c quan thot nc,v s thc hin ngay lp tc cc cng vic hiu chnh
c ngh bi ch u t theo kt qu ca cc th nghim v gim st xc nh ra cc vn
khng tha theo lut nh nh nc. Nhng th nghim ny c th xy ra sau khi trinh qu
trinh hon thnh theo thc t ca nh thu chnh v nh thu cp thot nc s lm tt c chit
khu cho chi tit ny.
13.11.2 The P&D Contractor shall be responsible for the submission of all necessary forms and shop
drawings to the Statutory Authorities which shall conform in layout to the latest architectural plans
submitted kept by these Authorities.
Nh thu cp thot nc s c trch nhim trinh cc mu giy t v cc bn v thi cng cn
thit cho c quan nh nc, nhng bn v ny cn phu hp vi bn v kin trc sau cung
c trinh cho c quan nh nc.
13.11.3 The submission shall comply with the practice and circular letters of the Statutory Authorities. The
shop drawings to be submitted shall be forwarded to the Owner for checking before submission.
Cc hng muc pht hnh phi theo thc t v cc thng t ca nh nc. Bn v thi cng c
trinh s c chuyn cho ch u t kim tra trc khi pht hnh.
13.11.4 The P&D Contractor shall ensure that his submission shall not delay the subsequent inspection
and test by the Statutory Authorities, otherwise he shall be fully responsible for any consequence
due to his delay.
Nh thu cp thot nc s m bo vic pht hnh khng tri hon qu trinh gim st v th
nghim sau ca c quan nh nc, nu khng, nh thu s chu hon ton trch nhim hu
qu ca vic tri hon ny.

J10068 12 Aug 2015


SN R05

141

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

13.11.5 The P&D Contractor shall allow for at least two submissions to each Authority and to submit of
complete sets of drawings, one to be made within 2 months after the award of the Contract and
the other before the Statutory Authorities inspection. The Owner may at his discretion instruct the
Contractor for additional submissions whenever necessary.
Nh thu cp thot nc s cho php t nht 2 h s pht hnh cho mi c quan nh nc v
pht hnh trn b bn v, mt b trong vng 2 thng sau khi thng thu v mt trc khi c
quan nh nc tin hnh thanh tra. Ch u t c th ch dn nh thu pht hnh thm khi cn
thit.
13.11.6 The P&D Contractor shall notify the Owner at least 14 days in advance of his application for
statutory tests and inspections. On receipt from the Statutory Authorities of a confirmed date for
test and inspection, the P&D Contractor shall inform the Architect without delay.
Nh thu cp thot nc s thng bo cho ch u t t nht 14 ngy trc cho cc th nghim
v thanh tra theo lut nh. Khi nhn c ngy xc nh cho vic gim st, thanh tra, nh thu
cp thot nc s xc nhn vi ch u t m khng c tri hon.

13.12

Commissioning and Testing Report and Certificate of Completion


Nghim thu, bo co th nghim v chng nhn hon thnh

13.12.1 A commissioning and testing report shall be forwarded to the Owner within fourteen (14) days
after completion of commissioning and testing the installation.
Vic nghim thu, bo co th nghim s c chuyn cho ch u t trong vng 14 ngy sau
khi hon tt nghim thu v th nghim lp t.
13.12.2 The commissioning and testing report shall comply to the requirements including but not limited
to HK-BEAM checklist CHK 028 for HK-BEAM credits achievement.
Vic nghim thu, bo co th nghim s tun theo nhng yu cu bao gm nhng khng gii
hn theo HK-BEAM, danh muc CHK 028 chng nhn t theo HK-BEAM

J10068 12 Aug 2015


SN R05

142

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

SECTION 14 MAINTENANCE SERVICES


PHN 14 DICH V BO TR
14.1

General Maintenance Requirements


Nhng yu cu bo tr chung

14.1.1 The P&D Contractor shall furnish maintenance, free of further charge, for the complete plumbing
and drainage service installation for a period of twelve (12) months from the date of acceptance.
Nh thu cp thot nc s cung cp dch vu bo hnh bo tri, khng tnh thm ph, cho ton b
cc lp t h thng cp thot nc trong khong thi gian 12 thng tnh t ngy c chp
thun.
14.1.2

The Contractor shall submit for prior approval and provide a comprehensive planned
maintenance programme and 24 hours emergency call out service during the maintenance
period.
Nh thu s trinh ph duyt v cung cp chng trinh bo tri ton din v khn cp trong 24
gi sau khi c cuc gi trong sut thi gian bo hnh.

14.1.3

Maintenance for the whole system shall be in accordance with the relevant Code of Practices,
manufacturers recommendation and various maintenance manual.
Vic bo tri cho ton b h thng s tun theo cc quy chun xy dng c lin quan, khuyn co
ca nh sn xut v hng dn bo tri khc.

14.1.4

This maintenance shall include the following services :Vic bo tri ny s bao gm nhng hng muc sau:
a.

Routine inspections, tests and maintenance services,


Cc kim tra thng l, th nghim v dch vu bo tri,

b.

Emergency inspections, tests and repairs.


Kim tra khn cp, th nghim v sa cha.

