k izdks"B
nSfud izxfr izfrosnu
No. : DGM(PMC)/DPR/2015/0747
Date : 09.10.15
Index
/ Project Zone
A.
/ Coke Zone
B.
/ Mills Zone
C.
/ Steel Zone
D.
.. / OP Zone
E.
F.
G.
/ Power Zone
H.
I.
Fabrication and Erection of Structural staircase for Ladle Furnace 1 at SMS III
Award letter issued to M/s Suprabhat Pal, Bhilai on 05.10.15 at the value of Rs. 98684
and completion period 3 months.
Review meeting held on 08.10.15
Instln. of By-Product Plant Complex & its integration with existing facilities for
COB#11 (Pkg. - 003A)
J.
2 / Utility Zone
K.
L.
Augmentation of Raw Material receipt & handling facilities with OHP, Part-B (Pkg. 061)
M.
4-( )-...
* -4 ( )
4:
( )
4 -( )-
4 -( )-
4 - 4 ( )-
4 -( )- ... & .
4 - 4 ( )-
4 -( )-...3
4 -( )-2
4-( ) @B
4 -( )-<=-..&...3
* D .
Depts Websites
. -( )-...
Projects (http://cmmsftp.sail-bhilaisteel.com/projects/index.htm)
Total
BE (A)
BE ( I )
DE (A)
DE ( I )
TOTAL
124
14
125
244
507
Activity
Submtd.
121
26
97
242
486
Unit
Appd/KFR
90
24
87
230
431
Total vol.
AAN
Comntd
U/S
13
0
0
0
13
18
2
8
8
36
0
0
2
4
6
Cum. Prog.
Oct15
Plan
A4
Date : 08.10.15
PROGRESS ON DATE
A3
Prog.
112
73
681
1224
2090*
Unit
110
72
667
1214
2063
Total vol.
2
0
3
0
5
0
1
9
9
19
Oct15
Plan
0
0
2
1
3
Cum. Prog.
Prog.
Earthwork
M3
84000
500
0
81500
Concreting
M3
30200
198
0
29432
Structure supply
T
2250
4
0
2240
0
Structure erection
T
2250
25
2124
Mech. Eqpt. supply
T
8200
0
0
8116
Elect. Eqpt. supply
T
1500
0
0
1480
*- Includes additional drgs. as per
Mech. Eqpt. erection
T
8200
344
18
7401
MECON.
Elect. Eqpt. erection
T
1500
8
0
1426
Part PAC issued on 14.04.15 w.e.f 12.01.15.
Part Commissioning certificate issued on 27.08.15 w.e.f. 20.07.15.
Processing of Gas from COB#11 in By-Product Plant - 3 started on
29.09.14. (Exhauster, ETP, PGC & Decanter running successfully). Ordering
(Mech.-8200 T & Elect.-1500 T) completed.
10/9/2015
Page : 2
SN
SCHEME / PACKAGE
PROGRESS ON DATE
Drawings
Total
Submtd.
Appd/KFR
AAN
Comntd
U/S
BE (A)
BE ( I )
DE (A)
DE ( I )
TOTAL
Activity
19
8
120
82
229
19
10
168
75
272*
16
7
144
60
227
0
1
11
10
22
2
2
6
1
11
1
0
7
4
12
7 M3 Concreting completed.
New Silos (CDI - 2 nos. & Boiler - 2 nos.):
Eqpt. erection in progress.
Stacker cum reclaimer 5,6,7:
Eqpt. erection in progress.
Wagon Tippler:
Elect. Eqpt. erection in progress.
Unit
Total vol.
Plan
Oct15
Prog.
Cum. Prog.
Earthwork
M3
30000
1000
0
22800
Concreting
M3
10050
250
0
9700
*-Includes addition drgs.
Strl. supply
T
190
0
0
190
Strl. Erection
T
190
0
0
190
Mech. Eqpt. Ordering
T
509
0
0
459
Elect. Eqpt. Ordering
T
173
0
0
173
Mech. Eqpt. supply
T
509
2
2
459
Elect. Eqpt. supply
T
173
0
0
170
Mech. Eqpt. erection
T
509
0
0
459
Elect. Eqpt. erection
T
173
0
0
126
Nitrification tank I: Part commissioning activity completed on
29.11.14.Nitrification tank II: Raft concreting completed during 24 08.15 28.08.15.
Drawings
Total
Submtd
Appd/KFR
AAN
Comntd
U/S
Review meeting held on
BE (A)
145
145
142
0
2
1
06.10.15.
BE I
DE (A)
DE I
TOTAL
Activity
4
661
413
1223
4
661
413
1223
4
647
409
1202
Unit
0
0
0
0
Total vol.
Plan
M3
0
10
4
16
Oct15
Prog.
0
4
0
5
Cum. Prog.
Earthwork
250000
5000
0
242000
M3
Concreting
#52000
380
43
50443
T
Strl. supply
8070
50
0
7744
T
#- Scope revised.
Strl. Erection
8070
100
12
7484
T
Mech.Eqpt. ordering
7500
7
0
7493
T
Elect Eqpt. Ordering
2500
0
0
2500
T
Mech. Eqpt. Supply
7500
205
0
6593
T
Elec. Eqpt. Supply
2500
15
0
2478
T
Mech. Eqpt. Erection
7500
470
0
5700
T
Elec. Eqpt. Erection
2500
300
0
810
Part PAC issued on 19.03.15 (for Dispatcher Building D2, 15 nos. APDs).
SCR- 5, 6, 7: Eqpt. erection in progress
New Silo (CDI - 2 nos. & Boiler - 2 nos.): Eqpt. erection in progress..Wagon
Tippler#4: Mech. Eqpt. erection completed.
SCR-3, 4: Trial run with load completed by 22.07.15.
10/9/2015
Page : 3
SN
A7
SCHEME / PACKAGE
Augmentation of Fuel & Flux Crushing &
Screening Facilities (Pkg. 064)
Contr. No. TK 2011/337
Consultant MECON
Agency M/s EPI
Contract price Rs. 272.65 Crs.
Contract signed on: 15.02.11,
Contr. Completion: 14.12.12,
Likely completion Mar16
(Proj. Mgr.- A P Barnwal, DGM, 20131)
PROGRESS ON DATE
CHP Area:
Civil work for LTSS-1,Final crushing
station, Bldg. in progress.
Str. work for Y11-200 in progress.
Total
Submtd.
Appd/KFR
AAN
Comntd
U/S
BE (A)
BE ( I )
DE (A)
DE ( I )
TOTAL
304
40
362
900
1606
266
38
455
520
1279
236
18
330
472
1056
10
0
42
0
52
16
19
56
14
105
4
1
27
34
66
Plan
Oct15
Prog.
Activity
Unit
Total vol.
Cum. Prog.
CSP Area :
Emergency coke yard: Eqpt. Erection in
progress.
Civil work for LTSS #2, 3 in progress.
Structural work of JH Z -17 in progress.
Fuel & Flux area: Civil work for LTSS #4, 5 in
progress.
M3
Earthwork
#85000
3500
0
81000
M3
Concreting
#16000
600
130
13760
Structure supply
T
7250
250
10
4340
# - Scope revised
Structure Erection
T
7250
250
12
3263
Mech. Eqpt. ordering
T
2522
200
0
2186
Elect Eqpt. Ordering
T
526
0
0
210
Mech. Eqpt. supply
T
2522
100
38
1520
Elect Eqpt. supply
T
526
30
20
186
Mech. Eqpt. erection
T
2522
30
3
425
Elect Eqpt. erection
T
526
30
0
91
Important activities completed / Highlights
C-line conveyor: Integrated load trial run of new C-line conveyor taken
on 07.11.13. CHP area: Civil work for Final crushing station ,LTSS-1 Bldg. &
Str. work for Conveyor Y11-200 in progress. Coal feeding in Coal Tower
started on 27.09.14.
CSP area: Trial run of Conveyor K11-9B & K11-10B completed.
Emergency coke yard: Eqpt. Erection in progress.
Civil work for LTSS #2, 3 in progress. Structural work of JH Z -17 in
progress.Fuel & Flux area: Civil work for LTSS #4, 5 in progress.
A 8 Cold repair of Coke Oven Battery no. -9 of CO & CCD (Stage-II approved on 04.08.12) completion: 25 months, Approved cost: Rs. 332.65 Crs. (Consultant CET)
Pkg.-1: Battery Proper
Review meeting scheduled on 16.10.15. Erection of All 136 nos. Flash plate completed on 31.01.15.
Review meeting held on 22.09.15.
Contract No. TK 2012/ 365 Agency MECON
Erection of Door frame completed on 02.07.15.
Contract price - Rs. 150.09 Crs.
Temporary Heating in progress.
All 136 nos. WHB assembly erected by 21.07.15..
Contract signed on : 29.08.12,
All 136 nos. Buckstay erected by 02.04.15.
Contr. Completion: 28.08.14,
Quenching Tower: Civil & Structural work in Erection of temporary tie rods & charging hole completed.
Likely completion Oct15
progress.
Major Refractory erection for Battery proper completed on 13.03.15.
(Proj. Mgr. D K Dewangan, DGM,20134)
Eqpt. Erection in progress.
Chimney Heating started on 22.06.15.
Wharf: Civil work in progress.
Temporary Heating started on 28.08.15.
Pkg.-4: Instrumentation & Automation
Review meeting scheduled on 15.10.15. All 13 nos. BE drgs. & 49 out of 50 nos. DE drgs. Submitted.
Review meeting held on 23.09.15.
Contract No. TK 2012/ 374
Equipment erection in progress.
Agency M/s Instrumentation Ltd.
Equipment erection in progress.
Contract price - Rs. 4.43 Crs.
Contract signed : 18.10.12, Contr. Completion:
17.06.14, Likely completion Oct15
(Proj. Mgr. D K Dewangan, DGM,20134)
10/9/2015
Page : 4
SN
A8
Pkg.-8A:
Replacement
of
Ammonia Review meeting scheduled on 09.10.15.
Saturators # 5 & 6 in ASP #2 of CO&CCD
Contract No. TK 2012/364 Agency Beekay
Contract price - Rs. 5.40 Crs.
Contract signed on : 22.08.12 Cont Completion: 21.08.14,
Likely completion Oct15
(Proj. Mgr. D K Dewangan, DGM,20134)
PGC#1-4:
Gas Pipe line testing in progress .
A9
10/9/2015
Page : 5
SN
SCHEME / PACKAGE
B. MILLS ZONE
B 1 Civil works for Bar & Rod Mill
(Pkg-051A-01) (Works Pkg.)
Consultant-MECON
Agency: M/s HSCL
Contract Price: Rs 123.93 Crs.
Contract signed on : 30.12.10
Completion period : 29.08.12
Likely Completion: Oct.15
(Proj. Mgr. A K Singh, AGM) 21014
B2
PROGRESS ON DATE
Unit
M3
M3
Earthwork
Concreting
Total Scope
(*- Revised)
Plan
Oct.15
Prog.
325000 *
87000 $
3430
2500
200
321
Cum. Prog.
321770
85240 #
B3
Pkg. covers fabrication & erection of structures for Block-3 (partly) and
Block-4 (complete). ie. from Axis- 29 to 47.
Activity
Unit
Total Scope
Oct.15
Plan
Prog.
Cum.
Prog.
Awarded on : 24.11.12,
Contract signed on 15.02.13
Award value: Rs. 47.11 Crs.
Contr. Completion: 23.05.13
Strl. fabrication
7000 *
200
6390
Strl. erection
7000 *
500
16.5
5495.5
(*- Revised)
10/9/2015
Page : 6
SN
B4
B5
SCHEME / PACKAGE
PROGRESS ON DATE
Reheating Furnaces for Bar & Rod Mill Design Engg., ordering, supply &
(Pkg.-049-1)
erection of eqpts. in progress.
Contract No.- TK/2011/335
Rod bending and shuttering for
Consultant - MECON
Concreting of basin of Cooling tower
Agency: M/s Fives Stein, Spain
at 7.4 M level in progress.
Fives Stein, India Beekay
Alignment of all Roller tables & of
Contract price: Rs. 54.23 Crs.
Furnace actuator without damper
Cont. signed on : 09.02.11
completed.
Cont. Completion: 08.11.12
Erection of Elect.eqpts. restarted on
Likely compln: Oct.15
21.04.15 and in progress.
(Proj. Mgr. J Gopi Krishnan, DGM)
21151
Installation of Bar & Rod Mill (Pkg.-046) Shifting, placement and erection of
Contract No.- TK/2010/323
equipments in Rolling Mill area, Rolling
Consultant - MECON
Mill exit area, Cooling bed area,
Agency: M/s Danieli & C SpA, ItalyCutting to length area, Product
Danieli India, Kolkata - Beekay
Forming area, Product Collecting area,
Contract price: Rs. 406.09 Crs.
Hyd. Cellars, Oil Cellars, etc in progress.
Cont. Signed on : 25.08.10
Elect. Erection work (on-field cable
Cont. Completion : 24.08.12
tray work in BC bay, cable laying from
Likely Completion : Oct.15
Switchgear to ECR-1, bus duct erection
(Proj. Mgr. - K D Prasad, DGM) 22183
in ECR-3) in progress.
Testing of balc 9 transformers of ECR-1
almost completed, oil filtration i/p.
2 T Mech. eqpts. & 0.5 T Elect. eqpts.
erected.
Total
Submtd
Appd/KFR
AAN
74
211
241
287
813
71
210
227
280
788
67
204
215
270
756
0
0
4
0
4
Unit
Total Scope
(*- Revised)
Activity
Comtd.
U/S
4
6
8
10
28
0
0
0
0
0
Oct.15
Plan
Cum. Prog.
Prog.
Concreting
M3
324
50
0
182
Mech. Eqpt. (Imp.)Supply
T
62*
Comp.
Elect. Eqpt. (Imp.) Supply
T
7*
0
0
6.5
Mech. Eqpt. (Ind.) Supply
T
1048*
0
0
1040
Elect. Eqpt. (Ind.) Supply
T
195*
0
0
167
Refractory (Imp.) Supply
T
190*
0
0
Comp.
