Government of Uganda: New Bridge Across River Nile at Jinja
Government of Uganda: New Bridge Across River Nile at Jinja
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
STRUCTURE PLAN & ELEVATION
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV ESTABLISHED
APPROVED
DATE
ABUTMENT A2
STRUCTURE - TOP PLAN
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV ESTABLISHED
APPROVED
DATE
ABUTMENT A2
APPROACH SLAB
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV ESTABLISHED
APPROVED
DATE
ABUTMENT A2
CABLE ANCHORAGE
STRUCTURAL DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID A2 & Y75
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV ESTABLISHED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y76 & Y77
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV ESTABLISHED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y78 & Y79
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV ESTABLISHED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y80 & Y81
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y82 & A20
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV ESTABLISHED
APPROVED
DATE
ABUTMENT A2
STRUCTURAL STAIR DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
APPROACH SLAB
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
STRUCTURE PLAN & ELEVATION
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
CABLE ANCHORAGE
STRUCTURAL DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
STRUCTURAL STAIR DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
STRUCTURAL STAIR DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
STRUCTURE - TOP PLAN
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID A2 & Y75
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y76 & Y77
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y78 & Y79
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y80 & Y81
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y82 & A20
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ABUTMENT A1
STRUCTURAL OUTLINE
SHEET - 1
UVCO/1407/JNJ/PY/
ABUTMENT A1
STRUCTURAL OUTLINE
SHEET - 2
UVCO/1407/JNJ/PY/
ABUTMENT A1
APPROACH SLAB
UVCO/1407/JNJ/PY/
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A1
STRUCTURAL OUTLINE
SHEET - 1
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A1
STRUCTURAL OUTLINE
SHEET - 2
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A1
BEARING DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A1
BEARING REINFORCEMENT
DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A1
APPROACH SLAB
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ABUTMENT A2
PRESTRESSING DETAILS @ GRID A2
UOUG-15401-W-A2-PT-0001
ABUTMENT A2
PRESTRESSING DETAILS @ GRID Y75
UOUG-15401-W-A2-PT-0002
ABUTMENT A2
PRESTRESSING DETAILS @ GRID Y76
UOUG-15401-W-A2-PT-0003
ABUTMENT A2
PRESTRESSING DETAILS @ GRID Y77
UOUG-15401-W-A2-PT-0004
ABUTMENT A2
PRESTRESSING DETAILS @ GRID Y78
UOUG-15401-W-A2-PT-0005
ABUTMENT A2
PRESTRESSING DETAILS @ GRID Y79
UOUG-15401-W-A2-PT-0006
ABUTMENT A2
PRESTRESSING DETAILS @ GRID Y80
UOUG-15401-W-A2-PT-0007
ABUTMENT A2
PRESTRESSING DETAILS @ GRID Y81
UOUG-15401-W-A2-PT-0008
ABUTMENT A2
PRESTRESSING DETAILS @ GRID Y82
UOUG-15401-W-A2-PT-0009
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0 RONALD
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT A2
STRUCTURE PLAN & ELEVATION
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0 RONALD
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT A2
STRUCTURE - TOP PLAN
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0 RONALD
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID A2 & Y75
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y76 & Y77
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y78 & Y79
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y80 & Y81
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
SECTIONS @ GRID Y82 & A20
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
STRUCTURAL STAIR DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
APPROACH SLAB
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
0
RONALD
REV
ESTABLISHED
CHECKED
APPROVED
DATE
ABUTMENT A2
CABLE ANCHORAGE
STRUCTURAL DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
1:150
KEYPLAN
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT A2
MIDDLE SLAB REINFORCEMENT
PLAN SHEET 1
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
1:150
KEYPLAN
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT A2
MIDDLE SLAB REINFORCEMENT
PLAN SHEET 2
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT A2
STAIR REINFORCEMENT DETAILS
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
1:150
KEYPLAN
ABUTMENT - A2
TOP SLAB REINFORCEMENT PLAN
(TOP BARS)
UVCO/1407/JNJ/PY/
1:150
ABUTMENT - A2
BOTTOM SLAB REINFORCEMENT PLAN
(BOTTOM BARS)
UVCO/1407/JNJ/PY/
KEYPLAN
SECTION A
SCALE
1:20
SECTION B
SCALE
1:20
SCALE
1:150
1:150
1:150
ABUTMENT - A2
TOP SLAB REBAR ARRANGEMENT & DETAILS
UVCO/1407/JNJ/PY/
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT - A2 WALLS
REBAR SCHEDULE
SHEET 1
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT - A2 WALLS
REBAR SCHEDULE
SHEET 2
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT - A2 WALLS
REBAR SCHEDULE
SHEET 3
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT - A2 WALLS
REBAR SCHEDULE
SHEET 4
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT - A2 WALLS
REBAR SCHEDULE
SHEET 5
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT - A2 WALLS
REBAR SCHEDULE
SHEET 6
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
ENGINEERING CONSULTANT:
EMPLOYER:
ENGINEERING CONTRACTOR:
DRAWING TITLE:
company
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVER
NILE AT JINJA
A
VANE
REV
ESTABLISHED
APPROVED
DATE
ABUTMENT - A2 WALLS
REBAR SCHEDULE
SHEET 7
WORKING DRAWING
DESCRIPTION
STAT.
