Calculation Barge Stability
Calculation Barge Stability
PROJECT
ENG. No.
OPERATION:
Barge orientation (tick one)
Over Bow
Over Stern
Over Side
(Un)-Loading operation (tick one)
Load In / Roll off (Barge to Land)
Load Out / Roll on (Land to Barge)
OTHER PARTICULARS:
ramp length
Cargo details:
Weight (incl. trailers)
Length
Width
Height (incl. trailers)
VCG (incl. trailer)
Rev.
23e081
20.00
=
=
=
=
=
1,175.00
83.20
30.00
23.00
13.50
ft
mT
mtr
mtr
mtr
mtr
6.10
2,588.11
272
98
75
44
mtr
KIPS
ft
ft
ft
ft
0
(max 15 axles long)
11.6
5.1
5.5
3.5
inch
inch
inch
inch
x
Boa 7-8-9
Barge:
TRANSPORTER INPUT
Transporter 1
Support 3
TCG (center trailer)
LCG (C.L. first axle)
Weight per axle
Weight cargo
# of axles
Trailer Configuration
# of axle rows
Axle spacing
W per axle row
Transporter 2
Support 4
TCG (center trailer)
LCG (C.L. first axle)
Weight per axle
Weight cargo
# of axles
Trailer Configuration
# of axle rows
Axle spacing
W per axle row
Transporter 3
Support 7
TCG (center trailer)
LCG (C.L. first axle)
Weight per axle
Weight cargo
# of axles
Trailer Configuration
# of axle rows
Axle spacing
W per axle row
Transporter 4
Support 8
TCG (center trailer)
LCG (C.L. first axle)
Weight per axle
Weight cargo
# of axles
Trailer Configuration
# of axle rows
Axle spacing
W per axle row
Transporter 5
Not Used
TCG (center trailer)
LCG (C.L. first axle)
Weight per axle
Weight cargo
# of axles
Trailer Configuration
# of axle rows
Axle spacing
W per axle row
Transporter 6
Not Used
TCG (center trailer)
LCG (C.L. first axle)
Weight per axle
Weight cargo
# of axles
Trailer Configuration
# of axle rows
Axle spacing
W per axle row
=
=
=
=
=
=
=
=
=
11.0
0.0
3.5
284.0
12
s
12
1.4
27.17
mtr
35
ft
11.1
mtr
0
ft
0.0
mT
7.71 KIPS
mT
625.55 KIPS
Nos.
("S" single, "D" double, "T" triple)
Nos.
mtr
4
ft
7.1
mT/axle row 59.84 KIPS/axle row
inch
inch
=
=
=
=
=
=
=
=
=
-10.5
6.4
3.5
294.0
12
d
6
1.4
56.00
mtr
-34
ft
-5.4
mtr
20
ft
12.0
mT
7.71 KIPS
mT
647.58 KIPS
Nos.
("S" single, "D" double, "T" triple)
Nos.
mtr
4
ft
7.1
mT/axle row 123.35 KIPS/axle row
inch
inch
=
=
=
=
=
=
=
=
=
11.0
35.7
3.5
211.0
12
s
12
1.4
21.08
mtr
36
ft
1.1
mtr
117
ft
1.5
mT
7.71 KIPS
mT
464.76 KIPS
Nos.
("S" single, "D" double, "T" triple)
Nos.
mtr
4
ft
7.1
mT/axle row 46.44 KIPS/axle row
inch
inch
=
=
=
=
=
=
=
=
=
-3.5
41.6
3.5
218.0
12
d
6
1.4
43.33
mtr
-11
ft
-5.8
mtr
136
ft
5.8
mT
7.71 KIPS
mT
480.18 KIPS
Nos.
("S" single, "D" double, "T" triple)
Nos.
mtr
4
ft
7.1
mT/axle row 95.45 KIPS/axle row
inch
inch
=
=
=
=
=
0.0
0.0
0.0
0.0
0
mtr
mtr
mT
mT
Nos.
inch
inch
=
=
=
=
s
0
1.4
0.00
=
=
=
=
=
=
=
=
=
0.0
0.0
0.0
0.0
0
s
0
1.4
0.00
mtr
0
ft
0.0
mtr
0
ft
0.0
mT
0.00 KIPS
mT
0.00 KIPS
Nos.
("S" single, "D" double, "T" triple)
Nos.
mtr
4
ft
7.1
mT/axle row
0.00 KIPS/axle row
0
0
0.00
0.00
ft
ft
KIPS
KIPS
0.0
0.0
inch
inch
inch
inch
inch
inch
inch
inch
NOTES
1.)
2.)
3.)
Ballast calculations
AXLE SEQUENCE AND LOADS
Ballast
steps
axle
row #
1
2
3
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
6.4
7.8
9.2
10.6
12
13.4
----------------------------------------
35.7
37.1
38.5
39.9
41.3
42.7
44.1
45.5
46.9
48.3
49.7
51.1
----------------------------
41.6
43
44.4
45.8
47.2
48.6
-----------------------------
0
----------------------------------
0
----------------------------------
Weight
per row
mT
27.2
27.2
27.2
27.2
27.2
83.2
83.2
83.2
83.2
83.2
83.2
48.3
21.1
21.1
21.1
21.1
64.4
64.4
64.4
64.4
64.4
64.4
21.1
-
62.4
62.4
75.3
101.0
139.6
191.0
191.0
191.0
0.0
4.8
14.5
29.1
48.4
58.4
78.3
108.1
147.9
147.9
147.9
-
46.3
46.3
89.4
119.7
137.1
141.7
141.7
141.7
0.0
16.2
27.6
34.2
35.9
69.3
92.7
106.2
109.7
109.7
109.7
-
62.4
89.6
129.6
182.5
248.2
326.8
410.0
493.2
683.1
687.9
697.6
712.1
731.5
762.5
803.5
854.5
915.4
979.8
1,044.2
-
Overall
Weight
on land
mT
1,175.0
1,168.8
1,156.3
1,137.6
1,112.6
1,085.4
1,045.4
992.5
926.8
848.2
765.0
681.8
491.9
487.1
477.4
462.9
443.5
412.5
371.5
320.5
259.6
195.2
130.8
-
Total
OK?
