HYDERABAD METROPOLITAN WATER SUPPLY &

SEWERAGE BOARD

Sewerage System in Hyderabad


maintained by HMWSSB

SNAP SHOT DETAILS OF WATER SUPPLY


HMWSSB
SERVICE AREA
Erstwhile MCH area
Peripheral & adj. Municipal areas
Total (GHMC)

MCH & Peripheral Areas


169.30 Sq.Kms
518.90 Sq.Kms
688.20 Sq.Kms

WATER SUPPLY
Length of Distribution Network
Installed Capacity of
Treatment System

: 6780 Km

No of Connections

: 7.92 Lakhs

Monthly Revenue

: Rs.62 Crores

Population Served

: 90.00 Lakh

Bore Wells (Power)

: 1078 Nos

Bore Wells (Hand Pumps)

: 6098 Nos.

Public Stand Posts

: 6599 Nos.

: 340 MGD

SNAP SHOT DETAILS OF SEWER SYSTEM


HMWSSB

Length of 600 mm dia and above

572 Kms.

Length of Laterals and Sub Mains


Kms. (Excluding all surrounding municipalities)

3500

No. of Sewer Manholes

1.72 Lakh

Sewerage treatment facility

750 MLD

1250 MLD

(Including GHMC, HMDA & Board)

Estimated Sewerage generated

Year and Capacity augmentation in Phases

80
60
90

Osmansagar

Himayathsagar

Manjeera

Singur

2007

15

90

38
2004

15

37

1993

Year

1920

30

1991

25

1981

20

1965

40

1927

Capacity in MGD

100

Krishna

Total Installed Capacity


340 MGD.
Sources becoming less reliable Osmansagar (25Mgd) & Himayathsagar (15Mgd)
dependability has gone below 40%
4

Sources of Water Supply:


The HMWSSB supplies potable Drinking Water to the citizens of
Hyderabad & Secunderabad City and provides Bulk water supply to the
Surrounding Municipalities, Cantonment Board, Osmania University, MES,
Railways, Industrial units etc.,
Presently, HMWSSB is drawing water from the following five sources
whose normal drawls and present drawls are shown below:
Sl.
No.

Source

Year
Commissioned

Normal
drawls
(in MGD)

Present
drawls
(in MGD)

Osmansagar

1920

25

23

Himayathsagar

1927

15

17

Manjira Barrage (Phase I &


II)

1965 & 1981

45

45

Singur Dam (Phase III & IV)

1991 & 1993

75

75

Krishna Project

2004 & 2006

90 & 90

180

340

340

Total from all sources

Back Ground:
A beginning was made in the year 1931, for development of sewerage
system in Hyd & Secbad, covering an area of 54 Sqkm. for a population of
4,68,000
Later Developments:
Old City:
A & H&L mains laid with laterals, (sewage is carried through a siphon at
Chadarghat and outfall sewer to Amberpet Treatment Plant).
New City & Secbad:
K&S trunk sewer from IDPL to Amberpet, and Kalasiguda Main from
Secbad Station to Hussainsagar surplus nala to join K&S main.

Remodeling Sewerage Scheme (1984-1992):


Old City:
Duplicate A main from
Kandhikal Gate to Kamal Talkies

Cap (Mld)

Length (Km)

62

4.93

Extension of H&L main

53

1.95

New City&Secbad: (Sew&Ind Effl).


Duplicate K&S trunk sewer
from IDPL to Amberpet

Cap (Mld)

Dup.Kalasiguda Main from


Secbad Stn to Nallagutta
to join Dup. K&S Main
Upgradation of Amberpet STP
to Primary Treatment

Length (Km)

362

18.50

30

5.00

113 Mld cap

Duplicate outfall sewer - From Chadarghat to Amberpet Treatment Plant.


