Republic of the Philippines

Province of Negros Oriental


Municipality of Dauin
Barangay Bagacay
OFFICE OF THE BARANGAY SUB-PROJECT MANAGEMENT COMMITTEE

SUB- PROJECT PROGRAM OF WORK


Sub-Project Title

Construction of Barangay Health Station (BHS)

Category
Physical Target
Total Sub-Project Cost
Mode of Implementation

Public Goods
51.0 sq. m.
Php 850,884.00
By Community Force Account (CFA)
Sub-Project Duration

: 80 Calendar Days (CD

Equipment/ Tools Needed

: Carpentry & Masonry

Sub-Project Location:
Sub-Project Site Location is 8KM away from town proper

Technical Personnel

: DAC/ME
Foreman

Item
no.

PROJECT DESCRIPTION : Construction of 51 sq-m BARANGAY HEALTH


STATION with 6M X 6.4M MAIN FLOOR AREA, 4.3m x 2.55 waiting area & 1.5m x
1.5m CR, ceiling, tiles, plumbing fixtures , electrical fixtures, plumbing, painting
and basic amenities.

I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV

Scope of Work ( Direct Cost )

% Wt.

SITE WORKS
CONCRETE WORKS
REINFORCING STEEL BARS
FORMWORKS & SCAFFOLDING
MASONRY WORKS
CARPENTRY WORKS
DOORS AND WINDOWS
ROOFING
PLUMBING WORKS
TILE WORKS
ELECTRICAL WORKS
PAINTING WORKS
STEEL BILLBOARD AND ROOF SIGNAGE
BASIC AMENITIES

Quantity

5.49
10.73
14.38
2.89
14.67
15.98
8.06
9.68
2.18
2.86
3.05
4.75
1.56
3.72

Total Direct Cost

120.00
17.78
2,432.85
23.00
144.00
1,872.00
18.44
82.00
1.00
5.00
1.00
265.00
1.00
1.00
SOURCE OF FUNDS

KALAHI-CIDSS
Grant -MCC

Direct Cost
Materials
Labor
1) Skilled
2) Unskilled
Sub-Total ( A )
B.
Indirect Cost
Overhead Cost
Handtools and Personal Protective
Equipment (PPE)
Pre-engineering
Project Supervision

sq.m.
cu.m.
kgs.
sq.m.
sq.m.
bd.ft
sq.m.
sq.m.
lot
sq.m.
lot
sq.m.
lot
lot

100.00

Breakdown of Estimated
Project Cost

Unit

Community
(Inkind)

BLGU
Cash

MLGU
In-Kind

Cash

A.

501,982.95
58,500.00
55,800.00
616,282.95

20,925.00
20,925.00

10,000.00

90,396.59

10,000.00

90,396.59

15,750.00

6,080.00

1,520.00

2,500.00
-

3,000.00

Environmental Impact
Administrative Cost
Material Testing
Treasurers Bond
Sub-Total ( B )

2,200.00
33,333.33
1,914.94
59,278.27

Total (A & B)
Contingency 5%
Total Project Cost

675,561.22
24,266.78
699,828.00

% Cost Sharing to TEPC

3,000.00
23,925.00
23,925.00

10,000.00
10,000.00

550.00
6,666.67
2,085.06
3,375.00
16,696.73

107,093.32
5,237.68
112,331.00

MCC Grant
LCC Cash
LCC Inkind

699,828.00
122,331.00
28,725.00

ADD: O&M (Other Amenities)

Grand Total

699,828.00

23,925.00

Prepared by :

10,000.00

112,331.00

Approved by :

ELSA A. TRUNO

ANTON

M.E.O Staff

BSPMC

Checked & Reviewed by:

Concurred by :

RODSON R. ESCORA

STEPHE

ACT-Deputy Area Coordinator (DAC)

Barang

Recommending Approval:

HON. NEI

CARMEN A. GAUDIANO
Municipal Engineer

Noted by :

GEORGE S. ISULAT

Regional Community Infrastructure Specialist (RCIS)

ic of the Philippines
e of Negros Oriental
icipality of Dauin
rangay Bagacay

UB-PROJECT MANAGEMENT COMMITTEE

CT PROGRAM OF WORK

80 Calendar Days (CD)


Carpentry & Masonry Tools

Unit Price

Total Amount

337.17
4,453.79
43.61
927.61
751.56
62.96
3,223.37
870.67
16,088.00
4,216.00
22,466.00
132.15
11,500.00
27,466.00

40,460.00
79,175.00
106,097.50
21,335.00
108,225.00
117,857.04
59,439.00
71,395.00
16,088.00
21,080.00
22,466.00
35,021.00
11,500.00
27,466.00
737,604.54

SOURCE OF FUNDS
MLGU

TOTAL
In-Kind
-

602,379.54

58,500.00
76,725.00
737,604.54

15,750.00

7,600.00

4,800.00

2,500.00
7,800.00

4,800.00

2,750.00
40,000.00
4,000.00
3,375.00
83,775.00

4,800.00

821,379.54
29,504.46
850,884.00

4,800.00
82.25%
14.38%
3.38%
4,800.00

100.00%
850,884.00

ANTONIO ALAM
BSPMC Chairperson

STEPHEN B. ALAM
Barangay Captain

HON. NEIL B. CREDO


Municipal Mayor

ENVIRONMENTAL MANAGEMENT REPORT


Sub-Project Title
:
Sub-Project Description :

Location
Total Approved Cost
Cost Sharing

Construction of Barangay Health Station


Construction of 51 sq.m. Barangay Health Station
area, 4.3mx2.55m waiting area & 1.5mx1.5m C.R.
fixtures, electrical fixtures, painting and basic amen
Barangay Bagacay, Dauin, Negros Oriental
PHP 850,884.00

:
:
:

Local Counterpart :
KALAHI Grant
Community
Barangay LGU
Municipal LGU
TOTAL
SPI Stage / Activities Conducted
I.

II

III

Siteworks

STRUCTURAL CONCRETE

REINFORCING STEEL BARS

PHP
PHP
PHP
PHP
PHP

Negative Impact

Mitigati

a.

Deep Excavation/Ground
Leveling

a-1.

b.

Backfilling of Excavated
Materials

b-1.

c.

Cutting down of affected


c-1.
trees inside construction site

a.

Increase in noise level

a-1.

b.

Construction Waste

b-1.

a.

Increase in noise level during a-1.


cutting of Steel bars

SPI Stage / Activities Conducted

Negative Impact

Mitigati

IV

MASONRY WORKS

a.

Hazard to Falling Debris and a-1.


Sharp Objects such as CW
Nails and other Carpentry
Handtools

CEMENT PLASTERING FINISH

a.

Increased Dust Particles

a-1.

VI

CARPENTRY AND JOINERY WORKS

a.

Increase in noise level

a-1.

VII

TILEWORKS

a.

VIII
IX
X
XI

DOOR AND WINDOWS


CORRUGATED METAL ROOFING
PLUMBING WORKS
ELECTRICAL WORKS

XII
XIII

AMENITIES AND FACILITIES


PAINTING AND VARNISHING
WORKS
STEEL BILLBOARD and ROOF
SIGNAGES

XIV

a.

none

a-1.

none
none
none
Increase Hazard due to live
and high voltage current

a-1.

none
none
none
Reviewed by:

Prepared By:

ANTONIO ALAM
BSPMC Chair
Concurred by:

CARMEN A. GAUDIANO
Municipal Engineer

NTAL MANAGEMENT REPORT

Construction of Barangay Health Station


Construction of 51 sq.m. Barangay Health Station with 6mx6.4m main floor
area, 4.3mx2.55m waiting area & 1.5mx1.5m C.R., ceiling, tiles, plumbing
ixtures, electrical fixtures, painting and basic amenities

Barangay Bagacay, Dauin, Negros Oriental

699,828.00
23,925.00
10,000.00
117,131.00
850,884.00
Mitigating Measures
Provide baricades and warning signs
to make aware of the community of
the on-going activity. And Strickly
follow the desired elevation on plan.
Provide workers Dust Mask during
execution of work to prevent workers
from inhailing dust particles.
Replace cut-down trees with new tree
seedlings within the vicinity

Inform the community about the


incoming activities and instruct the
workers to minimize the noise and
dust during the construction.
Observe proper disposal or segration
of construction waste e.g.
Biodegradable, Non-Biodegradable
and Hazardous Waste
Inform the community about the
incoming activities and instruct the
workers to minimize the noise and
dust during the construction.

Mitigating Measures
Workers must wear Hardhats and
Safety Boots on Site, removal of
scaffoldings must be placed on
designated areas to prevent workers
from injuries.
Provide workers Dust Mask during
execution of work to prevent workers
from inhailing dust particles.

Inform the community about the


incoming activities and instruct the
workers to minimize the noise and
dust during the construction.
none

none
none
none
Provide safety equipment and
appropriate warning signs along the
construction sites.
none
none
none

ALDRIN C. YANOC
Community Facilitator

RODSON R. ESCORA
Deputy Area Coordinator

BSPMC Form No. 3


KALAHI-CIDSS: MCC PROJECT
LOCAL COUNTERPART CONTRIBUTION
Barangay Bagacay
Municipality of Dauin
Province of Negros Oriental, Region VII, Phi
Sub-Project Title: Construction of Barangay Health Station
Budget Item

Unit used

No. of
Units

Per Unit
Cost

Total Sub-Project
Pro-posed
Cost
Amount of Grant

I. Administrative Cost
TE for opening of BSPMC DBP Account of CV's
TE for procurement transactions of CV's
Project Meetings
MCT-Initiated Meetings
Treasurer Payroll Processing
Forms/Supplies and Reproduction
Sub Total
II. Other Indirect Costs
Overhead Cost
Handtools
Pre-engineering
Project Supervisions
Environmental Mitigating Cost
Material Testing
Treasurer's Bond
Contingency
Sub Total
III. Direct Cost
Labor
Materials
Sub Total
TOTAL PROJECT COST
IV. Operations & Maintenance
Other Amenities
Sub Total
GRAND TOTAL
Prepared by:

MARVIN R. TUASON
Barangay Treasurer

1,880.00

1,566.67

12,600.00
6,672.00
7,500.00
3,920.00
7,428.00
40,000.00

10,500.00
5,560.00
6,250.00
3,266.67
6,190.00
33,333.33

15,750.00
7,600.00
2,500.00
7,800.00
2,750.00
4,000.00
3,375.00
29,504.46
73,279.46

15,750.00
6,080.00

135,225.00
602,379.54
737,604.54
850,884.00

114,300.00
501,982.95
616,282.95
699,828.01

0.00
0.00
850,884.00

0.00
699,828.01

2,200.00
1,914.94
24,266.78
50,211.72

o. 3
PROJECT
TRIBUTION PLAN
cay
auin
gion VII, Philippines

Mun LGU

Local Counterpart Contribution (LCC) Sources


Target Date of Delivery
of LCC
Brgy LGU
Community
DepEd
Total of LCC

313.33

313.33 August-December 2014

2,100.00
1,112.00
1,250.00
653.33
1,238.00
6,666.67

0.00

2,100.00 August-December 2014


1,112.00 August-December 2014
1,250.00 August-December 2014
653.33 August-December 2014
1,238.00 August-December 2014
6,666.67

0.00

0.00 August-December 2014


1,520.00 August-December 2014
2,500.00 August-December 2014
7,800.00 August-December 2014
550.00 August-December 2014
2,085.06 August-December 2014
3,375.00 August-December 2014
5,237.68 August-December 2014
23,067.74

0.00

0.00

1,520.00
2,500.00
4,800.00
550.00
2,085.06
3,375.00
5,237.68
20,067.74

0.00

90,396.59
90,396.59
117,131.00

10,000.00
10,000.00
10,000.00

20,925.00
23,925.00

0.00
0.00

20,925.00 August-December 2014


100,396.59 August-December 2014
121,321.59
151,056.00

0.00
117,131.00

0.00
10,000.00

0.00
23,925.00

0.00
0.00

0.00
0.00
151,056.00

3,000.00

3,000.00
20,925.00

Approved by:

ANTONIO ALAM
BSPMC Chairperson

OFFICE OF THE B

CONS

UNIT COST
Quantity Derivation
QUANTITY
Computation

DESCRIPTION

Unit

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

A. DIRECT COST
I. SITEWORKS
I - 1. Clearing and Lay-out
A. Materials
25- 2" x 2" x 12' Coco Lumber
Nylon String
3" CW Nails

120.00

sq.m.

100.00
2.00
7.00

bd ft
kg
kg

1.00
1.00

day
day

24.30

cu.m.

2.00

day

35.00

cu.m.

35.00

cu.m.

3.00

day

20.00
350.00
65.00

Sub-Total
B. Labor (80 sq.m./man-day)
Carpenter
Laborer

1.00
2.00

300.00
275.00

2.00

275.00

Sub-Total
I - 2. Structure Excavation
6 man-hour/cu.m (0.75md/cu.m)
Column Footing, Footing Tie Beam & Septic Vault
A. Labor
Laborer
Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
3.65 man-hour/cu.m
A. Materials
Filling Materials
Sub-Total
B. Labor
Laborer
Sub-Total
I - 4. Gravel Bedding
Crew: 2 cu.m./man-hour
Total Floor Area = (51 sq.m. x 0.1 m)= 5.1 say 6 cu.m.
A. Materials
Washed Gravel
Sub-Total
B. Labor
Laborer
Sub-Total
I - 5. Soil Poisoning
Crew: 2 cu.m./man-hour

6.00

550.00

4.00

275.00

cu.m.

6.00

cu.m.

2.00

day

750.00

2.00

275.00

UNIT COST
Quantity Derivation
QUANTITY
Computation

DESCRIPTION

A. Materials
Soil Poisoning Materials

Unit

51.00

cu.m.

1.00

day

17.78

cu.m.

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

80.00

Sub-Total
B. Labor (80 sq.m./man-day)
Laborer

2.00

275.00

Sub-Total
TOTAL FOR SITEWORKS
II. CONCRETE WORKS
8.51 man-hour/cu.m
(1*1*0.3*8)+(0.6*0.6
*0.3*2) =
Column =
0.25*0.25*4*8 =
Wall Footing =
0.3*0.2*39.2 =
(1.5*1.5+6*6.4+2*4)*0.1
=
Floor Slab =
(0.2*0.15*1.6*8)+(0.
Lintel Beam & Conc. Bench =
4*0.1*6) =
Roof Beam =
0.2*0.25*32.8 =
Ramp & Door Step = (1*2.4)+(1*0.6)*0.1 =
Septic Vault (Grade & Cover Slab) =
1.2*3*0.1*2 =
Footing =

A. Materials
Portland Cement
Red Cement (US Lansco or uqivalent)
Washed Sand
Washed Gravel

17.78*9=
8*6/3 =
17.78*0.5 =
17.78*1 =

2.62

cu.m.

2.50
2.35
4.87

cu.m.
cu.m.
cu.m.

0.62

cu.m.

1.64
2.46
0.72

cu.m.
cu.m.
cu.m.

160.00
16.00
9.00
18.00

bag
kilos
cu.m.
cu.m.

250.00
100.00
600.00
750.00

Sub-Total
B. Labor
Mason
Laborer
Sub-Total
TOTAL FOR CONCRETE WORKS
III. REINFORCING STEEL BARS
steel man -1, helper -1 w/ bar cutter =capability 25kgs /day
wall footing, columns & footings, floor slab, lintel beams,
and septic tank
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
Hacksaw Blade
Sub-Total
B. Labor
1-foreman,1-steelman2-laborer
steel man
Laborer
Sub-Total
TOTAL FOR REINFORCING STEEL BARS
IV. FORMWORKS & SCAFFOLDING
A. Materials
100 - 2"x2"x12' Coco Lumber
20 - 2"x2"x10' Coco Lumber for Bracing
1/4 thk. 4'x8' Ordinary Plywood
# 4 CW Nails
# 2 CW Nails
# 1 CW Nails

5.00
5.00

day
day

2,432.85

kgs.

2.00
8.00

320.00 Length
20.00 Length
65.00 Length
1.50
rolls
10.00 Pcs.

25.00
25.00

day
day

23.00

sq.m.

400.00
67.00
15.00
15.00
8.00
5.00

bd.ft.
bd.ft.
shts
kgs
kgs
kgs

300.00
275.00

150.00
220.00
370.00
2,500.00
75.00

1.00
2.00

300.00
275.00

20.00
25.00
365.00
65.00
70.00
70.00

UNIT COST
DESCRIPTION

Quantity Derivation
QUANTITY
Computation

Unit

No. of
Crew/
Labor

2.00
2.00

day
day

2.00
2.00

UNIT COST/
RATE PER
DAY

Sub-Total
B. Labor (40 sq.m./day)
Carpenter
Laborer

Sub-Total
TOTAL FOR FORMWORKS AND SCAFFOLDING
V. MASONRY WORKS
144.00
V - 1. CHB Laying
A. Materials
Portland Cement Type I
85.00
Washed Sand
6.00
4" x 8' x 16" CHB
1,800.00
# 16 G.I. Tie Wire
15.00
Sub-Total
B. Labor
Crew: 2men lay 100 pcs./day
(8.3 sq.m/d for 2 men)
Mason
8.00
Laborer
8.00
Sub-Total
V - 2. Plastering
144.00
Crew: 2 men plaster 8 sq.m./day
A. Materials
Portland Cement
86.00
Washed Sand
6.00
Sub-Total
B. Labor
Crew: 2 men plaster 8 sq.m./day
Mason
6.00
Laborer
6.00
Sub-Total
TOTAL FOR MASONRY WORKS
VI. CARPENTRY WORKS
1,872.00
VI - 1. Roof Framing and Purlins
1,205.00
A. Materials
Truss 1: 5 units
2"x5"x14' for Top Chord (Good Lumber)
2*5*2 = 116.67
2"x5"x12' for Bottom Chord (Good Lumber)
((2*5*12)/12)*2*5 = 100.00
2"x4"x8' for Web Member & Kingpost (Good Lumber)
((2*4*2)/12)*9*5 =
60.00
12mm dia. X 7" Machine Bolt w/ Knot and washer
direct counting
10.00
# 5 CWN
276.67*10/1000 =
3.00
Truss 2: 2 units
2"x5"x12' for Top Chord (Good Lumber)
(2*5*12*2*2)/12 =
40.00
2"x5"x14' for Bottom Chord (Good Lumber)
(2*5*14*2*2)/12 =
46.67
2"x4"x8' for Web Member & Kingpost (Good Lumber)
(2*4*8*3.5*4)/12 =
10.00
12mm dia. X 7" Machine Bolt w/ Knot and washer
direct counting
4.00
# 5 CWN
96.67*10/1000 =
1.00
Purlins, Wood Cleats & Fascia Board:
((2*3*10)/12)*16*4 = 320.00
2"x3"x 10' (Good Lumber)
((2*2*8)/12)*16*6/12 =
2"x2"x 8' (Good Lumber)
21.33
1"x12"x8' Hardi-Sanipa (Hardiflex-Board)
direct counting
20.00
# 4 CWN
341.33*10/1000 =
4.00
# 2 CWN
1.00

300.00
275.00

sq.m.

Bags
Cu.m.
Pcs
Kgs.

day
day

250.00
600.00
12.00
60.00

3.00
3.00

300.00
275.00

sq.m.

Bags
Cu.m.

day
day

250.00
600.00

3.00
4.00

300.00
275.00

bd ft
bd ft

bdft.
bdft.
bdft.
Pcs.
Kgs.

36.00
36.00
36.00
36.00
36.00

bdft.
bdft.
bdft.
Pcs.
Kgs.

36.00
36.00
36.00
36.00
36.00

bdft.
bdft.
Length
kgs.
kgs.

36.00
36.00
340.00
65.00
70.00

UNIT COST
Quantity Derivation
QUANTITY
Computation

DESCRIPTION

Anti-Termite (e.g. solignum, )

4.00

Unit

No. of
Crew/
Labor

gal

UNIT COST/
RATE PER
DAY

1,075.00

Sub-Total
B. Labor
Carpenters
Laborer
Sub-Total
VI - 2. Ceiling = 77.6 sq-m
A. Materials
Referring to Table 4-3 & 4-4 : (Simplified Construction Estimate by: Fajardo)
Total Ceiling Area =
8*7.4+6*3 +2*2 =
2"x2"x8' Ceiling Joist (Good Lumber)
81.2*4.167 =
1
/4" x 4' x 8' Marine Plywood
81.2/2.88 =
# 3 CWN
81.20*0.05 =
# 1 Finishing Nails
29*0.055 =
VI-3. Air Vents:
1"x2"x8' Wood Stick/Lattice (Good Lumber)
40*1*2*8/12 =
1/4" x 1/4" x 3' Plastic Screen
direct counting
# 2 CWN
Hardware Accessories
1/2 " CW Nails
50 - 2" x 2" x 10' Hangers (Good Lumber)
Anti-Termite (e.g. solignum, )
3" CW Nails
1/2 " CW Nails

direct counting

15.00
15.00

day
day

667.00

bd ft

3.00
3.00

300.00
275.00

81.20
378.96
29.00
5.00
2.00

sq.m.
bdft
Shts.
Kgs.
Kgs.

36.00
420.00
65.00
65.00

53.33
2.00
1.00

bdft
meter
Kgs.

55.00
40.00
70.00

6.00
167.00
1.00
7.00
2.00

kg
bd ft
gal
kg
kg

65.00
36.00
1,075.00
65.00
65.00

6.00
6.00

day
day

18.44

sq.m.

7.26

sq.m.

3.00

set

5,500.00

64.00

bdft

36.00

1.00

set

4,000.00

4.00
12.00
1.00

set
pcs
set

900.00
115.00
1,500.00

Sub-Total
B. Labor
capability = ceiling joist - 16sqm /day
ceiling board - 30 sqm/ day
Carpenters
Laborer
Sub-Total
TOTAL FOR CARPENTRY WORKS
VII. DOORS AND WINDOWS
A. Materials
DOORS
D - 1, (1.0m x 2.10m) Panel Door
D-1, 2"x6"x8' for Door Jamb (Good Lumber)

8*2*6*8/12 =

D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb


Lockset (high quality doorknob)

( 3-1/2" x 3-1/2" ) loose pin hinges


Lavatory-closet-cover with handle & Hinges attached

Sub-Total
fabrication & installation = 1 panel /day
B. Labor ( Installation )
Carpenters
Laborer

300.00
275.00

2.5 sq.m./man-days
4.00
4.00

day
day

16.23

sq.m.

Sub-Total
WINDOWS

3.00
3.00

1.00
1.00

300.00
275.00

UNIT COST
Quantity Derivation
QUANTITY
Computation

DESCRIPTION

12mm dia. X 6m, plain roundbar for grills

Unit

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

(0.6*12*19)/6 =

23.00

lengths

230.00

3,456.00

4.00

sets

1,200.00

2,304.00

2.00

sets

1,500.00

280.00

1.00

Sets

350.00

direct counting

9.00

Sets

750.00

W - 2, (1.20m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

4.00

Sets

750.00

W - 3, (0.60m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

1.00

Sets

350.00

Enamel Paint (Black)

1.00

liter

175.00

2"x6" wooden jamb assembly for W-1 w/ a dimension of


1.8m x 1.2m to include mollion partition at 0.60m interval.
2"x6" wooden jamb assembly for W-2 w/ a dimension of
1.2m x 1.2m to include mollion partition at 0.60m interval.
2"x6" wooden jamb assembly for W-5 w/ a dimension of
0.60m x 0.60m to include mollion partition at 0.60m
interval.
W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie
window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

Sub-Total
B. Labor
frame installation = 10 sqm/manday
frame fabrication= 2 sqm/manday
Carpenters
Laborer
Sub-Total
TOTAL FOR DOORS & WINDOWS
VIII. ROOFING
A. Materials
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)
(7.6/1)*2+1 =
Colorib Longspan 0.40mm x 1.10m x 3m (Green)
(2.55/1)*2 =
(7.6/2.2)*2+(2.55/2.2)*2
=
Colorib No. 24, x 8' Pre formed Side Gutter
Colorib No. 24, x 8' Pre formed Side End Flashing
47/2.2)*4+(3/2.2)*2 =
Colorib No. 24, x 8' Pre formed End Wall Flashing
(3/2.2)*2 =
(7.6/2.2)+(2.55/2.2) =
Colorib No. 24, x 8' Pre formed Ridgeroll
Roof Sealant
Tex Screw 2 1/2" dia. (for wood)
Blind Rivets
Sub-Total
B. Labor
35 pcs./man-days roof covering
Carpenters
Laborer
Sub-Total
TOTAL FOR ROOFING
IX. PLUMBING WORKS
A. Materials
IX-I Plumbing Fixtures:
Flush Type Toilet Bowl

7.00
7.00

day
day

82.00

sq.m.

17.00
6.00
10.00
11.00
3.00
5.00
2.00
1,300.00
200.00

pcs
pcs
pcs
pcs
pcs
pcs
lit
pc
pc

5.00
5.00

day
day

1.00

lot

1.00

unit

1.00
1.00

300.00
275.00

2,070.00
1,350.00
615.00
615.00
615.00
615.00
350.00
2.50
1.50

2.00
2.00

300.00
275.00

900.00

UNIT COST
No. of
Crew/
Labor

Quantity Derivation
QUANTITY
Computation

Unit

1.00

set

90.00

3.00
2.00
1.00
2.00
1.00
2.00
1.00
1.00

length
pc
pc
pc
length
pc
pc
pc

500.00
30.00
40.00
40.00
180.00
98.00
50.00
90.00

2.00
2.00
2.00
1.00
3.00
1.00

length
length
pc
pc
pc
pint

370.00
180.00
40.00
40.00
25.00
100.00

1.00
10.00
1.00
10.00
7.00
1.00
2.00
2.00
3.00
1.00

pc
length
pc
pc
pc
pc
pc
pc
roll
pint

700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00

3.00

pc

100.00

9.00
18.00
1.00

length
pc
pint

365.00
40.00
100.00

4.00
4.00

day
day

5.00

sq.m.

1.5*5.2/0.04 =
1.5*1.5/.04 =

230.00
120.00
10.00
20.00

pc
pc
bags
pc

30.00
30.00
100.00
250.00

6*1.4+0.6*0.8)/0.04 =

68.00
2.00
3.00

pc
kls.
pc

30.00
60.00
40.00

DESCRIPTION

4" x 4" PVC Floor Drain


IX-II Sewer Line:
At Toilet to Septic Vault Route
4" x 3.0m dia. PV Pipe serries 1000
4" dia. X 45 PVC Bend Elbow
2" dia. X 90 PVC Bend Elbow
4" dia. X 90 PVC Bend Elbow
2" X 3.0m PV Pipe
4" dia.x 4" dia. PVC Wye
4" dia.PVC Clean Out Plug
2" x 4" Tee
At Toilet to Septic Vault Route
3" x 3.0m dia. PV Pipe serries 1000
2" X 3.0m PV Pipe serries 1000
2" dia. X 90 PVC Bend Elbow
2" dia. PVC P-Trap
3" dia. X 45deg. PVC elbow
Solvent Cement
IX-III For Water Line:
Kitchen Sink,(0.4m x 0.6m, Single Tab, Stainless)

1/2" x 3.0m pipe pvc


1/2" dia. Gate valve
1/2" Coupling PVC
1/2" 90 deg. Bend elbow pvc
1/2" PVC Tee
1/2" female threaded adaptor
1/2" Faucet, hosebib, brass
Teflon Tape
Solvent Cement
IX-IV For Septic Vault Fittings:
4" x 4" PVC Tee
IX-V For Downspouts:
3" dia. x 3.0m PVC Pipe
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement

UNIT COST/
RATE PER
DAY

Sub-Total
B. Labor
Plumber/ Mason
Laborer

2.00
2.00

300.00
275.00

Sub-Total
TOTAL FOR PLUMBING WORKS
X. TILE WORKS
A. Materials
At Toilet:
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
8" x 8" Unglazed Floor Tiles (Green or equivalent colors)
White cement / Tile Grout
Tile Trim x 3m
At Lavatory:
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
White cement / Tile Grout
Tile Trim x 3m

UNIT COST
DESCRIPTION

Quantity Derivation
QUANTITY
Computation

Unit

No. of
Crew/
Labor

4.00
4.00

day
day

1.00
1.00

1.00

Lot

12.00
7.00
1.00
1.00

pcs.
pcs.
length
pc.

2.00
60.00
10.00
80.00
3.00

box
m
pc
m
pc

3,900.00
30.00
2.00
12.00
30.00

5.00
3.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00

assy
set
pc
pc
pc
pc
pc
unit
pc

350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00

1.00

set

2,000.00

7.00
7.00

day
day

UNIT COST/
RATE PER
DAY

Sub-Total
B. Labor
Mason
Laborer

300.00
275.00

Sub-Total
TOTAL FOR TILEWORKS
XI. ELECTRICAL WORKS
A. Materials
Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Juncton Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
10 watts compact flourescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Lighting Outlet ( 4" Porcelain Receptacle)
Female Adaptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)

20.00
25.00
240.00
40.00

Sub-Total
B. Labor
Electrician
Laborer
Sub-Total
TOTAL FOR ELECTRICAL WORKS
XII. PAINTING WORKS
A. Materials
Net Painting Area (Front Elev.-2faces) =
Net Painting Area (R/S Elev.-2faces) =
Net Painting Area (L/S Elev.-2faces) =
Net Painting Area (Rear -2faces) =
Net Painting Area ( Partition Wall -2faces) =
Net Painting Area (Ceiling) =
Total Net Area =
Concrete Putty
Concrete Neutralizer
Polituff
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White-Semi-Gloss

263.20/20 =
263.20/50 =
263.20/20 =
263.20/20 =
50.40

265.00

sq.m.