SCALE :
FILE NAME:
phase
zone
document
number
Method statement
Erection of material and passenger hoist
Model: SCQ120TD (GJJ)
Date
14 August 2015
Prepared by
GJJ / LCH
Checked by
LKM
Approved by
HINATA
Method statement
Erection of material and passenger hoist
Content
Revision: 0
Issued: 14 August 15
Page: 1
Page
1.0
Executive summary
2.0
3.0
4.0
17
5.0
Manpower
19
6.0
20
7.0
22
8.0
27
9.0
29
Appendices
Appendix A
Appendix B
Appendix C
General drawings
Erection procedure
Risk assessment
Method statement
Erection of material and passenger hoist
1.0
Revision: 0
Issued: 14 August 15
Page: 2
Executive summary
This document is intended to explain the detailed procedures for
the erection of material and passenger hoist (Model no.
SCQ120TD) for this project as shown in Figure 1 below.
Model
1#
Model
2#
Method statement
Erection of material and passenger hoist
Revision: 0
Issued: 14 August 15
Page: 3
Method statement
Erection of material and passenger hoist
2.0
Revision: 0
Issued: 14 August 15
Page: 4
Description
Law under production
safety Peoples
Republic of China
Construction of lifting
machinery
Material and passenger
hoist
Design code for concrete
structure
Design code for steel
structure
Project management
safety planning for
critical project
Special equipment
safety inspection
standards
Guide for production
and operation work
safety plans
The use of lifting wire
rope
Technical specifications
for the construction
machinery
Technical specifications
for the construction of
elevator Installation,
use and disassembly
Reference
2002
Category
National
Ministry of
construction
section 166
GB26557-2011
National
National
GB50010-2010
National
GB50017-2003
National
Ministry of
construction
section 87 (2009)
State council
section 373
National
AQ/T9002-2006
National
GB8918-2006
National
JGJ33-2001
Industry
JGJ215-2010
Industry
National
Method statement
Erection of material and passenger hoist
12
13
14
15
16
Technical specifications
for safety of highaltitude operation in
building construction
Construction safety
inspection standards
Technical specifications
for on-site inspection of
construction machinery
and equipment
Technical specifications
for the assessment of
the construction
equipment on
construction site
Technical specifications
for temporary electrical
works on construction
site
Revision: 0
Issued: 14 August 15
Page: 5
JGJ80-1991
Industry
JGJ592011
Industry
JGJ160-2008
Industry
JGJ189-2009
Industry
JGJ46-2005
Industry
Method statement
Erection of material and passenger hoist
3.0
Revision: 0
Issued: 14 August 15
Page: 6
Unit
SCQ120GD
m/min
1#
1200
63
(43 sections)
18o
0-36
2#
1200
32
(22 sections)
18o
0-36
meter
2.4*1.3*2.5
2.4*1.3*2.5
kg
kg
-
1000
250
SAJ30-1.2
650*650*150
8
211 Nord
30 (Siemens)
1000
250
SAJ30-1.2
650*650*150
8
211 Nord
30 (Siemens)
kg
meter
o
mm
kw
kw
Method statement
Erection of material and passenger hoist
Mast section weight
Hoist car weight
Kg
kg
Table 1
125
1800
Revision: 0
Issued: 14 August 15
Page: 7
125
1800
Hoist car
Hoist car (Figure 2) is mechanically operated with the aids of a
drive unit. The safe carrying capacity of the hoist car is 1200 kg.
