PTSB (Jsa Form)
PTSB (Jsa Form)
Area/Location
CEFS
Revision
Original Assessment
Date
Company / Department:
RA Team Leader (Name / Designation):
RA Team Members (Name / Designation):
~ Flow Fire Water Test & Support pressure from Fire Pump
~ Damage to Equipment
~ Body
Injury
~ Damage to Equipment
~ Body
Injury
~ Body Injury
~ Damage to Equipment
~ Body
Injury
~ Damage to Equipment
~ Electric Shock
~ Slip / tripping
~ body injury
~ equipment damage
~ Exposed wiring
~ electrocution to worker/operator
~ Damage to
Equipment
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
CEFS Management
Services Staff
~ Broken equipment
~ Damage to Equipment
~ Damage to Equipment
~ Equipment clogging
~ Inspect equipment before using it
~ Damage to Equipment
~ rusty and dented
Cylinder
~ NA
16
~ Equipment falling
~ Body Injury
~ Body Injury
~ Damage to
Equipment
Thi
s Risk Legend:
Se
1-4
Low
Type of Permits, Tick (/) which is applicable
cti 5-9
Medium
Cold Work
on
High
Hot Work
mu 10-25
st
Confined Space
be
co The Hazards, Control and Recovery Measures in this Assessment have been communicated to the persons involved in this activity:
mp Shafeeq bin Shahadan
SHE, Tech
let
Job Supervisor's Name
Designation
ed
wh
en
This Risk Assessment is reviewed by:
no
n
ro
PTSB Employee
Designation
uti
ne
job The Risk Assessment is approved by:
s
to
Permit Approver
Designation
be
car
rie
d
ou
t
CEFS Management
Services Staff
Re-Evaluated
Risk Level
CEFS Management
Services Staff
CEFS Management
Services Staff
~ Body Injury
Risk Control
Implementation
Due Date
Person (Name /
Designation)
~ head injury
~ body injury
~ Equipment falling
Additional Controls
Re-Evaluated
Likelihood
Risk Level
Existing Controls
Likelihood
Possible Consequences
(injury or ill-health) /
Environmental Impact
(include Who or What might
be harmed)
~ Traffic hazard.
Risk Evaluation
Re-Evaluated
Severity
Hazard Identification
Hazards / Environmental
Aspect
Severity
5/19/2015
No
ADMIN
0
0
0
0
0
Physical Isolation
Scafolding
Radiography
Fire Protection
Electrical Isolation
Vehicle Entry
Road Obstruction
5/19/2015
Signature
Date
Signature
Date
Signature
Date
Mitigation
Recovery Measures
E-P-025001, Rev 0
Area/Location
Company / Department:
Revision
Existing Controls
Risk Level
Hazard Identification
Hazards / Environmental
Aspect
Likelihood
Severity
No
Additional Controls
Risk Control
Implementation
Due Date
Person (Name /
Designation)
Re-Evaluated
Risk Level
Re-Evaluated
Likelihood
Re-Evaluated
Severity
Original Assessment
Date
0
0
0
4
0
0
5
0
0
0
0
0
0
0
0
0
0
0
Risk Legend:
1-4
5-9
Low
Medium
10-25
High
Fire Protection
Electrical Isolation
Vehicle Entry
Road Obstruction
The Hazards, Control and Recovery Measures in this Assessment have been communicated to the persons involved in this activity:
5/19/2015
Job Supervisor's Name
Designation
Signature
Date
Designation
Signature
Date
Designation
Signature
Date
PTSB Employee
Permit Approver
Physical Isolation
Scafolding
Mitigation
Recovery Measures
2
Minor
Minor Injury, LTI
Slight Impact
Minor Impact
Slight Damage
Minor Damage
Local Damage
BUSINESS
(CUSTOMER)
Slight impact/Formal
customer complaint
Limited
impact/Customer
complaint result in
financial liability
Considerable
Impact/Loss of
customer
REPUTATION
Slight Impact
Limited Impact
Considerable Impact
IMPACT
PEOPLE
ENVIRONMENT
ASSET
4
Major
Single Fatality
5
Catastrophic
Multiple Fatalities
Major National
Impact
Major Damage
Major International
Impact
Extensive
Damage/Unable to
Operate
Major International
Impact
10
15
20
25
12
16
20
Possible to occur in
the future
Happened at other
place
Once in 10 to 100
years (10-1 to 10-2)
12
15
Rarely/Seldom,
Heard of incident in
the industry
Once in 100 to 10000
years (10-2 to 10-4)
years
10
Unlikely
Never heard of in the
industry
Less than once in
10000 years (10-4)
years
Description
Low
Medium
High
Action
A risk considered LOW. However, control measures should be implemented and recorded
Risk requires a planned approach to control the hazard and applies necessary control measures
Requires immediate action to control the hazard
Impact on People
Impact on Environment
Impact on Asset
1. Spill/leak causing negligible impact 1. Slight Asset Damage
to local environment, contained
- Asset value less than RM 25,000
within the secondary containment
- No disruption to operation
First aid injury or slight health effects and does not reach water and soil ,
not affecting work performance or
and no volatilization to atmosphere
causing disability.
2. Noise, air emission, discharges
Example: first aid injury, exposure to not exceeding company or legislative
non hazardous dusts.
limits
Impact on Business
Impact on Reputation
1. Equipment failure will reduce the Slight Impact
level of performance as required by a - Public awareness may exist, but
customer. May result a formal
there is no public concern
complaint by a customer
2
Minor
Limited Impact
- Local public concern or complaints
- Local media and/or local political
attention with potentially negative
impact for company operations
3
Moderate
Considerable Impact
- Regional public concern. Extensive
adverse attention in local media.
- National media and/or regional
political attention resulting in
negative impact on company
operations
- Adverse stance of local government
and/or action Groups
4
Major
5
Catastrophic
Extensive Damage
- Asset value in excess of RM
10,000,000
- substantial or total loss of
operations
- Terminal recovery more than 6
months
International Impact
- International public attention.
Extensive adverse attention in
international media.
- National/international policies with
potentially severe impact on access
to new areas, grants of licenses
and/or tax legislation