14.1.5

All inspections, tests, maintenance services and repairs shall be carried out generally in
accordance with the manufacturers' recommendations/instructions and to the satisfaction of the
Owner.
Tt c vic gim st, th nghim, bo tri v sa cha s c tin hnh tng qut theo xut/
hng dn ca nh sn xut v tha mn yu cu ca ch u t.

14.1.6

The P&D Contractor shall give the Employer at least seven (7) days prior notice of when each
maintenance visit and inspection is due so that the Employer can nominate a representative to be
present.
Nh thu cp thot nc s a thng bo n vi nh ch trc t nht l 7 ngy ca mi ln
tin hnh kim tra, bo tri ch u t c th c ngi i din c mt.

14.1.7

The P&D Contractor shall despatch competent and experienced engineers and technicians
equipped with the appropriate testing instruments, tools, equipment, etc. to inspect, service, test,
adjust and maintain the installation in a satisfactory operating condition.
Nh thu c in s c k s v chuyn vin k thut c kinh nghim v c thm quyn vi y
cc thit b, dung cu, my mc c lin quan n vic th nghim n gim st, phuc vu, kim
tra, iu chnh v bo tri cc lp t trong iu kin vn hnh tha ng.

J10068 12 Aug 2015


SN R05

143

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

14.1.8

The P&D Contractor shall allow for carrying out such inspection, service, testing, adjustment and
maintenance at a time outside normal office hours including general holidays.
Nh thu cp thot nc s cho php tin hnh vic gim st, phuc vu, kim tra, iu chnh v
bo tri thi im ngoi gi hnh chnh bao gm c nhng ngy ngh chung.

14.1.9

Particularly in the case of complex installation, the P&D Contractor shall arrange at least two of
his senior servicemen being thoroughly familiarised with all aspects of such installation to be
responsible for inspection, maintenance and testing of the installation. In this type of installation
the P&D Contractor must be prepared to provide a high level of service, allowing for more
frequent service of environmentally sensitive equipment and when necessary, to ensure prompt
rectification of the faults resulting in unacceptably high rate of unwanted alarms all at the
expenses of the P&D Contractor.
Trong trng hp cc lp t phc tp, nh thu cp thot nc s sp xp cho t nht 2 nhn
vin trng hiu bit thu o v tt c cc kha cnh ca h thng lp t, c trch nhim gim
st, bo tri v th nghim h thng. Trong dng lp t ny, nh thu cp thot nc phi c
chun b cung cp mc dch vu cao, cho php phuc vu thng xuyn hn cc thit b nhy
cm vi mi trng, v ngay khi cn thit m bo hiu chnh nhanh chng cc li c nguyn
do t nhng cnh bo khng mong mun mc cao khng th chp nhn do ph tn ca nh
thu cp thot nc.

14.1.10 All labour and materials necessary, e.g. contacts, lamp bulbs, etc., including cleaning materials,
lubricants, battery electrolyte, tools, instruments, etc., and transportation required for carrying out
routine and emergency inspections, tests, repairs, replacements and maintenance services shall
be included in the Contract. Any renewals or repairs necessitated by reason of negligence or
misuse of the equipment or by reason of any other cause beyond the P&D Contractor's control
(with the exception of ordinary wear and tear) shall be carried out at an additional cost with prior
notice to the Owner.
Tt c nhn cng, vt liu cn thit, vi du nh cng tc, bng en, v.vbao gm cc vt liu lm
sch, du nhn, axit cho c quy, cc cng cu, my mc, v.vv phng tin vn chuyn cn
thit tin hnh k hoch gim st khn cp, kim tra, sa cha, thay th v dch vu bo tri s
c bao gm trong hp ng. Bt c s thay mi, sa cha cn thit phi c do nguyn nhn
s sut hay sai lch ca thit b hoc bi bt c nguyn nhn no khc vt ra ngoi tm kim
sot ca nh thu cp thot nc (loi tr h hng v tn hi thng thng) s c tin hnh
vi chi ph pht sinh vi thng bo trc cho ch u t.
14.1.11 The P&D Contractor shall also replenish at his own cost all media and materials expended or
used during the tests including diesel or petrol fuel and ensure that the entire installations are in a
satisfactory operational condition at the conclusion of each visit.
Nh thu cp thot nc cng s cung cp thm chi ph cho tt c phng tin, vt liu c
dung hoc s dung trong sut qu trinh th nghim bao gm du diesel, nhin liu kh t v
m bo ton b lp t trong tinh trng vn hnh tha ng ti thi im tng kt mi ln n
gim st, kim tra.
14.1.12 The P&D Contractor shall be responsible for all repairs necessary to maintain the installation in a
safe, reliable and operative condition at all times. The P&D Contractor must ensure that his
servicing staff shall carry out the necessary repairs by utilizing manufacturer's original
replacement parts. Any component taken down for services shall be reinstated within 2 hours or
otherwise replaced by a spare unit at the Contractor's expenses.
Nh thu cp thot nc s c trch nhim cho tt c sa cha cn thit duy tri cc lp t
trong iu kin vn hnh an ton ng tin cy ti mi thi im. Nh thu cp thot nc phi
m bo nhn vin phuc vu ca h s tin hnh nhng sa cha cn thit bng nhng b phn
thay th gc t nh sn xut. Bt c thnh phn no c tho b xung cho cc dch vu s