33.44
50.64
50.64
46.16
49.28
33.44
263.60
14.00
6.00
2.00
14.00
14.00
1.00
6.00

sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
gal
gal
pcs
gal
gal
gal
gal

1.00
1.00

300.00
275.00

335.00
335.00
188.00
425.00
588.00
475.00
520.00

UNIT COST
Quantity Derivation
QUANTITY
Computation

DESCRIPTION

Flat Enamel White


Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Paint Brush 4"
Paint Brush 2"
Paint Roller 7" with Pan
Sandpaper #100
Sandpaper #200

Unit

1.00
2.00
2.00
1.00
1.00
1.00
4.00
4.00
2.00
4.00
10.00
10.00

gal
pint
pint
pint
pint
pint
gal
pc
pc
set
sheet
sheet

5.00
5.00

day
day

1.00
1.00

1.00
LOT
LOT

1.00
1.00
1.00
1.00
1.00
1.00
1.00

unit
set
unit
unit
unit
unit
set

1. OVERHEAD COST
Foreman / Leadman

45.00

day

TOTAL FOR OVERHEAD COST


2. HANDTOOLS AND PROTECTIVE EQUIPMENT (PPE)
Shovel w/ handle
Crow Bar
Concrete Pail
Wheel Barrow
Sledge Hammer (5kg) w/ handle
Hard Hat
Hand Glooves

1.00
1.00
10.00
1.00
1.00
5.00
10.00

pc
pc
pc
pc
pc
pc
pcs

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
50.00
60.00

Sub-Total
B. Labor
Painter
Laborer
Sub-Total
TOTAL FOR PAINTING
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
Supply & Installation Fabricated Steel Billboard
Building Roof Signage

Sub Total
TOTAL FOR STEEL BILLBOARD AND ROOF SIGNAGE
XIV. BASIC AMENITIES
36" x 75" Wooden Bed
24" x 36" Wooden Table w/ Wooden Chair
BP Apparatus
Stethoscope
Weighing Scale for adult
Weighing Scale for infant
Medicine/Dressing Kit (CART W/ TRAY)
TOTAL FOR BASIC AMENITIES
Direct Cost Summary
Materials
Labor :
1) Skilled
2) Unskilled
Sub-Total ( A )
TOTAL DIRECT COST
B. INDIRECT COST

2.00
2.00

300.00
275.00

LOT
8,500.00
2,500.00

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00

1.00

350.00

700.00
900.00
95.00
1,700.00
750.00
350.00
35.00

UNIT COST
DESCRIPTION

No. of
Crew/
Labor

Quantity Derivation
QUANTITY
Computation

Unit

1.00

set

500.00

50.00

sht

50.00

6.00
12.00

day
day

5.00
5.00

pc
pc

Medicine Kit
TOTAL FOR HANDTOOLS
3. PRE-ENGINEERING
3.2 Reproduction of plans
TOTAL FOR PRE-ENGINEERING
4. PROJECT SUPERVISION
4.1 Municipal Engineer
4.2 BSPMC Volunteers
TOTAL FOR ENGINEERING SUPERVISION
5. ENVIRONMENTAL IMPACT
5.1 Warning Signs
5.2 Barricades
TOTAL FOR ENGINEERING SUPERVISION
6. ADMINISTRATIVE COST (Pls see separate calculation)
TOTAL FOR ADMINISTRATIVE COST
7. MATERIAL TESTING
TOTAL FOR MATERIAL TESTING
8. TREASURER'S BOND
TOTAL FOR TREASURERS BOND
TOTAL INDIRECT COST
TOTAL (A+B)
9. CONTINGENCY
TOTAL FOR CONTINGENCY
TOTAL ESTIMATED PROJECT COST

ADD: O&M (Other Amenities)


Grand Total
Prepared by:

Checked & Reviewed by:

ELSA A. TRUNO

RODSON R. ESCORA

Service Provider

Deputy Area Coordinator

1.00
1.00

UNIT COST/
RATE PER
DAY

800.00
250.00

300.00
250.00

Republic of the Philippines


Province of Negros Oriental
Municipality of Dauin
Barangay Bagacay

E OF THE BARANGAY SUB-PROJECT MANAGEMENT COMMITTEE


CONSTRUCTION OF BARANGAY HEALTH STATION

BILL OF QUANTITIES
COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

5.00

TOTAL UNIT
COST

25.00
350.00
65.00

300.00
275.00

275.00

55.00

605.00

275.00

25.00

775.00

275.00

TOTAL

KALAHI MCC
GRANT

2,500.00
700.00
455.00
3,655.00

2,083.33
583.33
379.17
3,045.83

300.00
550.00
850.00

300.00
400.00
700.00

1,100.00
1,100.00

800.00
800.00

21,175.00
21,175.00

17,645.83
17,645.83

3,300.00
3,300.00

2,400.00
2,400.00

4,650.00
4,650.00

3,875.00
3,875.00

1,100.00
1,100.00

800.00
800.00

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

416.67
116.67
75.83
609.17

150.00
150.00

300.00
300.00

900.00
900.00

300.00
300.00

3,529.17
3,529.17
-

775.00
775.00

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

80.00

275.00

25.00
25.00
25.00

275.00
100.00
625.00
775.00

300.00
275.00

7.50
11.00
18.50
25.00
3.75

157.50
231.00
388.50
2,525.00
78.75

300.00
275.00

5.00

25.00
25.00
365.00
65.00
70.00
70.00

TOTAL

KALAHI MCC
GRANT

4,080.00
4,080.00

3,400.00
3,400.00

550.00
550.00
40,460.00

400.00
400.00
33,066.67

44,000.00
1,600.00
5,625.00
13,950.00
65,175.00

36,666.67
1,333.33
4,687.50
11,625.00
54,312.50

3,000.00
11,000.00
14,000.00
79,175.00

3,000.00
8,000.00
11,000.00
65,312.50

50,400.00
4,620.00
25,252.50
3,787.50
787.50
84,847.50

42,000.00
3,850.00
21,043.75
3,156.25
656.25
70,706.25

7,500.00
13,750.00
21,250.00
106,097.50

7,500.00
10,000.00
17,500.00
88,206.25

10,000.00
1,675.00
5,475.00
975.00
560.00
350.00

8,333.33
1,395.83
4,562.50
812.50
466.67
291.67

COMMUNITY
INKIND

150.00
150.00
1,800.00

BLGU
CASH

MLGU
INKIND

CASH

680.00
680.00

5,593.33

1,000.00
2,000.00
10,000.00

333.33
266.67
(62.50)
325.00
862.50

10,000.00

862.50

8,400.00
770.00
4,208.75
631.25
131.25
14,141.25

14,141.25

7,000.00

3,000.00
3,000.00
3,000.00

3,750.00
3,750.00
3,750.00

1,666.67
279.17
912.50
162.50
93.33
58.33

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

300.00
275.00

25.00
25.00
3.00

275.00
625.00
15.00
60.00

300.00
275.00

25.00
25.00

275.00
625.00

300.00
275.00

TOTAL

KALAHI MCC
GRANT

19,035.00

15,862.50

1,200.00
1,100.00
2,300.00
21,335.00

1,200.00
800.00
2,000.00
17,862.50

23,375.00
3,750.00
27,000.00
900.00
55,025.00

19,479.17
3,125.00
22,500.00
750.00
45,854.17

7,200.00
6,600.00
13,800.00

7,200.00
4,800.00
12,000.00

23,650.00
3,750.00
27,400.00

19,708.33
3,125.00
22,833.33

5,400.00
6,600.00
12,000.00
108,225.00

5,400.00
4,800.00
10,200.00
90,887.50

3,986.11
3,416.67
2,050.00
300.00
90.00
1,366.67
1,594.44
341.67
120.00
30.00
10,933.33
728.89
5,750.00
216.67
58.33

5.00
5.00
5.00

41.00
41.00
41.00
36.00
36.00

4,783.33
4,100.00
2,460.00
360.00
108.00

5.00
5.00
5.00

41.00
41.00
41.00
36.00
36.00

1,640.00
1,913.33
410.00
144.00
36.00

5.00
5.00
5.00

41.00
41.00
345.00
65.00
70.00

13,120.00
874.67
6,900.00
260.00
70.00

COMMUNITY
INKIND
-

300.00
300.00
300.00

1,800.00
1,800.00

1,800.00
1,800.00
3,600.00

BLGU
CASH

MLGU
INKIND

CASH

3,172.50

3,172.50

3,895.83
625.00
4,500.00
150.00
9,170.83

3,941.67
625.00
4,566.67

13,737.50

797.22
683.33
410.00
60.00
18.00
273.33
318.89
68.33
24.00
6.00
2,186.67
145.78
1,150.00
43.33
11.67

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

1,075.00

5.00

KALAHI MCC
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

4,300.00

3,583.33

41,479.33

34,566.11

13,500.00
12,375.00
25,875.00

13,500.00
9,000.00
22,500.00

41.00
420.00
65.00
65.00

15,537.38
12,180.00
325.00
130.00

55.00
40.00
70.00

2,933.33
80.00
70.00

65.00
41.00
1,075.00
65.00
65.00

390.00
6,847.00
1,075.00
455.00
130.00
40,152.71

12,947.81
10,150.00
270.83
108.33
2,444.44
66.67
58.33
325.00
5,705.83
895.83
379.17
108.33
33,460.59

5,400.00
4,950.00
10,350.00
117,857.04

5,400.00
3,600.00
9,000.00
99,526.70

5,500.00

16,500.00

13,750.00

2,750.00

36.00

2,304.00

1,920.00

384.00

4,000.00

4,000.00

3,333.33

666.67

900.00
115.00
1,500.00

3,600.00
1,380.00
1,500.00
29,284.00

3,000.00
1,150.00
1,250.00
24,403.33

600.00
230.00
250.00
4,880.67

1,200.00
1,100.00
2,300.00

1,200.00
800.00
2,000.00

300.00
275.00

5.00

TOTAL

300.00
275.00

300.00
275.00

716.67
-

3,375.00
3,375.00

1,350.00
1,350.00
4,725.00

300.00
300.00

6,913.22

2,589.56
2,030.00
54.17
21.67
488.89
13.33
11.67
65.00
1,141.17
179.17
75.83
21.67
6,692.12

13,605.34

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

5.00

235.00

5,405.00

4,504.17

900.83

1,200.00

4,800.00

4,000.00

800.00

1,500.00

3,000.00

2,500.00

500.00

350.00

350.00

291.67

58.33

750.00

6,750.00

5,625.00

1,125.00

750.00

3,000.00

2,500.00

500.00

350.00

350.00

291.67

58.33

175.00

175.00

145.83

29.17

23,830.00

19,858.33

2,100.00
1,925.00
4,025.00
59,439.00

2,100.00
1,400.00
3,500.00
49,761.67

35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00

29,395.83
6,775.00
5,166.67
5,683.33
1,550.00
2,583.33
591.67
2,708.33
250.00
54,704.17

3,000.00
2,750.00
5,750.00
71,395.00

3,000.00
2,000.00
5,000.00
59,704.17

900.00

750.00

300.00
275.00

5.00
5.00
5.00
5.00
5.00
5.00
5.00

2,075.00
1,355.00
620.00
620.00
620.00
620.00
355.00
2.50
1.50

300.00
275.00

900.00

TOTAL

KALAHI MCC
GRANT

COMMUNITY
INKIND

525.00
525.00
825.00

750.00
750.00
750.00

BLGU
CASH

MLGU
INKIND

CASH

3,971.67

8,852.33

5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83

10,940.83

150.00

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

TOTAL

KALAHI MCC
GRANT

90.00

90.00

500.00
30.00
40.00
40.00
180.00
98.00
50.00
90.00

1,500.00
60.00
40.00
80.00
180.00
196.00
50.00
90.00

370.00
180.00
40.00
40.00
25.00
100.00

740.00
360.00
80.00
40.00
75.00
100.00

700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00

700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00

100.00

300.00

365.00
40.00
100.00

3,285.00
720.00
100.00
11,488.00

75.00
1,250.00
50.00
33.33
66.67
150.00
163.33
41.67
75.00
616.67
300.00
66.67
33.33
62.50
83.33
583.33
625.00
348.33
41.67
58.33
8.33
20.00
266.67
50.00
83.33
250.00
2,737.50
600.00
83.33
9,573.33

2,400.00
2,200.00
4,600.00
16,088.00

2,400.00
1,600.00
4,000.00
13,573.33

30.00
30.00
100.00
250.00

6,900.00
3,600.00
1,000.00
5,000.00

30.00
60.00
40.00

2,040.00
120.00
120.00

5,750.00
3,000.00
833.33
4,166.67
1,700.00
100.00
100.00

300.00
275.00

COMMUNITY
INKIND

600.00
600.00
600.00

BLGU
CASH

MLGU
INKIND

CASH

15.00
250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
1,914.67

1,914.67

1,150.00
600.00
166.67
833.33
340.00
20.00
20.00

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

TOTAL

KALAHI MCC
GRANT

COMMUNITY
INKIND

CASH

MLGU
INKIND

CASH

18,780.00

15,650.00

1,200.00
1,100.00
2,300.00
21,080.00

1,200.00
800.00
2,000.00
17,650.00

20.00
25.00
240.00
40.00

240.00
175.00
240.00
40.00

3,900.00
30.00
2.00
12.00
30.00

7,800.00
1,800.00
20.00
960.00
90.00

350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00

1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00

200.00
145.83
200.00
33.33
6,500.00
1,500.00
16.67
800.00
75.00
1,458.33
300.00
163.33
216.67
166.67
204.17
54.17
1,250.00
416.67

40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33

2,000.00

2,000.00

1,666.67

333.33

18,441.00

15,367.50

2,100.00
1,925.00
4,025.00
22,466.00

2,100.00
1,400.00
3,500.00
18,867.50

4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00

3,908.33
1,675.00
313.33
4,958.33
6,860.00
395.83
2,600.00

300.00
275.00

300.00
275.00

335.00
335.00
188.00
425.00
588.00
475.00
520.00

BLGU

300.00
300.00
300.00

525.00
525.00
525.00

3,130.00

3,130.00

3,073.50

3,073.50

781.67
335.00
62.67
991.67
1,372.00
79.17
520.00

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
50.00
60.00

300.00
275.00

500.00

9,000.00
2,500.00

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00

350.00

700.00
900.00
95.00
1,700.00
750.00
350.00
35.00

TOTAL

KALAHI MCC
GRANT

COMMUNITY
INKIND

520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
500.00
600.00
29,271.00

433.33
216.67
210.00
137.50
105.00
104.17
833.33
333.33
58.33
333.33
416.67
500.00
24,392.50

3,000.00
2,750.00
5,750.00
35,021.00

3,000.00
2,000.00
5,000.00
29,392.50

9,000.00
2,500.00
11,500.00
11,500.00

7,500.00
2,083.33
9,583.33
9,583.33

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
27,466.00

5,833.33
3,400.00
1,666.67
1,275.00
5,833.33
2,380.00
2,500.00
22,888.33

602,379.54

501,982.95

58,500.00
76,725.00
737,604.54
737,604.54

58,500.00
55,800.00
616,282.95
616,282.95
-

15,750.00
15,750.00

15,750.00
15,750.00

700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00

560.00
720.00
760.00
1,360.00
600.00
1,400.00
280.00

750.00
750.00
750.00

20,925.00
20,925.00
20,925.00

BLGU
CASH

MLGU
INKIND

CASH

86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,878.50

4,878.50

1,500.00
416.67
1,916.67
1,916.67

1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67

10,000.00

90,396.59

10,000.00
10,000.00

90,396.59
90,396.59
-

140.00
180.00
190.00
340.00
150.00
350.00
70.00

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST
500.00

50.00

800.00
250.00

300.00
250.00

82.25%

TOTAL

KALAHI MCC
GRANT

500.00
7,600.00

400.00
6,080.00

2,500.00
2,500.00

4,800.00
3,000.00
7,800.00

1,200.00
1,000.00
2,200.00
33,333.33
33,333.33
1,914.94
1,914.94

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND
-

100.00
1,520.00

2,500.00
2,500.00

3,000.00
3,000.00

CASH

1,500.00
1,250.00
2,750.00
40,000.00
40,000.00
4,000.00
4,000.00
3,375.00
3,375.00
83,775.00
821,379.54
29,504.46
29,504.46
850,884.00

59,278.27
675,561.22
24,266.78
24,266.78
699,828.00

3,000.00
23,925.00

10,000.00

23,925.00

10,000.00

300.00
250.00
550.00
6,666.67
6,666.67
2,085.06
2,085.06
3,375.00
3,375.00
16,696.73
107,093.32
5,237.68
5,237.68
112,331.00

850,884.00

699,828.00

23,925.00

10,000.00

112,331.00

794,300.00

249,325.00

18,150.00

###

521,329.17

Recommending Approval:

Approved by:

CARMEN A. GAUDIANO

ANTONIO ALAM

Municipal Engineer

BSPMC Chairperson

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

416.67
116.67
75.83
609.17

TOTAL

416.67
116.67
75.83
609.17

2,500.00
700.00
455.00
3,655.00

150.00
150.00

150.00
150.00

300.00
550.00
850.00

300.00
300.00

300.00
300.00

1,100.00
1,100.00

3,529.17
3,529.17

21,175.00
21,175.00

900.00
900.00

3,300.00
3,300.00

775.00
775.00

4,650.00
4,650.00

300.00
300.00

1,100.00
1,100.00

3,529.17
3,529.17
-

775.00
775.00
-

900.00
900.00

300.00
300.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

680.00
680.00

5,593.33

7,333.33
266.67
937.50
2,325.00
10,862.50

10,862.50

8,400.00
770.00
4,208.75
631.25
131.25
131.25

131.25

1,666.67
279.17
912.50
162.50
93.33
58.33

TOTAL LCC
(CASH &
INKIND)

INKIND
150.00
150.00
1,800.00

3,000.00
3,000.00
3,000.00

3,750.00
3,750.00
3,750.00

TOTAL

680.00
680.00

4,080.00
4,080.00

150.00
150.00
7,393.33

550.00
550.00
40,460.00

7,333.33
266.67
937.50
2,325.00
10,862.50

44,000.00
1,600.00
5,625.00
13,950.00
65,175.00

3,000.00
3,000.00
13,862.50

3,000.00
11,000.00
14,000.00
79,175.00

8,400.00
770.00
4,208.75
631.25
131.25
131.25

50,400.00
4,620.00
25,252.50
3,787.50
787.50
84,847.50

3,750.00
3,750.00
3,881.25

7,500.00
13,750.00
21,250.00
106,097.50

1,666.67
279.17
912.50
162.50
93.33
58.33

10,000.00
1,675.00
5,475.00
975.00
560.00
350.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

INKIND

3,172.50

3,172.50

3,895.83
625.00
4,500.00
150.00
9,170.83

TOTAL LCC
(CASH &
INKIND)

3,941.67
625.00
4,566.67

13,737.50

300.00
300.00
300.00

1,800.00
1,800.00

1,800.00
1,800.00
3,600.00

TOTAL

3,172.50

19,035.00

300.00
300.00
3,472.50

1,200.00
1,100.00
2,300.00
21,335.00

3,895.83
625.00
4,500.00
150.00
9,170.83

23,375.00
3,750.00
27,000.00
900.00
55,025.00

1,800.00
1,800.00

7,200.00
6,600.00
13,800.00

3,941.67
625.00
4,566.67

23,650.00
3,750.00
27,400.00

1,800.00
1,800.00
17,337.50

5,400.00
6,600.00
12,000.00
108,225.00

797.22
683.33
410.00
60.00
18.00

797.22
683.33
410.00
60.00
18.00

4,783.33
4,100.00
2,460.00
360.00
108.00

273.33
318.89
68.33
24.00
6.00

273.33
318.89
68.33
24.00
6.00

1,640.00
1,913.33
410.00
144.00
36.00

2,186.67
145.78
1,150.00
43.33
11.67

2,186.67
145.78
1,150.00
43.33
11.67

13,120.00
874.67
6,900.00
260.00
70.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

716.67

716.67

4,300.00

6,913.22

6,913.22

41,479.33

3,375.00
3,375.00

13,500.00
12,375.00
25,875.00

3,375.00
3,375.00

2,589.56
2,030.00
54.17
21.67

2,589.56
2,030.00
54.17
21.67

15,537.38
12,180.00
325.00
130.00

488.89
13.33
11.67

488.89
13.33
11.67

2,933.33
80.00
70.00

65.00
1,141.17
179.17
75.83
21.67
6,692.12

65.00
1,141.17
179.17
75.83
21.67
6,692.12

390.00
6,847.00
1,075.00
455.00
130.00
40,152.71

13,605.34

1,350.00
1,350.00
18,330.34

5,400.00
4,950.00
10,350.00
117,857.04

1,350.00
1,350.00
4,725.00

2,750.00

2,750.00

16,500.00

384.00

384.00

2,304.00

666.67

666.67

4,000.00

600.00
230.00
250.00
4,880.67

600.00
230.00
250.00
4,880.67

3,600.00
1,380.00
1,500.00
29,284.00

300.00
300.00

1,200.00
1,100.00
2,300.00

300.00
300.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

900.83

900.83

5,405.00

800.00

800.00

4,800.00

500.00

500.00

3,000.00

58.33

58.33

350.00

1,125.00

1,125.00

6,750.00

500.00

500.00

3,000.00

58.33

58.33

350.00

29.17

29.17

175.00

3,971.67

3,971.67

23,830.00

8,852.33

525.00
525.00
9,677.33

2,100.00
1,925.00
4,025.00
59,439.00

5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83

5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83

35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00

10,940.83

750.00
750.00
11,690.83

3,000.00
2,750.00
5,750.00
71,395.00

150.00

900.00

150.00

525.00
525.00
825.00

750.00
750.00
750.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

15.00
-

15.00
-

90.00
-

250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00

250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00

1,500.00
60.00
40.00
80.00
180.00
196.00
50.00
90.00

123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
1,914.67

123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
1,914.67

740.00
360.00
80.00
40.00
75.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
300.00
3,285.00
720.00
100.00
11,488.00

1,914.67

600.00
600.00
2,514.67

2,400.00
2,200.00
4,600.00
16,088.00

600.00
600.00
600.00

1,150.00
600.00
166.67
833.33

1,150.00
600.00
166.67
833.33

6,900.00
3,600.00
1,000.00
5,000.00

340.00
20.00
20.00

340.00
20.00
20.00

2,040.00
120.00
120.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH
-

3,130.00

3,130.00

TOTAL LCC
(CASH &
INKIND)

INKIND
300.00
300.00
300.00

TOTAL

3,130.00

18,780.00

300.00
300.00
3,430.00

1,200.00
1,100.00
2,300.00
21,080.00

40.00
29.17
40.00
6.67

40.00
29.17
40.00
6.67

240.00
175.00
240.00
40.00

1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33

1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33

7,800.00
1,800.00
20.00
960.00
90.00
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00

333.33

333.33

2,000.00

3,073.50

3,073.50

18,441.00

3,073.50

525.00
525.00
3,598.50

2,100.00
1,925.00
4,025.00
22,466.00

781.67
335.00
62.67
991.67
1,372.00
79.17
520.00

4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00

781.67
335.00
62.67
991.67
1,372.00
79.17
520.00

525.00
525.00
525.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,878.50

4,878.50

1,500.00
416.67
1,916.67
1,916.67

1,500.00
416.67
1,916.67
1,916.67

9,000.00
2,500.00
11,500.00
11,500.00

1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67

1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
27,466.00

86,386.59
20,925.00
107,311.59
107,311.59

602,379.54
58,500.00
76,725.00
737,604.54
737,604.54

86,386.59
86,386.59
86,386.59

140.00
180.00
190.00
340.00
150.00
350.00
70.00

TOTAL

750.00
750.00
750.00

20,925.00
20,925.00
20,925.00

86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,878.50

520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
500.00
600.00
29,271.00

750.00
750.00
5,628.50

3,000.00
2,750.00
5,750.00
35,021.00

140.00
180.00
190.00
340.00
150.00
350.00
70.00

15,750.00
15,750.00
700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

100.00
1,520.00

100.00
1,520.00

2,500.00
2,500.00

2,500.00
2,500.00

500.00
7,600.00
2,500.00
2,500.00

4,800.00
3,000.00
7,800.00

4,800.00
3,000.00
7,800.00

4,800.00
3,000.00
7,800.00

4,800.00

300.00
250.00
550.00
6,666.67
6,666.67
2,085.06
2,085.06
3,375.00
3,375.00
16,696.73
103,083.32
5,237.68
5,237.68
108,321.00

7,800.00
28,725.00
28,725.00

300.00
250.00
550.00
6,666.67
6,666.67
2,085.06
2,085.06
3,375.00
3,375.00
24,496.73
131,808.32
5,237.68
5,237.68
137,046.00

1,500.00
1,250.00
2,750.00
40,000.00
40,000.00
4,000.00
4,000.00
3,375.00
3,375.00
83,775.00
821,379.54
29,504.46
29,504.46
850,884.00

4,800.00

108,321.00

28,725.00

137,046.00

850,884.00

4,800.00

521,329.17

23,700.00

545,029.17

794,300.00

4,800.00

4,800.00

4,800.00
4,800.00

Noted by:

GEORGE S. ISULAT
RCIS

BARANGAY SUB-PROJECT WORK SCHE


Name of Sub-Project

: Construction of Barangay Health Station

Sub-Project duration

: 80

Physical Target

:
:
:
:
:

Region
Province
Municipality
Barangay

Calendar Days

Total Sub-Project Cost

51 Sq.m.
VII
NEGROS ORIENTAL
DAUIN
BAGACAY

Direct Cost
Indirect Cost
Date Started
Target Completion
Mode of Implementation

I. To be filled up by Deputy Area Coordinator

ITEM
NO.

DESCRIPTION

SITE WORKS

II

CONCRETE WORKS

III

REINFORCING STEEL
BARS

IV

QTY

UNIT

AMOUNT

WEIGHT

PHYSICAL

(%)

TARGET

120.00 sq.m.

40,460.00

5.49%

17.78 cu.m.

79,175.00

10.73%

kgs.

106,097.50

14.38%

FORMWORKS AND
SCAFOLDING

23.00 sq.m.

21,335.00

2.89%

MASONRY WORKS

144.00 sq.m.

108,225.00

14.67%

VI

CARPENTRY WORKS

1,872.00 bd.ft.

117,857.04

15.98%

VII DOORS AND WINDOWS

18.44 sq.m.

59,439.00

8.06%

VIII ROOFING

82.00 sq.m.

71,395.00

9.68%

16,088.00

2.18%

2,432.85

IX

PLUMBING WORKS

1.00

TILE WORKS

5.00 sq.m.

21,080.00

2.86%

XI

ELECTRICAL WORKS

1.00

22,466.00

3.05%

35,021.00

4.75%

XII PAINTING WORKS

XIII

STEEL BILLBOARD AND


ROOF SIGNAGES

XIV BASIC AMINITIES

lot.

lot.

265.00 sq.m.

1.00

lot.

11,500.00

1.56%

1.00

lot.

27,466.00

3.72%

737,604.54

100.00%

T O T A L

PHYSICAL
% PROGRESS (Actual)
PROGRESS (Planned)
FINANCIAL

WEEK 2

WEEK 3

PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL

II. To be filled up by Deputy Area Coordinator

% PROGRESS (Planned)

1ST MONTH
WEEK 1

PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE

10

11

12

13

14

15

16

16.36%

10.45%

10.25%

16.36%

26.81%

37.06%

17

120,672.10

77,079.67

75,604.47

120,672.10

197,751.78

273,356.24

FINANCIAL
PROGRESS (Actual)
Prepared by:

PERIODIC
COMMULATIVE

Concurred by:

JOCELYN DUSAL
PIT Chairperson

Checked by & Reviewed by:

NOEL TUASON
MIT Team Leader

RODSON R. ESCORA
Deputy Area Coordinator

WORK SCHEDULE & PHYSICAL PROGRESS REPORT

: P

850,884.00

: P
737,604.54
: P
83,775.00
:
:
: Community Force Account

LABOR

STATUS

No. of Days

SKILLED

Male
Female
Male
Female
Male
Female

80

UNSKILLED
TOTAL

TH

2ND MONTH

WEEK 3

WEEK 4

18

19

20

21

22

WEEK 5

23

24

25

26

27

28

WEEK 6

29

30

31

32

33

34

3RD MONTH

WEEK 7

35

36

37

38

39

40

WEEK 8

41

42

43

44

45

46

WEEK 9

47

48

49

50

51

52

WEEK 10

53

54

55

56

57

58

WEEK 11

59

60

61

62

63

64

WEEK 12

65

66

67

68

69

10.25%

4.89%

4.89%

7.40%

10.69%

15.00%

8.55%

3.05%

4.75%

3.72%

37.06%

41.95%

46.84%

54.24%

64.93%

79.93%

88.48%

91.53%

96.28%

100.00%

75,604.47

36,068.86

36,068.86

54,582.74

78,849.93

110,640.68

63,065.19

22,496.94

35,036.22

27,438.89

273,356.24

309,425.11

345,493.97

400,076.70

478,926.63

589,567.31

652,632.50

675,129.44

710,165.65

737,604.54

Approved by:

CARMEN A. GAUDIANO
Municipal Engineer

Noted by:

ANTONIO ALAM
BSPMC

GEORGE S. ISULAT
Regional Infra. Engineer

EPORT

No. of Days

Ave. Rate/Day

80

300.00
200.00

3RD MONTH

4TH MONTH
WEEK 12

70

WEEK 13

71

3.72%
100.00%

27,438.89
737,604.54

72

73

74

75

76

77

78

GEORGE S. ISULAT
Regional Infra. Engineer

PROPOSED PROCUREMENT ACTIO


Sub-project Name : Construction of Barangay Health Station
Location : Bagacay, Dauin, Negros Oriental
Timeline to complete
the activity (Inclusive
Dates)

Responsible Volunteer/s and Project Staff


( Complete Name)

1. Preparation of Planned Community


Procurement Packages

June 4, 2014

George alas-as BSPMC Chair, Teodolo Bulisid


-BAC,-PT,Engr. Rodson R. Escora - DAC, Ricky
T. Panoy -CF and Name-Engr. Carmen A.
GaudianoM.E.

