Pow Bagacay (BHS) - Final
Pow Bagacay (BHS) - Final
Category
Physical Target
Total Sub-Project Cost
Mode of Implementation
Public Goods
51.0 sq. m.
Php 850,884.00
By Community Force Account (CFA)
Sub-Project Duration
Sub-Project Location:
Sub-Project Site Location is 8KM away from town proper
Technical Personnel
: DAC/ME
Foreman
Item
no.
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
% Wt.
SITE WORKS
CONCRETE WORKS
REINFORCING STEEL BARS
FORMWORKS & SCAFFOLDING
MASONRY WORKS
CARPENTRY WORKS
DOORS AND WINDOWS
ROOFING
PLUMBING WORKS
TILE WORKS
ELECTRICAL WORKS
PAINTING WORKS
STEEL BILLBOARD AND ROOF SIGNAGE
BASIC AMENITIES
Quantity
5.49
10.73
14.38
2.89
14.67
15.98
8.06
9.68
2.18
2.86
3.05
4.75
1.56
3.72
120.00
17.78
2,432.85
23.00
144.00
1,872.00
18.44
82.00
1.00
5.00
1.00
265.00
1.00
1.00
SOURCE OF FUNDS
KALAHI-CIDSS
Grant -MCC
Direct Cost
Materials
Labor
1) Skilled
2) Unskilled
Sub-Total ( A )
B.
Indirect Cost
Overhead Cost
Handtools and Personal Protective
Equipment (PPE)
Pre-engineering
Project Supervision
sq.m.
cu.m.
kgs.
sq.m.
sq.m.
bd.ft
sq.m.
sq.m.
lot
sq.m.
lot
sq.m.
lot
lot
100.00
Breakdown of Estimated
Project Cost
Unit
Community
(Inkind)
BLGU
Cash
MLGU
In-Kind
Cash
A.
501,982.95
58,500.00
55,800.00
616,282.95
20,925.00
20,925.00
10,000.00
90,396.59
10,000.00
90,396.59
15,750.00
6,080.00
1,520.00
2,500.00
-
3,000.00
Environmental Impact
Administrative Cost
Material Testing
Treasurers Bond
Sub-Total ( B )
2,200.00
33,333.33
1,914.94
59,278.27
Total (A & B)
Contingency 5%
Total Project Cost
675,561.22
24,266.78
699,828.00
3,000.00
23,925.00
23,925.00
10,000.00
10,000.00
550.00
6,666.67
2,085.06
3,375.00
16,696.73
107,093.32
5,237.68
112,331.00
MCC Grant
LCC Cash
LCC Inkind
699,828.00
122,331.00
28,725.00
Grand Total
699,828.00
23,925.00
Prepared by :
10,000.00
112,331.00
Approved by :
ELSA A. TRUNO
ANTON
M.E.O Staff
BSPMC
Concurred by :
RODSON R. ESCORA
STEPHE
Barang
Recommending Approval:
HON. NEI
CARMEN A. GAUDIANO
Municipal Engineer
Noted by :
GEORGE S. ISULAT
ic of the Philippines
e of Negros Oriental
icipality of Dauin
rangay Bagacay
CT PROGRAM OF WORK
Unit Price
Total Amount
337.17
4,453.79
43.61
927.61
751.56
62.96
3,223.37
870.67
16,088.00
4,216.00
22,466.00
132.15
11,500.00
27,466.00
40,460.00
79,175.00
106,097.50
21,335.00
108,225.00
117,857.04
59,439.00
71,395.00
16,088.00
21,080.00
22,466.00
35,021.00
11,500.00
27,466.00
737,604.54
SOURCE OF FUNDS
MLGU
TOTAL
In-Kind
-
602,379.54
58,500.00
76,725.00
737,604.54
15,750.00
7,600.00
4,800.00
2,500.00
7,800.00
4,800.00
2,750.00
40,000.00
4,000.00
3,375.00
83,775.00
4,800.00
821,379.54
29,504.46
850,884.00
4,800.00
82.25%
14.38%
3.38%
4,800.00
100.00%
850,884.00
ANTONIO ALAM
BSPMC Chairperson
STEPHEN B. ALAM
Barangay Captain
Location
Total Approved Cost
Cost Sharing
:
:
:
Local Counterpart :
KALAHI Grant
Community
Barangay LGU
Municipal LGU
TOTAL
SPI Stage / Activities Conducted
I.
II
III
Siteworks
STRUCTURAL CONCRETE
PHP
PHP
PHP
PHP
PHP
Negative Impact
Mitigati
a.
Deep Excavation/Ground
Leveling
a-1.
b.
Backfilling of Excavated
Materials
b-1.
c.
a.
a-1.
b.
Construction Waste
b-1.
a.
Negative Impact
Mitigati
IV
MASONRY WORKS
a.
a.
a-1.
VI
a.
a-1.
VII
TILEWORKS
a.
VIII
IX
X
XI
XII
XIII
XIV
a.
none
a-1.
none
none
none
Increase Hazard due to live
and high voltage current
a-1.
none
none
none
Reviewed by:
Prepared By:
ANTONIO ALAM
BSPMC Chair
Concurred by:
CARMEN A. GAUDIANO
Municipal Engineer
699,828.00
23,925.00
10,000.00
117,131.00
850,884.00
Mitigating Measures
Provide baricades and warning signs
to make aware of the community of
the on-going activity. And Strickly
follow the desired elevation on plan.
Provide workers Dust Mask during
execution of work to prevent workers
from inhailing dust particles.
Replace cut-down trees with new tree
seedlings within the vicinity
Mitigating Measures
Workers must wear Hardhats and
Safety Boots on Site, removal of
scaffoldings must be placed on
designated areas to prevent workers
from injuries.
Provide workers Dust Mask during
execution of work to prevent workers
from inhailing dust particles.
none
none
none
Provide safety equipment and
appropriate warning signs along the
construction sites.
none
none
none
ALDRIN C. YANOC
Community Facilitator
RODSON R. ESCORA
Deputy Area Coordinator
Unit used
No. of
Units
Per Unit
Cost
Total Sub-Project
Pro-posed
Cost
Amount of Grant
I. Administrative Cost
TE for opening of BSPMC DBP Account of CV's
TE for procurement transactions of CV's
Project Meetings
MCT-Initiated Meetings
Treasurer Payroll Processing
Forms/Supplies and Reproduction
Sub Total
II. Other Indirect Costs
Overhead Cost
Handtools
Pre-engineering
Project Supervisions
Environmental Mitigating Cost
Material Testing
Treasurer's Bond
Contingency
Sub Total
III. Direct Cost
Labor
Materials
Sub Total
TOTAL PROJECT COST
IV. Operations & Maintenance
Other Amenities
Sub Total
GRAND TOTAL
Prepared by:
MARVIN R. TUASON
Barangay Treasurer
1,880.00
1,566.67
12,600.00
6,672.00
7,500.00
3,920.00
7,428.00
40,000.00
10,500.00
5,560.00
6,250.00
3,266.67
6,190.00
33,333.33
15,750.00
7,600.00
2,500.00
7,800.00
2,750.00
4,000.00
3,375.00
29,504.46
73,279.46
15,750.00
6,080.00
135,225.00
602,379.54
737,604.54
850,884.00
114,300.00
501,982.95
616,282.95
699,828.01
0.00
0.00
850,884.00
0.00
699,828.01
2,200.00
1,914.94
24,266.78
50,211.72
o. 3
PROJECT
TRIBUTION PLAN
cay
auin
gion VII, Philippines
Mun LGU
313.33
2,100.00
1,112.00
1,250.00
653.33
1,238.00
6,666.67
0.00
0.00
0.00
0.00
1,520.00
2,500.00
4,800.00
550.00
2,085.06
3,375.00
5,237.68
20,067.74
0.00
90,396.59
90,396.59
117,131.00
10,000.00
10,000.00
10,000.00
20,925.00
23,925.00
0.00
0.00
0.00
117,131.00
0.00
10,000.00
0.00
23,925.00
0.00
0.00
0.00
0.00
151,056.00
3,000.00
3,000.00
20,925.00
Approved by:
ANTONIO ALAM
BSPMC Chairperson
OFFICE OF THE B
CONS
UNIT COST
Quantity Derivation
QUANTITY
Computation
DESCRIPTION
Unit
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
A. DIRECT COST
I. SITEWORKS
I - 1. Clearing and Lay-out
A. Materials
25- 2" x 2" x 12' Coco Lumber
Nylon String
3" CW Nails
120.00
sq.m.
100.00
2.00
7.00
bd ft
kg
kg
1.00
1.00
day
day
24.30
cu.m.
2.00
day
35.00
cu.m.
35.00
cu.m.
3.00
day
20.00
350.00
65.00
Sub-Total
B. Labor (80 sq.m./man-day)
Carpenter
Laborer
1.00
2.00
300.00
275.00
2.00
275.00
Sub-Total
I - 2. Structure Excavation
6 man-hour/cu.m (0.75md/cu.m)
Column Footing, Footing Tie Beam & Septic Vault
A. Labor
Laborer
Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
3.65 man-hour/cu.m
A. Materials
Filling Materials
Sub-Total
B. Labor
Laborer
Sub-Total
I - 4. Gravel Bedding
Crew: 2 cu.m./man-hour
Total Floor Area = (51 sq.m. x 0.1 m)= 5.1 say 6 cu.m.
A. Materials
Washed Gravel
Sub-Total
B. Labor
Laborer
Sub-Total
I - 5. Soil Poisoning
Crew: 2 cu.m./man-hour
6.00
550.00
4.00
275.00
cu.m.
6.00
cu.m.
2.00
day
750.00
2.00
275.00
UNIT COST
Quantity Derivation
QUANTITY
Computation
DESCRIPTION
A. Materials
Soil Poisoning Materials
Unit
51.00
cu.m.
1.00
day
17.78
cu.m.
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
80.00
Sub-Total
B. Labor (80 sq.m./man-day)
Laborer
2.00
275.00
Sub-Total
TOTAL FOR SITEWORKS
II. CONCRETE WORKS
8.51 man-hour/cu.m
(1*1*0.3*8)+(0.6*0.6
*0.3*2) =
Column =
0.25*0.25*4*8 =
Wall Footing =
0.3*0.2*39.2 =
(1.5*1.5+6*6.4+2*4)*0.1
=
Floor Slab =
(0.2*0.15*1.6*8)+(0.
Lintel Beam & Conc. Bench =
4*0.1*6) =
Roof Beam =
0.2*0.25*32.8 =
Ramp & Door Step = (1*2.4)+(1*0.6)*0.1 =
Septic Vault (Grade & Cover Slab) =
1.2*3*0.1*2 =
Footing =
A. Materials
Portland Cement
Red Cement (US Lansco or uqivalent)
Washed Sand
Washed Gravel
17.78*9=
8*6/3 =
17.78*0.5 =
17.78*1 =
2.62
cu.m.
2.50
2.35
4.87
cu.m.
cu.m.
cu.m.
0.62
cu.m.
1.64
2.46
0.72
cu.m.
cu.m.
cu.m.
160.00
16.00
9.00
18.00
bag
kilos
cu.m.
cu.m.
250.00
100.00
600.00
750.00
Sub-Total
B. Labor
Mason
Laborer
Sub-Total
TOTAL FOR CONCRETE WORKS
III. REINFORCING STEEL BARS
steel man -1, helper -1 w/ bar cutter =capability 25kgs /day
wall footing, columns & footings, floor slab, lintel beams,
and septic tank
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
Hacksaw Blade
Sub-Total
B. Labor
1-foreman,1-steelman2-laborer
steel man
Laborer
Sub-Total
TOTAL FOR REINFORCING STEEL BARS
IV. FORMWORKS & SCAFFOLDING
A. Materials
100 - 2"x2"x12' Coco Lumber
20 - 2"x2"x10' Coco Lumber for Bracing
1/4 thk. 4'x8' Ordinary Plywood
# 4 CW Nails
# 2 CW Nails
# 1 CW Nails
5.00
5.00
day
day
2,432.85
kgs.
2.00
8.00
320.00 Length
20.00 Length
65.00 Length
1.50
rolls
10.00 Pcs.
25.00
25.00
day
day
23.00
sq.m.
400.00
67.00
15.00
15.00
8.00
5.00
bd.ft.
bd.ft.
shts
kgs
kgs
kgs
300.00
275.00
150.00
220.00
370.00
2,500.00
75.00
1.00
2.00
300.00
275.00
20.00
25.00
365.00
65.00
70.00
70.00
UNIT COST
DESCRIPTION
Quantity Derivation
QUANTITY
Computation
Unit
No. of
Crew/
Labor
2.00
2.00
day
day
2.00
2.00
UNIT COST/
RATE PER
DAY
Sub-Total
B. Labor (40 sq.m./day)
Carpenter
Laborer
Sub-Total
TOTAL FOR FORMWORKS AND SCAFFOLDING
V. MASONRY WORKS
144.00
V - 1. CHB Laying
A. Materials
Portland Cement Type I
85.00
Washed Sand
6.00
4" x 8' x 16" CHB
1,800.00
# 16 G.I. Tie Wire
15.00
Sub-Total
B. Labor
Crew: 2men lay 100 pcs./day
(8.3 sq.m/d for 2 men)
Mason
8.00
Laborer
8.00
Sub-Total
V - 2. Plastering
144.00
Crew: 2 men plaster 8 sq.m./day
A. Materials
Portland Cement
86.00
Washed Sand
6.00
Sub-Total
B. Labor
Crew: 2 men plaster 8 sq.m./day
Mason
6.00
Laborer
6.00
Sub-Total
TOTAL FOR MASONRY WORKS
VI. CARPENTRY WORKS
1,872.00
VI - 1. Roof Framing and Purlins
1,205.00
A. Materials
Truss 1: 5 units
2"x5"x14' for Top Chord (Good Lumber)
2*5*2 = 116.67
2"x5"x12' for Bottom Chord (Good Lumber)
((2*5*12)/12)*2*5 = 100.00
2"x4"x8' for Web Member & Kingpost (Good Lumber)
((2*4*2)/12)*9*5 =
60.00
12mm dia. X 7" Machine Bolt w/ Knot and washer
direct counting
10.00
# 5 CWN
276.67*10/1000 =
3.00
Truss 2: 2 units
2"x5"x12' for Top Chord (Good Lumber)
(2*5*12*2*2)/12 =
40.00
2"x5"x14' for Bottom Chord (Good Lumber)
(2*5*14*2*2)/12 =
46.67
2"x4"x8' for Web Member & Kingpost (Good Lumber)
(2*4*8*3.5*4)/12 =
10.00
12mm dia. X 7" Machine Bolt w/ Knot and washer
direct counting
4.00
# 5 CWN
96.67*10/1000 =
1.00
Purlins, Wood Cleats & Fascia Board:
((2*3*10)/12)*16*4 = 320.00
2"x3"x 10' (Good Lumber)
((2*2*8)/12)*16*6/12 =
2"x2"x 8' (Good Lumber)
21.33
1"x12"x8' Hardi-Sanipa (Hardiflex-Board)
direct counting
20.00
# 4 CWN
341.33*10/1000 =
4.00
# 2 CWN
1.00
300.00
275.00
sq.m.
Bags
Cu.m.
Pcs
Kgs.
day
day
250.00
600.00
12.00
60.00
3.00
3.00
300.00
275.00
sq.m.
Bags
Cu.m.
day
day
250.00
600.00
3.00
4.00
300.00
275.00
bd ft
bd ft
bdft.
bdft.
bdft.
Pcs.
Kgs.
36.00
36.00
36.00
36.00
36.00
bdft.
bdft.
bdft.
Pcs.
Kgs.
36.00
36.00
36.00
36.00
36.00
bdft.
bdft.
Length
kgs.
kgs.
36.00
36.00
340.00
65.00
70.00
UNIT COST
Quantity Derivation
QUANTITY
Computation
DESCRIPTION
4.00
Unit
No. of
Crew/
Labor
gal
UNIT COST/
RATE PER
DAY
1,075.00
Sub-Total
B. Labor
Carpenters
Laborer
Sub-Total
VI - 2. Ceiling = 77.6 sq-m
A. Materials
Referring to Table 4-3 & 4-4 : (Simplified Construction Estimate by: Fajardo)
Total Ceiling Area =
8*7.4+6*3 +2*2 =
2"x2"x8' Ceiling Joist (Good Lumber)
81.2*4.167 =
1
/4" x 4' x 8' Marine Plywood
81.2/2.88 =
# 3 CWN
81.20*0.05 =
# 1 Finishing Nails
29*0.055 =
VI-3. Air Vents:
1"x2"x8' Wood Stick/Lattice (Good Lumber)
40*1*2*8/12 =
1/4" x 1/4" x 3' Plastic Screen
direct counting
# 2 CWN
Hardware Accessories
1/2 " CW Nails
50 - 2" x 2" x 10' Hangers (Good Lumber)
Anti-Termite (e.g. solignum, )
3" CW Nails
1/2 " CW Nails
direct counting
15.00
15.00
day
day
667.00
bd ft
3.00
3.00
300.00
275.00
81.20
378.96
29.00
5.00
2.00
sq.m.
bdft
Shts.
Kgs.
Kgs.
36.00
420.00
65.00
65.00
53.33
2.00
1.00
bdft
meter
Kgs.
55.00
40.00
70.00
6.00
167.00
1.00
7.00
2.00
kg
bd ft
gal
kg
kg
65.00
36.00
1,075.00
65.00
65.00
6.00
6.00
day
day
18.44
sq.m.
7.26
sq.m.
3.00
set
5,500.00
64.00
bdft
36.00
1.00
set
4,000.00
4.00
12.00
1.00
set
pcs
set
900.00
115.00
1,500.00
Sub-Total
B. Labor
capability = ceiling joist - 16sqm /day
ceiling board - 30 sqm/ day
Carpenters
Laborer
Sub-Total
TOTAL FOR CARPENTRY WORKS
VII. DOORS AND WINDOWS
A. Materials
DOORS
D - 1, (1.0m x 2.10m) Panel Door
D-1, 2"x6"x8' for Door Jamb (Good Lumber)
8*2*6*8/12 =
Sub-Total
fabrication & installation = 1 panel /day
B. Labor ( Installation )
Carpenters
Laborer
300.00
275.00
2.5 sq.m./man-days
4.00
4.00
day
day
16.23
sq.m.
Sub-Total
WINDOWS
3.00
3.00
1.00
1.00
300.00
275.00
UNIT COST
Quantity Derivation
QUANTITY
Computation
DESCRIPTION
Unit
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
(0.6*12*19)/6 =
23.00
lengths
230.00
3,456.00
4.00
sets
1,200.00
2,304.00
2.00
sets
1,500.00
280.00
1.00
Sets
350.00
direct counting
9.00
Sets
750.00
4.00
Sets
750.00
1.00
Sets
350.00
1.00
liter
175.00
Sub-Total
B. Labor
frame installation = 10 sqm/manday
frame fabrication= 2 sqm/manday
Carpenters
Laborer
Sub-Total
TOTAL FOR DOORS & WINDOWS
VIII. ROOFING
A. Materials
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)
(7.6/1)*2+1 =
Colorib Longspan 0.40mm x 1.10m x 3m (Green)
(2.55/1)*2 =
(7.6/2.2)*2+(2.55/2.2)*2
=
Colorib No. 24, x 8' Pre formed Side Gutter
Colorib No. 24, x 8' Pre formed Side End Flashing
47/2.2)*4+(3/2.2)*2 =
Colorib No. 24, x 8' Pre formed End Wall Flashing
(3/2.2)*2 =
(7.6/2.2)+(2.55/2.2) =
Colorib No. 24, x 8' Pre formed Ridgeroll
Roof Sealant
Tex Screw 2 1/2" dia. (for wood)
Blind Rivets
Sub-Total
B. Labor
35 pcs./man-days roof covering
Carpenters
Laborer
Sub-Total
TOTAL FOR ROOFING
IX. PLUMBING WORKS
A. Materials
IX-I Plumbing Fixtures:
Flush Type Toilet Bowl
7.00
7.00
day
day
82.00
sq.m.
17.00
6.00
10.00
11.00
3.00
5.00
2.00
1,300.00
200.00
pcs
pcs
pcs
pcs
pcs
pcs
lit
pc
pc
5.00
5.00
day
day
1.00
lot
1.00
unit
1.00
1.00
300.00
275.00
2,070.00
1,350.00
615.00
615.00
615.00
615.00
350.00
2.50
1.50
2.00
2.00
300.00
275.00
900.00
UNIT COST
No. of
Crew/
Labor
Quantity Derivation
QUANTITY
Computation
Unit
1.00
set
90.00
3.00
2.00
1.00
2.00
1.00
2.00
1.00
1.00
length
pc
pc
pc
length
pc
pc
pc
500.00
30.00
40.00
40.00
180.00
98.00
50.00
90.00
2.00
2.00
2.00
1.00
3.00
1.00
length
length
pc
pc
pc
pint
370.00
180.00
40.00
40.00
25.00
100.00
1.00
10.00
1.00
10.00
7.00
1.00
2.00
2.00
3.00
1.00
pc
length
pc
pc
pc
pc
pc
pc
roll
pint
700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00
3.00
pc
100.00
9.00
18.00
1.00
length
pc
pint
365.00
40.00
100.00
4.00
4.00
day
day
5.00
sq.m.
1.5*5.2/0.04 =
1.5*1.5/.04 =
230.00
120.00
10.00
20.00
pc
pc
bags
pc
30.00
30.00
100.00
250.00
6*1.4+0.6*0.8)/0.04 =
68.00
2.00
3.00
pc
kls.
pc
30.00
60.00
40.00
DESCRIPTION
UNIT COST/
RATE PER
DAY
Sub-Total
B. Labor
Plumber/ Mason
Laborer
2.00
2.00
300.00
275.00
Sub-Total
TOTAL FOR PLUMBING WORKS
X. TILE WORKS
A. Materials
At Toilet:
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
8" x 8" Unglazed Floor Tiles (Green or equivalent colors)
White cement / Tile Grout
Tile Trim x 3m
At Lavatory:
8" x 8" Glazed Wall Tiles (Green or equivalent colors)
White cement / Tile Grout
Tile Trim x 3m
UNIT COST
DESCRIPTION
Quantity Derivation
QUANTITY
Computation
Unit
No. of
Crew/
Labor
4.00
4.00
day
day
1.00
1.00
1.00
Lot
12.00
7.00
1.00
1.00
pcs.
pcs.
length
pc.
