Professional Documents
Culture Documents
4.1.1.2 Contract Programme
4.1.1.2 Contract Programme
4.1.1.2 Contract Programme
Contract programme
b.
c.
d.
e.
f.
g.
Commissioning packages.
APPROVED
AlexV
JAMIL M AL-MUTAIRI,
MANAGER, EPED
PTS # 07EG908
Volume 1 OF 3
Page
22 of 481
4.1.1.3
Design schedule
Procurement
and
a.
b.
c.
d.
b.
c.
Construction schedule
AlexV
JAMIL M AL-MUTAIRI,
MANAGER, EPED
PTS # 07EG908
Volume 1 OF 3
Page
23 of 481
Commissioning schedule
4.1.2
Progress reporting
Executive summary.
b.
c.
d.
e.
f.
g.
Updated S curve.
h.
APPROVED
AlexV
JAMIL M AL-MUTAIRI,
MANAGER, EPED
programme
(extracted
PTS # 07EG908
Volume 1 OF 3
from
the
Page
24 of 481
i.
j.
k.
l.
APPROVED
AlexV
JAMIL M AL-MUTAIRI,
MANAGER, EPED
PTS # 07EG908
Volume 1 OF 3
Page
25 of 481