Location: Rochester
Programme/Course Leader: Simon Welsford
Lecturer (where appropriate): Simon Welsford
Technician (where appropriate): Fergus Maloney
Student or Student Group: Group- Mark Cooper, Charlie Ansell
day
week
month
x term
year
7. List control
measures in place to
reduce risks to an
acceptable standard
(Control measures should
Equipment has been tested beforehand for possible defects that could lead to
electrocution. Equipment will also be covered with rain-protectors in damp weather.
Filming will take place outside in daylight to avoid risk of assault.
Only those trained to use equipment (such as hot lighting) will be touching it. (whilst
wearing gloves)
1 of 2
January 2012
8. What University
protocols or local
procedures should be
followed or actioned?
(See website for full list or
UCA policies or procedures,
or reference local COSHH or
risk assessments)
Minor x
1
Moderate
2
Major/Fatal
3
Unlikely x
1
Likely
2
Very Likely
3
Low x
12
Medium
34
High
69
Work must not be started without the advice and approval of those named below.
LOW
Work may proceed because there are no significant risks and no special supervision is
required. Approval required from those below.
13. Signatures:
The
Risk Assessment must be communicated to all students and staff to which this assessment applies.
Programme/Course Leader:
Date:
Lecturer:
Date:
Student(s):
Date:
Date:
Date:
Estates Services Manager (where routes, building features etc are impacted):
Date:
2 of 2
January 2012