Community Update Meeting

October 14, 2015

Agenda
Demolition at 664 Pacific Street Site
LIRR Construction
Barclays Center Update

Pacific Park Brooklyn Overview

664 Pacific Demolition Site


Plywood fence
inside existing
chain link

FENCE
CURB

LIRR Illustration

LIRR West Portal Project

Anticipated Time Line*

2015
F M A M J J A S O N D

2016
F M A M J J A S O N D

2017
F M A M J J A S O N D

LIRR Yard

West Portal Construction


Drainage & Utilities
East Portal
Completion of Yard

*Subject to change. Does not include work done by public parties.

Green Roof/ West Portal Current Condition

West Portal Work


Roadway Restored

Sewer

Water

Utilities

Tunnel Roof

Tunnel

Tracks Operating

For illustrative purposes only

East Portal

10

Footing
11

West Portal Connection

12

34 Feet

13

14

Conduits

15

16

Retaining Wall

17

Backfill with soil

Support of Excavation

18

Formwork

19

Wall totally completed

Platform

20

Insert Substation

21

Barclays Center

22