LIST OF HYDROPOWER PROJECTS UNDERTAKEN BY MM PAKISTAN (PVT) LTD.

Project

Client

Description

Fee
Million

Value
Million
Rs: 59.10
billion

Consultancy Services
For Construction
Supervision of Kurram
Tangi Dam

WAPDA

The Kurram tangi Dam is located on


the Kurram River in north Waziristan
Agency in the Fata area of the KPK
province. The actual dam site is
located 22km upstream of the Kurram
Garhi Head works and 32km north of
Bannu City.
Key components:
322ft high& 1035ft in length CFRD
and appurtenant structures.
1 Spillway
2 cofferdams
Diversion tunnels
Stilling Basins
3 Weirs
5 tunnels
5 Powerhouses
New Head Regulator on left bank of
Kurram Garhi Head works and Thal
Canal.
Remodelling of existing Canals
(Civil and Marwat) Kaitu Weir and
Irrigation system compromising of
construction of new canals.
Main objectives:
Productive use of water resources
of Kurram and Kaitu River.
Irrigate new areas in Sheratallah,
SpairaRagha and Thal plains.
Supplementing existing command
areas of Civil and Marwat Canals.
Hydropower generation.
Improvement in the socio-economic
conditions of the most backward
area of KPK

Rs.
484.23

Consultancy Services of
Feasibility Study for
Investigation, Designing
and Initiating the
Construction Work for
Detention Weirs / Check
Dams / Small Dams in
Dadu and Larkana
Districts

Irrigation & Power


Department, GOS

The Project covers small dams in Dadu


and Larkana Districts of Sindh
Province.
The Consultancy assignment includes
Preliminary Studies, Feasibility Studies
and Design Report.

Rs. 29.13

Sediment Management
Study of Tarbela
Reservoir

Water and Power


Development
Authority.

Establish Consultants furnished office


at Tarbela Dam.
Review of existing, on-going, and
planned projects relevant to the study.
Procurement of Modern Equipments
for the Study.
Environmental & Ecology Studies.
Geotechnical Studies.
Assistance in Computer Modelling to
MML & HR Wallingford.
Assistance in subcontracts execution
to MML & HR Wallingford.

Feasibility Study,
Detailed Engineering
Design and Preparation
of Tender Documents for
Bunji Hydropower
Project

Water & Power


Development
Authority (WAPDA)

Bunji Hydropower Project is located on


the Indus River in the districts of Gilgit
and Skardu. The selected project
layout includes 180 m high dam. The
reservoir will extend 17 km upstream
from the dam in a narrow valley and
have a gross storage of 282 million
cubic meters. The optimised maximum
power of the project is 5400 MW with a
corresponding discharge of 1500 cubic
meters per second.

2015

2013

Rs. 201

Rs. 689

Completion

2013

2012

LIST OF HYDROPOWER PROJECTS UNDERTAKEN BY MM PAKISTAN (PVT) LTD.


Project

Client

Preparation of Detailed
Engineering Design,
Tender Documents and
PC-1 of Tarbela Dam 4th
Extension Hydropower
Project (Assignment-A)

WAPDA

Jinnah Barrage
Rehabilitation &
Modernization Project

Irrigation & Power


Department, Govt. of
Punjab,
PMO for Punjab
Barrages.

Description

The preparation of proposed project


Tarbela Dam 4th Extension of
Hydropower will be financed by the
credit proceeds for the WCAP. The
studies carried out so far have
identified the Tarbela 4th Extension
Hydropower Project by installation of a
Hydropower plant on the Tarbela Dam
4th Tunnel which is currently designed
as the irrigation tunnel is technically
and economically feasible without
affecting the irrigation release
capabilities of the Tarbela Dam.
Studies also show that the optimum
capacity of the hydropower plant on
Tunnel-4 is 960 MW, comprising two
generating units of 480 MW each. The
objectives of the consultancy
assignment are to prepare this project.

Rs. 29.6

This consultancy is for preparation of


detailed design of Jinnah Barrage
Rehabilitation and Modernization
Project to meet the requirements of the
Government and the World Bank,
including but not limited to the
following:

Local Rs.
45.759
Foreign
0.131

Consultancy Services for


Conducting the
Feasibility Study for 655
MW Suki Kinari Hydro
Power Project

S.K. Hydro (Pvt) Ltd.

Detailed Engineering
Design of Satpara Dam
Project

HEPO, WAPDA

Fee
Million

Value
Million

Completion

Design
Phase:
2012
Construction
Phase: 2017

2009

Detailed Design of the selected


structure with complete drawings
The impact of the very high 1992
flood that was close to the 100year return period and the
frequency and extent of
replenishment of the downstream
rock apron is to be examined.
Study the impact of the WAPDA
Hydropower project on detailed
design of Jinnah Barrage e.g. the
effect of by pass on the river
morphology.
Social and Environmental
assessment, Preparation of
Project estimates, reports and
economic analyses on the format
of the Performa-1 of Planning
Commission, Islamabad (PC-1
Performa).
Development of TORs for
supervision consultants and other
consultants.
Incorporate suggestion / advices
of POEs as and when required.
Design of capacity building
activities.
Rs. 23.75
0.43

Review of previous reports of


chart T. Man & GTZ
Collection of Hydrological Data
Preparation of tender documents
for Topo Survy and Geo-Tech
Investigation
Selection of site in the light of
previous reports and later studies.

The assignment involves

Review the detailed designs,


reports / data, surveys and
investigations, incorporate
proposed changes in the designs
and prepare construction drawings
for civil, irrigation and hydraulic

Rs. 70

2007

2006

LIST OF HYDROPOWER PROJECTS UNDERTAKEN BY MM PAKISTAN (PVT) LTD.


Project

Client

Description

Fee
Million

Value
Million

Completion

steel works, to check the


suppliers designs for mechanical
and electrical works.
Propose additional surveys and
field investigations as required for
implementation of the project.
The construction supervision,
monitoring of works and
administration of contracts will be
of such a quality as to allow
WAPDA and GOP for a smooth
implementation of the project.

Preparation of Feasibility
Study, Detailed
Engineering Design and
Tender Drawings /
Documents for Kurram
Tangi Dam

WAPDA

The study comprised the following


jobs:

Review and updation of all


existing studies, reports and data

Carrying out additional


investigations / surveys

Preparation of feasibility report

Preparation of engineering design


and tender drawings / documents.

Rs. 83

Neelam Valley Hydro


Project, Jagran

HEB/AJK

Review and approve design criteria,


design report, supervise geotechnical
investigation, specification report,
layout and construction drawings,
assembly drawings, as built drawings,
progress reports. Project Management.
Construction Supervision. Supervise
erection installation, testing and
commissioning E&M plant. Certification
of invoices monthly progress and
quality, attending meetings.

Rs. 19.8

Low Head Hydropower


Potential Project

Govt. of NWFP

Hydrological/Geological Studies,
Feasibility Study, PC-I, Detailed Design
- BOQ, Economics Financial Analysis,
Environment Impact Assessment,
Tender Documents, Construction
Drawings, Design Report and
Calculation.

Rs. 1.2

2004

Rs. 4000

1999

1997