Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

ABSTRACT

T8-STORM-Light Weight Performance Car


College: Poornima Group of Ins9tu9ons, Sitapura Jaipur

About the Team:


Team Leader: Manu Sharma
Technical & Co. Leader: Kuldeep Kr. Sharma, Himanshu Pandey
Team Members:

Aditya Kankani

Amit Kr. Agarwal

Ashok Kr. Sharma

Kuldeep Meena

Prashant Agrawal

Guided By:

Mr. Gyaneshwer Sharma & Mr. Sachin Kr. Mishra

Head of Department:

Mr. Naval Kishore Jain

SPECIFICATIONS

!
Dimensions:

Piston Displacement: 796cc

Length x Width x Height: 3035 x


1095 x 860 mm

Max Power: 37bhp @ 5000rpm

Ground Clearance: 76 mm
Wheel Base: 1980
Weight:
Kerb Weight: 340 kg
Gross Weight: 480 kg
Capacity:
SeaIng Capacity: 2 persons
Fuel Tank Capacity: 10 ltr.
Engine:
Model: Suzuki F8B
Type: 4 Stroke Cylinders
No. of Cylinders: 3

Max Torque: 59Nm @ 2500rpm


Mileage: 22kmpl
Power Transmission:

4- FWD All Synchromesh

1 REV

Steering: Rack & Pinion


Suspension (Front & Rear) : Fully
Independent Double Wishbone
Suspension with Coil Spring
Brakes (Front & Rear): Disc
Tyre:
Front: 145/70 R-12
Rear: 145/80 R-12

!
!

Brief Introduc9on
T8-Storm is an Exo-Skeletal 2-seater light weight performance vehicle inspired
by Ariel Atom a high performance sport car, built to perform on race track as
well as normal roads. The cockpit, engine block and aluminium crash box for
safety are integrated into single frame welded together to form the chassis.
LWPC is having fully independent double wishbone suspension with pushrod
mechanism along with anI-roll bars. MS Hollow pipe delivers strength to safety
cage ensuring protecIon of driver and co-driver. This car has a lesser
aerodynamic body than a normal car but its light weight helps to achieve higher
acceleraIon rate.

!
Project as a Product
Taking into consideraIon the increasing inclinaIon of youth towards speed
enthusiasm, this project is concerned with building high power-to-weight raIo
vehicles with Indian Road Safety Standards.

Time Dura9on:
Approx. Working Hours: 400-500 hrs
(4-5hrs per day for 4 months)

Project Cost:
This project is built in Poornima Group of InsItuIons, Mechanical Workshop,
which provided the tooling and machining faciliIes. A major part of Raw
Materials was provided from InsItute property that concludes that actual cost
of project.
Actual Cost: 80,000 (Excluding cost of tooling and machinery and raw material)

!
As a nished market product, total cost is calculated approximately as:
Total Cost: 2.15Lac.
Raw Material Cost: 50,000
Standard Parts Cost: 70,000
Tooling Cost: 95,000

You might also like