POW Batuhon Dacu (FMR) TypeR
POW Batuhon Dacu (FMR) TypeR
Physical Target
Total Sub-Project Cost
: 0.275 KM
PHP 1,654,450.00
Mode of Implementation
: By Contract
Project Description:
Sub-Project Duration
: 90 Calendar Days
Equipment/Tools Needed
Technical Personnel
No. of Laborers
: 90 person days
Sub-Project Location:
Sub-Project Site Location is 8KM away from Town Proper
Item
Scope of Work
No.
%(Wt)
102
201
311
500
Quantity
Unit
223.33
cu.m.
309.27
69,070.00
15.96%
214.50
cu.m.
944.70
202,638.38
62.13%
1100.00
sq.m.
717.27
788,994.00
15.73%
12.00
l.m.
16,643.25
199,719.00
0.74%
1.00
lot
9,425.00
9,425.00
5.44%
100.00%
494,623.23
Total (P)
1,269,846.38
SOURCE OF FUND
Breakdown of Estimated Project Cost
KALAHI Grant
Community
Barangay LGU
In-Kind
A.
Cash
Municipal LGU
In-Kind
Cash
Total
In-Kind
Direct Cost
Materials
842,788.83
10,000.00
99,562.55
952,351.38
Equipment
129,619.47
###
16,850.53
146,470.00
Labor
Skilled
65,150.00
Unskilled
77,000.00
28,875.00
1,114,558.30
28,875.00
Sub-Total A
B.
10,000.00
65,150.00
105,875.00
1,269,846.38
21,000.00
3,390.00
116,413.08
Indirect Cost
Overhead Cost
21,000.00
2,947.83
1,000.00
Project Supervision
442.17
8,500.00
1,000.00
2,000.00
4,000.00
12,500.00
3,000.00
600.00
3,600.00
Administrative Cost
34,782.61
5,217.39
40,000.00
Bidding Publication
6,521.74
978.26
7,500.00
Materials Testing
8,695.65
1,304.35
10,000.00
Treasurer's Bond
5,253.75
5,253.75
88,889.25
88,889.25
126,984.63
110,421.42
Sub-Total ( B )
187,369.25
TOTAL ( A+ B )
1,301,927.55
ADD: Contingency
127,748.38
5,000.00
321,117.63
5,000.00
1,590,964.01
28,875.00
10,000.00
1,000.00
244,161.46
28,875.00
10,000.00
1,000.00
255,691.18
5,000.00
1,353,883.82
81.83%
265,691.18
16.06%
34,875.00
2.11%
255,691.18
5,000.00
51,956.27
1,353,883.82
11,529.72
MCC Grant
Cost Sharing to TEPC
16,563.21
1,000.00
LCC Cash
LCC Inkind
63,485.99
1,654,450.00
100.00%
1,353,883.82
28,875.00
Prepared by :
10,000.00
1,000.00
1,654,450.00
Approved by :
MISAEL ALABAN
Service Provider
BSPMC Chairperson
Checked by:
Concurred by :
ERNESTO D. ALEJADO
Barangay Captain
Recommending Approval:
Municipal Mayor
BILL OF QUANTITIES
ITEM
NO.
Quantity Derivation
Computation
ITEM DESCRIPTION
QUANTI
UNIT
TY
Rate per
No. of
Day / Unit
Crew/
Cost
Add
Frieght &
Handling
Cost
Total Unit
Cost
223.33
223.33
cu.m.
cu.m.
223.33
cu.m.
1.00
3.00
1.00
Day/s
Day/s
Day/s
1.00
4.00
2.00
350.00
300.00
275.00
1.00
1.50
1.50
lot
Day/s
Day/s
1.00
3.00
10,000.00
16,880.00
6,500.00
214.50
cu.m.
(0.78*275) =
214.50
cu.m.
(0.78*275*1.15) =
246.68
cu.m.
246.68
cu.m.
3.00
3.00
3.00
Day/s
Day/s
Day/s
1.00
2.00
2.00
350.00
300.00
275.00
1.00
2.00
1.00
lot
Day/s
Day/s
1.00
1.00
6,500.00
13,800.00
14,800.00
C. Equipment
Preparation of fnish grade of item 200
including trench canal excavation
Mobilization & Demobilization
1-Backhoe (280 cu.m / day)
3-Dump Truck (240 cu.m / day)
286.4/280 =
286.4/240 =
A. Materials
Aggregate Subbase Course (Balastro Class "A" Type)
Sub-Total
B. Labor
Construction Foreman
*pls see equipment
Driver / Operator
*pls see equipment
Laborer
*pls see equipment
Sub-Total
C. Equipment
Mobilization & Demobilization
1-Road Roller (210cu.m/day)
246.68/210 =
1-Road Grader (400 cu.m / day)
246.68/400 =
550.00
55.00
605.00
1,100.00
275.00
4.00
275*4 = 1,100.00
275*4*0.15 = 165.00
165.00
sq.m.
m
m
sq.m.
cu.m.
cu.m.
165.00*9 = 1,485.00
bags
cu.m.
cu.m.
length
bdft
165.00*0.5=
165.00*1=
((300/1)+1)/(6/.6)*1.7=
(((2"*2"*12')/12)*54=
83.00
165.00
47.00
216.00
250.00
600.00
750.00
370.00
20.00
25.00
60.00
75.00
37.00
2.00
275.00
660.00
825.00
407.00
22.00
ITEM
NO.
Quantity Derivation
Computation
ITEM DESCRIPTION
QUANTI
UNIT
TY
Rate per
No. of
Day / Unit
Crew/
Cost
2.00
37.00
6.50
259.00
6.00
30.00
Total Unit
Cost
(((2"*6"*12')/12)*54=
2"x6"x12' Coco Lumber (Formworks)
((10.8/1)+1)/(6-.3)=
16mm dia. X 6.0 m Def. Bars (Formworks)
(((6*3.6)/0.2)/5)*28)/58
Assorted CWN (2" & 3")
Hard Asphalt (Joint Filler)
Hack Saw Blade
Water (for mixing)
Sub-Total
B. Labor
During Installation of Forms: (150 sq.m./day)
Carpenter
During Concrete Pouring: Gang of 15 Workers (1.40 man-hour/sq.m)
Construction Foreman
Mason
((1.4*1200)/8)/15
Laborers
Concrete Mixer Operator
Concrete Mixer Vibrator
Sub-Total
C.Equipment
7.85 cu.m/day
1- Concrete Mixer
180/7.82 =
648.00
3.00
10.00
5.00
6.00
23.00
bdft
length
kgs.
bag
pcs
cu.m.