2.00
60.00
10.00
80.00
3.00
box
m
pc
m
pc
3,900.00
30.00
2.00
12.00
30.00
5.00
3.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00
assy
set
pc
pc
pc
pc
pc
unit
pc
350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00
1.00
set
2,000.00
7.00
7.00
day
day
UNIT COST/
RATE PER
DAY
Sub-Total
B. Labor
Mason
Laborer
300.00
275.00
Sub-Total
TOTAL FOR TILEWORKS
XI. ELECTRICAL WORKS
A. Materials
Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Juncton Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
10 watts compact flourescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Lighting Outlet ( 4" Porcelain Receptacle)
Female Adaptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)
20.00
25.00
240.00
40.00
Sub-Total
B. Labor
Electrician
Laborer
Sub-Total
TOTAL FOR ELECTRICAL WORKS
XII. PAINTING WORKS
A. Materials
Net Painting Area (Front Elev.-2faces) =
Net Painting Area (R/S Elev.-2faces) =
Net Painting Area (L/S Elev.-2faces) =
Net Painting Area (Rear -2faces) =
Net Painting Area ( Partition Wall -2faces) =
Net Painting Area (Ceiling) =
Total Net Area =
Concrete Putty
Concrete Neutralizer
Polituff
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White-Semi-Gloss
263.20/20 =
263.20/50 =
263.20/20 =
263.20/20 =
50.40
265.00
sq.m.
33.44
50.64
50.64
46.16
49.28
33.44
263.60
14.00
6.00
2.00
14.00
14.00
1.00
6.00
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
gal
gal
pcs
gal
gal
gal
gal
1.00
1.00
300.00
275.00
335.00
335.00
188.00
425.00
588.00
475.00
520.00
UNIT COST
Quantity Derivation
QUANTITY
Computation
DESCRIPTION
Unit
1.00
2.00
2.00
1.00
1.00
1.00
4.00
4.00
2.00
4.00
10.00
10.00
gal
pint
pint
pint
pint
pint
gal
pc
pc
set
sheet
sheet
5.00
5.00
day
day
1.00
1.00
1.00
LOT
LOT
1.00
1.00
1.00
1.00
1.00
1.00
1.00
unit
set
unit
unit
unit
unit
set
1. OVERHEAD COST
Foreman / Leadman
45.00
day
1.00
1.00
10.00
1.00
1.00
5.00
10.00
pc
pc
pc
pc
pc
pc
pcs
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
50.00
60.00
Sub-Total
B. Labor
Painter
Laborer
Sub-Total
TOTAL FOR PAINTING
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
Supply & Installation Fabricated Steel Billboard
Building Roof Signage
Sub Total
TOTAL FOR STEEL BILLBOARD AND ROOF SIGNAGE
XIV. BASIC AMENITIES
36" x 75" Wooden Bed
24" x 36" Wooden Table w/ Wooden Chair
BP Apparatus
Stethoscope
Weighing Scale for adult
Weighing Scale for infant
Medicine/Dressing Kit (CART W/ TRAY)
TOTAL FOR BASIC AMENITIES
Direct Cost Summary
Materials
Labor :
1) Skilled
2) Unskilled
Sub-Total ( A )
TOTAL DIRECT COST
B. INDIRECT COST
2.00
2.00
300.00
275.00
LOT
8,500.00
2,500.00
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
1.00
350.00
700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
UNIT COST
DESCRIPTION
No. of
Crew/
Labor
Quantity Derivation
QUANTITY
Computation
Unit
1.00
set
500.00
50.00
sht
50.00
6.00
12.00
day
day
5.00
5.00
pc
pc
Medicine Kit
TOTAL FOR HANDTOOLS
3. PRE-ENGINEERING
3.2 Reproduction of plans
TOTAL FOR PRE-ENGINEERING
4. PROJECT SUPERVISION
4.1 Municipal Engineer
4.2 BSPMC Volunteers
TOTAL FOR ENGINEERING SUPERVISION
5. ENVIRONMENTAL IMPACT
5.1 Warning Signs
5.2 Barricades
TOTAL FOR ENGINEERING SUPERVISION
6. ADMINISTRATIVE COST (Pls see separate calculation)
TOTAL FOR ADMINISTRATIVE COST
7. MATERIAL TESTING
TOTAL FOR MATERIAL TESTING
8. TREASURER'S BOND
TOTAL FOR TREASURERS BOND
TOTAL INDIRECT COST
TOTAL (A+B)
9. CONTINGENCY
TOTAL FOR CONTINGENCY
TOTAL ESTIMATED PROJECT COST
ELSA A. TRUNO
RODSON R. ESCORA
Service Provider
1.00
1.00
UNIT COST/
RATE PER
DAY
800.00
250.00
300.00
250.00
BILL OF QUANTITIES
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
5.00
TOTAL UNIT
COST
25.00
350.00
65.00
300.00
275.00
275.00
55.00
605.00
275.00
25.00
775.00
275.00
TOTAL
KALAHI MCC
GRANT
2,500.00
700.00
455.00
3,655.00
2,083.33
583.33
379.17
3,045.83
300.00
550.00
850.00
300.00
400.00
700.00
1,100.00
1,100.00
800.00
800.00
21,175.00
21,175.00
17,645.83
17,645.83
3,300.00
3,300.00
2,400.00
2,400.00
4,650.00
4,650.00
3,875.00
3,875.00
1,100.00
1,100.00
800.00
800.00
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
416.67
116.67
75.83
609.17
150.00
150.00
300.00
300.00
900.00
900.00
300.00
300.00
3,529.17
3,529.17
-
775.00
775.00
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
80.00
275.00
25.00
25.00
25.00
275.00
100.00
625.00
775.00
300.00
275.00
7.50
11.00
18.50
25.00
3.75
157.50
231.00
388.50
2,525.00
78.75
300.00
275.00
5.00
25.00
25.00
365.00
65.00
70.00
70.00
TOTAL
KALAHI MCC
GRANT
4,080.00
4,080.00
3,400.00
3,400.00
550.00
550.00
40,460.00
400.00
400.00
33,066.67
44,000.00
1,600.00
5,625.00
13,950.00
65,175.00
36,666.67
1,333.33
4,687.50
11,625.00
54,312.50
3,000.00
11,000.00
14,000.00
79,175.00
3,000.00
8,000.00
11,000.00
65,312.50
50,400.00
4,620.00
25,252.50
3,787.50
787.50
84,847.50
42,000.00
3,850.00
21,043.75
3,156.25
656.25
70,706.25
7,500.00
13,750.00
21,250.00
106,097.50
7,500.00
10,000.00
17,500.00
88,206.25
10,000.00
1,675.00
5,475.00
975.00
560.00
350.00
8,333.33
1,395.83
4,562.50
812.50
466.67
291.67
COMMUNITY
INKIND
150.00
150.00
1,800.00
BLGU
CASH
MLGU
INKIND
CASH
680.00
680.00
5,593.33
1,000.00
2,000.00
10,000.00
333.33
266.67
(62.50)
325.00
862.50
10,000.00
862.50
8,400.00
770.00
4,208.75
631.25
131.25
14,141.25
14,141.25
7,000.00
3,000.00
3,000.00
3,000.00
3,750.00
3,750.00
3,750.00
1,666.67
279.17
912.50
162.50
93.33
58.33
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
300.00
275.00
25.00
25.00
3.00
275.00
625.00
15.00
60.00
300.00
275.00
25.00
25.00
275.00
625.00
300.00
275.00
TOTAL
KALAHI MCC
GRANT
19,035.00
15,862.50
1,200.00
1,100.00
2,300.00
21,335.00
1,200.00
800.00
2,000.00
17,862.50
23,375.00
3,750.00
27,000.00
900.00
55,025.00
19,479.17
3,125.00
22,500.00
750.00
45,854.17
7,200.00
6,600.00
13,800.00
7,200.00
4,800.00
12,000.00
23,650.00
3,750.00
27,400.00
19,708.33
3,125.00
22,833.33
5,400.00
6,600.00
12,000.00
108,225.00
5,400.00
4,800.00
10,200.00
90,887.50
3,986.11
3,416.67
2,050.00
300.00
90.00
1,366.67
1,594.44
341.67
120.00
30.00
10,933.33
728.89
5,750.00
216.67
58.33
5.00
5.00
5.00
41.00
41.00
41.00
36.00
36.00
4,783.33
4,100.00
2,460.00
360.00
108.00
5.00
5.00
5.00
41.00
41.00
41.00
36.00
36.00
1,640.00
1,913.33
410.00
144.00
36.00
5.00
5.00
5.00
41.00
41.00
345.00
65.00
70.00
13,120.00
874.67
6,900.00
260.00
70.00
COMMUNITY
INKIND
-
300.00
300.00
300.00
1,800.00
1,800.00
1,800.00
1,800.00
3,600.00
BLGU
CASH
MLGU
INKIND
CASH
3,172.50
3,172.50
3,895.83
625.00
4,500.00
150.00
9,170.83
3,941.67
625.00
4,566.67
13,737.50
797.22
683.33
410.00
60.00
18.00
273.33
318.89
68.33
24.00
6.00
2,186.67
145.78
1,150.00
43.33
11.67
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
1,075.00
5.00
KALAHI MCC
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
4,300.00
3,583.33
41,479.33
34,566.11
13,500.00
12,375.00
25,875.00
13,500.00
9,000.00
22,500.00
41.00
420.00
65.00
65.00
15,537.38
12,180.00
325.00
130.00
55.00
40.00
70.00
2,933.33
80.00
70.00
65.00
41.00
1,075.00
65.00
65.00
390.00
6,847.00
1,075.00
455.00
130.00
40,152.71
12,947.81
10,150.00
270.83
108.33
2,444.44
66.67
58.33
325.00
5,705.83
895.83
379.17
108.33
33,460.59
5,400.00
4,950.00
10,350.00
117,857.04
5,400.00
3,600.00
9,000.00
99,526.70
5,500.00
16,500.00
13,750.00
2,750.00
36.00
2,304.00
1,920.00
384.00
4,000.00
4,000.00
3,333.33
666.67
900.00
115.00
1,500.00
3,600.00
1,380.00
1,500.00
29,284.00
3,000.00
1,150.00
1,250.00
24,403.33
600.00
230.00
250.00
4,880.67
1,200.00
1,100.00
2,300.00
1,200.00
800.00
2,000.00
300.00
275.00
5.00
TOTAL
300.00
275.00
300.00
275.00
716.67
-
3,375.00
3,375.00
1,350.00
1,350.00
4,725.00
300.00
300.00
6,913.22
2,589.56
2,030.00
54.17
21.67
488.89
13.33
11.67
65.00
1,141.17
179.17
75.83
21.67
6,692.12
13,605.34
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
5.00
235.00
5,405.00
4,504.17
900.83
1,200.00
4,800.00
4,000.00
800.00
1,500.00
3,000.00
2,500.00
500.00
350.00
350.00
291.67
58.33
750.00
6,750.00
5,625.00
1,125.00
750.00
3,000.00
2,500.00
500.00
350.00
350.00
291.67
58.33
175.00
175.00
145.83
29.17
23,830.00
19,858.33
2,100.00
1,925.00
4,025.00
59,439.00
2,100.00
1,400.00
3,500.00
49,761.67
35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00
29,395.83
6,775.00
5,166.67
5,683.33
1,550.00
2,583.33
591.67
2,708.33
250.00
54,704.17
3,000.00
2,750.00
5,750.00
71,395.00
3,000.00
2,000.00
5,000.00
59,704.17
900.00
750.00
300.00
275.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
2,075.00
1,355.00
620.00
620.00
620.00
620.00
355.00
2.50
1.50
300.00
275.00
900.00
TOTAL
KALAHI MCC
GRANT
COMMUNITY
INKIND
525.00
525.00
825.00
750.00
750.00
750.00
BLGU
CASH
MLGU
INKIND
CASH
3,971.67
8,852.33
5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
10,940.83
150.00
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
TOTAL
KALAHI MCC
GRANT
90.00
90.00
500.00
30.00
40.00
40.00
180.00
98.00
50.00
90.00
1,500.00
60.00
40.00
80.00
180.00
196.00
50.00
90.00
370.00
180.00
40.00
40.00
25.00
100.00
740.00
360.00
80.00
40.00
75.00
100.00
700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
100.00
300.00
365.00
40.00
100.00
3,285.00
720.00
100.00
11,488.00
75.00
1,250.00
50.00
33.33
66.67
150.00
163.33
41.67
75.00
616.67
300.00
66.67
33.33
62.50
83.33
583.33
625.00
348.33
41.67
58.33
8.33
20.00
266.67
50.00
83.33
250.00
2,737.50
600.00
83.33
9,573.33
2,400.00
2,200.00
4,600.00
16,088.00
2,400.00
1,600.00
4,000.00
13,573.33
30.00
30.00
100.00
250.00
6,900.00
3,600.00
1,000.00
5,000.00
30.00
60.00
40.00
2,040.00
120.00
120.00
5,750.00
3,000.00
833.33
4,166.67
1,700.00
100.00
100.00
300.00
275.00
COMMUNITY
INKIND
600.00
600.00
600.00
BLGU
CASH
MLGU
INKIND
CASH
15.00
250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
1,914.67
1,914.67
1,150.00
600.00
166.67
833.33
340.00
20.00
20.00
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
TOTAL
KALAHI MCC
GRANT
COMMUNITY
INKIND
CASH
MLGU
INKIND
CASH
18,780.00
15,650.00
1,200.00
1,100.00
2,300.00
21,080.00
1,200.00
800.00
2,000.00
17,650.00
20.00
25.00
240.00
40.00
240.00
175.00
240.00
40.00
3,900.00
30.00
2.00
12.00
30.00
7,800.00
1,800.00
20.00
960.00
90.00
350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00
200.00
145.83
200.00
33.33
6,500.00
1,500.00
16.67
800.00
75.00
1,458.33
300.00
163.33
216.67
166.67
204.17
54.17
1,250.00
416.67
40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33
2,000.00
2,000.00
1,666.67
333.33
18,441.00
15,367.50
2,100.00
1,925.00
4,025.00
22,466.00
2,100.00
1,400.00
3,500.00
18,867.50
4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
3,908.33
1,675.00
313.33
4,958.33
6,860.00
395.83
2,600.00
300.00
275.00
300.00
275.00
335.00
335.00
188.00
425.00
588.00
475.00
520.00
BLGU
300.00
300.00
300.00
525.00
525.00
525.00
3,130.00
3,130.00
3,073.50
3,073.50
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
50.00
60.00
300.00
275.00
500.00
9,000.00
2,500.00
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
350.00
700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
TOTAL
KALAHI MCC
GRANT
COMMUNITY
INKIND
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
500.00
600.00
29,271.00
433.33
216.67
210.00
137.50
105.00
104.17
833.33
333.33
58.33
333.33
416.67
500.00
24,392.50
3,000.00
2,750.00
5,750.00
35,021.00
3,000.00
2,000.00
5,000.00
29,392.50
9,000.00
2,500.00
11,500.00
11,500.00
7,500.00
2,083.33
9,583.33
9,583.33
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
27,466.00
5,833.33
3,400.00
1,666.67
1,275.00
5,833.33
2,380.00
2,500.00
22,888.33
602,379.54
501,982.95
58,500.00
76,725.00
737,604.54
737,604.54
58,500.00
55,800.00
616,282.95
616,282.95
-
15,750.00
15,750.00
15,750.00
15,750.00
700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
560.00
720.00
760.00
1,360.00
600.00
1,400.00
280.00
750.00
750.00
750.00
20,925.00
20,925.00
20,925.00
BLGU
CASH
MLGU
INKIND
CASH
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,878.50
4,878.50
1,500.00
416.67
1,916.67
1,916.67
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67
10,000.00
90,396.59
10,000.00
10,000.00
90,396.59
90,396.59
-
140.00
180.00
190.00
340.00
150.00
350.00
70.00
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
500.00
50.00
800.00
250.00
300.00
250.00
82.25%
TOTAL
KALAHI MCC
GRANT
500.00
7,600.00
400.00
6,080.00
2,500.00
2,500.00
4,800.00
3,000.00
7,800.00
1,200.00
1,000.00
2,200.00
33,333.33
33,333.33
1,914.94
1,914.94
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
-
100.00
1,520.00
2,500.00
2,500.00
3,000.00
3,000.00
CASH
1,500.00
1,250.00
2,750.00
40,000.00
40,000.00
4,000.00
4,000.00
3,375.00
3,375.00
83,775.00
821,379.54
29,504.46
29,504.46
850,884.00
59,278.27
675,561.22
24,266.78
24,266.78
699,828.00
3,000.00
23,925.00
10,000.00
23,925.00
10,000.00
300.00
250.00
550.00
6,666.67
6,666.67
2,085.06
2,085.06
3,375.00
3,375.00
16,696.73
107,093.32
5,237.68
5,237.68
112,331.00
850,884.00
699,828.00
23,925.00
10,000.00
112,331.00
794,300.00
249,325.00
18,150.00
###
521,329.17
Recommending Approval:
Approved by:
CARMEN A. GAUDIANO
ANTONIO ALAM
Municipal Engineer
BSPMC Chairperson
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
416.67
116.67
75.83
609.17
TOTAL
416.67
116.67
75.83
609.17
2,500.00
700.00
455.00
3,655.00
150.00
150.00
150.00
150.00
300.00
550.00
850.00
300.00
300.00
300.00
300.00
1,100.00
1,100.00
3,529.17
3,529.17
21,175.00
21,175.00
900.00
900.00
3,300.00
3,300.00
775.00
775.00
4,650.00
4,650.00
300.00
300.00
1,100.00
1,100.00
3,529.17
3,529.17
-
775.00
775.00
-
900.00
900.00
300.00
300.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
680.00
680.00
5,593.33
7,333.33
266.67
937.50
2,325.00
10,862.50
10,862.50
8,400.00
770.00
4,208.75
631.25
131.25
131.25
131.25
1,666.67
279.17
912.50
162.50
93.33
58.33
TOTAL LCC
(CASH &
INKIND)
INKIND
150.00
150.00
1,800.00
3,000.00
3,000.00
3,000.00
3,750.00
3,750.00
3,750.00
TOTAL
680.00
680.00
4,080.00
4,080.00
150.00
150.00
7,393.33
550.00
550.00
40,460.00
7,333.33
266.67
937.50
2,325.00
10,862.50
44,000.00
1,600.00
5,625.00
13,950.00
65,175.00
3,000.00
3,000.00
13,862.50
3,000.00
11,000.00
14,000.00
79,175.00
8,400.00
770.00
4,208.75
631.25
131.25
131.25
50,400.00
4,620.00
25,252.50
3,787.50
787.50
84,847.50
3,750.00
3,750.00
3,881.25
7,500.00
13,750.00
21,250.00
106,097.50
1,666.67
279.17
912.50
162.50
93.33
58.33
10,000.00
1,675.00
5,475.00
975.00
560.00
350.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
INKIND
3,172.50
3,172.50
3,895.83
625.00
4,500.00
150.00
9,170.83
TOTAL LCC
(CASH &
INKIND)
3,941.67
625.00
4,566.67
13,737.50
300.00
300.00
300.00
1,800.00
1,800.00
1,800.00
1,800.00
3,600.00
TOTAL
3,172.50
19,035.00
300.00
300.00
3,472.50
1,200.00
1,100.00
2,300.00
21,335.00
3,895.83
625.00
4,500.00
150.00
9,170.83
23,375.00
3,750.00
27,000.00
900.00
55,025.00
1,800.00
1,800.00
7,200.00
6,600.00
13,800.00
3,941.67
625.00
4,566.67
23,650.00
3,750.00
27,400.00
1,800.00
1,800.00
17,337.50
5,400.00
6,600.00
12,000.00
108,225.00
797.22
683.33
410.00
60.00
18.00
797.22
683.33
410.00
60.00
18.00
4,783.33
4,100.00
2,460.00
360.00
108.00
273.33
318.89
68.33
24.00
6.00
273.33
318.89
68.33
24.00
6.00
1,640.00
1,913.33
410.00
144.00
36.00
2,186.67
145.78
1,150.00
43.33
11.67
2,186.67
145.78
1,150.00
43.33
11.67
13,120.00
874.67
6,900.00
260.00
70.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
716.67
716.67
4,300.00
6,913.22
6,913.22
41,479.33
3,375.00
3,375.00
13,500.00
12,375.00
25,875.00
3,375.00
3,375.00
2,589.56
2,030.00
54.17
21.67
2,589.56
2,030.00
54.17
21.67
15,537.38
12,180.00
325.00
130.00
488.89
13.33
11.67
488.89
13.33
11.67
2,933.33
80.00
70.00
65.00
1,141.17
179.17
75.83
21.67
6,692.12
65.00
1,141.17
179.17
75.83
21.67
6,692.12
390.00
6,847.00
1,075.00
455.00
130.00
40,152.71
13,605.34
1,350.00
1,350.00
18,330.34
5,400.00
4,950.00
10,350.00
117,857.04
1,350.00
1,350.00
4,725.00
2,750.00
2,750.00
16,500.00
384.00
384.00
2,304.00
666.67
666.67
4,000.00
600.00
230.00
250.00
4,880.67
600.00
230.00
250.00
4,880.67
3,600.00
1,380.00
1,500.00
29,284.00
300.00
300.00
1,200.00
1,100.00
2,300.00
300.00
300.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
900.83
900.83
5,405.00
800.00
800.00
4,800.00
500.00
500.00
3,000.00
58.33
58.33
350.00
1,125.00
1,125.00
6,750.00
500.00
500.00
3,000.00
58.33
58.33
350.00
29.17
29.17
175.00
3,971.67
3,971.67
23,830.00
8,852.33
525.00
525.00
9,677.33
2,100.00
1,925.00
4,025.00
59,439.00
5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00
10,940.83
750.00
750.00
11,690.83
3,000.00
2,750.00
5,750.00
71,395.00
150.00
900.00
150.00
525.00
525.00
825.00
750.00
750.00
750.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
15.00
-
15.00
-
90.00
-
250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00
250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00
1,500.00
60.00
40.00
80.00
180.00
196.00
50.00
90.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
1,914.67
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
1,914.67
740.00
360.00
80.00
40.00
75.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
300.00
3,285.00
720.00
100.00
11,488.00
1,914.67
600.00
600.00
2,514.67
2,400.00
2,200.00
4,600.00
16,088.00
600.00
600.00
600.00
1,150.00
600.00
166.67
833.33
1,150.00
600.00
166.67
833.33
6,900.00
3,600.00
1,000.00
5,000.00
340.00
20.00
20.00
340.00
20.00
20.00
2,040.00
120.00
120.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
-
3,130.00
3,130.00
TOTAL LCC
(CASH &
INKIND)
INKIND
300.00
300.00
300.00
TOTAL
3,130.00
18,780.00
300.00
300.00
3,430.00
1,200.00
1,100.00
2,300.00
21,080.00
40.00
29.17
40.00
6.67
40.00
29.17
40.00
6.67
240.00
175.00
240.00
40.00
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33
7,800.00
1,800.00
20.00
960.00
90.00
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00
333.33
333.33
2,000.00
3,073.50
3,073.50
18,441.00
3,073.50
525.00
525.00
3,598.50
2,100.00
1,925.00
4,025.00
22,466.00
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
525.00
525.00
525.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,878.50
4,878.50
1,500.00
416.67
1,916.67
1,916.67
1,500.00
416.67
1,916.67
1,916.67
9,000.00
2,500.00
11,500.00
11,500.00
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
27,466.00
86,386.59
20,925.00
107,311.59
107,311.59
602,379.54
58,500.00
76,725.00
737,604.54
737,604.54
86,386.59
86,386.59
86,386.59
140.00
180.00
190.00
340.00
150.00
350.00
70.00
TOTAL
750.00
750.00
750.00
20,925.00
20,925.00
20,925.00
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,878.50
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
500.00
600.00
29,271.00
750.00
750.00
5,628.50
3,000.00
2,750.00
5,750.00
35,021.00
140.00
180.00
190.00
340.00
150.00
350.00
70.00
15,750.00
15,750.00
700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
100.00
1,520.00
100.00
1,520.00
2,500.00
2,500.00
2,500.00
2,500.00
500.00
7,600.00
2,500.00
2,500.00
4,800.00
3,000.00
7,800.00
4,800.00
3,000.00
7,800.00
4,800.00
3,000.00
7,800.00
4,800.00
300.00
250.00
550.00
6,666.67
6,666.67
2,085.06
2,085.06
3,375.00
3,375.00
16,696.73
103,083.32
5,237.68
5,237.68
108,321.00
7,800.00
28,725.00
28,725.00
300.00
250.00
550.00
6,666.67
6,666.67
2,085.06
2,085.06
3,375.00
3,375.00
24,496.73
131,808.32
5,237.68
5,237.68
137,046.00
1,500.00
1,250.00
2,750.00
40,000.00
40,000.00
4,000.00
4,000.00
3,375.00
3,375.00
83,775.00
821,379.54
29,504.46
29,504.46
850,884.00
4,800.00
108,321.00
28,725.00
137,046.00
850,884.00
4,800.00
521,329.17
23,700.00
545,029.17
794,300.00
4,800.00
4,800.00
4,800.00
4,800.00
Noted by:
GEORGE S. ISULAT
RCIS
Sub-Project duration
: 80
Physical Target
:
:
:
:
:
Region
Province
Municipality
Barangay
Calendar Days
51 Sq.m.
VII
NEGROS ORIENTAL
DAUIN
BAGACAY
Direct Cost
Indirect Cost
Date Started
Target Completion
Mode of Implementation
ITEM
NO.
DESCRIPTION
SITE WORKS
II
CONCRETE WORKS
III
REINFORCING STEEL
BARS
IV
QTY
UNIT
AMOUNT
WEIGHT
PHYSICAL
(%)
TARGET
120.00 sq.m.
40,460.00
5.49%
17.78 cu.m.
79,175.00
10.73%
kgs.
106,097.50
14.38%
FORMWORKS AND
SCAFOLDING
23.00 sq.m.
21,335.00
2.89%
MASONRY WORKS
144.00 sq.m.
108,225.00
14.67%
VI
CARPENTRY WORKS
1,872.00 bd.ft.
117,857.04
15.98%
18.44 sq.m.
59,439.00
8.06%
VIII ROOFING
82.00 sq.m.
71,395.00
9.68%
16,088.00
2.18%
2,432.85
IX
PLUMBING WORKS
1.00
TILE WORKS
5.00 sq.m.
21,080.00
2.86%
XI
ELECTRICAL WORKS
1.00
22,466.00
3.05%
35,021.00
4.75%
XIII
lot.
lot.
265.00 sq.m.
1.00
lot.
11,500.00
1.56%
1.00
lot.
27,466.00
3.72%
737,604.54
100.00%
T O T A L
PHYSICAL
% PROGRESS (Actual)
PROGRESS (Planned)
FINANCIAL
WEEK 2
WEEK 3
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
% PROGRESS (Planned)
1ST MONTH
WEEK 1
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
10
11
12
13
14
15
16
16.36%
10.45%
10.25%
16.36%
26.81%
37.06%
17
120,672.10
77,079.67
75,604.47
120,672.10
197,751.78
273,356.24
FINANCIAL
PROGRESS (Actual)
Prepared by:
PERIODIC
COMMULATIVE
Concurred by:
JOCELYN DUSAL
PIT Chairperson
NOEL TUASON
MIT Team Leader
RODSON R. ESCORA
Deputy Area Coordinator
: P
850,884.00
: P
737,604.54
: P
83,775.00
:
:
: Community Force Account
LABOR
STATUS
No. of Days
SKILLED
Male
Female
Male
Female
Male
Female
80
UNSKILLED
TOTAL
TH
2ND MONTH
WEEK 3
WEEK 4
18
19
20
21
22
WEEK 5
23
24
25
26
27
28
WEEK 6
29
30
31
32
33
34
3RD MONTH
WEEK 7
35
36
37
38
39
40
WEEK 8
41
42
43
44
45
46
WEEK 9
47
48
49
50
51
52
WEEK 10
53
54
55
56
57
58
WEEK 11
59
60
61
62
63
64
WEEK 12
65
66
67
68
69
10.25%
4.89%
4.89%
7.40%
10.69%
15.00%
8.55%
3.05%
4.75%
3.72%
37.06%
41.95%
46.84%
54.24%
64.93%
79.93%
88.48%
91.53%
96.28%
100.00%
75,604.47
36,068.86
36,068.86
54,582.74
78,849.93
110,640.68
63,065.19
22,496.94
35,036.22
27,438.89
273,356.24
309,425.11
345,493.97
400,076.70
478,926.63
589,567.31
652,632.50
675,129.44
710,165.65
737,604.54
Approved by:
CARMEN A. GAUDIANO
Municipal Engineer
Noted by:
ANTONIO ALAM
BSPMC
GEORGE S. ISULAT
Regional Infra. Engineer
EPORT
No. of Days
Ave. Rate/Day
80
300.00
200.00
3RD MONTH
4TH MONTH
WEEK 12
70
WEEK 13
71
3.72%
100.00%
27,438.89
737,604.54
72
73
74
75
76
77
78
GEORGE S. ISULAT
Regional Infra. Engineer
June 4, 2014
June 7, 2014
-do-
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
Procurement Activities
Package 1: Hardware
Package 4: Aggregates
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
Package 6: Furniture
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
July 7, 2014
Package 5: Roofing
July 7, 2014
July 7, 2014
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
Package 7: Glass
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
-do-
July 9, 2014
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
7: Opening of Canvass
Package 1: Hardware, Package 3: Form Lumber,
Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost
-do-
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
9. Evaluation of Canvass
Package 1: Hardware, Package 3: Form Lumber,
Package 4: Aggregates, Package 6: Furniture,
Package 9: Project Billboard, Package 12: Handtools
& Personal Protective Equipment; Package 13:
Environmental Mitigating Cost
July 9, 2014
-do-
July 9, 2014
-do-
-do-
-do-
-do-
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
August 1, 2014
August 2-3,2014
-do-
-do-
Prepared by:
Reviewed & Checked by:
LORDECITO TUBAING
PT Chairperson
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
POW/Detailed
Estimates
Draft PCPP
Final PCPP
Final PCPP
Conference Conducted
Office supplies
Minutes of Conference
Invitation to Bid/Bid
Documents
Supplier's Office,
Establishment
Supplier's: Zenith
Commercials, Golden Rule,
Octagon Hardware
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Supplier's: Gold
Enterprises, Lucky
Enterprises, JM
Commercials
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Supplier's: Alagasi's
Welding Shop, Zamora
Welding Shop, Orient Pearl
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Supplier's: Earthworks,
Dumaguete Painthaus, JB
Marketing
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Supplier's Office,
Establishment
Supplier's: Alagasi's
Welding Shop, Zamora
Welding Shop, Orient Pearl
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Submitted Canvass
Form/Request for
Qoutation
Abstract of Canvass
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Office Supplies
Minutes of Opening
Office Supplies
Submitted Canvass
Form/Request for
Quotation
Minutes of Evaluation
Submitted Canvass
Form/Request for
Quotation
Minutes of Evaluation
Submitted Canvass
Form/Request for
Quotation
Abstract of Canvass
Submitted Canvass
Form/Request for
Quotation
Abstract of Canvass
Abstract of Canvass
Purchased Order
Abstract of Canvass
Purchased Order
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Purchased Order
Approved Purchased
Order
Purchased Order
Approved Purchased
Order
Supplier's Office,
Establishment
Supplier's Office,
Establishment
Project Site
Delivery
Receipt/Delivered
Goods
Goods Received
Project Site
Delivery
Receipt/Delivered
Goods
Goods Received
Project Site
Notice to Commence
Mobilization Started
Noted by:
Approved by:
ANTONIO ALAM
BSPMC Chairperson
Barangay
Bagacay
Municipality
DAUIN
Sub-project Duration
Province
NEGROS ORIENTAL
SOURCES OF FUNDS
DESCRIPTION
1st Tranche (Php)
489,879.60
139,965.60
PACKAGES
PACKAGE ITEMS
69,982.80
TOTAL
QTY
UNIT
TOTAL UNIT
COST
KC Grant:
699,828.00
PROC
METHOD
TOTAL
1st Tranche
KC Grant
PACKAGE 1 : HARDWARE
Materials:
Nylon String
Anti-Termite (e.g. solignum, )
2.00
kg
350.00
700.00
583.33
5.00
gal
1,075.00
5,375.00
4,479.17
2.00
meter
40.00
80.00
66.67
15.00
shts
365.00
5,475.00
4,562.50
29.00
Shts.
420.00
12,180.00
10,150.00
# 5 CWN
4.00
Kgs.
36.00
144.00
120.00
# 4 CW Nails
19.00
kgs
65.00
1,235.00
1,029.17
# 3 CWN
19.00
Kgs.
65.00
1,235.00
1,029.17
# 2 CWN
10.00
kgs.
70.00
700.00
583.33
# 1 CW Nails
5.00
kgs
70.00
350.00
291.67
2.00
Kgs.
65.00
130.00
108.33
# 1 Finishing Nails
1/2 " CW Nails
Portland Cement Type I
Red Cement (US Lansco or uqivalent)
8.00
331.00
kg
65.00
520.00
433.33
Bags
275.00
91,025.00
75,854.17
16.00
kilos
100.00
1,600.00
1,333.33
51.00
cu.m.
80.00
4,080.00
3,400.00
14.00
Pcs.
36.00
504.00
420.00
23.00
lengths
235.00
5,405.00
4,504.17
320.00
Length
157.50
50,400.00
42,000.00
20.00
Length
231.00
4,620.00
3,850.00
65.00
Length
388.50
25,252.50
21,043.75
1.50
rolls
2,525.00
3,787.50
3,156.25
15.00
Kgs.
60.00
900.00
750.00
Hacksaw Blade
10.00
Pcs.
78.75
787.50
656.25
1.00
set
4,000.00
4,000.00
3,333.33
1.00
set
1,500.00
1,500.00
1,250.00
4.00
set
900.00
3,600.00
3,000.00
12.00
pcs
115.00
1,380.00
1,150.00
20.00
Length
345.00
6,900.00
5,750.00
1.00
unit
900.00
900.00
1.00
set
90.00
90.00
75.00
3.00
length
500.00
1,500.00
1,250.00
2.00
pc
30.00
60.00
50.00
Page 54 of 165
750.00
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
PROC
METHOD
TOTAL
1st Tranche
2" dia. X 90 PVC Bend Elbow
1.00
pc
40.00
40.00
33.33
2.00
pc
40.00
80.00
66.67
1.00
length
180.00
180.00
150.00
2.00
pc
98.00
196.00
163.33
1.00
pc
50.00
50.00
41.67
1.00
pc
90.00
90.00
2.00
length
370.00
740.00
2.00
length
180.00
360.00
2.00
pc
40.00
80.00
1.00
pc
40.00
40.00
3.00
pc
25.00
75.00
Solvent Cement
1.00
pint
100.00
100.00
1.00
pc
700.00
700.00
Page 55 of 165
PACKAGE 1
KC Grant
75.00
616.67
300.00
66.67
33.33
62.50
83.33
583.33
QTY
UNIT
TOTAL UNIT
COST
PACKAGE
PACKAGES
1
PACKAGE ITEMS
PROC
METHOD
TOTAL
10.00
length
75.00
750.00
1.00
pc
418.00
418.00
1st Tranche
KC Grant
625.00
348.33
10.00
pc
5.00
50.00
7.00
pc
10.00
70.00
1.00
pc
10.00
10.00
8.33
2.00
pc
12.00
24.00
20.00
2.00
pc
160.00
320.00
266.67
Teflon Tape
3.00
roll
20.00
60.00
50.00
Solvent Cement
1.00
pint
100.00
100.00
83.33
3.00
pc
100.00
300.00
250.00
41.67
58.33
9.00
length
365.00
3,285.00
2,737.50
18.00
pc
40.00
720.00
600.00
1.00
pint
100.00
100.00
83.33
230.00
pc
30.00
6,900.00
5,750.00
3,000.00
120.00
pc
30.00
3,600.00
10.00
bags
100.00
1,000.00
833.33
Tile Trim x 3m
20.00
pc
250.00
5,000.00
4,166.67
68.00
pc
30.00
2,040.00
1,700.00
2.00
kls.
60.00
120.00
100.00
Tile Trim x 3m
3.00
pc
40.00
120.00
100.00
At Lavatory:
12.00
pcs.
20.00
240.00
200.00
7.00
pcs.
25.00
175.00
145.83
1.00
length
240.00
240.00
200.00
Screw Insulator
1.00
pc.
40.00
40.00
33.33
2.00
box
3,900.00
7,800.00
6,500.00
60.00
30.00
1,800.00
1,500.00
PVC Clamp
10.00
pc
2.00
20.00
16.67
80.00
12.00
960.00
800.00
3.00
pc
30.00
90.00
75.00
5.00
assy
350.00
1,750.00
1,458.33
3.00
set
120.00
360.00
300.00
2.00
pc
98.00
196.00
163.33
4.00
pc
65.00
260.00
216.67
5.00
pc
40.00
200.00
166.67
7.00
pc
35.00
245.00
204.17
Female Adaptor
5.00
pc
13.00
65.00
54.17
1.00
unit
1,500.00
1,500.00
1,250.00
5.00
pc
100.00
500.00
416.67
1.00
set
2,000.00
2,000.00
1,666.67
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)
Sub-Total
282,574.50
Concrete Putty
14.00
gal
335.00
4,690.00
Concrete Neutralizer
6.00
gal
335.00
2,010.00
Polituff
2.00
pcs
188.00
376.00
14.00
gal
425.00
5,950.00
Page 56 of 165
DS (LSG)
235,478.75
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
PROC
METHOD
TOTAL
1st Tranche
PACKAGE 2
14.00
gal
588.00
8,232.00
1.00
gal
475.00
475.00
6.00
gal
520.00
3,120.00
1.00
liter
175.00
175.00
1.00
gal
520.00
520.00
2.00
pint
130.00
260.00
2.00
pint
126.00
252.00
1.00
pint
165.00
165.00
1.00
pint
126.00
126.00
1.00
pint
125.00
125.00
Paint Thinner
4.00
gal
250.00
1,000.00
4.00
pc
100.00
400.00
2.00
pc
35.00
70.00
4.00
set
100.00
400.00
Sandpaper #100
10.00
sheet
50.00
500.00
Sandpaper #200
10.00
sheet
60.00
Sub-Total
600.00
29,446.00
Page 57 of 165
KC Grant
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
PROC
METHOD
TOTAL
1st Tranche
KC Grant
PACKAGE 3: LUMBER
Materials
1"x2"x8' Wood Stick/Lattice (Good Lumber)
53.33
bdft
55.00
2,933.33
2,444.44
378.96
bdft
41.00
15,537.38
12,947.81
167.00
bd ft
41.00
6,847.00
5,705.83
100.00
bd ft
25.00
2,500.00
2,083.33
400.00
bd.ft.
25.00
10,000.00
8,333.33
67.00
bd.ft.
25.00
1,675.00
1,395.83
PACKAGE-3
116.67
bdft.
41.00
4,783.33
100.00
bdft.
41.00
4,100.00
60.00
bdft.
41.00
2,460.00
LSG
3,986.11
3,416.67
2,050.00
40.00
bdft.
41.00
1,640.00
1,366.67
46.67
bdft.
41.00
1,913.33
1,594.44
10.00
bdft.
41.00
410.00
341.67
320.00
bdft.
41.00
21.33
bdft.
41.00
13,120.00
10,933.33
874.67
728.89
68,794.04
57,328.37
PACKAGE 4: AGGREGATES
PACKAGE-4
Materials:
Filling Materials
35.00
cu.m.
605.00
21,175.00
Washed Gravel
24.00
cu.m.
775.00
18,600.00
Washed Sand
21.00
cu.m.
625.00
13,125.00
10,937.50
Pcs
15.00
27,000.00
22,500.00
79,900.00
66,583.33
1,800.00
Sub-Total
17,645.83
LSG
15,500.00
PACKAGE 5: ROOFING
Materials:
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)
17.00
pcs
2,075.00
35,275.00
6.00
pcs
1,355.00
8,130.00
10.00
pcs
620.00
6,200.00
11.00
pcs
620.00
6,820.00
3.00
pcs
620.00
1,860.00
5.00
pcs
620.00
3,100.00
Roof Sealant
2.00
lit
355.00
710.00
1,300.00
pc
2.50
3,250.00
200.00
pc
1.50
300.00
PACKAGE-5
LSG
65,645.00
PACKAGE 6: FURNITURE
PACKAGE-6
Materials:
D - 1, (1.0m x 2.10m) Panel Door
set
5,500.00
16,500.00
13,750.00
64
bdft
36.00
2,304.00
1,920.00
sets
1,200.00
4,800.00
4,000.00
sets
1,500.00
3,000.00
1.00
Sets
350.00
350.00
Page 58 of 165
LSG
2,500.00
291.67
PACKAGE-6
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
TOTAL
PROC
LSG
METHOD
1st Tranche
KC Grant
1.00
unit
7,000.00
7,000.00
5,833.33
1.00
set
4,080.00
4,080.00
3,400.00
38,034.00
31,695.00
Sub-Total
Page 59 of 165
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
TOTAL
PROC
METHOD
1st Tranche
KC Grant
PACKAGE 7: GLASS
PACKAGE-7
Materials:
W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie window on
standard aluminum housing w/ 12mm dia. hole in between blades
interval
Sets
750.00
6,750.00
Sets
750.00
3,000.00
Sets
350.00
350.00
Sub-Total
LSG
10,100.00
P-8
1.00
lot
2,500.00
Sub-Total
2,500.00
LSG
2,500.00
P-9
1.00
lot
9,000.00
Sub-Total
9,000.00
7,500.00
LSG
9,000.00
7,500.00
PACKAGE-10
1.00
unit
2,000.00
2,000.00
Stethoscope
1.00
unit
1,530.00
1,530.00
1.00
unit
7,000.00
7,000.00
1.00
unit
2,856.00
2,856.00
1.00
set
3,000.00
3,000.00
Sub-Total
16,386.00
602,379.54
LSG
398,585.45
Skilled
58,500.00
unskilled
55,800.00
Sub-Total
CFA
P-11
114,300.00
1,720,223.63
716,679.54
41,249.21
-
439,834.66
PACKAGE-12
Shovel w/ handle
1.00
pc
700.00
700.00
560.00
Crow Bar
1.00
pc
900.00
900.00
720.00
Concrete Pail
10.00
pc
95.00
950.00
760.00
Wheel Barrow
1.00
pc
1,700.00
1,700.00
1,360.00
1.00
pc
750.00
750.00
Hard Hat
5.00
pc
350.00
1,750.00
1,400.00
Hand Glooves
10.00
pcs
35.00
350.00
280.00
Medicine Kit
1.00
set
500.00
500.00
400.00
7,600.00
6,080.00
PACKAGE-13
Sub-Total
LSG
600.00
5.00
pc
300.00
1,500.00
5.00
pc
250.00
1,250.00
Sub-Total
LSG
1,200.00
1,000.00
2,750.00
2,200.00
Overhead
15,750.00
6,516.67
Administrative Cost
40,000.00
33,333.33
Page 60 of 165
CFA
PACKAGE-14
j. Indirect Cost
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
PROC
METHOD
TOTAL
Reproduction of plans
2,500.00
Material Testing
4,000.00
Treasurers Bond
CFA
PACKAGE-14
1st Tranche
KC Grant
1,914.94
3,375.00
Contingency
29,504.46
Sub-Total
95,129.46
41,764.94
105,479.46
822,159.00
822,159.00
(0.01)
50,044.94
489,879.60
SAY
%
Checked by:
LORDECITO TUBAING
JUDITH GRAMATICA
CARMEN A. GAUDIANO
PPT
Municipal Engineer
Page 61 of 165
489,879.60
70.00%
oposed Sub-Project
: 822,159.00
: 80 C.D.
