Federal Register / Vol. 70, No.

39 / Tuesday, March 1, 2005 / Notices 9947

ER04–1072–003; PJM Interconnection, ER03–631–002; ISO New England Inc. P–2009–030; Virginia Electric Power
L.L.C., American Electric Power Service E–72 Company d/b/a Dominion Virginia
Corporation OMITTED Power/Dominion North Carolina Power
ER04–364–001, ER04–364–008, and EL04– E–73 H–3
138–003; Commonwealth Edison ER04–694–003 and ER04–694–004; P–2146–107; Alabama Power Company
Company and American Electric Power Vermont Electric Cooperative, Inc. H–4
Service Corporation, PJM E–74 P–1975–019, P–2055–014, P–2061–010, P–
Interconnection, L.L.C., American EL03–37–001; Town of Norwood, 2777–013 and P–2778–014; Idaho Power
Electric Power Services Corporation Massachusetts v. National Grid USA, Company
E–50 New England Electric System, H–5
ER03–563–032, ER03–563–033, ER03–563– Massachusetts Electric Company, and P–11925–003; Symbiotics, LLC
036, ER03–563–037, ER03–563–040 and Narragansett Electric Light Company H–6
ER03–563–042; Devon Power, LLC, E–75 P–362–006; Ford Motor Company
Middletown Power LLC, Montville ER04–717–000 and ER04–717–001; Orion H–7
Power LLC, Norwalk Power Marketing Power Midwest, L.P. P–460–032; City of Tacoma, Washington
and NRG Power Marketing, Inc. E–76 H–8
E–51 EL02–123–006; Boston Edison Company P–9042–036 and P–9042–062; Gallia Hydro
EL04–15–000, EL04–15–001, ER04–768– E–77 Partners and Rathgar Development
000; Texas New Mexico Power Company EL02–123–005 and ER02–170–005; Boston Associates, LLC
v. El Paso Electric Company Edison Company
E–52 E–78 Energy Projects—Certificates
ER04–1075–000; Holland Energy, LLC ER05–439–000; ISO New England Inc. C–1
E–53 E–79 OMITTED
RT01–74–008; GridSouth Transco, L.L.C., ER02–2397–002; Great Lakes Hydro C–2
Carolina Power & Light Company, Duke America, LLC OMITTED
Energy Corporation and South Carolina E–80 C–3
Electric & Gas Company ER05–294–000 and ER05–294–001; CP04–424–000; Petal Gas Storage, L.L.C.
E–54 Westbank Energy Capital, LLC C–4
ER04–961–001; Midwest Independent Miscellaneous Agenda CP04–385–000; Transcontinental Gas Pipe
Transmission System Operator, Inc. Line Corporation and Crosstex CCNG
E–55 M–1 Transmission, Ltd.
ER04–897–002; Commonwealth Edison RM02–4–003 and PL02–1–003; Critical C–5
Company Energy Infrastructure Information CP04–334–001; CenterPoint Energy—
E–56 M–2 Mississippi River Transmission
OMITTED OMITTED Corporation
E–57 Markets, Tariffs, and Rates—Gas
ER05–26–001; Mirant Kendall LLC and Magalie R. Salas
G–1
Mirant Americas Energy Marketing, L.P. Secretary.
OR05–1–000; Enbridge Energy Company,
E–58 The Capitol Connection offers the
Inc.
OMITTED opportunity for remote listening and
G–2
E–59 viewing of the meeting. It is available
RP00–463–006; Williston Basin Interstate
ER04–843–001; PPL Electric Utilities
Corporation
Pipeline Co. for a fee, live over the Internet, via C-
G–3 Band Satellite. Persons interested in
E–60
RP05–172–000; CenterPoint Energy— receiving the broadcast, or who need
OMITTED Mississippi River Transmission
E–61 information on making arrangements
Corporation
OMITTED G–4 should contact David Reininger or Julia
E–62 PR05–1–000; Nicor Gas Morelli at the Capitol Connection (703–
ER03–407–005 and ER03–407–006; G–5 993–3100) as soon as possible or visit
California Independent System Operator RP05–146–000; Northern Border Pipeline the Capitol Connection website at
Corporation Company http://www.capitolconnection.gmu.edu
E–63 G–6
EL01–93–010 and EL01–93–011; Mirant
and click on ‘‘FERC’’.
RP05–106–001; Algonquin Gas [FR Doc. 05–4050 Filed 2–25–05; 4:05 pm]
Americas Energy Marketing, L.P., Mirant Transmission, LLC
New England, LLC, Mirant Kendall, LLC G–7 BILLING CODE 6717–01–U
and Mirant Canal, LLC v. ISO New PR00–9–000; GulfTerra Texas Pipeline,
England Inc. L.P.
E–64 G–8 ENVIRONMENTAL PROTECTION
EL02–77–001; Puget Sound Energy, Inc. RP02–334–004; Northern Natural Gas
E–65 AGENCY
Company
EL04–63–001; East Texas Electric G–9 [FRL–7879–2]
Cooperative, Inc. RP00–336–030, RP04–110–003 and RP04–
E–66 251–002; El Paso Natural Gas Company Prevention of Significant Deterioration
OMITTED G–10 of Air Quality (PSD) Final
E–67 OMITTED Determinations
OMITTED G–11
E–68 RP97–13–014; East Tennessee Natural Gas, AGENCY: Environmental Protection
ER04–727–003; Jersey Central Power & LLC Agency.
Light Company G–12
E–69 ACTION: Notice of final actions.
AC04–30–001; Chevron Pipe Line
ER04–829–002; PJM Interconnection, Company SUMMARY: The purpose of this notice is
L.L.C. and Virginia Electric and Power
Company Energy Projects—Hydro to announce that between March 1,
E–70 H–1 1999, and November 30, 2004, the
OMITTED P–2574–032; Merimil Limited Partnership Region 2 Office of the U.S.
E–71 H–2 Environmental Protection Agency