Method statement
Erection of material and passenger hoist
Revision: 0
Issued: 14 August 15
Page: 8
Mast tie
Mast tie (Figure 3) is used to secure the mast tower to the
completed section of the bridge pylon. The mast tie is installed to
the bridge pylon using anchor bolts positioned and embedded to
the bridge pylon before concrete casting.
The tie-to-tie spacing should be less than 7.5 m.
Method statement
Erection of material and passenger hoist
Revision: 0
Issued: 14 August 15
Page: 9
Method statement
Erection of material and passenger hoist
Revision: 0
Issued: 14 August 15
Page: 10
Method statement
Erection of material and passenger hoist
Elevation
No.
(m)
1
5.688
Mast tie
spacing
(mm)
Type
Revision: 0
Issued: 14 August 15
Page: 11
Mast tie
adjustable
range (mm)
Mast tie
stress
Max (kN)
2175
Standard IV a
1930-2400
11.461
2293
Standard IV a
1930-2400
36.97
17.114
2334
Standard IV a
1930-2400
36.97
22.672
2361
Standard IV a
1930-2400
36.97
28.506
2439
Standard IV d
2340-3200
49.29
34.346
2830
Standard IV d
2340-3200
49.29
40.775
3055
Standard IV d
2340-3200
49.29
46.495
2690
Standard IV d
2340-3200
49.29
52.750
2027
Standard IV a
1930-2400
36.97
10
58.237
1744
Standard IV c
1410-1620
30.81
Mast tie
adjustable
range (mm)
Mast tie
stress
Max (kN)
Elevation
No.
(m)
1
4.231
Mast tie
spacing
(mm)
1930-2400
36.97
2126
Standard IV a
9.949
2301
Standard IV a
1930-2400
36.97
15.632
2476
Standard IV d
2340-3200
49.29
21.282
2649
Standard IV d
2340-3200
49.29
26.993
2824
Standard IV d
2340-3200
49.29
29.844
2917
Standard IV d
2340-3200
49.29
36.97
Method statement
Erection of material and passenger hoist
Revision: 0
Issued: 14 August 15
Page: 12
Mast tower
Mast tower (Figure 7) is composed of standard section with
dimension of W650mm x D650mm X H1508mm.
Method statement
Erection of material and passenger hoist
76
Figure 9 - Washer Detail
67
Revision: 0
Issued: 14 August 15
Page: 13
Method statement
Erection of material and passenger hoist
Revision: 0
Issued: 14 August 15
Page: 14
*Refer to Figure 8
Mast section
I washer thickness II washer thickness
(section)
(mm)
(mm)
4-5
4
none
6-7
4
none
8-9
4
none
10-11
4
none
18-19
none
8
19-20
none
8
20-21
none
8
21-22
none
8
22-23
none
8
23-24
none
8
24-25
none
8
25-26
none
8
26-27
none
8
27-28
none
10
28-29
none
10
29-30
none
10
30-31
none
10
31-32
none
10
32-33
none
10
33-34
none
10
34-35
none
10
35-36
none
10
36-37
none
10
37-38
none
10
38-39
none
10
39-40
none
10
40-41
none
10
Table 4 - Washer thickness
Method statement
Erection of material and passenger hoist
Revision: 0
Issued: 14 August 15
Page: 15
Anchor bolt
Mast ties are secured to the bridge pylon using anchor bolts as
shown in the figure below. Anchor bolts are installed prior to
concrete casting of the bridge pylon.
Revision: 0
Issued: 14 August 15
Page: 16
Method statement
Erection of material and passenger hoist
Size
Length
Hole
diameter
(mm)
M24
24300
28
Anchor
depth,
min.
(mm)
210
Pulling
force
per bolt
(kN)
75.5
Shear
force per
bolt (kN)
Tensile force
per bolt (kN)
80
140
Revision: 0
Issued: 14 August 15
Page: 17
Method statement
Erection of material and passenger hoist
4.0
Description
Transport vehicle
Chain hoist
2
4
5
6
7
8
9
Chain hoist
Chain hoist
Wire rope
Lifting ring
Electrical tools
Capacity
Unit
Quantity
3 tons
unit
10 tons
unit
5 tons M24
unit
set
20 tons
5 tons
6x19-1550-18
Mechanical tools
Theodolite
unit
unit
unit
set
set
1
1
10
Plumb bob
set
12
Spirit level
no
11
13
14
15
16
17
18
Dumpy level
Angle ruler
Walkie-talkie
Zx5-400-1
YZH1-600
Welding rod
20
22
Rope
21
no
Welding machine
19
set
Hammer
J507
30
16/18 pounds
18
set
set
set
Box
unit
set
no
no
meter
80
Revision: 0
Issued: 14 August 15
Page: 18
Method statement
Erection of material and passenger hoist
23
Pin
24
GI wire
no
kg
50
Safety helmet
no
20
Safety shoes
pair
20
2436,
L = 30mm
8#
Seat belts
Safety rope
no
m
Table 6 Equipment, tools and PPE
20
200
Method statement
Erection of material and passenger hoist
5.0
Revision: 0
Issued: 14 August 15
Page: 19
Manpower
No
1
2
3
4
5
6
Position/title
Construction
manager
Technical
manager
Job responsibilities
Responsible for the safety, quality and
schedule of installation works
Responsible for all technical issues related
to the hoist structures, etc.
Responsible for the safety of the installation
Safety officer
works, dismantling works, as well as during
the operational duration of the hoist.
Responsible for all the electrical works of
Electrician
the hoist
Responsible to operate the hoist in
Passenger hoist
accordance with the manual issued by the
operator
manufacturer.
Erection
Make sure the hoist is erected in accordance
supervisors and with the manufacturers requirements and
workers
specifications.
Table 7 - Manpower requirement
Method statement
Erection of material and passenger hoist
6.0
Revision: 0
Issued: 14 August 15
Page: 20
Method statement
Erection of material and passenger hoist
Revision: 0
Issued: 14 August 15
Page: 21
Manpower
Construction personnel (staff and labors) involved in the erection,
operation and maintenance works of the material and passenger
hoist shall undergo appropriate training in order to familiarize
themselves in the new working environment and the new work
activities.
They shall also undergo site safety induction course to orient them
with the new work activities and to inform them the safety
hazards that are present in the work activities. Safety induction is
conducted to make sure that all construction personnel are aware
of the hazards and the corresponding safety measures to be
implemented, to ensure the safe working conditions at the site at
all time.
Method statement
Erection of material and passenger hoist
7.0
Revision: 0
Issued: 14 August 15
Page: 22
Check for site accessibility for the delivery of all the parts of
the hoist.
Verify delivery checklist for correct type, quantity and
member parts identification.
Check for any major defects (e.g. defective steel members,
welding joints, etc.)
Check dimensions.
Check lifting inserts (on the foundation) and all lifting points.
Check for adequate crane capacity / unloading equipment
at site.
Check for adequate lifting gears.
Check storage areas if the member parts has to be stored
for future erection.
Check for adequate power supply.
Check all workers assigned to installation works are
qualified. All workers to wear proper PPE.
Check for provision of safety barriers at surrounding area.
Unauthorized construction personnel are prohibited to
enter the site area.
Method statement
Erection of material and passenger hoist
7.1
Revision: 0
Issued: 14 August 15
Page: 23
Method statement
Erection of material and passenger hoist
xi)
xii)
xiii)
xiv)
Revision: 0
Issued: 14 August 15
Page: 24
Method statement
Erection of material and passenger hoist
7.2
Revision: 0
Issued: 14 August 15
Page: 25
v)
vi)
vii)
viii)
Height (m)
<70
70-100 100-150 150-200 >200
Vertical
accuracy error, H0.5%
35
40
45
50
(mm)
Table 8 - Mast tower allowable vertical accuracy installation
error
ix)
x)
Method statement
Erection of material and passenger hoist
xi)
7.3
Revision: 0
Issued: 14 August 15
Page: 26
Method statement
Erection of material and passenger hoist
8.0
Revision: 0
Issued: 14 August 15
Page: 27
8.2
Method statement
Erection of material and passenger hoist
8.3
Revision: 0
Issued: 14 August 15
Page: 28
iii)
iv)
v)
8.4
Risk Assessment
The risk assessment for all the erection works in this project
can be found in Appendix C.
Method statement
Erection of material and passenger hoist
9.0
Revision: 0
Issued: 14 August 15
Page: 29
Appendices
Appendix A
Appendices
Appendix B
Appendices
Appendix C
Hazard
Falling from
height
Hazard description
Officer in-charge
Construction
manager, safety
officer, supervisor
and operator
Construction
manager, safety
officer, supervisor
and operator
Safety officer and
supervisor
Construction
manager, safety
Officer and
supervisor
Construction
manager, safety
Officer and
supervisor
Hazard
Falling objects
Hazard description