OURCES OF FUNDS
PERCENTAGE WEIGHT
TOTAL
LCC:
TO KC GRANT
AMOUNT
FUND SOURCE
TO LCC CASH
LEGEND:
KC Cost
699,82
TOTAL LCC :
151,05
85,631.70
575,511.30
70.00%
70.00%
24,466.20
164,431.80
20.00%
20.00%
In-kind:
28,72
12,233.10
82,215.90
10.00%
10.00%
Cash:
122,33
122,331.00
822,159.00
100.00%
100.00%
TOTAL
850,88
1st Tranche
2nd Tranche
LCC Cash
KC Grant
LCC Cash
REMARKS
3rd Tranche
KC Grant
LCC Cash
TOTAL
KC Grant
-
MONTH
TOTAL
LCC Cash
-
1
-
116.67
583.33
116.67
700.00
895.83
4,479.17
895.83
5,375.00
13.33
66.67
13.33
80.00
912.50
4,562.50
912.50
5,475.00
2,030.00
10,150.00
2,030.00
12,180.00
24.00
120.00
24.00
144.00
205.83
1,029.17
205.83
1,235.00
205.83
1,029.17
205.83
1,235.00
116.67
583.33
116.67
700.00
58.33
291.67
58.33
350.00
21.67
108.33
21.67
130.00
86.67
433.33
86.67
520.00
15,170.83
75,854.17
15,170.83
91,025.00
266.67
1,333.33
266.67
1,600.00
680.00
3,400.00
680.00
4,080.00
84.00
420.00
84.00
504.00
900.83
4,504.17
900.83
5,405.00
8,400.00
42,000.00
8,400.00
50,400.00
770.00
3,850.00
770.00
4,620.00
4,208.75
21,043.75
4,208.75
25,252.50
631.25
3,156.25
631.25
3,787.50
150.00
750.00
150.00
900.00
131.25
656.25
131.25
787.50
666.67
3,333.33
666.67
4,000.00
250.00
1,250.00
250.00
1,500.00
600.00
3,000.00
600.00
3,600.00
230.00
1,150.00
230.00
1,380.00
1,150.00
5,750.00
1,150.00
6,900.00
150.00
750.00
150.00
900.00
15.00
75.00
15.00
90.00
250.00
1,250.00
250.00
1,500.00
10.00
50.00
10.00
60.00
Page 62 of 165
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
2nd Tranche
LCC Cash
KC Grant
LCC Cash
REMARKS
3rd Tranche
KC Grant
LCC Cash
TOTAL
KC Grant
MONTH
TOTAL
LCC Cash
6.67
33.33
6.67
40.00
13.33
66.67
13.33
80.00
30.00
150.00
30.00
180.00
32.67
163.33
32.67
196.00
8.33
41.67
8.33
50.00
15.00
75.00
15.00
90.00
123.33
616.67
123.33
740.00
60.00
300.00
60.00
360.00
13.33
66.67
13.33
80.00
6.67
33.33
6.67
40.00
12.50
62.50
12.50
75.00
16.67
83.33
16.67
100.00
116.67
583.33
116.67
700.00
Page 63 of 165
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
2nd Tranche
LCC Cash
KC Grant
REMARKS
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
MONTH
TOTAL
LCC Cash
125.00
625.00
125.00
750.00
69.67
348.33
69.67
418.00
8.33
41.67
8.33
50.00
11.67
58.33
11.67
70.00
1.67
8.33
1.67
10.00
4.00
20.00
4.00
24.00
53.33
266.67
53.33
320.00
10.00
50.00
10.00
60.00
16.67
83.33
16.67
100.00
50.00
250.00
50.00
300.00
547.50
2,737.50
547.50
3,285.00
120.00
600.00
120.00
720.00
16.67
83.33
16.67
100.00
1,150.00
5,750.00
1,150.00
6,900.00
600.00
3,000.00
600.00
3,600.00
166.67
833.33
166.67
1,000.00
833.33
4,166.67
833.33
5,000.00
340.00
1,700.00
340.00
2,040.00
20.00
100.00
20.00
120.00
20.00
100.00
20.00
120.00
40.00
200.00
40.00
240.00
29.17
145.83
29.17
175.00
40.00
200.00
40.00
240.00
6.67
33.33
6.67
40.00
1,300.00
6,500.00
1,300.00
7,800.00
300.00
1,500.00
300.00
1,800.00
3.33
16.67
3.33
20.00
160.00
800.00
160.00
960.00
15.00
75.00
15.00
90.00
291.67
1,458.33
291.67
1,750.00
60.00
300.00
60.00
360.00
32.67
163.33
32.67
196.00
43.33
216.67
43.33
260.00
33.33
166.67
33.33
200.00
40.83
204.17
40.83
245.00
10.83
54.17
10.83
65.00
250.00
1,250.00
250.00
1,500.00
83.33
416.67
83.33
500.00
333.33
1,666.67
333.33
2,000.00
235,478.75
47,095.75
282,574.50
47,095.75
3,908.33
781.67
3,908.33
781.67
4,690.00
1,675.00
335.00
1,675.00
335.00
2,010.00
313.33
62.67
313.33
62.67
376.00
4,958.33
991.67
4,958.33
991.67
5,950.00
Page 64 of 165
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
2nd Tranche
LCC Cash
KC Grant
REMARKS
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
LCC Cash
MONTH
TOTAL
6,860.00
1,372.00
6,860.00
1,372.00
8,232.00
395.83
79.17
395.83
79.17
475.00
2,600.00
520.00
2,600.00
520.00
3,120.00
145.83
29.17
145.83
29.17
175.00
433.33
86.67
433.33
86.67
520.00
216.67
43.33
216.67
43.33
260.00
210.00
42.00
210.00
42.00
252.00
137.50
27.50
137.50
27.50
165.00
105.00
21.00
105.00
21.00
126.00
104.17
20.83
104.17
20.83
125.00
833.33
166.67
833.33
166.67
1,000.00
333.33
66.67
333.33
66.67
400.00
58.33
11.67
58.33
11.67
70.00
333.33
66.67
333.33
66.67
400.00
416.67
83.33
416.67
83.33
500.00
500.00
100.00
500.00
100.00
600.00
24,538.33
4,907.67
24,538.33
4,907.67
29,446.00
Page 65 of 165
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
2nd Tranche
LCC Cash
KC Grant
REMARKS
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
MONTH
TOTAL
LCC Cash
488.89
2,444.44
488.89
2,933.33
2,589.56
12,947.81
2,589.56
15,537.38
1,141.17
5,705.83
1,141.17
6,847.00
416.67
2,083.33
416.67
2,500.00
1,666.67
8,333.33
1,666.67
10,000.00
279.17
1,395.83
279.17
1,675.00
797.22
3,986.11
797.22
4,783.33
683.33
3,416.67
683.33
4,100.00
410.00
2,050.00
410.00
2,460.00
273.33
1,366.67
273.33
1,640.00
318.89
1,594.44
318.89
1,913.33
68.33
341.67
68.33
410.00
2,186.67
10,933.33
145.78
2,186.67
13,120.00
728.89
145.78
874.67
57,328.37
11,465.67
68,794.04
3,529.17
17,645.83
3,529.17
21,175.00
3,100.00
15,500.00
3,100.00
18,600.00
2,187.50
10,937.50
2,187.50
13,125.00
4,500.00
22,500.00
4,500.00
27,000.00
66,583.33
13,316.67
79,900.00
11,465.67
13,316.67
29,395.83
5,879.17
29,395.83
5,879.17
35,275.00
6,775.00
1,355.00
6,775.00
1,355.00
8,130.00
5,166.67
1,033.33
5,166.67
1,033.33
6,200.00
5,683.33
1,136.67
5,683.33
1,136.67
6,820.00
1,550.00
310.00
1,550.00
310.00
1,860.00
2,583.33
516.67
2,583.33
516.67
3,100.00
591.67
118.33
591.67
118.33
710.00
2,708.33
541.67
2,708.33
541.67
3,250.00
250.00
50.00
250.00
50.00
300.00
54,704.17
10,940.83
54,704.17
10,940.83
65,645.00
2,750.00
13,750.00
2,750.00
16,500.00
384.00
1,920.00
384.00
2,304.00
800.00
4,000.00
800.00
4,800.00
500.00
2,500.00
500.00
3,000.00
58.33
291.67
58.33
350.00
Page 66 of 165
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
2nd Tranche
LCC Cash
KC Grant
REMARKS
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
LCC Cash
TOTAL
1,166.67
5,833.33
1,166.67
7,000.00
680.00
3,400.00
680.00
4,080.00
31,695.00
6,339.00
38,034.00
6,339.00
Page 67 of 165
PROPOSED
IMPLEMENTATI
SCHEDULE
MONTH
1
1st Tranche
2nd Tranche
LCC Cash
KC Grant
REMARKS
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
79,717.09
1,125.00
5,625.00
1,125.00
6,750.00
2,500.00
500.00
2,500.00
500.00
3,000.00
291.67
58.33
291.67
58.33
350.00
8,416.67
1,683.33
8,416.67
1,683.33
10,100.00
2,083.33
416.67
2,083.33
416.67
2,500.00
2,083.33
416.67
2,083.33
416.67
2,500.00
7,500.00
1,500.00
9,000.00
7,500.00
1,500.00
9,000.00
1,666.67
333.33
1,666.67
333.33
2,000.00
1,275.00
255.00
1,275.00
255.00
1,530.00
5,833.33
1,166.67
5,833.33
1,166.67
7,000.00
2,380.00
476.00
2,380.00
476.00
2,856.00
2,500.00
500.00
2,500.00
500.00
3,000.00
13,655.00
2,731.00
92,897.50
18,579.50
10,500.00
2,100.00
13,655.00
2,731.00
16,386.00
501,982.95
100,396.59
602,379.54
79,717.09
5,625.00
1,500.00
1,500.00
MONTH
TOTAL
LCC Cash
19,500.00
17,500.00
58,500.00
58,500.00
18,334.77
17,716.02
55,800.00
55,800.00
37,834.77
114,300.00
140.00
560.00
140.00
700.00
180.00
720.00
180.00
900.00
190.00
760.00
190.00
950.00
340.00
1,360.00
340.00
1,700.00
150.00
600.00
150.00
750.00
350.00
1,400.00
350.00
1,750.00
70.00
280.00
70.00
350.00
100.00
400.00
100.00
500.00
6,080.00
1,520.00
7,600.00
1,200.00
300.00
1,500.00
1,000.00
250.00
1,250.00
2,200.00
550.00
2,750.00
2,100.00
114,300.00
716,679.54
45,716.02
100,396.59
18,579.50
35,216.02
616,282.95
1,520.00
130,732.27
300.00
250.00
550.00
9,233.33
15,750.00
3,000.00
3,666.67
Page 68 of 165
33,333.33
6,666.67
PROPOSED
IMPLEMENTATI
SCHEDULE
15,750.00
40,000.00
1st Tranche
2nd Tranche
LCC Cash
KC Grant
REMARKS
3rd Tranche
LCC Cash
231.22
1,040.03
238.39
1,846.67
KC Grant
TOTAL
LCC Cash
1,228.75
KC Grant
LCC Cash
-
1,914.94
3,375.00
MONTH
TOTAL
2,500.00
2,500.00
2,085.06
4,000.00
3,375.00
3,375.00
24,266.78
5,237.68
24,266.78
5,237.68
29,504.46
3,844.61
9,233.33
5,886.70
24,266.78
10,133.10
75,265.05
19,864.41
95,129.46
5,914.61
9,233.33
5,886.70
24,266.78
10,133.10
83,545.05
21,934.41
105,479.46
85,631.70
139,965.60
24,466.20
69,982.80
12,233.10
699,828.00
122,331.00
822,159.00
85,631.70
139,965.60
24,466.20
69,982.80
12,233.10
699,828.00
122,331.00
822,159.00
20.00%
Reviewed by:
PROPOSED
IMPLEMENTATI
SCHEDULE
10.00%
Submitted by:
Noted by:
RODSON R. ESCORA
ANTONIO ALAM
GEORGE S. ISULAT
BSMPC
Page 69 of 165
AMOUNT
(PESO)
699,828.00
151,056.00
28,725.00
122,331.00
850,884.00
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 70 of 165
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 71 of 165
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 72 of 165
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 73 of 165
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 74 of 165
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 75 of 165
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 76 of 165
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 77 of 165
Barangay
Bagacay
Municipality
DAUIN
Sub-project Duration
Province
NEGROS ORIENTAL
SOURCES OF FUNDS
DESCRIPTION
PACKAGES
PACKAGE ITEMS
489,879.60
139,965.60
69,982.80
TOTAL
QTY
UNIT
TOTAL UNIT
COST
KC Grant:
699,828.00
PROC
METHOD
TOTAL
1st Tranche
KC Grant
PACKAGE 1 : HARDWARE
Materials:
Nylon String
Anti-Termite (e.g. solignum, )
2.00
kg
300.00
600.00
500.00
5.00
gal
1,065.00
5,325.00
4,437.50
2.00
meter
85.00
170.00
141.67
15.00
shts
355.00
5,325.00
4,437.50
29.00
Shts.
425.00
12,325.00
10,270.83
# 5 CWN
4.00
Kgs.
48.00
192.00
160.00
# 4 CW Nails
19.00
kgs
45.00
855.00
712.50
# 3 CWN
19.00
Kgs.
46.00
874.00
728.33
# 2 CWN
10.00
kgs.
48.00
480.00
400.00
# 1 CW Nails
5.00
kgs
52.00
260.00
216.67
# 1 Finishing Nails
2.00
Kgs.
58.00
116.00
96.67
8.00
kg
50.00
400.00
333.33
Bags
250.00
82,750.00
68,958.33
331.00
16.00
kilos
75.00
1,200.00
1,000.00
51.00
cu.m.
75.00
3,825.00
3,187.50
14.00
Pcs.
35.00
490.00
408.33
23.00
lengths
250.00
5,750.00
4,791.67
320.00
Length
130.00
41,600.00
34,666.67
20.00
Length
185.00
3,700.00
3,083.33
65.00
Length
330.00
21,450.00
17,875.00
1.50
rolls
1,550.00
2,325.00
1,937.50
15.00
Kgs.
50.00
750.00
625.00
Hacksaw Blade
10.00
Pcs.
42.00
420.00
350.00
1.00
set
1,850.00
1,850.00
1,541.67
1.00
set
1,500.00
1,500.00
1,250.00
4.00
set
850.00
3,400.00
2,833.33
12.00
pcs
110.00
1,320.00
1,100.00
20.00
Length
345.00
6,900.00
5,750.00
unit
3,200.00
3,200.00
1.00
2,666.67
1.00
set
10.00
10.00
8.33
3.00
length
535.00
1,605.00
1,337.50
2.00
pc
47.50
95.00
79.17
1.00
pc
21.50
21.50
17.92
2.00
pc
62.50
125.00
104.17
1.00
length
205.00
205.00
170.83
2.00
pc
100.00
200.00
166.67
1.00
pc
87.50
87.50
2.00
length
420.00
840.00
2.00
length
205.00
410.00
2.00
pc
21.50
43.00
1.00
pc
65.00
65.00
3.00
pc
30.00
90.00
Solvent Cement
1.00
pint
175.00
175.00
pc
48.50
48.50
40.42
72.92
1.00
700.00
341.67
35.83
54.17
75.00
145.83
1.00
pc
750.00
750.00
10.00
length
56.00
560.00
1.00
pc
200.00
200.00
10.00
pc
4.00
40.00
7.00
pc
6.75
47.25
1.00
pc
9.25
9.25
625.00
7.71
2.00
pc
7.85
15.70
13.08
466.67
166.67
33.33
39.38
2.00
pc
135.00
270.00
225.00
Teflon Tape
3.00
roll
13.50
40.50
33.75
Solvent Cement
1.00
pint
175.00
175.00
145.83
3.00
pc
110.00
330.00
275.00
9.00
length
420.00
3,780.00
3,150.00
18.00
pc
37.50
675.00
562.50
1.00
pint
175.00
175.00
145.83
X. TILE WORKS
230.00
pc
15.50
3,565.00
2,970.83
120.00
pc
17.50
2,100.00
1,750.00
10.00
bags
65.00
650.00
541.67
Tile Trim x 3m
20.00
pc
28.00
560.00
466.67
At Lavatory:
68.00
pc
15.50
1,054.00
878.33
2.00
kls.
65.00
130.00
108.33
Tile Trim x 3m
3.00
pc
28.00
84.00
70.00
12.00
pcs.
22.50
270.00
225.00
7.00
pcs.
27.50
192.50
160.42
1.00
length
215.00
215.00
179.17
Screw Insulator
1.00
pc.
16.50
16.50
13.75
2.00
box
3,295.00
6,590.00
5,491.67
60.00
19.50
1,170.00
975.00
PVC Clamp
10.00
pc
1.50
15.00
12.50
80.00
8.50
680.00
566.67
3.00
pc
22.50
67.50
56.25
5.00
assy
280.00
1,400.00
1,166.67
3.00
set
125.00
375.00
312.50
2.00
pc
87.50
175.00
145.83
4.00
pc
55.00
220.00
183.33
5.00
pc
87.50
437.50
364.58
7.00
pc
30.00
210.00
175.00
Female Adaptor
5.00
pc
25.00
125.00
104.17
1.00
unit
2,650.00
2,650.00
2,208.33
5.00
pc
40.00
200.00
166.67
1.00
set
1,500.00
1,500.00
1,250.00
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)
Sub-Total (Actual)
245,092.20
37,482.30
31,235.25
282,574.50
235,478.75
14.00
gal
Concrete Neutralizer
6.00
gal
Polituff
2.00
pcs
PACKAGE 1
204,243.50
14.00
gal
14.00
gal
1.00
gal
6.00
gal
1.00
liter
1.00
gal
2.00
pint
2.00
pint
1.00
pint
1.00
pint
1.00
pint
Paint Thinner
4.00
gal
4.00
pc
2.00
pc
4.00
set
Sandpaper #100
10.00
sheet
Sandpaper #200
10.00
sheet
Sub-Total (Actual)
PACKAGE 2
29,446.00
29,446.00
PACKAGE 3: LUMBER
Materials
1"x2"x8' Wood Stick/Lattice (Good Lumber)
53.33
bdft
41.00
2,186.53
1,822.11
378.96
bdft
39.50
14,968.92
12,474.10
167.00
bd ft
39.50
6,596.50
5,497.08
100.00
bd ft
19.50
1,950.00
1,625.00
400.00
bd.ft.
19.50
7,800.00
6,500.00
67.00
bd.ft.
19.50
1,306.50
1,088.75
116.67
bdft.
39.50
4,608.47
100.00
bdft.
39.50
3,950.00
60.00
bdft.
39.50
2,370.00
PACKAGE-3
Truss 1: 5 units
3,840.39
LSG
3,291.67
1,975.00
40.00
bdft.
39.50
1,580.00
1,316.67
46.67
bdft.
39.50
1,843.47
1,536.22
10.00
bdft.
39.50
395.00
329.17
320.00
bdft.
39.50
12,640.00
10,533.33
21.33
bdft.
39.50
842.54
702.11
Sub-Total (Actual)
63,037.92
5,756.13
68,794.04
52,531.60
-
4,796.77
57,328.37
PACKAGE 4: AGGREGATES
PACKAGE-4
Materials:
Filling Materials
35.00
cu.m.
400.00
14,000.00
Washed Gravel
24.00
cu.m.
680.00
16,320.00
21.00
cu.m.
580.00
12,180.00
10,150.00
8.75
15,750.00
13,125.00
Sub-Total (Actual)
58,250.00
48,541.67
21,650.00
79,900.00
Washed Sand
4" x 8' x 16" CHB
1,800.00
Pcs
11,666.67
LSG
Materials:
PACKAGE-5
17.00
pcs
6.00
pcs
10.00
pcs
11.00
pcs
3.00
pcs
5.00
pcs
18,041.67
66,583.33
PACKAGE 5: ROOFING
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)
13,600.00
LSG
PACK
Roof Sealant
Tex Screw 2 1/2" dia. (for wood)
Blind Rivets
2.00
lit
1,300.00
pc
200.00
pc
Sub-Total (Actual)
65,645.00
65,645.00
PACKAGE 6: FURNITURE
PACKAGE-6
Materials:
D - 1, (1.0m x 2.10m) Panel Door
set
4,000.00
12,000.00
10,000.00
64
bdft
45.00
2,880.00
2,400.00
sets
3,350.00
13,400.00
11,166.67
sets
2,000.00
4,000.00
1.00
Sets
520.00
520.00
433.33
1.00
unit
3,400.00
3,400.00
2,833.33
1.00
set
1,800.00
1,800.00
1,500.00
38,000.00
31,666.67
Sub-Total (Actual)
LSG
3,333.33
34.00
28.33
38,034.00
31,695.00
PACKAGE 7: GLASS
PACKAGE-7
Materials:
W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie window on
standard aluminum housing w/ 12mm dia. hole in between blades
interval
Sets
Sets
Sets
Sub-Total (Actual)
LSG
10,100.00
10,100.00
1.00
lot
2,500.00
Sub-Total (Actual)
2,500.00
LSG
2,500.00
2,500.00
1.00
lot
8,900.00
8,900.00
LSG
7,416.67
Sub-Total (Actual)
8,900.00
100.00
7,416.67
83.33
9,000.00
7,500.00
PACKAGE-10
1.00
unit
Stethoscope
1.00
unit
1.00
unit
1.00
unit
1.00
set
LSG
16,386.00
16,386.00
415,780.12
344,400.10
CFA
P-11
58,500.00
unskilled
55,800.00
21,500.00
19,749.21
Sub-Total
114,300.00
41,249.21
1,720,223.63
530,080.12
385,649.31
PACKAGE-12
1.00
pc
350.00
350.00
280.00
Crow Bar
1.00
pc
325.00
325.00
260.00
Concrete Pail
10.00
pc
48.00
480.00
384.00
Wheel Barrow
1.00
pc
2,125.00
2,125.00
1.00
pc
1,350.00
1,350.00
Hard Hat
5.00
pc
110.00
550.00
Hand Glooves
10.00
pcs
38.00
380.00
304.00
Medicine Kit
1.00
set
1,850.00
1,850.00
1,480.00
7,410.00
5,928.00
Sub-Total (Actual)
1,700.00
LSG
1,080.00
440.00
190.00
152.00
7,600.00
6,080.00
PACKAGE-13
5.00
pc
Barricades
5.00
pc
270.00
1,350.00
-
1,080.00
LSG
Sub-Total (Actual)
1,350.00
1,400.00
1,080.00
1,120.00
2,750.00
2,200.00
Overhead
15,750.00
6,516.67
Administrative Cost
40,000.00
33,333.33
Reproduction of plans
2,500.00
Material Testing
4,000.00
Treasurers Bond
3,375.00
Contingency
CFA
PACKAGE-14
j. Indirect Cost
1,914.94
29,504.46
Sub-Total
95,129.46
41,764.94
103,889.46
48,772.94
188,189.43
55,457.36
633,969.58
434,422.25
822,159.00
SAY
822,159.00
489,879.60
70.00%
188,189.42
Workshop output of:
Checked by:
LEONORA COFINO
JUDITH GRAMATICA
CARMEN A. GAUDIANO
PPT
Municipal Engineer
sed Sub-Project
: 822,159.00
: 80 C.D.
