Download as pdf or txt
Download as pdf or txt
You are on page 1of 32

Retail

Mike King, CCIM


Undisclosed User (7 Acres)
Starting Construction August 2010

Pointe at Post Falls


- Cabela’s
- Wal-Mart (Under Construction)

Love s Travel Center (10 Acres)


Love’s
Starting Construction April 2010

Future Beck Rd. Interchange


2012 Estimated Completion
nfussion
con

information
Pie I Have Eaten

Pie I Have Left


14.0% 12.4% 12.2%

12.0%

10.0%
8.8%
7.1%
8 0%
8.0%

6.0%

4.0%

2.0%

0.0%

Coeur d' Alene Post Falls Rathdrum Hayden


Entered CRE Business
A
A. Expected Return
eturrn

C B. Actual Return
re

C. Why we drink
B
time
Overall Vacancy

Inline/Mall Vacancy
Thank You
For Slides
• Email mking@ccim.net
• Visit www.cbcsr.com

You might also like