VerDate jul<14>2003 14:21 Feb 28, 2005 Jkt 205001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1
9948 Federal Register / Vol. 70, No. 39 / Tuesday, March 1, 2005 / Notices

(EPA), issued 9 final determinations, the DATES: The effective dates for the above Region 2 Office, 290 Broadway, 25th
New Jersey Department of determinations are delineated in the Floor, New York, New York, 10007–
Environmental Protection (NJDEP) chart at the end of this notice (see 1866, at (212) 637–4085.
issued 12 final determinations and the SUPPLEMENTARY INFORMATION).
SUPPLEMENTARY INFORMATION: Pursuant
New York State Department of FOR FURTHER INFORMATION CONTACT: Mr.
Environmental Conservation (NYSDEC) to the PSD regulations, the Region 2
Frank Jon, Environmental Engineer of
issued 13 final determinations pursuant the Permitting Section, Air Programs Office of the USEPA, the NJDEP, and the
to the Prevention of Significant Branch, Division of Environmental NYSDEC have made final PSD
Deterioration of Air Quality (PSD) Planning and Protection, U.S. determinations relative to the facilities
regulations codified at 40 CFR 52.21. Environmental Protection Agency, listed below:

Name Location Project Agency Final action Date

Athens Generating Athens, NY ............. 3 Westinghouse 501G turbines, 3 heat NYSDEC New PSD Permit .... June 12, 2000.
Plant. recovery steam generators, 3 steam
turbines, and associated facilities. The
facility is rated at 1080 MW.
Virgin Islands Water St. Croix, VI ............ Consolidation of permits for Units 10, EPA PSD Permit Modi- November 27,
and Power Author- 11, 12, 14, 16, 17, 19 and 20. Various fication. 2000.
ity—Units 16, 17, permit revisions for PSD-affected units
19 and 20. 16, 17, 19, and 20.
Virgin Islands Water St. Thomas, VI ....... A new 24 MW simple cycle oil-fired gas EPA New PSD Permit .... January 3, 2001.
and Power Author- turbine. This United Technologies
ity—Unit 22 at the FT8–1 Power PAC gas turbine will
Krum Bay Facility. burn No. 2 fuel oil with a maximum
sulfur content of 0.2% sulfur by weight.
Cogen Tech- Linden, NJ .............. Allow VOC emission increases and add NJDEP PSD Permit Modi- May 6, 2001.
nologies—Linden power augmentation mode. fication.
Generating Plant.
East River New York, NY ........ Two combustion turbine GE 7FA gen- NYSDEC New PSD Permit .... July 18, 2001.
Repowering erators, two heat recovery steam gen-
Project. erators. The facility is rated at 360
MW.
Ravenswood Cogen- Long Island City, A 250 MW cogeneration facility .............. NYSDEC New PSD Permit .... August 31, 2001.
eration Project. NY.
Consolidated Edison Lakewood, NJ ........ Addition of three new simple-cycle tur- NJDEP PSD Permit Modi- September 10,
Development— bines. Each GE 7FA turbine has a fication. 2001.
Ocean Peaking 174.2 MW capacity.
Power.
NYC Department of Staten Island, NY ... Installation of flares at the Fresh Kills NYSDEC New PSD Permit .... September 17,
Sanitation—Fresh Landfill. 2001.
Kills Landfill Flares.
AES Red Oak LLC ... Sayreville, NJ ......... Addition of one 120 MMBTU/hr boiler, NJDEP PSD Permit Modi- October 24, 2001.
one 16 MMBTU/hr fuel gas heater, fication.
and one 49 MMBTU/hr emergency
generator.
AES Puerto Rico, Guayama, PR ......... The existing PSD permit was modified EPA PSD Permit Admin- October 29, 2001.
L.P.. to correct the ppm values in the per- istrative Change.
mit. The worst case ppm values did
not occur simultaneously with the
worst-case lb/hour values, as pre-
viously thought. There would be no in-
creases in the lb/hr, lb/MMBTU, per-
mitted values.
Astoria Energy, LLC Astoria, NY ............. Two GE Frame 7F series combustion NYSDEC New PSD Permit .... October 31, 2001.
turbines, two heat recovery steam
generators and one steam turbine.
The facility is rated at 1000 MW.
NYC Department of Staten Island, NY ... Six landfill gas flares with a design ca- NYSDEC PSD Permit Modi- November 2, 2001.
Sanitation—Fresh pacity of 5,000 standard cubic feet/ fication.
Kills Landfill Flares. min per flare.
Mantua Creek Gen- West Dept Ford Permit was modified to include three GE NJDEP PSD Permit Modi- November 15,
erating Project. Township, NJ. 7FB turbines instead of ABB. This fa- fication. 2001.
cility can produce a maximum power
of 911 MW with the duct burners on.
Bethlehem Energy Glenmont, NY ......... Three combined-cycle units with a nomi- NYSDEC New PSD Permit .... February 13, 2002.
Center. nal rating of 750 MW.
Poletti Station ........... Astoria, NY ............. Two GE Frame 7FA combustion tur- NYSDEC New PSD Permit .... April 29, 2002.
bines, two unfired heat recovery
steam generators, and one steam tur-
bine. The facility is rated at 500 MW.

VerDate jul<14>2003 14:21 Feb 28, 2005 Jkt 205001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1
Federal Register / Vol. 70, No. 39 / Tuesday, March 1, 2005 / Notices 9949