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
-
TIDAL INFORMATION:
2.13
mtr
0.30
mtr
5.0
4.0
3.0
2.0
1.0
0.0
-1.0
0.0 0.3 0.5 0.8 1.0 1.3 1.5 1.8 2.0 2.3 2.5 2.8 3.0 3.3 3.5 3.8 4.0 4.3 4.5 4.8 5.0 5.3 5.5 5.8 6.0
time (hrs)
tidal heights
jetty-water heights
Ballast calculations
PROJECT
ENG. No.
Overview
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
BOA 7-8-9
393
ft
100
ft
24
ft
11
ft
6
1
11
5
inch
inch
inch
inch
119.94
30.51
7.59
5.79
Ballasting with:
salt water
1,025
kg/m^3
Pump info:
Capacity =
1,500
mT/hr
Results/output in (Tick one):
Metric
Imperial
mtr
mtr
mtr
mtr
Rev.
23e081
63.93
LBS/ft^3
3,303,965 LBS/hr
x
Pre-ballasting
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
Step 11
Step 12
Step 13
Step 14
Step 15
Step 16
Step 17
Step 18
Step 19
Step 20
Step 21
Step 22
Step 23
Step 24
Sailing
-
0.0
Pumped
Quantity
LBS
24,688,875
0
125,156
125,156
264,468
0
0
0
125,156
264,468
125,156
389,624
389,624
528,936
125,156
0
125,156
264,468
0
0
125,156
0
264,468
125,156
0
22,072,506
-
hrs
Nos.
pumps
10
0
1
1
2
0
0
0
1
2
1
3
3
2
1
0
1
2
0
0
1
0
2
1
0
10
-
time
time
elapsed
involved since mean
hrs.
tide
1.04
1.04
0.00
1.04
0.04
1.07
0.04
1.11
0.04
1.15
0.00
1.15
0.00
1.15
0.00
1.15
0.04
1.19
0.04
1.23
0.04
1.27
0.04
1.31
0.04
1.35
0.08
1.43
0.04
1.47
0.00
1.47
0.04
1.50
0.04
1.54
0.00
1.54
0.00
1.54
0.04
1.58
0.00
1.58
0.04
1.62
0.04
1.66
0.00
1.66
1.04
2.70
-
average
draft
ft
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
6.00
-
trim
ft
-1.11
-1.11
-0.99
-0.86
-1.04
-0.97
-0.91
-0.82
-0.80
-0.88
-0.80
-0.95
-0.89
-0.90
-0.82
-0.82
-0.71
-1.00
-1.03
-1.03
-0.91
-0.87
-1.07
-0.84
-0.98
0.00
-
trim
angle
degrees
-0.16
-0.16
-0.14
-0.12
-0.15
-0.14
-0.13
-0.12
-0.12
-0.13
-0.12
-0.14
-0.13
-0.13
-0.12
-0.12
-0.10
-0.15
-0.15
-0.15
-0.13
-0.13
-0.16
-0.12
-0.14
0.00
-
heel
ft
0.06
0.06
-0.01
-0.09
0.07
0.24
0.08
-0.08
0.00
-0.16
-0.08
-0.01
0.05
0.17
0.06
0.19
0.08
0.12
0.17
0.21
0.02
0.06
0.11
0.00
0.17
0.00
-
heel
angle
degrees
0.03
0.03
-0.01
-0.05
0.04
0.14
0.04
-0.05
0.00
-0.09
-0.05
0.00
0.03
0.10
0.04
0.11
0.05
0.07
0.10
0.12
0.01
0.04
0.06
0.00
0.10
0.00
-
CONCLUSION
Max. barge-jetty distance
Min. barge-jetty distance
0.51
0.26
ft
ft
17.50
ft
0.00
-1.11
0.00
-0.16
2.70
2.70
hrs
hrs
Max. heel
Min. heel
Max. heel angle
Min. heel angle
0.24
-0.16
0.14
-0.09
ft
ft
degrees
degrees
ft
ft
degrees
degrees
NOTES
1.)
2.)
3.)
4.)
5.)
6.)
7.)
8.)
9.)
Port side is +, Starboard is Tank %-filled is never lower than 5% or higher than 95%
Tank 1 is at bow
If capacity is 0, this tank is not present
Reference point is at mid keel at the bow
Transporter movements are assumed to be timeless
A negative "barge-jetty" value means barge below jetty, a positive "barge-jetty" value means barge above jetty
Overall time excludes pump set-up and handling time
A minumum of one pump per used ballast tank is assumed
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
OK!
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
23e081
mtr
mtr
mtr
mtr
62.37
63.93
Rev.
LBS/ft^3
LBS/ft^3
3,303,965 LBS/hr
10
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
56.82
0.00
0.00
56.82
86.01
0.00
0.00
86.01
86.72
0.00
0.00
86.72
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
86.37
0.00
0.00
86.37
60.03
0.00
0.00
60.03
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
97.74
0.00
0.00
97.74
VCG
mtr
0.00
0.25
0.00
0.00
0.12
0.00
0.00
0.12
0.18
0.00
0.00
0.18
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
0.18
0.00
0.00
0.18
0.25
0.00
0.00
0.25
Light ship
3502.00
0.00
56.64
4.88
4,609.56
0.00
57.26
3.75
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
545.62
0.00
0.00
545.62
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
568.21
0.00
0.00
965.95
1548.14
0.00
0.00
1548.14
780.44
0.00
0.00
780.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1554.60
0.00
0.00
1554.60
360.21
0.00
0.00
360.21
time
involved
hrs
54,475.43
10,020.92
1.04
0.38
0.64
1.03
1.03
0.52
0.52
1.04
1.04
0.24
0.24
HYDROSTATICS
Average draft
Long. Cntr. Buoyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
6.00
187.85
191.87
1,734.84
155.95
0.00
6.00
6.00
0.00
ft
ft
ft
ft*tons
ft
ft
ft
ft
deg.
1.83
57.26
58.48
472.12
47.53
0.00
1.83
1.83
mtr
mtr
mtr
mT*mtr
mtr
43.78
11.82
31.96
mtr
mtr
mtr
143.64
38.77
104.87
ft
ft
ft
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
0.00
1.83
1.83
0.00
mtr
mtr
mtr
deg.
