Professional Documents
Culture Documents
Transformatoare de Curent
Transformatoare de Curent
March 6, 2013
Safety Hazards
Basic Safe Work Practices
March 6, 2013
Examples of CTs
March 6, 2013
Examples of CTs
March 6, 2013
Examples of CTs
March 6, 2013
Examples of CTs
March 6, 2013
Basic Theory:
CT as a Voltage Transformer
March 6, 2013
CT as a Voltage Transformer
March 6, 2013
Saturation Curves
March 6, 2013
March 6, 2013
10
March 6, 2013
11
March 6, 2013
12
Secondary
Induced Voltage
Spike
13
Death
March 6, 2013
14
March 6, 2013
15
CT Polarity
March 6, 2013
16
CT Polarity
March 6, 2013
17
CT Polarity
March 6, 2013
18
Bar-type CT
March 6, 2013
19
Small Window CT
March 6, 2013
20
Multi-ratio Window CT
March 6, 2013
21
CT Polarity
March 6, 2013
22
CT Polarity
March 6, 2013
23
CT Polarity
March 6, 2013
24
CT Polarity
25
March 6, 2013
26
March 6, 2013
27
March 6, 2013
28
29
Make before
Break switch with
contact to
shorting bar.
30
Make before
Break switch with
contact to
shorting bar.
Westinghouse-ABB Case/Switches
March 6, 2013
31
Westinghouse-ABB Case/Switches
March 6, 2013
32
Westinghouse-ABB Case/Switches
March 6, 2013
33
Shorting
Bar
Shorting
Bar
Westinghouse-ABB Case/Switches
March 6, 2013
34
Shorting
Bar
Test Plug
March 6, 2013
35
Shorting
Bar
Spring
Loaded
Contacts
March 6, 2013
36
Ground Checks
March 6, 2013
37
March 6, 2013
38
CT Circuit
Ground
March 6, 2013
39
March 6, 2013
40
Circuit Identification
March 6, 2013
41
42
Example of critical
information pertinent to
physical location of CT
Circuits.
March 6, 2013
43
March 6, 2013
44
Fluke Current
Measuring
Devices
March 6, 2013
45
Care
March 6, 2013
46
ARC EXITED
HERE
Quote from
the Accident
Report:
ARC ENTERED
HERE
The
Electrician
said he
could smell
his flesh
burning
CABLE
62E-04
March 6, 2013
47
When
shorting CT secondaries at CT
Shorting Blocks, care must be taken to
properly short the CT Circuit.
CT Shorting Blocks
March 6, 2013
48
Note that a
minimum of two
screws are
needed to short
this 1 CT if the
full winding is
shorted (Y1-Y5
in this case).
Single-Phase
wiring from
individual CT
to relays,
instruments,
etc.
Ground screw
connection
normally left inplace.
Shorting Block
Ground
March 6, 2013
49
March 6, 2013
50
Shorting Block
Ground
Ground screw
connection
normally left inplace.
Three-Phase
wiring to relays,
instruments, etc.
Note that it takes
a minimum of
four screws to
short this set of 3
CTs (2Y1, 4Y1,
6Y1, and one of
2Y5, 4Y5, and
6Y5 in this case)
as long as the
Wye connection is
intact white
wiring here.
March 6, 2013
51
March 6, 2013
52
Whenever
March 6, 2013
53
Questions?
March 6, 2013
54