Name Location Project Agency Final action Date

Liberty Generating Union County, NJ ... Three Mitsubishi Heavy Industries NJDEP New PSD Permit .... June 5, 2002.
Project. MHI501G combustion turbines, three
duct-fired heat recovery steam gen-
erators. Total power output is 1100
MW.
Wawayanda Energy Wawayanda, NY .... Two GE 7251-FB combustion turbines, NYSDEC New PSD Permit .... July 31, 2002.
Center. two heat recovery steam generators,
and one steam turbine generator. The
facility is rated at 540 MW.
PSEG Fossil LLC, Linden, NJ .............. Three GE 7FA combustion turbines, NJDEP New PSD Permit .... August 24, 2002.
Linden. three duct-fired heat recovery steam
generators. Total power output is
1186 MW.
Brookhaven Energy Brookhaven, NY ..... Two Alstom Power GT–24 combustion NYSDEC New PSD Permit .... August 26, 2002.
Project. turbine generators, a heat recovery
steam generator and one steam elec-
tric generator. The facility is rated at
580 MW.
Consolidated Edison Ocean County, NJ .. Original PSD permit issued on April 1, NJDEP PSD Permit Modi- September 4, 2002.
Development. 1991 for three simple-cycle turbines fication.
each rated at 174.2 MW capacity.
This modification entailed the addition
of three new natural gas-fired fuel
heaters each with a maximum heat
input rating of 4.62 MMBTU/hr.
Astoria (Reliant) Astoria, NY ............. The applicant will repower the existing NYSDEC New PSD Permit .... May 7, 2003.
Generating Station Astoria Generating Station (AGS). The
(formerly Orion repowering will include the installation
L.P.). of six combustion turbines, retirement
of four existing boilers and reuse of
existing equipment and infrastructure
including two steam turbine genera-
tors. The repowering will increase
AGS’s electric generating capacity
from 1,254 MW to 1,816 MW.
Wheelabrator Westville, NJ .......... To remove the carbon monoxide (CO) NJDEP PSD Permit Modi- June 26, 2003.
Gloucester Com- emission limits of 400 ppmdv @ 7% fication.
pany RRF. O2 and 45.5 lb/hr from the current
PSD permit and add a CO limit of
11.3 lb/hr.
Merck & Co., Inc ...... Rahway, NJ ............ Boiler and Industrial Furnace modifica- NJDEP PSD Permit Modi- September 19,
tion project. Boilers No. 3, 5 and 9 fication. 2003.
each has a maximum rated gross
heat input capacity of 99.5 MMBTU/
hr. Existing boilers 3 and 9 will now
be allowed to burn natural gas, fuel oil
or waste solvent. These two boilers
will be equipped with selective cata-
lytic reduction (SCR). Boiler No. 5 will
have low NOX burners to control NOX.
Boilers No. 7 and 8 will be retired.
Valero Refining Com- Paulsboro, NJ ......... Modification of an existing major sta- NJDEP New PSD Permit .... September 24,
pany. tionary source that triggered PSD for 2002.
CO, PM and PM10. Petroleum refining
facility with 75,000 barrels/day capac-
ity.
Coastal Eagle Point Westville, NJ .......... The facility increased the maximum oil NJDEP PSD Permit Modi- October 11, 2003.
Oil Co.. feed rate to the fluid catalytic cracking fication.
unit from 55,000 barrels per day to
67,650 barrels per day. The facility
also upgraded its existing Belco
scrubber from EDV–5000 to EDV–
6000 to improve control efficiency of
PM10 and SO3/H2SO4.
Cogen Technologies Linden, NJ .............. Modification to allow for an increase in NJDEP PSD Permit Modi- December 30,
sulfuric acid mist emission rate from fication. 2003.
9.0 lb/hr to 24.89 lb/hr during distillate
oil combustion on the No. 6 turbine
(181 MW). Annual sulfuric acid mist
emission rates will increase from 3.53
tons/year to 6.44 tons/year.

VerDate jul<14>2003 14:21 Feb 28, 2005 Jkt 205001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1
9950 Federal Register / Vol. 70, No. 39 / Tuesday, March 1, 2005 / Notices

