Professional Documents
Culture Documents
Inish Chedule: License Number
Inish Chedule: License Number
Inish Chedule: License Number
Contractors Name
License Number
Address
Phone Number
For the Project:
Project Name
Address
EXTERIOR FINISHES
Finish
Manufacturer
Additional Info
Model Number
Color/Finish
Brick
Mortar
Keystone(s)
Pre-cast Sills
Stucco
Stucco Trim
Siding Paint
Siding Accent
Siding Trim
Shingles
Windows
Front Door
Exterior Doors
PLUMBING FIXTURES
Fixture
Master Bath
Sink(s)
Manufacturer
Finish Schedule
Project Name
Sink Faucet(s)
Shower
Shower Faucet
Whirlpool Tub
Tub Faucet
Toilet
Bidet
Powder Room
Sink(s)
Sink Faucet(s)
Bathtub
Tub Faucet
Toilet
Bath Two
Sink(s)
Sink Faucet(s)
Bathtub
Tub Faucet
Shower
Shower Faucet
Toilet
Bath Three
Sink(s)
Sink Faucet(s)
Bathtub
Tub Faucet
Shower
Shower Faucet
Toilet
Finish Schedule
Project Name
Bath Four
Sink(s)
Sink Faucet(s)
Bathtub
Tub Faucet
Shower
Shower Faucet
Toilet
Bath Five
Sink(s)
Sink Faucet(s)
Bathtub
Tub Faucet
Shower
Shower Faucet
Toilet
Bath Six
Sink(s)
Sink Faucet(s)
Bathtub
Tub Faucet
Shower
Shower Faucet
Toilet
Kitchen
2 or 3 Bowl Sink
Sink Faucet
Single Bowl Sink
Single Bowl Faucet
Filter System
Finish Schedule
Project Name
Laundry Room
Sink
Sink Faucet
Bar Area
Bar Sink
Bar Sink Faucet
ACCEPTANCE
Please note these selections must be turned in to (contractors name) by the agreed upon
date, as stated in the Contract Documents. Many of these items need to be ordered shortly
after the contract is signed, therefore any delay may result in a delay in the completion of the
project. Any changes to the list might result in additional costs plus cost of materials.
Owners Signature
Date
Contractors Name
License Number
Address
Phone Number
For the Project:
Project Name
Address
Carpet
FL-2
Carpet
FL-3
Hardwood Floors
FL-4
Ceramic Tile
FL-5
Ceramic Tile
FL-6
Stone
FL-7
Mexican Tile
FL-8
Plywood Subfloor
FL-9
Finished Concrete
Manufacturer
WF-2
WF-3
WF-4
WF-5
WF-6
Manufacturer
WF-7
Wallpaper
WF-8
Wallpaper
WF-9
Recessed
Incandescent
LF-2
Pendant Fixture
LF-3
Pendant Fixture
LF-4
Pendant Fixture
LF-5
Pendant Fixture
LF-6
Fluorescent Fixture
LF-7
Fluorescent Fixture
LF-8
Broadway Light
LF-9
Broadway Light
LF-10
Broadway Light
LF-11
Ceiling Fan
LF-12
Ceiling Fan
LF-13
Ceiling Fan
LF-14
Ceiling Mounted
LF-15
Ceiling Mounted
LF-16
Ceiling Mounted
LF-17
LF-18
LF-19
Track Lighting
Manufacturer
LF-20
LF-21
LF-22
LF-23
LF-24
LF-25
Exterior Fixtures
EF-1
Carriage Lantern
EF-2
Carriage Lantern
EF-3
Flood Light
EF-4
Ceiling Fan
MISCELLANEOUS FINISHES
Wall Finish
MF-1
Stone on Fireplace
MF-2
Stone on Fireplace
MF-3
Countertop Finish
MF-4
Countertop Finish
MF-5
Countertop Finish
MF-6
Cabinet Finish
MF-7
Cabinet Finish
MF-8
Cabinet Finish
CM-1
Crown Moulding
CM-2
Crown Moulding
CM-3
Crown Moulding
CR-1
Chair Rail
CR-2
Chair Rail
BS-1
Base Moulding
Manufacturer
Manufacturer
DOOR HARDWARE
Door Hardware
DH-1
DH-2
French Doors
DH-3
DH-4
Storage Door
DH-5
Interior Passage
DH-6
Interior Privacy
DH-7
Dummy Knobs
DH-8
APPLIANCES
Appliance
Manufacturer
AP-1
Range
AP-2
Oven
AP-3
Cooktop
AP-4
Vent Hood
AP-5
Microwave
AP-6
Dishwasher
AP-7
Disposal
AP-8
Refrigerator
AP-9
Washer
AP-10
Dryer
AP-11
Ice Maker
AP-12
Trash Compactor
AP-13
Outdoor Range
AP-14
Convection Oven
AP-15
Double Oven
Wall Finish
Floor
Finish
Light Fixture(s)
Additional Info
ex: Foyer
WF-1
FL-4
LF-1
CM, CR - P-5
Foyer
Dining Room
Living Room
Great Room
Initialed by: Owner ____ Contractor ____
Kitchen
Breakfast Room
Study/Office
Powder Room
Laundry Room
Master Bedroom
Master Bath
Bedroom Two
Bedroom Three
Bedroom Four
Bedroom Five
Bath Two
Bath Three
Bath Four
Bath Five
Garage
Bonus
ACCEPTANCE
Please note these selections must be turned in to (contractors name) by the agreed upon
date, as stated in the Contract Documents. Many of these items need to be ordered shortly
after the contract is signed, therefore any delay may result in a delay in the completion of the
project. Any changes to the list might result in additional costs plus cost of materials.
Owners Signature
Date