Commissioning

BCN New L9/L10S


1 1 M ay 2 0 1 5

Commissioning Section I: 2016


2009-11: Section IV
11 km
12 stations

2016: Section I & part of II


19,6 km + 5,9 km without service
Barcelona
F.C. Stadium

15 stations + 3 st. Without service


Workshops

Courts
Trade Fair

With the commissioning of Section I, L9/10


will arrive to more strategic sites on the city

This L9 extension will result in a


relative growth of 200%

Port
Airport

Commissioning Section I: 2016


2014

2016

11.0 km, 12 stations

+ 26 km + 15 stations

With the commissioning of Section I, 25% of Barcelona


Metro Network will be fully automated (GoA4)

Commissioning Section I: 2016


Commissioning Aeroport T1 Zona Universitria:
Campus Nord

February 2016

Z.Universitria
Camp Nou
Torrassa

La Ribera
Aeroport
T.Crrega
Aeroport T2

Can Tries Gornal


Europa Fira

El Prat
Mas Blau
Parc
Nou

Cntric

Les Moreres

Fira

Mercabarna
Parc Logstic

Aeroport T1
ZF Nova Estaci

ZF Port
ZF ZAL

Collblanc

Provenana
Ciutat de la Justcia
Foneria
Foc Cisell
Motors
ZF Litoral

Stations :
Aeroport T. Crrega, La
Ribera and Camp Nou will
not enter revenue service

Commissioning Section I: 2016

Campus Nord
Z.Universitria
Camp Nou

Conventional
Tunnel 9m diameter
10 conventional stations

Torrassa

La Ribera
Aeroport
T.Crrega
Aeroport T2

Can Tries Gornal


Europa Fira

El Prat
Mas Blau
Parc
Nou

Cntric

Les Moreres

Fira

Mercabarna
Parc Logstic

Aeroport T1
ZF Nova Estaci

ZF Port
ZF ZAL

Collblanc

Provenana

L9 solution (2 levels)
Tunnel 12m diameter (with slab)
4 vertical tub stations
+ 1 conv.

Ciutat de la Justcia
Foneria
Foc Cisell
Motors
ZF Litoral

Viaduct
5 elevated stations

Commissioning Section I: 2016

Trains in different levels and platforms inside tunnel

Ramps to connect both levels

Commissioning Section I: 2016

Commissioning Section I: 2016

Commissioning Section I: 2016

Commissioning Section I: 2016

Commissioning Section I: 2016


Stabling areas:

AT2
AT1

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

FIE

ATR

FIE
AT2

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

10

14

13

17

GRN

TRS

CLB

GRN

TRS

CLB

1
1

1
1

CPN

ZUN

Depot
Airport Depot

Aeroport T1

Signaling
Restrictions on tracks to reach the workshop
Campus Nord

Tunnel: Single track available (MTO)

Z.Universitria

Viaduct: Single track available (MTO)

Camp Nou
Torrassa

La Ribera
Aeroport
T.Crrega
Aeroport T2

Can Tries Gornal


Europa Fira

El Prat
Mas Blau
Parc
Nou

Cntric

Les Moreres

Fira

Mercabarna
Parc Logstic

Aeroport T1
ZF Nova Estaci

ZF Port
ZF ZAL

Collblanc

Provenana
Ciutat de la Justcia
Foneria
Foc Cisell
Motors
ZF Litoral

CBTC zone in service


CBTC zone V2
Transfer zone
Bretelle
Simple switch
Ramps
Via pantal

Singular points
Nothern Terminus: Zona Universitria

Sense Servei

P. Cerd

1.188 m

Single track

Punts Singulars
Bifurcation

P. Cerd

Tallers

Driving mode change (MTO/ATPM)


Transfer zone
Is located at Workshops

Viaduct and Workshop

Viaduct and Workshop

Workshop
Transfer
zone

Workshop
Automated
Wash track

Service Scenarios

L9: End to End Carrousel (Airport Zona Universitria)


AT2

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

FIE
GRN

AT1

TRS

CLB

ATR
FIE
AT2

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

CPN
GRN

TRS

ZUN

CLB

Zona Universitaria

(*) Solo viable en


MTT

929

818

723

10

638 (*)

705 MTN
627 MTT

36,8 Km/h

1:06:23

37,5 Km/h

1:05:41

Service Scenarios

L9: Loop APT-CLB + Shuttle CLB-ZUN


AT2

AT1

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

FIE
GRN

TRS

CLB

GRN

TRS

CLB

ATR
FIE
AT2

MBL

PCN

PCT

= 8

PET

LRB

LMR

MCB

PCL

FIP

744

1:01:51
0:07:44

652

1:01:51
0:06:52

10 =

11 =

10

611

12 =

11

537

37,7 Km/h
38,9 Km/h

1:01:51
0:06:11
1:01:51
0:05:37

CPN

ZUN

Service Scenarios

L9: Express Services... Take overs? (discarded)

Service Scenarios

L9: Express services: Airport Trade Fair City


AT2

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

FIE
GRN

AT1

TRS

CLB

ATR
FIE
AT2

MBL

PCN

PCT

LRB

PET

LMR

Aeroport T1

2.

Aeroport T2

3.

El Prat

4.

Fira|Pedrosa

5.

Fira|Europa

6.

Torrassa

7.

Collblanc.

PCL

FIP

GRN

TRS

CLB

5+1 trenes a 1222

Para en (7):
1.

MCB

CPN

6+1 trenes a 1008

C2

C1

7+1 trenes a 850

C2

C1

8+1 trenes a 744

C2

C1

9+1 trenes a 652

C2

C1

C2
C2

C1

10+1 trenes a 611


718

C1

ZUN

Service Scenarios

L9: Express services: Airport Trade Fair


AT2

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

FIE
GRN

AT1

TRS

CLB

ATR
FIE
AT2

MBL

PCN

PCT

LRB

PET

LMR

MCB

PCL

FIP

CPN
GRN

TRS

CLB

Para en (4):
1.

Aeroport T1

2.

Aeroport T2

3.

El Prat

4.

Fira|Pedrosa

6+1 trenes a 1008

C2

C1

7+1 trenes a 850

C2

C1

8+1 trenes a 744

C2

C1

9+1 trenes a 652

C2

C1

10+1 trenes a 611

C1

C2
C2

630

C1

ZUN

Service Scenarios

Flexibility!
AT2

AT1

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

FIE
GRN

TRS

CLB

GRN

TRS

CLB

GRN

TRS

CLB

GRN

TRS

CLB

ATR
FIE

AT1

AT2

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

AT2

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

CPN

ZUN

CPN

ZUN

FIE

ATR
FIE
AT2

MBL

PCN

PCT

PET

LRB

LMR

MCB

PCL

FIP

Service Scenarios: 2017

L10: Carrousel Foneria Collblanc

Airport T1

Prat Est.

T2

Fira

Torrassa Collblanc
Z. Univ.
VIA NICA

Tallers

FNR
V1 Zona d Obres

CJT

PRV

Enhancements!

New Features
Express Services
New Passenger Information Model: Stations & Onboard
Derailment detector
New communications backbone topology (OF ring, self healing)
New Wifi Technology (backwards compatible)
Independent ATS Servers. Improved ergonomics + more degraded modes
Automated Train Wash Track
OCC Layout redesign

Project Management

ATC Deployment Planning

You might also like