Name Location Project Agency Final action Date

HOVENSA ................ Saint Croix, VI ........ The existing PSD permit for GT No. 10 EPA PSD Permit Modi- January 22, 2004.
was modified to allow for an increase fication.
in utilization of the combustion turbine
during natural gas firing while de-
creasing the quantity of oil combusted
in the unit. HOVENSA is also reduc-
ing the amount of oil fired in the Vacu-
um Unit heaters. This project does not
result in a significant net emission in-
crease for any pollutant.
Corning Glass .......... Canton, NY ............. New and modified glass furnaces. The NYSDEC PSD Permit Modi- February 23, 2004.
facility is subject to PSD for SO2 and fication.
NOX.
Puerto Rico Electric San Juan, PR ......... Two new Westinghouse 501 combustion EPA New PSD Permit .... April 1, 2004.
and Power Author- turbines with a combined output of
ity—San Juan 476 MW combined cycle.
Combined Cycle
Project.
Nucor Steel Auburn, Auburn, NY ............. The existing PSD permit was modified EPA PSD Permit Modi- June 22, 2004.
Inc. to allow the melt shop production limit fication.
to increase from 600,000 tons/year to
665,000 tons/year of steel. In addition,
a new 179 MMBTU/hour heat input
reheat furnace will replace the existing
one which is used with the rolling mill.
This facility is subject to PSD for CO,
NOX and SO2.
AES Puerto Rico, Guayama, PR ......... The existing PSD permit was modified EPA PSD Administrative August 10, 2004.
L.P. to update the PM10 condensible emis- Permit Modifica-
sions based on stack test results; to tion.
increase the size of the emergency
boiler feedwater pump diesel engine
from 400 hp to 430 hp; to increase
AES’s annual usage limit of lime from
6,736 tons/year to 8,950 tons/year; to
add the option of using trucks to haul
ash offsite for on-island beneficial
uses; to add a new category of start-
up that applies to startup following
outages; to increase the number of
turnovers in the startup fuel tank from
4 to 7 per year; and to change the
cover of the inactive coal yard from
grass to manufactured aggregate. As
a result of these changes, there is
only a trivial increase of 42 lb/year of
PM10 emissions.
Virgin Islands Water St. Thomas, VI ....... A new 39 MW simple-cycle GE Frame 6 EPA New PSD Permit .... September 8, 2004.
and Power Author- combustion turbine.
ity—Unit 23.
Bessicorp—Empire Rensselaer, NY ...... A recycled newsprint manufacturing NYSDEC New PSD Permit .... September 23,
Development Co., plant and a nominal 505 MW com- 2004.
LLC. bined-cycle cogeneration plant. Two
GE Frame 7FA combustion turbines,
two heat recovery steam generators,
a steam turbine, and an auxiliary boil-
er. 55 MW will be offered to the man-
ufacturing plant, the remainder elec-
tricity will be offered on the merchant
market.
American Re-Fuel Westbury, NY ......... PSD permit modification to increase the EPA Revised PSD Per- November 15,
Company of annual throughput of municipal waste mit. 2004.
Hempstead. at the facility from 914,325 tons/year
to 975,000 tons/12-month rolling aver-
age.

This notice lists only the facilities that EPA Actions: U.S. Environmental NJDEP Actions: New Jersey
have received final PSD determinations. Protection Agency, Region 2 Office, Air Department of Environmental
Anyone who wishes to review these Programs Branch—25th Floor, 290 Protection, Division of Environmental
determinations and related materials Broadway, New York, New York 10007– Quality, Bureau of Engineering and
should contact the following offices: 1866.

VerDate jul<14>2003 14:21 Feb 28, 2005 Jkt 205001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1
Federal Register / Vol. 70, No. 39 / Tuesday, March 1, 2005 / Notices 9951