Refractory (Ind.) Supply
1090*
0
0
561
Mech. Eqpt. Erection
T
1110*
10
0
858
Elect. Eqpt. Erection
T
202*
30
0
82.5
Erection of lifting frame assly., Chimney & lateral wall of Furnace completed & of
Flue duct 96 % completed Erection of all burners & roof beam of Furnace Proper
completed. Alignment of Skid & posts, Charge wall & DA fan completed. All
Imported Refractory received at site on 07.09.15. Pressure testing of indirect
cooling water piping for Furnace completed on 14.09.15.
Drawings
Total
Submtd
36
231
268
1280
1815
Appd/KFR
36
231
268
1280
1815
Activity
Unit
AAN
35
231
268
1279
1813
0
0
0
0
0
Total
Scope
Plan
Comntd
1
0
0
1
2
Oct.15
U/S
0
0
0
0
0
T
2300*
10
0
T
1857
0
0
T
1650
2
0
T
5500*
220
13
T
1824
30
3
Charging of Transformers in ECR-1 started on 05.09.15, 9 out of 18 charged.
Mech. Eqpt(Ind.) SupplyM/s Beekay
Mech. Eqpt. (Ind.) Supply M/S DIL
Elect. Eqpt. (Ind.) Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
2290
1069 #
1648
2869.5
1386.5
Diversion of Nallah passing through Concreting for slab of Manhole no.-17 Laying/jointing of pipes for manholes nos. 5 to 9 & 11 to 24 completed.
Universal Rail Mill layout (Pkg-118 S)
Activity
Unit
Total
Oct.15
completed on 30.09.15.
Agency-M/s Kulkarni & Sahu Buildcon
Contract price: Rs 9.68 Crs.
Cont. Signed on: 09.02.12
Completion period : 02.06.12
Likely Completion : Nov.15
(Proj. Mgr. - A S P Sarma, DGM) 22187
# Ordering of all 62 T
Mech. Eqpt. (Imp.) , all
1048 T Mech. Eqpt.
(Indig.), all 195 T Elect.
Eqpt. (Indig.) & all 7 T
Elect. Eqpt. (Imp.)
completed.
Cum. Prog.
Prog.
B6
Earthwork
Concreting
Supply of RCC Pipes
Laying/jointing of Pipes
10/9/2015
Page : 7
M3
M3
RM
RM
Scope
Plan
42000
9500
2450
2450
0
200
25
25
Prog.
0
0
0
0
Cum.
Prog.
39200
5320
1900
1900
SN
B7
SCHEME / PACKAGE
Civil works for Universal Rail Mill
(Pkg-052A) (Works Pkg.)
Consultant-MECON
Agency: M/s HSCL
Contract price: Rs. 289.51 Crs.
Eff. dt. of Cont. : 07.09.10,
Cont. signed on : 15.09.10
Cont. Completion: 06.03.12
Likely compln: Dec.15
(Proj. Mgr. A S P Sarma, DGM)
22187
B8
B9
Earthwork
Concreting (#)
M3
M3
500000*
230000 $
6000
493
500000
207046 #
$ - Revised Scope as informed by Zone # - RCC Figures reported by Zone after reconciliation
Strl. Fabrication for roof truss, supports & lighting walkway Cum. 32148 T steel collected by M/s HSCL. Strl. fabrication for Cols. & CGs for Blks-1 to 7 completed.
Assembly of all 342 columns & all 466 Crane Girders completed.
Cum. all 342 columns & 466 Crane girders erected.
342 Cols (Blk-152 nos,Blk-242 nos, Blk-355 nos, Blk-459 nos,Blk-545 nos,Blk-644 nos,Blk-7-45 nos)
26 th Review Meeting
held on 14.02.13.
466 CGs(Blk-1- 70 nos, Blk-2- 54 nos, Blk-3 76 nos, Blk-4- 86 nos,Blk-562 nos,Blk-660 nos &Blk-7-58 nos)
Cum. 481 out of 494 nos. Roof truss erected. 2 no. Long Crane girders at Blk-5 (A row) & 4 no. Long
Crane girders Blk-7 (B, B row) of 36 m erected. Erection of 58 long trusses (45 m) completed by
BE drgs. (Scope) 30000 T (Blk-1-4497 T, Blk-2-3354 T, Blk-3-4441 May.15. 1 no. long Roof girder at AB bay of Block-7 erected.
Status of Drgs. :-
Activity
PROGRESS ON DATE
Unit
Structural fabrication
Structural erection
Drawings
Total
50
40
240
954
1284
Activity
Oct.15
Total Scope
(*- Revised)
Plan
Prog.
Cum.
Prog.
T
T
30513 $
30513 $
380
1500
22
30
30155
28013
Submtd.
Appd/KFR
AAN
Comtd.
U/S
50
40
238
930
1258
49
39
222
912
1222
0
1
3
8
12
1
0
9
10
20
0
0
4
0
4
Total Scope
Oct.15
Cum.
(*-Revised)
Prog.
Plan
Prog.
Concreting (incl. precast slabs)
M3
475*
34
0
441
Elect. Eqpt. (Ind.) Ordering
T
170*
6
0
164
Refractories (Indig.) Supply
T
1520 $
20
0
1500 $
Refractories (Imp.) Supply
T
325 $
0
0
Comp.
Mech. Eqpt. (Imp.) Supply
T
190
26
0
164
Mech. Eqpt. (Ind.) Supply
T
1800*
20
0
1780
Elect. Eqpt. (Imp.) Supply
T
5
3.5
0
1.5
Elect. Eqpt. (Ind.) Supply
T
170*
36
0
134
Mech. Eqpt. Erection
T
1990*
150
5
1646
Elect. Eqpt. Erection
T
175
20
5
114
Refractories Erection
T
1845
400
41
1181
Column lift in CT at 12 m i/p. Erection of moving ducts, Flue tunnel & Chimney comp.
Erection of ref. in Combustion air pipe started on 19.11.14 & in Furnace Proper started
on 19.03.15. Alignment of moving skids & welding for fixed skids completed. Erection of
Indigenous refractory in Chimney area comp. & for flue tunnel 98% completed. Supply
of Elect. (Imp.) eqpts. started on 10.07.15. Supply of Imported refractory started on
06.08.15 and completed on 19.09.15. Erection of Indigenous refractory in Unfired Zone
of Furnace Proper area completed on 19.09.15.
10/9/2015
Page : 8
$ - Revised Scope
informed by Zone
as
Unit
$ - Excluding spares
Ordering of all 190 T Mech
Eqpt.(Imp.). all 1800 T
Mech Eqpt.(Indig.), all 5 T
Elect.
Eqpt.(Imp.),
completed.
Ordering of all 325 T Imp.
Refractory and 1520 T
Indig.
Refractory
completed.
SN
SCHEME / PACKAGE
B 10 Installation of Universal Rail Mill
(Pkg.-047)
Contract No. - TK/2010/322
Consultant - MECON
Agency - M/s SMS Meer GmbH,
Germany - SMS Meer India,
Kolkata -ABB, Bangalore
Contract price: Rs. 1174.46 Crs.
Contract Signed on: 23.08.10
Cont. Completion: 22.06.13
Likely Completion : Oct.15
(Proj. Mgr. -B K Dey, DGM) 20008
PROGRESS ON DATE
Erection & alignment of Mech. eqpts. in
various areas (Areas- 1 to 12, 14 to 19, 24
to 34) in progress.
Grouting of major eqpts. of Areas -1 to 9 &
Area-24 completed and in progress for
Areas 14 to 19 & 20 to 27.
Erection of Elect. eqpts. (RTDB, MCC
panel, LTSS, bus duct erection in ECR-2 &3,
cable laying, cable tray work in various
areas, HT cable laying up to ECR-3) in
progress.
Motor testing work of Area-1 (except
megger test for cable) and of Area-4 & 5
comp., of Areas-6 & panel wiring of LV
drive-1 i/p,
Testing work & other jobs for charging of
LTSS-13 in ECR-1 in progress.
Total
Submtd.
Appd/KFR
AAN
Comtd.
U/S
285
321
685
169
285
320
680
158
264
317
629
151
15
3
32
1
6
0
19
3
0
0
0
3
1460
1443
Unit
1361
Total
Scope
1808
6750*
5800
163
1808
12550
1971
51
Activity
Elect. Eqpt. (Ind.) Ordering
Mech. Eqpt. (Imp.) Supply
Mech. Eqpt. (Ind.) Supply
Elect. Eqpt. (Imp.) Supply
Elect. Eqpt. (Ind.) Supply
Mech. Eqpt. erection
Elect. Eqpt. erection
T
T
T
T
T
T
T
28
Oct.15
Plan
28
0
550
66
1000
60
Prog.
28
0
0
0
26
12
3
Cum. Prog.
1808
6750
5250
Completed
1742
6709
1237
Erection activities of Areas- 1 to 12, 14 to 19, 24 to 34, Hyd. Cellars and Oil cellars i/p. Erection of
Housing in all Mill Stands completed. Placement of eqpts. in 1st module of Cooling Bed area
completed on 31.07.15. Erection of Cold Carbide saw started on 14.09.15 Bus duct erection &
HT cable laying in ECR- 3 and grid earthing in ECR-2, LCSS and panel erection in ECR-3 i/p. One
Transformer of LTSS-13 of ECR-1 charged on 12.09.15 & another on 14.09.15.
Total
Submtd.
Appd/KFR
AAN
37
12
88
253
390
37
12
88
253
390
34
12
86
251
383
1
0
2
0
3
Unit
Total Scope
*- Revised
Plan
Drawings
Total
Submtd.
Appd/KFR
AAN
Comtd
U/S
203
48
270
761
1282
203
48
262
754
1267
203
48
262
754
1267
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Unit
Total Scope
(*-Revised)
2
0
0
2
4
Oct.15
Prog.
U/S
0
0
0
0
0
TOTAL
Activity
Oct.15
Plan
Prog.
Cum. Prog.
T
3463
20
0
3443
Elect. Eqpt. Erection
T
703*
3
0
700
Hot trials of Welding Machine no.-1 taken and 1st weld joint of 60 Kg rails (7.5 M) was done successfully
on 14.11.14. Both Brushing machines erected. Testing of motors of Roller table of Transfer Telpher area
completed. All 5 Xmers in S/s bldg.and 3 Xmers in Welding Bldg. charged. All ECRs-1 to 5 charged.
Comtd
to
be
commissioned for BRM
1100
17 Cranes, 3 Transfer
275
cars & 21 Electric Hoist.
Completed
Eqpt.
to
be
1319.5
commissioned for URM
1042.7
24 Cranes & 21 Elect.
1054
Hoist)
691
Cum. Prog.
(Eqpt.
Mech. (Manufacturing)
T
2636*
400
0
Mech. (B/o items) Ordering
T
464*
189
0
Elect. (B/o items) Ordering
T
1300*
Mech. Eqpt. Supply
T
3100*
100
0
Elect. Eqpt. Supply
T
1300*
50
0
Mech. Eqpt. Erection
T
3100*
100
0
Elect. Eqpt. Erection (incl DSL)
T
1300*
50
0
Eqpt. erection with Crane-106 in BRM & Crane-413, 416, 418 & 421 in URM i/p. LT mechanism with trolley
of Crane -101, 105 & 116 in BRM area erected. LT mechanism of Crane -406 of URM area erected.
Drawings
Drawing list KFR on 05.09.14.
Basic Engg. (A)
GA drgs for civil foundation plan KFR.
GA of Drop Test Area, Feeding Roller Basic Engg. (I)
Total
10/9/2015
Page : 9
Appd/KFR
AAN
Comtd
8
6
6
Submtd.
8
4
0
7
3
0
1
0
0
0
1
0
U/s
0
0
0
10
30
12
10
SN
SCHEME / PACKAGE
B 14 Illumination System for URM, BRM & RWL
PROGRESS ON DATE
Total
20
0
350
71
441
TOTAL
Activity
Total
Consultant- MECON
Contract no. TK/ 2013 / 385
Cont. price: Rs 22.84 Crs.
AgencyM/s Hankook-Sanmathi
Contract Signed on: 21.06.13
Contract Completion : 20.06.14
Likely Completion : Oct.15
(Proj. Mgr.- Rakesh Kumar, DGM) 21143
9
8
15
31
63
Submtd.
20
0
330
67
417
Unit
Appd/KFR
AAN
Comtd
16
0
160
65
241
Total
Scope
2
0
156
0
158
Plan
Prog.
T
T
448
448
50
50
0
0
Submtd.
Appd/KFR
AAN
Comtd
0
0
0
0
0
0
2
0
3
5
9
8
15
31
63
Unit
1
0
8
0
9
Oct.15
9
6
15
28
58
Total
Scope
Plan
Prog.
354
50
23
15.3
0
0
Oct.15
U/S
1
0
6
2
9
Cum. Prog.
358
183
U/S
0
0
0
0
0
Cum. Prog.
T
T
331
34.7
Alignment work of all 4 nos. CNC lathe machines completed. Cable laying work comp.
Total
Submtd.
Appd/KFR
AAN
Comtd
U/S
B 16 Air Conditioning System and Ventilation Design Engg., ordering,
supply & Drawings
Basic Engg. (A)
29
29
29
0
0
0
System for BRM, URM & RWL (Pkg.-125-02)
erection of eqpts. in progress.
Basic Engg. (I)
6
6
6
0
0
0
Consultant-MECON
Fabrication & erection of ducts (ECRs-1, Detail Engg. (A)
294
277
250
8
9
10
Contract price: Rs 47.92 Crs.
2 & 3 of BRM & ECRs-1 to 3 & 6 of URM) in Detail Engg. (I)
50
49
47
1
1
0
Contract no. TK/ 2013 / 387
TOTAL
379
361
332
9
10
10
progress.
Agency M/s Sterling & Wilson Ltd., Kolkata
Activity
Unit
Total Revised
Oct.15
Cum. Prog.
