Date Submitted:
TPV-00007
24 Oct 2014
No.
- In phase 2, interval between struts is 2.5m in - The difference in strut spacing between Special Order area and load of 75kN/m2 to both side in
The
Consultant
Phase 2 area is due to different loading conditions. The vicinity of Case 2 of Special order. However,
Special Order area is mostly loaded by traffic load (junction). 3PVC only applied a similar load,
Meanwhile, in Phase 2 area, two shallow-founded building exist, 75kN/m2, at only one side of section
Page1of10
Design
which give more load to diaphragm wall. Therefore, in order to 3-3 (this is asymmetrically model)
accommodate bigger load, more strut is required to increase strut for checking. At section 4-4, 5-5,
area (As) and consequently produce bigger spring value (please and 6-6, the applied loads are larger
as well.
for checking.
understood
as
understood
as
interval
interval
between
between
be
checking
modeled
stability.
Page2of10
then
bearing
analyzed
capacity
by
and
- The Design Consultant has not provided - Building dilapidation survey is ongoing. The building impact
3PVC agrees on the explanation
sufficient information for evaluating impact to
assessment and utility subsidence reports will be submitted that evaluating settlement impact to
neighbouring works during constructions.
neighboring constructions shall be
separately as per Tender Document Volume 4, Clause 28.
Impact level depends on foundation structure
foundation-construction
once
and
shadow-
received.
However,
in
contain
construction
model
for
neighboring
loads
without
foundation
or
pile
impact
to
neighbouring
In
modeling,
construction
bottom
for
shallow
Page3of10
example,
evaluated
for
pile-foundation-structure,
by
pile
element
matter.
- What
is
base
for allowable
depends
on
construction
structure
as
is
agreement
TCVN
provided
is 10cm.
10304:2014.
For
example,
total
on
evaluation,
referring
it
standard
is
in
types.
- The Design Consultant mentioned loads due - Please refer to our reply submitted to 3PV on 23 October 2014. For 3PVC received the explanation on
rd
to neighbouring contructions by sections in
example, building load and dimensions for section 3 is shown in 23 October, however the Design
Page4of10
calculate
Consultant
has
not
provided
basis
for
load
of
75kN/m2,
is
Otherwise,
accordingly.
requested
that
3PVC
the
is
Design
not
in
- At section 4-4, 5-5, and 6-6, what is base for - The as-built drawings of Opera View Hotel were sent to 3PV on 23 ok
October 2014. Details of loading calculation for this building are
calculating loads of 162kN/m2 by Opera
According
to
Drawing
building, 162kN/m2.
Page5of10
sufficient
information
of
neighbouring
- Models for calculating at section 3-3, 4-4, and - Please refer to our responses dated 23 October 2014 for your
perusal.
method.
construction
constructions,
the
evaluation
should
maximum
be
important
causing
deformation.
for
alternatives
selecting
for
It
the
is
support
different
construction stage.
for evaluation.
Page6of10
stage
Opera View Hotel (surface load for section 4-4), located 2m away
from D-Wall, therefore a mechanism of ground pressure
distribution occurred and decreased the distributed load to 68
for section 4-4 become smaller than surface load of section 3-3
12
Ok
- The section 4-4 (in 3PVs understanding) was subdivided into two
Ok
sections, 4-4 and 7-7. Detailed calculation for these two sections
has been provided to 3PV previously. Please refer to Permanent
Structural Calculation Sheet.
Base on tender documents for contract package - In principle SMJO does not change the design from tender stage
objection
to
Clients
No
2s
example:
Width of foundation;
ok
- It is required to add
(k) the CAD and - Please refer to Inception Report for your information.
ok
Beside 4 Japanese standards in TRS-TPV- - Some other applicable standards, codes and specification are Due
to insufficient
provided
available at SMJO office (hard copies and in Japanese) for your standards, 3PVC will apply the
references. Due to copyright, they are not allowable for mass following
example:
sharing.
principals
consideration:
DSRSC-ES
(Shield
Tunnel:
will
12/2002);
use
these.
However,
DSRSC-ST
in 3PVCs responsible.
Page8of10
for
(Steel-Concrete
- For
Hybrid
whose
DSRSC-DL
(Urban
Mountain
Tunnel:
05/2002); DSRSC-UT
(Foundation
Retaining
Structures
Structures:
and
addition,
06/2000);
(Steel-Concrete
Circular
Composite
BXD
For
Temporary
Structures
foreign
applying
standards in construction in
DSRSC-FS
SPECIFICATIONS
FOR
calculations
No.
40/2009/TT-
Preparedby:
Approvedby:
TranVanTu
DaoNgocVinh
VuMinhTri
ChiefofThirdPartyVerifier
CivilEngineer
Date:25/10/2014
Date:25/10/2014
Page10of10