Technology, 401 East State Street, FEDERAL COMMUNICATIONS FEDERAL RESERVE SYSTEM
Trenton, New Jersey 08625. COMMISSION
NYSDEC Actions: New York State Formations of, Acquisitions by, and
Network Reliability and Interoperability Mergers of Bank Holding Companies
Department of Environmental
Council
Conservation, Division of Air Resources, The companies listed in this notice
Bureau of Stationary Sources, 625 AGENCY: Federal Communications have applied to the Board for approval,
Broadway, Albany, New York 12233– Commission. pursuant to the Bank Holding Company
3251. ACTION: Notice of public meeting. Act of 1956 (12 U.S.C. 1841 et seq.)
If available pursuant to the (BHC Act), Regulation Y (12 CFR Part
Consolidated Permit Regulations (40 SUMMARY: In accordance with the 225), and all other applicable statutes
CFR part 124), judicial review of these Federal Advisory Committee Act and regulations to become a bank
determinations under section 307(b)(1) (FACA), this notice advises interested holding company and/or to acquire the
of the Clean Air Act (the Act) may be persons of the fourth meeting of the assets or the ownership of, control of, or
sought only by the filing of a petition for Network Reliability and Interoperability the power to vote shares of a bank or
review in the United States Court of Council (Council) under its charter bank holding company and all of the
Appeals for the appropriate circuit renewed as of December 29, 2003. The banks and nonbanking companies
within 60 days from the date on which meeting will be held at the Federal owned by the bank holding company,
these determinations are published in Communications Commission in including the companies listed below.
the Federal Register. Under section Washington, DC. The applications listed below, as well
307(b)(2) of the Act, these DATES: Tuesday, March 29, 2005, as other related filings required by the
determinations shall not be subject to beginning at 10 a.m. and concluding at Board, are available for immediate
later judicial review in civil or criminal 1 p.m. inspection at the Federal Reserve Bank
proceedings for enforcement. ADDRESSES: Federal Communications indicated. The application also will be
Commission, 445 12th St, SW., Room available for inspection at the offices of
Dated: February 11, 2005. the Board of Governors. Interested
TW–305, Washington, DC.
George Pavlou, persons may express their views in
FOR FURTHER INFORMATION CONTACT:
Acting Deputy Regional Administrator, writing on the standards enumerated in
Jeffery Goldthorp, the Designated
Region 2. the BHC Act (12 U.S.C. 1842(c)). If the
Federal Officer (DFO) at (202) 418–1096
[FR Doc. 05–3907 Filed 2–28–05; 8:45 am] proposal also involves the acquisition of
or Jeffery.Goldthorp@fcc.gov. The TTY
BILLING CODE 6560–50–P a nonbanking company, the review also
number is: (202) 418–2989.
includes whether the acquisition of the
SUPPLEMENTARY INFORMATION: The nonbanking company complies with the
ENVIRONMENTAL PROTECTION purpose of the Council is to provide standards in section 4 of the BHC Act
AGENCY recommendations to the FCC and to the (12 U.S.C. 1843). Unless otherwise