RCES OF FUNDS
PERCENTAGE WEIGHT
TOTAL
LCC:
TO KC GRANT
AMOUNT
(PESO)
FUND SOURCE
TO LCC CASH
LEGEND:
KC Cost
699,828.00
85,631.70
575,511.30
70.00%
70.00%
24,466.20
164,431.80
20.00%
20.00%
TOTAL LCC :
In-kind:
151,056.00
28,725.00
12,233.10
82,215.90
10.00%
10.00%
Cash:
122,331.00
122,331.00
822,159.00
100.00%
100.00%
TOTAL
850,884.00
1st Tranche
2nd Tranche
LCC Cash
KC Grant
LCC Cash
REMARKS
3rd Tranche
KC Grant
LCC Cash
TOTAL
KC Grant
-
MONTH
TOTAL
LCC Cash
-
1
-
100.00
500.00
100.00
600.00
887.50
4,437.50
887.50
5,325.00
28.33
141.67
28.33
170.00
887.50
4,437.50
887.50
5,325.00
2,054.17
10,270.83
2,054.17
12,325.00
32.00
160.00
32.00
192.00
142.50
712.50
142.50
855.00
145.67
728.33
145.67
874.00
80.00
400.00
80.00
480.00
43.33
216.67
43.33
260.00
19.33
96.67
19.33
116.00
66.67
333.33
66.67
400.00
13,791.67
68,958.33
13,791.67
82,750.00
200.00
1,000.00
200.00
1,200.00
637.50
3,187.50
637.50
3,825.00
81.67
408.33
81.67
490.00
958.33
4,791.67
958.33
5,750.00
6,933.33
34,666.67
6,933.33
41,600.00
616.67
3,083.33
616.67
3,700.00
3,575.00
17,875.00
3,575.00
21,450.00
387.50
1,937.50
387.50
2,325.00
125.00
625.00
125.00
750.00
70.00
350.00
70.00
420.00
308.33
1,541.67
308.33
1,850.00
250.00
1,250.00
250.00
1,500.00
566.67
2,833.33
566.67
3,400.00
220.00
1,100.00
220.00
1,320.00
1,150.00
5,750.00
1,150.00
6,900.00
533.33
2,666.67
533.33
PROPOSED
IMPLEMENTATION
SCHEDULE
3,200.00
1.67
8.33
1.67
10.00
267.50
1,337.50
267.50
1,605.00
15.83
79.17
15.83
95.00
3.58
17.92
3.58
21.50
20.83
104.17
20.83
125.00
34.17
170.83
34.17
205.00
33.33
166.67
33.33
200.00
8.08
40.42
8.08
48.50
14.58
72.92
14.58
87.50
140.00
700.00
140.00
840.00
68.33
341.67
68.33
410.00
7.17
35.83
7.17
43.00
10.83
54.17
10.83
65.00
15.00
75.00
15.00
90.00
29.17
145.83
29.17
175.00
125.00
625.00
125.00
750.00
93.33
466.67
93.33
560.00
33.33
166.67
33.33
200.00
6.67
33.33
6.67
40.00
7.88
39.38
7.88
47.25
1.54
7.71
1.54
9.25
2.62
13.08
2.62
15.70
45.00
225.00
45.00
270.00
6.75
33.75
6.75
40.50
29.17
145.83
29.17
175.00
55.00
275.00
55.00
330.00
630.00
3,150.00
630.00
3,780.00
112.50
562.50
112.50
675.00
29.17
145.83
29.17
175.00
594.17
2,970.83
594.17
3,565.00
350.00
1,750.00
350.00
2,100.00
108.33
541.67
108.33
650.00
93.33
466.67
93.33
560.00
175.67
878.33
175.67
1,054.00
21.67
108.33
21.67
130.00
14.00
70.00
14.00
84.00
45.00
225.00
45.00
270.00
32.08
160.42
32.08
192.50
35.83
179.17
35.83
215.00
2.75
13.75
2.75
16.50
1,098.33
5,491.67
1,098.33
6,590.00
195.00
975.00
195.00
1,170.00
2.50
12.50
2.50
15.00
113.33
566.67
113.33
680.00
11.25
56.25
11.25
67.50
233.33
1,166.67
233.33
1,400.00
62.50
312.50
62.50
375.00
29.17
145.83
29.17
175.00
36.67
183.33
36.67
220.00
72.92
364.58
72.92
437.50
35.00
175.00
35.00
210.00
20.83
104.17
20.83
125.00
441.67
2,208.33
441.67
2,650.00
33.33
166.67
33.33
200.00
250.00
1,250.00
250.00
1,500.00
245,092.20
40,848.70
204,243.50
40,848.70
6,247.05
31,235.25
6,247.05
37,482.30
47,095.75
235,478.75
47,095.75
282,574.50
24,538.33
4,907.67
24,538.33
4,907.67
29,446.00
24,538.33
4,907.67
24,538.33
4,907.67
29,446.00
364.42
1,822.11
364.42
2,186.53
2,494.82
12,474.10
2,494.82
14,968.92
1,099.42
5,497.08
1,099.42
6,596.50
325.00
1,625.00
325.00
1,950.00
1,300.00
6,500.00
1,300.00
7,800.00
217.75
1,088.75
217.75
1,306.50
768.08
3,840.39
768.08
4,608.47
658.33
3,291.67
658.33
3,950.00
395.00
1,975.00
395.00
2,370.00
263.33
1,316.67
263.33
1,580.00
307.24
1,536.22
307.24
1,843.47
65.83
329.17
65.83
395.00
2,106.67
10,533.33
2,106.67
12,640.00
140.42
702.11
140.42
842.54
63,037.92
10,506.32
52,531.60
10,506.32
959.35
4,796.77
959.35
5,756.13
57,328.37
11,465.67
68,794.04
2,333.33
11,666.67
2,333.33
14,000.00
2,720.00
13,600.00
2,720.00
16,320.00
2,030.00
10,150.00
2,030.00
12,180.00
2,625.00
13,125.00
2,625.00
15,750.00
9,708.33
58,250.00
11,465.67
9,708.33
48,541.67
3,608.33
18,041.67
3,608.33
21,650.00
66,583.33
13,316.67
79,900.00
13,316.67
54,704.17
10,940.83
54,704.17
10,940.83
65,645.00
54,704.17
10,940.83
54,704.17
10,940.83
65,645.00
2,000.00
10,000.00
2,000.00
12,000.00
480.00
2,400.00
480.00
2,880.00
2,233.33
11,166.67
2,233.33
13,400.00
666.67
3,333.33
666.67
4,000.00
86.67
433.33
86.67
520.00
566.67
2,833.33
566.67
3,400.00
300.00
1,500.00
300.00
1,800.00
31,666.67
6,333.33
38,000.00
6,333.33
5.67
28.33
5.67
34.00
6,339.00
31,695.00
6,339.00
38,034.00
8,416.67
1,683.33
8,416.67
1,683.33
10,100.00
8,416.67
1,683.33
8,416.67
1,683.33
10,100.00
2,083.33
416.67
2,083.33
416.67
2,500.00
2,083.33
416.67
2,083.33
416.67
2,500.00
1,483.33
16.67
1,500.00
2,083.33
416.67
2,083.33
416.67
2,500.00
7,416.67
1,483.33
8,900.00
7,416.67
1,483.33
8,900.00
83.33
16.67
100.00
7,500.00
1,500.00
9,000.00
1,483.33
13,655.00
2,731.00
13,655.00
2,731.00
13,655.00
2,731.00
13,655.00
2,731.00
16,386.00
346,483.43
69,296.69
415,780.12
68,880.02
2,083.33
416.67
16,386.00
19,500.00
17,500.00
58,500.00
58,500.00
18,334.77
17,716.02
55,800.00
55,800.00
114,300.00
114,300.00
37,834.77
35,216.02
UDIANO
68,880.02
37,834.77
37,299.35
416.67
460,783.43
69,296.69
530,080.12
70.00
280.00
70.00
350.00
65.00
260.00
65.00
325.00
96.00
384.00
96.00
480.00
425.00
1,700.00
425.00
2,125.00
270.00
1,080.00
270.00
1,350.00
110.00
440.00
110.00
550.00
76.00
304.00
76.00
380.00
370.00
1,480.00
370.00
1,850.00
5,928.00
1,482.00
7,410.00
1,482.00
38.00
152.00
38.00
190.00
1,520.00
6,080.00
1,520.00
7,600.00
1,080.00
270.00
1,350.00
270.00
-
270.00
1,080.00
270.00
1,350.00
280.00
1,120.00
280.00
1,400.00
550.00
2,200.00
550.00
2,750.00
9,233.33
15,750.00
3,000.00
3,666.67
231.22
1,040.03
1,228.75
238.39
1,846.67
33,333.33
1,914.94
3,375.00
15,750.00
6,666.67
40,000.00
2,500.00
2,500.00
2,085.06
4,000.00
3,375.00
3,375.00
29,504.46
24,266.78
5,237.68
24,266.78
5,237.68
3,844.61
9,233.33
5,886.70
24,266.78
10,133.10
75,265.05
19,864.41
95,129.46
5,596.61
9,233.33
5,886.70
24,266.78
10,133.10
82,273.05
21,616.41
103,889.46
11,155.07
92,897.50
18,579.50
8,416.67
1,683.33
156,771.52
31,417.90
188,189.43
74,476.63
47,068.10
5,886.70
61,566.13
10,549.77
543,056.48
90,913.10
633,969.58
85,631.70
139,965.60
24,466.20
69,982.80
12,233.10
543,056.48
122,331.00
822,159.00
20.00%
10.00%
Reviewed by:
Submitted by:
RODSON R. ESCORA
ANTONIO ALAM
BSMPC
AMOUNT
(PESO)
699,828.00
151,056.00
28,725.00
122,331.00
850,884.00
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
3
Destination/Description
Fare/
Allowance/
Unit Price
Qty.
Unit
pesos
No of
transactions
1,000.00
1 times
150.00
persons x
1 times
50.00
80.00
x
x
2
2
persons x
persons x
1 times
3 times
=
=
280.00
persons x
6 times
60.00
80.00
x
x
3
3
persons x
persons x
6 times
6 times
=
=
280.00
persons x
6 times
60.00
80.00
x
x
2
2
persons x
persons x
6 times
6 times
=
=
100.00
24.00
12
19
meetings
persons x
12 times
=
=
50.00
persons x
10 times
Meals
100.00
persons x
10 times
120.00
persons x
20 times
80.00
persons x
19 times
350.00
5.00
2.00
1,480.00
50.00
50.00
50.00
100.00
15.00
30.00
500.00
50.00
35.00
20.00
3.00
20.00
30.00
80.00
50.00
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
4
8
1524
1
1
1
1
1
1
4
1
4
1
1
20
1
1
2
1
Sub-Total
2. TE for procurement transactions of CVs
Serving of Canvass
Sub-Total
5. Treasurer Payroll Processing
Meals
Sub-Total
6. Forms/Supplies and
Reproduction
Bondpaper long
Ballpens
Reproduction
Petty cash box w/ padlock
Rubber Stamp
Stampad
Stamping Ink
Stapler
Stapler Remover
Staple Wire
Calculator
Columnar Book
Liquid Eraser
Paste/Glue
Folder long
Paper clip
Pentil pen
Log book
Fastener
reams
pcs
sheets
set
pc
pc
pc
pc
pc
boxes
pc
pcs
ps
pc
pcs
box
pc
pcs
box
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Sub-Total
Total for Admin Cost
Prepared by :
Approved by :
ELSA A. TRUNO
ANTONIO ALAM
MEO Staff
BSPMC Chairperson
Checked by:
Concurred by :
STEPHEN B. ALAM
Barangay Captain
Municipal Mayor
Recommending Approval:
Noted by:
GEORGE S. ISULAT
Regional Community Infrastructure Specialist
1,000.00
300.00
100.00
480.00
1,880.00
5,040.00
1,080.00
1,440.00
3,360.00
720.00
960.00
12,600.00
1,200.00
5,472.00
6,672.00
2,500.00
5,000.00
7,500.00
2,400.00
1,520.00
3,920.00
1,400.00
40.00
3,048.00
1,480.00
50.00
50.00
50.00
100.00
15.00
120.00
500.00
200.00
35.00
20.00
60.00
20.00
30.00
160.00
50.00
7,428.00
40,000.00
ANTONIO ALAM
BSPMC Chairperson
STEPHEN B. ALAM
Barangay Captain
Municipality
A. GENERAL INFORMATION
Name of proposed sub-project:
Category:
Public Goods
Province:
Region:
XII
Err:509 /sqm
Indirect Cost
Err:509
Total
Err:509
Err:509
Err:509
Err:509
Err:509
107,093.32
Err:509
Err:509
Err:509
Err:509
16,696.73
Err:509
% total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Total population
% to total
D. SAFEGUARD CONCERNS
Any displacement or relocation of community members during impleme
Yes
Acquisition of proposed site/location?
Deed of Sal
Donated LGU Ownd
Proposed site within the reservation areas?
Yes
No
Necessary permit/s accomplished? (e.g ECC, CNC)
Yes
No
EMP Only
Mitigating measures to be undertaken for the environmental impacts of the sub-project?
No
others specify
E. SP SUSTAINABILITY
Is there an existing O&M group or still to be organized?
Is the community willing to pay for Tariff and by How much?
Other sources of funds for the operation and maintenance activities?
Identified capability building requirements for O&M group?
How do we plan to maintain the completed sub-project?
Prepared by:
Brgy. Chairperson
MELQUIADEZ D. ATA
BSPMC Chairperson
Area Coordinator
MIAC Representative
51.0 sq.m
Err:509
ph 16,254.18/sq.m
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
specify
PHP 868,894.60
Err:509
Err:509
Wash Sand
Anti-Termite (e.g. solignum, )
Kitchen Sink,(0.4m x 0.6m, Single Tab, Stainless)
24.00
3.00
1.00
29.00
123.00
2.00
2.00
1.00
5.00
1.00
2.77
0.50
4.00
4.00
20.00
53.33
6.00
7.00
2.00
2.00
1.00
10.00
1.00
10.00
5.00
2.00
133.00
2.00
1.00
1.00
1.00
1.00
12.00
21.33
281.00
320.00
168.00
60.00
100.00
46.67
1.00
150.00
9.00
18.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
2.00
3.00
7.00
1.00
3.00
cu.m.
can
pc
Shts.
bdft
shts.
Kgs.
kgs.
Kgs.
Kgs.
Kgs.
Kgs.
pc
meter
Length
bdft
kg
pc
pc
pc
pc
pc
pc
length
shts.
meter
Length
pc
pc
pc
length
pc
pcs.
bdft.
bdft
bdft.
bdft
bdft.
bdft.
bdft.
set
bd ft
length
pc
length
box
length
unit
pc
pc
pc
pc
length
pcs.
set
pc
700
300.00
700.00
420.00
25.00
355.00
65.00
70.00
65.00
65.00
36.00
65.00
65.00
80.00
345.00
55.00
65.00
10.00
160.00
12.00
10.00
5.00
418.00
75.00
335.00
40.00
155.00
98.00
40.00
40.00
180.00
90.00
20.00
41.00
25.00
41.00
25.00
41.00
41.00
41.00
4,080.00
25.00
365.00
40.00
370.00
3,900.00
240.00
7,000.00
30.00
40.00
50.00
98.00
500.00
25.00
90.00
100.00
1,596.00
167.00
195.00
57.00
4.00
200.00
1.00
6.00
17.00
3.00
5.00
11.00
10.00
6.00
14.00
5.00
3.00
5.00
5.00
14.78
1.00
14.00
80.00
5.00
1.00
10.00
1.00
1.00
1.00
2.00
2.00
1.00
7.00
1.00
3.00
2.00
4.00
4.00
4.00
2.00
160.00
10.00
1.00
6.00
16.00
2.00
10.00
10.00
1.00
14.00
60.00
1.00
1.00
3.00
1,300.00
4.00
24.00
Pcs
bd ft
pc
pc
gal
pc
unit
pcs
pcs
pcs
pcs
pcs
pcs
gal
gal
pc
pc
pc
pc
cu.m.
gal
gal
m
assy
unit
Pcs.
unit
pint
pint
pint
pint
pint
pc
set
roll
pc
pc
set
gal
pcs
bag
pc
gal
gal
kilos
lit
sheet
sheet
pc.
gal
m
pint
unit
roll
pc
pc
cu.m.
15.00
41.00
30.00
30.00
1,050.00
1.50
2,000.00
1,355.00
2,075.00
620.00
620.00
620.00
620.00
335.00
335.00
40.00
30.00
100.00
13.00
500.00
520.00
425.00
12.00
350.00
900.00
75.00
1,500.00
165.00
125.00
130.00
126.00
126.00
35.00
3,000.00
30.00
35.00
100.00
100.00
250.00
188.00
245.00
2.00
475.00
520.00
100.00
355.00
50.00
60.00
40.00
588.00
30.00
90.00
1,530.00
20.00
2.50
30.00
775.00
1.00
unit
1.00
unit
4.00
kls.
4.00
meter
10.00
Pcs.
12.00
pcs
3.00
set
39.00 length
20.00 length
23.00
lengths
22.00 length
7,000.00
2,856.00
60.00
80.00
36.00
115.00
120.00
155.00
205.00
235.00
355.00
4.00
sets
1,200.00
2.00
sets
1,500.00
1.00
Sets
350.00
1.00
10.00
1.00
3.00
LOT
pc
pc
set
2,500.00
95.00
900.00
5,500.00
1.00
set
4,000.00
bdft
liter
kilos
pcs
pc
set
set
set
36.00
175.00
60.00
35.00
350.00
1,500.00
900.00
500.00
1.00
set
2,000.00
1.00
1.00
1.00
pc
pc
LOT
700.00
750.00
9,000.00
Concrete Pail
Crow Bar
D - 1, (1.0m x 2.10m) Panel Door
D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb
D-1, 2"x6"x8' for Door Jamb (Good Lumber)
Enamel Paint (Black)
Ga. 16, GI. Tie Wire
Hand Glooves
Hard Hat
Lavatory-closet-cover with handle & Hinges attached
Lockset (high quality doorknob)
Medicine Kit
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)
Shovel w/ handle
Sledge Hammer (5kg) w/ handle
Supply & Installation Fabricated Steel Billboard
64.00
1.00
4.00
10.00
5.00
1.00
4.00
1.00
9.00
Sets
750.00
4.00
Sets
750.00
1.00
Sets
350.00
1.00
pc
1,700.00
24.00
3.00
1.00
29.00
331.00
2.00
2.00
2.00
12.00
20.00
3.73
2.00
4.00
4.00
20.00
53.33
8.00
7.00
2.00
2.00
1.00
10.00
1.00
10.00
10.00
2.00
133.00
2.00
1.00
3.00
3.00
1.00
12.00
400.29
850.38
320.00
252.00
70.00
140.00
163.33
1.00
150.00
9.00
21.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
2.00
3.00
7.00
1.00
3.00
1,596.00
167.00
263.00
57.00
4.00
200.00
1.00
6.00
17.00
3.00
5.00
11.00
10.00
6.00
14.00
5.00
3.00
5.00
5.00
14.78
1.00
14.00
80.00
5.00
1.00
10.00
1.00
1.00
1.00
2.00
2.00
1.00
7.00
1.00
3.00
2.00
4.00
4.00
4.00
2.00
304.00
10.00
1.00
6.00
16.00
2.00
10.00
10.00
1.00
14.00
60.00
3.00
1.00
3.00
1,300.00
7.00
42.00
1.00
1.00
6.00
4.00
14.00
12.00
3.00
220.00
39.00
23.00
60.00
4.00
2.00
1.00
1.00
10.00
1.00
3.00
1.00
64.00
1.00
29.75
10.00
5.00
1.00
4.00
1.00
1.00
1.00
1.00
1.00
9.00
4.00
1.00
1.00
3.00
1.00
29.00
331.00
2.00
2.00
2.00
12.00
20.00
3.00
2.00
4.00
4.00
20.00
53.33
8.00
7.00
2.00
2.00
1.00
10.00
1.00
10.00
10.00
2.00
2.00
1.00
3.00
3.00
1.00
12.00
21.33
850.38
378.96
572.00
70.00
140.00
163.33
1.00
150.00
9.00
18.00
3.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
can
pc
Shts.
bdft
shts.
Kgs.
kgs.
Kgs.
Kgs.
Kgs.
Kgs.
pc
meter
Length
bdft
kg
pc
pc
pc
pc
pc
pc
length
shts.
meter
pc
pc
pc
length
pc
pcs.
bdft.
bdft
bdft
bdft.
bdft.
bdft.
bdft.
set
bd ft
length
pc
pc
length
box
length
unit
pc
pc
pc
300.00
700.00
420.00
25.00
355.00
65.00
65.00
65.00
65.00
36.00
65.00
65.00
80.00
345.00
55.00
65.00
10.00
160.00
12.00
10.00
5.00
418.00
75.00
335.00
40.00
98.00
40.00
40.00
180.00
90.00
20.00
41.00
25.00
41.00
41.00
41.00
41.00
41.00
4,080.00
25.00
365.00
40.00
25.00
370.00
3,900.00
240.00
7,000.00
30.00
40.00
50.00
2.00
3.00
7.00
1.00
3.00
1,596.00
167.00
263.00
57.00
4.00
200.00
1.00
6.00
17.00
3.00
5.00
11.00
10.00
6.00
14.00
5.00
3.00
5.00
5.00
14.78
1.00
14.00
80.00
5.00
1.00
10.00
1.00
1.00
1.00
2.00
2.00
1.00
7.00
1.00
3.00
2.00
4.00
4.00
4.00
2.00
304.00
10.00
1.00
6.00
16.00
2.00
10.00
10.00
pc
length
pcs.
set
pc
Pcs
bd ft
pc
pc
gal
pc
unit
pcs
pcs
pcs
pcs
pcs
pcs
gal
gal
pc
pc
pc
pc
cu.m.
gal
gal
m
assy
unit
Pcs.
unit
pint
pint
pint
pint
pint
pc
set
roll
pc
pc
set
gal
pcs
bag
pc
gal
gal
kilos
lit
sheet
sheet
98.00
500.00
25.00
90.00
100.00
15.00
41.00
30.00
30.00
1,050.00
1.50
2,000.00
1,355.00
2,075.00
620.00
620.00
620.00
620.00
335.00
335.00
40.00
30.00
100.00
13.00
500.00
520.00
425.00
12.00
350.00
900.00
75.00
1,500.00
165.00
125.00
130.00
126.00
126.00
35.00
3,000.00
30.00
35.00
100.00
100.00
250.00
188.00
245.00
2.00
475.00
520.00
100.00
355.00
50.00
60.00
Screw Insulator
Semi-Gloss Latex White
Service Drop Wire
Solvent Cement
Stethoscope
Teflon Tape
Tex Screw 2 1/2" dia. (for wood)
Tile Trim x 3m
Washed Gravel
Washed Sand
Weighing Scale for adult
Weighing Scale for infant
White cement / Tile Grout
1/8" x 1/8" x 3' Meshwire
12mm dia. X 7" Machine Bolt w/ Knot and washer
( 3-1/2" x 3-1/2" ) loose pin hinges
10 watts compact flourescent Lamp
10mm dia. X 6m Def. Bars
12mm dia. X 6m Def. Bars
12mm dia. X 6m, plain roundbar for grills
16mm dia. X 6m Def. Bars
1.00
pc.
14.00
gal
60.00
m
3.00
pint
1.00
unit
3.00
roll
1,300.00
pc
7.00
pc
24.00
cu.m.
24.00
Cu.m.
1.00
unit
1.00
unit
6.00
kls.
4.00
meter
14.00
Pcs.
12.00
pcs
3.00
set
342.00 length
81.00 length
23.00
lengths
60.00 length
40.00
588.00
30.00
100.00
1,530.00
20.00
2.50
40.00
775.00
700.00
7,000.00
2,856.00
60.00
80.00
36.00
115.00
120.00
155.00
205.00
235.00
355.00
4.00
sets
1,200.00
2.00
sets
1,500.00
1.00
Sets
350.00
1.00
10.00
1.00
3.00
LOT
pc
pc
set
2,500.00
95.00
900.00
5,500.00
1.00
set
4,000.00
bdft
liter
kilos
pcs
pc
set
set
set
36.00
175.00
60.00
35.00
350.00
1,500.00
900.00
500.00
1.00
set
2,000.00
1.00
1.00
1.00
pc
pc
LOT
700.00
750.00
9,000.00
Sets
750.00
Concrete Pail
Crow Bar
D - 1, (1.0m x 2.10m) Panel Door
D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb
D-1, 2"x6"x8' for Door Jamb (Good Lumber)
Enamel Paint (Black)
Ga. 16, GI. Tie Wire
Hand Glooves
Hard Hat
Lavatory-closet-cover with handle & Hinges attached
Lockset (high quality doorknob)
Medicine Kit
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)
Shovel w/ handle
Sledge Hammer (5kg) w/ handle
Supply & Installation Fabricated Steel Billboard
64.00
1.00
29.75
10.00
5.00
1.00
4.00
1.00
9.00
4.00
Sets
750.00
1.00
Sets
350.00
1.00
pc
1,700.00
Code
331.00
2.00
12
20.00
4.00
2.00
8.00
10.00
3.00
850.38
572.00
70.00
140.00
163.33
Description
Hardware
Lumber
Electrical
Furniture
Roofing
Painting
Amenities
Aggregates
Tiles
Windows
PPE
Billboard
Indirect Cost
Package #
1
2
3
4
5
6
7
8
9
10
11
12
13
56
9
18
8
9
20
5
3
4
3
6
2
263.00
304.00
342.00
81.00
60.00
29.75
OFFICE OF THE
CONS
UNIT COST
DESCRIPTION
A. Materials
Soil Poisoning Materials
Red Cement (US Lansco or uqivalent)
Portland Cement Type I
Nylon String
12mm dia. X 6m, plain roundbar for grills
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
# 16 G.I. Tie Wire
1/4 thk. 4'x8' Ordinary Plywood
1
/4" x 4' x 8' Marine Plywood
12mm dia. X 7" Machine Bolt w/ Knot and washer
12mm dia. X 7" Machine Bolt w/ Knot and washer
1"x12"x8' Hardi-Sanipa (Hardiflex-Board)
# 5 CWN
# 5 CWN
# 4 CW Nails
# 2 CW Nails
# 1 CW Nails
# 4 CWN
# 2 CWN
3" CW Nails
3" CW Nails
# 3 CWN
# 2 CWN
# 1 Finishing Nails
1/2 " CW Nails
Quantity Derivation
QUANTITY
Computation
8*6/3 =
(0.6*12*19)/6 =
81.2/2.88 =
direct counting
direct counting
direct counting
276.67*10/1000 =
96.67*10/1000 =
341.33*10/1000 =
81.20*0.05 =
29*0.055 =
51.00 cu.m.
