URAIAN / KEGIATAN
VOLUME
A. PEKERJAAN PERSIAPAN
1 Survey Awal, Penentuan Peil dan Serah Terima Lapangan
2 Mobilisasi dan Demobilisasi
3 Pembersihan Lokasi
4 Pemasangan Bowplank
5 Direksi Keet dan Bangsal Kerja
1
1
5000
300
72
265
2 Urugan Kembali
192
24
24
5 Turap Sementara
160
10
70
8 Perataan Tanah
C. PEKERJAAN STRUKTUR ATAS
1 Konstruksi Menara Baja Galvanis & Sistem Angkur
2 Pendirian Konstruksi Menara
3 Pengecatan Konstruksi Menara
4 Perancah dan Alat Bantu
400
15000
1
1
1
E. FASILITAS PENUNJANG
5
1
3
1
300
300
2
5
1
1
1
1
1
1
JUMLAH
Ls
Ls
Ls
m'
40,690,000.00
416,020,000.00
8,800.00
19,134.00
40,690,000.00
416,020,000.00
44,000,000.00
5,740,200.00
m2
165,000.00
11,880,000.00
518,330,200.00
m3
78,750.00
20,868,750.00
m3
25,988.00
4,989,696.00
177,763.00
4,266,312.00
209,063.00
5,017,512.00
m2
67,978.00
10,876,480.00
297,000.00
2,970,000.00
5,876,140.00
411,329,800.00
m2
17,100.00
6,840,000.00
467,158,550.00
Kg
Ls
Ls
Ls
33,000.00
27,500,000.00
22,000,000.00
16,500,000.00
495,000,000.00
27,500,000.00
22,000,000.00
16,500,000.00
561,000,000.00
unit
unit
unit
unit
unit
unit
paket
paket
paket
unit
unit
55,000,000.00
13,200,000.00
330,000,000.00
148,500,000.00
11,000,000.00
3,850,000.00
46,310,000.00
2,750,000.00
55,000,000.00
99,000,000.00
1,650,000.00
55,000,000.00
13,200,000.00
330,000,000.00
148,500,000.00
33,000,000.00
23,100,000.00
46,310,000.00
2,750,000.00
55,000,000.00
297,000,000.00
13,200,000.00
###
unit
unit
unit
unit
m'
m'
unit
unit
paket
paket
paket
paket
paket
paket
127,000,000.00
153,000,000.00
1,650,000.00
153,000,000.00
660,000.00
59,400.00
1,650,000.00
5,280,000.00
22,000,000.00
8,250,000.00
33,000,000.00
16,500,000.00
5,500,000.00
33,000,000.00
SUB JUMLAH
PPN 10%
JUMLAH
DIBULATKAN
635,000,000.00
153,000,000.00
4,950,000.00
153,000,000.00
198,000,000.00
17,820,000.00
3,300,000.00
26,400,000.00
22,000,000.00
8,250,000.00
33,000,000.00
16,500,000.00
5,500,000.00
33,000,000.00
###
###
387,326,875.00
###
###
Kode Analisa
Jenis Pekerjaan
Satuan Pembayaran
No.
:
: 1M2 MEMBERSIHKAN LOKASI LAPANGAN DAN PERATAAN
: M2
Kebutuhan
Satuan
A
1
2
Tenaga Kerja
Pekerja
Mandor
Kode Analisa
Jenis Pekerjaan
Satuan Pembayaran
No.
Indeks
Harga Satuan
Rp.
oh
0.100 Rp0.00
oh
0.050 Rp0.00
Jumlah Harga Tenaga Kerja
Kebutuhan
Satuan
Indeks
Harga Satuan
Rp.
A
1
2
3
Bahan
Kayu Klas II (Kayu 5/7)
Paku 5 cm - 12 cm
Papan Kayu Klas III
B
1
2
3
4
Tenaga Kerja
Pekerja
oh
0.100 Rp0.00
Tukang Kayu
oh
0.100 Rp0.00
Kepala Tukang Kayu
oh
0.010 Rp0.00
Mandor
oh
0.005 Rp0.00
Jumlah Harga Tenaga Kerja
m3
0.012
Kg
0.020
m3
0.007
Jumlah Harga Bahan
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00
AN BOUWPLANK
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00