Partial Turnkey Process Case1
Partial Turnkey Process Case1
Table of Contents
1. Case 1. New process/stock available Division /Circle..............................3
1.1
1.2
1.3
1.4
1.5
Budget allocation.......................................................................................... 7
1.5.1
1.5.2
1.5.3
1.6
1.7
1.7.1
1.7.3
1.7.4
1.8
Creation of JMC......................................................................................... 18
1.9
Creation of RABILL................................................................................... 19
1.2
1.3
If MR is require,
do check (tick)
1.4
Maintain centages amount and extra tax
amount to project
T-code- CJ40
Maintain centages amount to each WBS for those materials which
are provide by MSEDCL.
1.5
Budget allocation.
1.5.1 Copy total plan cost to TOP WBS t-code
IM52.
1.6
1.7
1.7.1
1.7.1.1
Note: Prior generating MR, user should check whether materials are in
stock.
If materials are in respective circle stock, then user should transfer circle
stock to respective division.
Enter MR number.
Click on
process
1.7.1.1.4
Print preview
1.7.2
Materials PO-4630000571
Centages PO 4630000572
1.7.3
1.7.4
1.8
Creation of JMC
Note: Here last two line item are material provided by MSEDCL.
1.9
Creation of RABILL
Here last two materials are provided by MSEDCL which is not editable field.
Note: RAbill amount is sum of materials provided by vendor only.
1.10