7

Construction of Nalas
Afzal Sagar Nala
Balkapur Channel
Premnagar Drain
Ameerpet Nala
Amberpet Tank & Nagamaiah Kunta Nala
Hussainsagar Nala
Murki Nala
Panja Gutta Nala
Surplus course of Panjagutta Nala
Yousufguda Nala
Hyderabad Water Supply & Sanitation Project (WB Aided):
{Cost Rs.42.00 Cr - Commissioned during-98}

Sewer mains, Dup A & K51 mains

Diversion of sewage from Yousufguda &


Banjara Nalas, Balkapur channel, Somajiguda,
Madarsa Maktha to the sew.main.

STP (20 Mld)


Necklace Rd.

at -

To treat part of sewage from Dup. A main and


disposal in the lake to maintain the hydrology of
the lake.

Constructed at six places on the incoming


nalas for diverting the raw sewage into sewer
8
mains.

I&D structures

Jeedimetla Sewer Main:


{Cost Rs.3.13 Cr - Commissioned during-1998}
Jeedimetla Effluent Treatment Plant to Duplicate K&S main.
Length 10.08 Kms.
Capacity 23.35 Mld
1st Megacity Project:
Under this project, Saidabad to Moosarambagh, Kanchanbagh to
Singareni Colony, K-51/28 sewers, and Habsiguda sewer network
have been completed.
Laying of local sewers in slums (MCH area): (2001-03)
G.O.Ms.No:441, MA&UD (W2) Deptt., dt:28.9.01 (Rs.54.00 Cr.Proj)
No.of slums
408
Length of sewer mains
240 Kms. (Ph-I & II)
Completed
PETL Sewer Main upto Dup.K&S main, Balanagar (2003-04)
Cost
Rs.11.50 Cr.
Work completed
100%
Total length
22.3 Kms.
Laid length
22.3 Kms.
9

Strengthening & Improvement of sewerage system in MCH area.


(G.O.Ms.No:519, MA&UD (W2) Deptt., dt:14-11-2003 Rs.150.00 Cr.)
Sewer mains
17 Nos.,
Total Length
72.50 Kms
Length of sewers laid
33.21 Kms Mains
16.00 Kms Laterals
NRCD Project (2005-2008): (Cost Rs.339.00 Cr.)
4 STPs
592 Mld cap.
339 Mld STP at Amberpet
172 Mld STP at Nagole &
30 Mld STP at Nallacheruvu
51 Mld STP at Attapur
Sewer mains
33 Kms.,
Interception & Diversion structures
on incoming nalas in to Musi 16 Nos.

10

Abatement of pollution to river Musi


Musi River flows through midst of the Hyderabad City
bifurcating city as South of Musi and North of Musi.
The entire sewage flows to River Musi through
various open nalas from South & North parts.
To contain such dry weather flows in the nalas and in
the Musi River, the Ministry of Environment & Forests,
GoI, has approved a project under National River
Conservation Plan of NRCD for laying suitable
Conveying Mains, construction of Interception &
Diversion Structures on Nalas and Sewage Treatment
Plants for treatment and disposal of sewage.
11

Pollution concentration at Amberpet Causeway


12

Pollution concentration in Surplus Nala


downstream of H.S.Lake.

13

Pollution levels in Muriki Nala near Chaderghat


14

Musi River near Chaderghat Area Showing Gas Bubbles


indicating Septic Conditions

15

Musi River at Chaderghat Lower Bridge


16

River Musi Flowing at the Back side of Imlibun Bus Station


17

River Musi Flowing at Nagole Bridge

18

Polluted Musi at Nagole Village

19

Musi River Pollution near Salarjung Bridge

20

Implementation of NRCD Project


Administrative approval given by Ministry of E&F, GoI.
i)
ii)

GoI Share (70%)


GoAP Share (30%)

Total

Commencement of the Project

Completion of the Project


(except Attapur STP due to land dispute)
Probable completion cost of project
-

Rs.234.958 Cr
Rs.100.697 Cr
------------------Rs.335.655 Cr
------------------Sep2004

2009
Rs.400.28 Cr.

21

KEY COMPONENTS OF THE PROJECT:


Construction of 16 Interception & Diversion
(I&D) Structures

Laying of Conveying Mains to nearby STPs


35.36 Km

Constructions of 4 STPs of 592 Mld Capacity

22

STPs LOCATIONS

NALLACHERUVU
STP
AMBERPET
STP
ZIAGUDA
NAGOLE
STP

MUSI RIVER

ATTAPUR
STP

NANDIMUSALAI
GUDA

23

INTERCEPTION & DIVERSION STRUCTURES LOCATIONS

9
8

6
1

5
2
4

MUSI RIVER

3
16

01. BAPUGHAT NULLAH


02. MUGHALKA NULLAH
03. PURANAPUL NULLAH ( PS )

12

10

13

04. PURANAPUL NULLAH (NORTH)


05. AFZAL SAGAR NULLAH
06. SURPLUS NULLAH

14

11
15

07. GOLNAKA NULLAH


08. PATEL NAGAR NULLAH
09. RAMANTHAPUR NULLAH
10. PURANAPOOL PART-II
(South)
11. BAHADURPUR NULLAH
12. PURANAPUL NULLAH(SOUTH)
13. HIGH COURT NULLAH
14. MUSLIMGANJ NULLAH
15. MURKI NULLAH
16. SAROOR NAGAR NULLAH

24

PLAN SHOWING THE LOCATION OF STPs AND


INTERCEPTION & DIVERSION STRUCTURES

9
8

6
1

EXT. OUTFALL SEWER

2 ZIAGUDA

AMBERPET

NALLACHERUVUSTP

RAMANTAPUR
MAIN(8.0Km)

STP

4
DUP NIS MAIN (4.0Km)

MUSI RIVER

NAGOLE STP

DUP SIS MAIN (13.20Km)

16

ATTAPUR STP
NANDIMUSALAIGUDA

13

10
11

12

14

15

01. BAPUGHAT NULLAH


02. MUGHALKA NULLAH
03. PURANAPUL NULLAH ( PS )
04. PURANAPUL NULLAH (NORTH)
05. AFZAL SAGAR NULLAH
06. SURPLUS NULLAH
07. GOLNAKA NULLAH
08. PATEL NAGAR NULLAH
09. RAMANTHAPUR NULLAH
10. PURANAPOOL PART-II
(South)
11. BAHADURPUR NULLAH
12. PURANAPUL NULLAH(SOUTH)
13. HIGH COURT NULLAH
14. MUSLIMGANJ NULLAH
15. MURKI NULLAH
16. SAROOR NAGAR NULLAH

25

COMPONENT WISE STATUS


STPs STATUS:
Sl.
No.

STP Location

Capacity

Status

Amberpet

339 Mld

Completed & Commissioned

Nagole

172 Mld

Completed & Commissioned

Nallacheruvu

30 Mld

Completed & Commissioned

Attapur

51 Mld

Almost completed, expected to be


commissioned by Sep2012

26

STATUS OF CONVEYING MAINS:


Sl.
No.

Conveying Main

Size

Length

Status

NIS Main

1800 mm

4.00 Km

Completed

SIS Main

2000 mm

13.51 Km

Completed

Ramanthapur Main

1000 mm

8.00 Km

Completed

Bahadurpura Main

1000 mm

5.36 Km

Completed

27

STATUS OF I & D STRUCTURES:


Sl.
No.

Location of I & D

Capacity
(Mld)

Type

Status

Puranapool Pumping
Stn.

4.00

Pumping

Completed

Puranapool

15.00

Gravity

Completed

Afzal Sagar

20.00

Pumping

Completed

Patel Nagar

8.47

Gravity

Completed

Puranapool South

5.00

Gravity

Completed

Puranapool Part-II

5.00

Gravity

Completed

Muslimjung

5.00

Gravity

Completed

High Court

10.00

Gravity

Completed
28

STATUS OF I & D STRUCTURES (Contd.):


Sl.
No.