4.00
Day/s
5.00
300.00
24.00
22.00
22.00
22.00
22.00
Day/s
Day/s
Day/s
Day/s
Day/s
1.00
2.00
10.00
1.00
1.00
350.00
300.00
275.00
300.00
300.00
22.00
day
1.00
1,000.00
1- Concrete Vibrator
22.00
day
1.00
500.00
12.00
ln.m.
12.00
12.00
pcs
4,800.00
435.00
5,235.00
16.00
pcs
320.00
32.00
352.00
360.00
bd.ft
22.00
2.20
24.20
Assorted CWN
6.00
kgs
65.00
6.50
71.50
12.00
kgs
85.00
8.50
93.50
52.00
pcs
225.00
22.50
247.50
180/7.82 =
20.00
370.00
65.00
2,500.00
60.00
20.00
Add
Frieght &
Handling
Cost
22.00
407.00
71.50
2,759.00
66.00
50.00
Sub-Total
Total for Item 311
RCPC CROSS DRAINAGE (with Reinforced
500 Concrete Wingwall, PC Outlet/Inlet,
Headwall)
Length =
4.00
pcs
370.00
37.00
407.00
74.00
bags
250.00
25.00
275.00
4.80
cu.m.
750.00
75.00
825.00
9.60
cu.m.
600.00
60.00
660.00
8.00
cu.m.
700.00
70.00
770.00
12.00
cu.m.
750.00
75.00
825.00
14.00
10.00
13.00
Day/s
Day/s
Day/s
1.00
lot
1.00
lot
1.00
1.00
1.00
Day/s
Day/s
Day/s
Sub-Total
Construction Foreman
Mason
Laborers
(600/1.5)/15=
1.00
4.00
12.00
350.00
300.00
275.00
Sub-Total
Total for Item 500
SPL - 1Billboard
Quantity: 1 unit
A. Materials
Project Billboard
8,500.00
Sub-Total
B. Labor
Contstruction Foreman
Carpenter
Laborer
Sub-Total
Total for Item SPL -1
Total Direct Cost
1.00
1.00
1.00
350.00
300.00
275.00
ITEM
NO.
ITEM DESCRIPTION
Quantity Derivation
Computation
QUANTI
UNIT
TY
Rate per
No. of
Day / Unit
Crew/
Cost
Add
Frieght &
Handling
Cost
Total Unit
Cost
INDIRECT COST:
OVERHEAD COST
Foreman/Leadman
60.00
days
350.00
10.00
10.00
1.00
pcs.
pcs.
set
125.00
25.00
1,890.00
20.00
shts
100.00
5.00
17.00
days
days
Warning Signs
5.00
pcs.
420.00
Barricades
5.00
pcs.
300.00
1.00
posting
Sub-total
HANDTOOLS AND PROTECTIVE EQUIPMENT
Hard Hat
Hand Glooves
Medicine Kit
Sub-total
PRE-ENGINEERING
Preparation of Plans (TAF)
Reproduction of Plans
Sub-total
PROJECT SUPERVISION
Municipal Engineer
BSPMC volunteers
Sub-total
ENVIRONMENTAL IMPACT
Sub-total
ADMINISTRATIVE COST
BIDDING PUBLICATION
MATERIAL TESTING
TREASURER'S BOND
VAT (7% OF Total Direct Cost)
Contractor Profit (10%)
TOTAL INDIRECT COST
TOTAL (A+B)
Add: Contingency
TOTAL ESTIMATED PROJECT COST (TEPC)
Add: O and M (Other Amenities)
TOTAL CONSTRUCTION COST
Prepared by:
800.00
250.00
2.00
7,500.00
7,500.00
81.83%
RODSON R. ESCORA
Deputy Area Coordinator
Recommending Approval:
CARMEN A. GA
Municipal En
QUANTITIES
COST SHARING
LGU
Total
COMMUNITY
CONTRIBUTI
ON
KALAHI
GRANT
350.00
3,600.00
550.00
4,500.00
350.00
3,600.00
400.00
4,350.00
10,000.00
25,320.00
29,250.00
64,570.00
8,849.56
22,407.08
25,884.96
57,141.59
69,070.00
61,491.59
149,238.38
149,238.38
132,069.36
132,069.36
1,050.00
1,800.00
1,650.00
4,500.00
1,050.00
1,800.00
1,200.00
4,050.00
6,500.00
27,600.00
14,800.00
48,900.00
5,752.21
24,424.78
13,097.35
43,274.34
202,638.38
179,393.69
408,375.00
54,780.00
136,125.00
19,129.00
4,752.00
361,393.81
48,477.88
120,464.60
16,928.32
4,205.31
150.00
150.00
150.00
450.00
450.00
450.00
BRGY.
CASH
IN-KIND
TOTAL
MUN.
CASH
IN-KIND
350.00
3,600.00
550.00
4,500.00
1,150.44
2,912.92
3,365.04
7,428.41
10,000.00
25,320.00
29,250.00
64,570.00
7,428.41
69,070.00
17,169.02
17,169.02
149,238.38
149,238.38
1,050.00
1,800.00
1,650.00
4,500.00
6,500.00
27,600.00
14,800.00
48,900.00
202,638.38
747.79
3,175.22
1,702.65
5,625.66
22,794.68
10,000.00
36,981.19
6,302.12
15,660.40
2,200.68
546.69
408,375.00
54,780.00
136,125.00
19,129.00
4,752.00
COST SHARING
Total
14,256.00
1,221.00
715.00
13,795.00
396.00
1,150.00
654,694.00
6,000.00
LGU
KALAHI
GRANT
12,615.93
1,080.53
632.74
12,207.96
350.44
1,017.70
579,375.22
8,400.00
13,200.00
60,500.00
6,600.00
6,600.00
101,300.00
6,000.00
8,400.00
13,200.00
44,000.00
6,600.00
6,600.00
84,800.00
22,000.00
19,469.03
COMMUNITY
CONTRIBUTI
ON
BRGY.
10,000.00
TOTAL
MUN.