J10068 12 Aug 2015


SN R05

144

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

c phuc hi li trong vng 2 gi hoc ngc li c thay th bi mt b phn d phng


thuc chi ph ca nh thu.
14.1.13 The P&D Contractor shall ensure minimum interruption to the functioning of the installation during
each inspection, testing, repair or maintenance service.
Nh thu cp thot nc s m bo hn ch lm gin on chc nng ca thit b trong sut
qu trnh gim st, th nghim, sa cha hay dch vu bo tri.
14.1.14 The P&D Contractor shall, as and when instructed by the Employer, repair or replace at his own
cost any part of the system proved to be defective by reason of Contractor's negligence, faulty
design, inadequate routine maintenance and supervision, workmanship or materials. No claim
whatsoever shall be made by the P&D Contractor for such repair or replacement if it is within the
scope of the P&D Contractor's responsibility.
Ngay khi c ch dn t nh ch , nh thu cp thot nc s sa cha hay thay th bng
chnh chi ph ca nh thu bt c phn no ca h thng chng minh b hng do s s sut ca
nh thu, thit k sai, bo tri gim st, cht lng thi cng hay vt liu khng phu hp. Nh thu
cp thot nc s khng lm bt c khiu ni no cho vic sa cha thay th nu n nm trong
phm vi trch nhim ca nh thu cp thot nc.
14.1.15 After each routine inspection, testing and maintenance service, the P&D Contractor shall furnish
to the Employer within fourteen (14) days a report complete with the following details:Sau mi ln kim tra bo dng, th nghim v bo tri, nh thu cp thot nc s giao cho
ngi thu bo co hon chnh trong vng 14 ngy vi nhng chi tit sau:
a.

Date and time of inspection, testing and maintenance service,


Ngy v gi kim tra, th nghim v bo tri,

b.

Persons carrying out the task,


Ngi tin hnh cng vic,

c.

Details of inspection and maintenance service,


Nhng chi tit kim tra, bo tri,

d.

Results of all tests performed,


Kt qu th hin ca tt c th nghim,

e.

Any external factors significantly affecting the service and test results,
Bt k cc tc nhn bn ngoi nh hng ng k n dch vu v kt qu th nghim,

f.

Any follow-up actions as required.


Bt k nhng hot ng k tip theo yu cu.

14.1.16 The P&D Contractor shall, at his own expenses, make all suitable arrangements to avoid damage
to property or installations provided by others during the course of his work. The P&D Contractor
shall be responsible for all losses and claims for injury or damage to any person or property
arises out of or in consequence of the execution of the maintenance work.
Nh thu cp thot nc, vi nhng chi ph ca ring h, s lm tt c sp xp thch hp trnh
gy h hng cho cc lp t thuc gi cung cp ca nh thu khc trong sut qu trinh thc hin
cng vic ca h. Nh thu cp thot nc s c trch nhim cho tt c nhng tn tht, khiu
ni v tai nn, tn tht i vi bt k ngi hay ti sn pht sinh thm hay do kt qu ca vic
thc hin qu trinh bo tri.

14.2

Emergency Inspections, Tests and Repairs


Kim tra khn cp, th nghim v sa cha

J10068 12 Aug 2015


SN R05

145

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

14.2.1 Emergency service including overtime work for minor repairs and adjustments shall be included
under the Contract.
Nh thu s phuc vu khn cp bao gm cng vic ngoi gi cho nhng sa cha nh hay vic
iu chnh.
14.2.2

The P&D Contractor shall be responsible for immediate answering of breakdown calls whether
true or false and attention to such calls both inside and outside the normal working hours in the
shortest possible time and using the quickest means of transport. In general a response time of
less than 1 hour will be expected.
Nh thu cp thot nc s c trch nhim tr li ngay nhng cuc gi khn cp du l ng hay
sai v lu nhng cuc gi c trong v ngoi gi lm vic binh thng trong khong thi gian
ngn nht c th v s dung phng tin vn chuyn nhanh nht. Nhin chung, mong mun c
th t c khong thi gian hi p t hn 1 gi.

14.2.3

Any necessary repairs shall be carried out with the most practicably expeditious means to ensure
minimum interruption to the operation of the plumbing and drainage installation.
Bt k nhng sa cha cn thit c tin hnh vi tc mau l kh thi m bo vic lm
gin on ti thiu n hot ng ca h thng cp thot nc.

14.2.4

The P&D Contractor shall keep a clear and legible record of all fault callouts and shall submit this
record within three days upon request by the Employer for inspection. The record shall indicate
the date, time of callout, persons attending, brief description of the fault and subsequent time of
clearance for each occasion.
Nh thu cp thot nc s gi ghi chp r rng i vi tt c nhng cuc gi v sai phm v s
trinh bn ghi chp ny trong vng 3 ngy da theo yu cu bi ch u t cho vic kim tra.
Bn ghi chp s ghi ngy gi cuc gi, ngi tham gia, m t s b sai phm v thi gian lm r
sau cho mi trng hp.