16.00
kilos
331.00
Bags
2.00
kg
23.00
lengths
320.00 Length
20.00 Length
65.00 Length
1.50
rolls
15.00
Kgs.
15.00
shts
29.00
Shts.
10.00
Pcs.
4.00
Pcs.
20.00
Length
3.00
Kgs.
1.00
Kgs.
15.00
kgs
8.00
kgs
5.00
kgs
4.00
kgs.
1.00
kgs.
7.00
kg
7.00
kg
5.00
Kgs.
1.00
Kgs.
2.00
Kgs.
2.00
kg
6.00
10.00
Hacksaw Blade
5.00
direct counting
Unit
2.00
4.00
12.00
1.00
kg
Pcs.
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
80.00
100.00
250.00
350.00
230.00
150.00
220.00
370.00
2,500.00
60.00
365.00
420.00
36.00
36.00
340.00
36.00
36.00
65.00
70.00
70.00
65.00
70.00
65.00
65.00
65.00
70.00
65.00
65.00
65.00
75.00
gal
1,075.00
meter
set
pcs
set
40.00
900.00
115.00
1,500.00
UNIT COST
DESCRIPTION
Unit
1.00
lot
1.00
1.00
unit
set
900.00
90.00
3.00
2.00
1.00
2.00
1.00
2.00
1.00
1.00
length
pc
pc
pc
length
pc
pc
pc
500.00
30.00
40.00
40.00
180.00
98.00
50.00
90.00
2.00
2.00
2.00
1.00
3.00
1.00
length
length
pc
pc
pc
pint
370.00
180.00
40.00
40.00
25.00
100.00
1.00
10.00
1.00
10.00
7.00
1.00
2.00
2.00
3.00
1.00
pc
length
pc
pc
pc
pc
pc
pc
roll
pint
700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00
3.00
pc
100.00
9.00
18.00
1.00
length
pc
pint
365.00
40.00
100.00
5.00
sq.m.
1.5*5.2/0.04 =
1.5*1.5/.04 =
230.00
120.00
10.00
20.00
pc
pc
bags
pc
30.00
30.00
100.00
250.00
6*1.4+0.6*0.8)/0.04 =
68.00
2.00
3.00
1.00
pc
kls.
pc
Lot
30.00
60.00
40.00
No. of
Crew/
Labor
Quantity Derivation
QUANTITY
Computation
UNIT COST/
RATE PER
DAY
UNIT COST
Quantity Derivation
QUANTITY
Computation
DESCRIPTION
Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Juncton Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
10 watts compact flourescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Lighting Outlet ( 4" Porcelain Receptacle)
Female Adaptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)
Unit
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
12.00
7.00
1.00
1.00
pcs.
pcs.
length
pc.
20.00
25.00
240.00
40.00
2.00
60.00
10.00
80.00
3.00
box
m
pc
m
pc
3,900.00
30.00
2.00
12.00
30.00
5.00
3.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00
assy
set
pc
pc
pc
pc
pc
unit
pc
350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00
1.00
set
2,000.00
Sub-Total
A. Materials
Filling Materials
Washed Sand
Washed Gravel
4" x 8' x 16" CHB
17.78*0.5 =
17.78*1 =
Sub-Total
25- 2" x 2" x 12' Coco Lumber
100 - 2"x2"x12' Coco Lumber
20 - 2"x2"x10' Coco Lumber for Bracing
2"x2"x8' Ceiling Joist (Good Lumber)
81.2*4.167 =
1"x2"x8' Wood Stick/Lattice (Good Lumber)
40*1*2*8/12 =
50 - 2" x 2" x 10' Hangers (Good Lumber)
Truss 1: 5 units
2"x5"x14' for Top Chord (Good Lumber)
2*5*2 =
2"x5"x12' for Bottom Chord (Good Lumber)
((2*5*12)/12)*2*5 =
2"x4"x8' for Web Member & Kingpost (Good Lumber)
((2*4*2)/12)*9*5 =
Truss 2: 2 units
2"x5"x12' for Top Chord (Good Lumber)
(2*5*12*2*2)/12 =
2"x5"x14' for Bottom Chord (Good Lumber)
(2*5*14*2*2)/12 =
2"x4"x8' for Web Member & Kingpost (Good Lumber)
(2*4*8*3.5*4)/12 =
Purlins, Wood Cleats & Fascia Board:
((2*3*10)/12)*16*4 =
2"x3"x 10' (Good Lumber)
((2*2*8)/12)*16*6/12 =
2"x2"x 8' (Good Lumber)
Sub-Total
DOORS
D - 1, (1.0m x 2.10m) Panel Door
D-1, 2"x6"x8' for Door Jamb (Good Lumber)
8*2*6*8/12 =
35.00
21.00
24.00
1,800.00
cu.m.
cu.m.
cu.m.
Pcs
550.00
600.00
750.00
12.00
100.00
400.00
67.00
378.96
53.33
167.00
bd ft
bd.ft.
bd.ft.
bdft
bdft
bd ft
20.00
20.00
25.00
36.00
55.00
36.00
116.67
100.00
60.00
bdft.
bdft.
bdft.
36.00
36.00
36.00
40.00
46.67
10.00
bdft.
bdft.
bdft.
36.00
36.00
36.00
320.00
21.33
bdft.
bdft.
36.00
36.00
7.26
sq.m.
3.00
set
5,500.00
64.00
bdft
36.00
UNIT COST
DESCRIPTION
Quantity Derivation
QUANTITY
Computation
Unit
1.00
set
16.23
sq.m.
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
4,000.00
Sub-Total
WINDOWS
2"x6" wooden jamb assembly for W-1 w/ a dimension of
1.8m x 1.2m to include mollion partition at 0.60m interval.
3,456.00
4.00
sets
1,200.00
2,304.00
2.00
sets
1,500.00
280.00
1.00
Sets
350.00
direct counting
9.00
Sets
750.00
4.00
Sets
750.00
1.00
Sets
350.00
Sub-Total
VIII. ROOFING
A. Materials
Colorib Longspan 0.40mm x 1.10m x 4.7m (Green)
(7.6/1)*2+1 =
Colorib Longspan 0.40mm x 1.10m x 3m (Green)
(2.55/1)*2 =
(7.6/2.2)*2+(2.55/2.2)*2 =
Colorib No. 24, x 8' Pre formed Side Gutter
Colorib No. 24, x 8' Pre formed Side End Flashing
47/2.2)*4+(3/2.2)*2 =
Colorib No. 24, x 8' Pre formed End Wall Flashing
(3/2.2)*2 =
(7.6/2.2)+(2.55/2.2) =
Colorib No. 24, x 8' Pre formed Ridgeroll
Roof Sealant
Tex Screw 2 1/2" dia. (for wood)
Blind Rivets
Sub-Total
XII. PAINTING WORKS
Concrete Putty
263.20/20 =
Concrete Neutralizer
263.20/50 =
Polituff
Flat Latex White
263.20/20 =
Semi-Gloss Latex White
263.20/20 =
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White-Semi-Gloss
50.40
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Paint Brush 4"
Paint Brush 2"
Paint Roller 7" with Pan
82.00
17.00
6.00
10.00
11.00
3.00
5.00
2.00
1,300.00
200.00
265.00
14.00
6.00
2.00
14.00
14.00
1.00
6.00
1.00
2.00
2.00
1.00
1.00
1.00
4.00
4.00
2.00
4.00
sq.m.
pcs
pcs
pcs
pcs
pcs
pcs
lit
pc
pc
sq.m.
gal
gal
pcs
gal
gal
gal
gal
gal
pint
pint
pint
pint
pint
gal
pc
pc
set
2,070.00
1,350.00
615.00
615.00
615.00
615.00
350.00
2.50
1.50
335.00
335.00
188.00
425.00
588.00
475.00
520.00
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
UNIT COST
DESCRIPTION
Quantity Derivation
QUANTITY
Computation
Sandpaper #100
Sandpaper #200
Enamel Paint (Black)
10.00
10.00
1.00
Sub-Total
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
Supply & Installation Fabricated Steel Billboard
Building Roof Signage
Sub Total
TOTAL FOR STEEL BILLBOARD AND ROOF SIGNAGE
XIV. BASIC AMENITIES
36" x 75" Wooden Bed
24" x 36" Wooden Table w/ Wooden Chair
BP Apparatus
Stethoscope
Weighing Scale for adult
Weighing Scale for infant
Medicine/Dressing Kit (CART W/ TRAY)
TOTAL FOR BASIC AMENITIES
2. HANDTOOLS AND PROTECTIVE EQUIPMENT (PPE)
Shovel w/ handle
Crow Bar
Concrete Pail
Wheel Barrow
Sledge Hammer (5kg) w/ handle
Hard Hat
Hand Glooves
Medicine Kit
TOTAL FOR HANDTOOLS
3. PRE-ENGINEERING
3.2 Reproduction of plans
TOTAL FOR PRE-ENGINEERING
4. PROJECT SUPERVISION
4.1 Municipal Engineer
4.2 BSPMC Volunteers
TOTAL FOR ENGINEERING SUPERVISION
5. ENVIRONMENTAL IMPACT
5.1 Warning Signs
5.2 Barricades
TOTAL FOR ENGINEERING SUPERVISION
6. ADMINISTRATIVE COST (Pls see separate calculation)
TOTAL FOR ADMINISTRATIVE COST
7. MATERIAL TESTING
TOTAL FOR MATERIAL TESTING
8. TREASURER'S BOND
TOTAL FOR TREASURERS BOND
TOTAL INDIRECT COST
TOTAL (A+B)
9. CONTINGENCY
Unit
No. of
Crew/
Labor
sheet
sheet
liter
UNIT COST/
RATE PER
DAY
50.00
60.00
175.00
1.00
1.00
1.00
LOT
LOT
LOT
1.00
1.00
1.00
1.00
1.00
1.00
1.00
unit
set
unit
unit
unit
unit
set
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
1.00
1.00
10.00
1.00
1.00
5.00
10.00
1.00
pc
pc
pc
pc
pc
pc
pcs
set
700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
500.00
50.00
sht
50.00
6.00
12.00
day
day
5.00
5.00
pc
pc
8,500.00
2,500.00
1.00
1.00
800.00
250.00
300.00
250.00
UNIT COST
DESCRIPTION
Quantity Derivation
QUANTITY
Computation
Unit
No. of
Crew/
Labor
ELSA A. TRUNO
RODSON R. ESCORA
Service Provider
UNIT COST/
RATE PER
DAY
BILL OF QUANTITIES
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
25.00
5.00
7.50
11.00
18.50
25.00
5.00
3.75
TOTAL UNIT
COST
TOTAL
KALAHI MCC
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
80.00
100.00
275.00
350.00
235.00
157.50
231.00
388.50
2,525.00
60.00
365.00
420.00
36.00
36.00
345.00
36.00
36.00
65.00
70.00
70.00
65.00
70.00
65.00
65.00
65.00
70.00
65.00
65.00
4,080.00
1,600.00
91,025.00
700.00
5,405.00
50,400.00
4,620.00
25,252.50
3,787.50
900.00
5,475.00
12,180.00
360.00
144.00
6,900.00
108.00
36.00
975.00
560.00
350.00
260.00
70.00
455.00
455.00
325.00
70.00
130.00
130.00
3,400.00
1,333.33
75,854.17
583.33
4,504.17
42,000.00
3,850.00
21,043.75
3,156.25
750.00
4,562.50
10,150.00
300.00
120.00
5,750.00
90.00
30.00
812.50
466.67
291.67
216.67
58.33
379.17
379.17
270.83
58.33
108.33
108.33
680.00
266.67
15,170.83
116.67
900.83
8,400.00
770.00
4,208.75
631.25
150.00
912.50
2,030.00
60.00
24.00
1,150.00
18.00
6.00
162.50
93.33
58.33
43.33
11.67
75.83
75.83
54.17
11.67
21.67
21.67
65.00
78.75
390.00
787.50
325.00
656.25
65.00
131.25
1,075.00
5,375.00
4,479.17
895.83
40.00
900.00
115.00
1,500.00
80.00
3,600.00
1,380.00
1,500.00
66.67
3,000.00
1,150.00
1,250.00
13.33
600.00
230.00
250.00
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
TOTAL
900.00
90.00
900.00
90.00
500.00
30.00
40.00
40.00
180.00
98.00
50.00
90.00
1,500.00
60.00
40.00
80.00
180.00
196.00
50.00
90.00
370.00
180.00
40.00
40.00
25.00
100.00
740.00
360.00
80.00
40.00
75.00
100.00
700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
100.00
300.00
365.00
40.00
100.00
3,285.00
720.00
100.00
30.00
30.00
100.00
250.00
6,900.00
3,600.00
1,000.00
5,000.00
30.00
60.00
40.00
2,040.00
120.00
120.00
KALAHI MCC
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
750.00
75.00
1,250.00
50.00
33.33
66.67
150.00
163.33
41.67
75.00
616.67
300.00
66.67
33.33
62.50
83.33
583.33
625.00
348.33
41.67
58.33
8.33
20.00
266.67
50.00
83.33
250.00
2,737.50
600.00
83.33
150.00
15.00
250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
5,750.00
3,000.00
833.33
4,166.67
1,700.00
100.00
100.00
1,150.00
600.00
166.67
833.33
340.00
20.00
20.00
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
TOTAL
20.00
25.00
240.00
40.00
240.00
175.00
240.00
40.00
3,900.00
30.00
2.00
12.00
30.00
7,800.00
1,800.00
20.00
960.00
90.00
350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00
2,000.00
KALAHI MCC
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00
200.00
145.83
200.00
33.33
6,500.00
1,500.00
16.67
800.00
75.00
1,458.33
300.00
163.33
216.67
166.67
204.17
54.17
1,250.00
416.67
40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33
2,000.00
1,666.67
333.33
278,574.50
179,702.50
17,645.83
10,937.50
15,500.00
22,500.00
17,645.83
2,083.33
8,333.33
1,395.83
12,947.81
2,444.44
5,705.83
35,940.50
55.00
25.00
25.00
3.00
605.00
625.00
775.00
15.00
5.00
5.00
5.00
25.00
25.00
25.00
41.00
55.00
41.00
21,175.00
13,125.00
18,600.00
27,000.00
79,900.00
2,500.00
10,000.00
1,675.00
15,537.38
2,933.33
6,847.00
5.00
5.00
5.00
41.00
41.00
41.00
4,783.33
4,100.00
2,460.00
5.00
5.00
5.00
41.00
41.00
41.00
1,640.00
1,913.33
410.00
5.00
5.00
41.00
41.00
13,120.00
874.67
68,794.04
3,986.11
3,416.67
2,050.00
1,366.67
1,594.44
341.67
10,933.33
728.89
95,933.75
5,500.00
16,500.00
13,750.00
2,750.00
36.00
2,304.00
1,920.00
384.00
5.00
1,000.00
2,000.00
-
3,529.17
1,187.50
1,100.00
4,500.00
3,529.17
416.67
1,666.67
279.17
2,589.56
488.89
1,141.17
797.22
683.33
410.00
273.33
318.89
68.33
2,186.67
145.78
19,186.75
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
4,000.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
TOTAL
KALAHI MCC
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
4,000.00
3,333.33
22,804.00
19,003.33
1,200.00
4,800.00
4,000.00
800.00
1,500.00
3,000.00
2,500.00
500.00
350.00
350.00
291.67
58.33
902,615.09
689,404.20
750.00
6,750.00
5,625.00
1,125.00
750.00
3,000.00
2,500.00
500.00
350.00
350.00
291.67
58.33
1,723,605.17
1,310,787.57
35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00
29,395.83
6,775.00
5,166.67
5,683.33
1,550.00
2,583.33
591.67
2,708.33
250.00
54,704.17
4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
3,908.33
1,675.00
313.33
4,958.33
6,860.00
395.83
2,600.00
433.33
216.67
210.00
137.50
105.00
104.17
833.33
333.33
58.33
333.33
2,075.00
1,355.00
620.00
620.00
620.00
620.00
355.00
2.50
1.50
335.00
335.00
188.00
425.00
588.00
475.00
520.00
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
666.67
-
3,000.00
6,000.00
3,800.67
134,880.84
256,157.51
5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
50.00
60.00
175.00
500.00
9,000.00
2,500.00
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
TOTAL
500.00
600.00
175.00
29,271.00
416.67
500.00
145.83
24,392.50
9,000.00
2,500.00
11,500.00
11,500.00
7,500.00
2,083.33
9,583.33
9,583.33
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
27,466.00
5,833.33
3,400.00
1,666.67
1,275.00
5,833.33
2,380.00
2,500.00
22,888.33
700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
500.00
7,600.00
560.00
720.00
760.00
1,360.00
600.00
1,400.00
280.00
400.00
6,080.00
700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
500.00
50.00
2,500.00
2,500.00
800.00
250.00
4,800.00
3,000.00
7,800.00
300.00
250.00
1,500.00
1,250.00
2,750.00
Err:509
82.25%
KALAHI MCC
GRANT
4,000.00
4,000.00
3,375.00
3,375.00
#REF!
#REF!
#REF!
1,200.00
1,000.00
2,200.00
Err:509
Err:509
1,914.94
1,914.94
Err:509
675,561.22
#REF!
COMMUNITY
INKIND
3,000.00
3,000.00
BLGU
CASH
MLGU
INKIND
CASH
83.33
100.00
29.17
4,878.50
1,500.00
416.67
1,916.67
1,916.67
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67
140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00
2,500.00
2,500.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
300.00
250.00
550.00
Err:509
Err:509
2,085.06
2,085.06
3,375.00
3,375.00
Err:509
Err:509
#REF!
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
TOTAL
KALAHI MCC
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
794,300.00
249,325.00
18,150.00
###
521,329.17
Recommending Approval:
Approved by:
CARMEN A. GAUDIANO
ANTONIO ALAM
Municipal Engineer
BSPMC Chairperson
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
680.00
266.67
15,170.83
116.67
900.83
8,400.00
770.00
4,208.75
631.25
150.00
912.50
2,030.00
60.00
24.00
1,150.00
18.00
6.00
162.50
93.33
58.33
43.33
11.67
75.83
75.83
54.17
11.67
21.67
21.67
680.00
266.67
15,170.83
116.67
900.83
8,400.00
770.00
4,208.75
631.25
150.00
912.50
2,030.00
60.00
24.00
1,150.00
18.00
6.00
162.50
93.33
58.33
43.33
11.67
75.83
75.83
54.17
11.67
21.67
21.67
4,080.00
1,600.00
91,025.00
700.00
5,405.00
50,400.00
4,620.00
25,252.50
3,787.50
900.00
5,475.00
12,180.00
360.00
144.00
6,900.00
108.00
36.00
975.00
560.00
350.00
260.00
70.00
455.00
455.00
325.00
70.00
130.00
130.00
65.00
131.25
65.00
131.25
390.00
787.50
895.83
895.83
5,375.00
13.33
600.00
230.00
250.00
13.33
600.00
230.00
250.00
80.00
3,600.00
1,380.00
1,500.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
150.00
15.00
-
150.00
15.00
-
900.00
90.00
-
250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00
250.00
10.00
6.67
13.33
30.00
32.67
8.33
15.00
1,500.00
60.00
40.00
80.00
180.00
196.00
50.00
90.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
740.00
360.00
80.00
40.00
75.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
300.00
3,285.00
720.00
100.00
1,150.00
600.00
166.67
833.33
1,150.00
600.00
166.67
833.33
6,900.00
3,600.00
1,000.00
5,000.00
340.00
20.00
20.00
340.00
20.00
20.00
2,040.00
120.00
120.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
40.00
29.17
40.00
6.67
40.00
29.17
40.00
6.67
240.00
175.00
240.00
40.00
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33
7,800.00
1,800.00
20.00
960.00
90.00
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00
333.33
333.33
2,000.00
35,940.50
35,940.50
215,643.00
3,529.17
2,187.50
3,100.00
4,500.00
3,529.17
416.67
1,666.67
279.17
2,589.56
488.89
1,141.17
3,529.17
2,187.50
3,100.00
4,500.00
3,529.17
416.67
1,666.67
279.17
2,589.56
488.89
1,141.17
21,175.00
13,125.00
18,600.00
27,000.00
21,175.00
2,500.00
10,000.00
1,675.00
15,537.38
2,933.33
6,847.00
797.22
683.33
410.00
797.22
683.33
410.00
4,783.33
4,100.00
2,460.00
273.33
318.89
68.33
273.33
318.89
68.33
1,640.00
1,913.33
410.00
2,186.67
145.78
131.25
2,186.67
145.78
131.25
13,120.00
874.67
115,120.50
2,750.00
2,750.00
16,500.00
384.00
384.00
2,304.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
666.67
666.67
4,000.00
3,800.67
3,800.67
22,804.00
800.00
800.00
4,800.00
500.00
500.00
3,000.00
58.33
58.33
350.00
118,825.34
118,825.34
827,285.04
1,125.00
1,125.00
6,750.00
500.00
500.00
3,000.00
58.33
58.33
350.00
224,046.51
224,046.51
1,572,945.09
5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
83.33
100.00
29.17
4,878.50
83.33
100.00
29.17
4,878.50
500.00
600.00
175.00
29,271.00
1,500.00
416.67
1,916.67
1,916.67
1,500.00
416.67
1,916.67
1,916.67
9,000.00
2,500.00
11,500.00
11,500.00
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
4,577.67
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
27,466.00
140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00
140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00
2,500.00
2,500.00
2,500.00
2,500.00
700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
500.00
7,600.00
2,500.00
2,500.00
4,800.00
3,000.00
7,800.00
4,800.00
3,000.00
7,800.00
300.00
250.00
550.00
Err:509
Err:509
2,085.06
2,085.06
3,375.00
3,375.00
Err:509
Err:509
#REF!