1,640.07
140.47
82.26
1,587.04
45.56
132.30
65,318.78
14,256.00
1,221.00
715.00
13,795.00
396.00
1,150.00
654,694.00
6,000.00
16,500.00
16,500.00
2,530.97
8,400.00
13,200.00
60,500.00
6,600.00
6,600.00
101,300.00
22,000.00
11,000.00
9,734.51
33,000.00
29,203.54
1,265.49
788,994.00
693,378.76
62,820.00
55,592.92
7,227.08
62,820.00
5,632.00
4,984.07
647.93
5,632.00
8,712.00
7,709.73
1,002.27
8,712.00
429.00
379.65
49.35
429.00
1,122.00
992.92
129.08
1,122.00
12,870.00
11,389.38
1,480.62
12,870.00
16,500.00
10,000.00
11,000.00
3,796.46
33,000.00
69,115.24
788,994.00
1,628.00
1,440.71
187.29
1,628.00
20,350.00
18,008.85
2,341.15
20,350.00
3,960.00
3,504.42
455.58
3,960.00
6,336.00
5,607.08
728.92
6,336.00
6,160.00
5,451.33
708.67
6,160.00
9,900.00
8,761.06
139,919.00
123,822.12
1,138.94
4,900.00
12,000.00
42,900.00
59,800.00
4,900.00
12,000.00
31,200.00
48,100.00
11,700.00
11,700.00
199,719.00
171,922.12
11,700.00
16,096.88
8,500.00
8,500.00
7,522.12
7,522.12
977.88
977.88
350.00
300.00
275.00
925.00
350.00
300.00
200.00
850.00
75.00
75.00
9,425.00
8,372.12
75.00
977.88
9,425.00
1,269,846.38
1,114,558.30
28,875.00
116,413.08
1,269,846.38
10,000.00
16,096.88
9,900.00
-
139,919.00
4,900.00
12,000.00
42,900.00
59,800.00
199,719.00
8,500.00
8,500.00
350.00
300.00
275.00
925.00
COST SHARING
Total
LGU
COMMUNITY
CONTRIBUTI
ON
KALAHI
GRANT
952,351.38
842,788.83
146,470.00
129,619.47
BRGY.
10,000.00
-
TOTAL
MUN.
-
99,562.55
952,351.38
16,850.53
146,470.00
-
65,150.00
65,150.00
105,875.00
77,000.00
28,875.00
1,269,846.38
1,114,558.30
28,875.00
21,000.00
21,000.00
21,000.00
21,000.00
1,250.00
250.00
1,890.00
3,390.00
1,086.96
217.39
1,643.48
2,947.83
65,150.00
105,875.00
1,269,846.38
21,000.00
21,000.00
10,000.00
4,000.00
8,500.00
12,500.00
1,250.00
250.00
1,890.00
3,390.00
1,000.00
1,000.00
1,000.00
1,000.00
4,000.00
2,100.00
1,750.00
1,500.00
1,250.00
3,600.00
40,000.00
7,500.00
10,000.00
5,253.75
88,889.25
126,984.63
321,117.63
1,590,964.01
63,485.99
1,654,450.00
3,000.00
34,782.61
6,521.74
8,695.65
110,421.42
187,369.25
1,301,927.55
51,956.27
1,353,883.82
1,654,450.00
1,353,883.82
8,500.00
8,500.00
4,000.00
350.00
-
28,875.00
10,000.00
1,000.00
1,000.00
28,875.00
10,000.00
1,000.00
600.00
5,217.39
978.26
1,304.35
5,253.75
88,889.25
16,563.21
127,748.38
244,161.46
11,529.72
255,691.18
28,875.00
10,000.00
1,000.00
18.16%
18.17%
255,691.18
270,776.76
(15,085.59)
MISAEL ALABAN
BSPMC Chairperson
2,000.00
2,000.00
4,000.00
8,500.00
12,500.00
2,100.00
250.00
-
Approved by:
CARMEN A. GAUDIANO
Municipal Engineer
163.04
32.61
246.52
442.17
2,000.00
2,000.00
116,413.08
1,500.00
-
5,000.00
5,000.00
5,000.00
5,000.00
3,600.00
40,000.00
7,500.00
10,000.00
5,253.75
88,889.25
126,984.63
321,117.63
1,590,964.01
63,485.99
1,654,450.00
1,654,450.00
Noted by:
GEORGE S. ISULAT
RCIS
Unit
used
No. of
Units
Per Unit
Cost
Total Sub-Project
Pro-posed
Cost
Amount of Grant
I. Administrative Cost
TE for opening of BSPMC DBP Account of CV's
TE for procurement transactions of CV's
Project Meetings
MCT-Initiated Meetings
Treasurer Payroll Processing
Forms/Supplies and Reproduction
Sub Total
II. Other Indirect Costs
Overhead Cost
Handtools
Pre-engineering
Project Supervisions
Bidding Publication
Environmental Mitigating Cost
Material Testing
Treasurer's Bond
VAT ( 7% of Total Direct Cost)
Contractors Profit (10%)
Contingency
Sub Total
III. Direct Cost
Labor
Materials
Equipment Rental
Sub Total
TOTAL PROJECT COST
IV. Operations & Maintenance
Other Amenities
Sub Total
GRAND TOTAL
Prepared by:
ELEUTERIO S. BANTOTO
Barangay Treasurer
2,800.00
2,434.78
7,140.00
5,400.00
9,900.00
6,000.00
8,760.00
40,000.00
6,208.70
4,695.65
8,608.70
5,217.39
7,617.39
34,782.61
21,000.00
3,390.00
2,000.00
12,500.00
7,500.00
3,600.00
10,000.00
5,253.75
88,889.25
126,984.63
63,485.99
344,603.62
21,000.00
2,947.83
110,421.42
51,956.27
204,542.91
171,025.00
952,351.38
146,470.00
1,269,846.38
1,654,450.00
142,150.00
842,788.83
129,619.47
1,114,558.30
1,353,883.82
0.00
0.00
1,654,450.00
0.00
1,353,883.82
6,521.74
3,000.00
8,695.65
.3
ROJECT
RIBUTION PLAN
Dacu
uin
ion VII, Philippines
931.30
704.35
1,291.30
782.61
1,142.61
5,217.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
300,566.18
442.17
1,000.00
12,500.00
978.26
600.00
1,304.35
5,253.75
88,889.25
16,563.21
11,529.72
139,060.71
0.00
0.00
1,000.00
1,000.00
0.00
28,875.00
99,562.55
16,850.53
116,413.08
260,691.18
0.00
260,691.18
10,000.00
10,000.00
11,000.00
0.00
11,000.00
28,875.00
28,875.00
0.00
28,875.00
Approved by:
GEORGE ALAS-AS
BSPMC Chairperson
: July 8, 2014
Barangay
Municipality
: Batuhon Dacu
: Dauin
Province
: Negros Oriental
DESCRIPTION
Err:509
Err:509
Err:509
PACKAGES
PACKAGE ITEMS
QTY
UNIT
UNIT COST
PROC
METHOD
TOTAL
223.33
214.50
1,100.00
12.00
1.00
cu.m.
cu.m.
sq.m.
l.m.
lot
ok
10.00
10.00
1.00
pcs.
pcs.
set
Package 3
sub-total
package 4
308.60
942.60
702.27
15,668.25
9,350.00
125.00
25.00
1,890.00
ok
5.00
5.00
pcs.
pcs.