2. Finalization of Packages & PCPP

June 7, 2014

-do-

3. Conduct of Pre-procurement Conference

June 11, 2014

George Alas-as-BSPMC Chair, Teodolo


Bulisid ,Benadeth Tuala-BAC, Jocelyn Alas-asPIT,Felix Avellano-PT, Engr. Rodson R. Escora DAC, Ricky T. Panoy-CF and Carmen A.
Gaudiano-M.E.

4. Preparation of Minutes of Conference

June 12, 2014

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Procurement Activities

5. Preparation of Procurement Documents

June 12-14, 2014

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

6. Serving of Canvass/Request for Qoutation


6.1 Serving of Canvass/Request for Qoutation
(for 1st tranche)

Package 1: Hardware

June 15, 2014

Package 3: Form Lumber

June 15, 2014

Package 4: Aggregates

June 15, 2014

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Procurement Activities

Timeline to complete
the activity (Inclusive
Dates)

Package 6: Furniture

June 15, 2014

Package 9: Project Billboard

June 15, 2014

Pckage 12: Handtools and Personal Protective


Equipment

June 15, 2014

Pckage 13: Environmental Mitigating Cost

June 15, 2014

Responsible Volunteer/s and Project Staff


( Complete Name)

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

6.2 Serving of Canvass/Request for Qoutation


(for 2nd tranche)

Package 2: Painting Works

July 7, 2014

Package 5: Roofing

July 7, 2014

Package 10: Basic Amenities

July 7, 2014

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

6.3 Serving of Canvass/Request for Qoutation


(for 3rd tranche)

Package 7: Glass

July 27, 2014


Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Procurement Activities

Package 8: Roof Signage

Timeline to complete
the activity (Inclusive
Dates)

-do-

June 17, 2014


George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.
Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

Package 2: Painting Works, Package 5: Roofing,


Package 10 Basic Amenities

July 9, 2014

Package 7: Glass, Package 8: Roof Signage

July 29, 2014

8. Preparation of Minutes of Opening

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

July 27, 2014

7: Opening of Canvass
Package 1: Hardware, Package 3: Form Lumber,
Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost

Responsible Volunteer/s and Project Staff


( Complete Name)

-do-

Procurement Activities

Timeline to complete
the activity (Inclusive
Dates)

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost

June 18, 2014

Package 2: Painting Works, Package 5: Roofing,


Package 10 Basic Amenities

July 10, 2014

Package 7: Glass, Package 8: Roof Signage

July 30, 2014

9. Evaluation of Canvass
Package 1: Hardware, Package 3: Form Lumber,
Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost

June 17, 2014

July 9, 2014

Package 7: Glass, Package 8: Roof Signage

July 29, 2014

10. Preparation of Abstract of Canvass

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

-do-

June 17, 2014


-do-

Package 2: Painting Works, Package 5: Roofing,


Package 10 Basic Amenities

July 9, 2014

Package 7: Glass, Package 8: Roof Signage

July 29, 2014

11. Preparation of Purchased Order

-do-

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost

June 19, 2014

Package 2: Painting Works, Package 5: Roofing,


Package 10 Basic Amenities

July 11, 2014

Package 7: Glass, Package 8: Roof Signage

July 31, 2014

12. Approving of Purchased Order

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

-do-

Package 2: Painting Works, Package 5: Roofing,


Package 10 Basic Amenities

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost

Responsible Volunteer/s and Project Staff


( Complete Name)

-do-

-do-

Procurement Activities

Timeline to complete
the activity (Inclusive
Dates)

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost

June 20, 2014

Package 2: Painting Works, Package 5: Roofing,


Package 10 Basic Amenities

July 12, 2014

Package 7: Glass, Package 8: Roof Signage

Responsible Volunteer/s and Project Staff


( Complete Name)

Hazley Lanfie,Teodulo Bulisid, Bernadita Tuala

August 1, 2014

13. Serving of Purchased Order to Winning


Suppliers

Hazley Lanfie,Teodulo Bulisid, Bernadita Tuala

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost

June 21-22, 2014

Package 2: Painting Works, Package 5: Roofing,


Package 10 Basic Amenities

July 13-14, 2014

Package 7: Glass, Package 8: Roof Signage

August 2-3,2014

-do-

14. Delivery of Goods

-do-

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools June 23 - July 3, 2014
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost
Selvino Bulisid - MIT Chair, MIT Members, Ricky
T. Panoy- ACT-CF, Rodson Escora-ACT-DAC
Package 2: Painting Works, Package 5: Roofing,
July
15-25,
2014
Package 10 Basic Amenities
Package 7: Glass, Package 8: Roof Signage

15. Mobilization and Start of SPI

August 4-14, 2014


July 5 - September 23, Selvino Bulisid - MIT Chair, MIT Members, Ricky
2014
T. Panoy- ACT-CF, Rodson Escora-ACT-DAC
BSPMC, Jocelyn Alas-as- PIT Chair and PIT
Members, Community Workers

Prepared by:
Reviewed & Checked by:

LORDECITO TUBAING
PT Chairperson

ENGR. CARMEN A. GAUDIANO


MCT-DAC

ENGR. RODSON R. ESCORA


ACT-DAC

EMENT ACTION PLAN (PAP)

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Brgy. Hall/BSPMC Office

POW/Detailed
Estimates

Draft PCPP

Brgy. Hall/BSPMC Office

POW & Draft PCPP

Final PCPP

Brgy. Hall/BSPMC Office

Final PCPP

Conference Conducted

Brgy. Hall/BSPMC Office

Office supplies

Minutes of Conference

Brgy. Hall/BSPMC Office

POW & Final PCPP

Invitation to Bid/Bid
Documents

Supplier's Office,
Establishment

Supplier's: Zenith
Commercials, Golden Rule,
Octagon Hardware

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Gold
Enterprises, Lucky
Enterprises, JM
Commercials

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Sugar Hills


Agricultural Corp., Solon
Construction, Lucky
Construction

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Supplier's Office,
Establishment

Supplier's: Alice Furniture,


BL Furniture, Elloren
Furniture

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Alagasi's
Welding Shop, Zamora
Welding Shop, Orient Pearl

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: New Bian Yek


Commercials, Dgte. YY
Trading, Duplamilco

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Ziplink Graphix,


I Concept, ADS Unlimited,
Sun Signs

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Earthworks,
Dumaguete Painthaus, JB
Marketing

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Suppliers: DN Steel, Union


Galvasteel, Uy Matiao
Trading Corp., Sm & Mst
Construction

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Mercury Drug,


Crown Pharmacy, HVL
Pharmacy, DOH
Pharmaceutical Distributor

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Reman Glass


and Aluminum, RJ Glass
and Aluminum, ESJ Glass,
Ong Ming Glass

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Supplier's Office,
Establishment

Supplier's: Alagasi's
Welding Shop, Zamora
Welding Shop, Orient Pearl

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Submitted Canvass
Form/Request for
Qoutation

Abstract of Canvass

Brgy. Hall/BSPMC Office

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Brgy. Hall/BSPMC Office

Office Supplies

Minutes of Opening

Brgy. Hall/BSPMC Office

Office Supplies

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Minutes of Evaluation

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Minutes of Evaluation

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Abstract of Canvass

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Abstract of Canvass

Brgy. Hall/BSPMC Office

Abstract of Canvass

Purchased Order

Brgy. Hall/BSPMC Office

Abstract of Canvass

Purchased Order

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Brgy. Hall/BSPMC Office

Purchased Order

Approved Purchased
Order

Brgy. Hall/BSPMC Office

Purchased Order

Approved Purchased
Order

Supplier's Office,
Establishment

Approved Purchased Conformed Purchased


Order
Order by Suppliers

Supplier's Office,
Establishment

Project Site

Delivery
Receipt/Delivered
Goods

Goods Received

Project Site

Delivery
Receipt/Delivered
Goods

Goods Received

Project Site

Notice to Commence

Mobilization Started

Noted by:

Approved by:

ENGR. HELEN C. YBANEZ


Area Coordinator

ANTONIO ALAM
BSPMC Chairperson

PLANNED COMMUNITY PRO


Date Prepared

July 10, 2014

Name of Proposed Sub-Project

Barangay

Bagacay

Total Cash (Php)

Municipality

DAUIN

Sub-project Duration

Province

NEGROS ORIENTAL

SOURCES OF FUNDS
DESCRIPTION
1st Tranche (Php)

489,879.60

2nd Tranche (Php)

139,965.60

3rd Tranche (Php)

PACKAGES

Mode of Implementation : Community Force Account (CFA)

PACKAGE ITEMS

69,982.80

TOTAL

QTY

UNIT

TOTAL UNIT
COST

KC Grant:

699,828.00

PROC
METHOD

TOTAL

1st Tranche
KC Grant
PACKAGE 1 : HARDWARE
Materials:
Nylon String
Anti-Termite (e.g. solignum, )

2.00

kg

350.00

700.00

583.33

5.00

gal

1,075.00

5,375.00

4,479.17

1/4" x 1/4" x 3' Plastic Screen

2.00

meter

40.00

80.00

66.67

1/4 thk. 4'x8' Ordinary Plywood

15.00

shts

365.00

5,475.00

4,562.50

1/4" x 4' x 8' Marine Plywood

29.00

Shts.

420.00

12,180.00

10,150.00

# 5 CWN

4.00

Kgs.

36.00

144.00

120.00

# 4 CW Nails

19.00

kgs

65.00

1,235.00

1,029.17

# 3 CWN

19.00

Kgs.

65.00

1,235.00

1,029.17

# 2 CWN

10.00

kgs.

70.00

700.00

583.33

# 1 CW Nails

5.00

kgs

70.00

350.00

291.67

2.00

Kgs.

65.00

130.00

108.33

# 1 Finishing Nails
1/2 " CW Nails
Portland Cement Type I
Red Cement (US Lansco or uqivalent)

8.00
331.00

kg

65.00

520.00

433.33

Bags

275.00

91,025.00

75,854.17

16.00

kilos

100.00

1,600.00

1,333.33

Soil Poisoning Materials

51.00

cu.m.

80.00

4,080.00

3,400.00

12mm dia. X 7" Machine Bolt w/ Knot and washer

14.00

Pcs.

36.00

504.00

420.00

12mm dia. X 6m, plain roundbar for grills

23.00

lengths

235.00

5,405.00

4,504.17

10mm dia. x 6.0m RSB

320.00

Length

157.50

50,400.00

42,000.00

12mm dia. x 6.0m RSB

20.00

Length

231.00

4,620.00

3,850.00

16mm dia. x 6.0m RSB

65.00

Length

388.50

25,252.50

21,043.75

1.50

rolls

2,525.00

3,787.50

3,156.25

# 16 G.I. Tie Wire

# 16 G.I. Tie Wire

15.00

Kgs.

60.00

900.00

750.00

Hacksaw Blade

10.00

Pcs.

78.75

787.50

656.25

D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb

1.00

set

4,000.00

4,000.00

3,333.33

Lavatory-closet-cover with handle & Hinges attached

1.00

set

1,500.00

1,500.00

1,250.00

Lockset (high quality doorknob)

4.00

set

900.00

3,600.00

3,000.00

( 3-1/2" x 3-1/2" ) loose pin hinges

12.00

pcs

115.00

1,380.00

1,150.00

1"x12"x8' Hardi-Sanipa (Hardiflex-Board)

20.00

Length

345.00

6,900.00

5,750.00

Flush Type Toilet Bowl

1.00

unit

900.00

900.00

4" x 4" PVC Floor Drain

1.00

set

90.00

90.00

75.00

4" x 3.0m dia. PV Pipe serries 1000

3.00

length

500.00

1,500.00

1,250.00

4" dia. X 45 PVC Bend Elbow

2.00

pc

30.00

60.00

50.00

IX. PLUMBING WORKS

Page 54 of 165

750.00

PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

PROC
METHOD

TOTAL

1st Tranche
2" dia. X 90 PVC Bend Elbow

1.00

pc

40.00

40.00

33.33

4" dia. X 90 PVC Bend Elbow

2.00

pc

40.00

80.00

66.67

2" X 3.0m PV Pipe

1.00

length

180.00

180.00

150.00

4" dia.x 4" dia. PVC Wye

2.00

pc

98.00

196.00

163.33

4" dia.PVC Clean Out Plug

1.00

pc

50.00

50.00

41.67

2" x 4" Tee

1.00

pc

90.00

90.00

3" x 3.0m dia. PV Pipe serries 1000

2.00

length

370.00

740.00

2" X 3.0m PV Pipe serries 1000

2.00

length

180.00

360.00

2" dia. X 90 PVC Bend Elbow

2.00

pc

40.00

80.00

2" dia. PVC P-Trap

1.00

pc

40.00

40.00

3" dia. X 45deg. PVC elbow

3.00

pc

25.00

75.00

Solvent Cement

1.00

pint

100.00

100.00

1.00

pc

700.00

700.00

Kitchen Sink,(0.4m x 0.6m, Single Tab, Stainless)

Page 55 of 165

LOCAL SHOPPING FOR GOODS (LSG)

PACKAGE 1

KC Grant

75.00
616.67
300.00
66.67
33.33
62.50
83.33
583.33

QTY

UNIT

TOTAL UNIT
COST

LOCAL SHOPPING FOR GOODS (LSG)

PACKAGE
PACKAGES
1

PACKAGE ITEMS

PROC
METHOD

TOTAL

1/2" x 3.0m pipe pvc

10.00

length

75.00

750.00

1/2" dia. Gate valve

1.00

pc

418.00

418.00

1/2" Coupling PVC

1st Tranche
KC Grant
625.00
348.33

10.00

pc

5.00

50.00

1/2" 90 deg. Bend elbow pvc

7.00

pc

10.00

70.00

1/2" PVC Tee

1.00

pc

10.00

10.00

8.33

1/2" female threaded adaptor

2.00

pc

12.00

24.00

20.00

1/2" Faucet, hosebib, brass

2.00

pc

160.00

320.00

266.67

Teflon Tape

3.00

roll

20.00

60.00

50.00

Solvent Cement

1.00

pint

100.00

100.00

83.33

4" x 4" PVC Tee

3.00

pc

100.00

300.00

250.00

3" dia. x 3.0m PVC Pipe

41.67
58.33

9.00

length

365.00

3,285.00

2,737.50

18.00

pc

40.00

720.00

600.00

1.00

pint

100.00

100.00

83.33

8" x 8" Glazed Wall Tiles (Green or equivalent colors)

230.00

pc

30.00

6,900.00

5,750.00

8" x 8" Unglazed Floor Tiles (Green or equivalent colors)

3,000.00

3" dia. X 90 deg. bend PVC Elbow


Solvent Cement
X. TILE WORKS

120.00

pc

30.00

3,600.00

White cement / Tile Grout

10.00

bags

100.00

1,000.00

833.33

Tile Trim x 3m

20.00

pc

250.00

5,000.00

4,166.67

68.00

pc

30.00

2,040.00

1,700.00

White cement / Tile Grout

2.00

kls.

60.00

120.00

100.00

Tile Trim x 3m

3.00

pc

40.00

120.00

100.00

At Lavatory:

8" x 8" Glazed Wall Tiles (Green or equivalent colors)

XI. ELECTRICAL WORKS

2" x 4" Utility Boxes Pvc

12.00

pcs.

20.00

240.00

200.00

4" x 4" Juncton Boxes PVC

7.00

pcs.

25.00

175.00

145.83

3/4" dia. RSC Pipe

1.00

length

240.00

240.00

200.00

Screw Insulator

1.00

pc.

40.00

40.00

33.33

3.5mm2 THW Stranded

2.00

box

3,900.00

7,800.00

6,500.00

Service Drop Wire

60.00

30.00

1,800.00

1,500.00

PVC Clamp

10.00

pc

2.00

20.00

16.67

Flexible tube 3/4" dia

80.00

12.00

960.00

800.00

Electrical Tape (Big)

3.00

pc

30.00

90.00

75.00

Flourescent Lamp, 40 watts

5.00

assy

350.00

1,750.00

1,458.33

10 watts compact flourescent Lamp

3.00

set

120.00

360.00

300.00

2 Gang Switch with Plate

2.00

pc

98.00

196.00

163.33

1 Gang Switcth w/ Plate

4.00

pc

65.00

260.00

216.67

Duplex Convenience Outlet

5.00

pc

40.00

200.00

166.67

Lighting Outlet ( 4" Porcelain Receptacle)

7.00

pc

35.00

245.00

204.17

Female Adaptor

5.00

pc

13.00

65.00

54.17

KWHR meter w/ Base

1.00

unit

1,500.00

1,500.00

1,250.00

Entrance Cap # 1" dia.

5.00

pc

100.00

500.00

416.67

1.00

set

2,000.00

2,000.00

1,666.67

Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)
Sub-Total

282,574.50

Concrete Putty

14.00

gal

335.00

4,690.00

Concrete Neutralizer

6.00

gal

335.00

2,010.00

Polituff

2.00

pcs

188.00

376.00

Flat Latex White

14.00

gal

425.00

5,950.00

Page 56 of 165

DS (LSG)

PACKAGE 2 : PAINTING WORKS

235,478.75

PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

PROC
METHOD

TOTAL

1st Tranche

PACKAGE 2

Semi-Gloss Latex White

14.00

gal

588.00

8,232.00

Quick Dry Enamel Chocolate Brown

1.00

gal

475.00

475.00

Quick Dry Enamel White-Semi-Gloss

6.00

gal

520.00

3,120.00

Enamel Paint (Black)

1.00

liter

175.00

175.00

Flat Enamel White

1.00

gal

520.00

520.00

Latex Tinting Color Rawsienna

2.00

pint

130.00

260.00

Latex Tinting Color Red

2.00

pint

126.00

252.00

Latex Tinting Color Blue

1.00

pint

165.00

165.00

Latex Tinting Color Yellow

1.00

pint

126.00

126.00

Latex Tinting Color Green

1.00

pint

125.00

125.00

Paint Thinner

4.00

gal

250.00

1,000.00

Paint Brush 4"

4.00

pc

100.00

400.00

Paint Brush 2"

2.00

pc

35.00

70.00

Paint Roller 7" with Pan

4.00

set

100.00

400.00

Sandpaper #100

10.00

sheet

50.00

500.00

Sandpaper #200

10.00

sheet

60.00

Sub-Total

600.00
29,446.00

Page 57 of 165

LOCAL SHOPPING FOR GOODS (LSG)

KC Grant

PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

PROC
METHOD

TOTAL

1st Tranche
KC Grant
PACKAGE 3: LUMBER
Materials
1"x2"x8' Wood Stick/Lattice (Good Lumber)

53.33

bdft

55.00

2,933.33

2,444.44

2"x2"x8' Ceiling Joist (Good Lumber)

378.96

bdft

41.00

15,537.38

12,947.81

50 - 2" x 2" x 10' Hangers (Good Lumber)

167.00

bd ft

41.00

6,847.00

5,705.83

25- 2" x 2" x 12' Coco Lumber

100.00

bd ft

25.00

2,500.00

2,083.33

400.00

bd.ft.

25.00

10,000.00

8,333.33

67.00

bd.ft.

25.00

1,675.00

1,395.83

100 - 2"x2"x12' Coco Lumber

PACKAGE-3

20 - 2"x2"x10' Coco Lumber for Bracing


Truss 1: 5 units

2"x5"x14' for Top Chord (Good Lumber)

116.67

bdft.

41.00

4,783.33

2"x5"x12' for Bottom Chord (Good Lumber)

100.00

bdft.

41.00

4,100.00

60.00

bdft.

41.00

2,460.00

2"x4"x8' for Web Member & Kingpost (Good Lumber)


Truss 2: 2 units

LSG

3,986.11
3,416.67
2,050.00

2"x5"x12' for Top Chord (Good Lumber)

40.00

bdft.

41.00

1,640.00

1,366.67

2"x5"x14' for Bottom Chord (Good Lumber)

46.67

bdft.

41.00

1,913.33

1,594.44

2"x4"x8' for Web Member & Kingpost (Good Lumber)

10.00

bdft.

41.00

410.00

341.67

Purlins, Wood Cleats & Fascia Board:

2"x3"x 10' (Good Lumber)

320.00

bdft.

41.00

21.33

bdft.

41.00

2"x2"x 8' (Good Lumber)


Sub-Total

13,120.00

10,933.33

874.67

728.89

68,794.04

57,328.37

PACKAGE 4: AGGREGATES
PACKAGE-4

Materials:
Filling Materials

35.00

cu.m.

605.00

21,175.00

Washed Gravel

24.00

cu.m.

775.00

18,600.00

Washed Sand

21.00

cu.m.

625.00

13,125.00

10,937.50

Pcs

15.00

27,000.00

22,500.00

79,900.00

66,583.33

4" x 8' x 16" CHB

1,800.00
Sub-Total

17,645.83
LSG

15,500.00

PACKAGE 5: ROOFING
Materials:
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)

17.00

pcs

2,075.00

35,275.00

6.00

pcs

1,355.00

8,130.00

Colorib No. 24, x 8' Pre formed Side Gutter

10.00

pcs

620.00

6,200.00

Colorib No. 24, x 8' Pre formed Side End Flashing

11.00

pcs

620.00

6,820.00

Colorib No. 24, x 8' Pre formed End Wall Flashing

3.00

pcs

620.00

1,860.00

Colorib No. 24, x 8' Pre formed Ridgeroll

5.00

pcs

620.00

3,100.00

Roof Sealant

2.00

lit

355.00

710.00

1,300.00

pc

2.50

3,250.00

200.00

pc

1.50

300.00

PACKAGE-5

Colorib Longspan 0.40mm x 1.10m x 3m (Green)

Tex Screw 2 1/2" dia. (for wood)


Blind Rivets
Sub-Total

LSG

65,645.00

PACKAGE 6: FURNITURE

PACKAGE-6

Materials:
D - 1, (1.0m x 2.10m) Panel Door

set

5,500.00

16,500.00

13,750.00

D-1, 2"x6"x8' for Door Jamb (Good Lumber)

64

bdft

36.00

2,304.00

1,920.00

2"x6" wooden jamb assembly for W-1 w/ a dimension of 1.8m x 1.2m to


include mollion partition at 0.60m interval.

sets

1,200.00

4,800.00

4,000.00

2"x6" wooden jamb assembly for W-2 w/ a dimension of 1.2m x 1.2m to


include mollion partition at 0.60m interval.

sets

1,500.00

3,000.00

2"x6" wooden jamb assembly for W-5 w/ a dimension of 0.60m x 0.60m


to include mollion partition at 0.60m interval.

1.00

Sets

350.00

350.00

Page 58 of 165

LSG

2,500.00
291.67

PACKAGE-6
PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

TOTAL

PROC
LSG
METHOD
1st Tranche
KC Grant

36" x 75" Wooden Bed

1.00

unit

7,000.00

7,000.00

5,833.33

24" x 36" Wooden Table w/ Wooden Chair

1.00

set

4,080.00

4,080.00

3,400.00

38,034.00

31,695.00

Sub-Total

Page 59 of 165

PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

TOTAL

PROC
METHOD
1st Tranche
KC Grant

PACKAGE 7: GLASS

PACKAGE-7

Materials:
W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie window on
standard aluminum housing w/ 12mm dia. hole in between blades
interval

Sets

750.00

6,750.00

W - 2, (1.20m X 1.20m) twelve Blades clear glass jalousie window on


standard aluminum housing w/ 12mm dia. hole in between blades
interval

Sets

750.00

3,000.00

W - 3, (0.60m X 1.20m) twelve Blades clear glass jalousie window on


standard aluminum housing w/ 12mm dia. hole in between blades
interval

Sets

350.00

350.00

Sub-Total

LSG

10,100.00

P-8

PACKAGE 8: ROOF SIGNAGE


Supply and Install Roof Signage

1.00

lot

2,500.00

Sub-Total

2,500.00

LSG

2,500.00

P-9

PACKAGE 9: PROJECT BILLBOARD


Supply and Install Community Project Steel Billboard

1.00

lot

9,000.00

Sub-Total

9,000.00

7,500.00

LSG

9,000.00

7,500.00

PACKAGE-10

PACKAGE 10: BASIC AMENITIES


BP Apparatus

1.00

unit

2,000.00

2,000.00

Stethoscope

1.00

unit

1,530.00

1,530.00

Weighing Scale for adult

1.00

unit

7,000.00

7,000.00

Weighing Scale for infant

1.00

unit

2,856.00

2,856.00

Medicine/Dressing Kit (CART W/ TRAY)

1.00

set

3,000.00

3,000.00

Sub-Total

16,386.00

Total Materials Cost

602,379.54

LSG

398,585.45

Skilled

58,500.00

unskilled

55,800.00

Sub-Total

CFA

P-11

PACKAGE 11: LABOR


21,500.00
19,749.21

114,300.00

Total Direct Cost (cash)

1,720,223.63

716,679.54

41,249.21
-

439,834.66

PACKAGE 12: HANDTOOLS AND PERSONAL PROTECTIVE EQUIPMENTS

PACKAGE-12

Shovel w/ handle

1.00

pc

700.00

700.00

560.00

Crow Bar

1.00

pc

900.00

900.00

720.00

Concrete Pail

10.00

pc

95.00

950.00

760.00

Wheel Barrow

1.00

pc

1,700.00

1,700.00

1,360.00

Sledge Hammer (5kg) w/ handle

1.00

pc

750.00

750.00

Hard Hat

5.00

pc

350.00

1,750.00

1,400.00

Hand Glooves

10.00

pcs

35.00

350.00

280.00

Medicine Kit

1.00

set

500.00

500.00

400.00

7,600.00

6,080.00

PACKAGE-13

Sub-Total

LSG

600.00

PACKAGE 13: ENVIRONMENTAL MITIGITING COST


Warning signs (Tarpulin Printing)
Barricades

5.00

pc

300.00

1,500.00

5.00

pc

250.00

1,250.00

Sub-Total

LSG

1,200.00
1,000.00

2,750.00

2,200.00

Overhead

15,750.00

6,516.67

Administrative Cost

40,000.00

33,333.33

Page 60 of 165

CFA

PACKAGE-14

j. Indirect Cost

PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

PROC
METHOD

TOTAL

Reproduction of plans

2,500.00

Material Testing

4,000.00

Treasurers Bond

CFA

PACKAGE-14

1st Tranche
KC Grant
1,914.94

3,375.00

Contingency

29,504.46

Sub-Total

95,129.46

Total Indirect Cost (cash)

GRAND TOTAL CASH

41,764.94

105,479.46
822,159.00
822,159.00
(0.01)

Workshop output of:

50,044.94

489,879.60

SAY
%

Checked by:

LORDECITO TUBAING

JUDITH GRAMATICA

CARMEN A. GAUDIANO

Procurement Team Head

PPT

Municipal Engineer

Page 61 of 165

489,879.60
70.00%

MMUNITY PROCUREMENT PACKAGING


: Construction of Barangay Health Station

oposed Sub-Project

: 822,159.00
: 80 C.D.

