Professional Documents
Culture Documents
11 2014 January PDF
11 2014 January PDF
PETRONAS
FINAL EXAMINATON
SEPTEMBER 2013 SEMESTER
COURSE
FCM2O63/EBB21
231
8AB,2123
- P ROBABI
LITY &
STATISTICS
DATE
TIME
9.00 AM
INSTRUCTIONS TO CANDIDATES
1.
2.
3.
4.
Where applicable, show clearly steps taken in arriving at the solutions and
indicate ALL assumptions.
5.
Note
Uniwersiti Teknologi
PETRONAS
FCM2063 lEAB2123
1.
a.
i.
1255.
ii.
iii.
Draw a box plot of the above data and indicate any outliers, if any.
[4 marks]
b.
During
i.
all the three system will be operable at the time of the launch?;
[3 marks]
ii.
all the three system will not be operable at the time of the launch?
[3 marks]
ii.
at least one of the system is not operable at the time of the launch?.
[4marks]
FCM2063 I EAB2123
2.
a.
A contractor wishes to bid for a construction project in Bandar Sri lskandar. The
profit (in million RM) of the project is described by the following probability density
-2.5
34
(RM1,000,000)
FIGURE Q2
Determne the probabi!ity density funclion, (x).
[2 marks]
lt
Find the probability that contractor will lose money in this job.
[2 marks]
ilt
iv.
b.
i.
lf
ii.
iii.
Find the probability that there is no accident will occur next month?
[4 marks]
FCM2063 lEAB2123
A student claims that the average amount of time spent studying for an exam is
3.
less than or equal to 120 minutes per day. A random sample of 25 students is
drawn from
of
deviation of 20 minutes.
ilt
By using lhe P-value approach, what is your conclusion about this test?
[4 marks]
V.
b.
The Malaysia Royal Polce Department claims that the incidence of violent crime
this year (2013) is down compared to last year (2012). From the 100 files of
crime reports, it shows that in year 2012, 260/0 of the reports were classified as
of violent crime while this year only 16%.
[5 marks]
il
Determine lhe P-value for this test and draw the conclusion.
ilt
[3 marks]
Give a 90% two sided confidence interval for the difference in proportion.
[2 marks]
FCM2O63 IEAB2123
4.
a.
Predictor
Goefficient
SE Coefficient
Constant
3.318
1.007
3.29
X1
0.7417
0.5768
Xz
0.6571
13.87
$=
R,=
n'z 1ao
87.6o/o
Analysis of Variance
Source
DF
SS
MS
Regression
133.366
66.683
Error
17.332
27
150.698
Total
i.
ii.
Copy the Minitab output and fill all of the missing values.
[4 marks]
lf
is
above analysis.
[2 marks]
ii.
iv.
02
[2 marks]
d = 0.05.
[2 marks]
FCM2063 tEAB2123
b.
TABLE 4(b)
Temperature
Gopper
(uC)
50
i.
ii.
iii.
Content
(%l
40
80
17,20
24, 22
16, 12
25, 23
of
comment.
[6 marks]
FCM2O3
5.
I EAB2123
For overseas flights, MAS airline has three different choices on its dinner
a.
menu: rice with beef, rice with chicken and lamb chop. Based on the past
experience the airline feels that each dinner is equally likely to be chosen.
lf a random sample of
five passengers is selected, what is the probability that at reast two
will choose lamb chop for dinner?
[4 marks]
lt
b.
35
>X,
r=l
35
Z',
t=l
= 7805
=1200
and R charts.
[6 marks]
ll
- END OF PAPER -