68,920.00
202,188.38
772,494.00
LOCAL
188,019.00 BIDDING FOR
WORKS (LBW)
9,350.00
126,984.63
88,889.25
1,456,845.26
1,250.00
250.00
1,890.00
LOCAL
SHOPPING
FOR GOODS
(LSG)
3,390.00
420.00
300.00
2,100.00
1,500.00
3,600.00
LOCAL
SHOPPING FOR
GOODS (LSG)
21,000.00
8,500.00
40,000.00
7,500.00
10,000.00
5,253.75
63,485.99
Treasurer Bond
Contingency Cost
sub-total
CFA
Package 2
Package 1
Direct Cost:
155,739.74
GRAND TOTAL CASH
1,619,575.00
SAY
1,619,575.00
0.00
Checked & Reviewed by:
RODSON R. ESCORA
Procurement Team Head
PPT
roposed Sub-Project
(Php)
ct Duration
: Concreting
of Access Road
:
:
1,619,575.00
90 C.D.
SOURCES OF FUNDS
PERCENTAGE WEIGHT
ESCRIPTION
TOTAL
KC Grant:
.
LEGEND:
TO KC
GRANT
LCC:
AMOUNT
(PESO)
FUND SOURCE
TO LCC CASH
KC GRANT
1,353,883
e (Php)
1,083,107.06
212,552.94
1,295,660.00
80.00%
80%
TOTAL LCC
300,566
he (Php)
e (Php)
ASH (Php)
135,388.38
135,388.38
1,353,883.82
26,569.12
26,569.12
265,691.18
161,957.50
161,957.50
1,619,575.00
10.00%
10.00%
100%
10.00%
10.00%
100%
LCC - In-kind
LCC - Cash
TOTAL
34,875
265,691
1,654,450
REMARKS
TRANCHING SCHEDULE
TOTAL
1st Tranche
KC Grant
61,491.59
179,393.70
610,563.74
171,922.12
8,372.12
20,064.26
2nd Tranche
LCC Cash
KC Grant
1,051,807.53
7,428.41
22,794.68
96,530.26
16,096.88
977.88
16,563.22
30,000.48
190,391.81
1,086.96
217.39
1,643.48
163.04
32.61
246.52
2,947.83
442.17
1,750.00
1,250.00
3,000.00
350.00
250.00
600.00
10,134.31
6,521.74
8,695.65
8,500.00
5,082.60
978.26
1,304.35
5,253.75
25,351.70
21,118.96
22,000.48
1,083,107.06
212,552.94
135,388.38
1,083,107.06
212,552.94
135,388.38
80.00%
0.00
10.00%
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
113,387.90
26,569.12
26,569.12
42,369.25
17,280.25
59,649.50
10,000.00
11,000.00
12,000.48
12,782.61
LCC Cash
7,428.41
22,794.68
96,530.26
16,096.88
977.88
16,563.22
71,609.00
232,000.33
68,920.00
202,188.38
772,494.00
188,019.00
9,350.00
126,984.63
88,889.25
1,456,845.26
1,086.96
217.39
1,643.48
163.04
32.61
246.52
1,250.00
250.00
1,890.00
2,947.83
442.17
3,390.00
1,750.00
1,250.00
3,000.00
350.00
250.00
600.00
2,100.00
1,500.00
3,600.00
8,500.00
5,082.60
978.26
1,304.35
5,253.75
11,529.72
21,000.00
8,500.00
40,000.00
7,500.00
10,000.00
5,253.75
63,485.99
15,039.40
15,039.40
51,956.27
11,529.72
21,000.00
34,917.40
6,521.74
8,695.65
51,956.27
75,738.88
11,529.72
123,091.06
32,648.68
155,739.74
26,569.12
135,388.38
26,569.12
1,353,883.82
265,691.18
1,619,575.00
26,569.12
135,388.38
26,569.12
1,353,883.82
265,691.18
1,619,575.00
0.00
10.00%
0.00
MONTHS
1
61,491.59
179,393.70
675,963.74
171,922.12
8,372.12
110,421.41
17,280.25
1,224,844.93
65,400.00
47,987.90
KC Grant
PROPOSED
IMPLEMENTATIO
SCHEDULE
Recommending Approval:
ESCORA
CARMEN A. GAUDIANO
oordinator
Municipal Engineer
Submitted by:
Noted by:
GEORGE S. ISULAT
BSMPC
AMOUNT
(PESO)
1,353,883.82
300,566.18
34,875.00
265,691.18
1,654,450.00
PROPOSED
LEMENTATION
SCHEDULE
MONTHS
ecialist
Name of Proposed Su
Barangay
Municipality
: Batuhon Dacu
: Dauin
Province
: Negros Oriental
DESCRIPTIO
Err:509
Err:509
Err:509
PACKAGES
PACKAGE ITEMS
QTY
UNIT
UNIT COST
PROC
METHOD
TOTAL
223.33
214.50
1,100.00
12.00
1.00
cu.m.
cu.m.
sq.m.
l.m.
lot
250.00
950.00
800.00
20,000.00
10,000.00
ok
package 4
Package 3
Package 2
Sub-Total (Actual)
55,832.50
203,775.00
880,000.00
LOCAL
240,000.00 BIDDING FOR
WORKS (LBW)
10,000.00
1,389,607.50
67,237.76
1,456,845.26
900.00
150.00
1,850.00
LOCAL
SHOPPING
FOR GOODS
(LSG)
10.00
10.00
1.00
pcs.
pcs.
set
90.00
15.00
1,850.00
ok
Sub-Total (Actual)
2,900.00
490.00
3,390.00
5.00
5.00
252.00
252.00
LOCAL
SHOPPING FOR
GOODS (LSG)
Sub-Total (Actual)
1,260.00
1,260.00
2,520.00
1,080.00
3,600.00
Indirect Cost:
Overhead Cost
Project Supervision
Administrative Cost
Bidding Publication
Materials Testting
pcs.
pcs.
21,000.00
8,500.00
40,000.00
7,500.00
10,000.00
5,253.75
63,485.99
Treasurer Bond
Contingency Cost
sub-total
CFA
Package 1
Direct Cost:
155,739.74
155,739.74
68,807.76
1,550,767.24
1,619,579.82
1,619,579.82
68,812.58
Checked & Reviewed by:
SAY
%
NOEL B. TUBIL
JULIUS M. ALAP-AP
RODSON R. ESCORA
PPT
Proposed Sub-Project
: Concreting
of Access Road
h (Php)
ect Duration
:
:
1,619,579.82
90 C.D.
SOURCES OF FUNDS
PERCENTAGE WEIGHT
DESCRIPTION
TOTAL
KC Grant:
he (Php)
che (Php)
che (Php)
ASH (Php)
.