OURCES OF FUNDS

PERCENTAGE WEIGHT
TOTAL

LCC:

TO KC GRANT

AMOUNT

FUND SOURCE

TO LCC CASH

LEGEND:

KC Cost

699,82

TOTAL LCC :

151,05

85,631.70

575,511.30

70.00%

70.00%

24,466.20

164,431.80

20.00%

20.00%

In-kind:

28,72

12,233.10

82,215.90

10.00%

10.00%

Cash:

122,33

122,331.00

822,159.00

100.00%

100.00%

TOTAL

850,88

1st Tranche

2nd Tranche

LCC Cash

KC Grant

LCC Cash

REMARKS

ESTIMATED COST INVOLED

3rd Tranche
KC Grant

LCC Cash

TOTAL
KC Grant
-

MONTH

TOTAL

LCC Cash
-

1
-

116.67

583.33

116.67

700.00

895.83

4,479.17

895.83

5,375.00

13.33

66.67

13.33

80.00

912.50

4,562.50

912.50

5,475.00

2,030.00

10,150.00

2,030.00

12,180.00

24.00

120.00

24.00

144.00

205.83

1,029.17

205.83

1,235.00

205.83

1,029.17

205.83

1,235.00

116.67

583.33

116.67

700.00

58.33

291.67

58.33

350.00

21.67

108.33

21.67

130.00

86.67

433.33

86.67

520.00

15,170.83

75,854.17

15,170.83

91,025.00

266.67

1,333.33

266.67

1,600.00

680.00

3,400.00

680.00

4,080.00

84.00

420.00

84.00

504.00

900.83

4,504.17

900.83

5,405.00

8,400.00

42,000.00

8,400.00

50,400.00

770.00

3,850.00

770.00

4,620.00

4,208.75

21,043.75

4,208.75

25,252.50

631.25

3,156.25

631.25

3,787.50

150.00

750.00

150.00

900.00

131.25

656.25

131.25

787.50

666.67

3,333.33

666.67

4,000.00

250.00

1,250.00

250.00

1,500.00

600.00

3,000.00

600.00

3,600.00

230.00

1,150.00

230.00

1,380.00

1,150.00

5,750.00

1,150.00

6,900.00

150.00

750.00

150.00

900.00

15.00

75.00

15.00

90.00

250.00

1,250.00

250.00

1,500.00

10.00

50.00

10.00

60.00

Page 62 of 165

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche

2nd Tranche

LCC Cash

KC Grant

LCC Cash

REMARKS

ESTIMATED COST INVOLED

3rd Tranche
KC Grant

LCC Cash

TOTAL
KC Grant

MONTH

TOTAL

LCC Cash

6.67

33.33

6.67

40.00

13.33

66.67

13.33

80.00

30.00

150.00

30.00

180.00

32.67

163.33

32.67

196.00

8.33

41.67

8.33

50.00

15.00

75.00

15.00

90.00

123.33

616.67

123.33

740.00

60.00

300.00

60.00

360.00

13.33

66.67

13.33

80.00

6.67

33.33

6.67

40.00

12.50

62.50

12.50

75.00

16.67

83.33

16.67

100.00

116.67

583.33

116.67

700.00

Page 63 of 165

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche

2nd Tranche

LCC Cash

KC Grant

REMARKS

ESTIMATED COST INVOLED

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

MONTH

TOTAL

LCC Cash

125.00

625.00

125.00

750.00

69.67

348.33

69.67

418.00

8.33

41.67

8.33

50.00

11.67

58.33

11.67

70.00

1.67

8.33

1.67

10.00

4.00

20.00

4.00

24.00

53.33

266.67

53.33

320.00

10.00

50.00

10.00

60.00

16.67

83.33

16.67

100.00

50.00

250.00

50.00

300.00

547.50

2,737.50

547.50

3,285.00

120.00

600.00

120.00

720.00

16.67

83.33

16.67

100.00

1,150.00

5,750.00

1,150.00

6,900.00

600.00

3,000.00

600.00

3,600.00

166.67

833.33

166.67

1,000.00

833.33

4,166.67

833.33

5,000.00

340.00

1,700.00

340.00

2,040.00

20.00

100.00

20.00

120.00

20.00

100.00

20.00

120.00

40.00

200.00

40.00

240.00

29.17

145.83

29.17

175.00

40.00

200.00

40.00

240.00

6.67

33.33

6.67

40.00

1,300.00

6,500.00

1,300.00

7,800.00

300.00

1,500.00

300.00

1,800.00

3.33

16.67

3.33

20.00

160.00

800.00

160.00

960.00

15.00

75.00

15.00

90.00

291.67

1,458.33

291.67

1,750.00

60.00

300.00

60.00

360.00

32.67

163.33

32.67

196.00

43.33

216.67

43.33

260.00

33.33

166.67

33.33

200.00

40.83

204.17

40.83

245.00

10.83

54.17

10.83

65.00

250.00

1,250.00

250.00

1,500.00

83.33

416.67

83.33

500.00

333.33

1,666.67

333.33

2,000.00

235,478.75

47,095.75

282,574.50

47,095.75

3,908.33

781.67

3,908.33

781.67

4,690.00

1,675.00

335.00

1,675.00

335.00

2,010.00

313.33

62.67

313.33

62.67

376.00

4,958.33

991.67

4,958.33

991.67

5,950.00

Page 64 of 165

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche

2nd Tranche

LCC Cash

KC Grant

REMARKS

ESTIMATED COST INVOLED

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

LCC Cash

MONTH

TOTAL

6,860.00

1,372.00

6,860.00

1,372.00

8,232.00

395.83

79.17

395.83

79.17

475.00

2,600.00

520.00

2,600.00

520.00

3,120.00

145.83

29.17

145.83

29.17

175.00

433.33

86.67

433.33

86.67

520.00

216.67

43.33

216.67

43.33

260.00

210.00

42.00

210.00

42.00

252.00

137.50

27.50

137.50

27.50

165.00

105.00

21.00

105.00

21.00

126.00

104.17

20.83

104.17

20.83

125.00

833.33

166.67

833.33

166.67

1,000.00

333.33

66.67

333.33

66.67

400.00

58.33

11.67

58.33

11.67

70.00

333.33

66.67

333.33

66.67

400.00

416.67

83.33

416.67

83.33

500.00

500.00

100.00

500.00

100.00

600.00

24,538.33

4,907.67

24,538.33

4,907.67

29,446.00

Page 65 of 165

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche

2nd Tranche

LCC Cash

KC Grant

REMARKS

ESTIMATED COST INVOLED

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

MONTH

TOTAL

LCC Cash

488.89

2,444.44

488.89

2,933.33

2,589.56

12,947.81

2,589.56

15,537.38

1,141.17

5,705.83

1,141.17

6,847.00

416.67

2,083.33

416.67

2,500.00

1,666.67

8,333.33

1,666.67

10,000.00

279.17

1,395.83

279.17

1,675.00

797.22

3,986.11

797.22

4,783.33

683.33

3,416.67

683.33

4,100.00

410.00

2,050.00

410.00

2,460.00

273.33

1,366.67

273.33

1,640.00

318.89

1,594.44

318.89

1,913.33

68.33

341.67

68.33

410.00

2,186.67

10,933.33

145.78

2,186.67

13,120.00

728.89

145.78

874.67

57,328.37

11,465.67

68,794.04

3,529.17

17,645.83

3,529.17

21,175.00

3,100.00

15,500.00

3,100.00

18,600.00

2,187.50

10,937.50

2,187.50

13,125.00

4,500.00

22,500.00

4,500.00

27,000.00

66,583.33

13,316.67

79,900.00

11,465.67

13,316.67

29,395.83

5,879.17

29,395.83

5,879.17

35,275.00

6,775.00

1,355.00

6,775.00

1,355.00

8,130.00

5,166.67

1,033.33

5,166.67

1,033.33

6,200.00

5,683.33

1,136.67

5,683.33

1,136.67

6,820.00

1,550.00

310.00

1,550.00

310.00

1,860.00

2,583.33

516.67

2,583.33

516.67

3,100.00

591.67

118.33

591.67

118.33

710.00

2,708.33

541.67

2,708.33

541.67

3,250.00

250.00

50.00

250.00

50.00

300.00

54,704.17

10,940.83

54,704.17

10,940.83

65,645.00

2,750.00

13,750.00

2,750.00

16,500.00

384.00

1,920.00

384.00

2,304.00

800.00

4,000.00

800.00

4,800.00

500.00

2,500.00

500.00

3,000.00

58.33

291.67

58.33

350.00

Page 66 of 165

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche

2nd Tranche

LCC Cash

KC Grant

REMARKS

ESTIMATED COST INVOLED

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

LCC Cash

TOTAL

1,166.67

5,833.33

1,166.67

7,000.00

680.00

3,400.00

680.00

4,080.00

31,695.00

6,339.00

38,034.00

6,339.00

Page 67 of 165

PROPOSED
IMPLEMENTATI
SCHEDULE
MONTH
1

1st Tranche

2nd Tranche

LCC Cash

KC Grant

REMARKS

ESTIMATED COST INVOLED

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

79,717.09

1,125.00

5,625.00

1,125.00

6,750.00

2,500.00

500.00

2,500.00

500.00

3,000.00

291.67

58.33

291.67

58.33

350.00

8,416.67

1,683.33

8,416.67

1,683.33

10,100.00

2,083.33

416.67

2,083.33

416.67

2,500.00

2,083.33

416.67

2,083.33

416.67

2,500.00

7,500.00

1,500.00

9,000.00

7,500.00

1,500.00

9,000.00

1,666.67

333.33

1,666.67

333.33

2,000.00

1,275.00

255.00

1,275.00

255.00

1,530.00

5,833.33

1,166.67

5,833.33

1,166.67

7,000.00

2,380.00

476.00

2,380.00

476.00

2,856.00

2,500.00

500.00

2,500.00

500.00

3,000.00

13,655.00

2,731.00

92,897.50

18,579.50

10,500.00

2,100.00

13,655.00

2,731.00

16,386.00

501,982.95

100,396.59

602,379.54

79,717.09

5,625.00

1,500.00
1,500.00

MONTH

TOTAL

LCC Cash

19,500.00

17,500.00

58,500.00

58,500.00

18,334.77

17,716.02

55,800.00

55,800.00

37,834.77

114,300.00

140.00

560.00

140.00

700.00

180.00

720.00

180.00

900.00

190.00

760.00

190.00

950.00

340.00

1,360.00

340.00

1,700.00

150.00

600.00

150.00

750.00

350.00

1,400.00

350.00

1,750.00

70.00

280.00

70.00

350.00

100.00

400.00

100.00

500.00

6,080.00

1,520.00

7,600.00

1,200.00

300.00

1,500.00

1,000.00

250.00

1,250.00

2,200.00

550.00

2,750.00

2,100.00

114,300.00

716,679.54

45,716.02

100,396.59

18,579.50

35,216.02

616,282.95

1,520.00

130,732.27

300.00
250.00
550.00

9,233.33

15,750.00
3,000.00

3,666.67

Page 68 of 165

33,333.33

6,666.67

PROPOSED
IMPLEMENTATI
SCHEDULE

15,750.00
40,000.00

1st Tranche

2nd Tranche

LCC Cash

KC Grant

REMARKS

ESTIMATED COST INVOLED

3rd Tranche

LCC Cash

231.22

1,040.03

238.39

1,846.67

KC Grant

TOTAL

LCC Cash
1,228.75

KC Grant

LCC Cash
-

1,914.94

3,375.00

MONTH

TOTAL

2,500.00

2,500.00

2,085.06

4,000.00

3,375.00

3,375.00

24,266.78

5,237.68

24,266.78

5,237.68

29,504.46

3,844.61

9,233.33

5,886.70

24,266.78

10,133.10

75,265.05

19,864.41

95,129.46

5,914.61

9,233.33

5,886.70

24,266.78

10,133.10

83,545.05

21,934.41

105,479.46

85,631.70

139,965.60

24,466.20

69,982.80

12,233.10

699,828.00

122,331.00

822,159.00

85,631.70

139,965.60

24,466.20

69,982.80

12,233.10

699,828.00

122,331.00

822,159.00

20.00%
Reviewed by:

PROPOSED
IMPLEMENTATI
SCHEDULE

10.00%
Submitted by:

Noted by:

RODSON R. ESCORA

ANTONIO ALAM

GEORGE S. ISULAT

Deputy Area Coordinator

BSMPC

Regional Community Infra. Engineer

Page 69 of 165

AMOUNT
(PESO)
699,828.00
151,056.00
28,725.00
122,331.00
850,884.00

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 70 of 165

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 71 of 165

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 72 of 165

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 73 of 165

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 74 of 165

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 75 of 165

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 76 of 165

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Regional Community Infra. Engineer

Page 77 of 165

ACTUAL COMMUNITY PROC


Date Prepared

Barangay

Bagacay

Name of Proposed Sub-Project


Total Cash (Php)

Municipality

DAUIN

Sub-project Duration

Province

NEGROS ORIENTAL

SOURCES OF FUNDS
DESCRIPTION

PACKAGES

Mode of Implementation : Community Force Account (CFA)

PACKAGE ITEMS

1st Tranche (Php)

489,879.60

2nd Tranche (Php)

139,965.60

3rd Tranche (Php)

69,982.80

TOTAL

QTY

UNIT

TOTAL UNIT
COST

KC Grant:

699,828.00

PROC
METHOD

TOTAL

1st Tranche
KC Grant
PACKAGE 1 : HARDWARE
Materials:
Nylon String
Anti-Termite (e.g. solignum, )

2.00

kg

300.00

600.00

500.00

5.00

gal

1,065.00

5,325.00

4,437.50

1/4" x 1/4" x 3' Plastic Screen

2.00

meter

85.00

170.00

141.67

1/4 thk. 4'x8' Ordinary Plywood

15.00

shts

355.00

5,325.00

4,437.50

1/4" x 4' x 8' Marine Plywood

29.00

Shts.

425.00

12,325.00

10,270.83

# 5 CWN

4.00

Kgs.

48.00

192.00

160.00

# 4 CW Nails

19.00

kgs

45.00

855.00

712.50

# 3 CWN

19.00

Kgs.

46.00

874.00

728.33

# 2 CWN

10.00

kgs.

48.00

480.00

400.00

# 1 CW Nails

5.00

kgs

52.00

260.00

216.67

# 1 Finishing Nails

2.00

Kgs.

58.00

116.00

96.67

1/2 " CW Nails

8.00

kg

50.00

400.00

333.33

Bags

250.00

82,750.00

68,958.33

Portland Cement Type I


Red Cement (US Lansco or uqivalent)

331.00
16.00

kilos

75.00

1,200.00

1,000.00

Soil Poisoning Materials

51.00

cu.m.

75.00

3,825.00

3,187.50

12mm dia. X 7" Machine Bolt w/ Knot and washer

14.00

Pcs.

35.00

490.00

408.33

12mm dia. X 6m, plain roundbar for grills

23.00

lengths

250.00

5,750.00

4,791.67

10mm dia. x 6.0m RSB

320.00

Length

130.00

41,600.00

34,666.67

12mm dia. x 6.0m RSB

20.00

Length

185.00

3,700.00

3,083.33

16mm dia. x 6.0m RSB

65.00

Length

330.00

21,450.00

17,875.00

1.50

rolls

1,550.00

2,325.00

1,937.50

# 16 G.I. Tie Wire

15.00

Kgs.

50.00

750.00

625.00

Hacksaw Blade

10.00

Pcs.

42.00

420.00

350.00

D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb

1.00

set

1,850.00

1,850.00

1,541.67

Lavatory-closet-cover with handle & Hinges attached

1.00

set

1,500.00

1,500.00

1,250.00

Lockset (high quality doorknob)

4.00

set

850.00

3,400.00

2,833.33

( 3-1/2" x 3-1/2" ) loose pin hinges

12.00

pcs

110.00

1,320.00

1,100.00

1"x12"x8' Hardi-Sanipa (Hardiflex-Board)

20.00

Length

345.00

6,900.00

5,750.00

# 16 G.I. Tie Wire

IX. PLUMBING WORKS

unit

3,200.00

3,200.00

Flush Type Toilet Bowl

1.00

2,666.67

4" x 4" PVC Floor Drain

1.00

set

10.00

10.00

8.33

4" x 3.0m dia. PV Pipe serries 1000

3.00

length

535.00

1,605.00

1,337.50

4" dia. X 45 PVC Bend Elbow

2.00

pc

47.50

95.00

79.17

2" dia. X 90 PVC Bend Elbow

1.00

pc

21.50

21.50

17.92

4" dia. X 90 PVC Bend Elbow

2.00

pc

62.50

125.00

104.17

2" X 3.0m PV Pipe

1.00

length

205.00

205.00

170.83

4" dia.x 4" dia. PVC Wye

2.00

pc

100.00

200.00

166.67

2" x 4" Tee

1.00

pc

87.50

87.50

3" x 3.0m dia. PV Pipe serries 1000

2.00

length

420.00

840.00

2" X 3.0m PV Pipe serries 1000

2.00

length

205.00

410.00

2" dia. X 90 PVC Bend Elbow

2.00

pc

21.50

43.00

2" dia. PVC P-Trap

1.00

pc

65.00

65.00

3" dia. X 45deg. PVC elbow

3.00

pc

30.00

90.00

Solvent Cement

1.00

pint

175.00

175.00

Kitchen Sink,(0.4m x 0.6m, Single Tab, Stainless)

pc

48.50

48.50

40.42
72.92

LOCAL SHOPPING FOR GOODS (LSG)

1.00

700.00
341.67
35.83
54.17
75.00
145.83

1.00

pc

750.00

750.00

1/2" x 3.0m pipe pvc

10.00

length

56.00

560.00

1/2" dia. Gate valve

1.00

pc

200.00

200.00

1/2" Coupling PVC

10.00

pc

4.00

40.00

1/2" 90 deg. Bend elbow pvc

7.00

pc

6.75

47.25

1/2" PVC Tee

1.00

pc

9.25

9.25

625.00

7.71

1/2" female threaded adaptor

2.00

pc

7.85

15.70

13.08

466.67
166.67
33.33
39.38

1/2" Faucet, hosebib, brass

2.00

pc

135.00

270.00

225.00

Teflon Tape

3.00

roll

13.50

40.50

33.75

Solvent Cement

1.00

pint

175.00

175.00

145.83

4" x 4" PVC Tee

3.00

pc

110.00

330.00

275.00

3" dia. x 3.0m PVC Pipe

9.00

length

420.00

3,780.00

3,150.00

3" dia. X 90 deg. bend PVC Elbow


Solvent Cement

18.00

pc

37.50

675.00

562.50

1.00

pint

175.00

175.00

145.83

X. TILE WORKS

8" x 8" Glazed Wall Tiles (Green or equivalent colors)

230.00

pc

15.50

3,565.00

2,970.83

8" x 8" Unglazed Floor Tiles (Green or equivalent colors)

120.00

pc

17.50

2,100.00

1,750.00

White cement / Tile Grout

10.00

bags

65.00

650.00

541.67

Tile Trim x 3m

20.00

pc

28.00

560.00

466.67

At Lavatory:

8" x 8" Glazed Wall Tiles (Green or equivalent colors)

68.00

pc

15.50

1,054.00

878.33

White cement / Tile Grout

2.00

kls.

65.00

130.00

108.33

Tile Trim x 3m

3.00

pc

28.00

84.00

70.00

XI. ELECTRICAL WORKS

2" x 4" Utility Boxes Pvc

12.00

pcs.

22.50

270.00

225.00

4" x 4" Juncton Boxes PVC

7.00

pcs.

27.50

192.50

160.42

3/4" dia. RSC Pipe

1.00

length

215.00

215.00

179.17

Screw Insulator

1.00

pc.

16.50

16.50

13.75

3.5mm2 THW Stranded

2.00

box

3,295.00

6,590.00

5,491.67

Service Drop Wire

60.00

19.50

1,170.00

975.00

PVC Clamp

10.00

pc

1.50

15.00

12.50

Flexible tube 3/4" dia

80.00

8.50

680.00

566.67

Electrical Tape (Big)

3.00

pc

22.50

67.50

56.25

Flourescent Lamp, 40 watts

5.00

assy

280.00

1,400.00

1,166.67

10 watts compact flourescent Lamp

3.00

set

125.00

375.00

312.50

2 Gang Switch with Plate

2.00

pc

87.50

175.00

145.83

1 Gang Switcth w/ Plate

4.00

pc

55.00

220.00

183.33

Duplex Convenience Outlet

5.00

pc

87.50

437.50

364.58

Lighting Outlet ( 4" Porcelain Receptacle)

7.00

pc

30.00

210.00

175.00

Female Adaptor

5.00

pc

25.00

125.00

104.17

KWHR meter w/ Base

1.00

unit

2,650.00

2,650.00

2,208.33

Entrance Cap # 1" dia.

5.00

pc

40.00

200.00

166.67

1.00

set

1,500.00

1,500.00

1,250.00

Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)
Sub-Total (Actual)

245,092.20

Savings amount determined after procurement

37,482.30

31,235.25

Sub Total for Package (Plan)

282,574.50

235,478.75

PACKAGE 2 : PAINTING WORKS


Concrete Putty

14.00

gal

Concrete Neutralizer

6.00

gal

Polituff

2.00

pcs

PACKAGE 1

4" dia.PVC Clean Out Plug

204,243.50

14.00

gal

Semi-Gloss Latex White

14.00

gal

Quick Dry Enamel Chocolate Brown

1.00

gal

Quick Dry Enamel White-Semi-Gloss

6.00

gal

Enamel Paint (Black)

1.00

liter

Flat Enamel White

1.00

gal

Latex Tinting Color Rawsienna

2.00

pint

Latex Tinting Color Red

2.00

pint

Latex Tinting Color Blue

1.00

pint

Latex Tinting Color Yellow

1.00

pint

Latex Tinting Color Green

1.00

pint

Paint Thinner

4.00

gal

Paint Brush 4"

4.00

pc

Paint Brush 2"

2.00

pc

Paint Roller 7" with Pan

4.00

set

Sandpaper #100

10.00

sheet

Sandpaper #200

10.00

sheet

Sub-Total (Actual)

LOCAL SHOPPING FOR GOODS (LSG)

PACKAGE 2

Flat Latex White

Savings amount determined after procurement

29,446.00

Sub Total for Package (Plan)

29,446.00

PACKAGE 3: LUMBER
Materials
1"x2"x8' Wood Stick/Lattice (Good Lumber)

53.33

bdft

41.00

2,186.53

1,822.11

2"x2"x8' Ceiling Joist (Good Lumber)

378.96

bdft

39.50

14,968.92

12,474.10

50 - 2" x 2" x 10' Hangers (Good Lumber)

167.00

bd ft

39.50

6,596.50

5,497.08

25- 2" x 2" x 12' Coco Lumber

100.00

bd ft

19.50

1,950.00

1,625.00

400.00

bd.ft.

19.50

7,800.00

6,500.00

67.00

bd.ft.

19.50

1,306.50

1,088.75

2"x5"x14' for Top Chord (Good Lumber)

116.67

bdft.

39.50

4,608.47

2"x5"x12' for Bottom Chord (Good Lumber)

100.00

bdft.

39.50

3,950.00

60.00

bdft.

39.50

2,370.00

100 - 2"x2"x12' Coco Lumber


20 - 2"x2"x10' Coco Lumber for Bracing

PACKAGE-3

Truss 1: 5 units

2"x4"x8' for Web Member & Kingpost (Good Lumber)


Truss 2: 2 units

3,840.39

LSG

3,291.67
1,975.00

2"x5"x12' for Top Chord (Good Lumber)

40.00

bdft.

39.50

1,580.00

1,316.67

2"x5"x14' for Bottom Chord (Good Lumber)

46.67

bdft.

39.50

1,843.47

1,536.22

2"x4"x8' for Web Member & Kingpost (Good Lumber)

10.00

bdft.

39.50

395.00

329.17

Purlins, Wood Cleats & Fascia Board:

2"x3"x 10' (Good Lumber)

320.00

bdft.

39.50

12,640.00

10,533.33

2"x2"x 8' (Good Lumber)

21.33

bdft.

39.50

842.54

702.11

Sub-Total (Actual)

63,037.92

Savings amount determined after procurement

5,756.13

Sub Total for Package (Plan)

68,794.04

52,531.60
-

4,796.77
57,328.37

PACKAGE 4: AGGREGATES

PACKAGE-4

Materials:
Filling Materials

35.00

cu.m.

400.00

14,000.00

Washed Gravel

24.00

cu.m.

680.00

16,320.00

21.00

cu.m.

580.00

12,180.00

10,150.00

8.75

15,750.00

13,125.00

Sub-Total (Actual)

58,250.00

48,541.67

Savings amount determined after procurement

21,650.00

Sub Total for Package (Plan)

79,900.00

Washed Sand
4" x 8' x 16" CHB

1,800.00

Pcs

11,666.67
LSG

Materials:

PACKAGE-5

Colorib Longspan 0.40mm x 1.10m x 3m (Green)

17.00

pcs

6.00

pcs

Colorib No. 24, x 8' Pre formed Side Gutter

10.00

pcs

Colorib No. 24, x 8' Pre formed Side End Flashing

11.00

pcs

Colorib No. 24, x 8' Pre formed End Wall Flashing

3.00

pcs

Colorib No. 24, x 8' Pre formed Ridgeroll

5.00

pcs

18,041.67
66,583.33

PACKAGE 5: ROOFING
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)

13,600.00

LSG

PACK

Roof Sealant
Tex Screw 2 1/2" dia. (for wood)
Blind Rivets

2.00

lit

1,300.00

pc

200.00

pc

Sub-Total (Actual)

Savings amount determined after procurement

65,645.00

Sub Total for Package (Plan)

65,645.00

PACKAGE 6: FURNITURE

PACKAGE-6

Materials:
D - 1, (1.0m x 2.10m) Panel Door

set

4,000.00

12,000.00

10,000.00

D-1, 2"x6"x8' for Door Jamb (Good Lumber)

64

bdft

45.00

2,880.00

2,400.00

2"x6" wooden jamb assembly for W-1 w/ a dimension of 1.8m x 1.2m to


include mollion partition at 0.60m interval.

sets

3,350.00

13,400.00

11,166.67

2"x6" wooden jamb assembly for W-2 w/ a dimension of 1.2m x 1.2m to


include mollion partition at 0.60m interval.

sets

2,000.00

4,000.00

2"x6" wooden jamb assembly for W-5 w/ a dimension of 0.60m x 0.60m


to include mollion partition at 0.60m interval.

1.00

Sets

520.00

520.00

433.33

36" x 75" Wooden Bed

1.00

unit

3,400.00

3,400.00

2,833.33

24" x 36" Wooden Table w/ Wooden Chair

1.00

set

1,800.00

1,800.00

1,500.00

38,000.00

31,666.67

Sub-Total (Actual)

LSG

3,333.33

Savings amount determined after procurement

34.00

28.33

Sub Total for Package (Plan)

38,034.00

31,695.00

PACKAGE 7: GLASS

PACKAGE-7

Materials:
W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie window on
standard aluminum housing w/ 12mm dia. hole in between blades
interval

Sets

W - 2, (1.20m X 1.20m) twelve Blades clear glass jalousie window on


standard aluminum housing w/ 12mm dia. hole in between blades
interval

Sets

W - 3, (0.60m X 1.20m) twelve Blades clear glass jalousie window on


standard aluminum housing w/ 12mm dia. hole in between blades
interval

Sets

Sub-Total (Actual)

LSG

Savings amount determined after procurement

10,100.00

Sub Total for Package (Plan)

10,100.00

PACKAGE 8: ROOF SIGNAGE


P-8

Supply and Install Roof Signage

1.00

lot

2,500.00

Sub-Total (Actual)

2,500.00

LSG

2,500.00

Savings amount determined after procurement

Sub Total for Package (Plan)

2,500.00

PACKAGE 9: PROJECT BILLBOARD


P-9

Supply and Install Community Project Steel Billboard

1.00

lot

8,900.00

8,900.00

LSG

7,416.67

Sub-Total (Actual)

8,900.00

Savings amount determined after procurement

100.00

7,416.67
83.33

Sub Total for Package (Plan)

9,000.00

7,500.00

PACKAGE-10

PACKAGE 10: BASIC AMENITIES


BP Apparatus

1.00

unit

Stethoscope

1.00

unit

Weighing Scale for adult

1.00

unit

Weighing Scale for infant

1.00

unit

1.00

set

Medicine/Dressing Kit (CART W/ TRAY)


Sub-Total (Actual)

LSG

Savings amount determined after procurement

16,386.00

Sub Total for Package (Plan)

16,386.00

Total Materials Cost

415,780.12

344,400.10

CFA

P-11

PACKAGE 11: LABOR


Skilled

58,500.00

unskilled

55,800.00

21,500.00
19,749.21

Sub-Total

114,300.00

41,249.21

Total Direct Cost (cash)

1,720,223.63

530,080.12

385,649.31

PACKAGE-12

PACKAGE 12: HANDTOOLS AND PERSONAL PROTECTIVE EQUIPMENTS


Shovel w/ handle

1.00

pc

350.00

350.00

280.00

Crow Bar

1.00

pc

325.00

325.00

260.00

Concrete Pail

10.00

pc

48.00

480.00

384.00

Wheel Barrow

1.00

pc

2,125.00

2,125.00

Sledge Hammer (5kg) w/ handle

1.00

pc

1,350.00

1,350.00

Hard Hat

5.00

pc

110.00

550.00

Hand Glooves

10.00

pcs

38.00

380.00

304.00

Medicine Kit

1.00

set

1,850.00

1,850.00

1,480.00

7,410.00

5,928.00

Sub-Total (Actual)

1,700.00

LSG

1,080.00
440.00

Savings amount determined after procurement

190.00

152.00

Sub Total for Package (Plan)

7,600.00

6,080.00

PACKAGE-13

PACKAGE 13: ENVIRONMENTAL MITIGITING COST


Warning signs (Tarpulin Printing)

5.00

pc

Barricades

5.00

pc

270.00

1,350.00
-

1,080.00

LSG

Sub-Total (Actual)

1,350.00

Savings amount determined after procurement

1,400.00

1,080.00
1,120.00

Sub Total for Package (Plan)

2,750.00

2,200.00

Overhead

15,750.00

6,516.67

Administrative Cost

40,000.00

33,333.33

Reproduction of plans

2,500.00

Material Testing

4,000.00

Treasurers Bond

3,375.00

Contingency

CFA

PACKAGE-14

j. Indirect Cost

1,914.94

29,504.46

Sub-Total

95,129.46

Total Indirect Cost (cash)

41,764.94

103,889.46

48,772.94

TOTAL SAVINGS DETERMINED AFTER PROCUREMENT

188,189.43

55,457.36

GRAND TOTAL CASH (Actual)

633,969.58

434,422.25

GRAND TOTAL CASH (Plan)

822,159.00

SAY

822,159.00

489,879.60
70.00%

188,189.42
Workshop output of:

Checked by:

LEONORA COFINO

JUDITH GRAMATICA

CARMEN A. GAUDIANO

Procurement Team Head

PPT

Municipal Engineer

UNITY PROCUREMENT PACKAGING


: Construction of Barangay Health Station

sed Sub-Project

: 822,159.00
: 80 C.D.