communications industry that, if noted, nonbanking activities will be
implemented, shall under all reasonably conducted throughout the United States.
[FRL–7879–5] foreseeable circumstances assure Additional information on all bank
optimal reliability and interoperability holding companies may be obtained
Science Advisory Board Staff Office; of wireless, wireline, satellite, cable,
Cancellation of Public Meetings of the from the National Information Center
and public data networks. At this fourth website at www.ffiec.gov/nic/.
Science Advisory Board meeting under the Council’s new
Environmental Engineering Committee Unless otherwise noted, comments
charter, the Council will discuss a regarding each of these applications
number of the items that will relate to must be received at the Reserve Bank
AGENCY: Environmental Protection
emergency services and E911. indicated or the offices of the Board of
Agency (EPA).
Members of the general public may Governors not later than March 25,
ACTION: Notice. attend the meeting. The Federal 2005.
Communications Commission will A. Federal Reserve Bank of
SUMMARY: The Environmental Protection attempt to accommodate as many Richmond (A. Linwood Gill, III, Vice
Agency (EPA), Science Advisory Board people as possible. Admittance, President) 701 East Byrd Street,
(SAB) Staff Office is canceling two however, will be limited to the seating Richmond, Virginia 23261–4528:
public meetings of the SAB’s available. The public may submit
1. Southern National Bancorp of
Environmental Engineering Committee written comments before the meeting to
Virginia, Inc., Charlottesville, Virginia;
(EEC) announced earlier (70 FR 7934, Jeffery Goldthorp, the Commission’s
to become a bank holding company by
February 16, 2005). Designated Federal Officer for the
acquiring 100 percent of the voting
Network Reliability and Interoperability
DATES: March 10, 2005. The public shares of Sonabank, N.A.,
Council, by e-mail
conference call from 3 p.m. to 5 p.m. Charlottesville, Virginia, an organizing
(Jeffery.Goldthorp@fcc.gov) or U.S.
Eastern Time has been cancelled. March national bank.
Postal Service mail (7–A325, 445 12th
15–17, 2005. The public meeting St, SW., Washington, DC 20554). Real B. Federal Reserve Bank of Kansas
scheduled for March 15–17, 2005 has Audio and streaming video access to the City (James Hunter, Assistant Vice
been cancelled. meeting will be available at http:// President) 925 Grand Avenue, Kansas
www.fcc.gov/realaudio/. City, Missouri 64198–0001:
Dated: February 23, 2005.
1. Sundance State Bank Profit Sharing
Vanessa T. Vu, Federal Communications Commission. and Employee Stock Ownership Plan
Director, EPA Science Advisory Board Staff Marlene H. Dortch, and Trust, Sundance, Wyoming; to
Office. Secretary. acquire an additional .41 percent for a
[FR Doc. 05–4000 Filed 2–28–05; 8:45 am] [FR Doc. 05–3936 Filed 2–28–05; 8:45 am] total of 26.06 percent, of the voting
BILLING CODE 6560–50–P BILLING CODE 6712–01–P shares of Sundance Bankshares, Inc.,

VerDate jul<14>2003 14:21 Feb 28, 2005 Jkt 205001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1

You might also like