0.00
6.00
6.00
ft
ft
ft
NOTES
Time involved to ballast sailing
Time elapsed since pre-ballast
Time elapsed since mean tide
1.04
2.70
2.70
hrs
hrs
hrs
BARGE DRAFT
1.) Port side is +, Starboard is 2.) Tank %-filled is between 5% and 95%
3.) Tank 1 is at bow
4.) If capacity is 0, this tank is not present
5.) Reference point is at mid keel at the bow
6.) Overall pump time excludes handling time
6.00 ft
6.00 ft
6.00 ft
6.00 ft
6.00 ft
stern
port side
6.00 ft
6.00 ft
6.00 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
Pre-ballasting
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
10
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
852.31
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
900.51
0.00
0.00
900.51
5.0%
5.0%
5.0%
5.0%
75.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
75.0%
5.0%
5.0%
75.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.85
0.00
0.00
102.85
VCG
mtr
0.00
0.25
0.00
0.00
1.82
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.43
0.00
0.00
3.43
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
16,249.91
0.01
58.14
3.49
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
8,184.34
0.00
0.00
8,184.34
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
795.49
0.00
0.00
965.95
1548.14
0.00
0.00
1548.14
780.44
0.00
0.00
780.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1554.60
0.00
0.00
1554.60
840.48
0.00
0.00
840.48
time
involved
hrs
69,752.86
11,208.75
1.04
0.53
0.64
1.03
1.03
0.52
0.52
1.04
1.04
0.56
0.56
HYDROSTATICS
Average draft
Long. Cntr. Buoyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.67
4.29
11.38
mtr
mtr
mtr
51.40
14.08
37.32
ft
ft
ft
0.02
5.35
5.33
0.03
mtr
mtr
mtr
deg.
0.06
17.56
17.50
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-1.11
18.08
16.98
-0.16
ft
ft
ft
deg.
-0.34
5.51
5.17
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved to pre-ballast
Start, time elapsed since mean tide
Time elapsed since mean tide
7.94
7.43
0.51
1.04
0.0
1.04
ft
ft
ft
hrs
hrs
hrs
2.42
2.27
0.15
mtr
mtr
mtr above jetty
16.95 ft
stern
port side
16.98 ft
17.00 ft
17.56 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
1
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
0
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
852.31
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
900.51
0.00
0.00
900.51
5.0%
5.0%
5.0%
5.0%
75.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
75.0%
5.0%
5.0%
75.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.85
0.00
0.00
102.85
VCG
mtr
0.00
0.25
0.00
0.00
1.82
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.43
0.00
0.00
3.43
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
0.00
16,249.91
0.00
0.01
119.94
58.14
13.50
3.49
Ballast step:
1
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
8,184.34
0.00
0.00
8,184.34
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
69,752.86
0.00
0.00
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.67
4.29
11.38
mtr
mtr
mtr
51.40
14.08
37.32
ft
ft
ft
0.02
5.35
5.33
0.03
mtr
mtr
mtr
deg.
0.06
17.56
17.50
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-1.11
18.08
16.98
-0.16
ft
ft
ft
deg.
-0.34
5.51
5.17
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 1
Time elapsed since pre-ballast
Time elapsed since mean tide
7.94
7.43
0.51
0.00
1.04
1.04
ft
ft
ft
hrs
hrs
hrs
2.42
2.27
0.15
mtr
mtr
mtr above jetty
16.95 ft
stern
port side
16.98 ft
17.00 ft
17.56 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
2
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
795.49
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
900.51
0.00
0.00
900.51
5.0%
5.0%
5.0%
5.0%
70.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
75.0%
5.0%
5.0%
75.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.85
0.00
0.00
102.85
VCG
mtr
0.00
0.25
0.00
0.00
1.70
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.43
0.00
0.00
3.43
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
6.24
16,199.33
47.68
0.00
119.94
58.31
13.50
3.50
Ballast step:
2
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
8,184.34
0.00
0.00
8,184.34
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
69,752.86
56.82
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.66
4.31
11.36
mtr
mtr
mtr
51.39
14.13
37.26
ft
ft
ft
0.00
5.34
5.34
-0.01
mtr
mtr
mtr
deg.
-0.01
17.52
17.53
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.99
18.02
17.03
-0.14
ft
ft
ft
deg.
-0.30
5.49
5.19
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 2
Time elapsed since pre-ballast
Time elapsed since mean tide
7.89
7.43
0.45
0.04
1.07
1.07
ft
ft
ft
hrs
hrs
hrs
2.40
2.27
0.14
mtr
mtr
mtr above jetty
17.04 ft
stern
port side
17.03 ft
17.02 ft
17.52 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
3
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
738.67
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
900.51
0.00
0.00
900.51
5.0%
5.0%
5.0%
5.0%
65.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
75.0%
5.0%
5.0%
75.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.85
0.00
0.00
102.85
VCG
mtr
0.00
0.25
0.00
0.00
1.58
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.43
0.00
0.00
3.43
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
18.72
16,154.99
31.79
-0.01
119.94
58.50
13.50
3.50
Ballast step:
3
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
8,184.34
0.00
0.00
8,184.34
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
69,752.86
56.82
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.66
4.32
11.34
mtr
mtr
mtr
51.36
14.17
37.20
ft
ft
ft
-0.03
5.33
5.35
-0.05
mtr
mtr
mtr
deg.
-0.09
17.48
17.57
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.86
17.95
17.09
-0.12
ft
ft
ft
deg.
-0.26
5.47
5.21
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 3
Time elapsed since pre-ballast
Time elapsed since mean tide
7.82
7.43
0.39
0.04
1.11
1.11
ft
ft
ft
hrs
hrs
hrs
2.38
2.27
0.12
mtr
mtr
mtr above jetty
17.14 ft
stern
port side
17.09 ft
17.05 ft
17.48 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
4
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
2
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
738.67
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
840.48
0.00
0.00
840.48
5.0%
5.0%
5.0%
5.0%
65.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
70.0%
5.0%
5.0%
70.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.70
0.00
0.00
102.70
VCG
mtr
0.00
0.25
0.00
0.00
1.58
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.23
0.00
0.00
3.23
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
37.43
16,053.64
23.84
0.01
119.94
58.22
13.50
3.50
Ballast step:
4
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
7,638.72
0.00
0.00
7,638.72
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.03
0.00
0.00
60.03
time
involved
hrs
68,661.61
120.07
0.04
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.66
4.28
11.39
mtr
mtr
mtr
51.39
14.03
37.36
ft
ft
ft
0.02
5.35
5.33
0.04
mtr
mtr
mtr
deg.
0.07
17.56
17.49
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-1.04
18.05
17.01
-0.15
ft
ft
ft
deg.