14.3

Routine Monthly Inspection, Testing and Maintenance


Kim tra bo dng hng thng, th nghim v bo tr
The P&D Contractor shall visit the installation at least once every month to carry out inspections,
tests, repairs and adjustments:Nh thu cp thot nc s thm cc lp t t nht mt ln mi thng tin hnh kim tra, th
nghim, sa cha v iu chnh:

14.3.1

Any repair of renew work shall be performed if necessary.


Nu cn thi phi thc hin cc sa cha lm mi h thng.

14.3.2

All electrical components including cables, panel, control relays, starters, etc. shall be inspected
and tested as specified.
Tt c thnh phn in nh cp, bng iu khin, r le kim sot, b khi ng, v.v s c
kim tra v th nghim theo quy cch.

14.3.3

14.3.4

All pipes and fittings shall be checked for leakage and corrosion and repaired or repainted as
necessary.
Tt c ng ng v phu kin s c kim tra r r, n mn v c sa cha hoc sn li nu
cn.
All valves shall be checked for freedom of operation, all control valves kept locked in the 'open'
position by strapping as applicable, inlet valves correctly bonded to earth, water supplies
maintained in service, etc..

J10068 12 Aug 2015


SN R05

146

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Tt c van s c kim tra vi vic t do vn hnh, tt c van kim sot kha trong v tr m
bng ai khi c th p dung, nhng van np c gn xung t mt cch chnh xc, nc cp
c duy tri trong h thng, v.v
14.3.5

Water and air pressure gauges must be inspected to ensure that correct pressures are
maintained. Gauges shall be calibrated at regular intervals. Water levels and air pressure in
pressure tanks must be checked to ensure that they are maintained in proper condition.
ng h o p sut kh v nc phi c kim tra m bo p sut chnh xc c duy tri.
ng h o s c hiu chnh trong khong chun. Mc nc v p sut kh trong bn p sut
phi c kim tra m bo chng c duy tri iu kin ng

14.3.6

All metallic elevated, priming and pressure tanks constructed by the P&D Contractor shall be
inspected for sediments, rust and corrosion. The P&D Contractor shall remove sediments, rust
and repaint the corroded parts as necessary.
Tt c bn nc kim loi p lc cha nc ln u c thi cng bi nh thu cp thot nc
s c kim tra s lng ng, r v n mn. Nh thu cp thot nc s loi b cn lng, r v
sn li nhng phn b n mn khi cn.

14.3.7

The P&D Contractor shall grease the valves, the bearing and other relevant mechanical parts of
the pumps, motors and engines as recommended by the manufacturers.
Nh thu cp thot nc s bi trn van, bc lt v nhng phn c kh c lin quan khc ca
bm, ng c v my mc theo yu cu ca nh sn xut.

14.3.8

A test run of at least 10 minutes shall be performed on each pump to ensure the pumping
systems are in satisfactory operating condition. Engine driven pumps shall be capable of starting
in 30 seconds or less. All manual and automatic starting and control mechanism, components,
switches, etc. shall be checked for proper functioning.
Mi bm cn chy th nghim trong t nht 10 pht m bo h thng bm tha mn iu
kin vn hnh. Bm dn ng s c kh nng khi ng trong 30 giy hoc t hn. Tt c b dn
ng, khi ng t ng v bng tay, cc thnh phn, cng tc, v.vv s c kim tra chc nng
chnh xc.

14.3.9

The P&D Contractor shall replace as required all parts such as bearings, valve seats, packing,
etc. due to wear and tear. In addition the Contractor shall maintain in good working order the
engines, the motors and the electrical power supply to the pumps from its electrical isolator or
switch, including changeover switches, starters, fixed and flexible conduits between
isolator/switch and cables therein. The Contractor shall also maintain all pump control pressure
and level switches in good order and inspect circuitry as previously indicated for electrical
system.
Nh thu cp thot nc s thay th theo yu cu nhng phn nh bc lt, chn van, vng m,
v.v do hao mn v h hng. Hn na nh thu s duy tri ch lm vic tt cho my mc,
ng c v cp in cho bm t cng tc in ca n, bao gm cng tc chuyn i, b khi
ng, ng dn c nh v ng dn mm gia cng tc v cp ti . Nh thu cng s duy tri tt
c cng tc mc nc v cng tc p sut bm trong ch tt v kim tra tnh an ton v in
nh c ch th trc .

14.3.10 The P&D Contractor shall clean and check all strainers.
Nh thu cp thot nc s lm sch v kim tra cc b lc
14.3.11 All anti-vibration supports shall be checked and inspected for deterioration.
B chng rung s c kim tra h hng.

J10068 12 Aug 2015


SN R05

147

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

14.3.12 All access doors and cleaning eyes of the drainage system shall be checked to ensure that are in
satisfactory operation.
Tt c ca thm v l thm cho h thng thot nc s c kim tra m bo vn hnh
tha ng.
14.3.13 All drain traps shall be inspected that are provided enough water seal and kept free of debris and
other obstructions.
Tt c by thot nc s c kim tra s ngp nc v khng c mng bm v nhng s
tt nghn khc.
14.3.14 The grease traps and petrol interceptors shall be checked and cleaned if necessary.
Thit b tch du m s c kim tra v lm sch nu cn.

