Contents
Company Profile
Founded in 1990 MEMCO is an
electrical, mechanical and contracting
group with offices in Dubai, Abu Dhabi,
Sharjah, Ajman and Al Ain. Through this
network we service our clients regionally.
We specialize in the design and planning
of facilities for commercial offices,
corporate, aviation, health, education,
transport, retail, residential, hospitality,
sport and leisure, telecommunications
and commercial clients in the private and
public sectors.
Our Philosophy
MEMCO
clients
expect
clever,
innovative design and planning solutions.
Our mission is to exceed that
expectation. We achieve this through
developing long- term relationships with
our clients, through teamwork and
through maintaining leadership in the
application of technology to our
business.
Wherever we operate, we offer personal
and locally integrated products and
services, which respect local culture,
tradition and law. Our services are
supported by specialization, financial
strength
and
human
technical
resourcing, afforded by our professional
network.
Dubai
P.O. Box 86955
Tel: +971 4 363 6766
Fax: +971 4 363 4488
memco1@memco.ae
www.memcogruop.net
About
MEMCO
is
an electrical /
mechanical contracting group,
based in the Middle East. The
quality of our service products
and their reliable delivery are
fundamental to the projection of a
culture of excellence and the
sustainability of our company. The
objective of this management
system is to provide a basis for
quality
and
for
continuing
improvement in our standards of
performance, levels of service and
our products. The implementation
and ongoing development of the
system is the responsibility of all
partners, managers and staff.
Experience
MEMCOs expansive portfolio of
Provide plant, systems of work, and arrangements for the use, handling,
storage and transport of the articles and substances we use in our work
that are safe and without risk to our health.
Provide all employees with personnel protection and clothing suitable for
the task to which they are assigned.
Provide and maintain safe access to and egress from any place of work
under our control and ensure emergency plans are in place for each place
of work.
Management Chart
Dubai Holding
Tecom
DEWA
Works Department, Al Ain, Abu Dhabi
Al Ain Municipality & Abu Dhabi Municipality
Private Department
ADDC
AADC
ADWEA
ADNOC
Department of Military Works
Al Ain University
Department of Social Services
East West International Group
National Projects & Construction (NPC)
ALDAR
Emirates Identity Authority
Emirates Hospital Supplies Co
Abu Dhabi Police HQ
Secure
Command Of Military Works
Consultants
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
W.S Atkins
Taillibert Gulf Environment
Maunsell Consultancy
Architecture Planning Group (A.P.G.)
Eronat Engineering Consultants
EHAF Consulting Engineers
S.D Arch
Jafar Tukan & Partners Architects & Engineers
Al Salam Engineering Consultant
Tayeb Engineering Consultant
Al Maqam Engineering Consultant
Emirates International Consultant
Parc International
Parsons
Secure
I.D.E.A.S Consultant
BEAD Architects & Engineers
Zone Architects
HOTELS
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
P. W. D., Al Ain
Jebel Hafeet Hotel, Al Ain
Taillibert Gulf Environment
Arab Contractors
1998
Power Consumption
: 6MW
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
FACTORIES
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
Power Consumption
: 3.5MW
GOVERNMENT BUILDINGS
Client
Project
Project Manager
Consultant
Main Contractor
Date of Execution
Scope of Works
Power Consumption
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
Power Consumption
: 5.1 MW
Client
Project
Project Manager
Consultant
Main Contractor
Date of Execution
Scope of Works
Power Consumption
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
: E.I.D.A
: Population Registration & ID Card Building
4 Buildings (U.A.Q , R.A.K , Ajman , Fujairah)
: Dar Al-Khaleej
: Memco Group
: (U.A.Q & Ajman 2008 , R.A.K & Fujairah 2009)
:
Design and Execution of Electrical System
Fire Alarm System
Sound System
Telephone System
Data Network
Audio Visual System
C. C. T. V. Camera System
Electrical Lighting
Garden Lighting
Queue Management System
Access Control System
Design and Execution of Fire Fighting System
Design and Execution of Plumbing & Drainage
Domestic Water Network
Hot Water Network
Drainage Network (external & internal)
Design and Execution of HVAC Work
Installation of HVAC System
Design and Execution of Infrastructure Work
a. Water supply system
b. Drainage system
c. Electrical system
d. Telephone system
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
P. W. D., Al Ain
Extension of Al Ain Municipality
Architectural & Planning Group
Rasco
2004
Power Consumption
: 2.0MW
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
P. W. D., Al Ain
Guard Administration Building, Al Ain
W. S. Atkins & Partners Overseas
Bin Ham Gen. Contracting Co.
2003
Power Consumption
: 6.0MW
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
Power Consumption
: 3MW
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
Power Consumption
: 2.0MW
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Work
:
:
:
:
:
:
Dubai Municipality
Offices, Workshop, Accommodation
Bel Yoahah Architectural & Engineering Consultants
Metac General Contracting Co.