-0.32
5.50
5.18
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 4
Time elapsed since pre-ballast
Time elapsed since mean tide
7.91
7.43
0.47
0.04
1.15
1.15
ft
ft
ft
hrs
hrs
hrs
2.41
2.27
0.14
mtr
mtr
mtr above jetty
16.97 ft
stern
port side
17.01 ft
17.05 ft
17.56 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
5
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
0
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
738.67
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
840.48
0.00
0.00
840.48
5.0%
5.0%
5.0%
5.0%
65.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
70.0%
5.0%
5.0%
70.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.70
0.00
0.00
102.70
VCG
mtr
0.00
0.25
0.00
0.00
1.58
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.23
0.00
0.00
3.23
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
62.39
16,078.59
19.07
0.03
119.94
58.32
13.50
3.51
Ballast step:
5
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
7,638.72
0.00
0.00
7,638.72
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
68,661.61
0.00
0.00
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.65
4.27
11.38
mtr
mtr
mtr
51.34
14.01
37.33
ft
ft
ft
0.07
5.38
5.31
0.14
mtr
mtr
mtr
deg.
0.24
17.64
17.41
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.97
18.01
17.04
-0.14
ft
ft
ft
deg.
-0.30
5.49
5.19
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 5
Time elapsed since pre-ballast
Time elapsed since mean tide
7.88
7.43
0.44
0.00
1.15
1.15
ft
ft
ft
hrs
hrs
hrs
2.40
2.27
0.14
mtr
mtr
mtr above jetty
16.92 ft
stern
port side
17.04 ft
17.16 ft
17.64 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
6
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
0
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
738.67
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
840.48
0.00
0.00
840.48
5.0%
5.0%
5.0%
5.0%
65.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
70.0%
5.0%
5.0%
70.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.70
0.00
0.00
102.70
VCG
mtr
0.00
0.25
0.00
0.00
1.58
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.23
0.00
0.00
3.23
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
89.56
16,105.76
10.04
0.01
119.10
58.42
13.50
3.53
Ballast step:
6
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
7,638.72
0.00
0.00
7,638.72
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
68,661.61
0.00
0.00
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.63
4.26
11.37
mtr
mtr
mtr
51.28
13.99
37.30
ft
ft
ft
0.02
5.35
5.33
0.04
mtr
mtr
mtr
deg.
0.08
17.56
17.48
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.91
17.98
17.07
-0.13
ft
ft
ft
deg.
-0.28
5.48
5.20
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 6
Time elapsed since pre-ballast
Time elapsed since mean tide
7.85
7.43
0.41
0.00
1.15
1.15
ft
ft
ft
hrs
hrs
hrs
2.39
2.27
0.13
mtr
mtr
mtr above jetty
17.03 ft
stern
port side
17.07 ft
17.11 ft
17.56 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
7
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
0
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
738.67
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
840.48
0.00
0.00
840.48
5.0%
5.0%
5.0%
5.0%
65.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
70.0%
5.0%
5.0%
70.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.70
0.00
0.00
102.70
VCG
mtr
0.00
0.25
0.00
0.00
1.58
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.23
0.00
0.00
3.23
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
129.58
16,145.79
4.70
-0.01
117.88
58.56
13.50
3.55
Ballast step:
7
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
7,638.72
0.00
0.00
7,638.72
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
68,661.61
0.00
0.00
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.61
4.25
11.35
mtr
mtr
mtr
51.20
13.95
37.25
ft
ft
ft
-0.02
5.33
5.35
-0.05
mtr
mtr
mtr
deg.
-0.08
17.48
17.56
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.82
17.93
17.11
-0.12
ft
ft
ft
deg.
-0.25
5.46
5.22
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 7
Time elapsed since pre-ballast
Time elapsed since mean tide
7.80
7.43
0.37
0.00
1.15
1.15
ft
ft
ft
hrs
hrs
hrs
2.38
2.27
0.11
mtr
mtr
mtr above jetty
17.15 ft
stern
port side
17.11 ft
17.07 ft
17.48 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
8
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
795.49
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
840.48
0.00
0.00
840.48
5.0%
5.0%
5.0%
5.0%
70.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
70.0%
5.0%
5.0%
70.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.70
0.00
0.00
102.70
VCG
mtr
0.00
0.25
0.00
0.00
1.70
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.23
0.00
0.00
3.23
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
182.47
16,255.50
1.74
0.00
116.79
58.59
13.50
3.58
Ballast step:
8
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
7,638.72
0.00
0.00
7,638.72
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
68,661.61
56.82
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.58
4.22
11.35
mtr
mtr
mtr
51.10
13.86
37.24
ft
ft
ft
0.00
5.34
5.34
0.00
mtr
mtr
mtr
deg.
0.00
17.52
17.52
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.80
17.92
17.12
-0.12
ft
ft
ft
deg.
-0.24
5.46
5.22
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 8
Time elapsed since pre-ballast
Time elapsed since mean tide
7.79
7.43
0.36
0.04
1.19
1.19
ft
ft
ft
hrs
hrs
hrs
2.38
2.27
0.11
mtr
mtr
mtr above jetty
17.12 ft
stern
port side
17.12 ft
17.12 ft
17.52 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
9
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
2
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
795.49
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
780.45
0.00
0.00
780.45
5.0%
5.0%
5.0%
5.0%
70.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
65.0%
5.0%
5.0%
65.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.52
0.00
0.00
102.52
VCG
mtr
0.00
0.25
0.00
0.00
1.70
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.03
0.00
0.00
3.03
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
248.22
16,201.18
0.11
-0.02
115.91
58.47
13.50
3.61
Ballast step:
9
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
7,093.09
0.00
0.00
7,093.09
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.03
0.00
0.00
60.03
time
involved
hrs
67,570.37
120.07
0.04
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.55
4.17
11.38
mtr
mtr
mtr
51.02
13.68
37.34
ft
ft
ft
-0.05
5.32
5.37
-0.09
mtr
mtr
mtr
deg.
-0.16
17.44
17.60
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.88
17.96
17.08
-0.13
ft
ft
ft
deg.