LEGEND:
TO KC
GRANT
LCC:
TO LCC CASH
KC GRANT
1,353,88
1,083,107.05
212,556.80
1,295,663.85
80.00%
80%
TOTAL LCC
300,57
135,388.38
135,388.38
1,353,883.82
26,569.60
26,569.60
265,696.00
161,957.98
161,957.98
1,619,579.82
10.00%
10.00%
100%
10.00%
10.00%
100%
LCC - In-kind
LCC - Cash
TOTAL
34,87
265,69
1,654,45
REMARKS
TRANCHING SCHEDULE
TOTAL
1st Tranche
KC Grant
2nd Tranche
LCC Cash
KC Grant
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
48,404.09
180,980.32
718,069.74
223,903.12
9,022.12
7,428.41
22,794.68
96,530.26
16,096.88
977.88
65,400.00
1,180,379.39
143,828.11
65,400.00
(128,571.86)
46,563.70
47,987.90
26,569.12
59,649.50
15,039.40
(4.34)
1,051,807.53
190,391.81
113,387.90
26,569.12
59,649.50
15,039.40
782.61
130.43
1,608.70
117.39
19.57
241.30
2,521.74
378.26
426.09
63.91
2,947.83
442.17
1,008.00
1,008.00
2,016.00
252.00
252.00
504.00
LCC Cash
48,404.09
180,980.32
783,469.74
223,903.12
9,022.12
7,428.41
22,794.68
96,530.26
16,096.88
977.88
55,832.50
203,775.00
880,000.00
240,000.00
10,000.00
1,224,849.27
231,995.99
1,389,607.50
4.34
67,237.76
1,224,844.93
232,000.33
1,456,845.26
782.61
130.43
1,608.70
117.39
19.57
241.30
900.00
150.00
1,850.00
2,521.74
378.26
2,900.00
426.09
63.91
490.00
2,947.83
442.17
3,390.00
1,008.00
1,008.00
2,016.00
252.00
252.00
504.00
1,260.00
1,260.00
2,520.00
984.00
96.00
984.00
96.00
1,080.00
600.00
3,000.00
600.00
3,600.00
10,130.45
6,521.74
8,695.65
8,500.00
5,086.94
978.26
1,304.35
5,253.75
8,500.00
5,086.94
978.26
1,304.35
5,253.75
11,529.72
21,000.00
8,500.00
40,000.00
7,500.00
10,000.00
5,253.75
63,485.99
155,739.74
11,000.00
51,956.27
11,529.72
21,000.00
34,913.06
6,521.74
8,695.65
51,956.27
12,000.00
12,782.61
11,529.72
123,086.72
32,653.02
4.34
(4.34)
22,000.00
75,738.88
(4.34)
0.48
25,351.70
21,118.96
22,000.48
(127,161.77)
46,723.61
47,987.90
3.86
21,123.30
10,000.00
26,569.12
PROPOSED
IMPLEMENTATI
SCHEDULE
MONTHS
1
3,000.00
25,347.84
AMOUNT
(PESO)
FUND SOURCE
75,738.88
11,529.72
123,091.06
32,648.68
155,739.74
59,649.50
15,039.40
1,405.75
164.25
68,807.76
1,210,264.97
165,833.67
87,400.00
75,738.88
11,529.72
1,352,473.73
265,531.27
1,550,767.24
1,083,103.20
212,556.80
135,387.90
26,569.60
135,387.90
26,569.60
1,353,879.00
265,696.00
1,619,575.00
80.00%
(127,161.77)
10.00%
47,987.90
10.00%
59,649.02
(1,405.27)
(164.73)
Recommending Approval:
68,807.76
Noted by:
Submitted by:
ESCORA
CARMEN A. GAUDIANO
MISAEL M. ALABAN
Coordinator
Municipal Engineer
BSMPC
AMOUNT
(PESO)
1,353,883.82
300,571.00
34,875.00
265,696.00
1,654,454.82
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTHS
3
Sub-Project duration
: 90
Physical Target
:
:
:
:
:
Region
Province
Municipality
Barangay
Calendar Days
275 L.M.
VII CENTRAL VISAYAS
NEGROS ORIENTAL
DAUIN
BATUHON DACU
: P
Direct Cost
Indirect Cost
Date Started
Target Completion
Mode of Implementation
: P
1,269,846.38
: P
384,603.62
:
:
: By Contract
1,654,450.00
LABOR
NO.
DESCRIPTION
311
500
QTY
UNIT
WEIGHT
PHYSICAL
(%)
TARGET
AMOUNT
223.33 cu.m.
69,070.00
5.44%
214.50 cu.m.
202,638.38
15.96%
1,100.00 sq.m.
788,994.00
62.13%
199,719.00
15.73%
12.00
1.00
l.m.
lot
T O T A L
9,425.00
1,269,846.38
0.74%
100.00%
PLANNED
PHYSICAL
% PROGRESS (Actual)
PROGRESS (Planned)
FINANCIAL
PROGRESS (Actual)
Prepared by:
WEEK 4
WEEK 5
WEEK 6
MONTH 3
WEEK 7
WEEK 8
WEEK 9
WEEK 10
MONTH 4
WEEK 11
WEEK 12
WEEK 13
# # # # # # # # # # # # # # # # # # # # # # # # # # # #
PLANNED
# # # # # # # # # # # # # # # # # # # # #
ACTUAL
PLANNED
###################################################################################################################################################
ACTUAL
PLANNED
###################################################################################################################################################
ACTUAL
PLANNED
# #
ACTUAL
PLANNED
# # # # # # # # # # # # # # # # # # # # # # # #
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
ACTUAL
1
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
Concurred by:
PIT Chairperson
MONTH 2
WEEK 3
275.00
ACTUAL
WEEK 2
90
TOTAL
MONTH 1
WEEK 1
90
UNSKILLED
ITEM
Average
Rate/Day
300.00
No. of Days
SKILLED
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
0.96%
0.96%
0.96%
9.29%
9.29%
18.96%
9.65%
9.65%
9.65%
9.65%
9.65%
9.65%
1.68%
2.64%
3.60%
4.56%
13.85%
23.14%
42.10%
51.75%
61.40%
71.05%
80.70%
90.35%
100.00%
90
91
21,333.42
12,190.53
12,190.53
12,190.53
117,968.73
117,968.73
240,762.87
122,540.18
122,540.18
122,540.18
122,540.18
122,540.18
122,540.18
21,333.42
33,523.94
45,714.47
57,904.99
175,873.72
293,842.45
534,605.32
657,145.50
779,685.67
902,225.85
1,024,766.02
1,147,306.20
1,269,846.38
50
1.68%
RODSON R. ESCORA
Deputy Area Coordinator
Approved by:
CARMEN A. GAUDIANO
Municipal Engineer
Noted by:
BSPMC
GEORGE S. ISULAT
RCIS
BARANGAY SUB-PROJECT
MANAGEMENT COMMITTEE
Description of Work
Item No.
