Professional Documents
Culture Documents
Hydraulic Analysis1 Balud Pump
Hydraulic Analysis1 Balud Pump
Hydraulic Analysis1 Balud Pump
Sub-project Type
:Water System Level 2 (Public Goods)
Barangay/s
Municipality
Province
Region
Fabrica
Mobo
Masbate
V
I - DESIGN OF RESERVOIR:
A. Reason for installing a reservoir
To balance the supply and demand in the system.
Supply
=
11.29 lps.
Demand
=
4.376 lps.
B. Location of the reservoir
=
Description
Actual number of household beneficiarie
(No. of HH)(Ave. HH Member)
Percent annualy
1+Growth rate^lifespan
No. of years
PP(1+GR)^Life Span
Ave. daily consumption per capita
average demand per day
ADD/24x60x60)
(Design population)(ADW DCD)
ADD/12x60x60)
Reservoir capacity:
1) By rule of thumb
Reservoir capacity
2) Theoretical
=
=
=
1/4 (ADD)
94.53 cu.m.
(Demand-Supply)(Ave. day)
3) Supply
(Supply)(Ave. day)
4) Adopted result
Reservoir capacity
94.53 cu.m.
Data
809
5
4,045.00
3
1.557967
15
6,301.98
60
Unit
HH
No.
No.
%
Years
No.
Liter
0.000694
378,119 Liter
4.376 LPS
Use an average reservoir capacity which could meet the demand of the future generation.
satisfy and hourly variations in the consumption rate
to provide for repair of pipes (particularly, the transmission) without interruption of service
6) Reservoir dimension
Dimension
4.56 m. 3
use
Length
Breadth
Height
Freeboard
Dead vol. Ht.
Actual reservoir capacity
=
=
=
0.20
0.10
=
4.50 m.
4.50 m.
3.00 m.
Check:
54.68
60.75 cu.m.
Poblacion
Balud
Masbate
V
Criteria:
Particular
Number of Household
Average Household Member
Total Population
Average Population Growth Rate
Design Lifespan
Design Population
Average Daily Water Demand
per Capita per Day
Average Daily Demand (ADD)
Maximum Daily Demand (MDD)
Maximum Pumping Hour
Maximum Demand Per Second
Description
Actual number of household beneficiaries
(No. of HH)(Ave. HH Member)
Percent annualy
No. of years
PP(1+GR)^Life Span
Ave. daily consumption per capita
(Design population)(ADW DCD)
1.3 x (ADD)
MDD/(Pumping Hour/60/60)
Data
803
5
4,015.00
3
15
6,255.24
60
375,314
487,908.66
12.00
11.29
PUMP DESIGN:
Total Length of Riser Pipe
Discharge (Q)
MDD
Design Operating Hours
Pump Capacity
TDH
Static Head
d
hf
hf
TDH
BHP
BHP
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
151.00
11.29 LPS
487,908.66 Liters/day
12.00
43,200.00
MDD/Design Operation(seconds)
11.29 LPS
Static Head + hf
23.92
50.00 mm
0.0826fLQ^2/D^5 ; where f=
0.02
101.82
125.74
(Pump Capacity)(TDH)/75e
where e =
0.7
27.05 hp
Use
5 hp
submersible pump
Unit
HH
No.
No.
%
Years
No.
Liter
Liter/day
Liter/day
Hrs
LPS
B. Pipeline Analysis
Branch Node
1
res(b)
c
2
c
d
No. of Household
119
119
Total Headloss
Available Head
0.896223
<
10.15
5.160832
<
8.678777
Hr = Residual head
Column Description:
Column
1
2-3
4
5
6
7
8
9
10
11
Description
Pipe section under consideration
Node section under consideration
Length of pipe section under consideration (meter)
Number of household served
Computed Peak Flow (liter per second)
Difference in elevation between nodes under consideration (meter)
Computed Pipe Diameter (mm), using the Darcy Weisbach Formula
Nominal Diameter available in the market (mm)
Headloss per 100 meters (refer to table 9.2)
Actual Headloss
Formula:
Column 6:
PF
PF
Where:
PF
GRF
N
= Peak flow.
= Growth rate factor.
= Total number of household served by the pipe section.
Hr
9.25
3.52
Remarks
ok
ok
PCWC
Simplifying:
Column 8:
HF
D^5
= f (L)(Q)^2/D^5
= f (L)(Q)^2/HF
HF
Where:
F
L
Q
D
Simplifying:
D^5
= (0.00165(L)(Q/1000)^2/HF)(1000)
(mm)
= (0.00165(Column 4)(Column 6/1000)^2/(Column 7))(1000)
Column 10:
From table 9.2, (interpolate when necessary).
