Perd Design SPG Part 2
Perd Design SPG Part 2
Perd Design SPG Part 2
in Sefton
Design
Part 2: Site design,
layout and access
September 2004
Andy Wallis
Planning and Economic
Regeneration Director
Balliol House
Balliol Road
Bootle
L20 3RY
Supplementar y planni n g g u i d a n c e n o t e 2 0 0 4 D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s
1. Introduction
3. Design requirements
2. General
a) Your proposed development should make best use of the
positive features of your site and contribute to the character
of the surrounding area.
b) Part 1 of this guidance note looks at the relationship
between proposals and their locations. Part 2 explains
the issues you should take account for the design of your
development to fit within a given site and its surrounding
area.
c) Your design should show that you understand the sites
characteristics and show that these have been incorporated
where feasible into the layout and detailed design of
buildings, roads, structures and spaces on the site.
d) In most cases careful appraisal of the development site
Is necessary to help the design process. This is explained
in Section 5.
D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s S u p p l e m e n t a r y p l a n n i n g g u i d a n c e n o t e 2 0 04
page
Supplementar y p l a n n i n g g u i d a n c e n o t e 2 0 04 D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s
5. Site appraisal
a) According to Section 2 of draft UDP policy DQ1 you must
carry out a site appraisal. This is a survey and evaluation of
the existing characteristics of a site and its surroundings.
b) The appraisal will help you to identify the limitations
and opportunities of your site at an early stage. You should
regard it as the starting point of the design process. The
appraisal will help you to develop a scheme which uses your
sites positive features, and will identify features worth
keeping.
c) The appraisal needs to be tailored to the size and type
of your proposed development. It will need to deal with two
main aspects the site in relation to its surrounding area
(its contextG) and also the characteristics of the site itself .
The main issues the appraisals should deal with are listed
in the next 2 sections. You must decide which requirements
are most relevant to you, the level of detail you need to
provide and the best way to present the information to us.
d) You may need to support the site the appraisal with
detailed surveys of specific topics (for example, level
surveys, ground condition surveys, archaeological surveys,
tree surveys and habitat surveys) depending on your site
and the type of development you are proposing. More advice
on specialist surveys is given at the end of Part 2.
The site in contextG
e) Describe and assess the relationship of the site to its
surroundings. To do this you should make reference to;
(i) Buildings, structures and spaces: Identify the
existing types of buildings and structures, including
types of boundary walls or fences and paved surfaces.
Assess the relationship buildings have to streets, open
spaces, and established building lines, detailing general
D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s S u p p l e m e n t a r y p l a n n i n g g u i d a n c e n o t e 2 0 04
page
6. Specialist Surveys
It is strongly recommend that specialist professional advice
is sought where proposals depend on accurate information
about site levels, ground conditions, transportation issues,
existing buildings and the like.
Early discussion with the Planning and Economic
Regeneration Department is also advisable in order to
identify or confirm the need for other types of survey
such as trees, habitats, and archaeology. The Planning and
Economic Regeneration Department may hold information,
or be able to direct applicants to sources of information
which will be of help in the process of site appraisal.
In some instances, for instance larger or particularly
sensitive scheme an Environmental Impact Assessment
(EIA) may be required. You should discuss the need for an
EIA with the planning officers. The requirement for EIA
is governed by national guidelines for particular types of
development.
page
Supplementar y p l a n n i n g g u i d a n c e n o t e 2 0 04 D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s
Glossary
page
Useful contacts
Planning Department,
Development Control South,
Balliol House,
Balliol Rd,
Bootle,
L20 3RY
Planning Department,
Development Control North,
9/11 Eastbank Street,
Southport,
PR8 1DL
Other
relevant
supplementary
guidance we have produced:
Archaeology
Providing a choice of travel
House extensions
Landscape character
planning
page
Supplementar y p l a n n i n g g u i d a n c e n o t e 2 0 04 D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s
English Partnerships
(North West)
Arpley House
110 Birchwood Boulevard
Birchwood
Warrington
WA3 7QH
Phone: 01925 651144
Fax: 01925 411493
Website: www.englishpartnerships.co.uk
Housing Corporation
Maple House
149 Tottenham Court Road
London
W1T 7BN
Phone: 020 7393 2000
Fax: 020 7393 2111
Email: enquiries@housingcorp.gsx.gov.uk
Website: www.housingcorp.gov.uk
D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s S u p p l e m e n t a r y p l a n n i n g g u i d a n c e n o t e 2 0 04
page
APPENDIX 1
j) We consulted
the general public and interested
organisations in August and September 2004. In total,
we sent 600 letters to local agents, housebuilders and
registered social landlords and other interested groups
(such as parish councils). We placed adverts in the local
press and the guidance was available in the two planning
offices and on our website.
k) We received comments about the guidance from Mr
Cowell, Secondsite Property Holdings and Government
Office North West. The table over the page summarises
the comments we received, and our responses.
l) We revised the guidance note to take account of the
comments received during the consultation process, and
made some other changes.
m) We reported the results of the consultation process
to the Planning Committee on 22 September 2004. The
revised Part 2 of the Design guidance note was adopted on
22 September 2004.
Supplementa r y p l a n n i n g g u i d a n c e n o t e 2 0 0 4 D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s
Summary of comment
Supportive of comprehensive
assessment of character
Specific points:
- useful to mention need for buildings
to face streets, squares or parks and
avoid inward-facing development
- welcome emphasis placed on
sustainable drainage systems
- section on access could be expanded
to take into account public transport
considerations
- Settlement Character Plans
- useful to have the conservation
areas marked on the plans as well.
De s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s S u p p l e m e n t a r y p l a n n i n g g u i d a n c e n o t e 2 0 0 4
page 11
Person or Organisation
commenting
Summary of comment
United Utilities
Part 2 of Design Supplementary Planning Guidance Note: Site design, layout and access
Mr Cowell
page 12
Supplementa r y p l a n n i n g g u i d a n c e n o t e 2 0 0 4 D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s
De s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s S u p p l e m e n t a r y p l a n n i n g g u i d a n c e n o t e 2 0 0 4
page 13
page 14
Supplementa r y p l a n n i n g g u i d a n c e n o t e 2 0 0 4 D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s
D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s S u p p l e m e n t a r y p l a n n i n g g u i d a n c e note 2004
Supplementar y planni n g g u i d a n c e n o t e 2 0 0 4 D e s i g n Pa r t 2 : S i t e d e s i g n , l a y o u t a n d a c c e s s