Placement of eqpts. in various area of
Contract Signed on: 25.06.13
Scope
Plan
Prog.
BRM and URM(Mech. eqpts., Elect. Mech. Eqpt (Ind.) supply
Contract Completion : 24.09.14
T
969 #
49
31
951
eqpts. like PDB, insulation work, cable Elect. Eqpt. (Ind.) Supply
Likely Completion : Oct.15
T
316 #
22
0
294
(Proj. Mgr.- J Gopi Krishnan, DGM) 21151
tray work & cable laying) in progress.
Mech. Eqpt (Ind.) erection
T
969 #
100
0
313
T
316 #
15
0
164
Piping work, welding, alignment, hydro Elect. Eqpt. (Ind.) erection
test and piping insulation work in Mech. eqpts.(VRF, ACs, pipes, GI sheets Chillers, valves, AHUs, FCUs, fans, Airwashers,
louvyers, desert cooler, pipes, plates, humid stats, pkg ACs, Cooling tower, dampers, etc)
progress.
B 17 Roll & Repair Shop Equipment for Universal Design Engg., ordering & supply of
Rail Mill (Pkg-142-02)
eqpts. in progress.
Contract no. TK/2013/391
Welding rectifier & m/cs, Radial drilling
supplied. Elect. eqpts (Cables, steel supports,cable tray, PDBs, SDBs, etc) supplied. Testing
of all AC and ventilation systems of Rail Welding Line area successfully comp. on 06.05.15.
Consultant-MECON
Cont. price: Rs 23.90 Crs.
Agency M/s MACO Corporation, Kolkata
Contract Signed:26.09.13
Contract Compln: 25.09.14
B 18 Air Drying Plant for Universal Rail Mill and Air Design Engg. in progress.
Drying and Filtration Plant for BRM (Pkg. -114A)
QAP of Strl. & Mech. eqpts. approved on
Consultant-MECON
Cont. price: Rs 1.34 Crs.
08.09.15.
Agency M/s Mellcon Engineers Pvt. Ltd, New Delhi
Contract Signed:31.03.15
Contract Compln: 30.11.15
(Proj. Mgr.- K V S Prakash Rao, DGM) 21374
Drawings
Total
14
14
13
62
103
Total
5
0
31
44
80
Submtd.
14
13
10
59
96
Unit
Appd/KFR
AAN
Comtd
Plan
T
T
420
20
117.5
10
0
0
302.5
10
Submtd.
Appd/KFR
AAN
Comtd
U/S
3
0
15
3
21
2
0
0
2
4
5
0
21
8
34
0
0
1
0
1
1
3
1
5
10
U/S
13
10
8
54
85
Total
Scope
Oct.15
0
1
0
0
1
Cum. Prog.
Prog.
0
0
2
3
5
0
0
4
0
4
Engg. meeting held at MECON, Ranchi during 01.07-04.07.15. List of drawings & datasheets for
air filter and air dryer KFR on 17.07.15.P & ID diagrams, eqpt. list and foundation drawing for air
filtration plant and assembly for BRM KFR. P & ID diagrams and foundation drawing for air dryer
for URM KFR. Electrical load list KFR and Power supply scheme approved. GA drg. & foundation
drg. for air receiver for BRM and URM KFR.
10/9/2015
Page : 10
C. STEEL ZONE
SN
C1
PROGRESS ON DATE
SCHEME / PACKAGE
Instn. of Desulphurisation Unit at SMS-II (Consultant-CET) Sanction Cost: Rs 83.90 Crs.
Drawings
Pkg.-IV 180T+50T Ladle Crane
Critical Issue
BE (A)
Contract No TK- 2006/221
Supply of Main Trolley.
DE (A)
Consultant-CET
Start erection of eqpt. by M/s DE I
Agency -M/s Jessop
TOTAL
Jessop.
Cost : Rs. 13.18 Crs
Contr. date : 10.03.06
Contr. comp : 09.06.07
Project Mgr- S.K.Jain, DGM- 1058
Total
Subm.
40
26
113
179
37
22
68
127
36
17
56
109
1
5
1
7
Unit
Total
vol.
385
*52
*385
*52
Plan
-
Activity
C2
2.1
T
T
T
T
Appd/KFR
AAN
Comnt
4
4
U/S
7
7
Oct15
Cum. Prog.
Prog.
206
22
24
7
Segment repair & mould repair shop for new slab caster at SMS-II, Consultant-CET
Instaln. of EOT Crane ,Wire Rope Hoist & Jib
All Mechanical & electrical equipments erection completed. Individual
Crane for Segment & Mould Repair Shop at
trial of mechanism completed. PAC issued on 03.01.14. Load test
SMS-II Contract no. TK/2010/305
completed and certificate issued by competent authority on 19.05.14.
Agency- M/s Grip Engnrs., Faridabad
Commissioning certificate issued w.e.f 09.08.2014.
Cost : Rs.1.77 Crs,;
Contr. Sign dt. 06.04.10,
Cont. Completion : 05.04.11,
Likely compl: Oct15
Proj. Mgr -K. Rajasekhar, AGM- 0518
2.2
2.3
Drawing
Total
BE (A)
DE (A)
DE I
TOTAL
15
21
20
56
Activity
Earthwork
Concrete
Elect. Eqpt. Ord
Elect. Eqpt. Supply
Elect. Eqpt Erection
Submtd.
15
21
19
55
Appd/KFR
13
19
19
51
Unit
Total Vol.
M3
M3
MT
MT
MT
125
75
32
32
32
AAN
Comtd.
2
2
0
4
0
0
0
0
Oct15
Plan
Progress
U/S
0
0
0
0
Cum.
Prog
125
75
32
32
32
Contract no . TK/2010/320
Agency- M/s Texllence CNC, Pune
Cost : Rs 87.63 Lakhs
Contract signed : 06.08.10,
Cont. Compl. : 05.08.11
Likely Completion Oct15
Proj. Mgr K. Rajshekhar, AGM- 0518
10/9/2015
Page : 11
SN
2.4
SCHEME / PACKAGE
Provision of Roll Cladding facilities &
other Auxiliaries in SRS
PROGRESS ON DATE
Contract no . TK/2010/328
Agency : Welding Alloys , Mumbai
Cost : Rs 1.92 Crs. Contract Signed : 11.11.10
Effective Dt. of contract : 02.11.10
Cont. Completion : 01.11.11
Likely Completion : Oct15
Proj. Mgr K. Rajshekhar, AGM- 0518
2.5
C3
Radiography completed
line). Charging balance.
Drawing
BE (A)
BE I
DE (A)
DE I
TOTAL
Addl. Drawings
BE (A)
BE I
DE (A)
DE I
TOTAL
Activity
Total
598
282
103
286
1269
-
Appd/KFR
AAN
Comntd
U/S
597
277
108
279
1261
586
270
102
249
1207
3
1
1
8
13
5
5
5
16
31
3
1
0
6
10
270
215
156
647
1288
Total vol.
7
0
1
30
38
4
11
9
139
163
0
0
1
9
10
Cum.
Prog.
281
226
167
825
1499
Unit
Oct15
Plan
Subtd.
T
T
T
T
T
T
T
T
T
T
T
2426
21562
349.2
1870.1
4212
21562
2426
349.2
1870.1
2059
1081
0
150
0
0
30.4
0
40.21
Prog.
2426
21463
349
1856
0
20950
2412
349.2
1825.6
2058.5
418.3
Mechanical test for travel of piston of Gas Holder, to its operating limit
conducted on 18.01.14 along with EMD & SMS-II. Standard leak test of
Gas Holder conducted during 04-07.02.14 along with EMD & SMS-II and
joint inspection recorded for 24, 48 & 72 hrs. Electrical equipment
erection started on 04.11.14.
10/9/2015
Page : 12
SN
C4
PROGRESS ON DATE
SCHEME / PACKAGE
Instln. Of Secondary Refining Unit for Erection of Storage Bunker is in
SMS-III (Pkg.-025A)
progress.
Cont. No. 2010/303
1.5 T tech strl erected.
Consultant MECON
43.5 T tech strl supplied.
Agency-M/s WISDRI, China
131 T mech eqpt supplied (imp.)
Cost : Rs. 205.56 Crs
80 T elect eqpt supplied (imp.)
Contract signed on 08.03.10,
Cont. Completion : : 22.09.12,
Likely Compl: Jun16
(LF1 - Nov'15, ARS1 - Feb'16,
LF 2 & 3, ARS 2 & 3 - Jun'16,
RH - Jun'16)
Proj. Mgr V.K. Rai, DGM - 0563
179
173
146
523
1021
Total
BE (A)
BE (I)
DE (A)
DE ( I )
TOTAL
Submtd.
179
173
146
509
1007
Submtd.
3
4
10
69
Activity
Mech. Eqpt.Ord. (Imp.)
Mech. Eqpt. Ord. (Indg.)
Elect. Eqpt. Ord. Imp.)
Elect.Eqpt. Ord. (Indg.)
Tech. Strl Fabrication
Refractory ordering (Imp.)
Refractory ordering (Indig.)
Mech. Eqpt.Supply. (Imp.)
Mech. Eqpt. Supply. (Indg.)
Tech. Strl Supply
Tech. strrl. erection
Elect. Eqpt. supply. (Imp.)
Elect. Eqpt. supply. (Indg.)
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Appd/KFR
AAN
176
171
145
489
981
3
1
1
0
5
Appd/KFR
0
1
0
2
3
86
73
Total
Vol.
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
1698
1652
303
873
2150
353
480
1698
1652
2150
2150
303
873
3350
1176
U/S
0
0
0
14
14
AAN
3
3
9
58
Unit
Comntd
0
1
0
6
7
Comntd
U/S
0
0
0
6
0
0
1
3
6
Oct15
Progress
Plan
0
0
180
131
270
200
119.5
34
4
57
80
130
70
24
42
4
Cum.
Prog.
1698
1652
303
873
2150
353
0
491.1
147.88
640.5
186.74
120
325
7.5
75
Mechanical (imp.) equipment supply started on 27.01.15. Tech. strl erection started for LF
area on 30.03.15. 35 MVA Ladle furnace transformer supplied in Apr.15. Electrical eqpt.
Erection started on 27.05.15. 35 MVA Ladle furnace transformer at LF-1 erected on 27.05.15.
35 MVA Transformer (for LF) received at site on 12.06.15. Mech. eqpt. Erection started on
25.08.15. 3rd and last 35 MVA trans. Supplied on 03.10.15.
C6
Drawings
Total
BE (A)
BE I
DE (A)
DE I
TOTAL
723
108
266
937
2034
Submtd
722
108
265
908
2003
Appd/KFR
706
108
258
902
1974
AAN
16
0
6
1
23
Comntd.
0
0
1
5
6
U/S
0
0
0
0
0
232
518
59
1843
2652
231
496
59
1814
2600
1
0
0
3
4
0
20
0
12
32
0
2
0
14
16
Addl. Drawings
BE (A)
BE I
DE (A)
DE I
TOTAL
Activity
Mech. Eqpt. Ord. (Imp.)
Mech. Eqpt. Ord. (Indg.)
Elect. Eqpt. Ord. (Imp.)
Elect. Eqpt. Ord. (Indg.)
Mech. Eqpt. Supply (Imp.)
Mech. Eqpt. Supply (Indg.)
Elect. Eqpt. Supply (Imp.)
Elect. Eqpt. Supply (Indg.)
Refractory Ord.
Elect. Eqpt. erection
Unit
Total Vol.
T
T
T
T
T
T
T
T
T
T
3299
10791
240
1176
3299
10791
240
1176
2200
971
Oct15
Plan
Prog
0
0
0
0
50
0
0
0
23.8
Cum. Prog.
3294
10380
239
1100
3294
10198
239
1097
0
138.8
Elect. Eqpt erection started on 27.12.14. Cable laying started in Caster-1 on 06.08.15.
10/9/2015
Page : 13
SN
C7
SCHEME / PACKAGE
Instln. of Hot Metal De-sulphurisation
Unit for SMS-III (Pkg.-027)
Contract No. TK-2008/283
Consultant MECON
Agency-M/s ESM USA-Beekay Engg.
Cost Rs. 37.73 Crs
Contract signed: 06.10.08 (Eff. date
06.03.09)
Contr. completion : 05.03.11,
Likely Compl: Mar16
Proj. Mgr -. N.V.Joshi, DGM-0799
PROGRESS ON DATE
Total
Submtd
Appd/KFR
AAN
Comtd
U/S
BE (A)
55
61
74
348
55
61
67
322
42
58
55
315
2
0
0
0
10
3
12
6
1
0
0
1
BE I
DE (A)
DE I
TOTAL
538
BE (A)
BE I
DE (A)
DE I
TOTAL
Activity
C8
Drawings
Total
BE (A)
BE I
DE (A)
DE I
TOTAL
73
95
186
280
634
Activity
505
470
Addl. Drawings
3
3
1
1
10
9
14
13
Unit
Total Vol.
T
T
T
T
T
T
T
T
T
T
T
T
15
300
2
60
420
420
15
300
2
60
315
62
Submtd.
73
95
186
277
631
Unit
Appd/KFR
0
0
1
1
Oct15
Plan
Progress
10
10
AAN
72
95
184
277
628
M3
Nos.
M3
T
T
T
T
T
T
T
T
T
T
T
108000
792
21195
4000
8364
2750
11114
21
2047
1.5
1000
4000
2068
1001.5
Comtd
1
0
0
0
1
Total vol.
2
0
0
Cum.
Prog.
15
290
2
60
410
0
15
290
2
5.5
0
0
0
0
Plan
Earthwork
Pilling (Scope revised)
Concreting
Refractory ordering
Tech. Structures Supply
Bldg. Structures supply
Structures erection
Mech. Eqpt. Supply. (Imp.)
Mech. Eqpt. Supply. (Indg.)
Elect. Eqpt. supply. (Imp.)
Elect. Eqpt. Supply. (Indg.)
Refractory supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
31
0
0
1
1
2
Oct15
Prog.