Column 11:
Actual Headloss
(m)
10142.14
0.804688
86400
0.000694
0.804688 1.049935
1.21875 1.049935 0.168815
1.1375
0.8125
0.715
0.2275
0.47125
0.979939
0.699956
0.615962
0.195988
0.405975
0.157561
0.112544
0.099038
0.031512
0.065275
397
2768.56
3165.56
Q
LPS
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.14
0.15
0.16
0.18
0.20
0.25
0.30
0.40
0.50
0.60
0.70
0.80
1.00
1.20
1.40
1.50
1.60
1.80
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
10.00
25
0.1
0.13
0.17
0.22
0.26
0.31
0.36
0.48
0.55
0.62
0.77
0.94
1.42
2
3.4
5.1
7.2
31
0.11
0.13
0.17
0.18
0.22
0.27
0.32
0.48
0.67
1.15
1.74
2.4
3.2
4.1
6.3
8.8
38
0.101
0.131
0.2
0.23
0.47
0.71
1
1.33
1.7
2.6
3.6
4.4
4.9
5.5
7.35
8.4
50
0.12
0.18
0.25
0.33
0.42
0.64
0.89
1.2
1.35
1.52
1.88
2.3
3.5
4.95
6.95
9.2
11.85
63
0.11
0.14
0.21
0.3
0.4
0.44
0.51
0.64
0.77
1.2
1.65
2.19
3
3.6
4.5
6.2
8.6
75
100
0.089
0.124
0.165
0.187
0.211
0.262
0.32
0.48
0.68
0.9
1.15
1.43
1.74
2.44
3.2
4.15
6.5
0.079
0.119
0.166
0.221
0.284
0.353
0.429
0.6
0.8
1.2
1.55
Q
LPS
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.14
0.15
0.16
0.18
0.20
0.25
0.30
0.40
0.50
0.60
0.70
0.80
1.00
1.20
1.40
1.50
1.60
1.80
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
10.00
25
0.2
0.26
0.34
0.44
0.52
0.62
0.72
0.96
1.1
1.24
1.54
1.88
2.84
4
6.8
10.2
14.4
31
0.15
0.18
0.22
0.26
0.34
0.36
0.44
0.54
0.64
0.96
1.34
2.3
3.48
4.8
6.4
8.2
12.6
17.6
38
0.13
0.15
0.16
0.202
0.262
0.4
0.46
0.94
1.42
2
2.66
3.4
5.2
7.2
8.8
9.8
11
14.7
16.8
50
0.7
0.1
0.14
0.24
0.36
0.5
0.66
0.84
1.28
1.78
2.4
2.7
3.04
3.76
4.6
7
9.9
13.9
18.4
23.7
63
0.12
0.17
0.22
0.28
0.42
0.6
0.8
0.88
1.02
1.28
1.54
2.4
3.3
4.38
6
7.2
9
12.4
17.2
75
100
0.7
0.91
0.117
0.177
0.248
0.33
0.374
0.422
0.524
0.64
0.96
1.36
1.8
2.3
2.86
3.48
4.88
6.4
8.3
13
0.104
0.129
0.157
0.238
0.332
0.442
0.368
0.706
0.858
1.2
1.6
2.4
3.1
150
Interpolation
2.10
0.388
0.15 x
0.154
0.40
x=
x=
0.06
0.09
0.11
0.14
0.21
2.50
0.16
x-y, y = O5
0.01
0.00385 + O5
0.15385
150
0.12
0.17
0.22
0.28
0.42
ITEM NO.
ITEM DESCRIPTION
QTY
UNIT
RATE
No. of
PER DAY/
Crew/
UNIT
Labor
COST
5
formula guide
TOTAL
7.00
(3)x(5)x(6
)
B.
MATERIALS
1 1/4 " dia. SDR 11 HDPE Pipe
1 1/4" Compression Elbow
1 1/4" male adapter
teflon tape
LABOR
Excavation and Backfilling of Pipelines
capability output:
excavation
backfilling
required man days:
excavation
backfilling
Common Laborer
Installation of Pipelines
capability output:
hauling, pipe laying and installation
Skilled Laborer
Common Laborer
15.00
1.00
1.00
2.00
m.
pcs.
pcs.
roll
est qty.
2.70
63.00
300.00
225.00
15.00
cu.m.
1.50 cu.m./mday
3.00 cu.m./mday
1.80
0.90
2.70
3.00 days
est qty.
15.00
1.00
227.00
681.00
m.
1.00
2.00
300.00
227.00
300.00
454.00
MATERIALS
3" dia. SDR 17 HDPE Pipe
3"x2 1/2" HDPE Reducing Coupling
2 1/2" dia. SDR 17 HDPE Pipe
2 1/2" dia. Compression Coupling
2 1/2"x1/2" HDPE Saddle Clamp
1/2" dia. HDPE Male adapter
1/2" dia. SDR 13.5 HDPE Pipe
420.00
1.00
1,000.00
17.00
10.00
20.00
1.00
m.
pc
m.
pc
pc
pc
roll
350.00
990.00
230.00
550.00
380.00
95.00
6,600.00
B.
LABOR
Excavation and Backfilling of Pipelines
capability output:
excavation
backfilling
required man days:
excavation
backfilling
Common Laborer
Installation of Pipelines
capability output:
hauling, pipe laying and installation
Skilled Laborer
Common Laborer
est qty.
309.60
cu.m.
1.50 cu.m./mday
3.00 cu.m./mday
206.40
103.20
309.60
31.00 days
est qty. 1,720.00
10.00
227.00
70,370.00
m.
1.00 lot
1.00
2.00
50,000.00
300.00
227.00
5,100.00
7,718.00
50,000.00
SUB
TOTAL
sum
(7)
sum (8)
945.00
300.00
225.00
30.00
681.00
300.00
454.00
147,000.00
990.00
230,000.00
9,350.00
3,800.00
1,900.00
6,600.00
2,935.00
with buttfusion
11.9
6600
70,370.00
5,100.00
7,718.00
31
2935
482,828.00
535,763.00
50,000.00
5,400.00
300
18.00
50.00
76,451.00
7540
83,991.00
20000
227
370.00
50.00
350 57.14286
27
729,979.00
54500
784,479.00
23,534.37
808,013.37
3
900
18500.22
1542.857
20943.08