14.4

Final Annual Inspection, Testing and Maintenance


Kim tra cui cung hng nm, th nghim v bo tr
At the final annual inspection, the P&D Contractor shall, in addition to the monthly inspection an
testing, carry out the following inspections, tests, repairs and adjustments as required:i vi vic kim tra hng nm cui cung b sung thm vo qu trinh kim tra th nghim hng
thng, nh thu cp thot nc s tin hnh kim tra, th nghim, sa cha v hiu chnh theo yu
cu nh sau:

10.1.1

All water tanks shall be drained and cleaned as following conditions: Tt c b cha nc s c x v lm sch theo nhng iu kin sau:
a.

The P&D Contractor shall give the Employer at least seven (7) days prior notice for cleaning
works.
Nh thu cp thot nc s a cho ngi ch thng bo vic lm v sinh t nht 7 ngy
trc .

b.

The time for cleaning work shall be agreed by the Employer.


Thi gian lm v sinh s c ch u t chp thun.

c.

The P&D Contractor shall be responsible for switch off/on the relevant water pumps and
valves before/after cleansing work.
Nh thu cp thot nc s c trch nhim tt m cc bm, van lin quan trc v sau khi
lm v sinh.

d.

The tank is emptied through the drain pipe gently not to flood the adjacent and cause any
damages.
B cha c x trng bng ng x mt cch nh ngng, khng lm ngp lut khu vc ln
cn v gy ra bt k h hng no.

e.

The tank shall be washed with cold water from 12mm rubber hose connected with a tap
nearby.
B cha s c chui ra vi nc lnh bng ng mm cao su 12mm ni vi vi nc lnh
gn .

f.

Any organic, vegetation and silt matters from walls and floor of the tank shall be brushed and
removed with nylon brushers.
Cc cht hu c, rong ru v bun trn tng v di y b s c chui ra bng bn
chi nylon.

J10068 12 Aug 2015


SN R05

148

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

g.

Internal walls and floors of the tanks shall be dried with mop to the satisfaction of the
Building Maintenance Manager or his representative. The representative must sign to certify
the completion of cleansing.
Tng bn trong v y b s c lau kh bng vi lau ban qun l to nh hoc ngi
i din ca h kim tra. Ngi i din phi k xc nhn vic hon thnh qu trinh lm v
sinh.

h.

The tank is refilled including adjusting ball valves or level controller to ensure that water
supply is back to normal. Air trapped inside water supply line to pumps shall be bleed off to
avoid air-lock of water pump.
B cha s c lm y tr li bao gm hiu chnh van hay thit b kim sot mc nc
m bo nc cp tr li binh thng. Kh kt bn trong c ng y ca bm s c
x b trnh kh trong bm.

10.1.2

All water pumps and controls shall be carried out as following:Tt c bm v vic kim sot s c tin hnh nh sau:
a.

Water pump coupling shall be checked alignment;


u ni bm s c kim tra thng hng;

b.

Pump packings shall be checked and replaced if necessary;


Cc m bm s c kim tra v thay th khi cn;

c.

The electrical tests of the pump control circuits shall be carried out and repaired if required;
Cc th nghim in ca dng in iu khin bm s c tin hnh v thay th nu cn;

d.

The performance test of pumps shall be carried out to ensure that are in satisfactory
operative condition;
Th nghim c tnh ca bm s c tin hnh m bo iu kin vn hnh tha ng;

e.

Liquid level controller electrodes shall be cleaned.


in cc thit b kim sot mc cht lng s c lm sch.

14.5

Certificate of Maintenance
Chng nhn bo hnh
After completion of the final annual inspection, testing and maintenance service to the plumbing
and drainage installation at the end of the maintenance period, the P&D Contractor shall within
14 days issue to the Owner a Certificate of Maintenance signed by the P&D Contractor.
Sau khi hon tt kim tra hng nm sau cung, th nghim v bo tri cho hng muc cp thot
nc cui giai on bo hnh, nh thu cp thot nc s pht hnh cho ch u t chng
nhn bo hnh c k bi nh thu cp thot nc.

14.6

Handover of Plumbing and Drainage Installation


Bn giao lp t cp thot nc
The plumbing and drainage installation will not be deemed as acceptable for handover to the
Owner. until the installation is in good working order and all as-built drawings, instruction and
maintenance manuals, spare parts lists, test reports, test certificates, etc. have been submitted to
the Owner.
Lp t cp thot nc s khng c chp nhn bn giao cho ch u t cho n khi cc lp
t trong ch hot ng tt v nhng bn v hon cng, hng dn v ch dn bo tri, danh
sch thit b d phng, bo co th nghim, chng nhn th nghim, v.vc trinh cho ch
u t.

