Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

ADEEL AHMAD KHAN

CURRICULUM VITAE
akmusazai@hotmail.com

To be part of an organization where I can widely utilize my


experience by hardworking, creativity, punctuality and
good knowledge, thus benefiting organization and further
improving my own skills. The golden rule of my work style
is Maximum attention, flexibility and adaptability to the
Managements needs to deliver the best Management
satiP
sfEaR
ctSioOnNAL INFORMATION

Father Name
Date of Birth
NIC No
Nationality
Gender
Domicile
Marital Status
Mobile
Home

:
:
:
:
:
:
:
:
:

Ghulam Ahmad Khan


31 March 1987
34101-8838251-7
Pakistani
Male
Gujranwala (Punjab)
Single
0092 322 446 7554
0092 55 329738 0

Postal Address:Adeel Khan S/O Ghulam Ahmad Khan


Near Govt. Girls High School
Ladhawala Warrich Gujranwal
Punjab Pakistan

EDUCATION
Board of Intermediate & Secondary Education Gujranwala

2002 Matriculation (Science)

1st division

Punjab Board of Technical Education, Lahore.

BACKGROUND

2005 DAE (R.A.C)

1st division

University of Engineering and Technology Lahore.


2010 B.Tech (Pass) (Mechanical R.A.C)

1st division

University of Engineering and Technology Lahore.


2013 B.Tech (Hons) (Mechanical R.A.C) 1st division

INTERNSHIPS
Mecatech Pvt.Ltd
HRA Consultant

EDUCATIONAL

Captive-Aire
COMPUTER SKILLS
Microsoft Office
Microsoft Project
Internet Surfing

Academic Project
HVAC Design For Residential Flats
HVAC Design For Hospital
GAS Turbine Power Plant
Major goal was to design a small scale Gas power generation system
using a micro Gas turbine, which is used to provide enough power to
produce electricity.

Professional Experience
Professional Experience

9 Years

PROFESSIONAL

CAREER

Served in the capacity of HVAC Project Engineer in following reputed companies.


April 2015 - Present

Kashif Aslam Associates

February 2013 April 2015

MIA Corporation

November 2010-January 2012

Captive Air

April 2006-November 2010

Mecatech pvt.Ltd

Responsibilities as HVAC Project Engineer at Projects,


Project Planning & Assessments
Quality Assurance & Quality Control
Complete Execution of Work As per drawings
Ducting and Piping Supervision
Supervision of Electrical work relate with HVAC
Building Management System relate with HVAC
Making demand for the site material from the drawing
Shop & As Built Drawings Preparation
Bill management
Technical Submittals
Invoicing
Cost Estimation reputed
Correspondence with Client consultant and all Departments
All Documentation & reports including PRs MRs Material Delivery
Statuses, Procurement Plans etc.

Projects:

Project Capacity

Bank Alfalah (Baghbanpura) (LHR)


80 Ton of Refrigeration
Bank Alfalah (chauburji) (LHR)
40 Ton of Refrigeration
Bank Alfalah (murdike) (LHR)
65 Ton of Refrigeration
Bank Alfalah (Okara)
67 Ton of Refrigeration
PASSCO Head Office Building (Lahore)
420 Ton of Refrigeration
Jinnah Burn center (Lahore)
720 Ton of Refrigeration
SUPARCO Labs (LHR)
640 Ton of Refrigeration
SUPARCO EVT/CATR (LHR)
420 Ton of Refrigeration
Fauji Foundation Head Office Building Block 3 (RWP) 150 Ton of Refrigeration
Fauji Foundation Teaching Hospital Block A (RWP)
210 Ton of Refrigeration
Meezan Bank Head Office Building Karachi
630 Ton of Refrigeration
Pakistan Institute For Parliament Services Islamabad 300 Ton of Refrigeration
Bank Alfalah Head Office Karachi
900 Ton of Refrigeration
MCB Center Lahore
300 Ton of Refrigeration
Emporium Mall Lahore
7000Ton of Refrigeration
PEPSICO (Hari pur Hattar)
135 Ton of Refrigeration
REFERENCES
Will be furnished on demand!

You might also like