2007
Power Consumption
: 2 MW
`
Client
Project
Consultant
Our Contract Value
Date of Execution
Scope of Works
:
:
:
:
:
:
All Work was executed in the data centre while the power supply was ON without any
disconnection.
`
Client
Project
Consultant
Date of Execution
Scope of Works
:
:
:
:
:
Al Ain Municipality
Municipality Building, Al Hayer Branch
Dr. Balfour & Sons
1994
Client
Project
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
P. W. D., Al Ain
Commercial Market, Al Oha
Genco
1992
HOSPITALS
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Work
:
:
:
:
:
:
Power Consumption
: 10MW
`
Client
Project
Consultant
Main Contractor
Main Contract Value
Our Contract Value
Date of Execution
Scope of Work
:
:
:
:
:
:
:
:
Power Consumption
: 3MW
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
Plumbing Works
Domestic Water Network
Hot Water Network
Drainage Network
HVAC System
Supply & Install of HVAC system
Power Consumption
Plumbing Works
Domestic Water Network
Hot Water Network
Drainage Network
HVAC System
Supply & Install of HVAC system
: 1.2 MW
Hyper Markets
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
Airports
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Power Consumption
: 10.5MW
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
Dubai Municipality
Cold Store at Central Fruit & Vegetable Market
Al-Turath Engineering Consultant
Metac General Contracting Co.
2007
Power Consumption
: 28 MW
TV&RADIO STATION
Client
Project
Project Manager
Consultant
Date of Execution
Scope of Works
:
:
:
:
:
:
All systems was done while the power and data server for the OSN was RUNNING ON
without any disturbance this was done because of the sensitivity and critical situation of the
type of their work.
TOWERS
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
SCADA SYSTEM
Client
Project
Consultant
Date of Execution
Scope of Works
UPS SYSTEM
Client
Project
Project Manager
Date of Execution
Scope of Works
PALACES
Client
Project
Consultant
Main Contractor
Main Contract Value
Date of Execution
Scope of Works
:
:
:
:
:
:
:
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
P. W. D., Al Ain
Al Maqam Palace Gate, Al Ain
Jafar Tukan & Partners Architects & Engineers
Code Contracting Co.
18 Million
1999
Execution of Electrical System
Telephone System
T. V. System
Intercom System
Fire Alarm System
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
Client
Project
Main Contract Value
Date of Execution
Scope of Works
:
:
:
:
:
Client
Project
Date of Execution
Scope
:
:
:
:
Al Ain Municipality
Mraijeb Garden Lighting
2001
Supply and Install Decorative Pole Mounted Garden Light with
all control panel
Client
Project
Client
Project
Consultant
Date of Execution
Scope
:
:
:
:
:
P. W. D., Al Ain
Street Lighting at Tawam Hospital, Al Ain
PWD
1992
Supply and Install Street Lighting with control panel
Client
Project
Date of Execution
Scope
:
:
:
:
Municipality of Al Ain
Al Nagfa Hill Street Lighting, Al Ain
1991
Supply and Install Street Lighting with control panel
: P.W.D., Al Ain
: Jebel Hafeet Hotel Under Ground Parking, Al Ain
: Taillibert Gulf Environment
: Arab Contractors
: 1998
-Execution of Electrical System
Electrical System
Fire Alarm System
Telephone System
C. C. T. V. Camera System
Electrical Lighting
Execution of Plumbing & Drainage
Domestic Water Network
Drainage Network (external & internal)
EMPLOYEES QUARTERS
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works :
: P.W.D., Al Ain
: Jebel Hafeet Employees Quarters, Al Ain .
: Taillibert Gulf Environment
: Development Const. & Cont. Co.
: 2003
Mech. Work
Supply and Install Kitchen Equipment & laundry
Equipment With All Electrical Works
SCHOOLS
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
Power Consumption
: 1.4 MW
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
P.W.D., Al Ain
Girls School at Falaj Hazza, Al Ain
Al Barajeel Engineering Consultant
Al Rafeh Transport & Gen. Cont. Est
2002
`
Client
Project
Consultant
Main Contractor
Main Contract Value
Date of Execution
Scope of Works
:
:
:
:
:
:
P.W.D., Al Ain
Al Hilli School for Boys, Al Ain
Al Barajeel Engineering Consultant
Al Rafeh Transport & Gen. Cont. Est
Above 3.2 Million
2002
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope
: P.W.D., Al Ain
: Al Quaa Primary School for Boys Type B
: Al Suweidi Engineering Consultant Bureau
: Bin Ham Gen. Cont. Co.