1,500.00
1,250.00
2,750.00
Err:509
Err:509
4,000.00
4,000.00
3,375.00
3,375.00
Err:509
Err:509
#REF!
4,800.00
4,800.00
#REF!
#REF!
300.00
250.00
550.00
Err:509
Err:509
2,085.06
2,085.06
3,375.00
3,375.00
Err:509
Err:509
#REF!
4,800.00
3,000.00
7,800.00
#REF!
#REF!
-
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
INKIND
TOTAL LCC
(CASH &
INKIND)
TOTAL
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
4,800.00
521,329.17
23,700.00
545,029.17
794,300.00
Noted by:
GEORGE S. ISULAT
RCIS
OFFICE OF THE B
CONS
UNIT COST
DESCRIPTION
A. Materials
Nylon String
Anti-Termite (e.g. solignum, )
1/4" x 1/4" x 3' Plastic Screen
1/4 thk. 4'x8' Ordinary Plywood
1
/4" x 4' x 8' Marine Plywood
# 5 CWN
# 4 CW Nails
# 3 CWN
# 2 CWN
# 1 CW Nails
# 1 Finishing Nails
1/2 " CW Nails
Portland Cement Type I
Red Cement (US Lansco or uqivalent)
Soil Poisoning Materials
12mm dia. X 7" Machine Bolt w/ Knot and washer
12mm dia. X 6m, plain roundbar for grills
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
# 16 G.I. Tie Wire
Hacksaw Blade
D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic jamb
Lavatory-closet-cover with handle & Hinges attached
Lockset (high quality doorknob)
Quantity Derivation
QUANTITY
Computation
direct counting
direct counting
81.2/2.88 =
96.67*10/1000 =
81.20*0.05 =
29*0.055 =
8*6/3 =
direct counting
(0.6*12*19)/6 =
Unit
2.00
kg
5.00
gal
2.00
meter
15.00
shts
29.00
Shts.
4.00
Kgs.
19.00
kgs
19.00
Kgs.
10.00
kgs.
5.00
kgs
2.00
Kgs.
8.00
kg
331.00
Bags
16.00
kilos
51.00 cu.m.
14.00
Pcs.
23.00
lengths
320.00 Length
20.00 Length
65.00 Length
1.50
rolls
15.00
Kgs.
10.00 Pcs.
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
350.00
1,075.00
40.00
365.00
420.00
36.00
65.00
65.00
70.00
70.00
65.00
65.00
250.00
100.00
80.00
36.00
230.00
150.00
220.00
370.00
2,500.00
60.00
75.00
1.00
set
4,000.00
1.00
4.00
12.00
1.00
1.00
1.00
3.00
2.00
1.00
2.00
set
set
pcs
lot
unit
set
length
pc
pc
pc
1,500.00
900.00
115.00
900.00
90.00
500.00
30.00
40.00
40.00
UNIT COST
DESCRIPTION
Quantity Derivation
QUANTITY
Computation
1.5*5.2/0.04 =
1.5*1.5/.04 =
6*1.4+0.6*0.8)/0.04 =
Unit
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
1.00
2.00
1.00
1.00
2.00
2.00
2.00
1.00
3.00
1.00
1.00
10.00
1.00
10.00
7.00
1.00
2.00
2.00
3.00
1.00
3.00
9.00
18.00
1.00
5.00
230.00
120.00
10.00
20.00
length
pc
pc
pc
length
length
pc
pc
pc
pint
pc
length
pc
pc
pc
pc
pc
pc
roll
pint
pc
length
pc
pint
sq.m.
pc
pc
bags
pc
180.00
98.00
50.00
90.00
370.00
180.00
40.00
40.00
25.00
100.00
700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00
100.00
365.00
40.00
100.00
68.00
2.00
3.00
1.00
12.00
7.00
1.00
1.00
2.00
60.00
10.00
80.00
3.00
5.00
3.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00
pc
kls.
pc
Lot
pcs.
pcs.
length
pc.
box
m
pc
m
pc
assy
set
pc
pc
pc
pc
pc
unit
pc
30.00
60.00
40.00
30.00
30.00
100.00
250.00
20.00
25.00
240.00
40.00
3,900.00
30.00
2.00
12.00
30.00
350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00
UNIT COST
DESCRIPTION
Quantity Derivation
QUANTITY
Computation
Unit
1.00
set
Panel Board (4-branches) to include 30A Main, 20A power outlet, 15A
lighting outlet & 15A spare)
No. of
Crew/
Labor
UNIT COST/
RATE PER
DAY
2,000.00
Sub-Total
Concrete Putty
Concrete Neutralizer
Polituff
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel Chocolate Brown
Quick Dry Enamel White-Semi-Gloss
Enamel Paint (Black)
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Paint Brush 4"
Paint Brush 2"
Paint Roller 7" with Pan
Sandpaper #100
Sandpaper #200
263.20/20 =
263.20/50 =
14.00
6.00
2.00
14.00
14.00
1.00
6.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
4.00
4.00
2.00
4.00
10.00
10.00
gal
gal
pcs
gal
gal
gal
gal
liter
gal
pint
pint
pint
pint
pint
gal
pc
pc
set
sheet
sheet
335.00
335.00
188.00
425.00
588.00
475.00
520.00
175.00
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
50.00
60.00
35.00
24.00
17.78*0.5 =
21.00
1,800.00
cu.m.
cu.m.
cu.m.
Pcs
550.00
750.00
600.00
12.00
263.20/20 =
263.20/20 =
50.40
Sub-Total
A. Materials
Filling Materials
Washed Gravel
Washed Sand
4" x 8' x 16" CHB
Sub-Total
IV. FORMWORKS & SCAFFOLDING
A. Materials
1"x2"x8' Wood Stick/Lattice (Good Lumber)
40*1*2*8/12 =
2"x2"x8' Ceiling Joist (Good Lumber)
81.2*4.167 =
50 - 2" x 2" x 10' Hangers (Good Lumber)
25- 2" x 2" x 12' Coco Lumber
100 - 2"x2"x12' Coco Lumber
20 - 2"x2"x10' Coco Lumber for Bracing
Truss 1: 5 units
2"x5"x14' for Top Chord (Good Lumber)
2*5*2 =
2"x5"x12' for Bottom Chord (Good Lumber)
((2*5*12)/12)*2*5 =
2"x4"x8' for Web Member & Kingpost (Good Lumber)
((2*4*2)/12)*9*5 =
Truss 2: 2 units
2"x5"x12' for Top Chord (Good Lumber)
(2*5*12*2*2)/12 =
2"x5"x14' for Bottom Chord (Good Lumber)
(2*5*14*2*2)/12 =
2"x4"x8' for Web Member & Kingpost (Good Lumber)
(2*4*8*3.5*4)/12 =
Purlins, Wood Cleats & Fascia Board:
((2*3*10)/12)*16*4 =
2"x3"x 10' (Good Lumber)
((2*2*8)/12)*16*6/12 =
2"x2"x 8' (Good Lumber)
1"x12"x8' Hardi-Sanipa (Hardiflex-Board)
direct counting
Sub-Total
VII. Furniture
A. Materials
23.00
sq.m.
53.33
378.96
167.00
100.00
400.00
67.00
bdft
bdft
bd ft
bd ft
bd.ft.
bd.ft.
55.00
36.00
36.00
20.00
20.00
25.00
116.67
100.00
60.00
bdft.
bdft.
bdft.
36.00
36.00
36.00
40.00
46.67
10.00
bdft.
bdft.
bdft.
36.00
36.00
36.00
320.00
21.33
20.00
bdft.
bdft.
Length
36.00
36.00
340.00
18.44
sq.m.
UNIT COST
DESCRIPTION
Unit
3.00
set
5,500.00
64.00
bdft
36.00
No. of
Crew/
Labor
Quantity Derivation
QUANTITY
Computation
8*2*6*8/12 =
UNIT COST/
RATE PER
DAY
3,456.00
4.00
sets
1,200.00
2,304.00
2.00
sets
1,500.00
280.00
1.00
Sets
350.00
Sub-Total
WINDOWS
16.23
sq.m.
Sub-Total
W - 1, (1.80m X 1.20m) twelve Blades clear glass jalousie
window on standard aluminum housing w/ 12mm dia. hole
in between blades interval
direct counting
9.00
Sets
750.00
4.00
Sets
750.00
1.00
Sets
350.00
82.00
17.00
6.00
10.00
11.00
3.00
5.00
2.00
1,300.00
200.00
sq.m.
pcs
pcs
pcs
pcs
pcs
pcs
lit
pc
pc
2,070.00
1,350.00
615.00
615.00
615.00
615.00
350.00
2.50
1.50
1.00
1.00
LOT
1.00
LOT
2,500.00
Sub Total
TOTAL FOR STEEL BILLBOARD AND ROOF SIGNAGE
XIV. BASIC AMENITIES
36" x 75" Wooden Bed
24" x 36" Wooden Table w/ Wooden Chair
BP Apparatus
Stethoscope
Weighing Scale for adult
Weighing Scale for infant
Medicine/Dressing Kit (CART W/ TRAY)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
unit
set
unit
unit
unit
unit
set
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
LOT
8,500.00
Sub-Total
UNIT COST
DESCRIPTION
Unit
1.00
1.00
10.00
1.00
1.00
5.00
10.00
1.00
pc
pc
pc
pc
pc
pc
pcs
set
700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
500.00
5.00
5.00
pc
pc
300.00
250.00
No. of
Crew/
Labor
Quantity Derivation
QUANTITY
Computation
ELSA A. TRUNO
RODSON R. ESCORA
Service Provider
UNIT COST/
RATE PER
DAY
BILL OF QUANTITIES
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
25.00
5.00
7.50
11.00
18.50
25.00
3.75
TOTAL UNIT
COST
TOTAL
KALAHI MCC
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
350.00
1,075.00
40.00
365.00
420.00
36.00
65.00
65.00
70.00
70.00
65.00
65.00
275.00
100.00
80.00
36.00
235.00
157.50
231.00
388.50
2,525.00
60.00
78.75
700.00
5,375.00
80.00
5,475.00
12,180.00
144.00
1,235.00
1,235.00
700.00
350.00
130.00
520.00
91,025.00
1,600.00
4,080.00
504.00
5,405.00
50,400.00
4,620.00
25,252.50
3,787.50
900.00
787.50
583.33
4,479.17
66.67
4,562.50
10,150.00
120.00
1,029.17
1,029.17
583.33
291.67
108.33
433.33
75,854.17
1,333.33
3,400.00
420.00
4,504.17
42,000.00
3,850.00
21,043.75
3,156.25
750.00
656.25
116.67
895.83
13.33
912.50
2,030.00
24.00
205.83
205.83
116.67
58.33
21.67
86.67
15,170.83
266.67
680.00
84.00
900.83
8,400.00
770.00
4,208.75
631.25
150.00
131.25
4,000.00
4,000.00
3,333.33
666.67
1,500.00
900.00
115.00
1,500.00
3,600.00
1,380.00
1,250.00
3,000.00
1,150.00
250.00
600.00
230.00
900.00
90.00
500.00
30.00
40.00
40.00
900.00
90.00
1,500.00
60.00
40.00
80.00
750.00
75.00
1,250.00
50.00
33.33
66.67
150.00
15.00
250.00
10.00
6.67
13.33
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
TOTAL
KALAHI MCC
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
180.00
98.00
50.00
90.00
370.00
180.00
40.00
40.00
25.00
100.00
700.00
75.00
418.00
5.00
10.00
10.00
12.00
160.00
20.00
100.00
100.00
365.00
40.00
100.00
180.00
196.00
50.00
90.00
740.00
360.00
80.00
40.00
75.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
300.00
3,285.00
720.00
100.00
150.00
163.33
41.67
75.00
616.67
300.00
66.67
33.33
62.50
83.33
583.33
625.00
348.33
41.67
58.33
8.33
20.00
266.67
50.00
83.33
250.00
2,737.50
600.00
83.33
30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
30.00
30.00
100.00
250.00
6,900.00
3,600.00
1,000.00
5,000.00
30.00
60.00
40.00
2,040.00
120.00
120.00
5,750.00
3,000.00
833.33
4,166.67
1,700.00
100.00
100.00
1,150.00
600.00
166.67
833.33
340.00
20.00
20.00
20.00
25.00
240.00
40.00
3,900.00
30.00
2.00
12.00
30.00
350.00
120.00
98.00
65.00
40.00
35.00
13.00
1,500.00
100.00
240.00
175.00
240.00
40.00
7,800.00
1,800.00
20.00
960.00
90.00
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00
200.00
145.83
200.00
33.33
6,500.00
1,500.00
16.67
800.00
75.00
1,458.33
300.00
163.33
216.67
166.67
204.17
54.17
1,250.00
416.67
40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
55.00
25.00
25.00
3.00
TOTAL UNIT
COST
TOTAL
KALAHI MCC
GRANT
2,000.00
2,000.00
335.00
335.00
188.00
425.00
588.00
475.00
520.00
175.00
520.00
130.00
126.00
165.00
126.00
125.00
250.00
100.00
35.00
100.00
50.00
60.00
275,674.50
4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
175.00
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
500.00
600.00
29,446.00
#REF!
3,908.33
1,675.00
313.33
4,958.33
6,860.00
395.83
2,600.00
145.83
433.33
216.67
210.00
137.50
105.00
104.17
833.33
333.33
58.33
333.33
416.67
500.00
22,020.00
21,175.00
18,600.00
13,125.00
27,000.00
79,900.00
17,645.83
15,500.00
10,937.50
22,500.00
17,645.83
605.00
775.00
625.00
15.00
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
1,666.67
333.33
#REF!
#REF!
#REF!
#REF!
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
29.17
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,404.00
3,529.17
3,100.00
1,187.50
4,500.00
3,529.17
1,000.00
-
5.00
5.00
5.00
5.00
55.00
41.00
41.00
25.00
25.00
25.00
2,933.33
15,537.38
6,847.00
2,500.00
10,000.00
1,675.00
2,444.44
12,947.81
5,705.83
2,083.33
8,333.33
1,395.83
488.89
2,589.56
1,141.17
416.67
1,666.67
279.17
5.00
5.00
5.00
41.00
41.00
41.00
4,783.33
4,100.00
2,460.00
5.00
5.00
5.00
41.00
41.00
41.00
1,640.00
1,913.33
410.00
5.00
5.00
5.00
41.00
41.00
345.00
13,120.00
874.67
6,900.00
75,694.04
3,986.11
3,416.67
2,050.00
1,366.67
1,594.44
341.67
10,933.33
728.89
5,750.00
9,729.17
797.22
683.33
410.00
273.33
318.89
68.33
2,186.67
145.78
1,150.00
1,945.83
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
TOTAL
500.00
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
5,500.00
16,500.00
13,750.00
2,750.00
36.00
2,304.00
1,920.00
384.00
1,200.00
4,800.00
4,000.00
800.00
1,500.00
3,000.00
2,500.00
500.00
350.00
350.00
291.67
58.33
26,954.00
15,670.00
3,134.00
3,350.00
2,791.67
558.33
750.00
6,750.00
5,625.00
1,125.00
750.00
3,000.00
2,500.00
500.00
350.00
350.00
291.67
58.33
10,100.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
KALAHI MCC
GRANT
2,075.00
1,355.00
620.00
620.00
620.00
620.00
355.00
2.50
1.50
9,000.00
2,500.00
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
#REF!
35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00
29,395.83
6,775.00
5,166.67
5,683.33
1,550.00
2,583.33
591.67
2,708.33
250.00
54,704.17
9,000.00
90,685.00
2,500.00
102,185.00
102,185.00
7,500.00
75,570.83
2,083.33
85,154.17
85,154.17
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
5,833.33
3,400.00
1,666.67
1,275.00
5,833.33
2,380.00
2,500.00
#REF!
#REF!
#REF!
#REF!
5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
1,500.00
15,114.17
416.67
17,030.83
17,030.83
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
COST SHARING
UNIT COST
ADD:
FREIGHT &
HANDLING
COST
TOTAL UNIT
COST
700.00
900.00
95.00
1,700.00
750.00
350.00
35.00
500.00
300.00
250.00
TOTAL
KALAHI MCC
GRANT
27,466.00
22,888.33
700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
500.00
7,600.00
560.00
720.00
760.00
1,360.00
600.00
1,400.00
280.00
400.00
6,080.00
1,500.00
1,250.00
2,750.00
1,200.00
1,000.00
2,200.00
Recommending Approval:
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
-
4,577.67
140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00
300.00
250.00
550.00
Approved by:
675561.2258889
CARMEN A. GAUDIANO
ANTONIO ALAM
Municipal Engineer
BSPMC Chairperson
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
116.67
895.83
13.33
912.50
2,030.00
24.00
205.83
205.83
116.67
58.33
21.67
86.67
15,170.83
266.67
680.00
84.00
900.83
8,400.00
770.00
4,208.75
631.25
150.00
131.25
116.67
895.83
13.33
912.50
2,030.00
24.00
205.83
205.83
116.67
58.33
21.67
86.67
15,170.83
266.67
680.00
84.00
900.83
8,400.00
770.00
4,208.75
631.25
150.00
131.25
700.00
5,375.00
80.00
5,475.00
12,180.00
144.00
1,235.00
1,235.00
700.00
350.00
130.00
520.00
91,025.00
1,600.00
4,080.00
504.00
5,405.00
50,400.00
4,620.00
25,252.50
3,787.50
900.00
787.50
666.67
666.67
4,000.00
250.00
600.00
230.00
250.00
600.00
230.00
1,500.00
3,600.00
1,380.00
150.00
15.00
250.00
10.00
6.67
13.33
150.00
15.00
250.00
10.00
6.67
13.33
900.00
90.00
1,500.00
60.00
40.00
80.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
30.00
32.67
8.33
15.00
123.33
60.00
13.33
6.67
12.50
16.67
116.67
125.00
69.67
8.33
11.67
1.67
4.00
53.33
10.00
16.67
50.00
547.50
120.00
16.67
180.00
196.00
50.00
90.00
740.00
360.00
80.00
40.00
75.00
100.00
700.00
750.00
418.00
50.00
70.00
10.00
24.00
320.00
60.00
100.00
300.00
3,285.00
720.00
100.00
1,150.00
600.00
166.67
833.33
1,150.00
600.00
166.67
833.33
6,900.00
3,600.00
1,000.00
5,000.00
340.00
20.00
20.00
340.00
20.00
20.00
2,040.00
120.00
120.00
40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33
40.00
29.17
40.00
6.67
1,300.00
300.00
3.33
160.00
15.00
291.67
60.00
32.67
43.33
33.33
40.83
10.83
250.00
83.33
240.00
175.00
240.00
40.00
7,800.00
1,800.00
20.00
960.00
90.00
1,750.00
360.00
196.00
260.00
200.00
245.00
65.00
1,500.00
500.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
333.33
#REF!
TOTAL LCC
(CASH &
INKIND)
INKIND
-
333.33
2,000.00
#REF!
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
29.17
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,404.00
#REF!
4,690.00
2,010.00
376.00
5,950.00
8,232.00
475.00
3,120.00
175.00
520.00
260.00
252.00
165.00
126.00
125.00
1,000.00
400.00
70.00
400.00
500.00
600.00
26,424.00
#REF!
781.67
335.00
62.67
991.67
1,372.00
79.17
520.00
29.17
86.67
43.33
42.00
27.50
21.00
20.83
166.67
66.67
11.67
66.67
83.33
100.00
4,404.00
3,529.17
3,100.00
2,187.50
4,500.00
3,529.17
3,529.17
3,100.00
2,187.50
4,500.00
3,529.17
21,175.00
18,600.00
13,125.00
27,000.00
21,175.00
488.89
2,589.56
1,141.17
416.67
1,666.67
279.17
488.89
2,589.56
1,141.17
416.67
1,666.67
279.17
2,933.33
15,537.38
6,847.00
2,500.00
10,000.00
1,675.00
797.22
683.33
410.00
797.22
683.33
410.00
4,783.33
4,100.00
2,460.00
273.33
318.89
68.33
273.33
318.89
68.33
1,640.00
1,913.33
410.00
2,186.67
145.78
1,150.00
1,945.83
2,186.67
145.78
1,150.00
1,945.83
13,120.00
874.67
6,900.00
11,675.00
#REF!
-
TOTAL
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
2,750.00
2,750.00
16,500.00
384.00
384.00
2,304.00
800.00
800.00
4,800.00
500.00
500.00
3,000.00
58.33
58.33
350.00
3,134.00
3,134.00
18,804.00
558.33
558.33
3,350.00
1,125.00
1,125.00
6,750.00
500.00
500.00
3,000.00
58.33
58.33
350.00
#REF!
#REF!
#REF!
#REF!
#REF!
5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
5,879.17
1,355.00
1,033.33
1,136.67
310.00
516.67
118.33
541.67
50.00
10,940.83
35,275.00
8,130.00
6,200.00
6,820.00
1,860.00
3,100.00
710.00
3,250.00
300.00
65,645.00
1,500.00
15,114.17
416.67
17,030.83
17,030.83
1,500.00
15,114.17
416.67
17,030.83
17,030.83
9,000.00
90,685.00
2,500.00
102,185.00
102,185.00
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
1,166.67
680.00
333.33
255.00
1,166.67
476.00
500.00
7,000.00
4,080.00
2,000.00
1,530.00
7,000.00
2,856.00
3,000.00
HARING
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL LCC
(CASH &
INKIND)
INKIND
TOTAL
4,577.67
4,577.67
27,466.00
140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00
140.00
180.00
190.00
340.00
150.00
350.00
70.00
100.00
1,520.00
700.00
900.00
950.00
1,700.00
750.00
1,750.00
350.00
500.00
7,600.00
300.00
250.00
550.00
300.00
250.00
550.00
1,500.00
1,250.00
2,750.00
Noted by:
GEORGE S. ISULAT
RCIS
OCTOBER/09/2013
Barangay
MASAPLOD SUR
Municipality
DAUIN
Sub-project Duration
Province
NEGROS ORIENTAL
DESCRIPTION
PACKAGES
PACKAGE ITEMS
QTY
UNIT
UNIT COST
TOTAL
PROC METHOD
1st Tranche
KC Grant
Package 1: HARDWARE
Materials
Anti-Termite (e.g. solignum, )
1
/4" x 4' x 8' Marine Plywood
3.00
can
300.00
900.00
594.00
29.00
Shts.
420.00
12,180.00
8,038.80
2.00
shts.
355.00
710.00
468.60
# 1 Finishing Nails
2.00
Kgs.
65.00
130.00
85.80
4.00
Kgs.
60.00
240.00
158.40
# 2 CWN
2.00
kgs.
65.00
130.00
85.80
# 3 CWN
12.00
Kgs.
65.00
780.00
514.80
# 4 CWN
20.00
Kgs.
65.00
1,300.00
858.00
# 5 CWN
4.00
Kgs.
36.00
144.00
95.04
#1 CWN
2.00
Kgs.
