Professional Documents
Culture Documents
Line Balancing & Worker Machine Process Chart
Line Balancing & Worker Machine Process Chart
Definisi
Line balancing merupakan suatu metode
penugasan sejumlah pekerjaan yang
saling berkaitan dalam satu lini produksi
sehingga setiap stasiun kerja memiliki
waktu yang tidak melebihi waktu siklus
dari stasiun kerja tersebut.
Line balancing berusaha menyeimbangkan
seluruh lintasan yang ada dalam lini
perakitan sehingga aliran produksi
berjalan lancar.
0.49
0.31
0.25
0.44
0.54
Operator 4
Operator 3
Operator 5
Operator 1
Operator 2
Line Efficiency ?
Standard Minutes
Allowed
Wait Time Based on
Operator
to Perform
Standard
Slowest Operator
Operation
Minutes
1
2
3
4
5
0.49
0.31
0.25
0.44
0.54
0.05
0.23
0.29
0.1
0
2.03
2.7
S .M .
1
5
A.M
1
0.54
0.54
0.54
0.54
0.54
X 100
0.49
0.31
0.25
0.44
0.54
0.05
0.23
0.29
0.1
0
0.54
0.54
0.54
0.54
0.54
2.03
2.7
Efficiency
75.19%
0.44
0.54
0.25
0.49
0.31
Assembly Line
(7 operations)
Operation Standard Minutes
1
1.5
2
2.25
3
1.25
4
2.5
5
3
6
2.75
7
1.75
Efficiency = 95%
1 day = 10 hours = 600 minutes
Thus R = 1000/600 = 1.67 units/minute
SM
N R AM R
Operation
Standard Minutes
1
2
3
4
5
6
7
1.5
2.25
1.25
2.5
3
2.75
1.75
minutes/unit
0.6
SM
R
E
15
1.67
0.95
26.36842105
27 operators
Output?
Operation
1
2
3
4
5
6
7
minutes/unit
1.5/0.6
2.25/0.6
Dst.
(standard
Standard Minutes minutes)/(minutes/u Operators
nit)
1.5
2.5
3
2.25
3.75
4
1.25
2.083333333
2
2.5
4.166666667
5
3
5
5
2.75
4.583333333
5
1.75
2.916666667
3
0.6
600/1000
27
Slowest One?
Operation
1
2
3
4
5
6
7
(standard
Standard Minutes minutes)/(minutes/u Operators
nit)
1.5
2.5
3
2.25
3.75
4
1.25
2.083333333
2
2.5
4.166666667
5
3
5
5
2.75
4.583333333
5
1.75
2.916666667
3
(2.5/3)*0.6
(3.75/4)*0.6
Dst.
0.5
0.5625
0.625
0.5
0.6
0.55
0.583333333
5 60
output
100 / hour 1000 / day
3
B
E
2.2 mins
A
2.7 mins
C
4.1mins
D
1.7mins
3.3
mins
2.6 mins
Question
1. What process is the bottleneck?
2. How much is the maximum
production per hour?
3. How much the efficiency?
4. How to minimize work stations?
5. How should they be grouped?
6. New efficiency?
A. 73.2%
B. 56.7%
C. 69.7%
D. 79.6%
E. 81.2%
Calculate efficiency
3.4 mins
B
E
2.2 mins
2.7 mins
C
4.1mins
D
1.7mins
3.3
mins
2.6 mins
(2.2+3.4+4.1+2.7+1.7+3.3+2.6)
4.1x7
20
28.7
69.7%
1-69.7%=30.3% Balance Delay
Number of Workstation
task times
N
cycle time (bottleneck)
20
= 4.88 work stations
4.1
4 Stations
20/24=83.3%
3.4
B
Station 1
Max prod./hour
60/6
Station 3
10 units/hour
E
2.2
2.7
4.1
Station 2
(5.8)
All under 6 minutes?
(6.0)
Station 4
1.7
3.3
2.6
5 Stations
5.6
B
E
2.2 mins
2.7 mins
C
4.1mins
Max Prod./hour
60/5.6
10.7 units/hour
1.7mins
3.3
mins
2.6 mins
5.0
40 secs
34 secs
84 secs
3
2
4
5
6
56 secs
45 secs
task times
N
cycle time
40+59+84+56+34+45 = 318
318/84 = 3.78 or 3 work stations
task times
318/6 x 84=
318/504 =
63%
100
99 secs
3 Stations ?
40 secs
118 secs
59 secs
34 secs
84 secs
318/3x118
56 secs
45 secs
318/354 = 89.8%
Efficency %
task times
101 secs
100
99 secs
40 secs
4 Stations?
84 secs
79 secs
59 secs
34 secs
84 secs
318/4 x 99 =
318/396 =
80.3%
56 secs
56 secs
45 secs
Machine 1
loading
loading
Machine 2
walking
press
loading
walking
loading
idle
press
lm
N1
l w
N = jumlah mesin
m = total machine running time
w = walking time
(l m)( K1 N1 K 2 )
N1
TECN2 (l w)( K1 N 2 K 2 )
K1 = operator rate
K2 = cost of machine
Time
(minute)
0,1
0,3
Press
Walk to next press
$ worker (K1) = $ 12 / hour
$ machine (K2) = $ 10 / hour
1,2
0,1
Jawaban
N = (l+m)/(l+w) = (0.4+1.2)/
(0.4+0.1) = 3.2
Sehingga jumlah mesin yang
mungkin adalah 3 atau 4 mesin
Jawaban
TEC3 = (l+m)(K1+n1K2)/n1
= (0.4+1.2)(12+3 x 10)/3/60
= $ 0.3733/ unit
TEC4 = (l+w)(K1+n2K2)
= (0.4+0.1)(12+4x 10)/60
= $ 0.4333 /unit