1.0
INTRODUCTION
1.1 Project name
CADANGAN MEMBINA BANGUNAN PEJABAT YANG MENGANDUNGI:
i. 1 UNIT BANGUNAN PEJABAT 12 TINGKAT (MENARA A)
ii. 1 UNIT BANGUNAN PEJABAT 9 TINGKAT (MENARA B)
iii. 1 UNIT RUANG PEJABAT BAWAH TANAH 4 TINGKAT
iv. 1 UNIT BANGUNAN GUNASAMA 2 TINGKAT YANG MENGANDUNGI
KEMUDAHAN GIMNASIUM, KAFETERIA, PUSAT SUMBER, DEWAN SERBAGUNA,
TASKA DAN SURAU SERTA
v. LAIN-LAIN KEMUDAHAN BERKAITAN IAITU:a. 3 TINGKAT TEMPAT LETAK KERETA ARAS BASMEN
b. 1 UNIT PENCAWANG ELEKTRIK
c. 1 UNIT RUMAH SAMPAH
DI ATAS LOT 33074 (PLOT P47), JALAN IMPACT, CYBER 6, MUKIM DENGKIL,
DAERAH SEPANG, SELANGOR DARUL EHSAN
1.2 Project Description
The project covers an area of 4.86 acres (1.967 ha). The site is located within Mukim
Sepang and Selangor district. Key and location plans are shown as per Figure 1 and 2
respectively.
Page 1 of 7
CADANGAN MEMBINA BANGUNAN PEJABAT DI ATAS LOT 33074 (PLOT P47), JALAN IMPACT, CYBER 6,
MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
________________________________________________________________________________________________________
2.0
Key plan, location plan and aerial view of the site is shown in Figures 1 to 3
respectively.
Page 2 of 7
CADANGAN MEMBINA BANGUNAN PEJABAT DI ATAS LOT 33074 (PLOT P47), JALAN IMPACT, CYBER 6,
MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
________________________________________________________________________________________________________
Page 3 of 7
CADANGAN MEMBINA BANGUNAN PEJABAT DI ATAS LOT 33074 (PLOT P47), JALAN IMPACT, CYBER 6,
MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
________________________________________________________________________________________________________
3.0
DESIGN THEORIES
3.1
3.2
Design Criteria
The design criteria adopted for the sediment basins are as follows:
3.3
Basin type
Soil type
:
:
4.0
Cut:
1.0 V : 1.5 H ;
Fill:
1.0 V : 2.0 H
Page 4 of 7
CADANGAN MEMBINA BANGUNAN PEJABAT DI ATAS LOT 33074 (PLOT P47), JALAN IMPACT, CYBER 6,
MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
________________________________________________________________________________________________________
ii)
4.2
Fill Material
Fill shall be of suitable materials in accordance to BS:1377.
4.3
Compaction of Fill
The standard of compaction to be achieved shall be related to the maximum
dry density of the soil as prescribed in BS1377 Test No.12 or Mod. AASHTO
Test (T-180) as follows:
5.0
a)
Top 1.0 meter of all embankments, under roadways and hard standings
subject to traffic, compacted material not to be less than 95% of the
maximum dry density.
b)
Elsewhere, dry density not to be less than 90% of the same. In-situ
density tests using the sand replacement method as described in
BS1377 Test No.14A or B as appropriate shall be carried out
6.0
6.1
The ESCP will be read with the engineering plans or written instruction that may
be issued in relation to the development at the subject site.
Contractors has to ensure that all erosion and sediment control works are
undertaken as instructed in the specification and constructed in accordance with
the Urban Stormwater Management Manual for Malaysia, 1999.
All Contractors will be informed of their responsibilities in minimizing the potential
soil erosion and pollution of down slope areas.
Page 5 of 7
CADANGAN MEMBINA BANGUNAN PEJABAT DI ATAS LOT 33074 (PLOT P47), JALAN IMPACT, CYBER 6,
MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
________________________________________________________________________________________________________
6.2
Land Disturbance
Construction activities on proposed site have the potential to pollute storm water.
These include earthworks that result in erosion and sedimentation as well as
contractors activities.
The soil and erosion hazard of the site will be kept to a minimum as limiting land
disturbance as follows:
6.3
6.4
Hoarding will be installed as shown on the plan to ensure prohibit unnecessary site
disturbance. Vehicular access to the site will be limited to only that essential for
construction work and all vehicles entering the site only through established site
access points.
All earthworks including water ways, drains and their outlets will be constructed to
be stable in at least the design storm event.
Soil materials will be replaced in the same order they are removed from the
ground. It is particularly important that all subsoil is buried and top soil remain on
the surface at the completion of the works.
All constructed slope will be close turfed immediately after the slope formation and
construction with as low as gradient as practical.
Where practicable, the construction programme will be scheduled so that the time
starting land disturbance activities to stabilization is less than six months, if
Weather permitting.
6.5
Page 6 of 7
CADANGAN MEMBINA BANGUNAN PEJABAT DI ATAS LOT 33074 (PLOT P47), JALAN IMPACT, CYBER 6,
MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN
________________________________________________________________________________________________________
Sediment removed from any trapping device will be disposed off in locations where
further erosion and consequent pollution to down slope lands and water ways will not
occur.
Water will be prevented from directly entering the permanent drainage systems
unless it is relatively sediment free.
Temporary erosion and sediment control structures will be removed only after the
protected lands are stabilized.
6.6
6.7
At least weekly
Immediately before site closure
Immediately following any rainfall event that caused runoff.
Page 7 of 7