Location
Note
STATION
0+000
0+020
0+040
0+060
0+080
0+100
0+120
0+140
0+160
0+180
0+200
0+220
0+240
0+260
0+273
Total Area :
Ave. Area :
QUANTITY CALCULATION
: Computed Areas are taken from CAD File ( Poly Line Method)
AREA
DISTANCE
VOLUME
ITEM 102
ITEM 104
(m)
ITEM 102
3.400
0.000
20.00
67.800
3.380
0.000
20.00
38.100
0.430
0.013
20.00
4.300
0.000
0.014
20.00
4.200
0.420
0.000
20.00
7.000
0.280
0.014
20.00
5.900
0.310
0.008
20.00
3.200
0.010
0.004
20.00
0.100
0.000
0.008
20.00
3.200
0.320
0.000
20.00
7.200
0.400
0.013
20.00
6.100
0.210
0.002
20.00
20.768
1.867
0.000
20.00
20.168
0.150
0.003
13.00
35.295
5.280
0.000
16.457
1.029
0.079
0.005
Total Volume =
Submitted by:
JERRY C. BALIOLA
Service Provider
REMARKS /
LOCATION
ITEM 104
0.130
0.270
0.140
0.140
0.220
0.120
0.120
0.080
0.130
0.150
0.020
0.030
0.020
223.330
1.570
223.330
0.235
1.805
Destination/Description
Fare/
Allowance/
Unit Price
Qty.
Unit
pesos
No of
transactions
250.00
meals
200.00
1 times
persons x
1 times
persons x
2 times
110.00 x
persons x
6 times
Sub-Total
2. TE for procurement
transactions of CVs
Serving of Canvass
meals
Serving of PO & Payments
persons x
6 times
80.00
110.00 x
persons x
6 times
meals
200.00
persons x
6 times
50.00
20.00
12
20
meetings
persons x
12 times
130.00
persons x
6 times
Meals
200.00
persons x
6 times
300.00
persons x
12 times
Meals
200.00
persons x
12 times
Bondpaper long
Reproduction
350.00
2.00
x
x
3
3000
reams
sheets
Staple Wire
Calculator
Columnar Book
Liquid Eraser
Paste/Glue
Folder long
Paper clip
Pentil pen
Log book
30.00
675.00
50.00
35.00
20.00
3.00
20.00
30.00
80.00
x
x
x
x
x
x
x
x
x
8
1
4
1
1
40
1
1
4
boxes
pc
pcs
ps
pc
pcs
box
pc
pcs
50.00
box
Sub-Total
3. Project Meetings
Supplies
Snacks
Sub-Total
4. MCT-Initiated Meetings
Sub-Total
5. Treasurer Payroll Processing
Sub-Total
6. Forms/Supplies and
Reproduction
Fastener
Sub-Total
TOTAL FOR ADMIN COST
Prepared by :
Approved by :
ELSA A. TRUNO
MEO Staff
Checked by:
BSPMC Chairperson
Concurred by :
RODSON R. ESCORA
Deputy Area Coordinator
Barangay Captain
Municipal Mayor
Recommending Approval:
Noted by:
GEORGE S. ISULAT
Regional Community Infrastructure Specialist
Amount
1,500.00
500.00
800.00
2,800.00
1,980.00
1,440.00
1,320.00
2,400.00
7,140.00
=
=
600.00
4,800.00
5,400.00
3,900.00
6,000.00
9,900.00
3,600.00
2,400.00
6,000.00
=
=
1,050.00
6,000.00
=
=
=
=
=
=
=
=
=
240.00
675.00
200.00
35.00
20.00
120.00
20.00
30.00
320.00
50.00
8,760.00
40,000.00
BSPMC Chairperson
Barangay Captain
June 4, 2014
June 7, 2014
-do-
Procurement Activities
Procurement Activities
Timeline to complete
Responsible Volunteer/s and Project Staff
the activity (Inclusive Conchita Tubog - PT Head and PT members,
( Complete
Ricky
T. Panoy-Name)
ACT-CF
Dates)
#REF!
Timeline to complete
the activity (Inclusive
Dates)
October 4, 2014
October 5, 2014
Procurement Activities
Prepared by:
Reviewed & Checked by:
CONCHITA TUBOG
PT Chairperson
Resources
Requirement
Expected outputs/
Remarks
POW/Detailed
Estimates
Draft PCPP
Final PCPP
Final PCPP
Conference Conducted
Office supplies
Minutes of Conference
ACT Office
Invitation to
Quote/Canvass
Documents
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Acknowledgement
Receipt
Constractor's Office,
Establishment
Name of Potential
Suppliers Contractors
Contractors: Uy Matiao
Trading Corporation, HLJ
Construction & Enterprise,
Big Foot Construction &
Supply, VVER Construction,
Leymark Construction,
NAKKA Construction, Wenly
Tan Construction, Tenaja
Construction & Services,
R.E. SINGSON
Construction, PhilSouth
Builders, SM & MST
Construction, Dumaguete
Zenith Commercial, Uy
Condev Construction
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Supplier's Office,
Establishment
Suppliers: Gold
Enterprises, Lucky
Enterprises, JM
Commercials, Dumaguete
Zenith Comercial, Octagon
Hardware, Duplamilco, LKC
Hardware
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Acknowledgement
Receipt
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Acknowledgement
Receipt
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Supplier's Office,
Establishment
Submitted Canvass
Form/Invitation to
Quote
Opening Conducted
Office Supplies
Minutes of Opening
Opened
Canvass/Quotation
Evaluation Conducted
Office supplies
Minutes of Evaluation
Office of the
Contractor/Supplier with
Lowest Calcuted Quotation
Lowest Calcuted
Quotation
Documents
Purchased Order
ACT Office
#REF!
Post Qualification
Evaluation Conducted
Post Qualification
Evaluation Report
NOL Issued
Final PO/Contract
Name of Potential
Suppliers Contractors
Office of the
Contractor/Supplier with
Lowest Calcuted
Responsive amount and
recommended for Award
Resources
Requirement
Expected outputs/
Remarks
Delivery
Receipt/Delivered
Goods
Delivery
Receipt/Delivered
Goods
Noted by:
Materials
Delivered/Contract
Implementation Started
Approved by:
LEONILA B. PATAJO
BSPMC Chairperson
:
:
:
Local Counterpart :
KALAHI Grant
Community
Barangay LGU
Municipal LGU
TOTAL
SPI Stage / Activities
Conducted
ITEM 102 Surplus Common
Excavation
PHP
PHP
PHP
PHP
PHP
Negative Impact
1,362,169.00
17,925.00
11,000.00
267,456.00
1,658,550.00
Mitigating Measures
a.
Deep Excavation/Ground
Leveling
a-1.
b.
Presence of Heavy
Equipment in the project
Site
b-1.
c.
c-1.
a.