-0.27
5.47
5.21
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 9
Time elapsed since pre-ballast
Time elapsed since mean tide
7.83
7.43
0.40
0.04
1.23
1.23
ft
ft
ft
hrs
hrs
hrs
2.39
2.27
0.12
mtr
mtr
mtr above jetty
17.16 ft
stern
port side
17.08 ft
17.00 ft
17.44 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
10
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
852.31
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
780.45
0.00
0.00
780.45
5.0%
5.0%
5.0%
5.0%
75.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
65.0%
5.0%
5.0%
65.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.52
0.00
0.00
102.52
VCG
mtr
0.00
0.25
0.00
0.00
1.82
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
3.03
0.00
0.00
3.03
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
326.83
16,336.61
-0.80
-0.01
115.23
58.59
13.50
3.66
Ballast step:
10
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
7,093.09
0.00
0.00
7,093.09
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
67,570.37
56.82
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.50
4.14
11.37
mtr
mtr
mtr
50.87
13.57
37.30
ft
ft
ft
-0.03
5.33
5.35
-0.05
mtr
mtr
mtr
deg.
-0.08
17.48
17.56
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.80
17.92
17.12
-0.12
ft
ft
ft
deg.
-0.25
5.46
5.22
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 10
Time elapsed since pre-ballast
Time elapsed since mean tide
7.80
7.48
0.31
0.04
1.27
1.27
ft
ft
ft
hrs
hrs
hrs
2.38
2.28
0.10
mtr
mtr
mtr above jetty
17.16 ft
stern
port side
17.12 ft
17.08 ft
17.48 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
11
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
3
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
909.13
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
720.41
0.00
0.00
720.41
5.0%
5.0%
5.0%
5.0%
80.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
60.0%
5.0%
5.0%
60.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.29
0.00
0.00
102.29
VCG
mtr
0.00
0.25
0.00
0.00
1.94
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.84
0.00
0.00
2.84
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
410.00
16,356.53
-1.35
0.00
114.58
58.38
13.50
3.69
Ballast step:
11
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
6,547.47
0.00
0.00
6,547.47
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.03
0.00
0.00
60.03
time
involved
hrs
66,479.12
176.89
0.04
0.04
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.47
4.06
11.40
mtr
mtr
mtr
50.74
13.33
37.41
ft
ft
ft
0.00
5.34
5.34
0.00
mtr
mtr
mtr
deg.
-0.01
17.52
17.53
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.95
18.00
17.05
-0.14
ft
ft
ft
deg.
-0.29
5.49
5.20
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 11
Time elapsed since pre-ballast
Time elapsed since mean tide
7.87
7.48
0.39
0.04
1.31
1.31
ft
ft
ft
hrs
hrs
hrs
2.40
2.28
0.12
mtr
mtr
mtr above jetty
17.05 ft
stern
port side
17.05 ft
17.05 ft
17.52 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
12
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
3
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
852.31
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
660.38
0.00
0.00
660.38
5.0%
5.0%
5.0%
5.0%
75.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
55.0%
5.0%
5.0%
55.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
102.01
0.00
0.00
102.01
VCG
mtr
0.00
0.25
0.00
0.00
1.82
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.64
0.00
0.00
2.64
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
493.17
16,262.81
-0.05
0.01
114.57
58.46
13.50
3.73
Ballast step:
12
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
6,001.85
0.00
0.00
6,001.85
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.03
0.00
0.00
60.03
time
involved
hrs
65,387.88
176.89
0.04
0.04
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.43
4.02
11.41
mtr
mtr
mtr
50.61
13.19
37.42
ft
ft
ft
0.01
5.35
5.33
0.03
mtr
mtr
mtr
deg.
0.05
17.55
17.50
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.89
17.97
17.08
-0.13
ft
ft
ft
deg.
-0.27
5.48
5.21
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 12
Time elapsed since pre-ballast
Time elapsed since mean tide
7.84
7.48
0.36
0.04
1.35
1.35
ft
ft
ft
hrs
hrs
hrs
2.39
2.28
0.11
mtr
mtr
mtr above jetty
17.06 ft
stern
port side
17.08 ft
17.10 ft
17.55 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
13
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
2
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
852.31
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
540.31
0.00
0.00
540.31
5.0%
5.0%
5.0%
5.0%
75.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
45.0%
5.0%
5.0%
45.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
101.13
0.00
0.00
101.13
VCG
mtr
0.00
0.25
0.00
0.00
1.82
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.22
0.00
0.00
2.22
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
683.08
16,212.59
0.30
0.02
115.11
58.44
13.50
3.84
Ballast step:
13
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,910.60
0.00
0.00
4,910.60
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.07
0.00
0.00
120.07
time
involved
hrs
63,205.39
240.14
0.08
0.08
0.08
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.32
3.90
11.43
mtr
mtr
mtr
50.27
12.79
37.48
ft
ft
ft
0.05
5.37
5.32
0.10
mtr
mtr
mtr
deg.
0.17
17.61
17.44
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.90
17.97
17.07
-0.13
ft
ft
ft
deg.
-0.28
5.48
5.20
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 13
Time elapsed since pre-ballast
Time elapsed since mean tide
7.84
7.48
0.36
0.08
1.43
1.43
ft
ft
ft
hrs
hrs
hrs
2.39
2.28
0.11
mtr
mtr
mtr above jetty
16.99 ft
stern
port side
17.07 ft
17.16 ft
17.61 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
14
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
795.49
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
540.31
0.00
0.00
540.31
5.0%
5.0%
5.0%
5.0%
70.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
45.0%
5.0%
5.0%
45.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
101.13
0.00
0.00
101.13
VCG
mtr
0.00
0.25
0.00
0.00
1.70
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.22
0.00
0.00
2.22
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
687.93
16,160.61
0.64
0.01
114.15
58.56
13.50
3.84
Ballast step:
14
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,910.60
0.00
0.00
4,910.60
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
63,205.39
56.82
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.32
3.91
11.41
mtr
mtr
mtr
50.26
12.83
37.43
ft
ft
ft
0.02
5.35
5.33
0.04
mtr
mtr
mtr
deg.
0.06
17.55
17.49
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.82
17.93
17.11
-0.12
ft
ft
ft
deg.
