Professional Documents
Culture Documents
Cables Sizing For Electro Chlorination Plant
Cables Sizing For Electro Chlorination Plant
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
Amps
876.485155
Uprated Currents :
Amps
1334.07177
Protection
ACB Protection
Cable selected:
Current rating of 3Run X 3Core 300 Sqmm. Al XLPE Cable Amps (A)
452*3
Amps 1356
9
10
11
876.5
0.130
415.0
0.750
3.0
0.0703
50.0
h) Sin
0.661
Voltage drop in %
0.87792
3.64335
Conculation
3% on operation
3Run X 3Core 300 Sqmm. Al XLPE Cable satisfies all requirements
Selection of this cable is correct.
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
Motor Load
Full load current :
Overall cable derating factor:
55 KW
95
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
152.979066
Protection
Fuse Protection
Cable selected:
329
95.0
0.212
415.0
0.860
1.0
0.0720
300.0
h) Sin
0.510
Voltage drop in %
2.60561
10.81330
10
3% on operation
10
570.0
0.212
415.0
0.300
1.0
0.072
300.0
h) Sin
0.954
Voltage drop in %
9.44065
39.17871
Conculation
Amps 329
10
11
15% on operation
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
Motor Load
Full load current :
Overall cable derating factor:
0.37 KW
1.1
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
1.77133655
Protection
Fuse Protection
Cable selected:
29
Amps 29
1.1
9.450
415.0
0.860
1.0
0.099
57.0
h) Sin
0.510
Voltage drop in %
0.21399
0.88805
10
3% on operation
10
6.6
9.450
415.0
0.340
1.0
0.099
57.0
h) Sin
0.940
Voltage drop in %
0.51908
2.15418
Conculation
10
11
15% on operation
Selection of this cable is correct.
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
Motor Load
Full load current :
Overall cable derating factor:
7.5 KW
14.8
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
23.8325282
Protection
Fuse Protection
Cable selected:
42
Amps 42
14.8
5.910
415.0
0.780
1.0
0.088
55.0
h) Sin
0.626
Voltage drop in %
1.58470
6.57649
10
3% on operation
10
88.8
5.910
415.0
0.340
1.0
0.088
55.0
h) Sin
0.940
Voltage drop in %
4.26394
17.69536
Conculation
10
11
15% on operation
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
CABLE SIZING CALACULATION OF PMCC TO ECS DILUTION LINE BOOSTER PUMP MOTOR
1
2
3
Motor Load
Full load current :
Overall cable derating factor:
7.5 KW
13.4
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
21.5780998
Protection
Fuse Protection
Cable selected:
42
Amps 42
13.4
5.910
415.0
0.860
1.0
0.088
63.0
h) Sin
0.510
Voltage drop in %
1.80650
7.49698
10
3% on operation
10
80.4
5.910
415.0
0.340
1.0
0.088
63.0
h) Sin
0.940
Voltage drop in %
4.42214
18.35187
Conculation
10
11
15% on operation
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
Motor Load
Full load current :
Overall cable derating factor:
3.7 KW
6.9
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
11.1111111
Protection
Fuse Protection
Cable selected:
29
Amps 29
6.9
9.450
415.0
0.860
1.0
0.099
67.0
h) Sin
0.510
Voltage drop in %
1.57778
6.54777
10
3% on operation
10
41.4
9.450
415.0
0.340
1.0
0.099
67.0
h) Sin
0.940
Voltage drop in %
3.82729
15.88325
Conculation
10
11
15% on operation
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
Motor Load
Full load current :
Overall cable derating factor:
1.5 KW
2.95
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
4.75040258
Protection
Fuse Protection
Cable selected:
29
Amps 29
3.0
9.450
415.0
0.870
1.0
0.099
63.0
h) Sin
0.493
Voltage drop in %
0.64148
2.66215
10
3% on operation
10
17.7
9.450
415.0
0.340
1.0
0.099
63.0
h) Sin
0.940
Voltage drop in %
1.53861
6.38525
Conculation
10
11
15% on operation
Selection of this cable is correct.
