Professional Documents
Culture Documents
Joe CV
Joe CV
Joe CV
NAME:
Joseph Fisher
ADDRESS:
12 Dorchester Way,
Prenton,
Birkenhead,
Wirral,
CH43-9JJ
DATE OF BIRTH:
30 June 1953
DRIVING LICENCE:
Full / Clean
MOBILE:
0044 - (0)7979791145 /
E-MAIL:
joe@qaweldspec.co.uk /
6a Piazzale Foscari
Apptment 3,
Marghera,
Venice, (VE)
ITALY,
joe.fisher47@googlemail.com
DISCIPLINE:
QUALIFICATIONS:
CSWIP, Senior Welding Inspector, level 3.2
P.C.N. Senior Welding Inspector 3.2.
JULY 07 OCT 08
QA/QC European Vendor inspection Attendance at material suppliers of Valve, Pipe, Fittings;
(ITALY); Galperti, Technoforge, Valve Italia, Santafede, Mega, .IBF, Dalmine, reviewing of material
(Raw / Finished); Certification/Documentation according to relevant requirements and standards,
verification of materials, Size/Grade and Traceability Markings, and Quantities, reporting to head
office with detailed report of material cert content and documentation, Packing condition of precise
amount of materials to be released.
Construction (Walter Tosto (Chieti) of five (5) large Dia x Med wall; W/t; 15 to 25 mm x 400mm;
Reactors;
Full control of Q.C.P.; Overseeing and acceptance of TOFD Validation prior to commencement
and Full coverage of all TOFD circumferential weld testing operations raising/closeout of N.C.R.s
review, witness, monitoring/random inspection and hold points, Overseeing and review and
signing off Q.C.P. material certification witnessing of mechanical testing chemical content of
materials, adherence to set construction sequence steps, review of radiographs of all segmental
head, circumferential, and longitudinal welding manual and sub/arc, positioning and fit up of all
external fitments + nozzles, monitoring proximity and orientation as per drawing requirements;
Surveillance during construction;
EMPLOYMENT:
NUOVO-PIGNONE (ITALY): QATAR GAS II + III. + RAS-LAFFAN PROJECT.
QA/QC
INSPECTOR
FEB. 06 MAY 06.
Workshop inspection of construction of C3 (propane)-N2 (nitrogen)+MR (mix) gas
compressor casings + Rotation equipment. Hub + shaft matching, and couplings,
Full inspection duties during construction of heavy wall casting, high-pressure gas turbine
compression casings / vessels, Turbine compressor and electric motor test bed verification,
also witnessing of post test Inspection of: dry gas bearing seal Integrity. Casing gas seal
test, vendor inspection visits to outside Contractor. Supplying various operating production
module panels. Coordination / communication and in -depth reporting between
manufacturer and Customer contractual requirements i.e. raising and close-out of N.C.R.S;
EMPLOYMENT:
B.I.E; WOODSIDE P.O.G. PROJECT
BUTTING PIPEMILL (GERMANY)
AUG. 05-FEB 06
Material inspection of outer carbon steel and cladded stainless steel line pipe,
Traceability of all materials pertaining to C.R.A. Line Pipe.Inspection of W/T;
1st + 2nd End-Main Body ID / OD; O.O.R; O.O.S.; Coating and coat repairs
Witnessing of welding process for welding of longitudinal welded seams prior
To internal and external pipe being sleeved and hydro statically expanded
To Buttings B.U.B.I. C.R.A.line pipe process,
Final bench inspection of all pipe i.e. Hydrostatic Testing, Ovallity checking, Identification
Stamping, Prior to final release of C.R.A. line pipe for despatch.