65.00
130.00
85.80
1"x1"x3' Meshwire
4.00
meter
80.00
320.00
211.20
20.00
Length
345.00
6,900.00
4,554.00
53.33
bdft
55.00
2,933.33
1,936.00
8.00
kg
65.00
520.00
343.20
10.00
shts.
335.00
3,350.00
2,211.00
2.00
meter
40.00
80.00
52.80
133.00
Length
155.00
20,615.00
13,605.90
195.00
pc
30.00
5,850.00
3,861.00
68.00
pc
30.00
2,040.00
1,346.40
57.00
pc
30.00
1,710.00
1,128.60
4.00
gal
1,050.00
4,200.00
2,772.00
200.00
pc
1.50
300.00
198.00
10.00
Pcs.
75.00
750.00
495.00
Nylon String
3.00
roll
30.00
90.00
59.40
Portland Cement
304.00
Bags
245.00
74,480.00
49,156.80
16.00
kilos
100.00
1,600.00
1,056.00
Roof Sealant
2.00
lit
355.00
710.00
468.60
1,300.00
pc
2.50
3,250.00
2,145.00
7.00
pc
40.00
280.00
184.80
6.00
kls.
60.00
360.00
237.60
4.00
meter
80.00
320.00
211.20
14.00
Pcs.
36.00
504.00
332.64
12.00
pcs
115.00
1,380.00
910.80
220.00
length
155.00
34,100.00
22,506.00
PCPP
PACKAGES
PACKAGE ITEMS
QTY
UNIT
UNIT COST
TOTAL
PROC METHOD
1st Tranche
KC Grant
39.00
23.00 lengths
length
60.00
length
205.00
7,995.00
235.00
5,405.00
5,276.70
3,567.30
355.00
21,300.00
14,058.00
At Lavatory:
D - 2, (0.80m x 2.10m) Plastic(PVC) Door w/ plastic
jamb
1.00
set
4,000.00
4,000.00
2,640.00
1.00
liter
175.00
175.00
115.50
25.75
kilos
60.00
1,545.00
1,019.70
1.00
set
1,500.00
1,500.00
990.00
4.00
set
900.00
3,600.00
2,376.00
1.00
lot
A. Materials
Kitchen Sink,(0.4m x 0.6m, Single Tab,
Stainless)
1.00
pc
700.29
700.29
462.19
7.00
pc
10.00
70.00
46.20
2.00
pc
160.00
320.00
211.20
2.00
pc
12.00
24.00
15.84
1.00
pc
10.00
10.00
6.60
10.00
pc
5.00
50.00
33.00
1.00
pc
418.00
418.00
275.88
10.00
length
75.00
750.00
495.00
26.40
1.00
pc
40.00
40.00
3.00
pc
40.00
120.00
79.20
3.00
length
180.00
540.00
356.40
1.00
pc
90.00
90.00
9.00
length
365.00
3,285.00
3.00
pc
25.00
75.00
18.00
pc
40.00
720.00
59.40
2,168.10
49.50
475.20
2.00
length
370.00
740.00
2.00
pc
30.00
60.00
2.00
pc
40.00
80.00
1.00
pc
50.00
50.00
2.00
pc
98.00
196.00
3.00
length
500.00
1,500.00
1.00
set
90.00
90.00
3.00
pc
100.00
300.00
198.00
1.00
unit
900.00
900.00
594.00
Solvent Cement
3.00
pint
100.00
300.00
198.00
Teflon Tape
3.00
roll
20.00
60.00
39.60
1.00
Lot
52.80
33.00
129.36
990.00
59.40
Interior Rough in
12.00
pcs.
20.00
240.00
158.40
7.00
pcs.
25.00
175.00
115.50
1.00
length
240.00
240.00
158.40
Screw Insulator
1.00
pc.
40.00
40.00
26.40
2.00
box
3,900.00
7,800.00
5,148.00
1,188.00
Electrical Wires
3.5mm2 THW Stranded
PCPP
39.60
A. Materials
2" x 4" Utility Boxes Pvc
488.40
60.00
30.00
1,800.00
PVC Clamp
10.00
pc
2.00
20.00
13.20
80.00
12.00
960.00
633.60
PACKAGES
PACKAGE ITEMS
QTY
UNIT
UNIT COST
TOTAL
PROC METHOD
1st Tranche
KC Grant
3.00
pc
30.00
90.00
59.40
5.00
assy
350.00
1,750.00
1,155.00
Electrical Fixtures
3.00
set
120.00
360.00
237.60
2.00
pc
98.00
196.00
129.36
4.00
pc
65.00
260.00
171.60
5.00
pc
40.00
200.00
132.00
7.00
pc
35.00
245.00
161.70
Female Adaptor
5.00
pc
13.00
65.00
42.90
1.00
unit
1,500.00
1,500.00
990.00
5.00
pc
100.00
500.00
330.00
1.00
set
2,000.00
2,000.00
1,320.00
14.00
gal
335.00
4,690.00
3,095.40
1,326.60
6.00
gal
335.00
2,010.00
Polituff
2.00
pcs
188.00
376.00
248.16
14.00
gal
425.00
5,950.00
3,927.00
5,433.12
14.00
gal
588.00
8,232.00
1.00
gal
475.00
475.00
313.50
6.00
gal
520.00
3,120.00
2,059.20
1.00
gal
520.00
520.00
343.20
2.00
pint
130.00
260.00
171.60
2.00
pint
126.00
252.00
166.32
1.00
pint
165.00
165.00
108.90
1.00
pint
126.00
126.00
83.16
1.00
pint
125.00
125.00
82.50
Paint Thinner
4.00
gal
250.00
1,000.00
660.00
4.00
pc
100.00
400.00
264.00
2.00
pc
35.00
70.00
46.20
4.00
set
100.00
400.00
264.00
Sandpaper #100
10.00
sheet
50.00
500.00
330.00
Sandpaper #200
10.00
sheet
60.00
600.00
396.00
1.00
pc
700.00
700.00
462.00
1.00
pc
900.00
900.00
594.00
Concrete Pail
10.00
pc
95.00
950.00
627.00
Wheel Barrow
1.00
pc
1,700.00
1,700.00
1,122.00
1.00
pc
750.00
750.00
495.00
Hard Hat
5.00
pc
350.00
1,750.00
1,155.00
10.00
pcs
35.00
350.00
231.00
1.00
set
500.00
500.00
330.00
295,606.62
195,100.37
Hand Glooves
Medicine kit box to include Betadine 100ml, Agua
Oxinada 100ml, cotton 5grams, bandage 5pcs, &
1st aide tape 1 roll
Sub-Total
Package 2: LUMBER
Materials
123.00
bdft
25.00
3,075.00
48.00
bdft
25.00
1,200.00
160.00
bdft
25.00
4,000.00
PCPP
PACKAGES
PACKAGE ITEMS
QTY
UNIT
UNIT COST
TOTAL
PROC METHOD
1st Tranche
168.00
bdft
25.00
4,200.00
504.00
bdft
25.00
12,600.00
281.00
bdft
25.00
7,025.00
84.00
bdft
25.00
2,100.00
65.38
bdft
25.00
1,634.50
150.00
bd ft
25.00
3,750.00
116.67
bdft.
41.00
4,783.33
100.00
bdft.
41.00
4,100.00
60.00
bdft.
41.00
2,460.00
40.00
bdft.
41.00
1,640.00
46.67
bdft.
41.00
1,913.33
10.00
bdft.
41.00
410.00
320.00
bdft.
41.00
13,120.00
Package 2
KC Grant
21.33
bdft.
41.00
874.67
378.96
bdft
41.00
15,537.38
167.00
bd ft
41.00
Sub-Total
6,847.00
91,270.21
Package 3: FURNITURE
D - 1, (1.0m x 2.10m) Panel Door
3.00
set
5,500.00
16,500.00
64.00
bdft
36.00
2,304.00
4.00
sets
1,200.00
4,800.00
2.00
sets
1,500.00
3,000.00
1.00
Sets
350.00
350.00
1.00
unit
7,000.00
7,000.00
1.00
set
4,080.00
4,080.00
Package 3
Sub-Total
Materials:
38,034.00
Package 4: ROOFING
17.00
pcs
2,075.00
35,275.00
6.00
pcs
1,355.00
8,130.00
10.00
pcs
620.00
6,200.00
11.00
pcs
620.00
6,820.00
3.00
pcs
620.00
1,860.00
Package 4
PCPP
Materials:
QTY
UNIT
5.00
UNIT COST
pcs
620.00
Sub-Total
TOTAL
3,100.00
PACKAGES
Package 4
PACKAGE ITEMS
PROC METHOD
61,385.00
1st Tranche
KC Grant
Package 5: AMENITIES
BP Apparatus
1.00
unit
2,000.00
2,000.00
Stethoscope
1.00
unit
1,530.00
1,530.00
1.00
unit
7,000.00
7,000.00
1.00
unit
2,856.00
2,856.00
1.00
set
3,000.00
Sub-Total
LSG
Package 5
Materials:
3,000.00
16,386.00
14.78
cu.m.
500.00
7,391.25
Washed Gravel
24.00
cu.m.
775.00
18,600.00
24.00
cu.m.
700.00
16,800.00
Pcs
15.00
23,940.00
Washed Sand
4" x 8' x 16" CHB
1,596.00
Sub-Total
LSG
Package 6
Materials:
66,731.25
9.00
Sets
750.00
6,750.00
4.00
Sets
750.00
3,000.00
1.00
Sets
350.00
350.00
Sub-Total
LSG
Package 7
Materials:
10,100.00
Materials:
Supply & Installation Fabricated Steel Billboard
1.00
LOT
9,000.00
1.00
LOT
2,500.00
Sub-Total
9,000.00
LSG
Package 8
2,500.00
11,500.00
Materials:
Warning Signs (Tarpulin POW)
Barricades
LSG
Package 9
pc
150.00
1,500.00
5.00
pc
250.00
1,250.00
1,000.00
2,750.00
2,200.00
58,500.00
1750.94
Sub-Total
1,200.00
P 10
Skilled
Unskilled
55,800.00
CFA
Sub-Total
114,300.00
1,750.94
708,063.08
199,051.31
PCPP
PACKAGES
PACKAGE ITEMS
QTY
UNIT
UNIT COST
TOTAL
PROC METHOD
1st Tranche
KC Grant
15,750.00
2,500.00
P 11
40,000.00
MATERIAL TESTING
4,000.00
TREASURER'S BOND
3,375.00
CONTINGENCY
CFA
PRE-ENGINEERING
ADMINISTRATIVE COST
408.69
29,504.46
95,129.46
408.69
803,192.54
199,460.00
(18,966.46)
SAY
822,159.00
559,862.40
80.00%
Checked by:
CARMEN A. GAUDIANO
Procurement Team Head
PCPP
PPT
Municipal Engineer
803,192.54
80 C.D
SOURCES OF FUNDS
.
PERCENTAGE WEIGHT
TOTAL
KC Grant:
LCC:
AMOUNT
FUND SOURCE
(PESO)
LEGEND:
TO KC GRANT TO LCC CASH
KC GRANT
699,828.00
137,046.00
559,862.40
86,656.80
646,519.20
80.00%
80%
TOTAL LCC
69,982.80
10,832.10
80,814.90
10.00%
10%
LCC - In-kind
28,725.00
69,982.80
10,832.10
80,814.90
10.00%
10%
LCC - Cash
108,321.00
699,828.00
108,321.00
808,149.00
100%
100%
TOTAL
836,874.00
REMARKS
TRANCHING SCHEDULE
TOTAL
1st Tranche
2nd Tranche
LCC Cash
KC Grant
LCC Cash
3rd Tranche
KC Grant
LCC Cash
TOTAL
KC Grant
LCC Cash
306.00
594.00
306.00
900.00
4,141.20
8,038.80
4,141.20
12,180.00
241.40
468.60
241.40
710.00
44.20
85.80
44.20
130.00
81.60
158.40
81.60
240.00
44.20
85.80
44.20
130.00
265.20
514.80
265.20
780.00
442.00
858.00
442.00
1,300.00
48.96
95.04
48.96
144.00
44.20
85.80
44.20
130.00
108.80
211.20
108.80
320.00
2,346.00
4,554.00
2,346.00
6,900.00
997.33
1,936.00
997.33
2,933.33
176.80
343.20
176.80
520.00
1,139.00
2,211.00
1,139.00
3,350.00
27.20
52.80
27.20
80.00
7,009.10
13,605.90
7,009.10
20,615.00
1,989.00
3,861.00
1,989.00
5,850.00
693.60
1,346.40
693.60
2,040.00
581.40
1,128.60
581.40
1,710.00
2,772.00
1,428.00
4,200.00
102.00
198.00
102.00
300.00
255.00
495.00
255.00
750.00
30.60
59.40
30.60
90.00
25,323.20
49,156.80
25,323.20
74,480.00
544.00
1,056.00
544.00
1,600.00
241.40
468.60
241.40
710.00
1,105.00
2,145.00
1,105.00
3,250.00
95.20
184.80
95.20
280.00
122.40
237.60
122.40
360.00
108.80
211.20
108.80
320.00
171.36
332.64
171.36
504.00
469.20
910.80
469.20
1,380.00
11,594.00
22,506.00
11,594.00
34,100.00
MONTHS
1
1,428.00
PCPP
PROPOSED
IMPLEMENTATION
SCHEDULE
REMARKS
TRANCHING SCHEDULE
TOTAL
1st Tranche
2nd Tranche
LCC Cash
KC Grant
LCC Cash
3rd Tranche
KC Grant
LCC Cash
TOTAL
KC Grant
5,276.70
2,718.30
1,837.70
3,567.30
1,837.70
5,405.00
7,242.00
14,058.00
7,242.00
21,300.00
1,360.00
2,640.00
1,360.00
7,995.00
4,000.00
59.50
115.50
59.50
175.00
525.30
1,019.70
525.30
1,545.00
510.00
990.00
510.00
1,500.00
1,224.00
2,376.00
1,224.00
3,600.00
238.10
462.19
238.10
700.29
23.80
46.20
23.80
70.00
108.80
211.20
108.80
320.00
8.16
15.84
8.16
24.00
3.40
6.60
3.40
10.00
17.00
33.00
17.00
50.00
142.12
275.88
142.12
418.00
255.00
495.00
255.00
750.00
13.60
26.40
13.60
40.00
40.80
79.20
40.80
120.00
183.60
356.40
183.60
540.00
30.60
59.40
30.60
90.00
1,116.90
2,168.10
1,116.90
3,285.00
25.50
49.50
25.50
75.00
244.80
475.20
244.80
720.00
251.60
488.40
251.60
740.00
20.40
39.60
20.40
60.00
27.20
52.80
27.20
80.00
17.00
33.00
17.00
50.00
66.64
129.36
66.64
196.00
510.00
990.00
510.00
1,500.00
30.60
59.40
30.60
90.00
102.00
198.00
102.00
300.00
306.00
594.00
306.00
900.00
102.00
198.00
102.00
300.00
20.40
39.60
20.40
60.00
81.60
158.40
81.60
240.00
59.50
115.50
59.50
175.00
81.60
158.40
81.60
240.00
13.60
26.40
13.60
40.00
2,652.00
5,148.00
2,652.00
7,800.00
612.00
1,188.00
612.00
1,800.00
6.80
13.20
6.80
20.00
326.40
633.60
326.40
960.00
MONTHS
1
2,718.30
PCPP
LCC Cash
PROPOSED
IMPLEMENTATION
SCHEDULE
REMARKS
TRANCHING SCHEDULE
TOTAL
1st Tranche
2nd Tranche
LCC Cash
KC Grant
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
30.60
59.40
30.60
-
90.00
-
1,155.00
595.00
1,750.00
122.40
237.60
122.40
360.00
66.64
129.36
66.64
196.00
88.40
171.60
88.40
260.00
68.00
132.00
68.00
200.00
83.30
161.70
83.30
245.00
22.10
42.90
22.10
65.00
510.00
990.00
510.00
1,500.00
170.00
330.00
170.00
500.00
680.00
1,320.00
680.00
2,000.00
1,594.60
3,095.40
1,594.60
4,690.00
683.40
1,326.60
683.40
2,010.00
127.84
248.16
127.84
376.00
2,023.00
3,927.00
2,023.00
5,950.00
2,798.88
5,433.12
2,798.88
8,232.00
161.50
313.50
161.50
475.00
1,060.80
2,059.20
1,060.80
3,120.00
176.80
343.20
176.80
520.00
88.40
171.60
88.40
260.00
85.68
166.32
85.68
252.00
56.10
108.90
56.10
165.00
42.84
83.16
42.84
126.00
42.50
82.50
42.50
125.00
340.00
660.00
340.00
1,000.00
136.00
264.00
136.00
400.00
23.80
46.20
23.80
70.00
136.00
264.00
136.00
400.00
170.00
330.00
170.00
500.00
204.00
396.00
204.00
600.00
238.00
462.00
238.00
700.00
306.00
594.00
306.00
900.00
323.00
627.00
323.00
950.00
578.00
1,122.00
578.00
1,700.00
255.00
495.00
255.00
750.00
595.00
1,155.00
595.00
1,750.00
119.00
231.00
119.00
350.00
170.00
330.00
170.00
500.00
195,100.37
100,506.25
295,606.62
100,506.25
3,075.00
3,075.00
3,075.00
1,200.00
1,200.00
1,200.00
4,000.00
4,000.00
4,000.00
MONTHS
1
595.00
PCPP
LCC Cash
PROPOSED
IMPLEMENTATION
SCHEDULE
REMARKS
TRANCHING SCHEDULE
TOTAL
1st Tranche
2nd Tranche
LCC Cash
KC Grant
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
LCC Cash
4,200.00
4,200.00
4,200.00
12,600.00
12,600.00
7,025.00
7,025.00
7,025.00
2,100.00
2,100.00
2,100.00
1,634.50
1,634.50
1,634.50
3,750.00
3,750.00
3,750.00
4,783.33
4,783.33
4,783.33
4,100.00
4,100.00
4,100.00
2,460.00
2,460.00
2,460.00
1,640.00
1,640.00
1,640.00
1,913.33
1,913.33
1,913.33
410.00
410.00
410.00
874.67
874.67
874.67
15,537.38
15,537.38
15,537.38
6,847.00
13,120.00
13,120.00
13,120.00
6,847.00
6,847.00
91,270.21
91,270.21
16,500.00
16,500.00
16,500.00
2,304.00
2,304.00
2,304.00
4,800.00
4,800.00
4,800.00
3,000.00
3,000.00
3,000.00
350.00
350.00
350.00
7,000.00
7,000.00
7,000.00
4,080.00
4,080.00
4,080.00
38,034.00
38,034.00
91,270.21
38,034.00
PCPP
8,818.75
26,456.25
8,818.75
26,456.25
35,275.00
2,032.50
6,097.50
2,032.50
6,097.50
8,130.00
1,550.00
4,650.00
1,550.00
4,650.00
6,200.00
1,705.00
5,115.00
1,705.00
5,115.00
6,820.00
465.00
1,395.00
465.00
1,395.00
1,860.00
MONTHS
1
12,600.00
PROPOSED
IMPLEMENTATION
SCHEDULE
REMARKS
TRANCHING SCHEDULE
TOTAL
1st Tranche
2nd Tranche
LCC Cash
KC Grant
3rd Tranche
LCC Cash
KC Grant
775.00
2,325.00
15,346.25
46,038.75
TOTAL
LCC Cash
KC Grant
LCC Cash
775.00
2,325.00
3,100.00
15,346.25
46,038.75
61,385.00
1,600.00
400.00
1,600.00
400.00
2,000.00
1,224.00
306.00
1,224.00
306.00
1,530.00
5,600.00
1,400.00
5,600.00
1,400.00
7,000.00
2,284.80
571.20
2,284.80
571.20
2,856.00
2,400.00
600.00
2,400.00
600.00
3,000.00
13,108.80
3,277.20
13,108.80
3,277.20
16,386.00
7,391.25
7,391.25
7,391.25
18,600.00
18,600.00
16,800.00
16,800.00
16,800.00
23,940.00
23,940.00
23,940.00
66,731.25
66,731.25
5,400.00
1,350.00
5,400.00
1,350.00
6,750.00
2,400.00
600.00
2,400.00
600.00
3,000.00
280.00
70.00
280.00
70.00
350.00
8,080.00
2,020.00
8,080.00
2,020.00
10,100.00
9,000.00
2,500.00
11,500.00
9,000.00
9,000.00
2,500.00
2,500.00
11,500.00
11,500.00
-
300.00
1,200.00
300.00
1,500.00
250.00
1,000.00
250.00
1,250.00
2,200.00
550.00
2,750.00
1,750.94
56,749.06
58,500.00
550.00
56,749.06
28,904.23
85,653.29
394,245.00
PCPP
23,426.25
4,318.75
7,199.61
15,377.41
7,199.61
48,600.39
55,800.00
4,318.75
7,199.61
15,377.41
8,950.55
105,349.45
114,300.00
52,377.50
20,308.41
18,654.61
242,785.97
465,277.11
708,063.08
MONTHS
1
18,600.00
66,731.25
PROPOSED
IMPLEMENTATION
SCHEDULE
REMARKS
TRANCHING SCHEDULE
TOTAL
1st Tranche
2nd Tranche
LCC Cash
KC Grant
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
15,750.00
KC Grant
-
24,000.00
1,506.25
2,500.00
2,500.00
40,000.00
40,000.00
2,085.06
4,000.00
3,375.00
3,375.00
29,504.46
1,914.94
24,266.78
5,237.68
24,266.78
5,237.68
24,266.78
25,822.74
26,181.72
68,947.74
95,129.46
52,377.50
44,575.19
44,477.35
268,967.69
534,224.85
803,192.54
69,982.80
10,832.10
69,982.80
10,832.10
268,967.69
534,224.85
10.00%
45,050.30
10.00%
25,407.61
699,828.00
108,321.00
1,506.25
437,370.00
24,932.50
86,656.80
360,402.40
(350,713.20)
(41,545.40)
Reviewed by:
(33,645.25)
Submitted by:
15,750.00
43,125.00
PCPP
15,750.00
2,500.00
2,085.06
MONTHS
1
16,000.00
3,375.00
A. GAUDIANO
LCC Cash
PROPOSED
IMPLEMENTATION
SCHEDULE
Noted by:
DIOSDADO EBARNE
GEORGE S. ISULAT
BSMPC
AMOUNT
(PESO)
699,828.00
137,046.00
28,725.00
108,321.00
836,874.00
PROPOSED
MPLEMENTATION
SCHEDULE
MONTHS
3
PCPP
PROPOSED
MPLEMENTATION
SCHEDULE
MONTHS
3
PCPP
PROPOSED
MPLEMENTATION
SCHEDULE
MONTHS
3
PCPP
PROPOSED
MPLEMENTATION
SCHEDULE
MONTHS
3
PCPP
PROPOSED
MPLEMENTATION
SCHEDULE
MONTHS
3
PCPP
PROPOSED
MPLEMENTATION
SCHEDULE
MONTHS
3
S. ISULAT
PCPP