EVT471

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

EVT 471: SAFETY WORK PROCEDURE OF JANITORS & BUILDINGS CLEANERS

1. Hazard Identification
N
o

Work
Activity

Mix
detergents
with acids in
containers to
prepare
cleaning
solutions
Cleaning
ceiling by
using ladder
and the
outside
windows at
height by
using crane

Hazard

-Exposed to
dangerous
chemical
-Long term side
effect due to
the chemical
reaction
-Equipment
and machinery
to be
malfunction
-Probability
workers fall is
high

Which can
cause /
effect

-Skin irritation
- Nausea
-Dizziness
-Redness and
peeling

2. Risk Analysis
Existing Risk
Control
(if any)

Wear mask and


gloves

-Fatal
-Trauma to
height
-Bone fracture
-Sprain

Wear safety
helmet and
safety boots

Lik
eli
ho
od

Sev
erit
y

3. Risk Control
Risk

Recommend
ed Control
Measures

PIC
(due
date/stat
us)

20
(High)

Wearing any
PPE necessary

Ms. A / 13
August
2014

8
(Medium)

More training
to reduce
exposure

Ms. B / 13
August
2014

4. HIRARC FORM

Company
Process / Location
Approved by:
(Name, designation)

HIRARC FORM
Conducted by:
TK SUCCESS SDN. BHD
Malaysia / Cleaning
Mr. F
(Site Manager)

Ms. A (Supervisor)

(Name, designation)
24 Jun 2014 to 28 July 2014
Date

EVT 471: SAFETY WORK PROCEDURE OF JANITORS & BUILDINGS CLEANERS

Date

11 July 2014

Moving heavy
furniture,
equipment or
supplies manually

-Heavy lifting
beyond limit
and awkward
posture and
movement
-Too much body
twisting when
moving the
object

Steam- clean or
shampoo carpets

Exposed to hot
steam

-Burn skin

-Exposed to
massive dust
and dirt
-Slipping

-Asthma
-Respiratory
infections
-Bone
fractures

-Exposed to UV
radiation
-Handling sharp
tools

-Skin cancer
-Cuts and
wounded
-Sprain or
clutched

Cleaning the
building floors by
mopping,
sweeping,
scrubbing and
vacuuming
Mow or trim lawns
or shrubbery using
mowers, hand
power trimmers
and clean debris
from grounds

Review date

-Backbone
injuries
-Effecting
body posture
-Sore knees,
shoulders and
arm

Use trolley to lift


too heavy object

Manual lifting
procedure

Place a sign

Use a sun
protection suit

29 September 2014

8
(Medium)

Protect
employees
from rough
surface, sharp
corners, jagged
edges of the
load

Mr. C / 13
August
2014

4
(Low)

Maintain the
procedure

Mr. D / 13
August
2014

6
(Medium)

Inspect floor
machine to
make sure in
good working

Mr. E / 13
August
2014

6
(Medium)

Received
adequate
instruction and
training

Ms. A / 13
August
2014

EVT 471: SAFETY WORK PROCEDURE OF JANITORS & BUILDINGS CLEANERS

Make adjustments
and minor repairs
to heating, cooling,
ventilating, and
electrical systems.

Dealing with
managers, other
workers and
supervisor

Exposed to high
voltage
electricity

-Electrical
shocked

Use electrical
insulation tools

Dealing with
angry
managers and
irresponsible
workers

-Stress
disorder
-Fear of
depression

Use great
communication
skills

6
(Medium)

Maintain the
procedure

Ms. B / 13
August
2014

4
(Low)

Effective
communication

Mr. C / 13
August
2014

You might also like