STOLT OFFSHORE (NORWAY); LANGLED PROJECT
MAR.05 JULY 05
Pipe Tracking and Loadout of all Plain, Anode & EX-H/W Buckle Arrestors C.W.C. carbon
steel pipes from pipe coating contractor Bredero Shaw (Norway), for construction of sub
sea pipeline, supplying L.B. 200, lay barge. Visual inspection of pipes, numbering, and
condition of concrete coating and exposed steel, receipt of all O,S,D, Documentation to put
through the system, compilation of email information, as per load out,
MOODY INTERNATIONAL (UK)
FEB.04 FEB.05
QA/QC Vendor inspection of construction of Wellhead & horizontal xmas tree actuator gate and
needle valves, nitrogen gas + hydro test witnessing of up/downstream, actuator function test at
valve manufacturers; Oliver valves(Manchester) / Bentley(stroud), Attendance at material
suppliers of pipe and fittings, review of material certification/documents according to relevant
Gas pipeline to the west 30 gas pipeline Dublin to Galway overseeing of joint venture
contractors. Sacim/Roadbridge. General surveillance of all pipeline construction duties, familiar
with semi automatic welding processes,saturnax (crc) passo and vermatt, carrying out parameter
checks during mainline production, final cathodic protection and Pearson testing and coating
integrity acceptance, review of contractors final documentation packages prior to acceptance by
s.p.i.
I.A.C.S. LTD
PIPELINE INSPECTOR
MAR. 01 -OCT.01
Construction of 36 carbon steel gas transmission pipeline south Wales Carmarthen general
welding inspection duties i.e. tie-ins special fabrications coatings lower and lay backfill.
IPEC INSPECTION SERVICES
FABRICATION SUPERVISOR
WELDING INSPECTOR
FEB. 99-OCT. 99
Various gas pipelines and AGIs in Ireland responsible for coordination review and witnessing of
hydro
testing, hot taps, pigging and documentation. Liaise with client, contractor;
ENRON ENERGY SERVICES (TURKEY)
QA/QC INSPECTOR
JUNE 98-DEC. 98
Full inspection duties during installation of large diameter heavy wall, high pressure gas
turbine steam drum casings / vessel, overseeing all circumferential and longitudinal
welding positioning and fit up of all external fitments + nozzles, monitoring proximity and
orientation as per drawing requirements,
Coordination / communication and in -depth reporting between contractor and Customer
contractual requirements i.e. issuing and close-out of N.C.R.S .Responsible for
coordination surveillance and
final inspection during the re-fit of HP steam drum
modifications as per B.S. 5500, ASME 1X on the Marmara Ereglisi power station Istanbul
Turkey, project. Duties included final inspection after heat treatment, witness hydro testing
and certification, documentation review and preparation of final certification packages.
Q.G.P.C. (QATAR)
QA/QC INSPECTOR
JAN. 98 MAY 98
Responsible for surveillance, coordination and final inspection during the installation of 30 Kuff
gas pipeline and AGI. Duties included monitoring of welder performance, review of radiographs
witness hydro testing and preparation of final documentation.
NES RECRUITMENT LTD (BELFAST)
MAR. 97 DEC. 97
QA/QC INSPECTOR
Responsible for the surveillance and documenting welding on the topsides piping and
construction of the turret rotation umbilical section of Schahallion project (FPSO) Harland &
Wolfe. Belfast, Control of all N.D.T. requirements for full skid associated pipe work topsides.
Various petro chem facilities in the North West responsible for surveillance during various plant
shutdowns on the tanks, vessels, heat exchangers and pipe work modification. Duties included
preparation of dossiers, review of NDT reports witness hydro testing and final certification
packages.
Q.G.P.C. QATAR
QA/QC/WELDING INSPECTOR
JAN. 95-JUNE 96
Based at Umm Saidd refinery Doha, day to day surveillance of welding, hydro testing, NDT and
review of radiographs. Final inspection approval of certification and work packages.
WELDING INSPECTOR
JULY 91 NOV. 94
Installation of various gas pipelines and AGIS in southern Ireland, duties included surveillance of
welding, coordination of NDT and final preparation of documentation for client approval.
QA NDT SERVICES LTD
WELDING SUPERVISOR
NOV. 89 - JUNE 91
Responsible for the day-to-day running of the welding school /department duties included liaison
with various clients for the training / upgrading of their welders. Running of welding procedures
and welder qualifications. Coordinate the NDT and destructive testing with the various in house
managers and with third party inspectors to witness bend tests charpy impact etc.