J10068 12 Aug 2015


SN R05

149

Technical Specification
WSP Vietnam Ltd

DEUTSCHES HAUS

Appendix SN-01: Deutsches Haus Aurecon Acoustic Report

J10068 12 Aug 2015


SN R05

150

German House, HCMC


Acoustic Technical Design Report
Mace Group

22 December 2014
Revision: 0
Reference: 243957

4.3

Building Services

4.3.1

Duct work layout

Careful consideration to basic design guidelines is essential to insure low levels of self-generated
noise and low turbulence flow. These guidelines include (but are not limited to) the following:
Start with the quietest possible equipment.
Locate air-handling equipment away from noise sensitive areas.
Recommended exit airflow velocities should not be exceeded.
Duct aspect ratio should not be more than 2.5:1
Locate dampers downstream from air-handling equipment to reduce regenerated noise.
Locate right-angle bends and dampers 5 to 10 diameters upstream from the outlet to reduce
regenerated noise.
Sudden changes in directions should be avoided. When not possible to avoid sudden changes,
turning vanes should be used to reduce pressure loss.
Diverging sections (branching) should be gradual angle of divergence shall be less than 20.
Duct transitions should be gradual to avoid abrupt changes in volume.
Use radiused elbows where possible.
Elbows with non-turning vanes should have a radius of three times the largest duct dimension.
Acoustical lining (1-inch thick) should be used for both supply and return ductwork as required to
achieve the applicable noise criteria, with no less than 30 feet from the air handling units.
Allow for proper fan outlet conditions. For rectangular ducts, the minimum length shall be 1.5 x the
largest outlet dimension; for round ducts, the minimum length shall be 1.5 x the outlet diameter.
Straight rigid ductwork equal to three times the largest duct dimension should be used before and
after sound attenuators (silencers).
Acoustical lagging should be used around all ductwork which passes through noise-sensitive areas
a minimum of 10 pipe diameters (or 10 times the larger square duct dimension) upstream and 20
diameters (or 20 times the larger square duct dimension) downstream of all transitions, tees, valves,
branch takeoffs or similar to ensure laminar flow beyond the cladding.
Do not rely on acoustical ceilings are as sound barriers; the space above a drop ceiling in an
acoustically sensitive area should not be used for high velocity terminal units.
Sound attenuator (silencer) selection must take into account the spectrum of the energy to be
reduced so that the resulting noise follows the proper RC contour, avoiding overdesign.
Careful design of cross-talk noise transfer between adjacent spaces through common supply /
return air ductwork through implementation of internal acoustic lining / cross-talk attenuators

4.3.2

Air velocities

In Duct Velocities
Ductwork shall be sized to ensure air-flow does not regenerate noise. Table 12 provides maximum
duct airflow velocities likely to achieve specific acoustic design criteria. Branch ducts should have

Project 243957 File German House Acoustics.docx 22 December 2014 Revision 0 Page 20

airflow velocities of about 80% of the values listed. Velocities in final runs to diffusers/grilles should be
50% of the values or less
Table 12: Limiting in-duct airflow velocities

Main Duct Location

In shaft or above plasterboard ceiling

Above suspended acoustic ceiling

Duct located within occupied space

Design Criterion
NR

Maximum Airflow Veloctiy (m/s)


Rectangular Duct

Circular Duct

45

18

25

35

13

18

25

13

45

13

23

35

15

25

10

45

10

20

35

13

25

Diffusers, Grilles and Dampers


Table 13 provides maximum free supply and return air velocities at diffusers and grilles likely to
achieve specific acoustic design criteria. The values are intended as a guideline and it is
recommended that manufacturer data is referred to when selecting diffusers, grilles and dampers in
preference to the values in the table when making selections in order to ensure compliance.
Table 13: Limiting air velocities through diffusers, grilles and dampers

Main Duct Location


Supply Air Outlet

Return Air Inlet

4.3.3

Design Criterion
NR
45
40
35
30
25
45
40
35
30
25

Maximum Airflow Velocity


(m/s)
3.2
2.8
2.5
2.2
1.8
3.8
3.4
3
2.5
2.2

Plumbing system

Plumbing noise can be as disrupting as HVAC noise when radiating into function and habitable
spaces. Turbulent flow piping noise can be caused by water or other liquids passing through elbows,
valves or other transition pieces causing the pipe to vibrate. This vibration then radiates as airborne
noise into the adjacent areas.
Lightweight PVC plastic pipe is now commonly used to replace cast iron, copper or mild steel tubing.
Because of its lightweight (i.e. low damping, mid-high radiation efficiency) construction, PVC pipes are

Project 243957 File German House Acoustics.docx 22 December 2014 Revision 0 Page 21

easily set into motion due to fluid flow, with the result being an increase in concerns and complaints
directed towards noise.
The following are guidelines which are intended to reduce plumbing noise:
Water velocity should not exceed 6 ft./s (2 m/s), and pipe sizes should be adjusted for this
maximum velocity.
Waste and water supply lines should not be installed in any walls enclosing noise sensitive spaces.
Vertical drain pipes should not be installed within interior or on the exterior walls of noise sensitive
spaces.
The number of pipe transitions (tees, elbows, Y connections, etc.) should be kept to a minimum.
Regulators should be installed as required to ensure that the water pressure is no greater than 50
pounds per square inch (344,000 Pa) in the main water supply lines.
Water-hammer arresters should be placed close to quick-acting valves and should be installed at
the end of plumbing lines over 35 feet (10 m) long.
Plumbing penetrations on opposite sides of any sound-rated partition assembly should be
separated by a minimum distance of 16 inches (406mm).
Select plumbing valves of the ball-type which exhibit minimum noise when in use.
Select faucets and taps with fully ported nozzles and equipped with aeration or anti-splash devices.
Waste piping and water supply piping should be isolated from the building construction at points of
contact with resilient sleeves, vibration isolators, or a minimum of -inch (6.4mm) of resilient
material such as soft neoprene, rubber, felt padding, etc.
Acoustical lagging over piping may be necessary when additional attenuation is required over noise
sensitive areas (e.g. bedrooms, living areas and office spaces).