-0.25
5.46
5.22
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 14
Time elapsed since pre-ballast
Time elapsed since mean tide
7.80
7.48
0.32
0.04
1.47
1.47
ft
ft
ft
hrs
hrs
hrs
2.38
2.28
0.10
mtr
mtr
mtr above jetty
17.08 ft
stern
port side
17.11 ft
17.14 ft
17.55 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
15
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
0
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
795.49
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
540.31
0.00
0.00
540.31
5.0%
5.0%
5.0%
5.0%
70.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
45.0%
5.0%
5.0%
45.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
101.13
0.00
0.00
101.13
VCG
mtr
0.00
0.25
0.00
0.00
1.70
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.22
0.00
0.00
2.22
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
697.61
16,170.29
0.96
0.02
113.21
58.55
13.50
3.85
Ballast step:
15
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,910.60
0.00
0.00
4,910.60
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
63,205.39
0.00
0.00
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.31
3.91
11.41
mtr
mtr
mtr
50.24
12.82
37.42
ft
ft
ft
0.06
5.37
5.31
0.11
mtr
mtr
mtr
deg.
0.19
17.62
17.43
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.82
17.93
17.11
-0.12
ft
ft
ft
deg.
-0.25
5.47
5.22
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 15
Time elapsed since pre-ballast
Time elapsed since mean tide
7.81
7.48
0.32
0.00
1.47
1.47
ft
ft
ft
hrs
hrs
hrs
2.38
2.28
0.10
mtr
mtr
mtr above jetty
17.02 ft
stern
port side
17.11 ft
17.20 ft
17.62 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
16
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
738.67
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
540.31
0.00
0.00
540.31
5.0%
5.0%
5.0%
5.0%
65.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
45.0%
5.0%
5.0%
45.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
101.13
0.00
0.00
101.13
VCG
mtr
0.00
0.25
0.00
0.00
1.58
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.22
0.00
0.00
2.22
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
712.14
16,128.00
1.27
0.01
112.30
58.71
13.50
3.86
Ballast step:
16
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,910.60
0.00
0.00
4,910.60
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
63,205.39
56.82
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.30
3.92
11.38
mtr
mtr
mtr
50.21
12.86
37.35
ft
ft
ft
0.02
5.35
5.33
0.05
mtr
mtr
mtr
deg.
0.08
17.56
17.48
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.71
17.88
17.16
-0.10
ft
ft
ft
deg.
-0.22
5.45
5.23
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 16
Time elapsed since pre-ballast
Time elapsed since mean tide
7.76
7.50
0.26
0.04
1.50
1.50
ft
ft
ft
hrs
hrs
hrs
2.36
2.29
0.08
mtr
mtr
mtr above jetty
17.12 ft
stern
port side
17.16 ft
17.20 ft
17.56 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
17
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
2
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
738.67
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
480.27
0.00
0.00
480.27
5.0%
5.0%
5.0%
5.0%
65.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
40.0%
5.0%
5.0%
40.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
100.41
0.00
0.00
100.41
VCG
mtr
0.00
0.25
0.00
0.00
1.58
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.00
0.00
0.00
2.00
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
731.50
16,027.29
1.35
0.01
109.28
58.27
13.50
3.87
Ballast step:
17
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,364.98
0.00
0.00
4,364.98
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.03
0.00
0.00
60.03
time
involved
hrs
62,114.14
120.07
0.04
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.29
3.88
11.42
mtr
mtr
mtr
50.17
12.71
37.46
ft
ft
ft
0.04
5.36
5.32
0.07
mtr
mtr
mtr
deg.
0.12
17.59
17.46
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-1.00
18.03
17.03
-0.15
ft
ft
ft
deg.
-0.31
5.49
5.19
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 17
Time elapsed since pre-ballast
Time elapsed since mean tide
7.89
7.50
0.39
0.04
1.54
1.54
ft
ft
ft
hrs
hrs
hrs
2.41
2.29
0.12
mtr
mtr
mtr above jetty
16.96 ft
stern
port side
17.03 ft
17.09 ft
17.59 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
18
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
0
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
738.67
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
480.27
0.00
0.00
480.27
5.0%
5.0%
5.0%
5.0%
65.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
40.0%
5.0%
5.0%
40.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
100.41
0.00
0.00
100.41
VCG
mtr
0.00
0.25
0.00
0.00
1.58
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.00
0.00
0.00
2.00
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
762.54
16,058.33
1.40
0.02
106.50
58.24
13.50
3.89
Ballast step:
18
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,364.98
0.00
0.00
4,364.98
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
62,114.14
0.00
0.00
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.27
3.87
11.41
mtr
mtr
mtr
50.11
12.69
37.42
ft
ft
ft
0.05
5.37
5.32
0.10
mtr
mtr
mtr
deg.
0.17
17.61
17.44
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-1.03
18.04
17.01
-0.15
ft
ft
ft
deg.
-0.31
5.50
5.19
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 18
Time elapsed since pre-ballast
Time elapsed since mean tide
7.90
7.50
0.40
0.00
1.54
1.54
ft
ft
ft
hrs
hrs
hrs
2.41
2.29
0.12
mtr
mtr
mtr above jetty
16.93 ft
stern
port side
17.01 ft
17.10 ft
17.61 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
19
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
0
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
738.67
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
480.27
0.00
0.00
480.27
5.0%
5.0%
5.0%
5.0%
65.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
40.0%
5.0%
5.0%
40.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
100.41
0.00
0.00
100.41
VCG
mtr
0.00
0.25
0.00
0.00
1.58
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.00
0.00
0.00
2.00
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
803.53
16,099.32
1.42
0.02
104.03
58.24
13.50
3.91
Ballast step:
19
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,364.98
0.00
0.00
4,364.98
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
62,114.14
0.00
0.00
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.25
3.86
11.39
mtr
mtr
mtr
50.03
12.66
37.37
ft
ft
ft
0.06
5.37
5.31
0.12
mtr
mtr
mtr
deg.
0.21
17.63
17.42
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-1.03
18.04
17.01
-0.15
ft
ft
ft
deg.
-0.31
5.50
5.19
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 19
Time elapsed since pre-ballast
Time elapsed since mean tide
7.90
7.50
0.40
0.00
1.54
1.54
ft
ft
ft
hrs
hrs
hrs
2.41
2.29
0.12
mtr
mtr
mtr above jetty
16.91 ft
stern
port side
17.01 ft
17.12 ft
17.63 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
20
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
681.85
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
480.27
0.00
0.00
480.27
5.0%
5.0%
5.0%
5.0%
60.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
40.0%
5.0%
5.0%
40.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
100.41
0.00
0.00
100.41
VCG
mtr
0.00
0.25
0.00
0.00
1.46
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.00
0.00
0.00
2.00
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
854.46
16,093.44
1.43
0.00
101.90
58.42
13.50
3.94
Ballast step:
20
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,364.98
0.00
0.00
4,364.98
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
62,114.14
56.82
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.22
3.86
11.36
mtr
mtr
mtr
49.92
12.66
37.26
ft
ft
ft
0.01
5.34
5.34
0.01
mtr
mtr
mtr
deg.
