This procedure is to establish control over the activities of
Electrical Works installation and commissioning
SCOPE:
This Procedure is applicable to the activities carried out at site for
Electrical Works
installation and commissioning
ISSUE
APPROVED BY
ISSUED BY
Director Operations
MR
DISTRIBUTION
DATE
NOTES:
1. This document is a property of the company and must be
surrendered to the
Document Controllerl M.R. on transfer or cessation of employment.
2. Recipient of the document shall sign on the space provided in the
adjacent column
Marked "Distribution" and on the accompanying Document Control
Sheet.
On transfer, the new recipient of the document shall sign below.
3. The Document Control sheet for every Document shall be sent back
to the Document
Controller IM.R. after signature for the correct issue no.
BEFORE CHANGE
ELEME
CS
DOCUMENT CODE
NO.
NAME OF THE DEPT. / SITE.
G P
0
PAGE NO.
4 0
Start
Drawings /
Specs/ Layout
Evaluation &
Selection of SubContractor
GP04003
Drawings / Specs/
Layout/ Quote
Study the
Drawings
Specifications &
Layout
Selection of
Approved SubContractor
Work
Order
Preliminary
Scheme
Interaction with
Sub-Contractor &
Make
Suitable
Changes
OK
No
Specs/ Layout/
Design
Parameters
Prepare
Schematic
Drawings based
Send for
Approval to
Client
OK
Specs/ Layout/
Design
Parameters
5
Make
Suitable
Changes
5
5
TOTAL PAGES
0
ELEME
CS
DOCUMENT
CODE NO.
A
NAME OF THE DEPT. / SITE.
G P
0
PAGE NO.
A
7
Material Supply
Inspection on
Receipt of
Material
OK
Reject/
Rectify
No
Execiton
Checklist
Site
Strange &
Installation
No
OK
Rectify
Yes
Commissioning
System
Design &
Performance
Parameters
10
Check
Performance
Parameters
11
OK
No
Rectify
0
5
5
TOTAL PAGES
0
Yes
List of Docs,
Test Report,
Data Sheets
Manuals
ELEME
CS
Handling Over
to the Clients
DOCUMENT
CODE NO.
End
NAME OF THE DEPT. / SITE.
NAME OF THE DOCUMENT:
Procedure for Electrical Works
G P
0
PAGE NO.
0
4 0
5
5
TOTAL PAGES
0
5
6.7
Activity
Responsibility
Project Incharge /
Engineer
Reg. Office / Project
Incharges
Project Incharge /
Site Engineer
Site Engineer
Site Engineer
Site Engineer
Site Engineer
Site Engineer
10
11
12
ELEME
CS
Stores Officer
Site Engineer
Site Engineer
Engineer along with
subContractor & client
Projects Incharge, Site
Engineer
DOCUMENT
CODE NO.
NAME OF THE DEPT. / SITE.
G P
0
PAGE NO.
4 0
7
5
TOTAL PAGES
0
LOCATION :
DATE:
S. No. Description
Yes
No
Drwg no :- __________
Issue No: - __________
NA
5
Check the location, number, type & size of (switches /
Fans/ lighting). Is it ok?
Any others?
SIGN. OF ELECTRICAU
Remarks: ____________________________________________________________________
ELEME
CS
P
0
PAGE NO.
0
LOCATION :
1)
DATE:
2)
3)
4)
5)
6)
7)
8)
2
4
TOTAL PAGES
0
S. No.
NA
1
Description
Yes
No
2)
Remarks
__________________________________________________________________________________________
________________________________________________________________________________________
ELEME
CS
DOCUMENT CODE
NO.
NAME OF THE DEPT. / SITE.
G
NAME OF THE DOCUMENT:
Procedure for Electrical Works
P
0
PAGE NO.
0
2
5
TOTAL PAGES
0
DATE: ________________
LOCATION: _______________________________
S.NO.
Description
NA
DG SET
1
Ensure seaworthy packing was done to protect the items
From saline atmosphere?
2
Yes
No
10
11
12
13
14
15
16
17
18
Any others?
ELEME
CS
DOCUMENT CODE
NO.
NAME OF THE DEPT. / SITE.
G
NAME OF THE DOCUMENT:
Procedure for Electrical Works
P
0
PAGE NO.
0
2
6
TOTAL PAGES
DATE :___________________
LOCTION :___________________________________________
S.NO
DESCRIPTION
NA
YES
NO
10
11
12
13
14
15
16
ELEME
CS
DOCUMENT CODE
NO.
NAME OF THE DEPT. / SITE.
G
NAME OF THE DOCUMENT:
Procedure for Electrical Works
P
0
PAGE NO.
0
2
7
TOTAL PAGES
0
DATE: ___________________
LOCTION: ___________________________________________
S.NO.
Description
NA
DG SET
1
Ensure seaworthy packing was done to protect the items
From saline atmosphere?
2
Yes
No
10
11
12
13
14
15