1) Construction area
i)
Construction area ground floor = 151.0m2
ii)
Construction area 1st floor
= 151.0m2
nd
iii)
Construction area 2 floor
= 151.0m2
iv)
Construction roof area
= 151.0m2
Total construction area
= 604.0m2
2) Structural Systems
i)
Beams: Precast beams
ii)
Columns: in-situ columns with reusable system formwork
iii)
Floor slab: Precast half slabs floor
iv)
Roof truss: Prefabricated steel roof truss
3) Wall System
i)
Internal wall: Precast concrete panel = 96m length
ii)
External wall : Precast blockworks
= 91m length
4) Other simplified construction solutions
i)
Doors: 100% comply with MS 1064 Part 4: 2001
Windows: 85% comply with MS 1064 Part 5: 2001
ii)
Staircase: 100% prefab staircase
iii)
Wall Plastering: 100% Spray plaster
iv)
Labour: 60% Other Labour Saving Product / Solution
(10 marks)
EC221
Task 2
20 STOREYS APARTMENT
1) Construction Area per floor
Area for 1 unit of apartment = 120m2
Lift lobby area = 150m2
Area for 1 floor = [120 10 units + 150] = 1350m2
2) Structural Systems
i) Tunnel formwork system
ii) Roof truss: prefabA steel roof truss.
Analyse and tabulate the IBS score for 20 Storeys apartment. (Refer Table 1, Table 2 and Table
3).
(10 marks)
EC221
Task 3
Project information:
Scarlet Villa is a residential development project by UDA Land Sdn Bhd. There are total 46 units
of bungalow, semi-detached house and terrace
i)
ii)
iii)