4.3.4

Generator room

While emergency generators are essential to ensure that critical building activities and life safety
systems are not compromised during power outages, the associated noise and vibration can be
transmitted to sensitive areas through building partitions (walls and floors), the structural system and
generator ventilation systems, potentially disrupting business meetings and guestroom areas
(including during testing of the generators). Architectural, structural, and mechanical design
considerations should include the following:
Improved airborne sound isolation between the generator room and adjacent noise-sensitive
spaces. Proper space planning can reduce noise and vibration control requirements through
buffering.
Space provision to accommodate large mufflers and silencers.
Absorptive finishes in the generator room should be included when feasible.
Structural support for the generator, an inertia base with two to three times the mass of the
generator, and potentially a floating floor (when a slab-on-grade condition is not possible).
Minimized floor deflections to allow efficient operation of spring isolators fitted to the generators.
Seismic requirements must also be evaluated.
Spring vibration isolators and inertia bases with two to three times the mass of the generator is
required in most applications.

Project 243957 File German House Acoustics.docx 22 December 2014 Revision 0 Page 22

Hospital-grade silencers (or better) for combustion exhaust.


Silencers with large cross-sectional areas to meet insertion loss requirements and accommodate
low pressure drop tolerances typical of generator radiator fans.
Vibration isolation hangers and flex connection for all ductwork and piping.
Resiliently suspended ceilings may be required for spaces below the generator room.
Specialised acoustic doorsets in an airlock arrangement are recommended for access to generator
rooms to assist in controlling noise breakout
Resiliently suspended acoustic ceiling to control noise to spaces above (currently indicated as
offices)

4.3.5

Transformer room

Transformers, like other electromagnetic devices, produce a "hum" known as magnetostriction, which
is caused by the alternating flux in the transformer core. The relative loudness depends on the
construction of the transformer, the manner of installation and the ambient sound level at the site.
When transformers are not properly mounted or supported, their vibration is transmitted to the support
structure and finds its way into neighboring spaces, manifesting itself as an annoying tonal noise.
Planning of transformer placement and proper installation can significantly reduce transformer noise.
Therefore, the following guidelines should be observed:
Install transformer(s) as far as possible from areas where the sound could be objectionable.
Avoid placing transformer(s) near multiple reflective surfaces such as in a corner, near a ceiling or
floor, or in a hallway.
Isolate the transformer core and coils from the ground or supporting structure using proper vibration
isolators. Air cooled dry transformers require isolating the core and coil from its support structure.
Oil filled transformers require isolating the core and coil from its tank base and isolate its tank base
from the support structure.
Use flexible conduit couplings between the transformer and the wiring system. This includes
incoming cables, busbars, stand-off insulators, etc., since any rigid connection from the vibrating
transformer to a solid structure will transmit vibration.
Mount transformer(s) on an inertia base or on a surface with the largest possible mass.
The transformer room dimensions should not correspond to half wavelength of the transformer
noise/vibration frequencies.
The transformer room walls, ceiling, floor, and access doors shall be designed according to airborne
transmission guidelines provided herein. The project acoustical consultant shall provide additional
guidelines (including the use of sound absorptive materials) based on the specific equipment
selected for the project.

4.3.6

Penetrations

All services penetrations and gaps/openings of a partition (floors, walls, ceilings etc) must be
inspected and treated carefully to ensure acoustic integrity. Services penetration must not have direct
contact with the intervening structure. This can be achieved by allowing small clearance (5 - 15mm)
around the penetration, and then acoustically treated as follows:
Metal sheet ducts (including sound attenuators) and hydraulic pipes

Project 243957 File German House Acoustics.docx 22 December 2014 Revision 0 Page 23

Concrete slab penetrations the gaps around the services penetrating the concrete slab should
3
be densely packed with insulation (minimum 50 mm, 48-60 kg/m glasswool or equivalent) and
sealed using non-setting resilient acoustic grade sealant/compound.
Wall penetrations the gaps around the services penetrating the concrete slab should be
3
densely packed with insulation (minimum 50 mm, 48-60 kg/m glasswool), patched with the same
number of lining sheets as per the construction of the penetrated wall (each side) and sealed
using non-setting resilient acoustic grade sealant/compound.
Flexible ducts
Flexible duct-work must not penetrate full-height partitions. Penetration through acoustically rated
walls should be through metal sheet sleeves. The acoustic treatment of the metal sheet sleeves
should be as per the acoustic treatment of metal sheet ducts mentioned above.
Cable trays
Pack the openings with 50 mm, 48-60 kg/m glasswool then patch and seal as per acoustic
treatment of metal sheet ducts above.
3

Joints and section interfaces (between walls and floor/ceiling/structural above, between window
frames and wall linings, between light weight partition wall and concrete wall, etc) all need to be
caulked airtight to maintain acoustic integrity.
4.3.7

