com/infra
Drilled pile
for demanding
conditions
Ruukki RD and RDs piles
Applications of RD piles
The use of RD piles in the foundations of different
buildings and structures allows reliable execution of
pile foundations also on sites with demanding soil
or installation conditions and sites requiring piles of
high load-bearing capacity and small installations
tolerances.
RD pile wall
The RD pile wall is a retaining wall solution based on
Ruukki RD piles for particularly demanding conditions
that is installed by drilling. Implementing the foundation
of the building by the RD pile wall eliminates the need of
a special construction-time retaining wall. RD pile wall
speeds up the implementation of the foundation and is
an economically sound solution. For more information
see Ruukki RD pile wall brochure.
Ruukki RD and RDs piles
Pile splices
RD and RDs piles come with threaded sleeves that meet the requirements for rigid splices of Eurocode 1993-5 Finnish
NA and Finnish Piling manual PO-2011. Threaded sleeves can be used with pile sizes RD/RDs115 to RD/RDs220 when
the thickness of the wall is at least 8mm. Piles may also be spliced by welding according to Ruukkis design and
installation instructionss, in which case the piles are delivered with specified bevels.
Identification of piles
Range
RD/RDs90
RD/RDs115/6.3
RD/RDs115/8
RDs125/6.3
RD/RDs140/8
RD/RDs140/10
RD/RDs170/10
R/RDsD170/12.5
RD/RDs220/10
RD/RDs220/12.5
6
RD threaded sleeve
Bearing plates
Usually a bearing plate is installed at the top of the RD pile to
transfer the loads of the superstructure to the pile. The bearing
plate is centred on the pile shaft by an internal sleeve, which
serves to keep the bearing plate in place.
Bearing plate
Threaded
pile section
Threaded sleeve
Casing shoe/
ring bit
Steel grades
Standard steel grade S355J2H and steel grades S440J2H and S550J2H specially manufactured by Ruukki
for piling applications are used for large diameter RD piles. Against special order the piles may also be
delivered in MH steel grades according to standard EN10219 or X grades according to API5L.
Identification of piles
Splicing of piles
Pile accessories
Stock sizes L=12m
RD400/12.5
S440J2H (S355J2H)
RD500/12.5
S440J2H (S355J2H)
RD600/12.5
S355J2H
RD700/12.5
S355J2H
RD800/12.5
S355J2H
Design of RD piles
RD piles are dimensioned according to current
European (CEN) norms and standards and/or national
regulations and guidelines. The extensive range of size
steel grades of Ruukki steel pipe piles provide grounds
for an overall economic foundation solution.
The piles may be dimensioned either as steel structures
or as steel-concrete composite structures. If, in addition
to the normal compressive force, the pile is also
loaded by bending moment/torque or shear force, it is
dimensioned for the combined stresses. The corrosion
Carbon
equivalent
Mechanical properties
Impact strength
CEV max.
Mn
fy min
fu
A5 min
T*)
KV min
[%]
[%]
[%]
[%]
[%]
[MPa]
[MPa]
[%]
[C]
[J]
S355J2H
0.45
0.22
1.6
0.03
0.03
355
470-630
20
-20
27
S440J2H
0.45
0.16
1.6
0.02
0.02
440
490-630
17
-20
27
S550J2H
0.47
0.12
1.9
0.02
0.02
550
605-760
14
-20
27
*) Testing temperature may also be -40 C. Demanded impact energy remains the same.
10
Diameter
[mm]
RD90
88.9
RD115
114.3
RDs125
127.0
RD140
139.7
RD170
168.3
RD220
219.1
RD270
273.0
RD320
323.9
RD400
406.4
RD450
457.0
RD500
508.0
RD550
559.0
RD600
610.0
RD650
660.0
RD700
711.0
RD750
762.0
RD800
813.0
RD900
914.0
RD1000
1016.0
RD1200
1220.0
10
12.5
14.2
16
18
20
11
1
12
5
6
7
8
9
13
Installation
RD piles are installed according to Ruukkis steel
pile design and installation manual and / or national
instructions, such as PO-2011 in Finland. RD piles allow
utilisation of versatile installation equipment with a
view to the requirements and conditions on site. When
selecting installation equipment for drilled RD piles, it
must be ensured that the piles can be installed to the
design depth into solid bedrock through soil layers and
possible obstacles and that the environmental impacts
of drilling remain as small as possible.
The drilling equipment used in the installation of RD piles
are based either on a top hammer or a DTH hammer. Top
hammer drilling equipment can generally be used for
drilling piles up to diameter RD220. The maximum pile
length with top hammer equipment is usually about
30 metres. DTH hammer equipment can drill piles up to
diameter RD1200. Pile length does not have a big impact
on drilling capacity and speed of installation.
14
For more information on Ruukki steel pile products see Ruukkis web pages.
Ruukkis dimensioning software and the Tekla components for piles and pile foundations
can be downloaded from software.ruukki.com.
15
CFI03/022EN/04.2014/PR