Presence of Heavy
Equipment in the project
Site
a-1.
a-1.
b-1.
b.
b-2.
c.
c-1.
none
Reviewed by:
Prepared By:
LEONILA B. PATAJO
RICKY T. PANOY
BSPMC Chair
Community Facilitator
CARMEN A. GAUDIANO
RODSON R. ESCORA
Municipal Engineer
Concurred by:
: Ocotber 9, 2013
Barangay
Municipality
Province
: Magsaysay
: Dauin
: Negros Oriental
:
:
SOURCES OF FUNDS
DESCRIPTION
PACKAGES
PACKAGE ITEMS
QTY
UNIT COST
TOTAL
KC Grant:
LCC:
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PROC
METHOD
TRAN
1st Tranche
KC Grant
2nd Tranche
LCC Cash
KC Grant
Package 1 - A
Package 1
Hardware:
Portland Cement (40kgs) Type 1
1470
bags
245.00
#REF!
length
340.00
#REF!
kg
46.50
#VALUE!
# 4 CWN
Hard Asphalt (Joint Filler)
#REF!
bags
1,950.00
Sub-Total (Actual)
360,150.00
#REF!
#REF!
306,127.50
LOCAL
SHOPPING
FOR GOODS
(LSG)
#REF!
#REF!
bags
54,022.50
#REF!
#VALUE!
#REF!
#REF!
54,022.50
#REF!
#REF!
#REF!
#REF!
-
LOCAL
SHOPPING
- FOR GOODS
(LSG)
#REF!
Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
#REF!
#REF!
#REF!
Package 3
Package 2
Base Aggregates
Embankment (Fill) Materials
363.15
cu.m
#REF!
cu.m
#REF!
#REF!
550.00
Sub-Total (Actual)
#REF!
#REF!
LOCAL
SHOPPING
FOR GOODS
(LSG)
#REF!
#REF!
cu.m
cum
640.00
790.00
Sub-Total (Actual)
#REF!
#REF!
#REF!
#REF!
LOCAL
SHOPPING
FOR GOODS
(LSG)
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Package 3-A
Aggregates
Class A Stone
#REF!
Sub-Total (Actual)
cum
690.00
LOCAL
SHOPPING
#REF!
FOR GOODS
(LSG)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Package 4
Form Lumber
2"x2"x8' Coco Lumber (Formworks)
#REF!
bd.ft
21.00
#REF!
bd.ft
21.00
Sub-Total (Actual)
#REF!
Package 5
#REF!
LOCAL
SHOPPING
FOR GOODS
(LSG)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
cu.m
#REF!
#REF!
#REF!
LOCAL
SHOPPING
#REF!
FOR GOODS
(LSG)
#REF!
Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Package 6
lot
45,000.00
#REF!
#REF!
#REF!
days
days
days
20,000.00
15,000.00
15,000.00
Sub-Total (Actual)
45,000.00
45,000.00
38,250.00
LOCAL
SHOPPING
FOR GOODS
(LSG)
6,750.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
#VALUE!
#REF!
#VALUE!
Package 10
Package 9
Package 8
Package 7
#REF!
days
days
700.00
520.00
Sub-Total (Actual)
#REF!
#REF!
#REF!
lot
lot
#REF!
Sub-Total (Actual)
#REF!
#REF!
unit
8,450.00
Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
Total Direct Cost
Handtools & Personal Protective Equipment (PPE)
Hard Hat
#REF!
Hand Glooves
10.00
Shovel w/ handle
10.00
Face Mask
10.00
Safety boots
10.00
Sub-Total (Actual)
Savings amount determined after procurement
#REF!
#REF!
#REF!
1.00
LOCAL
SHOPPING
FOR GOODS
(LSG)
LOCAL
SHOPPING
FOR GOODS
(LSG)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
13,612.84
11,153.12
4,000.00
2,163.02
40,000.00
39,340.00
24,765.96
6,163.02
79,340.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
8,450.00
LOCAL
SHOPPING
8,450.00 FOR GOODS
(LSG)
#REF!
#REF!
#REF!
pcs.
pairs
pcs.
pcs.
pairs
set
85.00 #REF!
35.00
350.00
225.00
2,250.00
8.50
85.00
280.00
2,800.00
1,750.00
1,750.00
#REF!
#REF!
6,760.00
1,690.00
6,760.00
1,690.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
LOCAL
SHOPPING
FOR GOODS
(LSG)
#REF!
#REF!
#REF!
280.00
1,800.00
68.00
2,240.00
70.00
450.00
17.00
560.00
1,400.00
350.00
#REF!
#REF!
#REF!
#REF!
79,340.00
Package 13
Package 12
Package 11
1.00
pcs.
6,400.00
Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
Environmental Mitigating Cost:
Warning Sign
5.00
Barricade
5.00
pcs.
pcs.
280.00
280.00
Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
Indirect Cost:
Overhead Cost
Project Supervision
Administrative Cost
Bidding Publication
#REF!
#REF!
6,400.00
5,120.00
1,280.00
5,120.00
1,280.00
#REF!
#REF!
#REF!
#REF!
#REF!
1,400.00
1,400.00
1,120.00
1,120.00
280.00
280.00
2,240.00
560.00
#REF!
#REF!
#REF!
#REF!
LOCAL
SHOPPING
6,400.00 FOR GOODS
(LSG)
#REF!
LOCAL
SHOPPING
2,800.00 FOR GOODS
(LSG)
#REF!
#REF!
#REF!
#REF!
5,860.00
7,491.42
Materials Testting
CFA
Treasurer Bond
8,000.00
8,000.00 #VALUE!
Contingency Cost
Sub-Total (Actual)
#REF!
15,491.42
#REF!
#REF!
2,403,025.00
SAY
%
#REF!
#REF!
Checked & Reviewed by:
#REF!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
5,860.00
#REF!
#REF!
#VALUE!
85,200.00
1,602,080.00
320,340.00
200,260.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
5,860.00
#REF!
#REF!
#REF!
#REF!
#VALUE!
Recommending Approval:
FELIX ABELLANO
TEODOLO T. BULISID
RODSON R. ESCORA
PPT
CARMEN A
Municipa
.
PERCENTAGE WEIGHT
LEGEND:
FUND SOURCE
AMOUNT
(PESO)
KC GRANT
#REF!
TOTAL
TO KC
GRANT
TO LCC
CASH
#REF!
#REF!
#REF!
TOTAL LCC
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
LCC - In-kind
LCC - Cash
TOTAL
#REF!
#REF!
#REF!
REMARKS
TRANCHING SCHEDULE
TOTAL
2nd Tranche
3rd Tranche
LCC Cash
KC Grant
LCC Cash
TOTAL
KC Grant
LCC Cash
54,022.50
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#REF!