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
Motor Load
Full load current :
Overall cable derating factor:
3.7 KW
7.3
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
11.75523349
Protection
Fuse Protection
Cable selected:
29
Amps 29
7.3
9.450
415.0
0.820
1.0
0.099
74.0
h) Sin
0.572
Voltage drop in %
1.75980
7.30319
10
3% on operation
10
43.8
9.450
415.0
0.340
1.0
0.099
74.0
h) Sin
0.940
Voltage drop in %
4.47221
18.560
Conculation
10
11
15% on operation
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
CABLE SIZING CALACULATION OF PMCC TO ECS NEUTRAIZATION PIT TRANSFER PUMP MOTOR
1
2
3
Motor Load
Full load current :
Overall cable derating factor:
15 KW
27.8
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
44.7665056
Protection
Fuse Protection
Cable selected:
93
Amps 93
27.8
1.540
415.0
0.830
1.0
0.081
75.0
h) Sin
0.558
Voltage drop in %
1.15147
4.77861
10
3% on operation
10
166.8
1.540
415.0
0.330
1.0
0.081
75.0
h) Sin
0.944
Voltage drop in %
3.05156
12.66398
Conculation
10
11
15% on operation
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
CABLE SIZING CALACULATION OF PMCC TO ECS CW SYSTEM HYPO DOSING PUMP MOTOR
1
2
3
Motor Load
Full load current :
Overall cable derating factor:
22 KW
40
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
64.4122383
Protection
Fuse Protection
Cable selected:
93
Amps 93
40.0
1.540
415.0
0.840
1.0
0.0808
57.0
h) Sin
0.543
Voltage drop in %
1.27265
5.28150
10
3% on operation
10
240.0
1.540
415.0
0.330
1.0
0.0808
57.0
h) Sin
0.944
Voltage drop in %
3.33696
13.84838
Conculation
10
11
15% on operation
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
CABLE SIZING CALACULATION OF PMCC TO ECS SWI SYSTEM HYPO DOSING PUMP MOTOR
1
2
3
Motor Load
Full load current :
Overall cable derating factor:
11 KW
19
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
30.5958132
Protection
Fuse Protection
Cable selected:
54
Amps 54
19.0
3.950
415.0
0.900
1.0
0.084
55.0
h) Sin
0.436
Voltage drop in %
1.56641
6.50061
10
3% on operation
10
114.0
3.950
415.0
0.330
1.0
0.084
55.0
h) Sin
0.944
Voltage drop in %
3.61847
15.01665
Conculation
10
11
15% on operation
PROJECT:
OWNER :
CONTRACTOR :
CONTRACTOR CONSULTANT:
OWNER'S CONSULTANT:
SYSTEM :
CABLE SIZING CALACULATION OF PMCC TO ECS RW SYSTEM HYPO DOSING PUMP MOTOR
1
2
3
Motor Load
Full load current :
Overall cable derating factor:
2.2 KW
4.6
Group derating factor x Ambient derating factor
= 0.69 x 0.9
0.621
Uprated Currents :
Amps
7.40740741
Protection
Fuse Protection
Cable selected:
29
Amps 29
4.6
9.450
415.0
0.810
1.0
0.099
54.0
h) Sin
0.586
Voltage drop in %
0.79956
3.31816
10
3% on operation
10
27.6
9.450
415.0
0.340
1.0
0.099
54.0
h) Sin
0.940
Voltage drop in %
2.05645
8.53428
Conculation
10
11
15% on operation
IEC DWG NO
NTPC_DRG_NO
PROJECT
CUSTOMER
NAME OF VENDOR
SYSTEM
IEC-W1309-060
0260-139-PVE-U-002
VALLUR THERMAL POWER PROJECT
NTPC TAMIL NADU ENERGY COMPANY LIMITED,CHENNAI
IEC FABCHEM LIMITED, Chennai.
ELECTRO CHLORINATION SYSTEM.
4 Uprated Currents :
465.2/0.71
Amps 655
5 Protection
Fuse Protection
7 Cable selected:
8 Current rating of Single Core 630sqmm. Al. Ar. FRLS. XLPE Cable
As per IS:
814A
% 0.5487190935
10 Permissible Voltage drop in %
0.55 x 3.5
% 1.925
12 Permissible Voltage drop
10% at starting
13 Conculation
4R X Single Core 630sqmm. Al. Ar. FRLS. XLPE Cable satisfies all requirements