Professional Documents
Culture Documents
Project Change Request
Project Change Request
Date requested:
Request Number
__/__/____
Department/Division:
Description of change requested
Value-Added Amount
Implementation Requirements
Cost of Implementation
Low
High
1.
2.
2.
4.
Total
Return on Investment
Annual savings (revenue enhancement or cost reductions)
Cost of implementation
Associated signiture
Authorizor's Signiture
#DIV/0!
Below are the definitions of the information to be placed in each field of the Project Change Request Form.
Product Definition:
The Project Change Request is the first part of a 2-part packet designed to support the evaluating
tracking of a suggested modification to a project's scope. The Project Change Request contains
information provided by the person making the request. The 2-part packet goes through three ph
first phase is the "Request" phase, the second phase is the "Impact Analysis" phase and the third
the "Approval-Denial" phase. The 2-part packet is designed to drive the change request process
become a permanent record of each specific request.
Date requested:
Request Number
Describe the details of the change being requested. Be sure to attach examples of any screens
that are part of the request. Explain why the change is justified. Be as specific as possible. Foc
benefits and the value the change provides to the organization.
Implementation Requirements
Describe any implementation requirements you are aware of such as training, scheduling, equip
purchases and all related time tables. If specialists are needed be sure to identify them and the
expected to play in the effort.
Cost of Implementation
1. Detail each cost component of the change. Provide the description on the lines
2. provided (add attachments if needed).
2.
4.
Return on Investment
Annual savings (revenue enhancement or cost reductions)
Cost of implementation (average of above total)
Authorizor's Name
Authorizor's Signiture
Date requested:
Request Number
__/__/____
scription
Value-Added Amount
Enter the dollar value
benefit of the change
for each Stakeholder
listed.
Total
Low
High
Enter
Enter
the high
the low
estimated estimated
cost
cost
$
$
$
Authorizor's Signiture
0
#DIV/0!