RCES OF FUNDS

PERCENTAGE WEIGHT
TOTAL

LCC:

TO KC GRANT

AMOUNT
(PESO)

FUND SOURCE

TO LCC CASH

LEGEND:

KC Cost

699,828.00

85,631.70

575,511.30

70.00%

70.00%

24,466.20

164,431.80

20.00%

20.00%

TOTAL LCC :
In-kind:

151,056.00

28,725.00

12,233.10

82,215.90

10.00%

10.00%

Cash:

122,331.00

122,331.00

822,159.00

100.00%

100.00%

TOTAL

850,884.00

1st Tranche

2nd Tranche

LCC Cash

KC Grant

LCC Cash

REMARKS

ESTIMATED COST INVOLED

3rd Tranche
KC Grant

LCC Cash

TOTAL
KC Grant
-

MONTH

TOTAL

LCC Cash
-

1
-

100.00

500.00

100.00

600.00

887.50

4,437.50

887.50

5,325.00

28.33

141.67

28.33

170.00

887.50

4,437.50

887.50

5,325.00

2,054.17

10,270.83

2,054.17

12,325.00

32.00

160.00

32.00

192.00

142.50

712.50

142.50

855.00

145.67

728.33

145.67

874.00

80.00

400.00

80.00

480.00

43.33

216.67

43.33

260.00

19.33

96.67

19.33

116.00

66.67

333.33

66.67

400.00

13,791.67

68,958.33

13,791.67

82,750.00

200.00

1,000.00

200.00

1,200.00

637.50

3,187.50

637.50

3,825.00

81.67

408.33

81.67

490.00

958.33

4,791.67

958.33

5,750.00

6,933.33

34,666.67

6,933.33

41,600.00

616.67

3,083.33

616.67

3,700.00

3,575.00

17,875.00

3,575.00

21,450.00

387.50

1,937.50

387.50

2,325.00

125.00

625.00

125.00

750.00

70.00

350.00

70.00

420.00

308.33

1,541.67

308.33

1,850.00

250.00

1,250.00

250.00

1,500.00

566.67

2,833.33

566.67

3,400.00

220.00

1,100.00

220.00

1,320.00

1,150.00

5,750.00

1,150.00

6,900.00

533.33

2,666.67

533.33

PROPOSED
IMPLEMENTATION
SCHEDULE

3,200.00

1.67

8.33

1.67

10.00

267.50

1,337.50

267.50

1,605.00

15.83

79.17

15.83

95.00

3.58

17.92

3.58

21.50

20.83

104.17

20.83

125.00

34.17

170.83

34.17

205.00

33.33

166.67

33.33

200.00

8.08

40.42

8.08

48.50

14.58

72.92

14.58

87.50

140.00

700.00

140.00

840.00

68.33

341.67

68.33

410.00

7.17

35.83

7.17

43.00

10.83

54.17

10.83

65.00

15.00

75.00

15.00

90.00

29.17

145.83

29.17

175.00

125.00

625.00

125.00

750.00

93.33

466.67

93.33

560.00

33.33

166.67

33.33

200.00

6.67

33.33

6.67

40.00

7.88

39.38

7.88

47.25

1.54

7.71

1.54

9.25

2.62

13.08

2.62

15.70

45.00

225.00

45.00

270.00

6.75

33.75

6.75

40.50

29.17

145.83

29.17

175.00

55.00

275.00

55.00

330.00

630.00

3,150.00

630.00

3,780.00

112.50

562.50

112.50

675.00

29.17

145.83

29.17

175.00

594.17

2,970.83

594.17

3,565.00

350.00

1,750.00

350.00

2,100.00

108.33

541.67

108.33

650.00

93.33

466.67

93.33

560.00

175.67

878.33

175.67

1,054.00

21.67

108.33

21.67

130.00

14.00

70.00

14.00

84.00

45.00

225.00

45.00

270.00

32.08

160.42

32.08

192.50

35.83

179.17

35.83

215.00

2.75

13.75

2.75

16.50

1,098.33

5,491.67

1,098.33

6,590.00

195.00

975.00

195.00

1,170.00

2.50

12.50

2.50

15.00

113.33

566.67

113.33

680.00

11.25

56.25

11.25

67.50

233.33

1,166.67

233.33

1,400.00

62.50

312.50

62.50

375.00

29.17

145.83

29.17

175.00

36.67

183.33

36.67

220.00

72.92

364.58

72.92

437.50

35.00

175.00

35.00

210.00

20.83

104.17

20.83

125.00

441.67

2,208.33

441.67

2,650.00

33.33

166.67

33.33

200.00

250.00

1,250.00

250.00

1,500.00
245,092.20

40,848.70

204,243.50

40,848.70

6,247.05

31,235.25

6,247.05

37,482.30

47,095.75

235,478.75

47,095.75

282,574.50

24,538.33

4,907.67

24,538.33

4,907.67

29,446.00

24,538.33

4,907.67

24,538.33

4,907.67

29,446.00

364.42

1,822.11

364.42

2,186.53

2,494.82

12,474.10

2,494.82

14,968.92

1,099.42

5,497.08

1,099.42

6,596.50

325.00

1,625.00

325.00

1,950.00

1,300.00

6,500.00

1,300.00

7,800.00

217.75

1,088.75

217.75

1,306.50

768.08

3,840.39

768.08

4,608.47

658.33

3,291.67

658.33

3,950.00

395.00

1,975.00

395.00

2,370.00

263.33

1,316.67

263.33

1,580.00

307.24

1,536.22

307.24

1,843.47

65.83

329.17

65.83

395.00

2,106.67

10,533.33

2,106.67

12,640.00

140.42

702.11

140.42

842.54
63,037.92

10,506.32

52,531.60

10,506.32

959.35

4,796.77

959.35

5,756.13

57,328.37

11,465.67

68,794.04

2,333.33

11,666.67

2,333.33

14,000.00

2,720.00

13,600.00

2,720.00

16,320.00

2,030.00

10,150.00

2,030.00

12,180.00

2,625.00

13,125.00

2,625.00

15,750.00

9,708.33

58,250.00

11,465.67

9,708.33

48,541.67

3,608.33

18,041.67

3,608.33

21,650.00

66,583.33

13,316.67

79,900.00

13,316.67

54,704.17

10,940.83

54,704.17

10,940.83

65,645.00

54,704.17

10,940.83

54,704.17

10,940.83

65,645.00

2,000.00

10,000.00

2,000.00

12,000.00

480.00

2,400.00

480.00

2,880.00

2,233.33

11,166.67

2,233.33

13,400.00

666.67

3,333.33

666.67

4,000.00

86.67

433.33

86.67

520.00

566.67

2,833.33

566.67

3,400.00

300.00

1,500.00

300.00

1,800.00

31,666.67

6,333.33

38,000.00

6,333.33

5.67

28.33

5.67

34.00

6,339.00

31,695.00

6,339.00

38,034.00

8,416.67

1,683.33

8,416.67

1,683.33

10,100.00

8,416.67

1,683.33

8,416.67

1,683.33

10,100.00

2,083.33

416.67

2,083.33

416.67

2,500.00

2,083.33

416.67

2,083.33

416.67

2,500.00

1,483.33

16.67

1,500.00

2,083.33

416.67

2,083.33

416.67

2,500.00

7,416.67

1,483.33

8,900.00

7,416.67

1,483.33

8,900.00

83.33

16.67

100.00

7,500.00

1,500.00

9,000.00

1,483.33

13,655.00

2,731.00

13,655.00

2,731.00

13,655.00

2,731.00

13,655.00

2,731.00

16,386.00

346,483.43

69,296.69

415,780.12

68,880.02

2,083.33

416.67

16,386.00

19,500.00

17,500.00

58,500.00

58,500.00

18,334.77

17,716.02

55,800.00

55,800.00

114,300.00

114,300.00

37,834.77

35,216.02

UDIANO

68,880.02

37,834.77

37,299.35

416.67

460,783.43

69,296.69

530,080.12

70.00

280.00

70.00

350.00

65.00

260.00

65.00

325.00

96.00

384.00

96.00

480.00

425.00

1,700.00

425.00

2,125.00

270.00

1,080.00

270.00

1,350.00

110.00

440.00

110.00

550.00

76.00

304.00

76.00

380.00

370.00

1,480.00

370.00

1,850.00

5,928.00

1,482.00

7,410.00

1,482.00

38.00

152.00

38.00

190.00

1,520.00

6,080.00

1,520.00

7,600.00

1,080.00

270.00

1,350.00

270.00
-

270.00

1,080.00

270.00

1,350.00

280.00

1,120.00

280.00

1,400.00

550.00

2,200.00

550.00

2,750.00

9,233.33

15,750.00
3,000.00

3,666.67

231.22

1,040.03

1,228.75

238.39

1,846.67

33,333.33
1,914.94

3,375.00

15,750.00

6,666.67

40,000.00

2,500.00

2,500.00

2,085.06

4,000.00

3,375.00

3,375.00
29,504.46

24,266.78

5,237.68

24,266.78

5,237.68

3,844.61

9,233.33

5,886.70

24,266.78

10,133.10

75,265.05

19,864.41

95,129.46

5,596.61

9,233.33

5,886.70

24,266.78

10,133.10

82,273.05

21,616.41

103,889.46

11,155.07

92,897.50

18,579.50

8,416.67

1,683.33

156,771.52

31,417.90

188,189.43

74,476.63

47,068.10

5,886.70

61,566.13

10,549.77

543,056.48

90,913.10

633,969.58

85,631.70

139,965.60

24,466.20

69,982.80

12,233.10

543,056.48

122,331.00

822,159.00

20.00%

10.00%

Reviewed by:

Submitted by:

RODSON R. ESCORA

ANTONIO ALAM

Deputy Area Coordinator

BSMPC

AMOUNT
(PESO)
699,828.00
151,056.00
28,725.00
122,331.00
850,884.00

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
3

ADMINISTRATIVE COST DERIVATION


Sub-project Activities

Destination/Description

Fare/
Allowance/
Unit Price

Qty.

Unit

pesos

No of
transactions

1. TE for Opening of BSPMC LBP Bank Account of CVs


DBP Initial Deposit
BSPMC office to Dumaguete
City (vice versa)

1,000.00

1 times

150.00

persons x

1 times

Dumaguete City transport


mealsDumaguete City

50.00
80.00

x
x

2
2

persons x
persons x

1 times
3 times

=
=

280.00

persons x

6 times

60.00
80.00

x
x

3
3

persons x
persons x

6 times
6 times

=
=

280.00

persons x

6 times

60.00
80.00

x
x

2
2

persons x
persons x

6 times
6 times

=
=

100.00
24.00

12
19

meetings
persons x

12 times

=
=

50.00

persons x

10 times

Meals

100.00

persons x

10 times

BSPMC office toDumaguete City


(vice versa)

120.00

persons x

20 times

80.00

persons x

19 times

350.00
5.00
2.00
1,480.00
50.00
50.00
50.00
100.00
15.00
30.00
500.00
50.00
35.00
20.00
3.00
20.00
30.00
80.00
50.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

4
8
1524
1
1
1
1
1
1
4
1
4
1
1
20
1
1
2
1

Sub-Total
2. TE for procurement transactions of CVs
Serving of Canvass

BSPMC office toDumaguete City


(vice versa)

Dumaguete City transport


mealsDumaguete City
Serving of PO & Payments

BSPMC office toDumaguete City


(vice versa)

Dumaguete City transport


meals Dumaguete City
Sub-Total
3. Project Meetings
Supplies
Snacks
Sub-Total
4. ACT-initiated Meetings
BSPMC office to Municipal Gym
(vice versa)

Sub-Total
5. Treasurer Payroll Processing

Meals
Sub-Total
6. Forms/Supplies and
Reproduction
Bondpaper long
Ballpens
Reproduction
Petty cash box w/ padlock
Rubber Stamp
Stampad
Stamping Ink
Stapler
Stapler Remover
Staple Wire
Calculator
Columnar Book
Liquid Eraser
Paste/Glue
Folder long
Paper clip
Pentil pen
Log book
Fastener

reams
pcs
sheets
set
pc
pc
pc
pc
pc
boxes
pc
pcs
ps
pc
pcs
box
pc
pcs
box

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Sub-Total
Total for Admin Cost
Prepared by :

Approved by :

ELSA A. TRUNO

ANTONIO ALAM

MEO Staff

BSPMC Chairperson

Checked by:

Concurred by :

ENGR. RODSON R. ESCORA

STEPHEN B. ALAM

Deputy Area Coordinator

Barangay Captain

ENGR. CARMEN A. GAUDIANO

HON. NEIL B. CREDO

Municipal Engineer - MCT DAC

Municipal Mayor

Recommending Approval:

Noted by:

GEORGE S. ISULAT
Regional Community Infrastructure Specialist

ATIVE COST DERIVATION


Amount

1,000.00
300.00
100.00
480.00
1,880.00
5,040.00
1,080.00
1,440.00
3,360.00
720.00
960.00
12,600.00
1,200.00
5,472.00
6,672.00
2,500.00
5,000.00
7,500.00
2,400.00
1,520.00
3,920.00

1,400.00
40.00
3,048.00
1,480.00
50.00
50.00
50.00
100.00
15.00
120.00
500.00
200.00
35.00
20.00
60.00
20.00
30.00
160.00
50.00

7,428.00
40,000.00

ANTONIO ALAM
BSPMC Chairperson

STEPHEN B. ALAM
Barangay Captain

HON. NEIL B. CREDO


Municipal Mayor

REVISED SUB-PROJECT CONCEPT FORM


Barangay

Municipality

A. GENERAL INFORMATION
Name of proposed sub-project:
Category:
Public Goods

Province:

Region:

XII

CONSTRUCTION OF BARANGAY HEALTH STATION


Enterprise

Human Resource Dev't.

What needs of the community will the proposed sub-project address?


1
2
3
B. TECHNICAL DESCRIPTION
Physical target:
51 sqm
Cost parameter:
Person/s who assisted in the preparation of techical proposal:
Proposed scope of works to be undertaken:

Err:509 /sqm

Manpower requirement / sources: (skilled)


Equipment requirement / sources:
Other component included in the proposal (e.g. trainings)
Procurement Method/s to be adopted:
C. FINANCIAL ECONOMIC ASPECT
Total Estimated Cost :
Err:509
Cost Sharing Arrangement:
Direct Cost
Grant Amount
616,282.95
LCC: BLGU
Community
Err:509
90,396.59
MLGU
PLGU/Others
4,800.00
sub-total
Err:509
Total LCC Cash
90,396.59
Total LCC In-kind
Err:509

Indirect Cost
Err:509

Total
Err:509
Err:509
Err:509
Err:509
Err:509
107,093.32
Err:509

Err:509
Err:509
Err:509
16,696.73
Err:509

Total number of Household (HH) in the barangay:


Number of HH currently without access to the needed
services that can be served by the proposed sub-project:

% total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Total population
% to total

Current expenses without the proposed SP


Expected expenses after completion of proposed SP:
Other benefits can be derived from the proposed sub-project:

D. SAFEGUARD CONCERNS
Any displacement or relocation of community members during impleme
Yes
Acquisition of proposed site/location?
Deed of Sal
Donated LGU Ownd
Proposed site within the reservation areas?
Yes
No
Necessary permit/s accomplished? (e.g ECC, CNC)
Yes
No
EMP Only
Mitigating measures to be undertaken for the environmental impacts of the sub-project?

No
others specify

E. SP SUSTAINABILITY
Is there an existing O&M group or still to be organized?
Is the community willing to pay for Tariff and by How much?
Other sources of funds for the operation and maintenance activities?
Identified capability building requirements for O&M group?
How do we plan to maintain the completed sub-project?

Prepared by:

Approved for endorsement to the MIBF

Head, Project Preparation Team

Brgy. Chairperson

Approved for endorsement to KALAHI-CIDSS:

Technical Verification by:

MELQUIADEZ D. ATA
BSPMC Chairperson

Municipal Mayor/MIBF Convenor

Area Coordinator

MIAC Representative

51.0 sq.m

Err:509

ph 16,254.18/sq.m

Err:509
Err:509

Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

specify

PHP 868,894.60

Err:509

Err:509

Wash Sand
Anti-Termite (e.g. solignum, )
Kitchen Sink,(0.4m x 0.6m, Single Tab, Stainless)

/4" x 4' x 8' Marine Plywood

2"x2"x8' Coco Lumber


Ga. 26, 4'x8' Plain GI Sheet
# 1 Finishing Nails
# 2 CWN
# 3 CWN
# 4 CWN
# 5 CWN
#1 CWN
1 Gang Switcth w/ Plate
1"x1"x3' Meshwire
1"x12"x8' Hardi-Sanipa (Hardiflex-Board)
1"x2"x8' Wood Stick/Lattice (Good Lumber)
1/2 " CW Nails
1/2" 90 deg. Bend elbow pvc
1/2" Faucet, hosebib, brass
1/2" female threaded adaptor
1/2" PVC Tee
1/2" Coupling PVC
1/2" dia. Gate valve
1/2" x 3.0m pipe pvc
1/4 thk. 4'x8' Ordinary Plywood
1/4" x 1/4" x 3' Plastic Screen
10mm dia. x 6.0m RSB
2 Gang Switch with Plate
2" dia. PVC P-Trap
2" dia. X 90 PVC Bend Elbow
2" X 3.0m PV Pipe serries 1000
2" x 4" Tee
2" x 4" Utility Boxes Pvc
2"x2"x 8' (Good Lumber)
2"x2"x10' Coco Lumber, Diagonal Braces
2"x3"x 10' (Good Lumber)
2"x3"x10' Coco Lumber, Vertical Support
2"x4"x8' for Web Member & Kingpost (Good Lumber)
2"x5"x12' for Bottom Chord (Good Lumber)
2"x5"x14' for Bottom Chord (Good Lumber)
24" x 36" Wooden Table w/ Wooden Chair
25- 2" x 3" x 12' Coco Lumber
3" dia. x 3.0m PVC Pipe
3" dia. X 90 deg. bend PVC Elbow
3" x 3.0m dia. PV Pipe serries 1000
3.5mm2 THW Stranded
3/4" dia. RSC Pipe
36" x 75" Wooden Bed
4" dia. X 45 PVC Bend Elbow
4" dia. X 90 PVC Bend Elbow
4" dia.PVC Clean Out Plug
4" dia.x 4" dia. PVC Wye
4" x 3.0m dia. PV Pipe serries 1000
4" x 4" Juncton Boxes PVC
4" x 4" PVC Floor Drain
4" x 4" PVC Tee

24.00
3.00
1.00
29.00
123.00
2.00
2.00
1.00
5.00
1.00
2.77
0.50
4.00
4.00
20.00
53.33
6.00
7.00
2.00
2.00
1.00
10.00
1.00
10.00
5.00
2.00
133.00
2.00
1.00
1.00
1.00
1.00
12.00
21.33
281.00
320.00
168.00
60.00
100.00
46.67
1.00
150.00
9.00
18.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
2.00
3.00
7.00
1.00
3.00

cu.m.
can
pc
Shts.
bdft
shts.
Kgs.
kgs.
Kgs.
Kgs.
Kgs.
Kgs.
pc
meter
Length
bdft
kg
pc
pc
pc
pc
pc
pc
length
shts.
meter
Length
pc
pc
pc
length
pc
pcs.
bdft.
bdft
bdft.
bdft
bdft.
bdft.
bdft.
set
bd ft
length
pc
length
box
length
unit
pc
pc
pc
pc
length
pcs.
set
pc

700
300.00
700.00
420.00
25.00
355.00
65.00
70.00
65.00
65.00
36.00
65.00
65.00
80.00
345.00
55.00
65.00
10.00
160.00
12.00
10.00
5.00
418.00
75.00
335.00
40.00
155.00
98.00
40.00
40.00
180.00
90.00
20.00
41.00
25.00
41.00
25.00
41.00
41.00
41.00
4,080.00
25.00
365.00
40.00
370.00
3,900.00
240.00
7,000.00
30.00
40.00
50.00
98.00
500.00
25.00
90.00
100.00

4" x 8' x 16" CHB


50 - 2" x 2" x 10' Hangers (Good Lumber)
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
8" x 8" Unglazed Floor Tiles (Green or eqivalent colors)
Anti-Termite (e.g. solignum, )
Blind Rivets
BP Apparatus
Colorib Longspan 0.40mm x 1.10m x 3m (Green)
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)
Colorib No. 24, x 8' Pre formed End Wall Flashing
Colorib No. 24, x 8' Pre formed Ridgeroll
Colorib No. 24, x 8' Pre formed Side End Flashing
Colorib No. 24, x 8' Pre formed Side Gutter
Concrete Neutralizer
Concrete Putty
Duplex Convenience Outlet
Electrical Tape (Big)
Entrance Cap # 1" dia.
Female Adaptor
Filling Materials
Flat Enamel White
Flat Latex White
Flexible tube 3/4" dia
Flourescent Lamp, 40 watts
Flush Type Toilet Bowl
Hacksaw Blade
KWHR meter w/ Base
Latex Tinting Color Blue
Latex Tinting Color Green
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Yellow
Lighting Outlet ( 4" Porcelain Receptacle)
Medicine/Dressing Kit (CART W/ TRAY)
Nylon String
Paint Brush 2"
Paint Brush 4"
Paint Roller 7" with Pan
Paint Thinner
Polituff
Portland Cement
PVC Clamp
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White-Semi-Gloss
Red Cement (US Lansco or uqivalent)
Roof Sealant
Sandpaper #100
Sandpaper #200
Screw Insulator
Semi-Gloss Latex White
Service Drop Wire
Solvent Cement
Stethoscope
Teflon Tape
Tex Screw 2 1/2" dia. (for wood)
Tile Trim x 3m
Washed Gravel

1,596.00
167.00
195.00
57.00
4.00
200.00
1.00
6.00
17.00
3.00
5.00
11.00
10.00
6.00
14.00
5.00
3.00
5.00
5.00
14.78
1.00
14.00
80.00
5.00
1.00
10.00
1.00
1.00
1.00
2.00
2.00
1.00
7.00
1.00
3.00
2.00
4.00
4.00
4.00
2.00
160.00
10.00
1.00
6.00
16.00
2.00
10.00
10.00
1.00
14.00
60.00
1.00
1.00
3.00
1,300.00
4.00
24.00

Pcs
bd ft
pc
pc
gal
pc
unit
pcs
pcs
pcs
pcs
pcs
pcs
gal
gal
pc
pc
pc
pc
cu.m.
gal
gal
m
assy
unit
Pcs.
unit
pint
pint
pint
pint
pint
pc
set
roll
pc
pc
set
gal
pcs
bag
pc
gal
gal
kilos
lit
sheet
sheet
pc.
gal
m
pint
unit
roll
pc
pc
cu.m.

15.00
41.00
30.00
30.00
1,050.00
1.50
2,000.00
1,355.00
2,075.00
620.00
620.00
620.00
620.00
335.00
335.00
40.00
30.00
100.00
13.00
500.00
520.00
425.00
12.00
350.00
900.00
75.00
1,500.00
165.00
125.00
130.00
126.00
126.00
35.00
3,000.00
30.00
35.00
100.00
100.00
250.00
188.00
245.00
2.00
475.00
520.00
100.00
355.00
50.00
60.00
40.00
588.00
30.00
90.00
1,530.00
20.00
2.50
30.00
775.00

Weighing Scale for adult


Weighing Scale for infant
White cement / Tile Grout
1/8" x 1/8" x 3' Meshwire
12mm dia. X 7" Machine Bolt w/ Knot and washer
( 3-1/2" x 3-1/2" ) loose pin hinges
10 watts compact flourescent Lamp
10mm dia. X 6m Def. Bars
12mm dia. X 6m Def. Bars
12mm dia. X 6m, plain roundbar for grills
16mm dia. X 6m Def. Bars

1.00
unit
1.00
unit
4.00
kls.
4.00
meter
10.00
Pcs.
12.00
pcs
3.00
set
39.00 length
20.00 length
23.00
lengths
22.00 length

7,000.00
2,856.00
60.00
80.00
36.00
115.00
120.00
155.00
205.00
235.00
355.00

2"x6" wooden jamb assembly for W-1 w/ a dimension of


1.8m x 1.2m to include mollion partition at 0.60m interval.

4.00

sets

1,200.00

2"x6" wooden jamb assembly for W-2 w/ a dimension of


1.2m x 1.2m to include mollion partition at 0.60m interval.

2.00

sets

1,500.00

2"x6" wooden jamb assembly for W-5 w/ a dimension of


0.60m x 0.60m to include mollion partition at 0.60m
interval.

1.00

Sets

350.00

1.00
10.00
1.00
3.00

LOT
pc
pc
set

2,500.00
95.00
900.00
5,500.00

1.00

set

4,000.00

bdft
liter
kilos
pcs
pc
set
set
set

36.00
175.00
60.00
35.00
350.00
1,500.00
900.00
500.00

1.00

set

2,000.00

1.00
1.00
1.00

pc
pc
LOT

700.00
750.00
9,000.00

Building Roof Signage

Concrete Pail
Crow Bar
D - 1, (1.0m x 2.10m) Panel Door
D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb
D-1, 2"x6"x8' for Door Jamb (Good Lumber)
Enamel Paint (Black)
Ga. 16, GI. Tie Wire
Hand Glooves
Hard Hat
Lavatory-closet-cover with handle & Hinges attached
Lockset (high quality doorknob)
Medicine Kit
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)

Shovel w/ handle
Sledge Hammer (5kg) w/ handle
Supply & Installation Fabricated Steel Billboard

64.00
1.00
4.00
10.00
5.00
1.00
4.00
1.00

W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

9.00

Sets

750.00

W - 2, (1.20m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

4.00

Sets

750.00

1.00

Sets

350.00

W - 3, (0.60m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval
Wheel Barrow

1.00

pc

1,700.00

24.00
3.00
1.00
29.00
331.00
2.00
2.00
2.00
12.00
20.00
3.73
2.00
4.00
4.00
20.00
53.33
8.00
7.00
2.00
2.00
1.00
10.00
1.00
10.00
10.00
2.00
133.00
2.00
1.00
3.00
3.00
1.00
12.00
400.29
850.38
320.00
252.00
70.00
140.00
163.33
1.00
150.00
9.00
21.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
2.00
3.00
7.00
1.00
3.00

1,596.00
167.00
263.00
57.00
4.00
200.00
1.00
6.00
17.00
3.00
5.00
11.00
10.00
6.00
14.00
5.00
3.00
5.00
5.00
14.78
1.00
14.00
80.00
5.00
1.00
10.00
1.00
1.00
1.00
2.00
2.00
1.00
7.00
1.00
3.00
2.00
4.00
4.00
4.00
2.00
304.00
10.00
1.00
6.00
16.00
2.00
10.00
10.00
1.00
14.00
60.00
3.00
1.00
3.00
1,300.00
7.00
42.00

1.00
1.00
6.00
4.00
14.00
12.00
3.00
220.00
39.00
23.00
60.00
4.00

2.00

1.00
1.00
10.00
1.00
3.00
1.00
64.00
1.00
29.75
10.00
5.00
1.00
4.00
1.00
1.00
1.00
1.00
1.00
9.00

4.00

1.00
1.00

Anti-Termite (e.g. solignum, )


Kitchen Sink,(0.4m x 0.6m, Single Tab, Stainless)

/4" x 4' x 8' Marine Plywood

2"x2"x8' Coco Lumber


Ga. 26, 4'x8' Plain GI Sheet
# 1 Finishing Nails
# 2 CWN
# 3 CWN
# 4 CWN
# 5 CWN
#1 CWN
1 Gang Switcth w/ Plate
1"x1"x3' Meshwire
1"x12"x8' Hardi-Sanipa (Hardiflex-Board)
1"x2"x8' Wood Stick/Lattice (Good Lumber)
1/2 " CW Nails
1/2" 90 deg. Bend elbow pvc
1/2" Faucet, hosebib, brass
1/2" female threaded adaptor
1/2" PVC Tee
1/2" Coupling PVC
1/2" dia. Gate valve
1/2" x 3.0m pipe pvc
1/4 thk. 4'x8' Ordinary Plywood
1/4" x 1/4" x 3' Plastic Screen
2 Gang Switch with Plate
2" dia. PVC P-Trap
2" dia. X 90 PVC Bend Elbow
2" X 3.0m PV Pipe serries 1000
2" x 4" Tee
2" x 4" Utility Boxes Pvc
2"x2"x 8' (Good Lumber)
2"x2"x10' Coco Lumber
2"x2"x8' (Good Lumber)
2"x3"x 10' (Good Lumber)
2"x4"x8' (Good Lumber)
2"x5"x12' (Good Lumber)
2"x5"x14' (Good Lumber)
24" x 36" Wooden Table w/ Wooden Chair
25- 2" x 3" x 12' Coco Lumber
3" dia. x 3.0m PVC Pipe
3" dia. X 90 deg. bend PVC Elbow
3" dia. X 45deg. PVC elbow
3" x 3.0m dia. PV Pipe serries 1000
3.5mm2 THW Stranded
3/4" dia. RSC Pipe
36" x 75" Wooden Bed
4" dia. X 45 PVC Bend Elbow
4" dia. X 90 PVC Bend Elbow
4" dia.PVC Clean Out Plug

3.00
1.00
29.00
331.00
2.00
2.00
2.00
12.00
20.00
3.00
2.00
4.00
4.00
20.00
53.33
8.00
7.00
2.00
2.00
1.00
10.00
1.00
10.00
10.00
2.00
2.00
1.00
3.00
3.00
1.00
12.00
21.33
850.38
378.96
572.00
70.00
140.00
163.33
1.00
150.00
9.00
18.00
3.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00

can
pc
Shts.
bdft
shts.
Kgs.
kgs.
Kgs.
Kgs.
Kgs.
Kgs.
pc
meter
Length
bdft
kg
pc
pc
pc
pc
pc
pc
length
shts.
meter
pc
pc
pc
length
pc
pcs.
bdft.
bdft
bdft
bdft.
bdft.
bdft.
bdft.
set
bd ft
length
pc
pc
length
box
length
unit
pc
pc
pc

300.00
700.00
420.00
25.00
355.00
65.00
65.00
65.00
65.00
36.00
65.00
65.00
80.00
345.00
55.00
65.00
10.00
160.00
12.00
10.00
5.00
418.00
75.00
335.00
40.00
98.00
40.00
40.00
180.00
90.00
20.00
41.00
25.00
41.00
41.00
41.00
41.00
41.00
4,080.00
25.00
365.00
40.00
25.00
370.00
3,900.00
240.00
7,000.00
30.00
40.00
50.00