4000
40
59
130
29
23
0
45
25
6300
416
33
12
22
13
9
6
U/S
0
0
0
0
0
Cum Prog
105682
792
20929
4000
8306
2750
9925
21
2032
1.5
985
0
1639
657.8
Trial run taken for Conv-2A on 25.05.15. Trial run taken for Conv-2B on 30.05.15. 2MVA Transformer 1
C charged for Kiln-1 on 03.06.15. Conveyor 3 B trial run taken successfully on 06.06.15. Kiln Feed
Building-1 screen trial taken on 12.06.15. Chilled water line testing done at ECR Building on
03.07.15. 2 nos. transformer (2 MVA) charged for Kiln no.2 on 04.07.15. Kiln Feed Building-2 screen
trial taken on 09.07.15. No load trial taken for 2 nos. blowers of
Kiln 2 on 13.07.15. 2 nos.
transformer (2 MVA) charged for Kiln no.3 on 14.07.15. No load trial taken for 2 more blowers of
Kiln 2 on 17.07.15. 1 no. & 2 nos transformer (2 MVA), of Kiln 4 & 5 respectively, charged on
24.07.15. PCC charged at Kiln-1 on 25.07.15. No load trial taken for 3 nos. blowers of Kiln 1 on
27.07.15. 1 no. transformer (2 MVA) charged for Kiln no.1 on 25.08.15. Total 9 out 12 nos trans.
charged.Trial run taken for vibro feeder of Kiln no.2 on 25.08.15. MCC of Kiln1 & 2 Charged on
28.08.15.
10/9/2015
Page : 14
SN
C9
Activity
Drawing
Total
BE (A)
BE I
DE (A)
DE I
TOTAL
Submtd.
34
4
64
182
284
Total
vol.
Appd/KFR
34
4
63
175
276
Activity
Unit
Unit
Cum. Prog.
SCHEME / PACKAGE
Installation of Cranes for BOF & CCP
(Pkg.-029A) (7Nos 300T + 80 T Cap.)
T
T
T
T
T
T
T
AAN
34
4
62
169
269
0
0
0
0
0
Total
vol.
507
494
760
3686
494
760
3686
Plan
9
200
100
50
10
Comntd.
0
0
1
6
7
Oct15
Progress
50
U/S
0
0
0
0
0
Cum.
Prog.
498
173
760
1101
106
749.3
0
Mech. eqpt. Supply started on 11.01.14. Elect. Eqpt. Supply started on 27.05.14.
Drawing
Total
BE (A)
BE I
DE (A)
DE I
Total
Submtd.
85
79
246
436
40
44
50
55
846
189
Activity
Appd/KFR
27
19
50
55
Unit
T
T
T
T
T
T
151
Total vol.
3484
233
3484
233
3484
233
AAN
2
0
0
0
Comntd.
1
1
0
0
2
Oct15
Plan
Progress
200
761.5
100
0
0
0
0
U/S
10
24
0
0
34
Cum.
Prog.
761.5
0
0
0
0
0
Drawing
Total
Submtd.
201
52
210
508
971
201
52
210
505
968
BE (A)
BE I
DE (A)
DE I
Total
Activity
Appd/KFR
Unit
T
T
T
T
T
T
200
51
205
501
957
Total vol.
704
329
704
329
704
329
AAN
1
0
0
1
2
Plan
14
50
20
Comntd.
0
0
4
0
4
Oct15
Progress
-
U/S
0
1
1
3
5
Cum.
Prog.
704
329
690
329
255
20
10/9/2015
Page : 15
SN
PROGRESS ON DATE
SCHEME / PACKAGE
C 13 Cast in situ bored piling work in SMS-III Piles-Nil.
complex (Pkg.-033-A 1)
Total Vol.
Award No.PCC/NTK/19/09
Consultant-MECON
Agency -M/s HSCL
Cost Rs 191.37 Crs (Revised)
Award Dt. 10.02.11. Cont. Signed: 21.02.11
Cont. compl. 20.10.12.
Unit
Earth work
Concreting For BOF
-For CCP
Total Concreting
Total Vol.
M3
M3
M3
M3
250000
99138
95025
194213*
Oct15
Cum. Prog.
Plan
Prog
5000
588
1108
1696
642
81
136
217
239122
82482
90333
172815
Activity
Unit
MT
MT
MT
MT
MT
MT
MT
Total Vol.
106947
57349
42601
99950
57349
42601
99950
Scope
1100
550
1650
1690
890
2580
240
110
350
290
156
446
96000
49277
37334
86611
41764.11
33947.89
75712
47721
39870
0
0
1432
0
2555
292
Submtd
Appd/KFR
AAN
Comntd
U/S
21
27
38
86
Unit
21
27
38
86
Total vol.
0
0
0
0
0
0
0
0
0
0
0
0
Cum.
Prog.
51708
40162
BE (A)
DE (A)
DE ( I)
TOTAL
Cum. Prog.
Comntd.
50000
40000
Total
Prog
Drawing
Oct15
Plan
AAN
Prog
Nos.
Nos.
Nos.
Activity
BOF
CCP
Cum. Prog.
Plan
Consultant MECON
Agency-M/s Simplex Infrastructures
Cost : Rs. 330.06 Crs (Revised)
Award Dt. 11.02.13
Contract signed: 28.02.13
Cont. Compl. : 30.04.14.
Likely Completion: Jan16
Proj. Mgr
C 17
Oct15
8425
8425
7520
7499
15945
15924
Earth Work
M3
233500
239490
Concreting(PCC)
M3
3000
2538.5
Concreting(RCC)
M3
2000
733
Pile drgs.- Total 15945 drgs. Issued (8425 for BOF & 7520 for CCP)
13320 m3 / 300000 m3 earthwork done & 54680 m3 / 180000 m3
concreting completed. Contract terminated on 09.02.13. Balance work
awarded to M/s Simplex Infrastructures on 11.02.13.
Unit
21
27
41
89
Activity
Oct15
Plan
U/S
T
T
T
T
T
T
187.3
44.5
187.3
44.5
187.3
44.5
7.3
2.5
17.3
9
50
20
Prog.
180
42
170
35
125
15
All parts of 75/15 T crane erected and load test completed on 04.07.15.
10/9/2015
Page : 16
SN
C 18
SCHEME / PACKAGE
Inter Plant Pipe Conveyor from RMP-3
to RMP-2 (Pkg.-140)
Contract no . TK/2011/334
Consultant- MECON
Agency : M/s FL Smidth Pvt. Ltd
Cost- Rs 58.11 Crs
Contract Signed : 04.02.11,
Cont. Completion : 03.05.12
Likely Completion : Nov15
PROGRESS ON DATE
in
progress.
Conveyor belt laying in progress.
BE (A)
BE I
DE (A)
DE I
TOTAL
Total
Submtd
Appd/KFR
AAN
50
27
145
60
282
50
21
142
53
266
48
19
141
53
261
0
0
0
0
0
Activity
Earthwork
Concreting
Mech. equipment Ord
Elect. equipment Ord
Bldg Strl Fab
Bldg Strl Supply
Tech. Strl Supply
Strl Erection
Mech. Eqpt supply
Elect. equipment Supply
Mech. Eqpt erection
Electrical Eqpt erection
Unit
Total vol.
M3
M3
T
T
T
T
T
T
T
T
T
T
9700
5100
558
200
1600
1600
55
1655
558
200
558
200
Comntd.
0
2
0
0
2
Oct15
Plan
Prog.
25
0.5
2
10
3
U/S
2
0
1
0
3
Cum Prog.
9700
5000
558
200
1600
1600
55
1654.5
556
200
546
197
C 19
C 20
Activity
Unit
Total vol.
Oct15
Plan
Cum Prog
Prog.
34535.6
21293.03
13242.57
2460.74
1605.93
854.81
10495.21
5700
4795.21
33
14040
729
BOF
T
24
8628.5
459
CCP
T
9
5411.5
270
Elect. Eqpt. erection
T
43
8
1235
BOF
T
13
2
650
CCP
T
30
6
585
Refractory
T
0
BOF
T
0
CCP
0
T
Converter-2- Top cone erected on 30.01.15. Converter-3- Erection of Trunnion ring
assembly completed on 16.02.15. Converter-3 bottom Shell erection completed on
28.02.15. Finfan Cooler erected at Pump house on 17.03.15. Converter-2 tilting
device installation done on 14.09.15.
10/9/2015
Page : 17
SN
SCHEME / PACKAGE
C 22 Illumination,Earthing & lighting protection system
PROGRESS ON DATE
Total
Submtd
BE (A)
DE I
TOTAL
47
72
27
44
Unit
9
19
Total vol.
0
0
10
12
Activity
Drawing
Total
14
7
54
41
116
Drawing
Total
299.15
299.15
Appd/KFR
12
5
28
11
56
Unit
5
1
15
6
27
Total vol.
M3
M3
T
T
T
3400
1070
300
50
50
Submtd
Appd/KFR
AAN
Comtd.
1
0
0
0
1
6
3
5
2
16
Oct15
Plan
Prog.
AAN
6
92
75
0
1
0
221
188
Unit
173
Total vol.
Activity
T
T
T
T
885
Prog.
0
6
103
79
Submtd
299.15
9
116
96
DE I
TOTAL
Compl.Dt. 28.02.14
T
T
T
8
13
Cum Prog
Oct15
Plan
0
Comntd.
Plan
0
885
175
U/S
0
1
8
1
10
Cum
Prog
2700
200
200
10
0
U/S
0
6
2
0
4
2
6
Cum Prog
Oct15
175
DE (A)
Consultant MECON
BE (A)
U/S
Earthwork
Concreting
Mech. equipment Ord
Elect. equipment Ord
Bldg Strl Fabrication
Comntd.
13
Activity
AAN
DE (A)
BE (A)
BE I
DE (A)
DE I
Total
Contract no . TK/2011/343
Consultant- MECON
Agency M/s OGPE
Cost : Rs. 9.18 crs
Cont. signed: 19.04.11
Effective Dt. of contract: 16.03.11
Contl. completion: 15.03.12
Likely Completion : Dec15
Appd/KFR
BE (I)
C 23
Prog.
-
885
31.67
78
352
0
Mech. Eqpt. Supplied started from 16.10.14. Electrical ordering startred from 04.03.15.
C 25
Drawing
Total
BE (A)
BE I
DE (A)
DE I
Total
13
39
48
3
103
Activity
Submtd
13
36
45
3
97
Unit
T
T
T
T
Appd/KFR
13
33
38
2
86
Total vol.
696.7
5.1
696.7
5.1
AAN
Comtd.
0
0
0
0
0
Oct15
Plan
0
3
7
1
11
Prog.
0
0
0
0
U/S
0
0
0
0
0
Cum
Prog
661.5
4.86
Oct15
Activity
Strl Fabrication
Strl Erection
Unit
T
T
10/9/2015
Page : 18
Total vol.
350
350
Oct15
Plan
Prog.
Cum
Prog
350
350
SN
SCHEME / PACKAGE
D 1 Installation of Buffer Vessels and
Pressure Reducing & Metering Stn. for
Oxygen, Nitrogen & Argon (Pkg. 075B)
Consultant-MECON,
AgencyM/s Blue Star Ltd, Kolkata & BHPV,
Visakhapatnam
Contract price Rs. 51.39 Crs.
Contract signed : 07.07.12 (Eff. date
06.07.12)
Contr. Completion : 05.07.13
Likely Completion: Dec.15
Proj. Mgr. R.K. Baghel, DGM, 3571
PROGRESS ON DATE
Total
12
91
58
161
Total
Additional drawings
DE (A)
71
DE I
14
Total
85
Activity
Submtd.
Appd/KFR
AAN
12
91
55
158
10
80
45
135
0
8
1
9
2
3
9
14
0
0
0
0
70
9
79
Unit
65
8
73
Total
vol.
14050*
1673*
292*
3
0
3
2
1
3
0
0
0
Cum.
Prog.
13950
1542
248
Earth work
Concreting
Tech. Strl. Fabrication
M3
M3
T
T
T
T
T
T
T
T
292*
1860*
2.2*
1860*
2.2*
1860*
2
Comntd.
Oct15
Plan
100
50
4
Prog.
U/S
192
0
0
1.5
0.2
62
0.4
1860
2.2
1847
1.8
1765
1.6
*SCOPE RVISED
SCHEME.
AS
PER
CHAGE
ORDER
Total
10
138
133
281
Submtd.
10
138
133
281
Unit
Appd/KFR
10
138
133
281
Total
vol.
9500
950
410
AAN
Comntd.
0
0
0
0
0
0
0
0
U/S
Plan
-
Prog.
-
0
0
0
0
Cum.
Prog.
9500
950
410
410
Oct15
Earth work
Concreting
Tech. Strl. Fabrication
M3
M3
T
410
T
T
T
T
561.3
2
561.3
2
1.3
1.3
-
560
2
560
2
10/9/2015
Page : 19
SN
SCHEME / PACKAGE
E
E1
PROGRESS ON DATE
M/s
Drawings
Comntd.
119
1
62
18
200
31
44
26
34
135
Oct.15
Total vol.
M3
T
Total
Plan
*46800
1770
Submtd.
122
6
65
142
335
BE (Appl.)*
BE (Info.)
DE (Appl.) *
DE (Info.) *
TOTAL
Prog.
Appd/KFR
120
6
64
135
325
Activity
M3
T
T
T
T
T
T
AAN
119
5
58
130
312
U/S
1
5
8
4
18
Cum.
Prog.
46800
1769
0
0
3
0
3
Plan
25
3
82
1
3
68
12
Comntd.
1
1
3
4
9
Oct.15
Total
vol.
*1400
*383
* 461
*267
*20
*267
*20
Unit
Concreting
Bldg. strs. Erection
Techno. Strs. Erection
Mech. Eqpt. Supply
Elect. Eqpt. Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Scintillant
on
Drawings
Total
21
2
57
72
152
Activity
Concreting
Techno. Strl erection
Elect. Eqpt. Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Unit
AAN
BE (Appl.)*
BE (Info.)
DE (Appl.) *
DE (Info.) *
TOTAL
Consultant-MECON
116
113
1599
913
2741
Prog
U/S
0
0
0
1
1
Cum.
Prog.
1375
380
379
266
17
199
8
E3
Appd/KFR
267
163
1695
969
3094
Hot trial done on 19.03.14. PAC (of part facility) issued on 11.07.14 w.e.f. 11.04.14.
2nd Sinter M/c of SP-3 dedicated to nation by Steel Secretary on 17.10.14.
Commissioning certificate issued on 19.01.15 w.e.f. 28.11.14. Emergency Sinter
Storage Bldg. (ESSB) - Conveyor route of ESSB started on 15.04.15. Sinter taken in
one hopper of ESSB.
Submtd
267
279
1695
969
3210
Concreting
Elect. Eqpt. Erection
2.2
Total
Activity
E2
2.1
Drawings
BE (Appl.)*
BE (Info.)
DE (Appl.) *
DE (Info.) *
TOTAL
Unit
M3
T
T
T
T
Submtd
21
2
56
70
149
Total
vol.
400
60
19.25
582
19.25
Appd/KFR
AAN
21
2
56
66
145
0
0
0
0
0
Oct.15
Plan
0
0
0
0
0
Comntd
0
0
0
4
4
Prog
U/S
0
0
0
0
0
Cum.
Prog.
350
57
18.75
543
13
10/9/2015
Page : 20
SN
SCHEME / PACKAGE
E4
PROGRESS ON DATE
Commissioning activity in progress.
Defect rectification job in progress.
*- Scope revised
E5
Total
Submtd. Appd/KFR
AAN
Comntd
U/S
122
0
2
2
BE (Appl.)*
126
126
22
0
0
0
BE (Info.)
22
22
293
0
0
2
DE (Appl.) *
295
295
214
0
1
0
DE (Info.) *
215
215
TOTAL
658
658
651
0
3
4
Oct.15
Cum. Prog.
Total
Activity
Unit
Plan
Prog.
vol.
Earth work
M3
*68050
37
68013
Concreting
M3
*19700
1
19699
Bldg. Strl. fabrication
T
*3451
1
3450
Bldg. Strl. Erection
T
*3451
30
3340
Tech. Strl. Erection
T
*503
3
500
Mech. Eqpt supply
T
* 2600
10
2590
Mech. Eqpt Erection
T
* 2600
40
2458
Elect. Eqpt Erection
T
*1960
40
1717
WT No. 5 inaugurated by Chairman on 18.06.13. PAC (part facilities New Wagon
Tippler No. 5 with SAC, belt conveyors J1C1/C2, J3C3/C4, J3SC3/SC4, J4C3, J4SC3,
J5C3 with mobile tripper, STC-3 & TBS, JH-5B, HTSS-54, LTSS-1&2 & LTSS-3 &4) issued on
27.08.14 w.e.f. 14.07.14. Hydraulic pressure test of fire hydrant pipeline at Stacker &
Re-claimer yard area completed on 28.08.15. Trial run of Twin Boom Stacker at load
taken on 11.09.15.
Drawings
Total
Submtd
Appd/KFR AAN
Comntd
U/S
BE (Appl.) *
334
293
227
40
16
10
BE (Info.)
25
18
17
0
1
0
DE (Appl.) *
467
467
274
60
88
45
DE (Info.) *
642
492
444
10
26
12
1468
TOTAL
Activity
Earth work
Concreting
Bldg. strs. Fabrication
Bldg. strs. Erection
1270
962
Unit
Total vol.
M3
M3
T
T
T
T
T
T
T
T
T
T
*375000
*100888
*14597
*14597
*4487
*4487
*3946
*1589
*3946
*1589
*3946
*1589
110
131
Oct.15
Plan
Prog.
1140
845
1306
1164
356
597
66
100
350
200
464
250
132
269
244
30
50
67
Cum.
Prog.
372780
98143
10519
6841
3808
495
3200
1150
3145
1047
2899
115
10/9/2015
Page : 21
1960
SN
SCHEME / PACKAGE
PROGRESS ON DATE
F. BF ZONE
F1
Drawings
Total
BE (Appl.)*
BE (Info.) *
DE (Appl.) *
DE (Info.) *
517
1204
3006
3504
8231
TOTAL
Activity
Unit
Submtd
Appd/KFR
501
1159
3004
3443
8107
473
1092
2712
3282
7559
Total vol.
AAN
7
2
85
26
120
Comntd.
Oct.15
Plan
U/S
21
59
135
105
320
Prog
0
6
72
30
108
Cum. Prog.
Earth work
M3
*260000
260000
Concreting
M3
* 81000
300
61
80383
Bldg. Strs. Fabrication
T
*24785
24785
Bldg. Strs. Erection
T
*24785
250
38
23647
Techno. Strs. Fabrication
T
*20404
20404
Techno. Strs. Erection
T
*20404
350
29
19350
Mech. Eqpt Ordering (Imp.)
T
*4223
4223
Mech. Eqpt Ordering (Indig.)
T
*8757
8757
Elect. Eqpt Ordering (Imp.)
T
54
54
Elect. Eqpt Ordering (Indig.)
T
*510
510
Refractory Ordering (Imp.)
T
*2144
2144
Refractory Ordering (Indig.)
T
21022
600
20422
Mech. Eqpt Supply (Imp.)
T
*4223
0
4210
Mech. Eqpt Supply (Indig.)
T
*8757
25
20
8681
Elect. Eqpt Supply (Imp.)
T
54
0
51
Elect. Eqpt Supply (Indig.)
T
*510
5
502
Refractory Supply (Imp.)
T
*2144
2144
Refractory Supply (Indig.)
T
21022
350
50
19850
Mech. Eqpt. Erection
T
*12980
445
28
11806
Elect. Eqpt. Erection
T
*564
5
552
Refractory Erection
T
23166
650
62
21319
1 No. 2 MVA Transformer (56F-2T) 11KV/0.433KV at Stock House charged from HTSS- 56 feeder No. 74 on 31.08.15. Erection of
Tuyere Stock & ESP duct at Stock House completed on 31.08.15. Casting of 1st floor slab of TRT Electrical Control Room
completed on 10.09.15. 1 No. 2MVA Transformer (56F-1T) 11KV/0.433KV at Stock House along with PCC56F charged from
HTSS-56, feeder No.-15 on 11.09.15. Casting of slab of DG set room completed on 26.09.15. Leakage testing of cooling water
circuit No. 3 of BF-8 completed on 03.10.15. 1 No. 2 MVA Transformer (57A-1T) 6.6KV/0.433 KV, at Central Contrl Room along
with PCC 57-A charged from HTSS - 57, feeder No. - 617 on 06.10.15.
Up-gradation of Stoves No. 10, 11 & 12 of Blast Furnace #4 (Proj. Mgr. S.K. Ghosh, DGM) 20274 (Consultant CET), Stage-II approval received on 12.03.13 at a sanction cost of Rs. 70.65 Crs.
Oct.15
HTS design for Achieving Higher Hot Blast
Total issued drgs by CET -150/159 Nos. (52/53 Strl,
Review
Meeting
held
on
Activity
Unit
Total vol.
Cum. Prog.
Plan
Prog
Temperature (Pkg. WP-01)
15.07.15.
all 7 Utility, 50/55 Refractory, 16/17 Civil & 25/27
Award letter No.: 5(2934)/349,
Earth work
M3
1900
0
200
Mech.).
Civil job for 2 Nos. CA fan
Date of Award :16.03.13
M3
377
75
80
Drgs status (Evotechs Scope) 50/83 submitted, Concreting
foundations
shall
be
Agency : Evo Tech, Bhilai Award value Rs. 18.44 Crs,
Techno. Strl Fabrication
T
995
60
165
31 Appd, 1 AAN, 18 commented.
completed by 01.08.15 yet
Contr. Completion: 15.11.14
Techno. Strl Erection
T
995
75
165
Erection of Stove shell is in progress.
to be done.
Likely completion: Dec.15
Preparation for casting of CA fan foundation is Pkg. No. SP-02 Stove Refractory Material (18 items) 2098.55T/7274.47T Supplied.
Pkg. No. SP-03: -16.2/48.6T Columns, 17.1/51.3T Girders & 27.9/83.7T Grids supplied.
in progress.
(Proj. Mgr. Mr. B.K. Prasad DGM) 20271
*- Scope revised.
F2
2.1
Pkg. No.SP-04: All 15 Stove Valves, Lubrication & Hydraulic system (1 No. each) supplied.
Pkg. No. SP-05 Expansion joints: - All 5 Nos. Expansion joint supplied.
2.2
Drawings
DE (Appl. Cat.)
DE (Info. Cat.)
TOTAL
Total
25
25
50
Activity
Submitted
25
24
49
Page : 22
Total vol.
AAN
1
1
2
Commented
0
3
3
Oct.15
U/S
1
0
1
Cum. Prog.
Plan
Prog
Mech. Eqpt Supply
T
43.5
43.5
Elect. Eqpt. Supply
T
22.7
22.7
11 No. BE (Appl.) & 3 No. BE (Info). Drgs approved. All Mech. & Elect. Eqpt. Ordered & supplied.
10/9/2015
Unit
Apprd /KFR
23
20
43
SN
2.3
SCHEME / PACKAGE
PROGRESS ON DATE
Design
engineering,
equipment
ordering & supply is in progress.
Total
BE
DE (Apl. Cat.)
DE (Info. Cat.)
TOTA
14
58
31
103
Submitted
Approved /KFR
AAN
Commented
U/S
14
52
15
81
13
39
5
57
1
5
2
8
0
6
7
13
0
2
1
3
Activity
Unit
Total vol.
T
T
* 64
* 64
Oct.15
held
on
Review meeting
09.07.15.
held
on
Review Meeting
05.01.15.
held
on
Cum. Prog.
Prog
Plan
0
0
Review meeting
30.10.14.
61.5
57.4
Rail
Laying
at
TLRS
(566
RM
completed).
Sheeting job (6410 Sq. M out of 7000
Sq. M. completed).
*- Scope revised.
Drawings
Total
BE (Appl. Cat.)*
78
110
94
370
652
BE (Info. Cat.)*
DE (Appl. Cat.)*
DE (Info. Cat.)*
TOTAL
Submitted
Approved /KFR
AAN
Commented
U/S
77
110
85
370
642
62
110
75
368
615
15
0
1
0
16
0
0
9
2
11
0
0
0
0
0
Activity
Unit
Total vol.
Earth work
Concreting
Bldg. Strs. Fabrication
Bldg. Strs. Erection
Techno. Strs. Fabrication
Techno. Strs. Erection
Mech. Eqpt Ordering (Indig.)
Elect. Eqpt Ordering (Indig.)
Mech. Eqpt Supply (Imp.)
Mech. Eqpt Supply (Indig.)
Elect. Eqpt Supply (Imp.)
Elect. Eqpt Supply (Indig.)
Refractory Supply (Imp.)
Refractory supply (Indig.)
Mech. Eqpt. Erection
Elect. Eqpt. Erection
M3
M3
T
T
T
T
T
T
T
T
T
T
T
T
T
T
*12000
*4700
*875
*875
*265
*265
*370
100
2200
*370
25
100
*1474
717
*2570
125
Oct.15
Plan
Cum. Prog.
Prog.
0
55
3
25
6
0
-
10990
4622
875
872
265
190
364
100
2200
295
25
75
168
2308
54
0
2
All imported items 2200 T Mech. Eqpt. & 25 T Elect. Eqpt. Ordered. Refractory ordering
(Imported & Indig.) completed. Erection of all 12 Nos. TLC (Torpedo Ladle Car)
completed by 31.05.15.
F4
*- Scope revised.
Drawings
BE (Appl. Cat.)
BE (Info. Cat.)
DE (Info. Cat.)
Total
Total
Submtd
Appd/KFR
6
20
20
46
6
20
20
46
6
20
20
46
Activity
Unit
T
T
T
T
T
Total vol.
*40
*107.8
61
273
0.17
AAN
Comntd.
U/S
0
0
0
0
0
0
0
0
0
0
0
0
Oct.15
Plan
Prog
0
-
Cum. Prog
0
107.8
61
273
0.17
All 6 Nos. BE (Appl. Cat.), 20 Nos. BE (Info. Cat.) & 20 Nos. DE (Info. Cat.)
Drawings have been approved. All Elect. Eqpt. & Mech. Eqpt. (Indig. &
Imported) ordered & Supplied.
10/9/2015
Page : 23
SN
SCHEME / PACKAGE
PROGRESS ON DATE
F5
Contract signed with Consortium of M/s Uniseven Engineering & Infrastructure Pvt
Ltd, Kolkata and M/s Soil & Enviro Industries Pvt Ltd, Kolkata on 22.08.15 wef
21.08.15 at a cost of Rs. 21,67,23,796/- with completion period of 12 months.
F6
6.1
Stage-II Approved on 16.02.11 at a cost of Rs. 21.27 Crs. (Rev. on 10.09.13) with completion period 14 months(Apr.12)
Rebuilding of Stove No. 18 of BF-6 (Consultant CET)
Total
Submtd
Appd/KFR
AAN
Comntd.
U/S
Electrical,
Instrumentation
&
Supply of balance Electrical equipment Drawings
20
20
16
1
3
0
Automation (Pkg-5)
(HT, LT Cable and Vacuum Contactor BE (Appl.)
DE (Appl.)
37
36
31
3
2
0
Agency: Hindustan Controls & Eqpt. P. Ltd.
Panel) is to be done.
Contractual cost: Rs. 2.53 Crs.
Contract signed: 18.03.11
Contr. completion: 17.05.12
Likely completion: Oct.15
(Proj. Mgr. V.K. Gawande, Sr. Mgr.) 22711
DE (Info) *
TOTAL
22
79
Activity
Change
order
for
capacity MSDS-5:
enhancement of MSDS-4 & MSDS-5
Lighting jobs in progress.
under Augmentation of MSDSs -7 (Pkg.
70) Dt. Of issue of change order: 11.10.11,
Contract Price: 4.57 Crs.
Contractual Completion: 10.09.12.
*- Scope revised.
Unit
19
66
0
4
1
6
Oct.15
Total vol.
Plan
0
0
Cum. Prog.
Prog.
G. POWER ZONE
Drawings
G 1 Augmentation of MSDSs & Installation MSDS-5:
BE (Appl. Cat.)
of MSDS-VII (Pkg.-070)
Lighting jobs in progress.
BE (Info. Cat.)
Contract No. TK-2008/282
Charging of outgoing feeders upto
(Consultant-MECON)
reactors are in progress (For sections 4, 5, DE (Appl. Cat.)
DE (Info. Cat.)
(Agency M/s Alstom)
6 & 9 - 13 feeders are charged).
TOTAL
Cont. signed on : 25.09.08
Activity
Contr. Completion : 24.09.10
Cost: Rs. 216.25 Crs.
Elect. Eqpt. supply
PAC issued on 19.03.15 w.e.f. 03.02.15.
20
76
Total
Submtd.
Appd/KFR
19
3
693
240
955
19
3
693
240
955
19
3
692
240
954
Unit
AAN
Comntd
0
0
1
0
1
0
0
0
0
0
Oct.15
Total vol.
U/S
0
0
0
0
0
Cum. Pro.
Plan
Prog
T
2425
1.5
2423.5
Mech. Eqpt. Erection
T
580
3
577
Elect. Eqpt. Erection
T
2425
25
2400
Preliminary Acceptance Certificate (PAC) for subject contract issued on 19.03.15
w.e.f. 03.02.15. Retrofit jobs - Door retrofit of 11KV reserve cubicle (panel) No. 41 at
MSDS-2 carried out on 19.06.15.
MSDS-4: Inauguration of MSDS-4 done by CEO, BSP on 29.10.13. 72 hrs. Trial run of all
3 units HVAC systems at MSDS-4 completed on 16.05.15.
MSDS-5: Charging of 50MVA Transformer (7T) with 11KV busduct on 05.09.15 &
50MVA Transformer (2T) with 11KV busduct on 09.09.15 completed. Charging of
11KV sections 7&8, 11KV Neutral Earthing Transformer (NET-7T) & 11KV Bus Coupler
(between section 6&7) with reactor completed on 11.09.15. HV test of HT cable to
existing 1 MVA Auxiliary Transformer-2T done on 11.09.15. 11KV sections 1, 2 & 3
through 11KV incomer-2 charged on 16.09.15. 11KV Out-going Feeder No.-148 for
Transformer Repair Shop charged upto reactor on 19.09.15. 16MVA Transformer-1T
charged on 22.09.15. Charging of 6.6 KV sections-1&2 done on 25.09.15. Charging
of Neutral Earthing Transformer for 6.6KV section-1 done on 29.09.15.
MSDS-7: 132 KV charged cable from MSDS-5to7 Normalised on 06.09.14. 2nd 1000
KVA transformer at MSDS-7 charged on 16.05.15.
Activity
Concreting
Mech. Eqpt. Supply
Elect. Eqpt. Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Unit
Total vol.
M3
T
T
T
T
640
7.5
*40.7
7.5
*40.7
Oct.15
Plan
Prog
Cum.
Progress
1.5
1
2.1
1
2.7
GF, 1st & 2nd floor brick work, Ground floor flooring completed.
10/9/2015
Page : 24
638.5
6.5
38.6
6.5
38
SN
SCHEME / PACKAGE
G2
*- Scope revised.
PROGRESS ON DATE
Eqpt. Erection at SSs - 43, 45, 47, 48, 56, 57,
60, 64, 65, 68, 71, 71A & 73 in progress.
Bldg. Structural Fabrication & erection job
is in progress.
HT panel testing at SS No. - 61 are in
progress.
11 KV Panel placements & interpanel
wiring at SS 63 are in progress.
19 M3 concreting completed.
17 T Bldg. Strs. Fabricated.
2 T Bldg. Strs. Erected.
G-3 Instn. of Boiler along with Steam TurboBlower Bldg. (Pkg.- 011-1A)
Consultant-MECON
Agency-M/s Fujian Long King Co. China
/Allied Energy Sys., New Delhi
Cont. price: Rs. 282.28 Crs.
Contract signed: 24.03.12
Contractual Completion: 23.11.13
Likely Completion : Dec15
(Proj. Mgr. : P. Subba Rao, DGM), 21090
* - Scope revised.
Total
129
2
1128
233
1492
BE (Appl. Cat.)*
BE (Info. Cat.)*
DE (Appl. Cat.)*
DE (Info. Cat.)*
TOTAL
Activity
Earth work
Concreting
Building strs. Fabrication
Building strs. Erection
Submtd. Appd/KFR
AAN Comntd
U/S
128
118
4
6
0
2
1
1
0
0
1037
949
37
50
1
229
195
34
0
0
1396
1263
76
56
1
Oct.15
Total
Cum.
Unit
Plan
Prog
vol.
Progress
M3 *133492 20000
518
96361
M3
*32091
2500
253
28183
T
*10400
2500
89
7655
T
T
T
T
T
*10400
128
*6116
128
*6116
128
*6116
2000
24
41
4
2
30
1500
36
3
9
8
8
28
Oct15
Cum.
Activity
Unit
Total vol.
Prog.
Plan
Prog
31570
32500*
280
Earth work
M3
6.5
11752.4
12500*
250
Concreting
M3
18
3806.4
3916
146
Building strs. Fabrication
T
23.2
3649.8
3916
220
Building strs. Erection
T
5200
5393
100
Mech. Eqpt ordering
T
250
273
23
Elect. equipment ordering
T
4394
5393
450
Mech. equipment supply
T
242
273
25
Elect. equipment supply
T
800
2.7
4014.7
5393
Mech. equipment Erection
T
90
117
273
Elect. equipment Erection
T
Bi Flue Steel pipes erection completed for both Chimneys. Casting of 3.0 m RCC
floor completed for MCC cum CR building inside PBS-1 on 25.04.15. MV/LV
Switchgear building 8 m floor RCC slab cast on 20.05.15. MCC building 12 M slab
casting and 3 Nos. column casting done on 12.06.15. STB building 0-0 M level floor
casting done on 27.06.15. MCC control room building 16 M slab casting done on
17.07.15. CEA Inspection of electrical facilities carried out on 20.9.2015.
10/9/2015
250
84
563
420
1317
Page : 25
232
66
563
420
1281
174
46
397
358
975
8
1
8
4
21
25
1
22
7
55
Meeting
held
on
Review
05.09.15.
meeting
held
on
6426
104
6075
104
6050
43
2940
T
Electrical Eqpt. Erection
T
53
Total 6905 Fabricated Strs. Supplied. Substation No. 64: 4 (Four) Nos. 11 KV
sections charged through SS-64 Incomer-1 on 29.08.15. Final slab of Substation No.
61 cast on 29.08.15. Charging of cubicle No. 74 at Substation No. - 56 (for
Transformer 56F - 2T) done on 31.08.15. 2 Nos. outgoing cubicles (10 & 33) feeding
distribution transformers at SS-64 charged on 05.09.15. Erection of Cable Gallery No.
- 5 & 6 at SS-73 Cable route completed on 07.09.15. 6.6 KV sections at Substation
No. - 47 charged through 6.6KV Incoming cables (3 Nos. each) from MSDS-4 to SS
No. - 47 on 11.09.15. 9 Nos. outgoing transformer feeders for BRM charged from HT
Sub-station No. - 64 on 14.09.15. CEA Inspection of HT Substation No. - 65 carried out
on 20.09.15.
Drawings
Total
Submtd.
Appd/KFR
AAN
Comntd.
U/S
BE (A)
BE I
DE (A)
DE I
Total
Review
07.09.15.
SN
G4
SCHEME / PACKAGE
PROGRESS ON DATE
Instln. of Steam turbine generator, STG area
back pressure turbine generator,
Air Condition system erection, Pipe lines
Cooling water system & Power
erection in progress. Lighting job in
Evacuation Sys. (Pkg.- 011-1B)
progress.
Consultant-MECON
BPTG Area
Agency-M/s Triveni Engineering.
Cable termination, Civil finishing jobs,
Contract Price Rs. 170.50 Crs.
Under ground pipeline erection in
Contract signed: 19.01.12
progress.
Contractual Completion : 18.07.13
Cooling water pipe route
Likely Completion : Oct.15
CW pipeline erection in progress. Gallery
(Proj. Mgr. : P. Subba Rao, DGM), 21090
between TR 35 & 36 is in progress.
* - Scope revised
CWPH: Erection of 3 pumps completed.
Erection
of
4th
Pump
in
progress.Ventilation system jobs are in
progress.
Cooling Tower: Maintenance platform jobs
in progress.
Total
Submtd.
BE (A)
BE I
DE (A)
DE I
Total
74
37
147
720
978
74
37
147
709
978
Activity
Appd/KFR
74
37
147
709
967
Unit
Earth work
Concreting
Piling
Building strs. Fabrication
Building strs. Erection
Mech. Eqpt ordering
Elect. equipment ordering
Mech. equipment supply
Elect. equipment supply
Mech. equipment Erection
Elect. equipment Erection
AAN
Total vol.
M3
M3
Nos.
T
T
T
T
T
T
T
T
41000
14061
340
1770 *
1770 *
1410
500
1410
500
1410
500
0
0
0
0
0
Comntd.
0
0
0
4
4
Oct15
Plan
Prog
1570
591
14
0
33
0
0
26
1
223
9
23.5
U/S
0
0
0
7
7
Cum.
Prog.
39430
13477
340
1770
1749
1410
500
1404
499
1289
476.5
work in
Drawings
Total
Submtd.
BE (A)
BE I
DE (A)
DE I
60
8
220
112
400
60
8
219
112
399
Total
Activity
Appd/KFR
60
8
219
112
399
Unit
Total vol.
AAN
51
7
205
98
361
Comntd.
4
0
4
3
11
Oct15
Plan
Prog
U/S
4
1
9
10
24
Cum.
Prog.
Earth work
M3
7300
20
7205
Concreting
M3
3000
24
2922
Building strs. Fabrication
T
30
0
30
Building strs. Erection
T
30
0
30
Mech. Equipment ordering
T
650
0
650
Elect. equipment ordering
T
30
0
30
Mech. equipment supply
T
650
2
642
Elect. equipment supply
T
30
0
30
Mech. equipment Erection
T
650
5
638
Elect. equipment Erection
T
30
1
25
Plant is in operation for DM water supply to Coke Oven battery # 11
from stream B & C. Generation of DM water from stream B done for a
continous period of 32.5 Hrs.
10/9/2015
Page : 26
SN
SCHEME / PACKAGE
G6
PROGRESS ON DATE
Unit#1- cold blast pipe line jobs & oil line
jobs in completion stage. Common cold
blast collector supply to BF#8 - pipe line
erection job is in completion stage.
Unit#3- Condenser surge pipe drain pipe
line modification work U/P. CondenserImpulse tubing jobs in progress. Oil
flushing in progress. Cold Blast Line
Bellow
erection
job
in
progress.
Transmitters Governor- Oil tubing at 4.5
mtr under progress. TR.9 all transmitter
gland & termination work under progress
Instrument job & caliberation in progress.
Total
BE (A)
BE I
DE (A)
DE I
Total
33
19
37
148
237
Submtd.
33
19
37
148
237
Activity
Earth work
Concreting
Piling
Mech. Eqpt. Ordering
Elect. Eqpt. Ordering
Mech. Eqpt. Supply
Elect. Eqpt. Supply
Mech. Eqpt. Erection
Elect. Eqpt. Erection
Appd/KFR
29
18
26
130
203
Unit
Total vol.
M3
M3
Nos.
T
T
T
T
T
T
4800
1700
88
1590*
347*
1590*
347*
1590*
347*
AAN
Comntd.
1
3
0
1
7
4
0
16
8
24
Oct15
Plan
Prog
157
40.5
25
29.3
141
U/S
0
0
0
2
2
Cum. Prog.
4643
1659.5
88
1590
347
1565
347
1560.7
206
Drawings
Total
Submtd.
BE (A)
BE I
DE (A)
DE I
Total
4
11
54
24
93
4
11
54
24
93
Activity
Appd/KFR
4
11
50
18
83
Unit
Total vol.
T
T
T
T
53
53
28
25
Eqpt. Ordering
Eqpt. Supply
Eqpt. Erection Phase-I
Eqpt. Erection Phase-II
AAN
Comntd.
0
0
0
0
0
4
0
6
0
10
Oct15
Plan
Prog
0.5
8
7
U/S
0
0
0
0
0
Cum. Prog.
53
52.5
22
0
Drawings
Total
Submtd.
Appd/KFR
Consultant-MECON,
BE (A)
BE I
DE (A)
DE I
Total
4
1
22
9
36
4
1
22
9
36
4
1
20
3
28
Activity
Eqpt. Supply
Eqpt. Erection
Unit
Total vol.
T
T
4.9
4.9
AAN
Comntd.
0
0
0
0
2
0
0
6
2
6
Oct15
Plan
Prog
0.9
U/S
0
0
0
0
0
Cum. Prog.
4.9
4
All 18 nos. RTU connected with Central Energy Monitoring system. UPS
charged on 22.05.14. OPC server installed at OP-II for BOO plant
parameters.
10/9/2015
Page : 27
SN
H-3
SCHEME / PACKAGE
Installation of Hot metal Rail Weigh Bridges
(Pkg-099B) Consultant-MECON,
PROGRESS ON DATE
Total
BE (A)
BE I
DE (A)
DE I
Total
2
21
13
12
48
Activity
Eqpt. Supply
Eqpt. Erection
Submtd.
Appd/KFR
2
21
13
12
48
AAN
2
19
13
12
46
Unit
Total vol.
T
T
54
54
0
0
0
0
0
Comntd.
U/S
0
2
0
0
2
Oct15
Plan
Prog
54
50
-
0
0
0
0
0
Cum. Prog.
50
0
Drawings
Total
BE (A)
BE I
DE (A)
DE I
Total
9
20
7
10
46
Activity
Earth work
Concreting
Eqpt. Supply
Eqpt. Erection
Submtd.
Appd/KFR
9
20
7
10
46
AAN
9
19
3
10
41
Unit
Total vol.
M3
M3
T
T
178
523
60
60
0
0
0
0
0
Comntd.
Oct15
Plan
Prog
100
-
U/S
0
0
0
0
0
0
1
4
0
5
Review
15.06.15.
meeting
Cum. Prog.
158
225
60
0
Party has already submitted soft & hard copy of all drgs to BEDB.
Appointment
of
consultant
for
development of Aquatic Centre near
Jayanti stadium ConsultantBEDB,
AgencyM/s ARCH-EN DESIGN Lucknow
Draft soft copy of specification & tendor Award letter issued on 20.12.12.
schedule sent by zone to Arch in design for
finalisation from their side on 08.04.15.
I-3
Unit
Total vol.
Oct.15
Plan
Prog.
Cum. Prog.
M3
800
500
M3
RM
800
223
20
0
400
10/9/2015
Page : 28
held
on
SN
SCHEME / PACKAGE
J-1
J. UTILITY ZONE
Aug. of Power Supply facilities for BF
Slag dumps (Electrical Pkg.) (Pkg.-2).
Consultant BEDB
J-2
PROGRESS ON DATE
7 nos. HT Isolator, all cables, 5 nos. high mast light & GI pipe supplied
and 2 nos. high mast erections completed. Fabrication of Cable tray
Balance Supply: LT & HT panel, Bus duct &
completed. 3 nos. transformers supplied at site on 15.05.14. HT cable
battery charger.
laying completed.
M/s Infra-in consulting Pvt. Ltd has not Presentation of detail project report held on 15.10.12.
applied for further date extension to
complete the work.
Consultant CET
Agency - M/s Sanjay Engr. & Fabricators
II
Activity
Unit
Total vol.
Earth work
Concreting
Brick work
Plastering
WBM
RCC Pipe Laying
M3
M3
M3
M2
M3
RM
39000
7000
2200
26000
22000
330
RM
3000
Oct.15
Plan
Prog.
1000
100
470
0
0
250
-
Cum. Prog.
34635
6523
2055
25680
22000
3000
J-4
Drawings
BE A
BE I
DE A
DE I
TOTAL
Total
Submtd
Appd/KFR
AAN
15
14
14
Comntd
0
U/S
0
30
30
29
67
66
64
56
168
51
161
51
158
0
2
0
1
0
0
All Earth work 3300M3, All Concreting 950M3, All 75T Bldg. strs.
fabrication & erection , All 5T Tech. strs. fabrication & erection, all
270T Mech. eqpt. & 20T Elect. eqpt. ordering, supply & erection
completed, Equipment Erection completed on 01.10.14. HT & MCC
panel charged on 31.03.15. Engg. closer meeting organized by
MECON Ranchi on 10.09.14 to complete the engg. issue. TOP
connection completed on 14.04.15. Blower fan testing completed.
10/9/2015
Page : 29
Review
28.05.14.
meeting
held
on
SN
SCHEME / PACKAGE
J-5
PROGRESS ON DATE
Drawings
Total
BE (A)
BE I
DE (A)*
DE I*
Total
25
5
440
1878
2348
Submtd.
25
5
440
1878
2348
Activity
Unit
Earth work
Concreting
Bldg. Strl. fabrication
Bldg. Strl. erection
Tech. Strl. fabrication
Tech. Strl. erection
Mech. Eqpt. Ordering
Elect. Eqpt. ordering
Mech. Eqpt. supply
Elect. Eqpt. supply
Mech. Eqpt. erection
Elect. Eqpt. erection
M3
M3
T
T
T
T
T
T
T
T
T
T
Appd/KFR
22
3
428
1753
2206
Total vol.
*100000
*16348
*7305
*7305
10000
10000
37
3
37
3
37
3
AAN
Comntd
U/S
1
1
0
108
110
1
1
12
17
31
1
0
0
0
1
Oct.15
Plan
3000
650
500
350
0
250
0
0
0
0
0
0
Prog.
400
148
37
37
19
Cum. Prog.
91514
14961
4638
3653
9098
3579
36
2
36
2
10
0.5
10/9/2015
Page : 30
SN
SCHEME / PACKAGE
PROGRESS ON DATE
Design Engg. in progress.
WTP-1: 16/22 nos. piles casting completed.
WTP-3: Thickner A (BOF): Plinth beam casting
completed.
Thickner B (BOF): column upto slab level
completed.
Thickner C (BOF): R/S for slab of in progress.
Thickner A&B (SRU): All footing completed.
SST PH plinth beam casting completed.
WTP-4: Excavation for SST in progress.
Plinth beam of SST pump house completed.
ECR:18/22 nos. footing completed.
WTP-5: 24/25 nos. footing completed for MWPH.
65/94 nos. footing completed for common
pump house with emergency overhead tank.
Common pump house earth work in progress.
BE A*
BE I
DE A
DE I
TOTAL
66
66
47
12
23
23
19
234
151
36
34
58
23
184
507
75
315
32
117
0
38
40
129
3
31
Unit
Total vol.
Oct.15
Plan
Prog.
M3
M3
T
T
T
T
T
T
*104000
*21235
*2800
*2800
*3000
*530
*3000
*530
Earth work
Concreting
Tech. Strs. Fabrication
Tech. Strs. Erection
Mech. Eqpt. Ordering
Elect. Eqpt. Ordering
Mech. Eqpt. Supply
Elect. Eqpt. Supply
AAN
2000
1000
50
Comntd
1550
91
200
10
80
5
U/S
BE A
BE I
DE A
DE I
TOTAL
104
24
494
158
780
Activity
Earth work
Concreting
Bldg. Strs. Fabrication
Bldg. Strs. erection
Tech. Strs. Fabrication
Tech. Strs. erection
Mech. Eqpt. Ordering
Elect. Eqpt. Ordering
Mech. Eqpt. Supply
Elect. Eqpt supply
Mech. Eqpt. Erection
Elect. Eqpt Erection
82
17
296
92
487
M3
M3
63
9
186
60
318
Total
vol.
87420
*19785
MT
MT
MT
MT
T
T
T
MT
T
MT
*425
*425
*435
*435
*1500
*905
*1500
*905
*1500
*905
Unit
0
0
14
0
14
78012
8181
1970
450
61
20
18
8
60
23
109
Oct.15
Plan
Prog
600
20
700
58
100
60
0
0
0
0
0
0
100
50
2
5
1
0
36
9
46
Cum. Prog.
73939
14769
216
169
150
100
1300
500
400
400
41
50
Mech. eqpt. erection started on 25.01.15. WTP-1: Civil work of WTP-1 in all respect up to tie
beam at RL 318.40 completed by 30.01.15. WTP-2: Casting of slab at 314m level
completed on 10-11.01.15. WTP-3: - Casting of fan deck slab of WTP-3 cooling tower
completed on 03.04.15.WTP-4: Casting of slab of pump house at WTP-4 completed on
10.06.14. WTP-5: Raft concreting started on 13.08.15. PCC work started on 29.05.15.
Scale pit raft concreting completed on 16.07.15. WTP-6: Concreting of secondary settling
tank wall completed on 11.03.15. Hot sump wall completed. Concreting of cold sump
slab 80% completed on 19.09.15.ECR (WTP-6 BRM area): Casting of slab for ECR completed
on 11.06.15. Casting of air washer slab for ECR completed on 15.09.15.
WTP-7: SST completed. Concreting of ICW Cooling Tower up to fan deck level
completed. Concreting of slab for ECR bldg. at WTP-7 BRM area completed on
28.07.15. Casting of Pump house slab completed on 04.09.15
10/9/2015
Page : 31
Cum. Prog.
Eqpt. ordering & supply started on 17.02.15. WTP-1: Raft Concreting completed on
10.12.14. casting of top slab of PH completed on 28.08.15. WTP-3: Earth work for
thickener started on 09.08.14. WTP-4: Excavation for Secondary settling tank started
on 12.03.15. ECR:10/22 nos. footing completed.
WTP-5: Excavation for MWPH & DWPH completed.
Drawings
Total
Submtd
Appd/KFR
AAN
Comntd
U/S
in progress.
Submtd
Activity
Appd/KFR
Total
SN
SCHEME / PACKAGE
J-8
J-9
PROGRESS ON DATE
Drawings
Total
BE A
BE I*
DE A
DE I
34
14
226
61
335
TOTAL
Activity
32
11
77
25
145
Unit
Total vol.
0
2
0
1
57
17
0
18
57
38
Oct.15
Plan
Prog
950
300
350
45
90
19
80
16
U/S
0
0
8
0
8
#Cum. Prog.
Earth work
M3
*50000
41408
Concreting
M3
*15000
9432
Bldg. Strs. fabrication
MT
*1250
703
Bldg. Strs. Erection
MT
*1250
578
30
Tech. Strs. supply
MT
6000
4615
120
Tech. Strs. erection
MT
6000
21
2959
10
Mech. Eqpt ordering
MT
*550
350
10
Elect. Eqpt ordering
MT
*250
170
15
Mech. Eqpt Supply
MT
*550
10
350
5
Elect. Eqpt Supply
MT
*250
19
151
35
Mech. eqpt. erection
MT
*550
3
10
Elect. Eqpt erection
MT
*250
#Cum. Prog. Reconciol by zone on 07.10.15. DWTP: Casting of Dirty Back wash water
compartment completed. Casting of Drinking water treatment plant Pump House
slab completed on 10.09.14. MWPH: Laying of DN 900mm pipe near Boria gate
completed on 07.12.13. Intake PH: Casting of top slab of IWPH completed on
12.01.15. ECR: casting of slab completed on 15.09.14. Mech. & Elect. eqpt. supply
started on 08.04.14. MCC panel for IWPH supplied on 09.09.14. Mech. eqpt. erection
started on 13.08.15.
Oct.15
Cum. Prog.
Activity
Unit
Total vol.
Plan
Prog
Earth work
M3
1080000
10000
2300
904200
Concreting
M3
6130
0
3661
Supply of Ballast
M3
103500
0
75230
Dismtlg. of existing track
RM
8000
0
1400
Laying of railway track
TM
41500
500
24925
WT-5 - Main line (Western side) track connectivity completed & loco
Activity
(Pkg.-95B)
Unit
Total
vol.
M3
M3
M3
RM
RM
150000
5800
79000
13500
*37300
Oct.15
Plan
Prog
Cum. Prog.
ConsultantMECON
Agency -M/s ISC projects Pvt. Ltd. Bhusawal
Contract Price Rs. 76.08 Crs. (4th revision)
Contract signed 18.08.10
Contr. completion; 17.02.13
(Proj. Mgr.; D.K, Pouriya DGM), 21954
Earth work
Concreting
Supply of Ballast
Dismtlg. of existing track
Laying of railway track
Track no. 18 near high line linking completed on 22.10.13. Line no. 41: track laying of
dump car line, Boiler coal line & escape engine line completed by 23.05.14.
10/9/2015
Page : 32
0
0
0
0
0
147835
5458
61000*
11761
15500*
SN
SCHEME / PACKAGE
PROGRESS ON DATE
Activity
Unit
M3
M3
M3
M2
Earth work
Concreting
Sub grade
Road carpeting
210277*
4100
60200
72450*
0
0
200
0
Cum. Prog.
162575
3979
59020
49259
25
Road carpeting behind PRO completed on 01.07.14. Survey for 8A, 8B &
8C completed.
Drawings
Total
Submtd
BE (A)
ROB No.-2: Road widening work from BE (I)
Boria road T junction to Boria gate in DE (A)
TOTAL
progress.
28
2
95
125
17
2
52
Activity
Service road work from CED circle to
Bhathi Thana in progress.
Piles
ROB No.-3: Concreting work in Earth work
Concreting
progress.
Elect. Eqpt. ordering
Elect. Eqpt. supply
Elect. Eqpt. Erection
Bldg. Structural fabn.
Bldg. Strl. erection
Road WMM
Road Carpeting (BM)
Appd/KFR
71
62
Total
vol.
344
260000
26000
33.8
33.8
33.8
28
28
65000
4450
Unit
Nos.
M3
M3
T
T
T
T
T
M2
RM
AAN
13
2
47
Comntd
2
0
2
2
0
3
Oct.15
Plan
0
0
100
0
0
0
0
0
4000
0
U/S
0
0
0
0
Cum. Prog.
Prog.
127
58600
16291
9
9
6
10
8
15550
2350
F.O.no.-2: Road widening work from Boria road T junction to Boria gate
in progress. F.O.no.-3: GAD submitted on 29.07.14. Casting of 10th deck
slab completed by 30.05.15. F.O. no.-1: GAD approved from railway.
Approval of GAD awaited form NHAI.
J-14 Electrical enabling works at TDS-I & new
LT substation near Boria Stores (Pkg.113).
Consultant MECON,
Agency M/s ABB
Contract price Rs. 26.18 Crs
Contract signed on : 01.05.08,
Contr. completion: 31.03.09
Likely completion: -------(Proj. Mgr. : N.C.Ray, DGM), 21359
Total
Submtd.
14
3
71
101
189
DE (A)
DE I
TOTAL
Activity
Unit
Appd/KFR
AAN
Comntd
U/S
14
3
66
93
9
3
48
85
5
0
16
1
0
0
2
7
0
0
0
0
176
145
22
Oct.15
Plan
Prog
Total vol.
Cum. Prog.
Earth work
M3
1284
1284
Concreting
M3
877
877
Elect. Eqpt. Supply
T
1185
1185
Elect. Eqpt. Erection
T
1185
1185
HM Tower: 18/19 nos. high mast tower charged by 29.03.13. 29/32 nos.
CSS erection completed by 08.02.14. Erection completed on 01.07.14
10/9/2015
Page : 33
SN
SCHEME / PACKAGE
PROGRESS ON DATE
Communication protocol issued on 04.11.14. List of drawing & Billing Kick off meeting held on 14.11.14.
schedule approved, Power od attorney submitted. Land allotted for
stores at TDs-1.
Consultant- MECON
Agency- M/s HCL Info systems
Contract price Rs. 0.8137 Crs
Contract signed on : 30.04.11
Contr. Completion by : 29.08.11
Likely completion: -------(Proj. Mgr. : N.C.Ray, DGM), 21359
J-17
J-18
Oct.15
Plan
Prog
Cum. Prog.
Unit
Total vol.
Oct.15
Plan
Prog
Earth work
M3
Concreting
RCC Pipe laying
M3
RM
129500
12110
1150
500
300
0
1000
15.8
15.8
15.8
Cum. Prog.
63330
4801
1029
Kick off meeting held on 31.10.14. List of drawing & Site organisation
chart submitted on 08.12.14. Name plate & QAP approvesd on 08.12.14.
Name plate & numbering system, List of drawing & document, list of
equipment, P&I diagram approved on13.01.15. Layout Plan, GA & cross
section of plant submitted on 10.01.15. Pert Network submitted on
29.01.15. L-2 Network submitted on 03.02.15.
Activity
Unit
Total vol.
Oct.15
Plan
Prog
Cum. Prog.
Earth work
M3
3700
0
3125
Concreting
M3
1313
0
450
230
Strl. Fabrication
230
T
230
200
Strl. Erection
T
0
All 44 foundation bolt lift completed by 25.01.14. Strl fabrication started
on 30.01.13. Strs. erected started on 27.01.14. All 44 strl. Column erected
by 29.03.14. Erection of bracing (1-18) completed. Fabrication &
erection of all 18 nos. truss completed.
Total vol.
J-20
Unit
Earth work
M3
1000
Elect. Eqpt. ordering
T
15.8
Elect. Eqpt. supply
T
15.8
Elect. Eqpt. Erection
T
15.8
Cable laying job completed. All work completed on 30.09.2014.
Activity
J-19
Activity
Activity
Unit
Total vol.
Concreting
M3
2800
Brick work
M3
650
Road carpeting
M2
1800
Railway track laying
RM
150
Road carpeting completed on 21.12.11.
10/9/2015
Page : 34
Oct.15
Plan
Prog
0
0
0
Cum. Prog.
1740
606
1800
0
SN
SCHEME / PACKAGE
J-21
J-22
J-23
J-24
PROGRESS ON DATE
Activity
in
Drawings
Total
Submtd.
DE (A)
TOTAL
7
19
3
29
7
14
1
22
Critical issue:
BE (A)
Issue of load data for equipment
BE I
foundation drawings by MECON.
Activity
Dismantling of Eqpt.
Relocation of Eqpt.
Case handles in arbitration.
Appd/KFR
7
14
0
21
Unit
No.
No.
Activity
Total vol.
AAN
U/S
0
0
1
1
Cum. Prog.
Oct.15
Plan
Prog
Total
vol.
0
0
0
0
Oct.15
Plan
Prog
62
40
Unit
Comntd.
0
0
0
0
62
22
Cum. Prog.
Dismantling of sheet
M2
30000
0
26250
Dismantling of Railway track
MT
200
0
200
Dismantling of Boundary wall
RM
490
0
Dismantling of Railway track completed on 09.07.11. Case handles in
arbitration.
-
M/s Sadani Enterprises has not applied 10 nos. Machine commissioned successfully by 26.03.13.
for further date extension to complete
the work.
J-25
K.
K1
K2
K3
Activity
Earth work
Concreting
Fabrication of Strs.
Erection of Strs.
Fabrication of Tech. Pipes
Erection of Tech. Pipes
Column strengthening of all
Unit
Total vol.
Oct.15
Plan
Prog
M3
705
0
M3
215
0
T
135
0
T
135
0
RM
1660
0
RM
1660
0
42 columns completed by 09.09.13.
Cum. Prog.
245
108
72
63
839
839
SAIL Board has decided that the SPUs will be established with Joint Venture.
10/9/2015
Page : 35
L.
SN
L1
L2
L3
NIT
01.08.14
TOD
20.10.14
PBOD
10.03.15
BIDDERS
Consortium of MECON Ltd.,
Bangalore
23.08.14
31.10.14
10.07.15
31.10.14
29.11.14
25.02.15
31.10.14
27.12.14
10.08.15
10.05.13
24.06.13
08.01.14
11.03.14
25.04.14
20.09.14
L7
16.12.13
27.12.13
13.04.15
L8
20.05.14
16.07.14
07.07.15
L9
14.03.15
15.04.15
03.08.15
L4
L5
L6
L 10
L 11
L 12
L 13
L 14
STATUS AS ON DATE
(L-1 Cost - 556.02 Cr., Estimate - 732.08 Cr.)
Proposal sent to Corporate Office on 26.03.15 for Stage-II approval.
Reply on PAG meeting sent to Corp. Office by PP&E deptt. on 02.07.15.
PAG held on 25.06.15.
Validity of offer including price bid has been extended by M/s MECON
Limited up to 31.10.15.
{L-1 Cost - Rs. 14.47 Crs. (NOC), Cost Estimate -Rs. 23.11 Crs. (NOC)}
Case sent to PP&E on 03.08.15 for obtaining Stage-II approval.
E-mail sent to PP&E and Shop (MM) on 10.09.15 to inform the status of
the pkg., reply awaited.
{Negotiated price - Rs 67.54 lakhs (NOC), Estimate - Rs 64.34 lakhs (NOC)}
Documents sent to Shop on 11.08.15 for obtaining Stage-II approval.
Validity of offer extended by M/s Bhilai Techneeds till 31.10.15.
Documents sent to Project Co-ordinators on 24.09.15 for obtaining
Stage-II approval.
(L-1 cost 31 % more than Estimate, Estimate-Rs. 8.6 Crs.)
Validity of offer not extended by party.
{L-1 Cost : Rs 4,39,57,641 (NOC)}, CETs estimate : Rs. 8.76 Crs. (NOC)}
14.10.14
05.12.14
15.09.15
25.02.15
11.05.15
31.08.15
22.06.15
22.07.15
01.10.15
Bhilai
Amkay Construction Co. , Bhilai
09.06.14
13.09.14
28.03.14
16.05.14
10/9/2015
Page : 36
TER issued by EDD on 27.08.15 and the same has been forwarded to
Shop on 03.09.15.
CBEC held on 22.09.15.
SN
SCHEME / PACKAGE
L 15 Relocation of Nitrogen Vessels (7 Nos.) and installation of New
Pressure Reducing and Metering Station (PRMS) Package-II
(Consultant MECON) (PCC-TK- R K Panigrahi, DGM) 20168
NIT
19.12.14
TOD
05.02.15
19.12.14
05.03.15
24.02.15
26.03.15
09.03.15
06.05.15
01.07.15
30.07.15
26.06.15
13.08.15
15.07.15
18.08.15
PBOD
BIDDERS
1. Tuaman Engineering Limited, Kolkata
2. Linde India Limited,Kolkata
3. Blue Star Limited,Kolkata
4. Sanmathi Enterprises,Bhilai
5. Bhilai Techneeds, Bhilai & Mechast Engineers, Bhilai
6. Otto Projects Pvt. Ltd, Kolkata
1. Beijing Shougang Construction Group CoLtd.,
China -Stewarts and Lloyds of India Ltd, Kolkata.
2 Motherwell Bridge Ltd., UK Gillanders Arbuthnot & Co Ltd, Kolkata
3. Bengal Tools Limited
4. Lazarus and Associates Limited, UK and Maco
Corporation (India) Pvt. Ltd. Kolkata
1. Otto Projects Pvt. Ltd., Kolkata
2. Graduate Agro & Mechanical Engineers, Bhilai
3. Technovations, Bhilai
4. Consortium of Mechast Engineers, Durg and Forbes
Marshall Pvt. Ltd., Pune
5. Instrumentation Ltd., Kota
6. Consortium of Oriental Nicco Projects Private
Ltd., Ahmedabad and Oriental Enterprise Pvt. Ltd.,
Vadodara
1. Hamon Research-Cottrell India, Kolkata
2. Unicon Engineers, Coimbatore
3. Elex India P Ltd, Thane & BSBK Bhilai
4. Andrew Yule & Co. Ltd., Kolkata
5. GEA Process Engg (India) Pvt. Ltd., Thane
6. Soil & Enviro Industries Pvt. Ltd., Kolkata
7. K.C. Cottrell India Pvt. Ltd., Gurgaon
8. Alstom India Ltd., Kolkata
1. Amkay Construction Co., Bhilai
2. R K Infrastructure, Ambikapur
3. Rajasthan Associates,Raipur
4. Kulkarni & Sahu Buildcon Pvt. Ltd., Bhilai
5. HSCL, Bhilai
6. West India Construction Co., Bhilai
1. BSBK, Pvt. Ltd., Bhilai.
2. S.K. Jain Construction Pvt. Ltd. Bhilai
3 Vishwa Infrastructure and Services Ltd. Hyderabad
4. Reliable Hi-Tech Infrastructure Pvt. Ltd., Rourkela
5. HSCL, Bhilai
6. Graduate Agro & Mechanical Engineers, Bhilai
1. Oriental Nicco Projects Pvt. Ltd., Kolkata
2. Danieli Corus India Pvt. Ltd., New Delhi
3. Kuttner GmbH & Co KG, Germany
4. Paul Wurth India Pvt. Ltd.
STATUS AS ON DATE
TAR issued by MECON on 26.08.15.
15.07.15
18.08.15
06.05.15
31.08.15
04.08.15
03.09.15
6.
7.
8.
9.
10.
11.
15.09.15
18.09.15
18.09.15
10/9/2015
Page : 37
SN
SCHEME / PACKAGE
L 26 Re-building of COB No.7&8 in CO&CCD
(Consultant-CET) (PCC TK V Anil Kumar, AGM) 20206
a.
Battery Proper (Pkg-1)
b.
Oven Machines (Pkg-2)
NIT
TOD
22.06.15
13.08.15
PBOD
BIDDERS
c.
22.07.15
05.10.15
d.
22.07.15
01.08.15
CUI, Ukraine
e.
22.06.15
01.08.15
04.08.15
22.09.15
L 27 Installation of ESP in Sinter Dispatch Route of Sinter Plant II (Pkg.II) (Consultant-CET) (PCC TK V Anil Kumar, AGM) 20206
STATUS AS ON DATE
10/9/2015
Page : 38
SN
SCHEME / PACKAGE
L 31 Installation of Electric Motor driven turbo blower at P & B Station
(Consultant MECON) (PCC TK- R K Panigrahi, DGM) 20168
NIT
TOD
PBOD
BIDDERS
Stage-I approved by SAIL Board on 03.04.07 at an indicative cost of Rs. 11262 Crs. and sanctioned Rs. 200 Crs. Towards Enabling / Preliminary works.
M1
15.05.14
22.10.14
03.03.15
M2
14.08.14
22.09.14
13.08.15
M3
31.08.13
08.11.13
M4
i.
ii.
iii.
M5
M6
M 7
STATUS AS ON DATE
As per MOM held at SAIL Corporate Office on 04.07.15, proposal is
kept in abeyance for time being. Meanwhile, BSP may examine the
feasibility of interconnection of the air blast grids of PBS-1 & PBS-2
with the help of Consultant.
TC recommendation approved on 09.08.13 for cancellation of the
present tender & re-tendering the package.
Revised proposal awaited from Zone.
Letter sent to Shop on 29.08.13 informing about the cancellation of
tender and to re-tender package after reviewing TS & Eligibility
criteria.
10.03.15
10.04.15
24.02.15
02.05.15
08.09.15
HSCL,Bhilai
1.New Fire Engineers.
2. Sterling & Wilson:
3.Securix multiple solution
4. SFS Fire & Security
{L-1 Cost Rs. 48.76 crs, Estimate Rs. 40.24 crs (NOC)}
Case sent to PP&E on 18.04.15 for obtaining Stage-II approval.
Revised price after discount received from bidder on 08.09.15 and
has been sent to MECON for re-evaluation.
Vide our email dtd 06.10.15, party has been requested to extend the
price & offer validity upto 31.12.15.
- {L-1 Cost Rs. 8.9 crs, (LCNC) Estimate Rs. 10.97 crs}
Case sent to PP&E on 15.09.15 for obtaining Stage-II approval.
TC recommendation approved on 15.09.15 for award of work to
Consortium of M/s Amkey Construction Co., Durg and M/s Balaji
Enterprises, Bhilai.
Revised Final TAR received from MECON on 08.06.15.
Mail sent to MECON on 17.08.15 to give commercial
comments/recommendation on offers submitted by parties.
10/9/2015
Page : 39
SN
SCHEME / PACKAGE
2. High Alumina Low Cement Gunning Castable (01 item)
Open Tender
NIT
07.05.15
TOD
05.06.15
3. SS Anchors 03 items
Open Tender
18.05.15
10.06.15
M8
09.05.15
13.07.15
M 9
05.06.15
28.08.15
M 10
Balance Railway Track Work for Plant Internal Yard (Pkg- 95B1)
(Consultant- MECON) (PCC NTK- Satya Prakash, DM) 22738
13.08.15
04.09.15
M 11
20.02.15
09.09.15
1. Tata Motors
01.10.15
29.10.15
M 12
M 13
M 14
M 15
M 16
M 17
M 18
PBOD
Bidders
1. Continental Refractories.
2. Sharadaa Ceramics.
3. Shreekant Ind..
4. Industrial Associates.
5. Refcom.
6. Dalmia Refractories.
7. TRL Krosaki.
8. National Refractories.
9. Champion Ceramics
10. IGL Refractories
11. Arvind
STATUS AS ON DATE
Comments/recommendation received from Shop on 26.09.15.
Reminder sent to MECON on 29.09.15 & 0810.15 for comments /
recommendation on parties offers and clarification
for
10/9/2015
Page : 40