(iii)Acknowledgements

On the 26 of January 2015, I had started my industrial training in KLOBERZ SDN BHD
located at Merchant Square, Petaling Jaya. The purpose of my 3 months industrial training is to
fulfill the requirement to complete my degree which is Bachelor of Engineering (Honours)
Mechanical in Tunku Abdul Rahman University College.
Here, I would like to take this opportunity to thank you all the individuals that had been
supported and helping me in this past three months. Firstly, I would like to thank my family who
had been supporting me all this years. Thank you for all the tolerant that you all gave to me.
Next, I would like to acknowledge the following people for their support and assistance with
this internship. I would like to specially thank my supervisor and also the Director from Kloberz
Sdn Bhd. The supervision and support that they gave truly help the progression and smoothness
of my internship program. Their co-operation is much indeed appreciated. I also want to show
my gratefulness to all the colleagues from Kloberz Sdn Bhd who spared their precious time in
helping me with my works and activities.
Great deals appreciated also go to the contribution of my college University College Tunku
Abdul Rahman. I also would like to thank to Engr. Lee Siew Seong of Industrial Training
Coordinator and all the staff in the office that patiently helping us completes this program.
Last but not least I would like to thank all my friends for guiding me and gave me all the help
that I needed for completing this report and the troubles also the problems which have been
solved through the teamwork and braingstorm among ourselves to obtain the best solution to
handle our internship task.

(iv) Abstract
Throughout the internship training, I learnt about the various kind of water treatment
plants in Klang Valley and the processes of treatment of water. I also stand a chance to complete
the drawing of the single membrane drawn in AutoCAD. After the drawing, Mr Tan JK taught
me about the drawing of P&ID of the water filtration system. The drawing is drawn in AutoCAD
also represent the product and the instrument of a respective system.
In addition, there were also site visit to sewage treatment plant at Kajang. Measured the
real UF systems dimension according to the requirement which is the height,the length and the
width. After that, photo is taken as a reference to be draw in AUTOCAD. After the visit, I
finished the exact drawing of the UF system in AutoCAD.
Lastly, I also learn to draw a full and complete drawing of KRISTAL Standard UF
Systems which is MK-40 : 40- Module system. The UF system consists of 40 membranes with 3
main pipes which is Permeate, Reject and Feed Header to perform the Ultrafiltration in System.
And finished a P&ID on a Kristal Standard UF Systems along with its Legend and everything
related with this system is being done.

Chapter 1: Introduction
1.1 Industrial Training Scheme
Practical training is compulsory for all students From Faculty of Engineering and Built
Enviroment in Tunku Abdul Rahman University College in order to obtain a three credit hour
as a criteria to complete our degree programme. As an student from Mechanical Engineering,
they must undergone practical training from 26th of January 2015 to 2nd of May 2015 before
they were qualified to receive a degree in Mechanical Engineering. With the combination of
knowledge working experience during the 3 months training, students are required to
produce a written report.
1.2 Objective / Purpose of Industrial Training
The main objective of Industrial Training program is to expose students to actual working
environment and enhance their knowledge and skill from what they have learnt in the
college. Another purpose of this program is to instill the good qualities of integrity,
responsibility and self-confidence. All ethical values and good working practices must be
followed by student. It is also to help the students about the safety practices and regulations
inside the industry and to instill spirit of teamwork and good relationship between student
and other employees.
Preciously, I have learned lots of knowledge in various kind of machines, tools and also
safety features which is needed to follow in order to avoid any accident to happen. Currently,
engineers like us are able to produce a quotation, a draft of AutoCAD drawing and go visit
site to inspect the error of installation and the logic error in their PLC system. Finally, this
training also helps to assess students ability and competency in preparation to join workface
during completion of studies in Tunku Abdul Rahman University College.

1.3 Industrial Training Job Scope.


During this 14 weeks of internship in Kloberz Sdn Bhd, I had became the Project Engineer of
this company which assist the supervisor which is also the Director of the company which is Mr
Tan Jin Kiat. He gave me a lot of responsible in handling various kind of jobs relating to
engineering field which mainly on Water Treatment Plant which is STP and WTP.
Due to the lack of engineering based employee in his company, he gave me trust and responsible
to a very huge project which amounting total amount of millions in order to assist him in
completing the project in time. One of the largest project that I had a chance to enroll and plays a
part is project in Cameron Highland named as Ulu Jelai Hydroelectric Project which sums at an
amount of rm4, 000,000 in total.
During this period of handling the project, I was given an opportunities to inspect all the P & ID
which is the electrical component and the flow of the water tanks and treatment plant in the
project. Due to the hectic working hours of Mr Tan and the trust he had on me, he let me inspect
the components and the flow of the whole water treatment system and only need to report to him
everyday to see the progress.(Please refer to the appendix for the picture of the P&ID). From
component listing and amendment of the various parts in order for the mechanical parts to works
effectively with the logic of the PLC due to a lot of Level Switch to detect the level of water in
the tank.
Next, during this internship period , Mr Tan also told me to do a lot of data analysis of the water
treatment plant mainly on Huber Technology, from Denmark which can be found at the website
of www.huber.se. This huge company supplies a lot of product which is expensive yet it is very
reliable and long lasting compared to products from China. Due to the less knowledge and the
product is too expensive, thus it is not popular among in Malaysia. Mr Tan have the vision to
spread Huber Products in Malaysia. Products like ROTAMAT Fine Screen and Rotary Drum
Fine Screen is the most popular product among Huber Technology.(Please refer to appendix for
better image of the product.

I was brought by Mr Tan to meet an Engineer from Huber which originated from Germany to
visit sitres with us. His name is Mr Martin Burger. Although he doesnt speak a good English, yet
he shares a lot of valuable experience with us about the machine of the waste water treatment
plant and the prospective of water treatment in the future world. This is because water is an
essential for every human being.(Photo on site visits will be attached in the Appendix).
After listing all the components from the Ulu Jelai Hydroeletric Project, Mr Tan has told me to
do Quotation on every needed parts in the water treatment to get the best price with the best
quality product. Doing quotation and identify also choosing the best manufacturer for pumps,
sensors and so on has been a challenge for me. The challenge was overcome when Mr Tan taught
me the criteria to choose the best parts to be used in our project and it is worth the price in order
for the hydroelectric dam to work out effectively. This is because the water generated will
generate electric and in the same time will generate clean water to the resident nearby Cameron
Highland.(Refer to Appendix for more photos about Ulu Jelai Hydroelectric Project)
As the Project Engineer in the company, I was requested by Mr Tan to do enquires about
products in water treatment plant. This is because there are a lot of more and new products in the
market which we couldnt get enough information due to lack of communication with the
supplier. Thus, Mr Tan requested me to do data analysis and communicate with the existing
customer to do know more and know well of new product which can overcome the conventional
way of treating water neither sewage or water treatment plant.
Throughout the internship period, Mr Tan gave me the full responsibility on drafting using
AutoCAD 2009. He gave me almost everything from editing or gave me an idea of the whole
Ultrafiltration system which consisit of membrane from 4 until to 16 units in a skid. By using
skills learnt from the college and also some studies on AutoCAD. I manage to obtain Mr Tans
confidence to let me edit every single AutoCAD drawing and it is being doing effectively. Thank
you to Mr Tan because my AutoCAD skill have been greatly improved and I am able to drawing
a lot of things or product which is neat and very detailed.(Please refer to the appendix for more
picture of the drawing made by myself.

1.4 Background and Details of Company

Company Logo.

Kloberz Sdn. Bhd


(6889646-D)

Company was founded in year 2005


Office based in Petaling Jaya and workshop in Subang
Paid up capital of RM 200,00 & Authorized capital RM1,000,000
Major bankers are UOB, MAYBANK, & OCBC
Registered company with CIDB, SPAN, MATRADE, PKK, MOF, MIDA etc
Global presence with working partners and dealers in Indonesia, Philippine, Vietnam,
Brunei, Myanmar etc

Details of Company
We are one of the leading system integrator and manufacturer of various membranes and
complimentary products. With our vast experience we have repeatedly demonstrated through
hundreds of installations in different applications that our products and people have the proven
experience to treat virtually any water source.
Our wide range of filtration products can be applied for:

Municipal drinking water and wastewater treatment


Industrial process water and wastewater treatment
Seawater desalination
Wastewater / Sewage water recycle
Commercial property development
Mobile and emergency response
Household water filtration
Shipboard water and wastewater treatment
Military water and wastewater treatment

Membrane technologies are based on filtration methods found all around us in nature. This
technology incorporates microscopic pores that are much smaller in size than common
contaminants, minerals, bacteria and viruses. This physical barrier only allows pure water to pass
through and has revolutionized the way in which the world treats and manages its water
resources.
Swelling world populations, industrial growth and changing climates will continue to place
enormous pressures on the world's water systems. Together, Kloberz will work towards the
future to ensure that the world has access to clean, safe drinking water and the best available
treatment to preserve the natural environment.
Together we create the future of water treatment technologies.

Functions, Business Objectives and Missions of company

Function
Major semiconductor / microelectronics clients includes Komag, Motorola,
Texas Instrument, NEC and ON Semiconductor.
Built the boiler feed water system for YTL Corporation
Central Utility Facilities (CUF) plant in East Coast of Malaysia
Petrochemical industry in Gebeng, Malaysia
Palm Oil Mill In Malaysia

Experience in constructing state-of-the-art ultrapure water treatment


systems producing 18.3 mega-ohm resistivity water qualities with other
parameters, measured in ppb levels.
Experiences in designing and building demin plant
Experiences in designing and building potable water treatment plant
Experiences in designing and building industrial waste treatment plant

Projects

Experienc
es

Business Objectives and Achievements.

CONSTRUCTION INDUSTRY DEVELOPMENT BOARD MALAYSIA (CIDB)


WATER QUALITY ASSOCIATION (WQA)
INTERNATIONAL DESALINATION ASSOCIATION (IDA)
ENVIRONMENT FEDERATION (WEF)
ENVIRONMENTAL MANAGEMENT & RESEARCH ASSOCIATION OF
MALAYSIA (ENSEARCH)
MALAYSIAN INDUSTRIAL DEVELOPMENT AUTHORITY (MIDA)
MALAYSIA EXTERNAL TRADE DEVELOPMENT CORPORATION (MATRADE)

Mission made with the aid of images.


This is to ensure workers in this company attracted by the unique presentation of the Mission in
the company and achieve it by working hard and have teamwork during our work in this
company, Kloberz Sdn Bhd.

Pro cess
D esign
O ptim izatio
n
Engineering
Procurem en
t
Fabrication
Installation
C om m ission
ing
O pe ration
M aintenanc
e

O ffer range of custom ized


liquid treatm ent plants for
both industrial and
m unicipal applications

Experi
enced
Integr
ated
Soluti
on
Provi
der

M aking a superior
system s a cost
effective solution
for clients

G oal
E xcell
ent
C usto
m er
Servic
e

1.5 Structure of Organisation of Kloberz Sdn Bhd

Director
Mr Tan Jin Kiat
Admin
Executive
Ms Chow Win
Niy

Sales Engineer
Mr.Mohd Fuad
Bin Helmy

Project
Engineer
Ting Jack Wee

1.6 Projects by Kloberz Sdn Bhd


Recent Major Project References

10

No.

Project Title

Year

Total Price

Ulu Jelai Hydroelectric

2015

RM 4,000,000

Orang Asli Cameron Highland

2014

RM 400,000

Pantai 2 STP

2013

RM 5,000,000

Kementerian Luar Bandar (Orang Asli Projects)

2010

RM 500,000

Klian Intan WTP

2010

RM 500,000

Petronas Refinary Labuan

2009

RM 600,000

Penang Hill WTP

2008

RM 500,000

Clients of Kloberz Sdn Bhd.

Project References:
Proton City, Malaysia

11

Pantai 2 Underground STP, BEWG 1,000,000 PE Ro2


12

1.7 Training Department


Training Department: Project and Sales Department.
13

In this department which is Project and Sales Department relates a lot of means into the
mechanical engineering studies. This is because there are a lot of products and customer which
have to be served. As an engineer in this department, it is a must to visit the sites to see the
progress of the construction of our project. This is because our mission is to give excellent
service to the customer and get their project done in time. Due to the WTP which is water
treatment plant mainly project by the government, there is always a deadline to be follow. Thus,
as a Project Engineer we have to go and visit 8-9 sites per day which varies from Kajang until
Cameron Highland. I was under a Senior Project Engineer, Mr Mohd Fuad who guide me along
the internship period. As he is an experienced employee in Kloberz Sdn Bhd,he shares a lot of
experience and ways to solve various kind of emergency situation and always remain calm when
there is situation in order to solve it and overcome the problem with an effective way.
On the other hand, in the normal ways we will have to sit in the office to serve customers and
also supplier in the company. There are a lot of customers to will call in to enquire about their
projects on gong and also a lot of technical problem to be discussed during the office hour.
Once in a blue moon, when the customer couldnt contact us they will come into our office to
find us to solve a lot of problems regarding to their projects. If there is a lot of major problems,
the customer will ask their engineer to come to office to discuss with us, the project engineer in
order to solve the problem effectively. This is one of the customer services that have been
promised by our company. This resulting our company to be the most outstanding water
treatment company in Klang Valley. There is also a lot of communication with the supplier to get
to know their new products in the supplier company also enhance the relationship with their staff
from the supplier in order to get the best deal during quotation of parts in their companies.

Training personnel

14

<Describe the names, job positions and working relationships among the personnel of training
organisation and department>
There are 3 person in the company which is Kloberz Sdn Bhd which taught me a lot of things,
helped me to solve various problem that I had never encountered before and also as the best
companion when im out to site and also at office for work.
The first one is Mr Tan Jin Kiat. He is my supervisor, a sales engineer, a project engineer, he
holds all position because he is the Director of Kloberz Sdn Bhd. From time to time, he will fetch
me to visit sites in Cameron Highland. In the same time he will tell me what to pay attention to
when I reach the site and also safety precaution. Mr Tan always concern about the safety of his
employee and give us full support in solving problems. He will also treat us a lot of foods and
lunch as a reward for our hardwork
Next is Ms. Chow Win Niy. She is the Admin Executive in Kloberz Sdn Bhd. She assist me in
doing quotation with customer. She gave me a lot of reference of quotation made by engineers in
our company. She taught me a lot of things regarding to price negotiation, the proper ways to
communicate with customer and also provide me a lot of utilities needed in the office to
complete me task given. She indeed helped me to grow up and learn a lot of different types of
relationships between people and also ways to survive in society nowadays
Lastly is Mr Mohd Fuad bin Helmy. He is the Sales Engineer of Kloberz Sdn Bhd. He have
Master in Chemical Engineering. He explained to me the importance of studying mechanical
engineering which will actually benefits and accepted by almost every engineering field. He also
shares a lot of experience regarding to work scope in Kloberz Sdn Bhd. He is indeed a person
that is willing to teach and not stingy in sharing his knowledge to me.

Chapter 2: Ulu Jelai Hydroelectric Project.

15

The Ulu Jelai Hydroelectric Project is a 372 MW hydropower development on the Bertam River,
Pahang. The scheme is expected to produce an annual energy supply of 326 GWh. The main
features of the project are an 88-metre high, 740,000 cubic metre RCC dam with service and
emergency ungated spillways, provision for theflushing of sediment from the reservoir,diversion
weirs on the Telom and Lemoi rivers for the transfer of water to Susu Dam, an intake tower,
power tunnels and an underground powerhouse cavern. Construction work for the project
commenced in late 2010 and has been scheduled to complete by end of 2016. The first contract
package involving the access roads and associated earthworks is in progress. Meanwhile for the
second contract package, construction of the dam and the various tunnels leading to the
underground power station has just begun.
The power waterway which extends from the power intake structure to the power station
basically consists of a 9.5 metre diameter horseshoe-shaped and 4.2 kilometre long unlined
headrace tunnel, which includes a 40 metres long concrete lined rock trap; a 5.2 metre diameter
by 173 metres high concrete-lined pressure shaft; 5.2 metre diameter horseshoe-shaped by 86
metres long concrete lined pressure tunnel; 5.2 metre diameter, 10 metres long steel-lined, single
penstock embedded in concrete; steel bifurcation; and 3.75 metre diameter steel-lined, dual
penstock, embedded in concrete. The generating units (2 x 186 MW) would be housed in an
underground power station cavern, approximately 82 m x 22.5 m x 35.5 m. Other underground
facilities include the transformer cavern of approximately 34 m x 17 m x 17 m, downstream
surge chamber of approximately 40 m x 14 m x 35 m, associated service tunnels, access tunnels,
and ventilation tunnels, and a concrete lined 7.7 metre diameter horseshoe-shaped tail race tunnel
of approximately 1,720 metres in length. The scheme also includes the diversion of water from
the Telom and Lemoi river catchments through the 3-metre diameter transfer tunnels, with
respective lengths of 8,500 metres and 7,500 metres to the Susu Dam storage. Apart from
presenting the project key features and how it works, the talk also touched on the excavation of
the tunnels, which is a major part of the construction work. The construction of the Main Access
Tunnel (MAT) involving the excavation of a top heading in soft material using canopy tubes,
steel ribs and shotcrete for support was highlighted. The images below shows the photos of one
of the area which is the MAT, Multi-Purpose Tunnel area to be place.
Pictures of MAT Area.
16

Other than Mat area, there are are 9 Areas under control of our company to place water treatment
system, water filtration system and water storage tank.Each area plays their own part in treating
water and also filtrate water to supply to fire machine bay hall.
Area 1 : Tailrace Dewatering Chamber
This area consist of a surge chamber which is a place where the raw water from mountain was
suck in the tank ready to be stored and treated for various uses. It uses the centrifugal pump to
pump water into the Intermediate Tank Chiller Area in order to allow water to flow into the tank
to be treated.

17

Area 2 and Area 3 : Centrifugal Pump, Multi Pump.


In this two area, we havemultiple pumps to pump water into Raw Water Tank MAT Area. Yet,
before it enters the tank, it will go though ARKAL Screen Filter to filter off those large particles
before going to the raw water tank.
Area 4 : Raw Water Tank MAT Area.
The raw water pumped from the Surge Chamber will divided into a lot of areas to be used for a
lot of different reason. In Raw Water Tank MAT Area, there will some of the water to be supplied
into Machine Hall and Fire Hydrant. Some are also feed into Generation Control Building Area.
Area 5 : Raw Water Tank Switchyard Area
The water from this tank is obtained from the Raw Water Tank MAT Area using pumps from raw
water pumping stations.
Area 6 : Potable water tank Switchyard Area
Potable means useable water or drinkable water which is describe that the water is ready to
use.The potable water means the water is already treated and can be used for drinking and other
usage purpose.
Area 7 : Machine Hall Service Bay
In this area it consists of two tanks to be filled. This is because this area is the most important
area to generate power and electricity. It also provides water for the emergency hydrant of the
surrounding area. Thus, the tank is make sure to be fully filled and also there is no error in
indicating their logic error in the PLC.
Area 8 : Potable Water Tank MAT Area

18

There are one water tank in this area which is supplied by Raw Water Tank MAT Area where the
treated water is passed into this tank. This tank will suppose water into the Potable Treatment
Plant.
Area 9 : Potable Treatment Plant
This area is the main place where all the water is being treated. There are a lot of machines,
pumps and tanks with also the dosing pump in order to clear the water and also allows the water
to be treated inside it. Without this area, every water in this Ulu Jelai Hydroelectric Project will
not be able to work and progress.
The List of Components in every Areas.
Machine Bay Hall
No.
Parts
1 Potable Tanks
2 Gate valve
3 Ball Valve
Motorized needle valve
4
5
6
7

DN100
Reducing pressure valve
SS 304 Pipes
SS 304 Pipes
Ultrasonic level meter +

8 Transmitter
9 Level Switch

Specification
8000 l
DN100
DN40
DN100
DN200
DN40
DN100

Model

Make

Verimex
Verimex
Verimex
Verimex

Nos.
2
6
2
2
1
5000
8000

Prosonic S
FMU90

E&H
E&H

2
2

19

Pumping
Station
Ref
RWMP03-

Parts
Multistage centrifugal

Specification
5.6l/s@121.5

Model

Make
Lowar

Nos.

04
PWMP01-

pumps
Multistage centrifugal

m
5.6l/s@121.5

22SV10F110T

a
Lowar

02

pumps
Check Valve
Butterfly Valve
Gate Valve
Butterfly Valve
Electromagnetic Flow Meter
SS 304 Pipes

m
DN80
DN100
DN80
DN80
DN50
DN50

22SV10F110T
Verimax
Verimax
Verimax
Verimax

2
4
4
4
6
2
2500mm
12100m

SS 304 Pipes
SS 304 Pipes

DN80
DN100

m
3440mm

Water Treatment Plant


20

No
.

Parts
Clarified water tank
Centrifugal Pumps
Centrifugal Pumps
Chemical Tanks
Backwash Tank
Sludge Tank

Specification
5300 l
1.5 m3/hr @ 30 m
1.5 m3/hr @ 50 m
100 l
45 m3 (6mLx3mWx2.5mH)
2.5 m3 (1mx1mx2.5mH)
6058mmLx2438mmWx2591mm

7
8
9
10

Container
Decanter
Sand Filter
Dual Media Filter

H
3m3/hr
1.5m3/hr
1.5m3/hr

1
1
2
1
15000m

11
12
13
14
15
16
17
18
19
20

SS 304 Pipe
SS 304 Pipe
Motorized gate valve
Gate valve
Motorized needle valve
Motorized ball valve
Check valve
Ball valve
Ball valve
Potable Tanks
Electromagnetic flow

DN40
DN50
DN50
DN50
DN40
DN40
DN40
DN50
DN40
10000 l

m
6000mm
1
5
1
13
4
4
4
1

DN 50

1
7

1
2
3
4
5
6

21 meter
22 Level Switch

Make
Lowara
Lowara

Nos.
1
2
2
3
1
1

E&H

Raw Water Tank


No
.

Parts
1 Motorized Gate Valve
2 Gate Valve
Ultrasonic level meter +

Specification
DN200
DN200

3 Transmitter
4 Level Switch

Treated Water Tank


No Parts

Specification

Model
Verimax
Verimax
Prosonic S

Make

Nos.
1
2

FMU90

E&H
E&H

1
1

Model

Make

Nos.
21

.
1 Potable Tanks
2 Gate Valve
3 Ball Valve
Ultrasonic level meter +

10000 l
DN100
DN40

4 Transmitter
5 Level Switch

1
1
1

Verimax
Verimax
Prosonic S
FMU90

E&H
E&H

1
1
4400m

3 SS 304 Pipes

DN200

m
2300m

4 SS 304 Pipes

DN100

m
4400m

5 SS 304 Pipes

DN80

m
1000m

6 SS 304 Pipes

DN40

MAT Area
Switchyard Area
No.
Parts
1 Gate valve
2 Gate valve
3 Gate valve
4 Motorized Needle Valve
5 Level Controller Valve
6 Pressure Regulating Valve
7 Motorized Gate Valve
8 SS304 Pipe

Specification
DN250
DN100
DN200
DN200
DN200
DN200
DN200
DN200

Model
Verimax
Verimax
Verimax
Verimax
Verimax
Verimax
Verimax

Make

Nos.
1
1
1
1
1
1
1
4000
22

mm
Ultrasonic level meter +
9 Transmitter
10 Level Switch

Prosonic S
FMU90

E&H
E&H

1
1

Chapter 3: Conclusions & Recommendations


Conclusion
Throughout the whole industrial training, I learnt about the Huber Heat Exchanger RO
Win. Getting to know the purpose of heat exchanger also how to it works which helps to heat up
and save energy for the respective area.Other than that, I also study on a Huber product which is
the Belt Screen Escamax. It uses a perforated plate to do the screening in deep water channel.
Made a full presentation of Huber product which is the Escamax. The detail to be
included in the presentation is introduction of the product, principle of operation and the video of
the related product. Continues with the presentation to include the size of the system which is
always depends on the water quality and the size of the particle in the water. This presentation
greatly improved my knowledge on Huber products.

23

Drawn a full and complete drawing of KRISTAL Standard UF Systems which is MK-50 :
20- Module system. The UF system consists of 20 membranes with 3 main pipes which is
Permeate, Reject and Feed Header to perform the Ultrafiltration in System
Get to know and understand products from ARKAL FILTRATION SYSTEM and
knowing the difference and the usage of each filter. There are a lot of types of categories which is
Screen, Manual, Hydrocyclone, and Media and lastly is the SPIN KLIN which is all under
ARKAL Filtration SYSTEM.

Recommendations
There were few suggestions that I would like to suggest to the company. The company
should emplyoe more workers to help them in working with their big projects. This is because
there are a lot of processes and maintenance needed in their companies. Due to lack of
workforce, there are a lot of projects being abandoned and given to other water treatment
company tyo take over. This will cause the profit of the company to be reduced
In addition, the company should implement a time stamp system. This is to ensure every
of the employee doing their jobs effectively and didnt lazy on working on their tasks. In my
period, there are no time stamping system. Thus some of the colleagues does not come in work

24

on time. This causes the production rate and the project on hand to be delayed. This will ruin the
image of the company.
Lastly, the company should do more advertisement and amend the store to be more
strategic places. This is because the location of the warehouse is so far that it takes a lot of time
to retrieve the stock and the time left is not sufficient to approach customer to help with the
installation and maintenance.

References
1. http://www.huber.de/
2. http://www.kloberz.com.my/
3. http://www.huber.de/products/screens-and-fine-screens/screen-basket/retractable-basketscreen-s-16.html
4.

Water Treatment, Membrane Processes. J.Mallevialle et al., McGraw-Hill.

Read more: http://www.lenntech.com/scientific-books/water-treatment/overview-bookswater-treatment.htm#ixzz3aUxOJzXp


5.

Membrane Technology and Applications. R. Baker, McGraw-Hill.

25

6. http://www.huber.de/solutions/energy-efficiency/wastewater-collection-andtreatment.html

Appendices

26