0.02
17.53
17.51
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.91
17.98
17.07
-0.13
ft
ft
ft
deg.
-0.28
5.48
5.20
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 20
Time elapsed since pre-ballast
Time elapsed since mean tide
7.85
7.50
0.35
0.04
1.58
1.58
ft
ft
ft
hrs
hrs
hrs
2.39
2.29
0.11
mtr
mtr
mtr above jetty
17.06 ft
stern
port side
17.07 ft
17.08 ft
17.53 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
21
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
0
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
681.85
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
480.27
0.00
0.00
480.27
5.0%
5.0%
5.0%
5.0%
60.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
40.0%
5.0%
5.0%
40.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
100.41
0.00
0.00
100.41
VCG
mtr
0.00
0.25
0.00
0.00
1.46
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
2.00
0.00
0.00
2.00
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
915.36
16,154.33
1.43
0.01
100.13
58.48
13.50
3.98
Ballast step:
21
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,364.98
0.00
0.00
4,364.98
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
62,114.14
0.00
0.00
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.18
3.85
11.33
mtr
mtr
mtr
49.80
12.61
37.19
ft
ft
ft
0.02
5.35
5.33
0.04
mtr
mtr
mtr
deg.
0.06
17.55
17.49
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.87
17.96
17.09
-0.13
ft
ft
ft
deg.
-0.26
5.47
5.21
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 21
Time elapsed since pre-ballast
Time elapsed since mean tide
7.83
7.50
0.33
0.00
1.58
1.58
ft
ft
ft
hrs
hrs
hrs
2.39
2.29
0.10
mtr
mtr
mtr above jetty
17.06 ft
stern
port side
17.09 ft
17.12 ft
17.55 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
22
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
2
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
681.85
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
420.24
0.00
0.00
420.24
5.0%
5.0%
5.0%
5.0%
60.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
35.0%
5.0%
5.0%
35.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
99.28
0.00
0.00
99.28
VCG
mtr
0.00
0.25
0.00
0.00
1.46
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
1.77
0.00
0.00
1.77
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
979.77
16,098.67
1.41
0.01
98.57
58.18
13.50
4.02
Ballast step:
22
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
3,819.36
0.00
0.00
3,819.36
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.03
0.00
0.00
60.03
time
involved
hrs
61,022.90
120.07
0.04
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.14
3.79
11.35
mtr
mtr
mtr
49.67
12.44
37.23
ft
ft
ft
0.03
5.36
5.33
0.06
mtr
mtr
mtr
deg.
0.11
17.58
17.47
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-1.07
18.06
16.99
-0.16
ft
ft
ft
deg.
-0.33
5.51
5.18
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 22
Time elapsed since pre-ballast
Time elapsed since mean tide
7.92
7.50
0.42
0.04
1.62
1.62
ft
ft
ft
hrs
hrs
hrs
2.41
2.29
0.13
mtr
mtr
mtr above jetty
16.94 ft
stern
port side
16.99 ft
17.05 ft
17.58 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
23
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
625.03
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
420.24
0.00
0.00
420.24
5.0%
5.0%
5.0%
5.0%
55.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
35.0%
5.0%
5.0%
35.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
99.28
0.00
0.00
99.28
VCG
mtr
0.00
0.25
0.00
0.00
1.33
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
1.77
0.00
0.00
1.77
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
1044.19
16,106.27
1.55
0.00
98.98
58.52
13.50
4.06
Ballast step:
23
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
3,819.36
0.00
0.00
3,819.36
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
56.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
61,022.90
56.82
0.04
0.04
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.10
3.79
11.31
mtr
mtr
mtr
49.53
12.43
37.10
ft
ft
ft
0.00
5.34
5.34
0.00
mtr
mtr
mtr
deg.
0.00
17.52
17.52
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.84
17.94
17.10
-0.12
ft
ft
ft
deg.
-0.26
5.47
5.21
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 23
Time elapsed since pre-ballast
Time elapsed since mean tide
7.82
7.50
0.32
0.04
1.66
1.66
ft
ft
ft
hrs
hrs
hrs
2.38
2.29
0.10
mtr
mtr
mtr above jetty
17.10 ft
stern
port side
17.10 ft
17.10 ft
17.52 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
C-jacket on barge
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
0
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
625.03
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
420.24
0.00
0.00
420.24
5.0%
5.0%
5.0%
5.0%
55.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
35.0%
5.0%
5.0%
35.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
99.28
0.00
0.00
99.28
VCG
mtr
0.00
0.25
0.00
0.00
1.33
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
1.77
0.00
0.00
1.77
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
252.96
259.98
326.04
336.00
11.00
-3.50
11.00
-10.50
111.53
112.93
74.95
77.05
13.50
13.50
13.50
13.50
16,237.06
0.02
58.32
4.14
Ballast step:
24
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
3,819.36
0.00
0.00
3,819.36
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
61,022.90
0.00
0.00
C-jacket on barge
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.50
196.09
207.01
2,884.08
62.86
ft
ft
ft
ft*tons
ft
5.33
59.77
63.10
784.88
19.16
mtr
mtr
mtr
mT*mtr
mtr
15.02
3.76
11.26
mtr
mtr
mtr
49.28
12.33
36.95
ft
ft
ft
0.05
5.37
5.32
0.10
mtr
mtr
mtr
deg.
0.17
17.61
17.44
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.98
18.02
17.04
-0.14
ft
ft
ft
deg.