: 2002
:
Electrical works:
Electrical System
Fire Alarm System
Intercom system
Sound System,
Telephone System
HVAC Work:
Supply & Install of all HVAC System
Power consumption: 1.4MW
Client
Project
Consultant
Date of Execution
Scope
: P.W.D., Al Ain
: Preparatory School for Boys, Al Maqam
: Al Maqam Engineering Consultant
: 1996
:
Electrical works:
Electrical System
Fire Alarm System
Intercom system
Sound System,
Telephone System
HVAC Work:
Supply & Install of all HVAC System
Power Consumption : 1.4MW
`
Client
: P.W.D., Al Ain
Project
: Combined School for Boys, Al Hayer
Consultant
: T.K.B
Date of Execution : 1996
Scope
:
Electrical works:
Electrical System
Fire Alarm System
Intercom system
Sound System,
Telephone System
HVAC Work:
Supply & Install of all HVAC System
Power Consumption : 1.4MW
Client
: P.W.D., Al Ain
Project
: Preparatory School for Girls, Markhania
Consultant
: Al Maqam Engineering Consultant
Date of Execution : 1995
Scope
:
Electrical works:
Electrical System
Fire Alarm System
Intercom system
Sound System,
Telephone System
HVAC Work:
Supply & Install of all HVAC System
Power Consumption : 1.4MW
Client
: P.W.D., Al Ain
Project
: Secondary Girls School, Al Hilli
Consultant
: Consulting Engineering
Date of Execution : 1995
Scope
:
Electrical works:
Electrical System
Fire Alarm System
Intercom system
Sound System,
Telephone System
HVAC Work:
Supply & Install of all HVAC System
Power Consumption : 1.4MW
ADNOC
Client
Project
Consultant
Main Contractor
Our Contract Value
Date of Execution
Scope of Works
:
:
:
:
:
:
:
ADNOC
Al-Ghail Filling Station At Al Ain
Ghazi Awaad
Al Rawafid Gen. Contracting co.
1.3 Million
2005
`
Client
Project
Consultant
Main Contractor
Our Contract Value
Date of Execution
Scope of Works
:
:
:
:
:
:
:
ADNOC
Al-Kuwaitat Filling Station at Al Ain
Ghazi Awaad
Al Rawafid Gen. Contracting Co.
Above 1 Million
2006
RESIDENTIAL BUILDINGS
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
: P.W.D., Al Ain
: 44 Villas, Al Kureh
: Al Itfaq Al Watani Consultant
: 1999
: Electrical Works, Telephone System, T.V System, Intercom System
Client
: P.W.D.
Project
: 120 Villas, Al Yahar South
Consultant
: Mimar Consulting Engineering
Date of Execution : 1998
Scope
: Electrical Works, Telephone System, T.V System, Intercom System
Client
Project
Consultant
Date of Execution
Scope
: P.W.D., Al Ain
: 112 Villas, Nahil Town
: Parc International
: 1996
: Electrical Works, Telephone System, T.V System, Intercom System
Client
Project
Consultant
Date of Execution
Scope
: P.W.D., Al Ain
: 58 Villas, Suleimat
: Emirates International Consultant
: 1996
: Electrical Works, Telephone System, T.V System, Intercom System
`
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
`
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
Client
Project
Consultant
Date of Execution
Scope
:
:
:
:
:
:
Plumbing Works
Domestic Water Network
Hot Water Network
Drainage Network (internal & external)
DEMOLITION WORKS
Client
Project
Consultant
Date of Execution
Scope of Works
:
:
:
:
:
ALDAR
Sheikha ha Salamah Mosque
Architectural Planning Group (APG)
2006
`
Client
Project
Consultant
Main Contractor
Date of Execution
Scope of Works
:
:
:
:
:
:
P. W. D., Al Ain
Al Ain Police Administration Building
EHAF Consulting Engineers
Al Tharawat Gen. Cont. Est.
2007
HELIPAD
Client
Project
Date of Execution
Scope
:
:
:
:
P.W.D. , Al Ain
Helipad for Umm Zumool Police Station
1992
Supply and Installation of Complete Electrical System
as per Civil Aviation specifications - Abu Dhabi
Client
Project
Date of Execution
Scope
:
:
:
:
P.W.D. , Al Ain
Helipad for Sweihan Hospital, Sweihan
1992
Supply and Installation of Electrical System
Client
Project
Date of Execution
Scope
:
:
:
:
P.W.D. , Al Ain
Helipad Lighting of Tawam Hospital, Al Ain
1992
Supply and Installation of Lighting System
INDUSTRIAL FACILITIES
123-
:
:
:
:
:
Client
Project
Consultant
Date of Execution
Scope
:
:
:
:
:
Client
Project
: Butti Al Oitaba
: Design ,Supply & Installation reverse osmosis
desalination plant, Al Hayer, Al Ain
: Above 0.2 Million
: 1993
: Electro mechanical works for desalination plant
to generate production of 10,000 gallons per day.
2- POULTRY FARM
Client
Project
Our Contract Value
Date of Execution
Scope of Works
:
:
:
:
:
Client
Project
Our Contract Value
Date of Execution
Scope of Works
:
:
:
:
:
3-GREEN HOUSES
Client
Project
Date of Execution
Scope of Works
Client
Project
Date of Execution
Scope of Works
:
:
:
:
Client
Project
Our Contract Value
Date of Execution
Scope of Works
:
:
:
:
: