Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

ASPHALT MIXING PLANT

IN 100% ISO SEA CONTAINERS


NEW: CSD 1500 – CAPACITY 90 TO 120 T/H
LINTEC’s latest product.
Designed for fast road jobs, as well
as good road repair work. – highly
mobile, but however very sturdy.

Advantages of containerised
Asphalt Mixing plant CSD 1500

• Small plant area


TECHNICAL DATA ASPHALT MIXING PLANT CSD 1500: • Fast erection and dismantling
• Low transport costs
Item Description Unit Quantity • No concrete foundations required
Screen drum • Lower energy consumption
Screening
Sections pieces 4/5
• Long lifetime components
Capacity Hot stone bin t 25
Reclaimed filler silo t 15 • Equipment housed in weather
resistant containers
Hot rolled asphalt production
• Low noise, smell and dust
Production capacity max. t/h 120
emission levels
Aggregate temp. increase K 150
• Very rigid and compact design
Aggregate density t/m3 1,6
• Easy access to all plant compon-
Exhaust gas temperature °C 90 - 120
ents on each container floor
Batch size kg 1650
• Exceptional maintenance and
Batch cycle s 45
service access

Free access under mixer for Combined mixing- and filter tower Throwbelt
direct loading
THE NEW ASPHALT MIXING
PLANT IN ISO SEA-CONTAINERS
TYPE CSD 1500
ADVANTAGES OF THE PLANT

Low Transport Costs - Weather Protection -


Each plant component is supplied in The housing of components within the
a 100% ISO sea container, which rigid containers, provide full climatic
has been inspected and certified by protection and maintenance safety.
Germanischer Lloyd.
Containerisation means: no low loa- Environmental Friendly -
ders, no excess width, no excess The Lintec containerised plant opera-
weight, lowest container freight rates tes with low noise and dust emissions
and fast transport. (<20 mg/Nm3). The loss of process
generated heat to the atmosphere is Pumproom with thermal oil heater
No Concrete Foundations - reduced due to enclosed containeri-
The ground area of the containers sation.
ensure stability on compacted soil. Processing of up to 30% recycled
material is possible. This optional Plant Building Concept -
Erection and Testing prior to equipment is also installed in contai- The Lintec tower plant comprises of
Shipment - ners. stacked containers that provide a
The components are erected and all pleasing industrial factory view. Twin
motors, screws etc. run through a test Energy Saving - stacked containers have a fully
phase. Considerable saving of energy costs protected central stairway that
is achieved by the Lintec screening provides easy access to each
Short Erection and Dismantling drum mounting. This eliminates the container floor.
Time - hot elevator associated with other
The crane is only required for a short tower plants. The Lintec screening Plant Security -
period and the plant ready to operate drum combines the heating and The plant tower can only be accessed
after one week and can be dismantled screening of the minerals in a single via one main lockable security door
within a few days. Therefore the plant process unit thus eliminating process thus preventing unauthorised access
may be considered mobile. heat loss due to material transpor- to the plant, theft and vandalism.
tation. The heated minerals also
benefit from the conducted heat from
the drum shell thus effecting further
savings.

LINTEC Burner 8 MW Pneumatic system Weighing- and mixing unit


The specifications within this brochure can be varied to client specific
requirements. These variations would consider the following options:

• combination of cold feed units


• burner specification and combustion fuel type
• capacity of filtration equipment
• size and type of silos and storage units
• size and type of hot mix material storage
• addition of recycling and additive facilities

LINTEC GmbH & Co. KG


Alter Postweg 28
D-21614 Buxtehude
Tel.: +49(0)4161-866-0
Fax: +49(0)4161-866-188
E-mail: info@lintec-gmbh.de
Internet: http://www.lintec-gmbh.de

LINTEC GmbH & Co. KG


Niederlassung Teltow
Rheinstraße 3
D-14513 Teltow
Tel.: +49(0)3328-3090-600
Fax: +49(0)3328-3092-59
E-mail: sales@lintec-gmbh.de
Internet: http://www.lintec-gmbh.de

IPS-LINTEC ASIA PACIFIC PTE LTD


71 Tech Park Crescent, Tuas Tech Park
Singapore 638072
Tel.: +65(0) 6863 11 11
Fax: +65(0) 6863 38 11
E-mail: info@ips.com.sg
Internet: http://www.ips.com.sg

LINTEC POLSKA
Spólka z o. o. ul. Sarnowska 2
63-900 Rawicz, Polska
Tel.: +48(0)65-5 46 46 47
Fax: +48(0)65-5 46 46 40
E-mail: info@lintec-polska.com.pl Authorised Dealer:
Internet: http://www.lintec-polska.com.pl

LINTEC GmbH & Co. KG


Moscow Branch
Ul. Rustaweli, 14/6
127254 Moskow, Russia
Tel.: +7 095 219 05 55
Fax: +7 095 219 05 33
E-mail: info@lintec-gmbh.ru
Internet: http://www.lintec-gmbh.ru

You might also like