4" dia.x 4" dia. PVC Wye


4" x 3.0m dia. PV Pipe serries 1000
4" x 4" Juncton Boxes PVC
4" x 4" PVC Floor Drain
4" x 4" PVC Tee
4" x 8' x 16" CHB
50 - 2" x 2" x 10' Hangers (Good Lumber)
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
8" x 8" Unglazed Floor Tiles (Green or eqivalent colors)
Anti-Termite (e.g. solignum, )
Blind Rivets
BP Apparatus
Colorib Longspan 0.40mm x 1.10m x 3m (Green)
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)
Colorib No. 24, x 8' Pre formed End Wall Flashing
Colorib No. 24, x 8' Pre formed Ridgeroll
Colorib No. 24, x 8' Pre formed Side End Flashing
Colorib No. 24, x 8' Pre formed Side Gutter
Concrete Neutralizer
Concrete Putty
Duplex Convenience Outlet
Electrical Tape (Big)
Entrance Cap # 1" dia.
Female Adaptor
Filling Materials
Flat Enamel White
Flat Latex White
Flexible tube 3/4" dia
Flourescent Lamp, 40 watts
Flush Type Toilet Bowl
Hacksaw Blade
KWHR meter w/ Base
Latex Tinting Color Blue
Latex Tinting Color Green
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Yellow
Lighting Outlet ( 4" Porcelain Receptacle)
Medicine/Dressing Kit (CART W/ TRAY)
Nylon String
Paint Brush 2"
Paint Brush 4"
Paint Roller 7" with Pan
Paint Thinner
Polituff
Portland Cement
PVC Clamp
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White-Semi-Gloss
Red Cement (US Lansco or uqivalent)
Roof Sealant
Sandpaper #100
Sandpaper #200

2.00
3.00
7.00
1.00
3.00
1,596.00
167.00
263.00
57.00
4.00
200.00
1.00
6.00
17.00
3.00
5.00
11.00
10.00
6.00
14.00
5.00
3.00
5.00
5.00
14.78
1.00
14.00
80.00
5.00
1.00
10.00
1.00
1.00
1.00
2.00
2.00
1.00
7.00
1.00
3.00
2.00
4.00
4.00
4.00
2.00
304.00
10.00
1.00
6.00
16.00
2.00
10.00
10.00

pc
length
pcs.
set
pc
Pcs
bd ft
pc
pc
gal
pc
unit
pcs
pcs
pcs
pcs
pcs
pcs
gal
gal
pc
pc
pc
pc
cu.m.
gal
gal
m
assy
unit
Pcs.
unit
pint
pint
pint
pint
pint
pc
set
roll
pc
pc
set
gal
pcs
bag
pc
gal
gal
kilos
lit
sheet
sheet

98.00
500.00
25.00
90.00
100.00
15.00
41.00
30.00
30.00
1,050.00
1.50
2,000.00
1,355.00
2,075.00
620.00
620.00
620.00
620.00
335.00
335.00
40.00
30.00
100.00
13.00
500.00
520.00
425.00
12.00
350.00
900.00
75.00
1,500.00
165.00
125.00
130.00
126.00
126.00
35.00
3,000.00
30.00
35.00
100.00
100.00
250.00
188.00
245.00
2.00
475.00
520.00
100.00
355.00
50.00
60.00

Screw Insulator
Semi-Gloss Latex White
Service Drop Wire
Solvent Cement
Stethoscope
Teflon Tape
Tex Screw 2 1/2" dia. (for wood)
Tile Trim x 3m
Washed Gravel
Washed Sand
Weighing Scale for adult
Weighing Scale for infant
White cement / Tile Grout
1/8" x 1/8" x 3' Meshwire
12mm dia. X 7" Machine Bolt w/ Knot and washer
( 3-1/2" x 3-1/2" ) loose pin hinges
10 watts compact flourescent Lamp
10mm dia. X 6m Def. Bars
12mm dia. X 6m Def. Bars
12mm dia. X 6m, plain roundbar for grills
16mm dia. X 6m Def. Bars

1.00
pc.
14.00
gal
60.00
m
3.00
pint
1.00
unit
3.00
roll
1,300.00
pc
7.00
pc
24.00
cu.m.
24.00
Cu.m.
1.00
unit
1.00
unit
6.00
kls.
4.00
meter
14.00
Pcs.
12.00
pcs
3.00
set
342.00 length
81.00 length
23.00
lengths
60.00 length

40.00
588.00
30.00
100.00
1,530.00
20.00
2.50
40.00
775.00
700.00
7,000.00
2,856.00
60.00
80.00
36.00
115.00
120.00
155.00
205.00
235.00
355.00

2"x6" wooden jamb assembly for W-1 w/ a dimension of


1.8m x 1.2m to include mollion partition at 0.60m interval.

4.00

sets

1,200.00

2"x6" wooden jamb assembly for W-2 w/ a dimension of


1.2m x 1.2m to include mollion partition at 0.60m interval.

2.00

sets

1,500.00

2"x6" wooden jamb assembly for W-5 w/ a dimension of


0.60m x 0.60m to include mollion partition at 0.60m
interval.

1.00

Sets

350.00

1.00
10.00
1.00
3.00

LOT
pc
pc
set

2,500.00
95.00
900.00
5,500.00

1.00

set

4,000.00

bdft
liter
kilos
pcs
pc
set
set
set

36.00
175.00
60.00
35.00
350.00
1,500.00
900.00
500.00

1.00

set

2,000.00

1.00
1.00
1.00

pc
pc
LOT

700.00
750.00
9,000.00

Sets

750.00

Building Roof Signage

Concrete Pail
Crow Bar
D - 1, (1.0m x 2.10m) Panel Door
D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb
D-1, 2"x6"x8' for Door Jamb (Good Lumber)
Enamel Paint (Black)
Ga. 16, GI. Tie Wire
Hand Glooves
Hard Hat
Lavatory-closet-cover with handle & Hinges attached
Lockset (high quality doorknob)
Medicine Kit
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)

Shovel w/ handle
Sledge Hammer (5kg) w/ handle
Supply & Installation Fabricated Steel Billboard

W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

64.00
1.00
29.75
10.00
5.00
1.00
4.00
1.00

9.00

W - 2, (1.20m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval
W - 3, (0.60m X 1.20m) twelve Blades clear glass jalousie
window on standard aluminum housing w/ 12mm dia. hole
in between blades interval
Wheel Barrow

4.00

Sets

750.00

1.00

Sets

350.00

1.00

pc

1,700.00

Code

331.00

2.00
12
20.00
4.00
2.00

8.00

10.00

3.00

850.38
572.00
70.00
140.00
163.33

Description
Hardware
Lumber
Electrical
Furniture
Roofing
Painting
Amenities
Aggregates
Tiles
Windows
PPE
Billboard
Indirect Cost

Package #
1
2
3
4
5
6
7
8
9
10
11
12
13

56
9
18
8
9
20
5
3
4
3
6
2

263.00

304.00

342.00
81.00
60.00

29.75

OFFICE OF THE

CONS

UNIT COST
DESCRIPTION

A. Materials
Soil Poisoning Materials
Red Cement (US Lansco or uqivalent)
Portland Cement Type I
Nylon String
12mm dia. X 6m, plain roundbar for grills
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
# 16 G.I. Tie Wire
1/4 thk. 4'x8' Ordinary Plywood
1
/4" x 4' x 8' Marine Plywood
12mm dia. X 7" Machine Bolt w/ Knot and washer
12mm dia. X 7" Machine Bolt w/ Knot and washer
1"x12"x8' Hardi-Sanipa (Hardiflex-Board)
# 5 CWN
# 5 CWN
# 4 CW Nails
# 2 CW Nails
# 1 CW Nails
# 4 CWN
# 2 CWN
3" CW Nails
3" CW Nails
# 3 CWN
# 2 CWN
# 1 Finishing Nails
1/2 " CW Nails

Quantity Derivation
QUANTITY
Computation

8*6/3 =

(0.6*12*19)/6 =

81.2/2.88 =
direct counting
direct counting
direct counting
276.67*10/1000 =
96.67*10/1000 =

341.33*10/1000 =

81.20*0.05 =
29*0.055 =

1/2 " CW Nails


Anti-Termite (e.g. solignum, )
1/4" x 1/4" x 3' Plastic Screen
Lockset (high quality doorknob)

( 3-1/2" x 3-1/2" ) loose pin hinges


Lavatory-closet-cover with handle & Hinges attached

51.00 cu.m.
16.00
kilos
331.00
Bags
2.00
kg
23.00
lengths
320.00 Length
20.00 Length
65.00 Length
1.50
rolls
15.00
Kgs.
15.00
shts
29.00
Shts.
10.00
Pcs.
4.00
Pcs.
20.00
Length
3.00
Kgs.
1.00
Kgs.
15.00
kgs
8.00
kgs
5.00
kgs
4.00
kgs.
1.00
kgs.
7.00
kg
7.00
kg
5.00
Kgs.
1.00
Kgs.
2.00
Kgs.
2.00
kg
6.00
10.00

Hacksaw Blade

5.00
direct counting

Unit

2.00
4.00
12.00
1.00

kg
Pcs.

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

80.00
100.00
250.00
350.00
230.00
150.00
220.00
370.00
2,500.00
60.00
365.00
420.00
36.00
36.00
340.00
36.00
36.00
65.00
70.00
70.00
65.00
70.00
65.00
65.00
65.00
70.00
65.00
65.00
65.00
75.00

gal

1,075.00

meter
set
pcs
set

40.00
900.00
115.00
1,500.00

UNIT COST
DESCRIPTION

Unit

1.00

lot

1.00
1.00

unit
set

900.00
90.00

3.00
2.00
1.00
2.00
1.00
2.00
1.00
1.00

length
pc
pc
pc
length
pc
pc
pc

500.00
30.00
40.00
40.00
180.00
98.00
50.00
90.00

2.00
2.00
2.00
1.00
3.00
1.00

length
length
pc
pc
pc
pint

370.00
180.00
40.00
40.00
25.00
100.00

1.00
10.00
1.00
10.00
7.00
1.00
2.00
2.00
3.00
1.00

pc
length
pc
pc
pc
pc
pc
pc
roll
pint

700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00

3.00

pc

100.00

9.00
18.00
1.00

length
pc
pint

365.00
40.00
100.00

5.00

sq.m.

1.5*5.2/0.04 =
1.5*1.5/.04 =

230.00
120.00
10.00
20.00

pc
pc
bags
pc

30.00
30.00
100.00
250.00

6*1.4+0.6*0.8)/0.04 =

68.00
2.00
3.00
1.00

pc
kls.
pc
Lot

30.00
60.00
40.00

IX. PLUMBING WORKS


IX-I Plumbing Fixtures:
Flush Type Toilet Bowl
4" x 4" PVC Floor Drain
IX-II Sewer Line:
At Toilet to Septic Vault Route
4" x 3.0m dia. PV Pipe serries 1000
4" dia. X 45 PVC Bend Elbow
2" dia. X 90 PVC Bend Elbow
4" dia. X 90 PVC Bend Elbow
2" X 3.0m PV Pipe
4" dia.x 4" dia. PVC Wye
4" dia.PVC Clean Out Plug
2" x 4" Tee
At Toilet to Septic Vault Route
3" x 3.0m dia. PV Pipe serries 1000
2" X 3.0m PV Pipe serries 1000
2" dia. X 90 PVC Bend Elbow
2" dia. PVC P-Trap
3" dia. X 45deg. PVC elbow
Solvent Cement
IX-III For Water Line:
Kitchen Sink,(0.4m x 0.6m, Single Tab, Stainless)

1/2" x 3.0m pipe pvc


1/2" dia. Gate valve
1/2" Coupling PVC
1/2" 90 deg. Bend elbow pvc
1/2" PVC Tee
1/2" female threaded adaptor
1/2" Faucet, hosebib, brass
Teflon Tape
Solvent Cement
IX-IV For Septic Vault Fittings:
4" x 4" PVC Tee
IX-V For Downspouts:
3" dia. x 3.0m PVC Pipe
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement
X. TILE WORKS
A. Materials
At Toilet:
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
8" x 8" Unglazed Floor Tiles (Green or equivalent colors)
White cement / Tile Grout
Tile Trim x 3m
At Lavatory:
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
White cement / Tile Grout
Tile Trim x 3m
XI. ELECTRICAL WORKS
A. Materials

No. of
Crew/
Labor

Quantity Derivation
QUANTITY
Computation

UNIT COST/
RATE PER
DAY

UNIT COST
Quantity Derivation
QUANTITY
Computation

DESCRIPTION

Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Juncton Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
10 watts compact flourescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Lighting Outlet ( 4" Porcelain Receptacle)
Female Adaptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)

Unit

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

12.00
7.00
1.00
1.00

pcs.
pcs.
length
pc.

20.00
25.00
240.00
40.00

2.00
60.00
10.00
80.00
3.00

box
m
pc
m
pc

3,900.00
30.00
2.00
12.00
30.00

5.00
3.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00

assy
set
pc
pc
pc
pc
pc
unit
pc

350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00

1.00

set

2,000.00

Sub-Total
A. Materials
Filling Materials
Washed Sand
Washed Gravel
4" x 8' x 16" CHB

17.78*0.5 =
17.78*1 =

Sub-Total
25- 2" x 2" x 12' Coco Lumber
100 - 2"x2"x12' Coco Lumber
20 - 2"x2"x10' Coco Lumber for Bracing
2"x2"x8' Ceiling Joist (Good Lumber)
81.2*4.167 =
1"x2"x8' Wood Stick/Lattice (Good Lumber)
40*1*2*8/12 =
50 - 2" x 2" x 10' Hangers (Good Lumber)
Truss 1: 5 units
2"x5"x14' for Top Chord (Good Lumber)
2*5*2 =
2"x5"x12' for Bottom Chord (Good Lumber)
((2*5*12)/12)*2*5 =
2"x4"x8' for Web Member & Kingpost (Good Lumber)
((2*4*2)/12)*9*5 =
Truss 2: 2 units
2"x5"x12' for Top Chord (Good Lumber)
(2*5*12*2*2)/12 =
2"x5"x14' for Bottom Chord (Good Lumber)
(2*5*14*2*2)/12 =
2"x4"x8' for Web Member & Kingpost (Good Lumber)
(2*4*8*3.5*4)/12 =
Purlins, Wood Cleats & Fascia Board:
((2*3*10)/12)*16*4 =
2"x3"x 10' (Good Lumber)
((2*2*8)/12)*16*6/12 =
2"x2"x 8' (Good Lumber)
Sub-Total
DOORS
D - 1, (1.0m x 2.10m) Panel Door
D-1, 2"x6"x8' for Door Jamb (Good Lumber)

8*2*6*8/12 =

35.00
21.00
24.00
1,800.00

cu.m.
cu.m.
cu.m.
Pcs

550.00
600.00
750.00
12.00

100.00
400.00
67.00
378.96
53.33
167.00

bd ft
bd.ft.
bd.ft.
bdft
bdft
bd ft

20.00
20.00
25.00
36.00
55.00
36.00

116.67
100.00
60.00

bdft.
bdft.
bdft.

36.00
36.00
36.00

40.00
46.67
10.00

bdft.
bdft.
bdft.

36.00
36.00
36.00

320.00
21.33

bdft.
bdft.

36.00
36.00

7.26

sq.m.

3.00

set

5,500.00

64.00

bdft

36.00

UNIT COST
DESCRIPTION

Quantity Derivation
QUANTITY
Computation

Unit

1.00

set

16.23

sq.m.

D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

4,000.00

Sub-Total
WINDOWS
2"x6" wooden jamb assembly for W-1 w/ a dimension of
1.8m x 1.2m to include mollion partition at 0.60m interval.

3,456.00

4.00

sets

1,200.00

2,304.00

2.00

sets

1,500.00

280.00

1.00

Sets

350.00

direct counting

9.00

Sets

750.00

W - 2, (1.20m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

4.00

Sets

750.00

W - 3, (0.60m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

1.00

Sets

350.00

2"x6" wooden jamb assembly for W-2 w/ a dimension of


1.2m x 1.2m to include mollion partition at 0.60m interval.
2"x6" wooden jamb assembly for W-5 w/ a dimension of
0.60m x 0.60m to include mollion partition at 0.60m
interval.
Sub-Total
W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie
window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

Sub-Total
VIII. ROOFING
A. Materials
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)
(7.6/1)*2+1 =
Colorib Longspan 0.40mm x 1.10m x 3m (Green)
(2.55/1)*2 =
(7.6/2.2)*2+(2.55/2.2)*2 =
Colorib No. 24, x 8' Pre formed Side Gutter
Colorib No. 24, x 8' Pre formed Side End Flashing
47/2.2)*4+(3/2.2)*2 =
Colorib No. 24, x 8' Pre formed End Wall Flashing
(3/2.2)*2 =
(7.6/2.2)+(2.55/2.2) =
Colorib No. 24, x 8' Pre formed Ridgeroll
Roof Sealant
Tex Screw 2 1/2" dia. (for wood)
Blind Rivets
Sub-Total
XII. PAINTING WORKS
Concrete Putty
263.20/20 =
Concrete Neutralizer
263.20/50 =
Polituff
Flat Latex White
263.20/20 =
Semi-Gloss Latex White
263.20/20 =
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White-Semi-Gloss
50.40
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Paint Brush 4"
Paint Brush 2"
Paint Roller 7" with Pan

82.00
17.00
6.00
10.00
11.00
3.00
5.00
2.00
1,300.00
200.00
265.00
14.00
6.00
2.00
14.00
14.00
1.00
6.00
1.00
2.00
2.00
1.00
1.00
1.00
4.00
4.00
2.00
4.00

sq.m.
pcs
pcs
pcs
pcs
pcs
pcs
lit
pc
pc
sq.m.
gal
gal
pcs
gal
gal
gal
gal
gal
pint
pint
pint
pint
pint
gal
pc
pc
set

2,070.00
1,350.00
615.00
615.00
615.00
615.00
350.00
2.50
1.50

335.00
335.00
188.00
425.00
588.00
475.00
520.00
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00

UNIT COST
DESCRIPTION

Quantity Derivation
QUANTITY
Computation

Sandpaper #100
Sandpaper #200
Enamel Paint (Black)

10.00
10.00
1.00

Sub-Total
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
Supply & Installation Fabricated Steel Billboard
Building Roof Signage

Sub Total
TOTAL FOR STEEL BILLBOARD AND ROOF SIGNAGE
XIV. BASIC AMENITIES
36" x 75" Wooden Bed
24" x 36" Wooden Table w/ Wooden Chair
BP Apparatus
Stethoscope
Weighing Scale for adult
Weighing Scale for infant
Medicine/Dressing Kit (CART W/ TRAY)
TOTAL FOR BASIC AMENITIES
2. HANDTOOLS AND PROTECTIVE EQUIPMENT (PPE)
Shovel w/ handle
Crow Bar
Concrete Pail
Wheel Barrow
Sledge Hammer (5kg) w/ handle
Hard Hat
Hand Glooves
Medicine Kit
TOTAL FOR HANDTOOLS
3. PRE-ENGINEERING
3.2 Reproduction of plans
TOTAL FOR PRE-ENGINEERING
4. PROJECT SUPERVISION
4.1 Municipal Engineer
4.2 BSPMC Volunteers
TOTAL FOR ENGINEERING SUPERVISION
5. ENVIRONMENTAL IMPACT
5.1 Warning Signs
5.2 Barricades
TOTAL FOR ENGINEERING SUPERVISION
6. ADMINISTRATIVE COST (Pls see separate calculation)
TOTAL FOR ADMINISTRATIVE COST
7. MATERIAL TESTING
TOTAL FOR MATERIAL TESTING
8. TREASURER'S BOND
TOTAL FOR TREASURERS BOND
TOTAL INDIRECT COST
TOTAL (A+B)
9. CONTINGENCY

Unit

No. of
Crew/
Labor

sheet
sheet
liter

UNIT COST/
RATE PER
DAY

50.00
60.00
175.00

1.00
1.00

1.00
LOT
LOT

LOT

1.00
1.00
1.00
1.00
1.00
1.00
1.00

unit
set
unit
unit
unit
unit
set

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00

1.00
1.00
10.00
1.00
1.00
5.00
10.00
1.00

pc
pc
pc
pc
pc
pc
pcs
set

700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
500.00

50.00

sht

50.00

6.00
12.00

day
day

5.00
5.00

pc
pc

8,500.00
2,500.00

1.00
1.00

800.00
250.00

300.00
250.00

UNIT COST
DESCRIPTION

Quantity Derivation
QUANTITY
Computation

Unit

No. of
Crew/
Labor

TOTAL FOR CONTINGENCY


TOTAL ESTIMATED PROJECT COST

ADD: O&M (Other Amenities)


Grand Total
Prepared by:

Checked & Reviewed by:

ELSA A. TRUNO

RODSON R. ESCORA

Service Provider

Deputy Area Coordinator

UNIT COST/
RATE PER
DAY

Republic of the Philippines


Province of Negros Oriental
Municipality of Dauin
Barangay Bagacay

E OF THE BARANGAY SUB-PROJECT MANAGEMENT COMMITTEE


CONSTRUCTION OF BARANGAY HEALTH STATION

BILL OF QUANTITIES
COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

25.00
5.00
7.50
11.00
18.50
25.00

5.00

3.75

TOTAL UNIT
COST

TOTAL

KALAHI MCC
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

80.00
100.00
275.00
350.00
235.00
157.50
231.00
388.50
2,525.00
60.00
365.00
420.00
36.00
36.00
345.00
36.00
36.00
65.00
70.00
70.00
65.00
70.00
65.00
65.00
65.00
70.00
65.00
65.00

4,080.00
1,600.00
91,025.00
700.00
5,405.00
50,400.00
4,620.00
25,252.50
3,787.50
900.00
5,475.00
12,180.00
360.00
144.00
6,900.00
108.00
36.00
975.00
560.00
350.00
260.00
70.00
455.00
455.00
325.00
70.00
130.00
130.00

3,400.00
1,333.33
75,854.17
583.33
4,504.17
42,000.00
3,850.00
21,043.75
3,156.25
750.00
4,562.50
10,150.00
300.00
120.00
5,750.00
90.00
30.00
812.50
466.67
291.67
216.67
58.33
379.17
379.17
270.83
58.33
108.33
108.33

680.00
266.67
15,170.83
116.67
900.83
8,400.00
770.00
4,208.75
631.25
150.00
912.50
2,030.00
60.00
24.00
1,150.00
18.00
6.00
162.50
93.33
58.33
43.33
11.67
75.83
75.83
54.17
11.67
21.67
21.67

65.00
78.75

390.00
787.50

325.00
656.25

65.00
131.25

1,075.00

5,375.00

4,479.17

895.83

40.00
900.00
115.00
1,500.00

80.00
3,600.00
1,380.00
1,500.00

66.67
3,000.00
1,150.00
1,250.00

13.33
600.00
230.00
250.00

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

TOTAL

900.00
90.00

900.00
90.00

500.00
30.00
40.00
40.00
180.00
98.00
50.00
90.00

1,500.00
60.00
40.00
80.00
180.00
196.00
50.00
90.00

370.00
180.00
40.00
40.00
25.00
100.00

740.00
360.00
80.00
40.00
75.00
100.00

700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00

700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00

100.00

300.00

365.00
40.00
100.00

3,285.00
720.00
100.00

30.00
30.00
100.00
250.00

6,900.00
3,600.00
1,000.00
5,000.00

30.00
60.00
40.00

2,040.00
120.00
120.00

KALAHI MCC
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

750.00
75.00
1,250.00
50.00
33.33
66.67
150.00
163.33
41.67
75.00
616.67
300.00
66.67
33.33
62.50
83.33
583.33
625.00
348.33
41.67
58.33
8.33
20.00
266.67
50.00
83.33
250.00
2,737.50
600.00
83.33

150.00
15.00
250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67

5,750.00
3,000.00
833.33
4,166.67
1,700.00
100.00
100.00

1,150.00
600.00
166.67
833.33
340.00
20.00
20.00

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

TOTAL

20.00
25.00
240.00
40.00

240.00
175.00
240.00
40.00

3,900.00
30.00
2.00
12.00
30.00

7,800.00
1,800.00
20.00
960.00
90.00

350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00
2,000.00

KALAHI MCC
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00

200.00
145.83
200.00
33.33
6,500.00
1,500.00
16.67
800.00
75.00
1,458.33
300.00
163.33
216.67
166.67
204.17
54.17
1,250.00
416.67

40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33

2,000.00

1,666.67

333.33

278,574.50

179,702.50
17,645.83
10,937.50
15,500.00
22,500.00
17,645.83
2,083.33
8,333.33
1,395.83
12,947.81
2,444.44
5,705.83

35,940.50

55.00
25.00
25.00
3.00

605.00
625.00
775.00
15.00

5.00
5.00

5.00

25.00
25.00
25.00
41.00
55.00
41.00

21,175.00
13,125.00
18,600.00
27,000.00
79,900.00
2,500.00
10,000.00
1,675.00
15,537.38
2,933.33
6,847.00

5.00
5.00
5.00

41.00
41.00
41.00

4,783.33
4,100.00
2,460.00

5.00
5.00
5.00

41.00
41.00
41.00

1,640.00
1,913.33
410.00

5.00
5.00

41.00
41.00

13,120.00
874.67
68,794.04

3,986.11
3,416.67
2,050.00
1,366.67
1,594.44
341.67
10,933.33
728.89
95,933.75

5,500.00

16,500.00

13,750.00

2,750.00

36.00

2,304.00

1,920.00

384.00

5.00

1,000.00
2,000.00
-

3,529.17
1,187.50
1,100.00
4,500.00
3,529.17
416.67
1,666.67
279.17
2,589.56
488.89
1,141.17
797.22
683.33
410.00
273.33
318.89
68.33
2,186.67
145.78
19,186.75

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

4,000.00

5.00
5.00
5.00
5.00
5.00
5.00
5.00

TOTAL

KALAHI MCC
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

4,000.00

3,333.33

22,804.00

19,003.33

1,200.00

4,800.00

4,000.00

800.00

1,500.00

3,000.00

2,500.00

500.00

350.00

350.00

291.67

58.33

902,615.09

689,404.20

750.00

6,750.00

5,625.00

1,125.00

750.00

3,000.00

2,500.00

500.00

350.00

350.00

291.67

58.33

1,723,605.17

1,310,787.57

35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00

29,395.83
6,775.00
5,166.67
5,683.33
1,550.00
2,583.33
591.67
2,708.33
250.00
54,704.17

4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00

3,908.33
1,675.00
313.33
4,958.33
6,860.00
395.83
2,600.00
433.33
216.67
210.00
137.50
105.00
104.17
833.33
333.33
58.33
333.33

2,075.00
1,355.00
620.00
620.00
620.00
620.00
355.00
2.50
1.50

335.00
335.00
188.00
425.00
588.00
475.00
520.00
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00

666.67
-

3,000.00

6,000.00

3,800.67

134,880.84

256,157.51

5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST
50.00
60.00
175.00

500.00

9,000.00
2,500.00

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00

TOTAL

500.00
600.00
175.00
29,271.00

416.67
500.00
145.83
24,392.50

9,000.00
2,500.00
11,500.00
11,500.00

7,500.00
2,083.33
9,583.33
9,583.33

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
27,466.00

5,833.33
3,400.00
1,666.67
1,275.00
5,833.33
2,380.00
2,500.00
22,888.33

700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
500.00
7,600.00

560.00
720.00
760.00
1,360.00
600.00
1,400.00
280.00
400.00
6,080.00

700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
500.00

50.00

2,500.00
2,500.00

800.00
250.00

4,800.00
3,000.00
7,800.00

300.00
250.00

1,500.00
1,250.00
2,750.00
Err:509

82.25%

KALAHI MCC
GRANT

4,000.00
4,000.00
3,375.00
3,375.00
#REF!
#REF!
#REF!

1,200.00
1,000.00
2,200.00
Err:509
Err:509
1,914.94
1,914.94
Err:509
675,561.22
#REF!

COMMUNITY
INKIND

3,000.00
3,000.00

BLGU
CASH

MLGU
INKIND

CASH

83.33
100.00
29.17
4,878.50

1,500.00
416.67
1,916.67
1,916.67

1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67

140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00

2,500.00
2,500.00

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

300.00
250.00
550.00
Err:509
Err:509
2,085.06
2,085.06
3,375.00
3,375.00
Err:509
Err:509
#REF!