Location of I&D

Capacity
(Mld)

Type

Status

Saroornagr

30.00

Gravity

Completed

10

Murki Nala

45.00

Gravity

Completed

11

Ramanthapur

10.00

Gravity

Completed

12

Surplus Nala

80.00

Pumping

Completed

13

Bapughat

30.20

Gravity

Completed

14

Mughalkanala

16.70

Pumping

Completed

15

Bahadurpura

37.60

Pumping

Completed

16

Golnaka

6.15

Pumping

Completed

29

OUTCOMES OF THE NRCD Ph-I PROJECT:

A total of 592 Mld sewage treatment facilities developed


i) Amberpet339 Mld
ii) Nagole 172 Mld
iii) Nallacheruvu
30 Mld
iv) Attaupr 51 Mld

The sewage is treated to river disposable standards and being let into
river musi, thereby improvement in the river hydrology and environs

The sewage entering into musi through 16 open nalas have been
intercepted and being conveyed to the STP of respective catchment's
area.

Trunk conveying mains of 1200 mm - 2000 mm dia have been laid for the
above purpose

Improved sanitation facility through Phase-I is achieved to the citizens of


Hyderabad, thereby maintaining hygienic conditions in the habitation and
improved hydrology in the river
30

EXHIBITS OF COMPLETED
COMPONENTS OF THE PROJECT

31

339 Mld STP at Amberpet

Inlet works Coarse Screen

Inlet works - Fine Screen

32

Inlet works Conveyor

Main Pumping Station Wet Well

339 Mld STP at Amberpet

Distribution Box & UASB Reactors

Effluent Channel from Reactor to FAL

FAL - Aerator

33

339 Mld STP at Amberpet

Weir Connecting FAL to Polishing Pond

Connecting channel from Polishing Pond to CMT

34
Chlorine Mixing Tank

Effluent Outlet Channel

172 Mld STP at Nagole


STP commissioned and inaugurated on 13th Dec2008

UASB Reactors

FAL

Polishing Pond

Distribution Boxes

Panel Board in MPS


35

30 Mld STP at Nallacheruvu


STP commissioned and inaugurated on 25th Feb2009

36

I & DS North of Musi Amberpet Catchment

Puranapool Pumping Station

Afzalsagar

Puranapool

Patelnagar

37

I &DS South of Musi Nagole Catchment

Puranapool

Muslimjung

Puranapool Part-II

High Court Nala

38

CONVEYING MAINS

NIS Conveying Main


39

SIS Conveying Main

40

PROPOSED
NRCD PROJECT PHASE-II
(Abatement of Pollution of River Musi)

41

NRCD Project Ph-II

At the time of preparation of first project proposals, the dry


weather flows in the project area was considered for 363.3
Sqkm drainage basin area i.e. the area of erstwhile MCH for
the flows of 2005 horizon year for 592 Mld.

Due to rapid urbanization, further water supply source


augmentation was implemented to meet the water supply
demands of Hyderabad City.

Resulting additional sewage flows are being generated in


Musi catchment area requiring additional conveying mains and
treatment facilities.

Accordingly, as per the guidance of MoEF, GoI, the HMWSSB


prepared and submitted the Detailed Project Report for Ph-II
project under NRCD.
42

SALIENT FEATURES - NRCD PROJECT Ph-II


Total catchment basin area considered under the project is 574.59
Sqkm covering the entire GHMC area draining to Musi river. (MCH
was expanded as GHMC)
The project area on South of Musi is - 158.43 Sqkm i.e. 27.56%
The project area on North of Musi is - 416.11 Sqkm i.e. 72.44%
As per the population projections, the expected sewage flow:
For South of Musi
2024 412 Mld
- 2044 503 Mld
For North of Musi

2024 - 2044 -

926 Mld
1324 Mld

43

The length of the river considered for pollution


prevention is 28 Km under this project as against
the earlier length of 14 Km in the first project.
Now the quantity of sewage flows considered for
the treatment is 610 Mld in addition to the 592 Mld
taken up in the first project and 120 Mld capacity
smaller STPs taken up by HMDA under the Lake
Conservation programme.