54,022.50
#REF!
360,150.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
MONTHS
1
306,127.50
#REF!
PROPOSED
IMPLEMENTATION
SCHEDULE
#REF!
#REF!
#REF!
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6,750.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
2,500.00
5,825.00
7,835.00
45,621.02
8,325.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
7,835.00
45,621.02
45,000.00
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
22,087.16
23,533.86
#REF!
#REF!
-
#REF!
38,250.00
4,000.00
3,835.00
#REF!
#VALUE!
#REF!
#VALUE!
#REF!
#VALUE!
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
75,700.00
74,026.98
#REF!
#REF!
10,500.00
11,823.02
#REF!
#REF!
86,200.00
85,850.00
22,323.02
172,050.00
#REF!
#REF!
#REF!
#REF!
149,726.98
#REF!
#REF!
6,760.00
1,690.00
8,450.00
6,760.00
1,690.00
8,450.00
#REF!
#REF!
#REF!
8,325.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
280.00
1,800.00
68.00
2,240.00
70.00
450.00
17.00
560.00
350.00
2,250.00
85.00
2,800.00
1,400.00
350.00
1,750.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
5,120.00
1,280.00
6,400.00
5,120.00
1,280.00
6,400.00
#REF!
#REF!
#REF!
#REF!
13,488.58
7,000.00
30,000.00
6,000.00
8,708.92
1,500.00
5,008.58
1,500.00
4,000.00
#REF!
#REF!
1,120.00
1,120.00
280.00
280.00
1,400.00
1,400.00
2,240.00
560.00
2,800.00
#REF!
#REF!
3,442.50
#REF!
#REF!
#REF!
19,348.58
7,000.00
37,491.42
6,000.00
12,151.42
1,500.00
13,008.58
1,500.00
12,000.00 #VALUE!
- #VALUE!
81,840.00
#VALUE!
#REF!
#REF!
31,500.00
8,500.00
50,500.00
7,500.00
#VALUE!
#VALUE!
-
3,442.50
60,488.58
16,717.50
#REF!
#REF!
3,442.50
#REF!
#REF!
#REF!
60,488.58
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#VALUE!
#VALUE!
16,717.50 #REF!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
#REF!
11,277.50
106,109.60
25,042.50
#REF!
#VALUE!
#VALUE!
40,042.50
200,260.00
40,042.50
1,837,292.00
371,253.00
2,403,025.00
115,060.00
#REF!
94,150.40
#REF!
#VALUE!
Submitted by:
#VALUE!
Noted by:
CARMEN A. GAUDIANO
GEORGE A. ALAS-AS
GEOGRE S. ISULAT
Municipal Engineer
BSMPC
Negros Oriental
Mode of Implementation:
By Contract
PACKAGE ITEMS
Direct Cost:
Materials
Package 1
Unskilled labor
Contract
Indirect Cost:
Hand tools/PPE
Pre-engineering
Project Supervision
CFA
In - Kind
In - Kind
25,260.00
3,157.50
3,157.50
2,000.00
3,200.00
400.00
400.00
### 3,557.50
3,557.50
TOTAL
Workshop output of:
Checked by:
Reviewed by:
FELIX AVELLANO
Procurement Team Head
CARMEN A. GAUDIANO
RODSON R. ESCORA
Municipal Engineer
TERPART CONTRIBUTION
ED and SCHEDULE OF
RY
PROPOSED
IMPLEMENTATION
TOTAL
SCHEDULE
31,575.00
2,000.00
4,000.00
ESCORA
ordinating Team
###
Submitted by:
GEORGE ALAS-AS
BSPMC Chairperson
1st Tranche
CHECKLIST OF DOCUMENTARY REQUIREMENTS
Barangay MAGSAYSAY
Municipality of Dauin
Sub-Project Title: Concreting of Barangay Road
Phase/Cycle: 2
RFR REVIEW SHEET
Item #
1st TRANCHE
Requirements
Comments
Actions Taken
For Asec. CGG/ NPM's Signature
For regional compliance
For Transmittal to Finance Unit
Returned to Region
KALAHI-CIDSS:MCC
As of October 31, 2
PA
C
KA
G
ES
Barangay :
MAGSAYSAY
Municipality : Dauin
Sub-Project : Concreting of Barangay Road
Package Items
Cash
In-Kind
SCHEDULE OF LOCAL
2nd Tranche
Cash
1st Tranche
Cash
Planned
In-Kind
Actual
Planned
Actual
Planned
DIRECT COST:
I# 102-Surplus Common
I# 104-Embankment
I# 200-Aggregate Sub-ba
I# 311-PCCP
I# 505-Grouted Riprap
I# 500-Installation of RCPC
Project Steel Billboard
Unskilled Worker
TOTAL DIRECT COST
INDIRECT COST:
Overhead Cost
Bidding Publication
Administrative Cost
Package 5
Materials Testing
Treasurer's Bond
Contingency
Handtools / PPE
Package 2
Pre-Engineering
Project Supervision
Environmental Impact
Package 4
BSPMC Filing Cabinet
Package 3
VAT (7 % of Direct Cost
Package 1
TOTAL INDIRECT COST
GRAND TOTAL
Package 1
Prepared by:
11,766.00
25,013.09
35,732.85
81,221.35
53,353.50
6,000.00
1,500.00
208,586.79
31,575.00
0.00 31,575.00
0.00
6,000.00
0.00
0.00
34,042.50
34,042.50
40,042.50
1,500.00
8,000.00
2,000.00
5,253.75
1,758.00
8,500.00
720.00
1,500.00
82,521.46
111,753.21
320,340.00
2,000.00
4,000.00
0.00 6,000.00
0.00 37,575.00
Verified by:
ARLENE P. GESULGA
Municipal Financial Analyst
ALAHI-CIDSS:MCC PROJECT
438,000.00
:
:
400,425.00
37,575.00
0.00
0.00
0.00
Planned
Actual
Planned
Actual
Planned
TOTAL
Cash
Actual
0.00
0.00
6,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,500.00
8,000.00
2,000.00
5,253.75
17,038.50
1,758.00
0.00
8,500.00
720.00
1,500.00
133,567.96
179,838.21
400,425.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,038.50
0.00
0.00
0.00
0.00
Verified by:
17,004.00
0.00 34,042.50
0.00 40,042.50
0.00
0.00
0.00
0.00
Actual
11,766.00
25,013.09
35,732.85
81,221.35
65,353.50
0.00
1,500.00
0.00
220,586.79
6,000.00
0.00
Planned
Noted by:
JOEL A. EREDIANO
Area Coordinator
TOTAL
In-Kind
Planned
Actual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,575.00
31,575.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,000.00
4,000.00
0.00
0.00
0.00
6,000.00
37,575.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oordinator (RFFP-Coordinator)