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

TOTAL

KALAHI MCC
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

#REF!
#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

794,300.00

249,325.00

18,150.00

###

521,329.17

Recommending Approval:

Approved by:

CARMEN A. GAUDIANO

ANTONIO ALAM

Municipal Engineer

BSPMC Chairperson

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

680.00
266.67
15,170.83
116.67
900.83
8,400.00
770.00
4,208.75
631.25
150.00
912.50
2,030.00
60.00
24.00
1,150.00
18.00
6.00
162.50
93.33
58.33
43.33
11.67
75.83
75.83
54.17
11.67
21.67
21.67

680.00
266.67
15,170.83
116.67
900.83
8,400.00
770.00
4,208.75
631.25
150.00
912.50
2,030.00
60.00
24.00
1,150.00
18.00
6.00
162.50
93.33
58.33
43.33
11.67
75.83
75.83
54.17
11.67
21.67
21.67

4,080.00
1,600.00
91,025.00
700.00
5,405.00
50,400.00
4,620.00
25,252.50
3,787.50
900.00
5,475.00
12,180.00
360.00
144.00
6,900.00
108.00
36.00
975.00
560.00
350.00
260.00
70.00
455.00
455.00
325.00
70.00
130.00
130.00

65.00
131.25

65.00
131.25

390.00
787.50

895.83

895.83

5,375.00

13.33
600.00
230.00
250.00

13.33
600.00
230.00
250.00

80.00
3,600.00
1,380.00
1,500.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

150.00
15.00
-

150.00
15.00
-

900.00
90.00
-

250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00

250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00

1,500.00
60.00
40.00
80.00
180.00
196.00
50.00
90.00

123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67

123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67

740.00
360.00
80.00
40.00
75.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
300.00
3,285.00
720.00
100.00

1,150.00
600.00
166.67
833.33

1,150.00
600.00
166.67
833.33

6,900.00
3,600.00
1,000.00
5,000.00

340.00
20.00
20.00

340.00
20.00
20.00

2,040.00
120.00
120.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

40.00
29.17
40.00
6.67

40.00
29.17
40.00
6.67

240.00
175.00
240.00
40.00

1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33

1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33

7,800.00
1,800.00
20.00
960.00
90.00
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00

333.33

333.33

2,000.00

35,940.50

35,940.50

215,643.00

3,529.17
2,187.50
3,100.00
4,500.00
3,529.17
416.67
1,666.67
279.17
2,589.56
488.89
1,141.17

3,529.17
2,187.50
3,100.00
4,500.00
3,529.17
416.67
1,666.67
279.17
2,589.56
488.89
1,141.17

21,175.00
13,125.00
18,600.00
27,000.00
21,175.00
2,500.00
10,000.00
1,675.00
15,537.38
2,933.33
6,847.00

797.22
683.33
410.00

797.22
683.33
410.00

4,783.33
4,100.00
2,460.00

273.33
318.89
68.33

273.33
318.89
68.33

1,640.00
1,913.33
410.00

2,186.67
145.78
131.25

2,186.67
145.78
131.25

13,120.00
874.67
115,120.50

2,750.00

2,750.00

16,500.00

384.00

384.00

2,304.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

666.67

666.67

4,000.00

3,800.67

3,800.67

22,804.00

800.00

800.00

4,800.00

500.00

500.00

3,000.00

58.33

58.33

350.00

118,825.34

118,825.34

827,285.04

1,125.00

1,125.00

6,750.00

500.00

500.00

3,000.00

58.33

58.33

350.00

224,046.51

224,046.51

1,572,945.09

5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83

5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83

35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00

781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67

781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67

4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

83.33
100.00
29.17
4,878.50

83.33
100.00
29.17
4,878.50

500.00
600.00
175.00
29,271.00

1,500.00
416.67
1,916.67
1,916.67

1,500.00
416.67
1,916.67
1,916.67

9,000.00
2,500.00
11,500.00
11,500.00

1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67

1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
27,466.00

140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00

140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00

2,500.00
2,500.00

2,500.00
2,500.00

700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
500.00
7,600.00
2,500.00
2,500.00

4,800.00
3,000.00
7,800.00

4,800.00
3,000.00
7,800.00

300.00
250.00
550.00
Err:509
Err:509
2,085.06
2,085.06
3,375.00
3,375.00
Err:509
Err:509
#REF!

1,500.00
1,250.00
2,750.00
Err:509
Err:509
4,000.00
4,000.00
3,375.00
3,375.00
Err:509
Err:509
#REF!

4,800.00
4,800.00

#REF!
#REF!

300.00
250.00
550.00
Err:509
Err:509
2,085.06
2,085.06
3,375.00
3,375.00
Err:509
Err:509
#REF!

4,800.00
3,000.00
7,800.00
#REF!
#REF!
-

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

INKIND

TOTAL LCC
(CASH &
INKIND)

TOTAL

#REF!

#REF!
#REF!

#REF!

#REF!
#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

4,800.00

521,329.17

23,700.00

545,029.17

794,300.00

Noted by:

GEORGE S. ISULAT
RCIS

OFFICE OF THE B

CONS

UNIT COST
DESCRIPTION

A. Materials
Nylon String
Anti-Termite (e.g. solignum, )
1/4" x 1/4" x 3' Plastic Screen
1/4 thk. 4'x8' Ordinary Plywood
1
/4" x 4' x 8' Marine Plywood
# 5 CWN
# 4 CW Nails
# 3 CWN
# 2 CWN
# 1 CW Nails
# 1 Finishing Nails
1/2 " CW Nails
Portland Cement Type I
Red Cement (US Lansco or uqivalent)
Soil Poisoning Materials
12mm dia. X 7" Machine Bolt w/ Knot and washer
12mm dia. X 6m, plain roundbar for grills
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
# 16 G.I. Tie Wire
Hacksaw Blade
D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb
Lavatory-closet-cover with handle & Hinges attached
Lockset (high quality doorknob)

( 3-1/2" x 3-1/2" ) loose pin hinges


IX. PLUMBING WORKS
Flush Type Toilet Bowl
4" x 4" PVC Floor Drain
4" x 3.0m dia. PV Pipe serries 1000
4" dia. X 45 PVC Bend Elbow
2" dia. X 90 PVC Bend Elbow
4" dia. X 90 PVC Bend Elbow

Quantity Derivation
QUANTITY
Computation

direct counting
direct counting
81.2/2.88 =
96.67*10/1000 =
81.20*0.05 =

29*0.055 =

8*6/3 =
direct counting
(0.6*12*19)/6 =

Unit

2.00
kg
5.00
gal
2.00
meter
15.00
shts
29.00
Shts.
4.00
Kgs.
19.00
kgs
19.00
Kgs.
10.00
kgs.
5.00
kgs
2.00
Kgs.
8.00
kg
331.00
Bags
16.00
kilos
51.00 cu.m.
14.00
Pcs.
23.00
lengths
320.00 Length
20.00 Length
65.00 Length
1.50
rolls
15.00
Kgs.
10.00 Pcs.

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

350.00
1,075.00
40.00
365.00
420.00
36.00
65.00
65.00
70.00
70.00
65.00
65.00
250.00
100.00
80.00
36.00
230.00
150.00
220.00
370.00
2,500.00
60.00
75.00

1.00

set

4,000.00

1.00
4.00
12.00
1.00
1.00
1.00
3.00
2.00
1.00
2.00

set
set
pcs
lot
unit
set
length
pc
pc
pc

1,500.00
900.00
115.00
900.00
90.00
500.00
30.00
40.00
40.00

UNIT COST
DESCRIPTION

Quantity Derivation
QUANTITY
Computation

2" X 3.0m PV Pipe


4" dia.x 4" dia. PVC Wye
4" dia.PVC Clean Out Plug
2" x 4" Tee
3" x 3.0m dia. PV Pipe serries 1000
2" X 3.0m PV Pipe serries 1000
2" dia. X 90 PVC Bend Elbow
2" dia. PVC P-Trap
3" dia. X 45deg. PVC elbow
Solvent Cement
Kitchen Sink,(0.4m x 0.6m, Single Tab, Stainless)

1/2" x 3.0m pipe pvc


1/2" dia. Gate valve
1/2" Coupling PVC
1/2" 90 deg. Bend elbow pvc
1/2" PVC Tee
1/2" female threaded adaptor
1/2" Faucet, hosebib, brass
Teflon Tape
Solvent Cement
4" x 4" PVC Tee
3" dia. x 3.0m PVC Pipe
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement
X. TILE WORKS
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
8" x 8" Unglazed Floor Tiles (Green or equivalent colors)
White cement / Tile Grout
Tile Trim x 3m
At Lavatory:
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
White cement / Tile Grout
Tile Trim x 3m
XI. ELECTRICAL WORKS
2" x 4" Utility Boxes Pvc
4" x 4" Juncton Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Flourescent Lamp, 40 watts
10 watts compact flourescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Lighting Outlet ( 4" Porcelain Receptacle)
Female Adaptor
KWHR meter w/ Base
Entrance Cap # 1" dia.

1.5*5.2/0.04 =
1.5*1.5/.04 =

6*1.4+0.6*0.8)/0.04 =

Unit

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

1.00
2.00
1.00
1.00
2.00
2.00
2.00
1.00
3.00
1.00
1.00
10.00
1.00
10.00
7.00
1.00
2.00
2.00
3.00
1.00
3.00
9.00
18.00
1.00
5.00
230.00
120.00
10.00
20.00

length
pc
pc
pc
length
length
pc
pc
pc
pint
pc
length
pc
pc
pc
pc
pc
pc
roll
pint
pc
length
pc
pint
sq.m.
pc
pc
bags
pc

180.00
98.00
50.00
90.00
370.00
180.00
40.00
40.00
25.00
100.00
700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00
100.00
365.00
40.00
100.00

68.00
2.00
3.00
1.00
12.00
7.00
1.00
1.00
2.00
60.00
10.00
80.00
3.00
5.00
3.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00

pc
kls.
pc
Lot
pcs.
pcs.
length
pc.
box
m
pc
m
pc
assy
set
pc
pc
pc
pc
pc
unit
pc

30.00
60.00
40.00

30.00
30.00
100.00
250.00

20.00
25.00
240.00
40.00
3,900.00
30.00
2.00
12.00
30.00
350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00

UNIT COST
DESCRIPTION

Quantity Derivation
QUANTITY
Computation

Unit

1.00

set

Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)

No. of
Crew/
Labor

UNIT COST/
RATE PER
DAY

2,000.00

Sub-Total
Concrete Putty
Concrete Neutralizer
Polituff
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White-Semi-Gloss
Enamel Paint (Black)
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Paint Brush 4"
Paint Brush 2"
Paint Roller 7" with Pan
Sandpaper #100
Sandpaper #200

263.20/20 =
263.20/50 =

14.00
6.00
2.00
14.00
14.00
1.00
6.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
4.00
4.00
2.00
4.00
10.00
10.00

gal
gal
pcs
gal
gal
gal
gal
liter
gal
pint
pint
pint
pint
pint
gal
pc
pc
set
sheet
sheet

335.00
335.00
188.00
425.00
588.00
475.00
520.00
175.00
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
50.00
60.00

35.00
24.00
17.78*0.5 =
21.00
1,800.00

cu.m.
cu.m.
cu.m.
Pcs

550.00
750.00
600.00
12.00

263.20/20 =
263.20/20 =
50.40

Sub-Total
A. Materials
Filling Materials
Washed Gravel
Washed Sand
4" x 8' x 16" CHB
Sub-Total
IV. FORMWORKS & SCAFFOLDING
A. Materials
1"x2"x8' Wood Stick/Lattice (Good Lumber)
40*1*2*8/12 =
2"x2"x8' Ceiling Joist (Good Lumber)
81.2*4.167 =
50 - 2" x 2" x 10' Hangers (Good Lumber)
25- 2" x 2" x 12' Coco Lumber
100 - 2"x2"x12' Coco Lumber
20 - 2"x2"x10' Coco Lumber for Bracing
Truss 1: 5 units
2"x5"x14' for Top Chord (Good Lumber)
2*5*2 =
2"x5"x12' for Bottom Chord (Good Lumber)
((2*5*12)/12)*2*5 =
2"x4"x8' for Web Member & Kingpost (Good Lumber)
((2*4*2)/12)*9*5 =
Truss 2: 2 units
2"x5"x12' for Top Chord (Good Lumber)
(2*5*12*2*2)/12 =
2"x5"x14' for Bottom Chord (Good Lumber)
(2*5*14*2*2)/12 =
2"x4"x8' for Web Member & Kingpost (Good Lumber)
(2*4*8*3.5*4)/12 =
Purlins, Wood Cleats & Fascia Board:
((2*3*10)/12)*16*4 =
2"x3"x 10' (Good Lumber)
((2*2*8)/12)*16*6/12 =
2"x2"x 8' (Good Lumber)
1"x12"x8' Hardi-Sanipa (Hardiflex-Board)
direct counting
Sub-Total
VII. Furniture
A. Materials

23.00

sq.m.

53.33
378.96
167.00
100.00
400.00
67.00

bdft
bdft
bd ft
bd ft
bd.ft.
bd.ft.

55.00
36.00
36.00
20.00
20.00
25.00

116.67
100.00
60.00

bdft.
bdft.
bdft.

36.00
36.00
36.00

40.00
46.67
10.00

bdft.
bdft.
bdft.

36.00
36.00
36.00

320.00
21.33
20.00

bdft.
bdft.
Length

36.00
36.00
340.00

18.44

sq.m.

UNIT COST
DESCRIPTION

Unit

3.00

set

5,500.00

64.00

bdft

36.00

D - 1, (1.0m x 2.10m) Panel Door


D-1, 2"x6"x8' for Door Jamb (Good Lumber)

No. of
Crew/
Labor

Quantity Derivation
QUANTITY
Computation

8*2*6*8/12 =

UNIT COST/
RATE PER
DAY

2"x6" wooden jamb assembly for W-1 w/ a dimension of


1.8m x 1.2m to include mollion partition at 0.60m interval.

3,456.00

4.00

sets

1,200.00

2"x6" wooden jamb assembly for W-2 w/ a dimension of


1.2m x 1.2m to include mollion partition at 0.60m interval.

2,304.00

2.00

sets

1,500.00

280.00

1.00

Sets

350.00

2"x6" wooden jamb assembly for W-5 w/ a dimension of


0.60m x 0.60m to include mollion partition at 0.60m
interval.

Sub-Total
WINDOWS

16.23

sq.m.

Sub-Total
W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie
window on standard aluminum housing w/ 12mm dia. hole
in between blades interval

direct counting

W - 2, (1.20m X 1.20m) twelve Blades clear glass jalousie


window on standard aluminum housing w/ 12mm dia. hole
in between blades interval
W - 3, (0.60m X 1.20m) twelve Blades clear glass jalousie
window on standard aluminum housing w/ 12mm dia. hole
in between blades interval
Sub-Total
VIII. ROOFING
A. Materials
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)
(7.6/1)*2+1 =
Colorib Longspan 0.40mm x 1.10m x 3m (Green)
(2.55/1)*2 =
(7.6/2.2)*2+(2.55/2.2)*2 =
Colorib No. 24, x 8' Pre formed Side Gutter
Colorib No. 24, x 8' Pre formed Side End Flashing
47/2.2)*4+(3/2.2)*2 =
Colorib No. 24, x 8' Pre formed End Wall Flashing
(3/2.2)*2 =
(7.6/2.2)+(2.55/2.2) =
Colorib No. 24, x 8' Pre formed Ridgeroll
Roof Sealant
Tex Screw 2 1/2" dia. (for wood)
Blind Rivets
Sub-Total
XIII. STEEL BILLBOARD AND ROOF SIGNAGE

9.00

Sets

750.00

4.00

Sets

750.00

1.00

Sets

350.00

82.00
17.00
6.00
10.00
11.00
3.00
5.00
2.00
1,300.00
200.00

sq.m.
pcs
pcs
pcs
pcs
pcs
pcs
lit
pc
pc

2,070.00
1,350.00
615.00
615.00
615.00
615.00
350.00
2.50
1.50

1.00

1.00
LOT

Building Roof Signage

1.00

LOT

2,500.00

Sub Total
TOTAL FOR STEEL BILLBOARD AND ROOF SIGNAGE
XIV. BASIC AMENITIES
36" x 75" Wooden Bed
24" x 36" Wooden Table w/ Wooden Chair
BP Apparatus
Stethoscope
Weighing Scale for adult
Weighing Scale for infant
Medicine/Dressing Kit (CART W/ TRAY)

1.00
1.00
1.00
1.00
1.00
1.00
1.00

unit
set
unit
unit
unit
unit
set

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00

Supply & Installation Fabricated Steel Billboard

LOT
8,500.00

Sub-Total

UNIT COST
DESCRIPTION

Unit

1.00
1.00
10.00
1.00
1.00
5.00
10.00
1.00

pc
pc
pc
pc
pc
pc
pcs
set

700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
500.00

5.00
5.00

pc
pc

300.00
250.00

TOTAL FOR BASIC AMENITIES


2. HANDTOOLS AND PROTECTIVE EQUIPMENT (PPE)
Shovel w/ handle
Crow Bar
Concrete Pail
Wheel Barrow
Sledge Hammer (5kg) w/ handle
Hard Hat
Hand Glooves
Medicine Kit
TOTAL FOR HANDTOOLS
5. ENVIRONMENTAL IMPACT
5.1 Warning Signs
5.2 Barricades
TOTAL FOR ENGINEERING SUPERVISION
Prepared by:

No. of
Crew/
Labor

Quantity Derivation
QUANTITY
Computation

Checked & Reviewed by:

ELSA A. TRUNO

RODSON R. ESCORA

Service Provider

Deputy Area Coordinator

UNIT COST/
RATE PER
DAY

Republic of the Philippines


Province of Negros Oriental
Municipality of Dauin
Barangay Bagacay

E OF THE BARANGAY SUB-PROJECT MANAGEMENT COMMITTEE


CONSTRUCTION OF BARANGAY HEALTH STATION

BILL OF QUANTITIES
COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

25.00

5.00
7.50
11.00
18.50
25.00
3.75

TOTAL UNIT
COST

TOTAL

KALAHI MCC
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

350.00
1,075.00
40.00
365.00
420.00
36.00
65.00
65.00
70.00
70.00
65.00
65.00
275.00
100.00
80.00
36.00
235.00
157.50
231.00
388.50
2,525.00
60.00
78.75

700.00
5,375.00
80.00
5,475.00
12,180.00
144.00
1,235.00
1,235.00
700.00
350.00
130.00
520.00
91,025.00
1,600.00
4,080.00
504.00
5,405.00
50,400.00
4,620.00
25,252.50
3,787.50
900.00
787.50

583.33
4,479.17
66.67
4,562.50
10,150.00
120.00
1,029.17
1,029.17
583.33
291.67
108.33
433.33
75,854.17
1,333.33
3,400.00
420.00
4,504.17
42,000.00
3,850.00
21,043.75
3,156.25
750.00
656.25

116.67
895.83
13.33
912.50
2,030.00
24.00
205.83
205.83
116.67
58.33
21.67
86.67
15,170.83
266.67
680.00
84.00
900.83
8,400.00
770.00
4,208.75
631.25
150.00
131.25

4,000.00

4,000.00

3,333.33

666.67

1,500.00
900.00
115.00

1,500.00
3,600.00
1,380.00

1,250.00
3,000.00
1,150.00

250.00
600.00
230.00

900.00
90.00
500.00
30.00
40.00
40.00

900.00
90.00
1,500.00
60.00
40.00
80.00

750.00
75.00
1,250.00
50.00
33.33
66.67

150.00
15.00
250.00
10.00
6.67
13.33

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

TOTAL

KALAHI MCC
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

180.00
98.00
50.00
90.00
370.00
180.00
40.00
40.00
25.00
100.00
700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00
100.00
365.00
40.00
100.00

180.00
196.00
50.00
90.00
740.00
360.00
80.00
40.00
75.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
300.00
3,285.00
720.00
100.00

150.00
163.33
41.67
75.00
616.67
300.00
66.67
33.33
62.50
83.33
583.33
625.00
348.33
41.67
58.33
8.33
20.00
266.67
50.00
83.33
250.00
2,737.50
600.00
83.33

30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67

30.00
30.00
100.00
250.00

6,900.00
3,600.00
1,000.00
5,000.00

30.00
60.00
40.00

2,040.00
120.00
120.00

5,750.00
3,000.00
833.33
4,166.67
1,700.00
100.00
100.00

1,150.00
600.00
166.67
833.33
340.00
20.00
20.00

20.00
25.00
240.00
40.00
3,900.00
30.00
2.00
12.00
30.00
350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00

240.00
175.00
240.00
40.00
7,800.00
1,800.00
20.00
960.00
90.00
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00

200.00
145.83
200.00
33.33
6,500.00
1,500.00
16.67
800.00
75.00
1,458.33
300.00
163.33
216.67
166.67
204.17
54.17
1,250.00
416.67

40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

55.00
25.00
25.00
3.00

TOTAL UNIT
COST

TOTAL

KALAHI MCC
GRANT

2,000.00

2,000.00

335.00
335.00
188.00
425.00
588.00
475.00
520.00
175.00
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
50.00
60.00

275,674.50
4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
175.00
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
500.00
600.00
29,446.00

#REF!
3,908.33
1,675.00
313.33
4,958.33
6,860.00
395.83
2,600.00
145.83
433.33
216.67
210.00
137.50
105.00
104.17
833.33
333.33
58.33
333.33
416.67
500.00
22,020.00

21,175.00
18,600.00
13,125.00
27,000.00
79,900.00

17,645.83
15,500.00
10,937.50
22,500.00
17,645.83

605.00
775.00
625.00
15.00

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

1,666.67

333.33
#REF!

#REF!

#REF!

#REF!
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
29.17
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,404.00

3,529.17
3,100.00
1,187.50
4,500.00
3,529.17

1,000.00
-

5.00
5.00
5.00
5.00

55.00
41.00
41.00
25.00
25.00
25.00

2,933.33
15,537.38
6,847.00
2,500.00
10,000.00
1,675.00

2,444.44
12,947.81
5,705.83
2,083.33
8,333.33
1,395.83

488.89
2,589.56
1,141.17
416.67
1,666.67
279.17

5.00
5.00
5.00

41.00
41.00
41.00

4,783.33
4,100.00
2,460.00

5.00
5.00
5.00

41.00
41.00
41.00

1,640.00
1,913.33
410.00

5.00
5.00
5.00

41.00
41.00
345.00

13,120.00
874.67
6,900.00
75,694.04

3,986.11
3,416.67
2,050.00
1,366.67
1,594.44
341.67
10,933.33
728.89
5,750.00
9,729.17

797.22
683.33
410.00
273.33
318.89
68.33
2,186.67
145.78
1,150.00
1,945.83

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

TOTAL

500.00

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

5,500.00

16,500.00

13,750.00

2,750.00

36.00

2,304.00

1,920.00

384.00

1,200.00

4,800.00

4,000.00

800.00

1,500.00

3,000.00

2,500.00

500.00

350.00

350.00

291.67

58.33

26,954.00

15,670.00

3,134.00

3,350.00

2,791.67

558.33

750.00

6,750.00

5,625.00

1,125.00

750.00

3,000.00

2,500.00

500.00

350.00

350.00

291.67

58.33

10,100.00

5.00
5.00
5.00
5.00
5.00
5.00
5.00

KALAHI MCC
GRANT

2,075.00
1,355.00
620.00
620.00
620.00
620.00
355.00
2.50
1.50

9,000.00
2,500.00

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00

#REF!

35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00

29,395.83
6,775.00
5,166.67
5,683.33
1,550.00
2,583.33
591.67
2,708.33
250.00
54,704.17

9,000.00
90,685.00
2,500.00
102,185.00
102,185.00

7,500.00
75,570.83
2,083.33
85,154.17
85,154.17

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00

5,833.33
3,400.00
1,666.67
1,275.00
5,833.33
2,380.00
2,500.00

#REF!

#REF!

#REF!

#REF!

5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
1,500.00
15,114.17
416.67
17,030.83
17,030.83
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00

COST SHARING

UNIT COST
ADD:
FREIGHT &
HANDLING
COST

TOTAL UNIT
COST

700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
500.00

300.00
250.00

TOTAL

KALAHI MCC
GRANT

27,466.00

22,888.33

700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
500.00
7,600.00

560.00
720.00
760.00
1,360.00
600.00
1,400.00
280.00
400.00
6,080.00

1,500.00
1,250.00
2,750.00

1,200.00
1,000.00
2,200.00

Recommending Approval:

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH
-

4,577.67

140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00

300.00
250.00
550.00

Approved by:
675561.2258889

CARMEN A. GAUDIANO

ANTONIO ALAM

Municipal Engineer

BSPMC Chairperson

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

116.67
895.83
13.33
912.50
2,030.00
24.00
205.83
205.83
116.67
58.33
21.67
86.67
15,170.83
266.67
680.00
84.00
900.83
8,400.00
770.00
4,208.75
631.25
150.00
131.25

116.67
895.83
13.33
912.50
2,030.00
24.00
205.83
205.83
116.67
58.33
21.67
86.67
15,170.83
266.67
680.00
84.00
900.83
8,400.00
770.00
4,208.75
631.25
150.00
131.25

700.00
5,375.00
80.00
5,475.00
12,180.00
144.00
1,235.00
1,235.00
700.00
350.00
130.00
520.00
91,025.00
1,600.00
4,080.00
504.00
5,405.00
50,400.00
4,620.00
25,252.50
3,787.50
900.00
787.50

666.67

666.67

4,000.00

250.00
600.00
230.00

250.00
600.00
230.00

1,500.00
3,600.00
1,380.00

150.00
15.00
250.00
10.00
6.67
13.33

150.00
15.00
250.00
10.00
6.67
13.33

900.00
90.00
1,500.00
60.00
40.00
80.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67

30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67

180.00
196.00
50.00
90.00
740.00
360.00
80.00
40.00
75.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
300.00
3,285.00
720.00
100.00

1,150.00
600.00
166.67
833.33

1,150.00
600.00
166.67
833.33

6,900.00
3,600.00
1,000.00
5,000.00

340.00
20.00
20.00

340.00
20.00
20.00

2,040.00
120.00
120.00

40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33

40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33

240.00
175.00
240.00
40.00
7,800.00
1,800.00
20.00
960.00
90.00
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH
333.33

#REF!

TOTAL LCC
(CASH &
INKIND)

INKIND
-

333.33

2,000.00

#REF!
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
29.17
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,404.00

#REF!
4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
175.00
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
500.00
600.00
26,424.00

#REF!
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
29.17
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,404.00

3,529.17
3,100.00
2,187.50
4,500.00
3,529.17

3,529.17
3,100.00
2,187.50
4,500.00
3,529.17

21,175.00
18,600.00
13,125.00
27,000.00
21,175.00

488.89
2,589.56
1,141.17
416.67
1,666.67
279.17

488.89
2,589.56
1,141.17
416.67
1,666.67
279.17

2,933.33
15,537.38
6,847.00
2,500.00
10,000.00
1,675.00

797.22
683.33
410.00

797.22
683.33
410.00

4,783.33
4,100.00
2,460.00

273.33
318.89
68.33

273.33
318.89
68.33

1,640.00
1,913.33
410.00

2,186.67
145.78
1,150.00
1,945.83

2,186.67
145.78
1,150.00
1,945.83

13,120.00
874.67
6,900.00
11,675.00

#REF!
-

TOTAL

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

2,750.00

2,750.00

16,500.00

384.00

384.00

2,304.00

800.00

800.00

4,800.00

500.00

500.00

3,000.00

58.33

58.33

350.00

3,134.00

3,134.00

18,804.00

558.33

558.33

3,350.00

1,125.00

1,125.00

6,750.00

500.00

500.00

3,000.00

58.33

58.33

350.00

#REF!

#REF!

#REF!

#REF!

#REF!

5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83

5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83

35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00

1,500.00
15,114.17
416.67
17,030.83
17,030.83

1,500.00
15,114.17
416.67
17,030.83
17,030.83

9,000.00
90,685.00
2,500.00
102,185.00
102,185.00

1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00

1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00

7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00

HARING

SUB-TOTAL LCC

MLGU
INKIND

CASH

TOTAL LCC
(CASH &
INKIND)

INKIND

TOTAL

4,577.67

4,577.67

27,466.00

140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00

140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00

700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
500.00
7,600.00

300.00
250.00
550.00

300.00
250.00
550.00

1,500.00
1,250.00
2,750.00

Noted by:

GEORGE S. ISULAT
RCIS

ENHANCED PLANNED COMMUNITY PROCU


Date Prepared

OCTOBER/09/2013

Name of Proposed Sub-Project

Barangay

MASAPLOD SUR

Total Cash (Php)

Municipality

DAUIN

Sub-project Duration

Province

NEGROS ORIENTAL
DESCRIPTION

1st Tranche (Php)


2nd Tranche (Php)
3rd Tranche (Php)

PACKAGES

Mode of Implementation : Community Force Account (CFA)

PACKAGE ITEMS

TOTAL CASH (Php)

QTY

UNIT

UNIT COST

TOTAL

PROC METHOD
1st Tranche
KC Grant

Package 1: HARDWARE
Materials
Anti-Termite (e.g. solignum, )
1
/4" x 4' x 8' Marine Plywood

3.00

can

300.00

900.00

594.00

29.00

Shts.

420.00

12,180.00

8,038.80

Ga. 26, 4'x8' Plain GI Sheet

2.00

shts.

355.00

710.00

468.60

# 1 Finishing Nails

2.00

Kgs.

65.00

130.00

85.80

# 16 G.I. Tie Wire

4.00

Kgs.

60.00

240.00

158.40

# 2 CWN

2.00

kgs.

65.00

130.00

85.80

# 3 CWN

12.00

Kgs.

65.00

780.00

514.80

# 4 CWN

20.00

Kgs.

65.00

1,300.00

858.00

# 5 CWN

4.00

Kgs.

36.00

144.00

95.04

#1 CWN

2.00

Kgs.

65.00

130.00

85.80

1"x1"x3' Meshwire

4.00

meter

80.00

320.00

211.20

1"x12"x8' Hardi-Sanipa (Hardiflex-Board)

20.00

Length

345.00

6,900.00

4,554.00

1"x2"x8' Wood Stick/Lattice (Good Lumber)


1/2 " CW Nails

53.33

bdft

55.00

2,933.33

1,936.00

8.00

kg

65.00

520.00

343.20

1/4 thk. 4'x8' Ordinary Plywood

10.00

shts.