44

The Quantity of sewage flowing in the river Musi as


per the dry weather flow measurements:
At chainage 1.0 Km

9.7 Mld

At chainage 4.5 Km

96.4Mld

At chainage 12 Km

472.8 Mld

At chainage 15 Km

716.2 Mld

At chainage 28 Km

949.54 Mld

(considered at Hydershah Court)

(end of GHMC limits, Nallacheruvu)

45

Major Project Components:


Construction of STPs.
Laying conveying mains to STPs.
Construction of I&Ds at Nalas to divert the sewage
into conveying mains.

46

Proposals of STPs:
The entire Musi river catchment in the limits of GHMC has been
divided into 10 sub-catchments locating the STPs for easy
collection of sewage, treatment and disposal.
The total quantity of sewage proposed to be treated at all
locations is 610 Mld.
The details of proposed location of STPs & capacities.
Location of STP
Amberpet
Nagole
Nallacheruvu
Hydershakote
Attapur
Miralam
Fathenagar
IDPL Township
Nagaram (Kapra)
Kuntlur (Hayathnagar)

Capacity in Mld
142
140
80
30
70
6
30
59
29
24

47

Proposals of Conveying Mains:


The conveying mains are proposed on either side of river to intercept the
flows from the Nalas to convey upto the proposed STPs.
The total length of conveying mains proposed to STPs is 74.7 Km.
The details of proposed conveying mains, location & its sizes:
Sl.
No.

Name of conveying main

Location

Length
In Km

Size
(in mm)

4.64

1600 2200

From
Saroornagar I&D

To
STP Nagole

4.03

1600

1.40

Triplicate SIS

(a) Triplicate K & S

Budha Bhavan

(b) Triplicate K & S

Fever Hospital

Fever
Hospital
Surplus Nala

Bapughat

Nallacheruvu

23.30

Kukatpally Y
Junction
IDL, Kukatpally

Fatehnagar

8.35

2.5 x 2.5 M
Duct
2.0 x 2.0 M
2.5 x 2.5 M
3.0 x 3.0 M
Duct
600 1100

Balanagar

10.50

800- 1400

Qutubullapur

IDPL Colony

12.76

600 - 1400

Triplicate NIS

4
5

Fathenagar & Bharatnagar


Main
Balanagar Extension Main

IDPL Mains

Nagaram Main

Kapra Cheruvu

Nagaram STP

8.00

800 1100

Nacharam Main

Nacharam

Nallacheruvu
STP

1.72

1000
48

Proposals of Interception & Diversion Structures:


The additional units of I&Ds are proposed adjacent ot the
existing I&Ds for diversion of excess sewage into proposed
conveying mains.
Total 8 I&Ds are proposed on either side of river to diver the
sewage into new conveying mains.

49

TOTAL PROJECT COST


Sl.
No

Components

Tentative
DPR Cost
(in Crores)

Land Acquisition

18.00

Construction of I&DS for diversion of sewage in


to conveying mains

3.22

3(a)

Construction of Main Pumping Stations of STP

84.43

3(b)

Construction of 610 capacity STPs

474.83

Laying of conveying mains

263.38

Sub-total

843.86

4
5

Centages (@3% of project cost)

24.77

O&M Costs for 3 years

54.34

TOTAL COST

922.97
50

HMWSSB, constantly making efforts from the inception


to strengthen the sewerage system of Hyderabad City
in order to control the pollution levels caused due to
increased sewage flows generated in Hyderabad city
on account of rapid urbanization.
The measures includes; laying of suitable sewer
collection network consisting laterals, branch mains,
trunk mains and large conveying mains & construction
of STPs for treatment of sewage to the river
disposable standards.

51

On implementation of NRCD Project Phase-I, the


sewage pollution levels in the Musi River have come
down to the significantly with treatment of sewage to
the extent of 650 Mld through various sewage
treatment plants.
Further Improved sanitation facility through NRCD
Phase-II would be achieved to the citizens of
Hyderabad, thereby maintaining hygienic conditions in
the habitation and improved hydrology in the river.
Sewage treated to river disposable standards to be let
into river Musi facilitates further prevention of pollution
in the downstream of Musi river.
52