-0.30
5.49
5.19
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 24
Time elapsed since pre-ballast
Time elapsed since mean tide
7.88
7.50
0.38
0.00
1.66
1.66
ft
ft
ft
hrs
hrs
hrs
2.40
2.29
0.12
mtr
mtr
mtr above jetty
16.95 ft
stern
port side
17.04 ft
17.12 ft
17.61 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
170.46
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
420.24
0.00
0.00
420.24
5.0%
5.0%
5.0%
5.0%
15.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
35.0%
5.0%
5.0%
35.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
99.28
0.00
0.00
99.28
VCG
mtr
0.00
0.25
0.00
0.00
0.36
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
1.77
0.00
0.00
1.77
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
252.96
259.98
326.04
336.00
13.72
-0.76
13.72
-7.77
98.14
99.54
61.56
63.66
13.50
13.50
13.50
13.50
15,782.49
0.00
58.52
4.21
Ballast step:
25
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
3,819.36
0.00
0.00
3,819.36
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
454.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
61,022.90
454.57
0.30
0.30
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.00
195.73
206.29
2,831.62
64.07
ft
ft
ft
ft*tons
ft
5.18
59.66
62.88
770.61
19.53
mtr
mtr
mtr
mT*mtr
mtr
15.32
3.87
11.45
mtr
mtr
mtr
50.26
12.69
37.57
ft
ft
ft
0.01
5.19
5.18
0.02
mtr
mtr
mtr
deg.
0.03
17.03
17.01
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-0.76
17.40
16.64
-0.11
ft
ft
ft
deg.
-0.23
5.30
5.07
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 25
Time elapsed since pre-ballast
Time elapsed since mean tide
8.28
7.48
0.80
0.30
1.96
1.96
ft
ft
ft
hrs
hrs
hrs
2.52
2.28
0.24
mtr
mtr
mtr above jetty
16.62 ft
stern
port side
16.64 ft
16.65 ft
17.03 ft
Ballast calculations
PROJECT
Ballast step:
Barge details:
Name
Length (L)
Width (W)
Height (H)
Max. draft
ENG. No.
23e081
Rev.
LBS/ft^3
LBS/ft^3
BOA 7-8-9
393
ft
100
ft
24
ft
19
ft
6
1
11
0
inch
inch
inch
inch
119.94
30.51
7.59
5.79
mtr
mtr
mtr
mtr
62.37
63.93
3,303,965 LBS/hr
1
Nos. tanks in use
BALLAST INFO
No.
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Capacity
m^3
0.0
168.4
0.0
0.0
1108.7
0.0
0.0
1108.7
1678.2
0.0
0.0
1678.2
1692.0
0.0
0.0
1692.0
1693.8
0.0
0.0
1693.8
1692.0
0.0
0.0
1692.0
1685.2
0.0
0.0
1685.2
1171.4
0.0
0.0
1171.4
%-filled
Weight
mT
0.00
8.63
0.00
0.00
284.10
0.00
0.00
1022.78
1634.15
0.00
0.00
1634.15
867.15
0.00
0.00
867.15
86.81
0.00
0.00
86.81
86.72
0.00
0.00
86.72
1640.96
0.00
0.00
1640.96
420.24
0.00
0.00
420.24
5.0%
5.0%
5.0%
5.0%
25.0%
5.0%
5.0%
90.0%
95.0%
5.0%
5.0%
95.0%
50.0%
5.0%
5.0%
50.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
95.0%
5.0%
5.0%
95.0%
35.0%
5.0%
5.0%
35.0%
TCG
mtr
0.00
0.00
0.00
0.00
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
7.62
0.00
0.00
-7.62
LCG
mtr
0.00
4.78
0.00
0.00
16.82
0.00
0.00
16.82
29.99
0.00
0.00
29.99
44.96
0.00
0.00
44.96
59.95
0.00
0.00
59.95
74.95
0.00
0.00
74.95
89.92
0.00
0.00
89.92
99.28
0.00
0.00
99.28
VCG
mtr
0.00
0.25
0.00
0.00
0.61
0.00
0.00
2.18
3.49
0.00
0.00
3.49
1.85
0.00
0.00
1.85
0.19
0.00
0.00
0.19
0.19
0.00
0.00
0.19
3.50
0.00
0.00
3.50
1.77
0.00
0.00
1.77
Light ship
3502.00
0.00
56.64
4.88
Ramps
Ramps
Ramps
P1 (4 Nos. at 48.3 sT)
P2 (4 Nos. at 39.5 sT)
P3 (4 Nos. at 23.5 sT)
7.00
10.20
10.20
175.60
143.60
85.00
11.00
-3.50
-10.50
7.30
2.40
-1.80
119.00
119.00
119.00
87.90
77.20
62.00
7.59
7.59
7.59
8.19
8.19
8.29
211.00
218.00
284.00
294.00
13.72
-0.76
13.72
-7.77
98.14
99.54
61.56
63.66
13.50
13.50
13.50
13.50
15,728.16
0.01
57.98
4.09
Ballast step:
26
Grand Total / System COG
Free Surface
Correction
mT*mtr
0.00
303.69
0.00
0.00
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
4,423.37
0.00
0.00
4,423.37
3,819.36
0.00
0.00
3,819.36
Pumped
Quantity
mT
0.00
0.00
0.00
0.00
113.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
time
involved
hrs
61,022.90
113.64
0.08
0.08
HYDROSTATICS
Average draft
Long. Cntr. Boyancy
Long. Cntr Flotation
Moment to change trim
Metacentric Height
Ad =
LCB =
LCF =
MT1 =
KM =
17.00
195.73
206.29
2,831.62
64.07
ft
ft
ft
ft*tons
ft
5.18
59.66
62.88
770.61
19.53
mtr
mtr
mtr
mT*mtr
mtr
15.44
3.88
11.56
mtr
mtr
mtr
50.66
12.73
37.93
ft
ft
ft
0.02
5.20
5.18
0.04
mtr
mtr
mtr
deg.
0.07
17.06
16.99
ft
ft
ft
Trim = Weight*(LCG-LCB)/MT1
Draft bow (Db) = Ad-(Trim*(LCF/L))
Draft stern(Ds)=Ad+(Trim((L-LCF)/L))
Trim angle (Ta) =
-1.12
17.59
16.47
-0.16
ft
ft
ft
deg.
-0.34
5.36
5.02
mtr
mtr
mtr
Heel = sin(Ha) * W
Draft Port side =Ad + Heel/2
Draft Starboard side=Ad - Heel/2
Heel angle (Ha) = atan(TCG/G'M)
Freeboard at jetty
Jetty - water distance
Barge - Jetty distance
Time involved ballast step 26
Time elapsed since pre-ballast
Time elapsed since mean tide
8.45
7.43
1.02
0.08
2.04
2.04
ft
ft
ft
hrs
hrs
hrs
2.58
2.27
0.31
mtr
mtr
mtr above jetty
16.43 ft
stern
port side
16.47 ft
16.50 ft
17.06 ft