335.00

3,350.00

2,211.00

1/4" x 1/4" x 3' Plastic Screen

2.00

meter

40.00

80.00

52.80

10mm dia. x 6.0m RSB

133.00

Length

155.00

20,615.00

13,605.90

8" x 8" Glazed Wall Tiles (Green or equivalent colo

195.00

pc

30.00

5,850.00

3,861.00

8" x 8" Glazed Wall Tiles (Green or equivalent colo

68.00

pc

30.00

2,040.00

1,346.40

8" x 8" Unglazed Floor Tiles (Green or eqivalent co

57.00

pc

30.00

1,710.00

1,128.60

4.00

gal

1,050.00

4,200.00

2,772.00

200.00

pc

1.50

300.00

198.00

Anti-Termite (e.g. solignum, )


Blind Rivets
Hacksaw Blade

10.00

Pcs.

75.00

750.00

495.00

Nylon String

3.00

roll

30.00

90.00

59.40

Portland Cement

304.00

Bags

245.00

74,480.00

49,156.80

Red Cement (US Lansco or uqivalent)

16.00

kilos

100.00

1,600.00

1,056.00

Roof Sealant

2.00

lit

355.00

710.00

468.60

1,300.00

pc

2.50

3,250.00

2,145.00

Tex Screw 2 1/2" dia. (for wood)


Tile Trim x 3m

7.00

pc

40.00

280.00

184.80

White cement / Tile Grout

6.00

kls.

60.00

360.00

237.60

4.00

meter

80.00

320.00

211.20

14.00

Pcs.

36.00

504.00

332.64

1/8" x 1/8" x 3' Meshwire


12mm dia. X 7" Machine Bolt w/ Knot and washer
( 3-1/2" x 3-1/2" ) loose pin hinges

12.00

pcs

115.00

1,380.00

910.80

10mm dia. X 6m Def. Bars

220.00

length

155.00

34,100.00

22,506.00

PCPP

Page 148 of 165

PACKAGES

PACKAGE ITEMS

QTY

UNIT

UNIT COST

TOTAL

PROC METHOD
1st Tranche
KC Grant

12mm dia. X 6m Def. Bars

39.00

12mm dia. X 6m, plain roundbar for grills

23.00 lengths

length

16mm dia. X 6m Def. Bars

60.00

length

205.00

7,995.00

235.00

5,405.00

5,276.70
3,567.30

355.00

21,300.00

14,058.00

At Lavatory:
D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic
jamb

1.00

set

4,000.00

4,000.00

2,640.00

Enamel Paint (Black)

1.00

liter

175.00

175.00

115.50

Ga. 16, GI. Tie Wire

25.75

kilos

60.00

1,545.00

1,019.70

Lavatory-closet-cover with handle & Hinges attache

1.00

set

1,500.00

1,500.00

990.00

Lockset (high quality doorknob)

4.00

set

900.00

3,600.00

2,376.00

IX. PLUMBING WORKS

1.00

lot

A. Materials
Kitchen Sink,(0.4m x 0.6m, Single Tab,
Stainless)

1.00

pc

700.29

700.29

462.19

1/2" 90 deg. Bend elbow pvc

7.00

pc

10.00

70.00

46.20

1/2" Faucet, hosebib, brass

2.00

pc

160.00

320.00

211.20

1/2" female threaded adaptor

2.00

pc

12.00

24.00

15.84

1/2" PVC Tee

1.00

pc

10.00

10.00

6.60

10.00

pc

5.00

50.00

33.00

1/2" Coupling PVC


1/2" dia. Gate valve

1.00

pc

418.00

418.00

275.88

1/2" x 3.0m pipe pvc

10.00

length

75.00

750.00

495.00
26.40

1.00

pc

40.00

40.00

3.00

pc

40.00

120.00

79.20

2" X 3.0m PV Pipe serries 1000

3.00

length

180.00

540.00

356.40

2" x 4" Tee

1.00

pc

90.00

90.00

3" dia. x 3.0m PVC Pipe

9.00

length

365.00

3,285.00

3" dia. X 45deg. PVC elbow

3.00

pc

25.00

75.00

18.00

pc

40.00

720.00

LOCAL SHOPPING FOR GOODS (LSG)

2" dia. PVC P-Trap


2" dia. X 90 PVC Bend Elbow

3" dia. X 90 deg. bend PVC Elbow


Package 1

59.40
2,168.10
49.50
475.20

3" x 3.0m dia. PV Pipe serries 1000

2.00

length

370.00

740.00

4" dia. X 45 PVC Bend Elbow

2.00

pc

30.00

60.00

4" dia. X 90 PVC Bend Elbow

2.00

pc

40.00

80.00

4" dia.PVC Clean Out Plug

1.00

pc

50.00

50.00

4" dia.x 4" dia. PVC Wye

2.00

pc

98.00

196.00

4" x 3.0m dia. PV Pipe serries 1000

3.00

length

500.00

1,500.00

4" x 4" PVC Floor Drain

1.00

set

90.00

90.00

4" x 4" PVC Tee

3.00

pc

100.00

300.00

198.00

Flush Type Toilet Bowl

1.00

unit

900.00

900.00

594.00

Solvent Cement

3.00

pint

100.00

300.00

198.00

Teflon Tape

3.00

roll

20.00

60.00

39.60

1.00

Lot

XI. ELECTRICAL WORKS

52.80
33.00
129.36
990.00
59.40

Interior Rough in

12.00

pcs.

20.00

240.00

158.40

4" x 4" Juncton Boxes PVC

7.00

pcs.

25.00

175.00

115.50

3/4" dia. RSC Pipe

1.00

length

240.00

240.00

158.40

Screw Insulator

1.00

pc.

40.00

40.00

26.40

2.00

box

3,900.00

7,800.00

5,148.00
1,188.00

Electrical Wires
3.5mm2 THW Stranded

PCPP

39.60

A. Materials
2" x 4" Utility Boxes Pvc

488.40

Service Drop Wire

60.00

30.00

1,800.00

PVC Clamp

10.00

pc

2.00

20.00

13.20

Flexible tube 3/4" dia

80.00

12.00

960.00

633.60

Page 149 of 165

PACKAGES

PACKAGE ITEMS

QTY

UNIT

UNIT COST

TOTAL

PROC METHOD
1st Tranche
KC Grant

Electrical Tape (Big)

3.00

pc

30.00

90.00

59.40

5.00

assy

350.00

1,750.00

1,155.00

Electrical Fixtures

Flourescent Lamp, 40 watts


10 watts compact flourescent Lamp

3.00

set

120.00

360.00

237.60

2 Gang Switch with Plate

2.00

pc

98.00

196.00

129.36

1 Gang Switcth w/ Plate

4.00

pc

65.00

260.00

171.60

Duplex Convenience Outlet

5.00

pc

40.00

200.00

132.00

Lighting Outlet ( 4" Porcelain Receptacle)

7.00

pc

35.00

245.00

161.70

Female Adaptor

5.00

pc

13.00

65.00

42.90

KWHR meter w/ Base

1.00

unit

1,500.00

1,500.00

990.00

Entrance Cap # 1" dia.

5.00

pc

100.00

500.00

330.00

1.00

set

2,000.00

2,000.00

1,320.00

14.00

gal

335.00

4,690.00

3,095.40
1,326.60

Panel Board (4-branches) to include 30A Main,


20A power outlet, 15A lighting outlet & 15A spare)
Concrete Putty
Concrete Neutralizer

6.00

gal

335.00

2,010.00

Polituff

2.00

pcs

188.00

376.00

248.16

Flat Latex White

14.00

gal

425.00

5,950.00

3,927.00

Semi-Gloss Latex White

5,433.12

14.00

gal

588.00

8,232.00

Quick Dry Enamel Chocolate Brown

1.00

gal

475.00

475.00

313.50

Quick Dry Enamel White-Semi-Gloss

6.00

gal

520.00

3,120.00

2,059.20

Flat Enamel White

1.00

gal

520.00

520.00

343.20

Latex Tinting Color Rawsienna

2.00

pint

130.00

260.00

171.60

Latex Tinting Color Red

2.00

pint

126.00

252.00

166.32

Latex Tinting Color Blue

1.00

pint

165.00

165.00

108.90

Latex Tinting Color Yellow

1.00

pint

126.00

126.00

83.16

Latex Tinting Color Green

1.00

pint

125.00

125.00

82.50

Paint Thinner

4.00

gal

250.00

1,000.00

660.00

Paint Brush 4"

4.00

pc

100.00

400.00

264.00

Paint Brush 2"

2.00

pc

35.00

70.00

46.20

Paint Roller 7" with Pan

4.00

set

100.00

400.00

264.00

Sandpaper #100

10.00

sheet

50.00

500.00

330.00

Sandpaper #200

10.00

sheet

60.00

600.00

396.00

1.00

pc

700.00

700.00

462.00

2. HANDTOOLS AND PROTECTIVE EQUIPMENT (PPE)


Shovel w/ handle
Crow Bar

1.00

pc

900.00

900.00

594.00

Concrete Pail

10.00

pc

95.00

950.00

627.00

Wheel Barrow

1.00

pc

1,700.00

1,700.00

1,122.00

Sledge Hammer (5kg) w/ handle

1.00

pc

750.00

750.00

495.00

Hard Hat

5.00

pc

350.00

1,750.00

1,155.00

10.00

pcs

35.00

350.00

231.00

1.00

set

500.00

500.00

330.00

295,606.62

195,100.37

Hand Glooves
Medicine kit box to include Betadine 100ml, Agua
Oxinada 100ml, cotton 5grams, bandage 5pcs, &
1st aide tape 1 roll
Sub-Total
Package 2: LUMBER
Materials

123.00

bdft

25.00

3,075.00

2"x2"x8' Coco Lumber

48.00

bdft

25.00

1,200.00

2"x2"x8' Coco Lumber

160.00

bdft

25.00

4,000.00

Page 150 of 165


LSG)

PCPP

2"x2"x8' Coco Lumber

PACKAGES

PACKAGE ITEMS

QTY

UNIT

UNIT COST

TOTAL

PROC METHOD
1st Tranche

2"x3"x10' Coco Lumber, Vertical Support

168.00

bdft

25.00

4,200.00

2"x2"x10' Coco Lumber, Horizontal Support

504.00

bdft

25.00

12,600.00

2"x2"x10' Coco Lumber, Diagonal Braces

281.00

bdft

25.00

7,025.00

2"x3"x10' Coco Lumber, Vertical Support

84.00

bdft

25.00

2,100.00

2"x2"x10' Coco Lumber, Horizontal Support

65.38

bdft

25.00

1,634.50

150.00

bd ft

25.00

3,750.00

2"x5"x14' for Top Chord (Good Lumber)

116.67

bdft.

41.00

4,783.33

2"x5"x12' for Bottom Chord (Good Lumber)

100.00

bdft.

41.00

4,100.00

60.00

bdft.

41.00

2,460.00

2"x5"x12' for Top Chord (Good Lumber)

40.00

bdft.

41.00

1,640.00

2"x5"x14' for Bottom Chord (Good Lumber)

46.67

bdft.

41.00

1,913.33

2"x4"x8' for Web Member & Kingpost (Good Lumbe

10.00

bdft.

41.00

410.00

320.00

bdft.

41.00

13,120.00

Package 2

25- 2" x 3" x 12' Coco Lumber


Truss 1: 5 units

2"x4"x8' for Web Member & Kingpost (Good Lumbe


Truss 2: 2 units

LOCAL SHOPPING FOR GOODS (LSG)

KC Grant

Purlins, Wood Cleats & Fascia Board:


2"x3"x 10' (Good Lumber)
2"x2"x 8' (Good Lumber)

21.33

bdft.

41.00

874.67

2"x2"x8' Ceiling Joist (Good Lumber)

378.96

bdft

41.00

15,537.38

50 - 2" x 2" x 10' Hangers (Good Lumber)

167.00

bd ft

41.00

Sub-Total

6,847.00
91,270.21

Package 3: FURNITURE
D - 1, (1.0m x 2.10m) Panel Door

3.00

set

5,500.00

16,500.00

64.00

bdft

36.00

2,304.00

2"x6" wooden jamb assembly for W-1 w/ a


dimension of 1.8m x 1.2m to include mollion
partition at 0.60m interval.

4.00

sets

1,200.00

4,800.00

2"x6" wooden jamb assembly for W-2 w/ a


dimension of 1.2m x 1.2m to include mollion
partition at 0.60m interval.

2.00

sets

1,500.00

3,000.00

2"x6" wooden jamb assembly for W-3 w/ a


dimension of 0.60m x 0.60m to include mollion
partition at 0.60m interval.

1.00

Sets

350.00

350.00

36" x 75" Wooden Bed

1.00

unit

7,000.00

7,000.00

24" x 36" Wooden Table w/ Wooden Chair

1.00

set

4,080.00

4,080.00

Package 3

D-1, 2"x6"x8' for Door Jamb (Assembly)

Sub-Total

LOCAL SHOPPING FOR GOODS (LSG)

Materials:

38,034.00

Package 4: ROOFING

Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)

17.00

pcs

2,075.00

35,275.00

6.00

pcs

1,355.00

8,130.00

Colorib No. 24, x 8' Pre formed Side Gutter

10.00

pcs

620.00

6,200.00

Colorib No. 24, x 8' Pre formed Side End Flashing

11.00

pcs

620.00

6,820.00

Colorib No. 24, x 8' Pre formed End Wall Flashing

3.00

pcs

620.00

1,860.00

Package 4

Colorib Longspan 0.40mm x 1.10m x 3m (Green)

PCPP

Page 151 of 165

LOCAL SHOPPING FOR GOODS (LSG)

Materials:

QTY

Colorib No. 24, x 8' Pre formed Ridgeroll

UNIT

5.00

UNIT COST

pcs

620.00

Sub-Total

TOTAL

3,100.00

LOCAL SHOPPING FOR GOODS (L

PACKAGES
Package 4

PACKAGE ITEMS

PROC METHOD

61,385.00

1st Tranche
KC Grant

Package 5: AMENITIES
BP Apparatus

1.00

unit

2,000.00

2,000.00

Stethoscope

1.00

unit

1,530.00

1,530.00

Weighing Scale for adult

1.00

unit

7,000.00

7,000.00

Weighing Scale for infant

1.00

unit

2,856.00

2,856.00

Medicine/Dressing Kit (CART W/ TRAY)

1.00

set

3,000.00

Sub-Total

LSG

Package 5

Materials:

3,000.00
16,386.00

Package 6: AGGREGATES AND MASONRY PRODUCTS


Filling Materials

14.78

cu.m.

500.00

7,391.25

Washed Gravel

24.00

cu.m.

775.00

18,600.00

24.00

cu.m.

700.00

16,800.00

Pcs

15.00

23,940.00

Washed Sand
4" x 8' x 16" CHB

1,596.00
Sub-Total

LSG

Package 6

Materials:

66,731.25

Package 7: WINDOW GLASS

W - 1, (1.80m X 1.20m) twelve Blades clear glass


jalousie window on standard aluminum housing w/
12mm dia. hole in between blades interval

9.00

Sets

750.00

6,750.00

W - 2, (1.20m X 1.20m) twelve Blades clear glass


jalousie window on standard aluminum housing w/
12mm dia. hole in between blades interval

4.00

Sets

750.00

3,000.00

W - 3, (0.60m X 0.60m) six Blades clear glass


jalousie window on standard aluminum housing w/
12mm dia. hole in between blades interval

1.00

Sets

350.00

350.00

Sub-Total

LSG

Package 7

Materials:

10,100.00

Materials:
Supply & Installation Fabricated Steel Billboard

1.00

LOT

9,000.00

Building Roof Signage

1.00

LOT

2,500.00

Sub-Total

9,000.00

LSG

Package 8

Package 8: STEEL BILLBOARD BILLBOARD AND ROOF SIGNAGE

2,500.00
11,500.00

Materials:
Warning Signs (Tarpulin POW)
Barricades

LSG

Package 9

Package 9: ENVIRONMENTAL MITIGATING COST


10.00

pc

150.00

1,500.00

5.00

pc

250.00

1,250.00

1,000.00

2,750.00

2,200.00

58,500.00

1750.94

Sub-Total

1,200.00

P 10

Skilled
Unskilled

55,800.00

CFA

Package 10: LABOR:

Sub-Total

114,300.00

1,750.94

TOTAL DIRECT COST

708,063.08

199,051.31

PCPP

Page 152 of 165

PACKAGES

PACKAGE ITEMS

QTY

UNIT

UNIT COST

TOTAL

PROC METHOD
1st Tranche
KC Grant

Package 11: INDIRECT COST


OVERHEAD COST

15,750.00
2,500.00

P 11

40,000.00

MATERIAL TESTING

4,000.00

TREASURER'S BOND

3,375.00

CONTINGENCY

CFA

PRE-ENGINEERING
ADMINISTRATIVE COST

408.69

29,504.46

TOTAL INDIRECT COST


GRAND TOTAL CASH

Workshop output of:

95,129.46

408.69

803,192.54

199,460.00

(18,966.46)

SAY

822,159.00

559,862.40
80.00%

Checked by:

CARMEN A. GAUDIANO
Procurement Team Head

PCPP

PPT

Page 153 of 165

Municipal Engineer

COMMUNITY PROCUREMENT PACKAGING


Proposed Sub-Project

: Construction of 1 unit BARANGAY HEALTH STATION


:

803,192.54

80 C.D

SOURCES OF FUNDS

.
PERCENTAGE WEIGHT

TOTAL
KC Grant:

LCC:

AMOUNT

FUND SOURCE

(PESO)

LEGEND:
TO KC GRANT TO LCC CASH

KC GRANT

699,828.00
137,046.00

559,862.40

86,656.80

646,519.20

80.00%

80%

TOTAL LCC

69,982.80

10,832.10

80,814.90

10.00%

10%

LCC - In-kind

28,725.00

69,982.80

10,832.10

80,814.90

10.00%

10%

LCC - Cash

108,321.00

699,828.00

108,321.00

808,149.00

100%

100%

TOTAL

836,874.00

REMARKS

TRANCHING SCHEDULE
TOTAL
1st Tranche

2nd Tranche

LCC Cash

KC Grant

LCC Cash

3rd Tranche
KC Grant

LCC Cash

TOTAL
KC Grant

LCC Cash

306.00

594.00

306.00

900.00

4,141.20

8,038.80

4,141.20

12,180.00

241.40

468.60

241.40

710.00

44.20

85.80

44.20

130.00

81.60

158.40

81.60

240.00

44.20

85.80

44.20

130.00

265.20

514.80

265.20

780.00

442.00

858.00

442.00

1,300.00

48.96

95.04

48.96

144.00

44.20

85.80

44.20

130.00

108.80

211.20

108.80

320.00

2,346.00

4,554.00

2,346.00

6,900.00

997.33

1,936.00

997.33

2,933.33

176.80

343.20

176.80

520.00

1,139.00

2,211.00

1,139.00

3,350.00

27.20

52.80

27.20

80.00

7,009.10

13,605.90

7,009.10

20,615.00

1,989.00

3,861.00

1,989.00

5,850.00

693.60

1,346.40

693.60

2,040.00

581.40

1,128.60

581.40

1,710.00

2,772.00

1,428.00

4,200.00

102.00

198.00

102.00

300.00

255.00

495.00

255.00

750.00

30.60

59.40

30.60

90.00

25,323.20

49,156.80

25,323.20

74,480.00

544.00

1,056.00

544.00

1,600.00

241.40

468.60

241.40

710.00

1,105.00

2,145.00

1,105.00

3,250.00

95.20

184.80

95.20

280.00

122.40

237.60

122.40

360.00

108.80

211.20

108.80

320.00

171.36

332.64

171.36

504.00

469.20

910.80

469.20

1,380.00

11,594.00

22,506.00

11,594.00

34,100.00

Page 154 of 165

MONTHS
1

1,428.00

PCPP

PROPOSED
IMPLEMENTATION
SCHEDULE

REMARKS

TRANCHING SCHEDULE
TOTAL
1st Tranche

2nd Tranche

LCC Cash

KC Grant

LCC Cash

3rd Tranche
KC Grant

LCC Cash

TOTAL
KC Grant
5,276.70

2,718.30

1,837.70

3,567.30

1,837.70

5,405.00

7,242.00

14,058.00

7,242.00

21,300.00

1,360.00

2,640.00

1,360.00

7,995.00

4,000.00

59.50

115.50

59.50

175.00

525.30

1,019.70

525.30

1,545.00

510.00

990.00

510.00

1,500.00

1,224.00

2,376.00

1,224.00

3,600.00

238.10

462.19

238.10

700.29

23.80

46.20

23.80

70.00

108.80

211.20

108.80

320.00

8.16

15.84

8.16

24.00

3.40

6.60

3.40

10.00

17.00

33.00

17.00

50.00

142.12

275.88

142.12

418.00

255.00

495.00

255.00

750.00

13.60

26.40

13.60

40.00

40.80

79.20

40.80

120.00

183.60

356.40

183.60

540.00

30.60

59.40

30.60

90.00

1,116.90

2,168.10

1,116.90

3,285.00

25.50

49.50

25.50

75.00

244.80

475.20

244.80

720.00

251.60

488.40

251.60

740.00

20.40

39.60

20.40

60.00

27.20

52.80

27.20

80.00

17.00

33.00

17.00

50.00

66.64

129.36

66.64

196.00

510.00

990.00

510.00

1,500.00

30.60

59.40

30.60

90.00

102.00

198.00

102.00

300.00

306.00

594.00

306.00

900.00

102.00

198.00

102.00

300.00

20.40

39.60

20.40

60.00

81.60

158.40

81.60

240.00

59.50

115.50

59.50

175.00

81.60

158.40

81.60

240.00

13.60

26.40

13.60

40.00

2,652.00

5,148.00

2,652.00

7,800.00

612.00

1,188.00

612.00

1,800.00

6.80

13.20

6.80

20.00

326.40

633.60

326.40

960.00

Page 155 of 165

MONTHS
1

2,718.30

PCPP

LCC Cash

PROPOSED
IMPLEMENTATION
SCHEDULE

REMARKS

TRANCHING SCHEDULE
TOTAL
1st Tranche

2nd Tranche

LCC Cash

KC Grant

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

30.60

59.40

30.60
-

90.00
-

1,155.00

595.00

1,750.00

122.40

237.60

122.40

360.00

66.64

129.36

66.64

196.00

88.40

171.60

88.40

260.00

68.00

132.00

68.00

200.00

83.30

161.70

83.30

245.00

22.10

42.90

22.10

65.00

510.00

990.00

510.00

1,500.00

170.00

330.00

170.00

500.00

680.00

1,320.00

680.00

2,000.00

1,594.60

3,095.40

1,594.60

4,690.00

683.40

1,326.60

683.40

2,010.00

127.84

248.16

127.84

376.00

2,023.00

3,927.00

2,023.00

5,950.00

2,798.88

5,433.12

2,798.88

8,232.00

161.50

313.50

161.50

475.00

1,060.80

2,059.20

1,060.80

3,120.00

176.80

343.20

176.80

520.00

88.40

171.60

88.40

260.00

85.68

166.32

85.68

252.00

56.10

108.90

56.10

165.00

42.84

83.16

42.84

126.00

42.50

82.50

42.50

125.00

340.00

660.00

340.00

1,000.00

136.00

264.00

136.00

400.00

23.80

46.20

23.80

70.00

136.00

264.00

136.00

400.00

170.00

330.00

170.00

500.00

204.00

396.00

204.00

600.00

238.00

462.00

238.00

700.00

306.00

594.00

306.00

900.00

323.00

627.00

323.00

950.00

578.00

1,122.00

578.00

1,700.00

255.00

495.00

255.00

750.00

595.00

1,155.00

595.00

1,750.00

119.00

231.00

119.00

350.00

170.00

330.00

170.00

500.00

195,100.37

100,506.25

295,606.62

100,506.25

3,075.00

3,075.00

3,075.00

1,200.00

1,200.00

1,200.00

4,000.00

4,000.00

4,000.00

Page 156 of 165

MONTHS
1

595.00

PCPP

LCC Cash

PROPOSED
IMPLEMENTATION
SCHEDULE

REMARKS

TRANCHING SCHEDULE
TOTAL
1st Tranche

2nd Tranche

LCC Cash

KC Grant

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

LCC Cash

4,200.00

4,200.00

4,200.00

12,600.00

12,600.00

7,025.00

7,025.00

7,025.00

2,100.00

2,100.00

2,100.00

1,634.50

1,634.50

1,634.50

3,750.00

3,750.00

3,750.00

4,783.33

4,783.33

4,783.33

4,100.00

4,100.00

4,100.00

2,460.00

2,460.00

2,460.00

1,640.00

1,640.00

1,640.00

1,913.33

1,913.33

1,913.33

410.00

410.00

410.00

874.67

874.67

874.67

15,537.38

15,537.38

15,537.38

6,847.00

13,120.00

13,120.00

13,120.00

6,847.00

6,847.00

91,270.21

91,270.21

16,500.00

16,500.00

16,500.00

2,304.00

2,304.00

2,304.00

4,800.00

4,800.00

4,800.00

3,000.00

3,000.00

3,000.00

350.00

350.00

350.00

7,000.00

7,000.00

7,000.00

4,080.00

4,080.00

4,080.00

38,034.00

38,034.00

91,270.21

38,034.00

PCPP

8,818.75

26,456.25

8,818.75

26,456.25

35,275.00

2,032.50

6,097.50

2,032.50

6,097.50

8,130.00

1,550.00

4,650.00

1,550.00

4,650.00

6,200.00

1,705.00

5,115.00

1,705.00

5,115.00

6,820.00

465.00

1,395.00

465.00

1,395.00

1,860.00

Page 157 of 165

MONTHS
1

12,600.00

PROPOSED
IMPLEMENTATION
SCHEDULE

REMARKS

TRANCHING SCHEDULE
TOTAL
1st Tranche

2nd Tranche

LCC Cash

KC Grant

3rd Tranche

LCC Cash

KC Grant

775.00

2,325.00

15,346.25

46,038.75

TOTAL

LCC Cash

KC Grant

LCC Cash

775.00

2,325.00

3,100.00

15,346.25

46,038.75

61,385.00

1,600.00

400.00

1,600.00

400.00

2,000.00

1,224.00

306.00

1,224.00

306.00

1,530.00

5,600.00

1,400.00

5,600.00

1,400.00

7,000.00

2,284.80

571.20

2,284.80

571.20

2,856.00

2,400.00

600.00

2,400.00

600.00

3,000.00

13,108.80

3,277.20

13,108.80

3,277.20

16,386.00

7,391.25

7,391.25

7,391.25

18,600.00

18,600.00

16,800.00

16,800.00

16,800.00

23,940.00

23,940.00

23,940.00

66,731.25

66,731.25

5,400.00

1,350.00

5,400.00

1,350.00

6,750.00

2,400.00

600.00

2,400.00

600.00

3,000.00

280.00

70.00

280.00

70.00

350.00

8,080.00

2,020.00

8,080.00

2,020.00

10,100.00

9,000.00

2,500.00
11,500.00

9,000.00

9,000.00

2,500.00

2,500.00

11,500.00

11,500.00
-

300.00

1,200.00

300.00

1,500.00

250.00

1,000.00

250.00

1,250.00

2,200.00

550.00

2,750.00

1,750.94

56,749.06

58,500.00

550.00

56,749.06
28,904.23
85,653.29
394,245.00

PCPP

23,426.25

4,318.75

7,199.61

15,377.41

7,199.61

48,600.39

55,800.00

4,318.75

7,199.61

15,377.41

8,950.55

105,349.45

114,300.00

52,377.50

20,308.41

18,654.61

242,785.97

465,277.11

708,063.08

Page 158 of 165

MONTHS
1

18,600.00

66,731.25

PROPOSED
IMPLEMENTATION
SCHEDULE

REMARKS

TRANCHING SCHEDULE
TOTAL
1st Tranche

2nd Tranche

LCC Cash

KC Grant

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

15,750.00

KC Grant
-

24,000.00
1,506.25

2,500.00

2,500.00

40,000.00

40,000.00

2,085.06

4,000.00

3,375.00

3,375.00
29,504.46

1,914.94

24,266.78

5,237.68

24,266.78

5,237.68

24,266.78

25,822.74

26,181.72

68,947.74

95,129.46

52,377.50

44,575.19

44,477.35

268,967.69

534,224.85

803,192.54

69,982.80

10,832.10

69,982.80

10,832.10

268,967.69

534,224.85

10.00%

45,050.30

10.00%

25,407.61
699,828.00

108,321.00

1,506.25

437,370.00

24,932.50

86,656.80
360,402.40
(350,713.20)

(41,545.40)
Reviewed by:

(33,645.25)
Submitted by:

15,750.00

43,125.00

PCPP

15,750.00

2,500.00
2,085.06

MONTHS
1

16,000.00

3,375.00

A. GAUDIANO

LCC Cash

PROPOSED
IMPLEMENTATION
SCHEDULE

Noted by:

GERUNDIO C. BAUTISTA JR.

DIOSDADO EBARNE

GEORGE S. ISULAT

Deputy Area Coordinator

BSMPC

Regional Community Infra. Engineer

Page 159 of 165

AMOUNT
(PESO)

699,828.00
137,046.00
28,725.00
108,321.00
836,874.00

PROPOSED
MPLEMENTATION
SCHEDULE

MONTHS
3

PCPP

Page 160 of 165

PROPOSED
MPLEMENTATION
SCHEDULE

MONTHS
3

PCPP

Page 161 of 165

PROPOSED
MPLEMENTATION
SCHEDULE

MONTHS
3

PCPP

Page 162 of 165

PROPOSED
MPLEMENTATION
SCHEDULE

MONTHS
3

PCPP

Page 163 of 165

PROPOSED
MPLEMENTATION
SCHEDULE

MONTHS
3

PCPP

Page 164 of 165

PROPOSED
MPLEMENTATION
SCHEDULE

MONTHS
3

S. ISULAT

nity Infra. Engineer

PCPP

Page 165 of 165