Electrical flush boxes

The location of electrical flush boxes shall be such that the acoustic performance of the partition shall
not be degraded. This includes:
Flush boxes should not be installed back to back. Flush boxes shall be offset in stud bays
No more than four flush boxes shall be installed per side of a partition
Where flush boxes cannot be offset in stud bays, acoustic/fire rated flush boxes shall be used.
Acoustic flush boxes shall be installed as per manufacturers specifications
Where multiple flush boxes must be installed to a single side of a partition in a mutual stud bay,
treatment should be as per back-to-back remedy specified in the Gib Noise Control Manual shown
below in Figure 6

Project 243957 File German House Acoustics.docx 22 December 2014 Revision 0 Page 24

Figure 6: Treatment of back to back flush boxes

Project 243957 File German House Acoustics.docx 22 December 2014 Revision 0 Page 25

4.3.8

Vibration Isolation

All reciprocating equipment is to be installed on appropriate OEM specified vibration isolation mounts
which are required to achieve a minimum 95% isolation efficiency to minimise structure borne noise
transmission. Table 14 shows the schedule of applicable vibration isolators and bases for the
mechanical plant. Suspended pipe work and air ducts are to be mounted using resilient hangers and
supports.
Table 14: Schedule of vibration isolators and bases
Slab on grade

Floor span

Floor span

Floor span

Up to 6 m

6 to 9 m

9 to 12 m

Shaft
Power
kW

Speed
r/s

Centrifugal Fans
560 mm dia.

All

All

20

20

45

610 mm dia.

30

<6
6 to 9
>9

B
B
B

3
3
3

65
45
20

B
B
B

3
3
3

90
45
20

B
B
B

3
3
3

90
65
20

B
B
B

3
3
3

90
65
45

37

<6
6 to 9
>9

C
C
C

3,5
3,5
3,5

65
45
25

C
C
C

3,5
3,5
3,5

90
45
45

C
C
C

3,5
3,5
3,5

90
65
45

C
C
C

3,5
3,5
3,5

90
65
65

Axial fans
560 mm dia.

All

All

20

20

20

610 mm dia.

All

<6
6 to 9
>9

B
B
B

3
3
3

65
20
20

C
B
B

3
3
3

90
45
45

C
C
B

3
3
3

90
65
45

C
C
B

3
3
3

90
65
45

7.5

20

20

20

20

11 and
<1 kPa
s.p.

<6
6 to 9
>9

A
A
A

3
3
3

20
20
20

A
A
A

3
3
3

90
65
45

A
A
A

3
3
3

90
65
45

C
A
A

3
3
3

90
65
45

11 and
1 kPa
s.p

<6
6 to 9

B
B

3
3

20
20

C
C

3
3

90
45

C
C

3
3

90
65

C
C

3
3

90
65

>9

20

45

45

65

All

All

20

45

45

1.5
2.2 to 5.5
7.5 to 30
37 to 90
110

All
All
All
All
All

A
B
C
C
C

1
2
3
3
3

4
5
20
20
20

A
C
C
C
C

2
3
3
3
3

10
20
20
20
45

A
C
C
C
C

2
3
3
3
3

10
20
45
45
45

A
C
C
C
C

2
3
3
3
3

10
20
45
65
65

All

All

20

45

65

Equipment type

Base Isol.
type type

Min.
Defl.
mm

Base Isol.
type type

Min.
Defl.
mm

Base Isol.
type type

Min.
Defl.
mm

Base Isol.
type type

Min.
Defl.
mm

Air handling
units, air
conditioning
units - packaged
and evaporative
coolers

Condensing units
Pumps

Water heaters
Air compressors
and vacuum

Project 243957 File German House Acoustics.docx 22 December 2014 Revision 0 Page 26

Slab on grade
Equipment type

pumps
Tank mounted
Base-mounted
Large reciprocating
Engine-drivengenerators

Floor span

Floor span

Floor span

Up to 6 m

6 to 9 m

9 to 12 m

Shaft
Power
kW

Speed
r/s

7.5
11
All
All

All
All
All
All

A
C
C
C

3
3
3
3

20
20
20
20

A
C
C
C

3
3
3
3

20
20
20
20

A
C
C
C

3
3
3
3

45
45
45
45

A
C
C
C

3
3
3
3

45
45
45
45

All

All

20

45

65

90

Base Isol.
type type

Min.
Defl.
mm

Base types:
A.
No base, isolators attached directly to equipment.
B.
Steel machinery base
C.
Concrete inertia base

Base Isol.
type type

Min.
Defl.
mm

Base Isol.
type type

Min.
Defl.
mm

Base Isol.
type type

Min.
Defl.
mm

Isolator types:
1.
Neoprene pads (m=multiple layers)
2.
Neoprene mounts
3.
Open spring mounts.
4.
Vertically restrained spring mounts.
5.
Horizontal thrust restraints.

Project 243957 File German House Acoustics.docx 22 December 2014 Revision 0 Page 27

Unit 5, 16/F Green Power Building


35 Ton Duc Thang Street
District 1, Ho Chi Minh City
Vietnam
Tel: +84 8 2220 5345
Fax: +84 8 2220 5348
www.wspgroup.com

You might also like